26

Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes
Page 2: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Racine Rd (County P) and 12th Street

Access Meeting #2June 3, 2014

Page 3: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Introductions• WIS 441 Tri-County Project team

Brian Roper, Project Chief

Chad DeGrave, Design Supervisor

Scott Ebel, Design Project Manager

Tammy Rabe, Construction Supervisor

Mark Kantola, Communication Manager

Page 4: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Presentation outline

• Project improvements and schedule overview• Recap of alternatives presented on 4/26/14• Feedback since previous meeting• New alternative

Page 5: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Reconstruct 5 interchanges and add missing movements at US 41

Project improvements-overview

Page 6: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Replace 6 miles of mainline pavement, expand to 6 lanes

Project improvements-overview

Page 7: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Improve design speed of roadway curves

Project improvements-overview

Page 8: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Construct a second parallel bridge over Little Lake Butte des Morts

Project improvements-overview

Page 9: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Revise interchange control

Project improvements-overview

Page 10: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

• Add auxiliary lanes along US 41 for system interchange operation

Project improvements-overview

Page 11: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Function 2012 2013 2014 2015 2016 2017 2018 2019

Design

Real Estate

Utilities

Construction

Note: Timelines are subject to change

Project schedule

Page 12: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

County P/Racine Rd interchangeMainline design speed = 70 mph

Forecasted Mainline Volumes = 88,000 / 70,400 AADT

(Existing Mainline Volumes = 60,500 / 48,100 AADT)

Forecasted Ramp Volume = 23,100 AADT

(Existing Ramp Volume = 19,600 AADT)

Railroad Crossing

Highest crash rate within WIS 441 Project Corridor. (1.23 per million users)

Page 13: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Best Operational Alternative

Remove 12th street access to Racine

Eliminates all turning conflicts less than 100’ from interchange

Page 14: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Currently Proposed Alternative

Reduces conflicts but still maintains some 12th Street access

Page 15: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Dismissed Alternatives

Provides less distance to accelerate onto highway

Does not meet desirable standards

Eliminates Left Turn Business and property accesses

Page 16: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Dismissed Alternatives

Reverse curve for 23,100 AADT volume

Does not meet desirable standards

Eliminates left turn business and property accesses

Page 17: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

15th Street Access Alternative

Access to Racine via 15th Street

No access to 12th street

Additional real estate and construction cost

Page 18: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Calder Stadium Impact Alternative

Significant impact to athletic field and parking

May not be acceptable to FHWA due to avoidable impacts at Section 4(f) public recreation area.

Page 19: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Feedback

• Desire for left turn onto Racine (County P)• Concern about increased traffic to school and

neighborhood with 15th Street alternatives• Request for an alternative shifting roundabout

to accommodate full access at 12th Street

Page 20: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Currently Proposed Alternative

Reduces conflicts but still maintains some 12th Street access

Page 21: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

RAB Shifted Alternative

Full access at 12th

Significantly increased project costs and impacts

Additional real estate impacts including a relocation

Increased distance between intersections

Closer proximity to residents

Page 22: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Next Steps

• Community and Municipality Feedback

• If move forward with new alternativeo Refine conceptual design and capture all impactso Determine cost share or scope reduction opportunitieso Environmental document re-evaluation process

Page 23: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes
Page 24: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Background Slides

Page 25: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

Racine Interchange Area

Page 26: Racine Rd (County P) and 12 Street - 511WI · County P/Racine Rd interchange Mainline design speed = 70 mph Forecasted Mainline Volumes = 88,000 / 70,400 AADT (Existing Mainline Volumes

1188

106

345

30

1094

376368

297

Peak Hour Traffic Volumes (2038)

93571

17562