WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc.RISK LEVEL EMPLOYED ADJUSTED
Manual handling of large
items
Strains, crushing, cuts and abrasions PTS Operatives 5 Assess all activity before undertaking work and express caution when manipulating
and moving large items and loads. Clear area of potential obstructions and warn
others of hazards
4 Yes
Manual handling activities Strains, crushing, cuts and abrasions PTS Operatives 5 Assess all activity before undertaking work and express caution when manipulating
and moving large items and loads. Clear area of potential obstructions and warn
others of hazards
4 Yes
Use of Portable Electric
Appliances & Power tools
etc.
Electrocution & other fault associated
hazards
PTS Operatives 4 Ensure all portable electric equipment and power tools are incorporated in a
maintenance programme that regularly inspects and tests the items to ensure their
integrity and lack of defect.
1 Yes
Use of mobile elevated
work platform
Working from height, falling objects,
falling persons etc.
PTS Operatives & all
persons in vicinity
8 nsure ony competant persons operate . . . . an n accor ance w toperational recommendations and approved practice. Ensure provision use of correct
PPE and FALL RESTRAINTequipment.Notify all others in the vicinity of work being
done. Banksman to operate emergecy stop in the event of malfunction
4 Yes
Mobile Crane working Vehicular movement on site All persons in vicinity 6 Use only competent trained operator and ensure routes are planned prior to crane
movement Banksman to operate emergency stop in event of malfunction
3 Yes
Movement of large loads on site All persons in vicinity 6 Secure all loads and ensure only competent banksmen assist operations. 3 Yes
Collisions and equipment damage All persons in vicinity 5 Conduct crane work in accordance with PTS company policy,LOLER REGS and
BS7121
3 Yes
WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc.
RISK LEVEL EMPLOYED ADJUSTED
All terrain fork lift truck
operations
Vehicular movement on site All persons in vicinity 6 Use only competent trained operator and ensure routes are planned prior to truck
movement.
3 Yes
Movement of large loads on site All persons in vicinity 6 Secure all loads before movement. 3 Yes
Transport of equipment and
large loads on site
Vehicular movement on s ite Al l persons in vicini ty 6 Clear area and routes of obstructions and inform others of act iv ity being undertaken. 3 Yes
Collisions and equipment damage All persons in vicinity 4 Use banksmen, especially for reversing manoeuvres. 3 Yes
Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation
Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation
POWER TECHNOLOGY SOLUTION
POWER TECHNOLOGY SOLUTIONS
RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL
7/30/2019 RA1 - NG Pembroke
http://slidepdf.com/reader/full/ra1-ng-pembroke 2/2
All works Inclement weather conditions All persons in vicinity 5 All working will be restricted to daylight hours, and where rainfall or the likelihood of
rainfall is present, necessary works will be protected by the provision of impermeable
sheeting.
1 Yes
All works Danger to and from persons gaining
unauthorised access.All people willhave competancies and trained to
All persons in vicinity 5 All access and vehicular movements will be controlled by the erection of temporary
fencing surrounding the work area. Such fencing will be secured in position andclearly posted with appropriate signs indicating undertakings.
2 Yes
All works Danger from live overhead electric
lines,All equipment is deemed as live
and working at 400kv.
PTS Operatives & all
persons in vicinity
9 All works to be undertaken under a permit to work system, and isolation from other
sources of supply to be checked as required. Demarcation of the work area to be
adhered to whilst assuring correct minimum clearances from all other lines and bus
sections.
3 Yes
Miscellaneous Slips, trips, falls etc. PTS Operatives 4 Encourage diligence and conscientiousness at all times and employ good
housekeeping measures as are inherent throughout PTS/RWE works.
3 Yes
All works Noise pollution PTS operatives & all
persons in vicinity
3 Eliminate the production of significant noise levels wherever possible, if this is not
possible then ensure noise is reduced as best as is practicable and provide hearing
1
Walking on Trench Covers Collapse of weak Trench
Covers,High pressure Air pipes in
PTS operatives & all
persons in vicinity
7 Avoid stepping on cable trenches at all times. Any damaged trench covers should be
reported and barriered with immediate effect.
1
Working in the proximity of
Unsilenced Circuit
Noise pollution from circuit breakers
opening / closing
PTS operatives & all
persons in vicinity
5 Ear protection to be worn when working in close proximity to in service circuit
breakers. Communicate with client with regards to likelihood of circuit breakers being
1 Yes
Power failure of Crane Crushing from suspended load,
crushing distance off 600mm to be
PTS operatives & all
persons in vicinity
6 Emergency Control measures in place as per points 7a &7b or method statement.
Risk Levels are gauged between 0 and 10, indicative of their assessed potential to occur.
RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL