74
BERITA ACARA PROGRESS PROYEK HOTEL NOVOTEL GRAND SHAYLA MAKASSAR No : 1 Periode : 01 November 2012 - 30 Jan

RAB Pek.elektronika - Hotel Shayla

Embed Size (px)

Citation preview

Page 1: RAB Pek.elektronika - Hotel Shayla

BERITA ACARA PROGRESS

PROYEK HOTEL NOVOTEL GRAND SHAYLA MAKASSAR

No : 1 Periode : 01 November 2012 - 30 Januari 2013

Page 2: RAB Pek.elektronika - Hotel Shayla

01 November 2012 - 30 Januari 2013

Page 3: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri Rekapitulasi Pekerjaan MEP

PROYEK HOTEL NOVOTEL GRAND SHAYLA MAKASSAR PAKET PEKERJAAN ELEKTRONIKA

DESCRIPTION Amount Amount Amount

NO. Material Upah Material + Upah Rp. Rp. Rp.

I. PEKERJAAN PERSIAPAN - - -

II. PEKERJAAN FIRE ALARM - - -

III, PEKERJAAN SOUND SYSTEM

IV. PEKERJAAN TELEPON

V. PEKERJAAN DATA

VI. PEKERJAAN CCTV

VII. PEKERJAAN MATV

VIII. MATERIAL ON SITE

T O T A L

Page 4: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -1/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

III. PEKERJAAN PENGINDERA API ( FIRE ALARM )III.1 PERALATAN UTAMA

a. MCFA 2 Loop, 100 Point, MDF c/w grounding dan interface ke ext 1 Unitb. Battery type Nicad Recharger 2 Jam c/w grounding 1 Unitc. Power Surge Aresster c/w grounding 2 Unitd. Annunciator 1 Unite. Testing and Commissioning 1 Lot

III.2 KABEL UTAMAa Kabel (FRC 2 x 2.5 mm2 + PVC Cond. HI 20 mm) 445 M'c Twisted Shielded 18 AWG 2 Pairs (Tahan Api) + 450 M'

Konduit Dari MDFA - TB-FAd Twisted Shielded 18 AWG 2 Pairs (Tahan Api) + 1 Lot

Konduit Dari MCFA ke sound systeme Twisted Shielded 18 AWG 2 Pairs (Tahan Api) + 1 Lot

Konduit Dari MCFA ke telphonef Twisted Shielded 18 AWG 2 Pairs (Tahan Api) + 1 LotKonduit Dari MCFA ke lift

g Twisted Shielded 18 AWG 2 Pairs (Tahan Api) + 1 LotKonduit Dari MCFA ke pressure fan

III.3 PEKERJAAN INSTALASI DAN FIXTURESIII.3.1 LANTAI BASEMENT

a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 53 Titik- Instalasi Smoke Detector 3 Titik- Instalasi Fixed Temperature Detector 2 Titik- Instalasi Alarm Bell 4 Titik- Instalasi Manual Break Glass Push Button 4 Titik- Instalasi Indicating Lamp 4 Titik

Page 5: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -2/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

c. Fixtures dan armatures- Rate of Rise Detector 53 Buah- Smoke Detector 3 Buah- Fixed Temperature Detector 2 Buah- Alarm Bell 4 Buah- Manual Break Glass Push Button 4 Buah- Indicating Lamp 4 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 4 Buah- Box Fire Extinguisher 4 Buah- Mobile Dry Extinguisher CO2 25 kg 1 Buah

III.3.2 LANTAI GROUNDa. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 19 Titik- Instalasi Smoke Detector 8 Titik- Instalasi Fixed Temperature Detector 2 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 19 Buah- Smoke Detector 8 Buah- Fixed Temperature Detector 2 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

Page 6: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -3/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

III.3.3 LANTAI MEZANINEa. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 38 Titik- Instalasi Smoke Detector 12 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 38 Buah- Smoke Detector 12 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

III.3.4 LANTAI DUAa. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 20 Titik- Instalasi Smoke Detector 9 Titik- Instalasi Alarm Bell 3 Titik- Instalasi Manual Break Glass Push Button 3 Titik- Instalasi Indicating Lamp 3 Titik

c. Fixtures dan armatures- Rate of Rise Detector 20 Buah- Smoke Detector 9 Buah- Alarm Bell 3 Buah- Manual Break Glass Push Button 3 Buah- Indicating Lamp 3 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 3 Buah- Box Fire Extinguisher 3 Buah

Page 7: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -4/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

III.3.5 LANTAI 3 - 4 ( 2 LANTAI TYPICAL )a. Adressible Moudul Box ( AMB ) 2 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 30 Titik- Instalasi Smoke Detector 74 Titik- Instalasi Alarm Bell 6 Titik- Instalasi Manual Break Glass Push Button 6 Titik- Instalasi Indicating Lamp 6 Titik

c. Fixtures dan armatures- Rate of Rise Detector 30 Buah- Smoke Detector 74 Buah- Alarm Bell 6 Buah- Manual Break Glass Push Button 6 Buah- Indicating Lamp 6 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 6 Buah- Box Fire Extinguisher 6 Buah

