RANCANGAN ANGGARAN BIAYA Proyek Pembangunan Balai Dusun Kranggan Desa Banyurojo Kecamatan Mertoyudan Kabupaten Magelang Dikerjakan Oleh TIM I KKN UNDIP Tahun 2015 NO URAIAN PEKERJAAN VOLUME SAT. PEK. JUMLAH NILAI SAT. ( Rp. ) ( Rp. ) I PEK. PERSIAPAN DAN GALIAN 1 Pemasangan Bouwplank 0.00 Ls - 200,000.00 2 Galian Tanah Pondasi 50.20 m3 35,125.00 ### II PEK. PONDASI DAN LANTAI 1 Pasang anstamping 5.50 m3 135,700.00 746,350.00 2 Pasang pondasi batu kali 35.20 m3 649,140.00 ### 3 Pondasi FootPlat 2.95 m3 - - 4 Urugan Tanah Bawah Lantai 53.20 m3 11,708.33 622,883.33 5 Pasangan Lantai Granitt 30x30 133.00 m2 149,812.69 ### III PEK. STRUKTUR 1 Beton Sloff 25/20 2.95 m3 ### ### 2 Beton Kolom Struktur 30/30 5.67 m3 - - 3 Beton Kolom Praktis 15/15 0.16 m3 ### 602,584.32 4 Beton RingBulk 20/25 2.95 m3 ### ### IV PEK. DINDING 1 Pasang batu bata bangunan 20.80 m3 - - 2 Plesteran Dinding 304.90 m2 35,230.00 ### 3 Acian Dinding 304.90 m2 19762.50 ### 4 Pengecatan Dinding 240.40 m2 12,702.00 ### V PEK. ATAP DAN PLAFOND 1 Atap Genteng Metal Surya Colour 101.65 m2 70,000.00 ### 2 Rangka Atap Baja Ringan Zinc Alum C 0.00 ls - ### 3 Nok dan Gording Baja Ringan 0.00 ls - ### 4 ListPlank 45.00 m - - 5 Pasang plafon gypsum rangka holo 133.00 m2 31,010.00 ### VI PEK. KAYU DAN PINTU 1 Pasang Kusen Pintu dan Jendela 2.68 m3 ### ### 2 Pasang Daun Pintu 7.39 m2 - - 3 Pasang Daun Jendela 10.80 m2 - - 4 Pasang pintu KM 1.00 Unit 700,000.00 700,000.00 VII PEK. INSTALASI LISTRIK 1 Instalasi titik lampu 5.00 ttk 100,000.00 500,000.00 2 Instalasi titik stop kontak 3.00 ttk 95,000.00 285,000.00 3 Pasang saklar tunggal 5.00 Unit 35,000.00 175,000.00 4 Pasang lampu Hemat Energy 18 watt 5.00 Unit 40,000.00 200,000.00 5 Instalasi Lampu Neon 2.00 Unit 100,000.00 200,000.00

RAB Balai Dusun Kranggan

Embed Size (px)

DESCRIPTION

arsitektur

Citation preview

XXXXX
RABRANCANGAN ANGGARAN BIAYAProyek Pembangunan Balai Dusun Kranggan Desa BanyurojoKecamatan Mertoyudan Kabupaten MagelangDikerjakan Oleh TIM I KKN UNDIP Tahun 2015NOURAIAN PEKERJAANVOLUMESAT. PEK.JUMLAHJUML. HARGANILAISAT.( Rp. )( Rp. )( Rp. )IPEK. PERSIAPAN DAN GALIAN1Pemasangan Bouwplank0.00Ls-200,000.002Galian Tanah Pondasi50.20m335,125.001,763,275.001,963,275.00IIPEK. PONDASI DAN LANTAI1Pasang anstamping5.50m3135,700.00746,350.002Pasang pondasi batu kali35.20m3649,140.0022,849,728.003Pondasi FootPlat2.95m3- 0- 04Urugan Tanah Bawah Lantai53.20m311,708.33622,883.335Pasangan Lantai Granitt 30x30133.00m2149,812.6919,925,088.4244,144,049.76IIIPEK. STRUKTUR1Beton Sloff 25/202.95m33,862,720.0011,395,024.002Beton Kolom Struktur 30/305.67m3- 0- 03Beton Kolom Praktis 15/150.16m33,862,720.00602,584.324Beton RingBulk 20/252.95m33,862,720.0011,395,024.0023,392,632.32IVPEK. DINDING1Pasang batu bata bangunan20.80m3- 0- 