WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc. RISK LEVEL EMPLOYED ADJUSTED Manual handling of large items St rains, crushin g, cut s an d ab rasi on s PTS Oper at iv es 5 As sess all a ct iv it y be fore u nd er taki ng w or k and ex pr es s caut io n wh en man ipulating and moving large items and loads. Clear area of potential obstructions and warn others of hazards 4 Yes Manual han dlin g ac ti vi ti es St rain s, cr us hi ng , cut s and abrasi on s PTS Oper at iv es 5 Assess all act iv it y before und er taki ng wor k and ex pr ess caution wh en man ipul at ing and moving large items and loads. Clear area of potential obstructions and warn others of hazards 4 Yes Use of Portable Electric  Applian ces & Power too ls etc. Electrocution & other fault associated hazards PTS Ope ra ti ve s 4 En su re al l p or tabl e e le ct ri c equ ip me nt an d p ow er tool s are in co rp or at ed in a maintenance programme that regularly inspects and tests the items to ensure their integrity and lack of defect. 1 Yes Use of mobile elevated work platform Working from height, falling objects, falling persons etc. PTS Operatives & all persons in vicinity 8 ns ur e ony co mp e ta nt pe rs on s op er a te .. .. an n accor an ce w t operational recommendations and approved practice. Ensure provision use of correct PPE and FALL RESTRAINTequipment.Notify all others in the vicinity of work being done. Banksman to operate emergecy stop in the event of malfunction 4 Yes Mobi le Cr an e wo rk in g Vehi cula r moveme nt on si te Al l pe rson s in vi ci ni ty 6 Us e on ly compet en t tr ai ne d op er at or an d en sure rout es ar e pl an ne d pr io r to cr an e movement Banksman to operate emergency stop in event of malfunction 3 Yes Movement of large loads on site All persons in vicinity 6 Secure all loads and ensure only competent banksmen assist operations. 3 Yes Colli sio ns and e quipment d ama ge All perso ns in vic inity 5 Conduct cra ne work in acc ord ance wit h PTS company polic y,L OLE R R EGS and BS7121 3 Yes WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc. RISK LEVEL EMPLOYED ADJUSTED  All terrain fo rk lift truck operations Veh icu lar mov ement on sit e All persons in vic inity 6 Use only competen t tra ined opera tor and ensur e rou tes are pla nned pri or to truck movement. 3 Yes Movement of large loads on site All persons in vicinity 6 Secure all loads before movement. 3 Yes Transport of equipment and large loads on site Ve hic u lar mo ve ment on si te All per sons in vic init y 6 Clear ar ea and ro ute s of obst r uc ti ons and info rm oth ers of acti vi ty bein g undert ak en. 3 Ye s Collisions and equipment damage All persons in vicinity 4 Use banksmen, especially for reversing manoeuvres. 3 Yes Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation POWER TECHNOLOGY SOLUTION POWER TECHNOLOGY SOLUTIONS RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL

RA1 - NG Pembroke

Embed Size (px)

Citation preview

Page 1: RA1 - NG Pembroke

7/30/2019 RA1 - NG Pembroke

http://slidepdf.com/reader/full/ra1-ng-pembroke 1/2

WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc.RISK LEVEL EMPLOYED ADJUSTED

Manual handling of large

items

Strains, crushing, cuts and abrasions PTS Operatives 5 Assess all activity before undertaking work and express caution when manipulating

and moving large items and loads. Clear area of potential obstructions and warn

others of hazards

4 Yes

Manual handling activities Strains, crushing, cuts and abrasions PTS Operatives 5 Assess all activity before undertaking work and express caution when manipulating

and moving large items and loads. Clear area of potential obstructions and warn

others of hazards

4 Yes

Use of Portable Electric

 Appliances & Power tools

etc.

Electrocution & other fault associated

hazards

PTS Operatives 4 Ensure all portable electric equipment and power tools are incorporated in a

maintenance programme that regularly inspects and tests the items to ensure their 

integrity and lack of defect.

1 Yes

Use of mobile elevated

work platform

Working from height, falling objects,

falling persons etc.