III.3.6 LANTAI 5a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 15 Titik- Instalasi Smoke Detector 37 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 15 Buah- Smoke Detector 37 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah

Page 8: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -5/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Box Fire Extinguisher 2 Buah

III.3.7 LANTAI 6 -7 -8 ( 3 LANTAI TYPICAL )a. Adressible Moudul Box ( AMB ) 3 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 45 Titik- Instalasi Smoke Detector 111 Titik- Instalasi Alarm Bell 6 Titik- Instalasi Manual Break Glass Push Button 6 Titik- Instalasi Indicating Lamp 6 Titik

c. Fixtures dan armatures- Rate of Rise Detector 45 Buah- Smoke Detector 111 Buah- Alarm Bell 6 Buah- Manual Break Glass Push Button 6 Buah- Indicating Lamp 6 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 6 Buah- Box Fire Extinguisher 6 Buah

III.3.8 LANTAI 9a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 15 Titik- Instalasi Smoke Detector 37 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 15 Buah- Smoke Detector 37 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah

Page 9: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -6/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

III.3.9 LANTAI 10a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 15 Titik- Instalasi Smoke Detector 37 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 15 Buah- Smoke Detector 37 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

III.3.10 LANTAI 11a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 15 Titik- Instalasi Smoke Detector 37 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 15 Buah- Smoke Detector 37 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah

Page 10: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman -7/46 Fire Alarm

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN FIRE ALARM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

III.3.11 LANTAI 12a. Adressible Moudul Box ( AMB ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Instalasi Rate of Rise Detector 15 Titik- Instalasi Smoke Detector 37 Titik- Instalasi Alarm Bell 2 Titik- Instalasi Manual Break Glass Push Button 2 Titik- Instalasi Indicating Lamp 2 Titik

c. Fixtures dan armatures- Rate of Rise Detector 15 Buah- Smoke Detector 37 Buah- Alarm Bell 2 Buah- Manual Break Glass Push Button 2 Buah- Indicating Lamp 2 Buah- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) 2 Buah- Box Fire Extinguisher 2 Buah

Dipindahkan ke Penjumlahan Total - - -

Page 11: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 1/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

IV. PEKERJAAN SOUND SYSTEMIV.1 PERALATAN UTAMA

a. PUBLIC ADDRESS/EVACUATION SYSTEM - Emergency Microphone 1 Unit - Ext. Power Amplifier 240 Watt 7 Unit - Mixer Voice Alarm System 1 Unit - CD/MMC/USB player with FM Tunner 1 Unit - Double Cassete Deck Player 1 unit - Remote Paging Mic. 2 unit - Speaker Selector 16 Ch. 1 unit - Power Supply + Surge Arrester 1 unit - Graphic Equalizer 2 Ch. 1 unit - Cabinet Rack w/ Accessories 1 unit - Testing and Commissioning 1 Ls

b. CARCALL SYSTEM - Mixer Amplifier 120 W 1 Unit - Power Amplifier 120 W 1 Unit - Carcall Microphone 1 Unit - Cabinet Rack w/ Accessories 1 Unit - Testing and Commissioning 1 Ls

c LOCAL SOUND SYSTEM (SKY LOUNGE) - LANTAI GROUND - 8 Ch Mixer Console 1 Unit - Graphic Equalizer 2 Ch. 1 Unit - Amplifier 2 x 250W 1 Unit - CD/MMC/USB player with FM Tunner 1 unit - Hand-held Wireless Mic + Wireless Tuner 2 unit - Cabinet Rack w/ Accessories 1 unit - Speaker 180W 4 unit - Testing and Commissioning 1 Ls

Page 12: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 2/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

d PROFFESIONAL SOUND SYSTEM - BALLROOM - 16 Ch Mixer Console 1 Unit - Graphic Equalizer 2 Ch 4 Unit - Digital Speaker Controller 1 Unit - Power Amplifier 2 x 450W 1 Unit - Power Amplifier 2 x 600W 1 unit - CD/MMC/USB player with FM Tunner 1 unit - DVD Player 1 unit - Hand held Wireless Mic 4 unit - Antenna Distributor 1 unit - Wireless Antenna 4 Unit - Dynamic Microphone w/ floor stand 4 Unit - Prof. Speaker 200W 4 Unit - Sub Woofer Speaker 2 Unit - Cabinet Rack w/ Accessories 1 Ls - Head Phone 1 unit - Wireless Receiver 1 unit- 24 channel Audio Multicore cable 1 Ls- 2 core @2.5 mm Loudspeaker cable 1 Ls- Extention Cable for Hand Microphone 1 Ls- Material pendukung (konektor2,jumper cable,dsb) 1 Ls - Ceiling Speaker 1,5 - 3W (Evacuation) 7 Unit - Volume Kontrol 3 Buah- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 7 Titik- Instalasi Volume control NYMHY 3x1.5mm2 3 Titik- Testing and Commissioning 1 Ls