02Plesteran Dinding304.90m235,230.0010,741,627.003Acian Dinding304.90m219762.506,025,586.254Pengecatan Dinding240.40m212,702.003,053,560.8019,820,774.05VPEK. ATAP DAN PLAFOND1Atap Genteng Metal Surya Colour101.65m270,000.007,115,500.002Rangka Atap Baja Ringan Zinc Alum C0.00ls-10,000,000.003Nok dan Gording Baja Ringan0.00ls-5,000,000.004ListPlank45.00m- 0- 05Pasang plafon gypsum rangka holo133.00m231,010.004,124,330.0026,239,830.00VIPEK. KAYU DAN PINTU1Pasang Kusen Pintu dan Jendela2.68m310,174,000.0027,266,320.002Pasang Daun Pintu7.39m2- 0- 03Pasang Daun Jendela10.80m2- 0- 04Pasang pintu KM1.00Unit700,000.00700,000.0027,966,320.00VIIPEK. INSTALASI LISTRIK1Instalasi titik lampu5.00ttk100,000.00500,000.002Instalasi titik stop kontak3.00ttk95,000.00285,000.003Pasang saklar tunggal5.00Unit35,000.00175,000.004Pasang lampu Hemat Energy 18 watt5.00Unit40,000.00200,000.005Instalasi Lampu Neon2.00Unit100,000.00200,000.001,360,000.00VIIIPEK. INSTALASI AIR1Pasang instalasi air bersih10.00m10,000.00100,000.002Pasang instalasi air kotor22.00m15,000.00330,000.003Pasang kran2.00bh45,000.0090,000.006Pasang pompa air1.00unit1,000,000.001,000,000.001,520,000.00IXPEK. FINISHING1Pemasangan Paving Blok Teras18.00m285,000.001,530,000.002Pemasangan Closed Jongkok1.00Unit500,000.00500,000.003Pemasangan Batu Alam pada Dinding Luar29.00m2120,000.003,480,000.005,510,000.00TOTAL HARGA151,916,881.13- 0- 0- 0- 0
Rekap RABREKAPITULASI RANCANGAN ANGGARAN BIAYAProyek Pembangunan Balai Dusun Kranggan Desa BanyurojoKecamatan Mertoyudan Kabupaten MagelangDikerjakan Oleh TIM I KKN UNDIP Tahun 2015NOURAIAN PEKERJAANJUMLAHIPEK. PERSIAPAN DAN GALIAN1,963,275.00IIPEK. PONDASI DAN LANTAI44,144,049.76IIIPEK. STRUKTUR23,392,632.32IVPEK. DINDING19,820,774.05VPEK. ATAP DAN PLAFOND26,239,830.00VIPEK. KAYU DAN PINTU27,966,320.00VIIPEK. INSTALASI LISTRIK1,360,000.00VIIIPEK. INSTALASI AIR1,520,000.00IXPEK.FINISHING5,510,000.00JUMLAH151,916,881.13PEMBULATAN151,917,000.00TERBILANG: SERATUS LIMA PULUH SATU JUTA SEMBILAN RATUS TUJUH BELAS RIBU RUPIAH
AHSP 1DAFTAR ANALISAANALISAVOLUMETENAGA/BAHANHARGA SATUANHARGAJUMLAH HARGAA.11M3GALIAN TANAH PONDASI :0.7500orgpekerjaRp.50,000.00Rp.37,500.000.0250orgmandorRp.28,000.00Rp.700.00Rp.38,200.00A.161M3URUGAN TANAH KEMBALI :0.2500orgpekerjaRp.50,000.00Rp.12,500.000.0100orgmandorRp.70,000.00Rp.700.00Rp.13,200.00A.181M3URUGAN PASIR :1.2000m3pasir urugRp.100,000.00Rp.120,000.000.3000orgpekerjaRp.50,000.00Rp.15,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.135,700.00G.21M3AANTSTAMPING BATU BELAH :1.2000m3batu belahRp.135,000.00Rp.162,000.001.5000orgpekerjaRp.50,000.00Rp.75,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.237,700.00G.321M3PAS. PONDASI BATU BELAH1PC : 3KP : 10PS :1.2000m3batu belahRp.135,000.00Rp.162,000.001.2500zaksemen (PC)Rp.69,000.00Rp.86,250.000.1230m3kapurRp.1,750,000.00Rp.215,250.000.4870m3pasir pasangRp.130,000.00Rp.63,310.001.2000orgtukang batuRp.65,000.00Rp.78,000.000.1200orgkep. Tukang batuRp.70,000.00Rp.8,400.003.6000orgpekerjaRp.50,000.00Rp.180,000.000.1800orgmandorRp.70,000.00Rp.12,600.00Rp.805,810.00G.32i1M3PAS. BATU BATA 1PC : 3PS :500.00bhbataRp.750.00Rp.375,000.003.1500zaksemen (PC)Rp.69,000.00Rp.217,350.000.3780m3pasir pasangRp.130,000.00Rp.49,140.001.5000orgtukang batuRp.65,000.00Rp.97,500.000.1500orgKep. Tukang batuRp.70,000.00Rp.10,500.004.5000orgpekerjaRp.50,000.00Rp.225,000.000.2250orgmandorRp.70,000.00Rp.15,750.00Rp.990,240.00G.331M3PAS. BATU BATA 1PC : 3KP : 10PS :500.00bhbataRp.750.00Rp.375,000.000.7740zaksemen (PC)Rp.69,000.00Rp.53,406.000.0900m3kapurRp.1,750,000.00Rp.157,500.000.4200m3pasir pasangRp.130,000.00Rp.54,600.001.5000orgtukang batuRp.65,000.00Rp.97,500.000.1500orgkep. Tukang batuRp.70,000.00Rp.10,500.004.5000orgpekerjaRp.50,000.00Rp.225,000.000.2250orgmandorRp.70,000.00Rp.15,750.00Rp.989,256.00G.50p1 M2PLESTERAN 1PC : 3PS :0.1350zaksemen (PC)Rp.69,000.00Rp.9,315.000.1300m3pasir pasangRp.130,000.00Rp.16,900.000.2000orgtukang batuRp.65,000.00Rp.13,000.000.0200orgkep. Tukang batuRp.70,000.00Rp.1,400.000.4000orgpekerjaRp.50,000.00Rp.20,000.000.0200orgmandorRp.70,000.00Rp.1,400.00Rp.62,015.00G.501 M2PLESTERAN 1PC : 3KP : 10PS :0.1120zaksemen (PC)Rp.69,000.00Rp.7,728.000.0100m3kapurRp.1,750,000.00Rp.17,500.000.0200m3pasir pasangRp.130,000.00Rp.2,600.000.2000orgtukang batuRp.65,000.00Rp.13,000.000.0200orgkep. Tukang batuRp.70,000.00Rp.1,400.000.4000orgpekerjaRp.50,000.00Rp.20,000.000.0200orgmandorRp.70,000.00Rp.1,400.00Rp.63,628.00Spl V1M3BETON BERTULANG 1PC : 2PS : 3KR :A ) G.41Adukan6.4000zaksemen (PC)Rp.69,000.00Rp.441,600.000.5400m3pasir betonRp.135,000.00Rp.72,900.000.8200m3splitRp.225,000.00Rp.184,500.001.0000orgtukang batuRp.65,000.00Rp.65,000.000.1000orgkep. Tukang batuRp.70,000.00Rp.7,000.006.0000orgpekerjaRp.50,000.00Rp.300,000.000.3000orgmandorRp.70,000.00Rp.21,000.00Rp.1,092,000.00B) I.2Pembesian :110.00Kgbesi betonRp.14,000.00Rp.1,540,000.002.5000Kgkawat betonRp.17,500.00Rp.43,750.006.5000orgtukang besiRp.65,000.00Rp.422,500.002.2500orgkep. Tukang besiRp.70,000.00Rp.157,500.002.5000orgpekerjaRp.50,000.00Rp.125,000.000.125orgmandorRp.70,000.00Rp.8,750.00Rp.2,297,500.00C) F. 8Cetakan :0.4000m3kayu BegistingRp.2,000,000.00Rp.800,000.004.0000KgpakuRp.15,000.00Rp.60,000.005.0000orgtukang kayuRp.70,000.00Rp.350,000.000.5000orgkep. Tukang kayuRp.75,000.00Rp.37,500.004.0000orgpekerjaRp.50,000.00Rp.200,000.000.1000orgmandorRp.70,000.00Rp.7,000.00Rp.1,454,500.00D)Pembongkaran begesteng dan penyiraman 1 m3 beton2.0000orgpekerjaRp.50,000.00Rp.100,000.00Rp.100,000.00E )Steger/penyokong tiap 1 m3 beton0.6500m3Kayu