PTS Operatives & all

persons in vicinity

8 nsure ony competant persons operate . . . . an n accor ance w toperational recommendations and approved practice. Ensure provision use of correct

PPE and FALL RESTRAINTequipment.Notify all others in the vicinity of work being

done. Banksman to operate emergecy stop in the event of malfunction

4 Yes

Mobile Crane working Vehicular movement on site All persons in vicinity 6 Use only competent trained operator and ensure routes are planned prior to crane

movement Banksman to operate emergency stop in event of malfunction

3 Yes

Movement of large loads on site All persons in vicinity 6 Secure all loads and ensure only competent banksmen assist operations. 3 Yes

Collisions and equipment damage All persons in vicinity 5 Conduct crane work in accordance with PTS company policy,LOLER REGS and

BS7121

3 Yes

WORK ACTIVITY HAZARDS IDENTIFIED PERSONS AT RISK CONTROL MEASURES RISK LEVEL Acc.

RISK LEVEL EMPLOYED ADJUSTED

 All terrain fork lift truck

operations

Vehicular movement on site All persons in vicinity 6 Use only competent trained operator and ensure routes are planned prior to truck

movement.

3 Yes

Movement of large loads on site All persons in vicinity 6 Secure all loads before movement. 3 Yes

Transport of equipment and

large loads on site

Vehicular movement on s ite Al l persons in vicini ty 6 Clear area and routes of obstructions and inform others of act iv ity being undertaken. 3 Yes

Collisions and equipment damage All persons in vicinity 4 Use banksmen, especially for reversing manoeuvres. 3 Yes

Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation

Preliminary Hazard Risk Assessment for the works to be undertaken at Pembroke 400kV Substation

POWER TECHNOLOGY SOLUTION

POWER TECHNOLOGY SOLUTIONS

RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL

Page 2: RA1 - NG Pembroke

7/30/2019 RA1 - NG Pembroke

http://slidepdf.com/reader/full/ra1-ng-pembroke 2/2

 All works Inclement weather conditions All persons in vicinity 5 All working will be restricted to daylight hours, and where rainfall or the likelihood of 

rainfall is present, necessary works will be protected by the provision of impermeable

sheeting.

1 Yes

 All works Danger to and from persons gaining

unauthorised access.All people willhave competancies and trained to

 All persons in vicinity 5 All access and vehicular movements will be controlled by the erection of temporary

fencing surrounding the work area. Such fencing will be secured in position andclearly posted with appropriate signs indicating undertakings.

2 Yes

 All works Danger from live overhead electric

lines,All equipment is deemed as live

and working at 400kv.

PTS Operatives & all

persons in vicinity

9 All works to be undertaken under a permit to work system, and isolation from other 

sources of supply to be checked as required. Demarcation of the work area to be

adhered to whilst assuring correct minimum clearances from all other lines and bus

sections.

3 Yes

Miscellaneous Slips, trips, falls etc. PTS Operatives 4 Encourage diligence and conscientiousness at all times and employ good

housekeeping measures as are inherent throughout PTS/RWE works.

3 Yes

 All works Noise pollution PTS operatives & all

persons in vicinity

3 Eliminate the production of significant noise levels wherever possible, if this is not

possible then ensure noise is reduced as best as is practicable and provide hearing

1

Walking on Trench Covers Collapse of weak Trench

Covers,High pressure Air pipes in

PTS operatives & all

persons in vicinity

7  Avoid stepping on cable trenches at all times. Any damaged trench covers should be

reported and barriered with immediate effect.

1

Working in the proximity of 

Unsilenced Circuit

Noise pollution from circuit breakers

opening / closing

PTS operatives & all

persons in vicinity

5 Ear protection to be worn when working in close proximity to in service circuit

breakers. Communicate with client with regards to likelihood of circuit breakers being

1 Yes

Power failure of Crane Crushing from suspended load,

crushing distance off 600mm to be

PTS operatives & all

persons in vicinity

6 Emergency Control measures in place as per points 7a &7b or method statement.

Risk Levels are gauged between 0 and 10, indicative of their assessed potential to occur.

RA/LOCATION/CLIENT/MONTH/YEAR-ISSUE LEVEL