IV.2 INSTALASI DAN FIXTURES

konduit, terminasi, T-does, socket, dan accessories.IV.2.1 LANTAI BASSEMENT

a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 50 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 6 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Instalasi Column Speaker 10 Watt NYMHY 2x1.5mm2 9 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 3 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 15 M'

Instalasi Tata Suara termasuk kabel NYMHY 3 x 1,5 mm2,

Page 13: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 3/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 6 Buah- Column Speaker 10 Watt - Carcall 9 Buah- Wall Speaker 6 Watt - at StairCase 3 Buah - Volume Kontrol 2 Buah

Page 14: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 4/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

IV.2.2 LANTAI GROUNDa. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 86 M'- Instalasi Horn Speaker 15 watt NYMHY 2x2.5mm2 3 Titik- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 11 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 3 Titik- Instalasi Volume control NYMHY 3x1.5mm2 3 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 82 M'

c. Fixtures dan armatures- Horn Speaker 15 Watt - Carcall 3 Buah- Ceiling Speaker 1,5 - 3 Watt 11 Buah- Wall Speaker 6 Watt - at StairCase 3 Buah - Volume Kontrol 3 Buah

IV.2.3 LANTAI MEZANINEa. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 90 M'- Instalasi Column Speaker 10 Watt NYMHY 2x1.5mm2 7 Titik- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 21 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'

c. Fixtures dan armatures- Column Speaker 10 W - CarCall 7 Buah- Ceiling Speaker 1,5 - 3 Watt 21 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah - Volume Kontrol 2 Buah

IV.2.4 LANTAI 2a. Terminal Boxes ( TB - TS. ) 2 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 94 M'- Instalasi Column Speaker 10 Watt NYMHY 2x1.5mm2 4 Titik- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 32 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik

Page 15: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 5/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'- Kabel Distribusi dari MDF ke TB taman NYMHY 2 x 2.5 mm2 138 M'

c. Fixtures dan armatures- Column Speaker 10 W - di Taman 4 Buah- Ceiling Speaker 1,5 - 3 Watt 32 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah - Volume Kontrol 2 Buah

d MEETING ROOOM 1 - 5PEKERJAAN CONFERENCE SYSTEM - AUDITORIUM

- Central Unit Amplifier 1 unit- Chairman Unit 1 unit- Delegate Unit 48 unit- Mixer Amplifier 120 W 1 unit- DVD Recorder 1 unit- Speaker System 30W 4 unit- Hand held Wireless Mic + Wireless Tuner 2 unit- Wooden Rack 1 unit- Power Supply + Surge Arrester 1 unit- Testing and commissioning 1 ls

IV.2.5 LANTAI 3 - 4 ( 2 LANTAI TYPICAL )a. Terminal Boxes ( TB - TS. ) 2 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 220 M'

- Instalasi Column Speaker 10 Watt NYMHY 2x1.5mm2 4 Titik- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 26 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 4 Titik- Instalasi Volume control NYMHY 3x1.5mm2 4 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 4 M'- Kabel Distribusi dari MDF ke TB taman NYMHY 2 x 2.5 mm2 145 M'

c. Fixtures dan armatures- Column Speaker 10 W - di Taman 4 Buah- Ceiling Speaker 1,5 - 3 Watt 26 Buah- Wall Speaker 6 Watt - at StairCase 4 Buah- Volume Kontrol 4 Buah

Page 16: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 6/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

IV.2.6 LANTAI 5

a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 115 M'- Instalasi Column Speaker 10 Watt NYMHY 2x1.5mm2 2 Titik- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 13 Titik

- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 110 M'- Kabel Distribusi dari MDF ke TB taman NYMHY 2 x 2.5 mm2 150 M'

c. Fixtures dan armatures- Column Speaker 10 W - di Taman 2 Buah- Ceiling Speaker 1,5 - 3 Watt 13 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah- Volume Kontrol 2 Buah

IV.2.7 LANTAI 6 -7 -8 ( 3 LANTAI TYPICAL )a. Terminal Boxes ( TB - TS. ) 3 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 390 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 39 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 6 Titik- Instalasi Volume control NYMHY 3x1.5mm2 6 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 130 M'

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 39 Buah- Wall Speaker 6 Watt - at StairCase 6 Buah- Volume Kontrol 6 Buah

IV.2.8 LANTAI 9a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 135 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 13 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'

Page 17: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 7/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 13 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah- Volume Kontrol 2 Buah

IV.2.9 LANTAI 10a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 140 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 13 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 13 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah- Volume Kontrol 2 Buah

IV.2.10LANTAI 11a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 145 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 13 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 13 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah- Volume Kontrol 2 Buah

Page 18: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 8/46 Sound system

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN SOUND SYSTEM

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

IV.2.11LANTAI 12a. Terminal Boxes ( TB - TS. ) 1 Unitb. Instalasi peralatan lengkap kabel, konduit dan accessories