tahunRp.2,000,000.00Rp.1,300,000.007.0000kgPakuRp.15,000.00Rp.105,000.0010.0000orgtukang kayuRp.70,000.00Rp.700,000.001.0000orgkep. Tukang kayuRp.75,000.00Rp.75,000.003.5000orgpekerjaRp.50,000.00Rp.175,000.000.1750orgmandorRp.70,000.00Rp.12,250.00Rp.2,367,250.00Spl.Vd1M3Beton bertulang K - 175 dengan pembesian 110 kg (beton praktis)1.0000X(A) AdukanRp.1,092,000.00Rp.1,092,000.001.0000X(B) PembesianRp.2,297,500.00Rp.2,297,500.001.0000X(C) BegistingRp.1,454,500.00Rp.1,454,500.001.0000X(D) PembongkaranRp.100,000.00Rp.100,000.00Rp.4,944,000.001M3Beton bertulang K - 225 dengan pembesian 110 kg (beton praktis)1.0000X(A) AdukanRp.1,092,000.00Rp.1,092,000.001.0000X(B) PembesianRp.2,297,500.00Rp.2,297,500.001.0000X(C) BegistingRp.1,454,500.00Rp.1,454,500.001.0000X(D) PembongkaranRp.100,000.00Rp.100,000.001.0000X(E) StegerRp.2,367,250.00Rp.2,367,250.00Rp.7,311,250.001M1SPONENGAN SUDUT0.0026m3pasir pasangRp.130,000.00Rp.338.000.0271zaksemen (PC)Rp.69,000.00Rp.1,869.900.0300orgtukang batuRp.65,000.00Rp.1,950.000.0030orgkep. Tukang batuRp.70,000.00Rp.210.000.0800orgpekerjaRp.50,000.00Rp.4,000.000.0040orgmandorRp.70,000.00Rp.280.00Rp8,647.90G.671M2PEK. LANTAI KERJA 1 : 3 : 5 tebal 7 cm0.0700m3batu splitRp.225,000.00Rp.15,750.000.3000zaksemen (PC)Rp.69,000.00Rp.20,700.000.0440m3pasir pasangRp.130,000.00Rp.5,720.000.1350orgtukang batuRp.65,000.00Rp.8,775.000.0140orgkep. Tukang batuRp.70,000.00Rp.980.000.5200orgpekerjaRp.50,000.00Rp.26,000.000.0370orgmandorRp.70,000.00Rp.2,590.00Rp.80,515.001 M2PAS. LANTAI KERAMIK 20 / 201.1000m2Keramik 20 /20Rp.80,000.00Rp.88,000.000.0110m3pasir pasangRp.130,000.00Rp.1,430.000.1200zaksemen (PC)Rp.69,000.00Rp.8,280.000.0250zaksemen berwarnaRp.250,000.00Rp.6,250.000.2500orgtukang batuRp.65,000.00Rp.16,250.000.0250orgkep. Tukang batuRp.70,000.00Rp.1,750.000.5000orgpekerjaRp.50,000.00Rp.25,000.000.0250orgmandorRp.70,000.00Rp.1,750.00Rp.148,710.001 M2PAS. DINDING KERAMIK 20 / 251.0500m2Keramik 20/25Rp.85,000.00Rp.89,250.000.0110m3pasir pasangRp.130,000.00Rp.1,430.000.1200zaksemen (PC)Rp.69,000.00Rp.8,280.000.0250kgsemen berwarnaRp.250,000.00Rp.6,250.000.2500orgtukang batuRp.65,000.00Rp.16,250.000.0250orgkep. Tukang batuRp.70,000.00Rp.1,750.000.5000orgpekerjaRp.50,000.00Rp.25,000.000.0250orgmandorRp.70,000.00Rp.1,750.00Rp.149,960.00G.69a1 M2PAS. KERAMIK 30/30 PUTIH1.1000m2Keramik 30/30Rp.80,000.00Rp.88,000.000.0110m3pasir pasangRp.130,000.00Rp.1,430.000.1200zaksemen (PC)Rp.69,000.00Rp.8,280.000.0250kgsemen berwarnaRp.250,000.00Rp.6,250.000.2500orgtukang batuRp.65,000.00Rp.16,250.000.0250orgkep. Tukang batuRp.70,000.00Rp.1,750.000.5000orgpekerjaRp.50,000.00Rp.25,000.000.0250orgmandorRp.70,000.00Rp.1,750.00Rp.148,710.00G.69a1 M2PAS. KERAMIK 30/30 WARNA1.1000m2Keramik 30/30Rp.200,000.00Rp.220,000.000.0110m3pasir