United States Nuclear Regulatory Commission Official Hearing Exhibit
In the Matter of: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 | 05000286 Exhibit #: Identified: Admitted: Withdrawn: Rejected: Stricken:
Other:
NYS000480-00-BD01 6/12/20136/12/2013
NYS000480 Submitted: June 10, 2013
c:..\,.~""R REGU(.q;.
l~\ • 0 · . · . ~ ~ '(' .... 1- 0'
? ~ ****il
0
0
o
ENTERGY ENGINEERING STANDARD I EN·Ep·S·002·MUL TI I REV. 1
Underground Piping and Tanks PAGE 14 OF 15 General Visual Inspection
ATTACHMENT 7.2 PIPEIT ANK COATING VISUAL INSPECTION CHECKLIST
Sheet 1 of2
NOTE: A photographic record of each indication should be retained with the inspection report.
LinelTank 10 & Name: 8-in . City Water Line 1502
System: City Water
Location: IP2 Transformer Yard
Coating Material : coal tar enamel/saturated asbestos felt wrap
Work Order: 323250-02
Inspection Date: 12/13/2012
Inspector: J_ Peterson
Thickness: iaw AWWA C203
Backfill Makeup:
Contains Rocks? Yes [ No [X]
I Not Coated
Description: No rocks were observed to be in contact with the pipe. However some rocks were found in the backfill. See pictures attached.
Contains Other Foreign Objects? Yes [ No [X] Description: ____________ _
Note
1. Any Mechanical Damage? Yes [ ] No [X]
2_ Any Holiday/Hole? Yes [ ] No [X]
3_ Any Blistering? Yes [ ] No [X]
4. Any Peeling? Yes [ ] No [X]
5. Any Flaking? Yes [ ] No [X]
6. Any Delamination? Yes [ ] No [X]
7. Any Embrittlement? Yes [ ] No [Xl
8. Any Embedded Rocks (Coating and/or Base)? Yes [ I No [X]
9_ Any Cracking? Yes [X] No [X]
10. Any Gouges? Yes [ ] No [X]
11_ Any Rusting? Yes [X] No [ ]
12. Other? Yes [ ] No [X]
Any Yes answer requires a CR to be Initiated
General Appearance: A portion of the 8·inch City Water line (# 1502) supply to the AFW pumps was
excavated and visually inspected. The total length of the city water line inspected full circumference was
approx.10 ft. Some areas along inspected length of pipe were observed to have localized coating cracking
and signs of rust.
Degradation Found? Yes [X ] No [ ] Further Evaluation Required? Yes [X] No [ ]
)
o
o
ENTERGY ENGINEERING STANDARD EN-EP-S-002-MULTI REV. 1
Underground Piping and Tanks PAGE 140F 15 General Visual Inspection
ATTACHMENT 7.2 PIPE/TANK COATING VISUAL INSPECTION CHECKLIST
Sheet 2 of2
Comments: Recommend coating removal to bare metal at locations having degraded coating and
performing UT to determine if any significant wall loss. Photos and sketch attached. Ref: Drawings 9321-
2236 and 9321-2237
CR Required? Yes [X 1 No [ 1 CR No. CR-IP2-2013-00131
Performed By: -'J!.\oo!l>Se!<lpl!h!JFc.",,!,p:J;emte2!.rl>!s~~;<~qt&:2;I<:..:.' '-.:::::; .... =.:1"'!4:1oc;,~::>.~_::.-_ Date: 04/12/2013
Program Owner or Qualified Designee: Nelson Azevedo I ~ ~?,@.... Date: 04/12/2013
o o EXC 4-2/ EXCAVATION OF 22 MT OUTSIDE MOAT AREA
Piping Uncovered for inspection: 2-inch City Water Line 1511 supply to VC 8-inch City Water Line 1502 supply to AFW pumps 1.5-in WC Line to VC
•
.Yi' PRe~sU~T'OW L.IIJe FOR PENETRATION'S Se:E o-...JG. ° c\:!>ZI-S:<--'O'30=-
O ~
• I ... 1-1 ... --
• e.Vo I2'-W:°-<j I ~i~~~\i\ I
~
o -, .. \. c."""
,
l~ Ref: Drawing 9321-2236
o
u ;)
o City
Line 1502 =-..... :.. upplyto AFW
o
o
o
)