- Kabel Distribusi dari MDF ke TB - TS.1, NYMHY 3 x 2,5 mm2 150 M'- Instalasi Ceiling Speaker 1,5 - 3 Watt NYMHY 2x1.5mm2 13 Titik- Instalasi Wall Speaker 6 Watt ( FRC 2 x 1.5 mm2) 2 Titik- Instalasi Volume control NYMHY 3x1.5mm2 2 Titik- Kabel Distribusi dari MDF ke TB - TS.1, FRC 2x 2,5 mm2 12 M'

c. Fixtures dan armatures- Ceiling Speaker 1,5 - 3 Watt 13 Buah- Wall Speaker 6 Watt - at StairCase 2 Buah- Volume Kontrol 2 Buah

Dipindahkan ke Penjumlahan Total - - -

Page 19: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 1/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

V PEKERJAAN TELEPONV.1 PERALATAN UTAMA

a. PABX kap. 25 / 350 ext (Expandable), lengkap dengan power 1 Unitsupply, rectifier, battery charger 3 jam, operator console,Billing system, MDF 200 Pair dan peralatan bantu lainnya.

b. Instalasi dari R. Kabel Telkom ke MDF (ruang operator), 120 M'Jelly Armoured Cable 30 x 2 x 0,6 mm

c. Kabel distribusi dan Instalasi dari MDF ke tiap TB :TB – T.B, ITC 40 x 2 x 0,6 mm. 50 M'TB – T.1, ITC 40 x 2 x 0,6 mm. 86 M'TB – T.M2, ITC 40 x 2 x 0,6 mm. 90 M'TB – T.2, ITC 40 x 2 x 0,6 mm. 94 M'TB – T.3, ITC 40 x 2 x 0,6 mm. 98 M'TB – T.4 s/d 12, ITC 40 x 2 x 0,6 mm. 1,200 M'

d. Testing dan Commissioning 1 Lote. Grounding system 1 Lot

V.2 INSTALASI DAN FIXTURESInstalasi Telepon termasuk pengkabelan ITC 2x2x 0,6 mmkonduit, terminasi, T-Does, socket, dan accessories

V.2.1 LANTAI BASSEMENTa. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 4 Titikc. Fixtures dan armatures

- Outlet Telepon 4 Buah- Hand Set Telepon 4 Buah - Cable Tray 600 x 100 17 M' - Cable Tray 400 x 100 82 M'

Page 20: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 2/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

V.2.2 LANTAI GROUND a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 4 Titikc. Fixtures dan armatures

- Outlet Telepon 4 Buah- Hand Set Telepon 4 Buah- Cable tray, 300 mm x 100 mm 15 M'- Cable tray, 200 mm x 100 mm 45 M'

V.2.3 LANTAI MEZANINEa. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 17 Titikc. Fixtures dan armatures

- Outlet Telepon 17 Buah- Hand Set Telepon 17 Buah- Cable tray, 300 mm x 100 mm 15 M'- Cable tray, 200 mm x 100 mm 53 M'

V.2.4 LANTAI 2a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 8 Titikc. Fixtures dan armatures

- Outlet Telepon 8 Buah- Hand Set Telepon 8 Buah- Cable tray, 200 mm x 100 mm 55 M'- Cable tray, 300 mm x 100 mm 15 M'

V.2.5 LANTAI 3 - 4 ( 2 LANTAI TYPICAL ) a. Terminal Boxes (TB) 2 Unitb. Pekerjaan Instalasi :

Page 21: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 3/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Instalasi Telepon langsung 68 Titik

Page 22: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 4/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

c. Fixtures dan armatures- Outlet Telepon 68 Buah- Hand Set Telepon 68 Buah- Cable tray, 200 mm x 100 mm 156 M'- Cable tray, 300 mm x 100 mm 30 M'

V.2.6 LANTAI 5 a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 34 Titikc. Fixtures dan armatures

- Outlet Telepon 34 Buah- Hand Set Telepon 34 Buah- Cable tray, 200 mm x 100 mm 78 M'- Cable tray, 300 mm x 100 mm 15 M'

V.2.7 LANTAI 6 -7 -8 ( 3 LANTAI TYPICAL )a. Terminal Boxes (TB) 3 Unit

b. Pekerjaan Instalasi :- Instalasi Telepon langsung 102 Titik

c. Fixtures dan armatures- Outlet Telepon 102 Buah- Hand Set Telepon 102 Buah- Cable tray, 200 mm x 100 mm 234 M'- Cable tray, 300 mm x 100 mm 45 M'

V.2.8 LANTAI 9a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 34 Titikc. Fixtures dan armatures

- Outlet Telepon 34 Buah- Hand Set Telepon 34 Buah- Cable tray, 200 mm x 100 mm 78 M'

Page 23: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 5/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

- Cable tray, 300 mm x 100 mm 15 M'

Page 24: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 6/46 Telepon

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN TELEPON

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

V.2.9 LANTAI 10a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 34 Titikc. Fixtures dan armatures

- Outlet Telepon 34 Buah- Hand Set Telepon 34 Buah- Cable tray, 200 mm x 100 mm 78 M'- Cable tray, 300 mm x 100 mm 15 M'

V.2.10 LANTAI 11a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 34 Titikc. Fixtures dan armatures