pasangRp.130,000.00Rp.1,430.000.1200zaksemen (PC)Rp.69,000.00Rp.8,280.000.0250kgsemen berwarnaRp.250,000.00Rp.6,250.000.2500orgtukang batuRp.65,000.00Rp.16,250.000.0250orgkep. Tukang batuRp.70,000.00Rp.1,750.000.5000orgpekerjaRp.50,000.00Rp.25,000.000.0250orgmandorRp.70,000.00Rp.1,750.00Rp.280,710.00F.271M3PAS. KUSEN KAYU BANGKIRAI1.1000m3kayu bangkiraiRp.13,000,000.00Rp.14,300,000.0036.000orgtukang kayuRp.70,000.00Rp.2,520,000.003.6000orgkep. Tukang kayuRp.75,000.00Rp.270,000.0012.000orgpekerjaRp.50,000.00Rp.600,000.000.6000orgmandorRp.70,000.00Rp.42,000.00Rp.17,732,000.00F.33b1 M2PAS. DAUN PINTU PANIL PAPAN BANGKIRAI0.0400m3kayu bangkiraiRp.15,000,000.00Rp.600,000.002.0000orgpekerjaRp.50,000.00Rp.100,000.007.0000orgtukang kayuRp.70,000.00Rp.490,000.000.7000orgkep. Tukang kayuRp.75,000.00Rp.52,500.000.1000orgmandorRp.70,000.00Rp.7,000.00Rp1,249,500.00F.361 M2PAS. DAUN JENDELA KACA RANGKA BANGKIRAI0.0160m3kayu bangkiraiRp.15,000,000.00Rp.240,000.000.6000m2kaca 5 mmRp.80,000.00Rp.48,000.001.2500orgpekerjaRp.50,000.00Rp.62,500.004.5000orgtukang kayuRp.70,000.00Rp.315,000.000.4500orgkep. Tukang kayuRp.75,000.00Rp.33,750.000.0075orgmandorRp.70,000.00Rp.525.00Rp699,775.00F.221 M3PAS. KUDA - KUDA KAYU BANGKIRAI1.1000m3kayu bangkiraiRp.13,000,000.00Rp.14,300,000.0024.0000orgtukang kayuRp.70,000.00Rp.1,680,000.002.4000orgkep.tukang kayuRp.75,000.00Rp.180,000.008.0000orgpekerjaRp.50,000.00Rp.400,000.000.4000orgmandorRp.70,000.00Rp.28,000.00Rp16,588,000.00F.22a1 M3PAS. NOK JURAI KAYU BANGKIRAI1.1000m3kayu bangkiraiRp.13,000,000.00Rp.14,300,000.0030.0000orgtukang kayuRp.70,000.00Rp.2,100,000.002.4000orgkep.tukang kayuRp.75,000.00Rp.180,000.0010.0000orgpekerjaRp.50,000.00Rp.500,000.000.1000orgmandorRp.70,000.00Rp.7,000.00Rp17,087,000.00F.211 M2PAS. LISTPLANK 2/200.0230m3papan bangkiraiRp.15,000,000.00Rp.345,000.000.0500kgpakuRp.15,000.00Rp.750.000.8000orgtukang kayuRp.70,000.00Rp.56,000.000.0800orgkep. Tukang kayuRp.75,000.00Rp.6,000.000.2800orgpekerjaRp.50,000.00Rp.14,000.000.0140orgmandorRp.70,000.00Rp.980.00Rp422,730.001 m listplankRp.84,546.00F.211 M2PAS. LISTPLANK 2,5/300.0250m3papan bangkiraiRp.15,000,000.00Rp.375,000.000.0500kgpakuRp.15,000.00Rp.750.000.8000orgtukang kayuRp.70,000.00Rp.56,000.000.0800orgkep. Tukang kayuRp.75,000.00Rp.6,000.000.2800orgpekerjaRp.50,000.00Rp.14,000.000.0140orgmandorRp.70,000.00Rp.980.00Rp452,730.001 m listplankRp.135,819.00F.21a1 M1PAS. RUITER0.0040m3papan bangkiraiRp.15,000,000.00Rp.60,000.000.2250orgtukang kayuRp.70,000.00Rp.15,750.000.0230orgkep. Tukang kayuRp.75,000.00Rp.1,725.000.5000orgpekerjaRp.50,000.00Rp.25,000.000.0380orgmandorRp.70,000.00Rp.2,660.00Rp105,135.00F.161 M2PAS. USUK BANGKIRAI 4/6 RENG BANGKIRAI 2/30.0070m3kayu bangkiraiRp.13,000,000.0091,000.004.0000m'rengRp.5,000.0020,000.000.2500kgpakuRp.15,000.003,750.000.2000hrtukang