- Outlet Telepon 34 Buah- Hand Set Telepon 34 Buah- Cable tray, 200 mm x 100 mm 78 M'- Cable tray, 300 mm x 100 mm 15 M'

V.2.11 LANTAI 12a. Terminal Boxes (TB) 1 Unitb. Pekerjaan Instalasi :

- Instalasi Telepon langsung 34 Titikc. Fixtures dan armatures

- Outlet Telepon 34 Buah- Hand Set Telepon 34 Buah- Cable tray, 200 mm x 100 mm 78 M'- Cable tray, 300 mm x 100 mm 15 M'

Dipindahkan ke Penjumlahan Total - - -

Page 25: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 1/46 Data

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN DATA

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VI. PEKERJAAN DATA VI.2 PEKERJAAN INSTALASI DAN FIXTURES, DLL

Instalasi Data termasuk pengkabelan UTP Cat 5epipa konduit, terminasi, T-Dos, socket, dan accessories

VI.2.1 LANTAI BASSEMENTa. Access Switch 24 port c/w Accessories 1 Setb. Switch Hub 8 port c/w Accessories 1 Setc. Instalasi titik data UTP Cat.5e 2 Titikd. Fixtures :

- Outlet Data RJ 45 2 Buah

VI.2.2 LANTAI GROUNDa. Switch Hub 16 port c/w Accessories 1 Setb. Instalasi titik data UTP Cat.5e 10 Titikc. Instalasi titik data UTP Cat.5e untuk Access Point 6 Titikd. Instalasi feeder data UTP Cat.6 dr Switch 24port Lt. Bsment 86 M;e. Fixtures :

- Outlet Data RJ 45 16 Buah- Access Point / WiFi 6 Buah

VI.2.3 LANTAI MEZANINEa. Switch Hub 16 port c/w Accessories 1 Setb. Instalasi titik data UTP Cat.5e 10 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 16 port Lt.Ground 15 M;d. Fixtures :

- Outlet Data RJ 45 10 Buah

Page 26: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 2/46 Data

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN DATA

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VI.2.4 LANTAI 2a. Switch Hub 8 port c/w Accessories 1 Setb. Instalasi titik data UTP Cat.5e 7 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 16 port Lt.Mezanine 15 M;d. Fixtures :

- Outlet Data RJ 45 7 Buah

VI.2.5 LANTAI 3 -4 ( 2 LANTAI TYPICAL )a. Switch Hub 8 port c/w Accessories 2 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 12 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 8 port Lt.2 30 M;d. Fixtures :

- Outlet Data RJ 45 12 Buah- Access Point / WiFi 12 Buah

VI.2.6 LANTAI 6 -7-8 ( 3 LANTAI TYPICAL )a. Switch Hub 8 port c/w Accessories 3 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 9 Titikc. Instalasi feeder data UTP Cat.6 152 M;d. Fixtures :

- Outlet Data RJ 45 9 Buah- Access Point / WiFi 9 Buah

VI.2.7 LANTAI 9a. Switch Hub 8 port 1 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 3 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 24 port Lt.Bsment 134 M;d. Fixtures :

- Outlet Data RJ 45 3 Buah- Access Point / WiFi 3 Buah

Page 27: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 3/46 Data

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN DATA

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

Page 28: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 4/46 Data

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN DATA

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VI.2.8 LANTAI 10a. Switch Hub 8 port 1 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 3 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 8 port Lt.9 15 M;d. Fixtures :

- Outlet Data RJ 45 3 Buah- Access Point / WiFi 3 Buah

VI.2.9 LANTAI 11a. Switch Hub 8 port 1 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 3 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 8 port Lt.10 15 M;d. Fixtures :

- Outlet Data RJ 45 3 Buah- Access Point / WiFi 3 Buah

VI.2.10 LANTAI 12a. Switch Hub 8 port 1 Setb. Instalasi titik data UTP Cat.5e untuk Access Point 3 Titikc. Instalasi feeder data UTP Cat.6 dr Switch 8 port Lt.11 15 M;d. Fixtures :

- Outlet Data RJ 45 3 Buah- Access Point / WiFi 3 Buah

Dipindahkan ke Penjumlahan Total - - -

Page 29: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri 1 CCTV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN CCTV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VII PEKERJAAN CCTVVII.1 PERALATAN UTAMA

a. 16 Channel Digital Video Recording (DVR) 3 Unitb. 21" LED Colour Monitor for Multiscreen 3 Unitc. 21" LED Colour Monitor for Spot 3 Unitd. Keyboard Joystick 3 Unite. 19" Rack for main unit c/w Accessories 1 Unitf. Material bantu 1 Lsg. Testing and Commissioning 1 Ls

VII.2 PEKERJAAN INSTALASI DAN FIXTURES, DLLa. Indoor Fixed Dome Color Camera 35 Unitb. Indoor Speeddome Color Dome Camera 22x Optical Zoom 12 Unitc. Instalasi titik Camera RG-6 in pipa conduit 20mm2 47 Titik

d. 12 Titik

e. 47 Titik

Dipindahkan ke Penjumlahan Total - - -

Instalasi titik Control Speeddome Camera STP AWG18 in pipa conduit 20mm2

Instalasi titik Power Camera NYM 3x1.5mm in pipa conduit 20mm2

Page 30: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 1/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VIII. PEKERJAAN MATVPekerjaan termasuk pengadaan dan pemasangan material di-site,lengkap peralatan bantu dan berfungsi dengan baik.