kayuRp.70,000.0014,000.000.0200hrkep. Tukang kayuRp.75,000.001,500.000.2000hrpekerjaRp.50,000.0010,000.000.0100hrmandorRp.70,000.00700.00Rp140,950.00H.21 M2PAS. ATAP GENTENG BETON :15.000bhgenteng presRp.4,000.00Rp.60,000.000.1000orgtukang batuRp.65,000.00Rp.6,500.000.0100orgkep. Tukang batuRp.70,000.00Rp.700.000.1000orgpekerjaRp.50,000.00Rp.5,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.72,900.001 M2PAS. ATAP GENTENG LAMA :0.1000orgtukang batuRp.65,000.00Rp.6,500.000.0100orgkep. Tukang batuRp.70,000.00Rp.700.000.1000orgpekerjaRp.50,000.00Rp.5,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.12,900.00H.61 M1PAS. GENTENG KERPUS :5.0000bhkerpusRp.6,000.00Rp.30,000.000.0500zaksemen (PC)Rp.69,000.00Rp.3,450.000.0100m3kapurRp.1,750,000.00Rp.17,500.000.0200m3pasir pasangRp.130,000.00Rp.2,600.000.2000orgtukang batuRp.65,000.00Rp.13,000.000.0200orgkep. Tukang batuRp.70,000.00Rp.1,400.000.4000orgpekerjaRp.50,000.00Rp.20,000.000.0200orgmandorRp.70,000.00Rp.1,400.00Rp.89,350.00K.301 M2MENGECAT KAYU :0.3000kgcat kayuRp.75,000.00Rp.22,500.000.0800kgplamur kayuRp.20,000.00Rp.1,600.000.1000kgmenieRp.20,000.00Rp.2,000.000.1000lbrampelasRp.3,000.00Rp.300.000.2650orgtukang catRp.65,000.00Rp.17,225.000.0265orgkep. Tukang catRp.70,000.00Rp.1,855.000.1500orgpekerjaRp.50,000.00Rp.7,500.000.0750orgmandorRp.70,000.00Rp.5,250.00Rp.58,230.001 M2MENGECAT KAYU ULANG :0.6500mengecat kayu baruRp.58,230.00Rp.37,849.50Rp.37,849.50K.30b1 M2MENGECAT TEMBOK :0.3000kgcat tembokRp.150,000.00Rp.45,000.000.2250kgplamur tembokRp.6,500.00Rp.1,462.500.1000lbrampelasRp.3,000.00Rp.300.000.0750orgtukang catRp.65,000.00Rp.4,875.000.0075orgkep. Tukang catRp.70,000.00Rp.525.000.0500orgpekerjaRp.50,000.00Rp.2,500.000.0025orgmandorRp.70,000.00Rp.175.00Rp.54,837.501 M2MENGECAT TEMBOK ULANG :0.9000mengecat tembok baruRp.54,837.50Rp.49,353.75Rp.49,353.75K.30c1 M2MENGECAT PLAFOND :0.3000kgcat tembokRp.150,000.00Rp.45,000.000.2250kgplamur tembokRp.6,500.00Rp.1,462.500.1000lbrampelasRp.3,000.00Rp.300.000.0750orgtukang catRp.65,000.00Rp.4,875.000.0075orgkep. Tukang catRp.70,000.00Rp.525.000.0500orgpekerjaRp.50,000.00Rp.2,500.000.0025orgmandorRp.70,000.00Rp.175.00Rp.54,837.501 M2MENGECAT PLAFOND ULANG :0.9000mengecat plafond baruRp.54,837.50Rp.49,353.75Rp.49,353.75An.L.41M2BONGKAR PASANGAN BATU BATA0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00Bongkar 1 m3Rp.71,333.33An.L.51M2BONGKAR PASANGAN LANTAI TEGEL0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00An.L.61M2BONGKAR PLESTERAN0.0500orgpekerjaRp.50,000.00Rp.2,500.000.0100orgmandorRp.70,000.00Rp.700.00Rp.3,200.00An.L.71M2MENURUNKAN GENTENG0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00An.L.9a1M2BONGKAR USUK0.0083orgtukang kayuRp.70,000.00Rp.581.000.0008orgkep. Tukang