VIII.1 PERALATAN UTAMAa. Kabel Vision Provider 1 Lotb. Parabola 12 Ft 2 Unitc. Antena UHF 2 Unitd. Antena VHF 1 Unite. Line Antenna Amplifier 5 Unitf. Power Divider 3 Unit

g. Satellite Receiver 10 Unith. RF Modulator for Satellite Receiver 10 Uniti. RF Modulator for In-House Movie 3 Unitj. Single Channel Receiver for Local Channel 15 Unit

k. Active Combiner 1 Unitl. 19" Rack c/w Accessories 2 Unit

m. Base Frame for Modulator+Single Channel Receiver 4 Unitn. Power Supply Unit for All Modules 4 Unito. Splitter 4W 1 Unitp. Splitter 6W 1 Unit

q. 850 M'

r.Kabel Coaxial RG 11 / 75 Ohm + PVC HI 20 mm untuk Feeder/Riser

455 M'

s. Grounding System 1 Lott. Material bantu 1 Lot

u. Testing and Commissioning 1 Lot

VIII.2 PEKERJAAN INSTALASI & FIXTUIRES VIII.2.1 Lantai BASSEMENT

a. Tap Off 4W 1 Unitb. Outlet TV 2 Buahc. Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 2 Titik

Kabel Coaxial RG 11 / 75 Ohm + PVC HI 20 mm untuk antenna UHF/VHF/Parabola

Page 31: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 2/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

d. Instalasi Kabel Power untuk booster, NYM 3x1.5 mm + PVC Cond. HI 20 mm 1 Titik

Page 32: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 3/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VIII.2.2 Lantai GROUND a. Tap Off 4W 1 Unitb. Booster Amplifier 1 Unitc. Outlet TV 6 Buahd. Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 6 Titik

e. Instalasi Kabel Power untuk booster, NYM 3x1.5 mm + PVC Cond. HI 20 mm 1 Titik

VIII.2.4 Lantai 2a. Tap Off 4W 3 Unitb. Booster Amplifier 1 Unitc. Outlet TV 12 Buahd. Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 12 Titik

e. Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 1 Titik

VIII.2.5 Lantai 3 - 4 ( 2 lantai typical )a Tap Off 4W 18 Unitb Booster Amplifier 2 Unitc Splitter 3W 2 Unite Outlet TV 72 Buahf Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 72 Titikg Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 2 Titik

VIII.2.6 Lantai 5a Tap Off 4W 9 Unitb Booster Amplifier 1 Unitc Splitter 3W 1 Buahd Outlet TV 36 Buahe Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 36 Titikf Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 3 Titik

Page 33: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 4/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VIII.2.7 Lantai 6 -7-8 ( 3 LANTAI TYPICAL )a Tap Off 4W 27 Unitb Booster Amplifier 3 Unitc Splitter 3W 3 Buahd Outlet TV 108 Buahe Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 108 Titikf Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 3 Titik

VIII.2.8 LANTAI 9a Tap Off 4W 9 Unitb Booster Amplifier 1 Unitc Splitter 3W 1 Buahe Outlet TV 36 Buahf Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 36 Titikg Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 1 Titik

VIII.2.9 LANTAI 10a Tap Off 4W 9 Unitb Booster Amplifier 1 Unitc Splitter 3W 1 Buahe Outlet TV 36 Buahf Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 36 Titikg Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 1 Titik

VIII.2.10LANTAI 11a Tap Off 4W 9 Unitb Booster Amplifier 1 Unitc Splitter 3W 1 Buahe Outlet TV 36 Buahf Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 36 Titikg Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 1 Titik

Page 34: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 5/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

VIII.2.11LANTAI 12a Tap Off 4W 9 Unitb Booster Amplifier 1 Unitc Splitter 3W 1 Buahe Outlet TV 36 Buahf Instalasi Coax. 5C-2V, 75 Ohm + PVC. Cond. HI 20 mm 36 Titikg Instalasi Kabel Power untuk booster, NYM 3x2.5 mm + PVC Cond. HI 20 mm 1 Titik

Dipindahkan ke Penjumlahan Total - - -

Page 35: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 6/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

Page 36: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 7/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

Page 37: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 8/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

Page 38: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 9/46 MATV

PAKET PEKERJAAN ELEKTRONIKPEKERJAAN MATV

DESCRIPTION Unit Price Unit Price Amount Amount Total

NO. Quantity Unit Material Upah Material Upah Amount Rp Rp Rp. Rp. Rp.