kayuRp.75,000.00Rp.60.000.0330orgpekerjaRp.50,000.00Rp.1,650.000.0170orgmandorRp.70,000.00Rp.1,190.00Rp.2,840.00An.L.9b1M2BONGKAR RENG0.0167orgtukang kayuRp.70,000.00Rp.1,169.000.0017orgkep. Tukang kayuRp.75,000.00Rp.127.500.0670orgpekerjaRp.50,000.00Rp.3,350.000.0330orgmandorRp.70,000.00Rp.2,310.00Rp.5,660.00An.L.9ab1M2BONGKAR USUK DAN RENGRp.8,500.00An.L.9c1M2BONGKAR PLAFOND0.0167orgtukang kayuRp.70,000.00Rp.1,169.000.0017orgkep. Tukang kayuRp.75,000.00Rp.127.500.0670orgpekerjaRp.50,000.00Rp.3,350.000.0330orgmandorRp.70,000.00Rp.2,310.00Rp.6,956.50An.L.121M3BONGKAR KUDA - KUDA / GORDING6.0000orgtukang kayuRp.70,000.00Rp.420,000.000.6000orgkep. Tukang kayuRp.75,000.00Rp.45,000.004.0000orgpekerjaRp.50,000.00Rp.200,000.000.2000orgmandorRp.70,000.00Rp.14,000.00Rp.679,000.00Magelang, 01 Juni 2014Dibuat olehA F A N D IK.30c1 M2MENGECAT PLAFOND :0.2500kgcat tembokRp.Rp.0.1500kgplamur tembokRp.6,500.00Rp.975.000.1000lbrampelasRp.6,500.00Rp.650.000.2750orgtukang catRp.65,000.00Rp.17,875.000.0250orgkep. Tukang catRp.70,000.00Rp.1,750.000.1500orgpekerjaRp.50,000.00Rp.7,500.000.0100orgmandorRp.70,000.00Rp.700.00Rp.1 M2MENGECAT PLAFOND ULANG :0.9000mengecat plafond baruRp.Rp.Rp.An.L.41M2BONGKAR PASANGAN BATU BATA0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00Bongkar 1 m3Rp.71,333.33An.L.51M2BONGKAR PASANGAN LANTAI TEGEL0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00An.L.61M2BONGKAR PLESTERAN0.0500orgpekerjaRp.50,000.00Rp.2,500.000.0100orgmandorRp.70,000.00Rp.700.00Rp.3,200.00An.L.71M2MENURUNKAN GENTENG0.2000orgpekerjaRp.50,000.00Rp.10,000.000.0100orgmandorRp.70,000.00Rp.700.00Rp.10,700.00An.L.9a1M2BONGKAR USUK0.0083orgtukang kayuRp.70,000.00Rp.581.000.0008orgkep. Tukang kayuRp.75,000.00Rp.60.000.0330orgpekerjaRp.50,000.00Rp.1,650.000.0170orgmandorRp.70,000.00Rp.1,190.00Rp.2,840.00An.L.9b1M2BONGKAR RENG0.0167orgtukang kayuRp.70,000.00Rp.1,169.000.0017orgkep. Tukang kayuRp.75,000.00Rp.127.500.0670orgpekerjaRp.50,000.00Rp.3,350.000.0330orgmandorRp.70,000.00Rp.2,310.00Rp.5,660.00An.L.9ab1M2BONGKAR USUK DAN RENGRp.8,500.00An.L.9c1M2BONGKAR PLAFOND0.0167orgtukang kayuRp.70,000.00Rp.1,169.000.0017orgkep. Tukang kayuRp.75,000.00Rp.127.500.0670orgpekerjaRp.50,000.00Rp.3,350.000.0330orgmandorRp.70,000.00Rp.2,310.00Rp.6,956.50An.L.121M3BONGKAR KUDA - KUDA / GORDING6.0000orgtukang kayuRp.70,000.00Rp.420,000.000.6000orgkep. Tukang kayuRp.75,000.00Rp.45,000.004.0000orgpekerjaRp.50,000.00Rp.200,000.000.2000orgmandorRp.70,000.00Rp.14,000.00Rp.679,000.00An.H9b1 M2PAS. ATAP ASBES GELOMBANG KECIL1.100m2asbes gelombang kecilRp.Rp.4.000bhpaku sumbatRp.750.00Rp.3,000.000.2000orgtukang batuRp.65,000.00Rp.13,000.000.0200orgkep. Tukang batuRp.70,000.00Rp.1,400.000.1000orgpekerjaRp.50,000.00Rp.5,000.000.0050orgmandorRp.70,000.00Rp.350.00Rp.