Page 39: RAB Pek.elektronika - Hotel Shayla

L I S T O F M A T E R I A L S P E C I F I C A T I O N

HOTEL NOVOTEL GRAND SHAYLAJL. CHAIRIL ANWAR - MAKASAR

NO DESCRIPTION OF MATERIAL MANUFACTURE

I PEKERJAAN PUBLIC ADDRESS

A. Main Unit 1 MP3 Player,AM/FM Tuner Bosch 2 Paging Microphone Bosch 3 Mixer Pre Amplifier Bosch 4 Power Amplifier 240W Bosch 5 Speaker Selector 16 Zone Inter-M 6 Ceiling Speaker Bosch 7 Volume Control Bosch 8 Rack 19" dan Accessories Local

B. Material Instalasi 1 Kabel instalasi titik NYMHY Supreme 2 Kabel instalasi feeder/riser NYMHY Supreme 3 Terminal Box dan Accessories Local 4 Material bantu Local

II PEKERJAAN FIRE ALARM

A. Main Unit 1 MCFA Full Addressible 2 Loop Edward 2 Remote Annunciator Edward 3 Addressible Module Edward 4 All Detectors Edward/FST/setara 5 Alarm Bell Edward/FST/setara 6 Indicator Lamp Edward/FST/setara 7 Manual Call Point Edward/FST/setara

B. Material Instalasi 1 Kabel instalasi titik NYA Supreme 2 Kabel instalasi control STP AWG-18 Belden 3 Terminal Box dan Accessories Local 4 Material bantu Local

III PEKERJAAN TELEPON

A. Main Unit 1 Hybrid PABX Panasonic

B. Material Instalasi 1 Outlet Telepon Schneider/Hager/setara 2 Kabel instalasi titik ITC 2p Supreme 3 Kabel Feeder ITC Multipair Supreme 4 Terminal Box dan Accessories Local 5 Material bantu Local

Page 40: RAB Pek.elektronika - Hotel Shayla

IV PEKERJAAN MATV

A. Main Unit 1 Antenna UHF/VHF Ikusi/setara 2 Antenna Parabola Local 3 Channel Amplifier Ikusi/setara 4 Satellite Receiver Local 5 Modulator Ikusi/setara 6 RF Booster Ikusi/setara 7 Active Combiner Ikusi/Fagor/setara 8 Splitter Ikusi/setara 9 Tap Off Ikusi/setara 10 Rack 19" dan Accessories Local

B. Material Instalasi 1 Outlet TV Schneider/Hager/setara 2 Kabel instalasi titik Coaxial RG-6 Belden/setara 3 Kabel instalasi feeder/riser Coaxial RG-11 Belden/setara 4 Material bantu Local

V PEKERJAAN CCTV

A. Main Unit 1 16 Ch. DVR Bosch 2 Indoor Fixed Dome Color Camera Bosch 3 Indoor Speeddome Color Camera Bosch 4 Material bantu Local

B. Material Instalasi 1 Kabel instalasi titik Coaxial RG-6 Belden/setara 2 Material bantu Local

VI PEKERJAAN DATA

A. Main Unit 1 Switch Hub/Access Point/WiFi Dlink/LinkSys/setara 2 Outlet data Schneider/Hager/setara

B. Material Instalasi 1 Instalasi kabel UTP Cat.5e dan Cat.6 Schneider/setara 2 Material bantu Local

VII PEKERJAAN TRAY

TRAY 1 Straight Tray Interack 2 Fitting-fitting Local 3 Material bantu Local

Page 41: RAB Pek.elektronika - Hotel Shayla

L I S T O F M A T E R I A L S P E C I F I C A T I O N

HOTEL NOVOTEL GRAND SHAYLAJL. CHAIRIL ANWAR - MAKASAR

REMARK

Page 42: RAB Pek.elektronika - Hotel Shayla
Page 43: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 14/46 Prelim

PAKET PEKERJAAN ELEKTRIKALPEKERJAAN PERSIAPAN

No Uraian Pekerjaan Unit Qty Unit Price Unit Price Amount Material Upah Material

Rp Rp Rp.

1

Jumlah 1 - - - 2

Jumlah 1 - - - 3

Jumlah 1 - - - 4

Jumlah 1 - - - 5

Jumlah 1 - - - 6

Jumlah 1 - - - 7

Jumlah 1 - - - 8

Jumlah 1 - - - 9

Jumlah 1 - - - 10

Jumlah 1 - - - 11

Jumlah 1 - - -

Biaya - biaya untuk mengadakan staf dilapangan yang akan mengelola pelaksanaan pekerjaan, semua biaya administrasi dan biaya mengurus segala hal yang berhubungan dengan tanggung jawabnya terhadap kontrak ini.

Biaya mobilisasi dan demobilisasi termasuk biaya ijin pemasukan peralatan dan perlengkapan kerja kedalam lokasi proyek dan pemindahan dari satu tempat ke tempat lainnya didalam lokasi pekerjaan serta mengeluarkannya setelah penyelesaian pekerjaan

Pengadaan peralatan dan perlengkapan kerja yang lengkap untuk kelancaran pelaksanaan pekerjaan sebagaimana yang dimaksud dalam Dokumen Kontrak berikut pemeliharaannya selama digunakan di proyek

Pembuatan dan pencetakan Dokumen Kontrak lengkap dengan gambar kontrak sebanyak 4 (empat) set yang terdiri atas 2 (dua) set asli dan 2 (dua) set copy.

Pengadaan gambar pelaksanaan (construction drawing) sebanyak yang diperlukan untuk keperluan kerja dilapangan termasuk 2 (dua) set keperluan pengawasan.

Pembuatan gambar kerja (shop drawing) berikut perhitungan atau kalkulasi yang terinci sebanyak 3 (tiga) set, hingga disetujui Manajemen Konstruksi dan atau Pemberi Tugas.

Pembuatan gambar-gambar terlaksana (as built drawing) sebanyak 1 (satu) set kalkir dan 4 (empat) set blue print.

Kontraktor harus menjaga lokasi kerja tetap bersih dan mengangkut ke luar lokasi proyek semua sampah secara teratur setiap hari dan pada waktu penyelesaian pekerjaan harus tetap bersih dan rapih. (catatan : Dalam pengangkutan keluar proyek tidak boleh mengotori jalan dan prasarana umum )

Kontraktor bertanggung jawab atas penjagaan, penerangan dan perlindungan terhadap semua material dan pekerjaan dilokasi proyek selama masa pelaksanaan kontrak siang dan malam hari. Pemberi Tugas tidak bertanggung jawab terhadap Kontraktor dan sub Kontraktor atas kehilangan, kerusakan bahan - bahan bangunan, peralatan atau pekerjaan yang sedang dalam pelaksanaan.

Setiap pembangkit tenaga listrik sementara atau penerangan sementara termasuk pemasangan kabel-kabel dan meteran yang dipergunakan untuk pekerjaan atau pengambilan daya dari sumber atau PLN yang sudah ada, maka semua biaya pengadaan dan pemakaian daya selama pelaksanan proyek termasuk izin yang diperlukan serta perapihan setelah pekerjaan selesai sudah harus diperhitungkan oleh Kontraktor.

Pengadaan sumber air bersih sementara untuk air kerja dan keperluan lainnya dari sumber yang ada ( sumur pantek / jet pump, sumur dalam / deep well), termasuk membuat sambungan-sambungan sementara untuk mengalirkan air dan mencabutnya kembali setelah pekerjaan selesai.

Page 44: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 15/46 Prelim

PAKET PEKERJAAN ELEKTRIKALPEKERJAAN PERSIAPAN

No Uraian Pekerjaan Unit Qty Unit Price Unit Price Amount Material Upah Material

Rp Rp Rp. 12

Jumlah 1 - - - 13 Asuransi Tenaga Kerja (ASTEK) untuk pekerja dan staff Jumlah 1 - - - 14 Biaya Testing dan Commissioning

(1) Elektrikal Jumlah 1 Termasuk (2) Fire Alarm Jumlah 1 - Termasuk (3) Tata Suara Jumlah 1 - Termasuk (4) MATV Jumlah 1 - Termasuk (5) Telepon Jumlah 1 - Termasuk (6) Penangkal Petir Jumlah 1 Termasuk

15

Jumlah 1 - - - 16

(1) Biaya pengurusan ijin penyambungan daya listrik ......... KVA(PT.PLN) termasuk biaya administrasi dan terduga lainnya. Jumlah 1 - - -

(2) Biaya pengurusan ijin penyambungan telepon ..... Saluran (lines) dari PT. TELKOM termasuk biaya administrasi dantak terduga lainnya. Jumlah 1 - - -

Dipindahkan ke Penjumlahan Total -

Pengadaan telephone dan perlengkapannya sesuai kebutuhan termasuk pengurusan permohonan kepada Perumtel dan pembayaran semua tagihan selama masa pelaksanaan pekerjaan dan menyerahkannya kepada Pemberi Tugas setelah penyerahan pertama termasuk biaya balik nama kepada Pemberi Tugas.

Termasuk operasi lengkap dengan Instalasi dan pengabelan dari Panel (sumber daya) sampai ke alat (mesin) yang mau ditest termasuk pengadaan air dan penunjang lainnya, serta melatih personel dan menyediakan buku petunjuk yang merupakan tanggung jawab kontraktor dan sesuai kondisi didalam Dokumen Tender untuk lingkup pekerjaan, sebagai berikut :

Biaya resmi untuk penyambungan dan perijinan IMB ( Tidak termasuk ), Daya Listrik 2 x500 kva (Existing 865 KVA), Telepon dan Air Bersih dari Instansi Pemerintah ditanggung oleh Pemberi Tugas.

Kontraktor diwajibkan membantu Pemberi Tugas dalam pengurusan perolehan perijinan dan penyediaan dokumen yang diperlukan oleh Instansi-instansi Pemerintah tersebut :

Page 45: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 16/46 Prelim

Amount Upah Rp.

-

-

-

-

-

-

-

-

-

-

-

Page 46: RAB Pek.elektronika - Hotel Shayla

PT.Plammeka Jayaasri halaman - 17/46 Prelim

Amount Upah Rp.

- -

- - - -

-

-

-

-