AHSP 2DAFTAR HARGA ANALISA PEKERJAANKOTA SEMARANG TAHUN 2014NOSNIKODEKOEFSATURAIAN PEKERJAANHARGA BAHAN / UPAHJUMLAH103-2835-20086.11m3Menggali Tanah Biasa Sedalam 1m35125.006.1.2Tenaga35125.000.75OHPekerja45000.0033750.000.025OHMandor55000.001375.00203-2835-20026.41m'Pengukuran dan Pemasangan Bowplank102265.00Bahan91340.000.012m3kayu 5/7 x 4m kayu kuring4500000.0054000.000.02kgpaku biasa 2" - 5"12000.00240.000.007m3kayu papan 3/20 kuring5300000.0037100.00Tenaga10925.000.1OHtukang kayu55000.005500.000.1OHpekerja45000.004500.000.01OHkepala tukang65000.00650.000.005OHmandor55000.00275.00303-2835-20086.31m3Memasang Pondasi Batu Kali 1Pc : 5Pp649140.006.3.1Bahan515640.001.2m3Batu Belah 15/20190000.00228000.00136kgPortland Semen1275.00173400.000.544m3Pasir Pasang210000.00114240.006.3.2Tenaga133500.001.5OHPekerja50000.0075000.000.75OHTukang Batu65000.0048750.000.075OHKepala Tukang70000.005250.000.075OHMandor60000.004500.00403-7395-20086.351m2Memasang Lantai Keramik 30 x 30149812.696.35.1Bahan94862.6911.87BuahUbin Keramik 30 x 304727.2756112.6910kgPortland Semen1250.0012500.000.045m3Pasir Pasang200000.009000.001.5kgSemen Warna11500.0017250.006.35.2Tenaga54950.000.7OHPekerja45000.0031500.000.35OHTukang Batu55000.0019250.000.035OHKepala Tukang65000.002275.000.035OHMandor55000.001925.00503-2837-20086.51m2Memasang Plesteran 1Pc:5Pp Tebal 15 mm35230.006.5.1Bahan11680.005.184kgPortland Semen1250.006480.000.026m3Pasir Pasang200000.005200.006.5.2Tenaga23550.000.3OHPekerja45000.0013500.000.15OHTukang Batu55000.008250.000.015OHKepala Tukang65000.00975.000.015OHMandor55000.00825.00603-2837-20086.271m2Memasang Acian19762.506.27.1Bahan4062.503.25kgPortland Semen1250.004062.506.27.2Tenaga15700.000.2OHPekerja45000.009000.000.1OHTukang Batu55000.005500.000.01OHKepala Tukang65000.00650.000.01OHMandor55000.00550.007-6.141m2Pengecatan Tembok Baru (1plamir, 1cat dasar, 2 cat penutup)12702.00Bahan7790.000.1kgPlamir10500.001050.000.1kgCat Dasar18000.001800.000.26kgCat Penutup 2x19000.004940.00Tenaga4912.000.02OHPekerja45000.00900.000.063OHTukang Cat55000.003465.000.0063OHKepala Tukang65000.00409.500.0025OHMandor55000.00137.50803-2839-20086.71m2Memasang Langit Langit Gypsum Board (120x240)31010.006.7.1Bahan23160.000.364LbrGypsum Board60000.0021840.000.11kgPaku Sekrup12000.001320.006.7.2Tenaga7850.000.1OHPekerja45000.004500.000.05OHTukang Kayu55000.002750.000.005OHKepala Tukang65000.00325.000.005OHMandor55000.00275.00903-3434-20086.21m3Membuat Kusen Pintu dan Jendela Klas II10174000.006.2.1Bahan8560000.001.2m3Kayu Klas II (Kamfer), Balok7100000.008520000.001.25kgPaku Biasa 2"-5"16000.0020000.001kgLem Kayu20000.0020000.006.2.2Tenaga1614000.006OHPekerja50000.00300000.0018OHTukang Kayu65000.001170000.001.8OHKepala Tukang70000.00126000.000.3OHMandor60000.0018000.00
AHSP 36.39A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m)SNI 03-2835-2002BahanKayu TerentangM0.2702,000,000.00540,000.00Paku Biasa 2"-5"Kg2.00010,000.0020,000.00Minyak BekistingLt0.60010,000.006,000.00Besi Beton polosKg200.00012,000.002,400,000.00Kawat BetonKg3.00013,000.0039,000.00Semen PortlandKg323.0001,050.00339,150.00Pasir BetonM0.520125,000.0065,000.00Koral BetonM0.780135,000.00105,300.00TenagaPekerjaOh4.85036,000.00174,600.00Tukang BatuOh0.35042,500.0014,875.00Tukang KayuOh1.56047,500.0074,100.00Tukang BesiOh1.40045,000.0063,000.00Kepala TukangOh0.33145,000.0014,895.00MandorOh0.17040,000.006,800.00Sub Total3,862,720.00