PC farm Basic constraints Data throughput in input Good estimate: full 10 Gb links (52-56 from detectors) Number of 10 Gb ports on the router available for PCs O(30) CPU needed for L1/L2 processing Unknown Estimation of an extreme case: run the full reconstruction with (guessed) 1 sec/event, the power of 30 2*12 core PC will process 40 KHz of data
Citation preview
TDAQ commissioning
R. Fantechi
TDAQ commissioningCoordination activity started on JanuarySeveral items to be attacked already in
JanuaryRegular meetings: 15/1, 29/1, 6/2
First topics attacked:PC FarmRun ControlL0TP tests
PC farmBasic constraints
Data throughput in input Good estimate: 25-30 full 10 Gb links (52-56 from
detectors)Number of 10 Gb ports on the router available for
PCs O(30)
CPU needed for L1/L2 processing Unknown Estimation of an extreme case: run the full
reconstruction with (guessed) 1 sec/event, the power of 30 2*12 core PC will process 40 KHz of data
52(56)x 10Gb portsto detector area
HP8212 with 88x 10Gb and 24x 1Gb
30x 10Gb portsto online farm
34x 1Gb portsto merger
HPxx 48x 1Gb + 4x 10Gb
HP2920 24x 1Gbor 48x 1Gb DCS IPMI ...
Cern CDR + GPN
Cern TN
30 farmcomputers
3 mergercomputers?
1Gb link10Gb link
PC farm discussion Focus on O(30) PCs
2 CPUs, 8 or 12 cores, 64 GB of memoryGood PS and at least a PCI 16X GEN 3 for a GPU
GPU to be installed in a second time to boost L1/L2 capacity Keeping the network infrastructure as simple as of today
Several investigations ongoingAlberto and Paolo looking for offers in ItalyRF looking for existing CERN-wide contracts in IT or LHC
experiments, to profit from good discountsJonas searching the market in Germany and evaluating the cost
of his proposal of assembling PCs on shelves inside the racks
Some points still to be defined for the pf-ring driver
PC farm discussion 2 more mergers are needed
Connect the 1 Gb/s outputs of the 30 PCs to a 48 port 2920 with 4 10 Gb interfaces
3 10 Gb interfaces to go to the 3 mergersThe fourth one back to the router do go to the
CDR
Additional network switch needed for IPMI control
PC farm discussion Start to think for a strategy if more power is needed
GPUs is one way, but no work has started yet However, there is a limit to the number/power of GPUs to be put in a PC
Power supply capability, PCI slots Cost tradeoff for high performance GPUs
On the other side, increase the number of PCs Change the network configuration Either build a tree of routers (topology and configuration to be checked) or
go to a more expensive Brocade router to replace the actual HP8xxx one
Limited solution (Jonas): equip each one of the 30 PCs with 2 10 Gb Interfaces and connect other 30 PCs in cascade
On top of this, consider that according to the performance of the trigger we may have an input rate of less than 30 10 Gb links. This will create free slots in the router for more PCs. Again not a scalable solution
L0TP No request for the time being for a test at CERN
Ferrara claims it is able to exercise the L0tp proto with a clever PC program
Possibility of a test here middle of MarchECN 3 facilities always ready (continuous dry
run)Clock, Talk boardService PCsEverything restarted at the beginning of 2014Regularly used for the CREAM testsTo be eventually integrated with more TEL62s
NetworkAlmost all the switches available in IT
A first batch of installations in ECN3 are foreseen soon LAV4-11, CHANTI, router line cards
Followed by the LKr switchesComplete with Straws and the restAll fiber patches for clock and network ordered
Insulation of the networkA cluster of two virtual machines running Windows Terminal
server have been defined and available to us Work to be started to configure the accesses
Another VM with Linux available to start the same exercise for Linux applications
Run controlMeeting on the upgrade of the run control before
ChristmasNicolas has prepared a draft note
To be finalized this weekImplementation starting in March
Main pointsMaintain configuration files in a central databaseTo be transferred to the detector clients at init/startrunUtility to handle the interaction with the database
Clients to be upgraded/writtenTdspy (main effort), LKr init, LKr calib, GTK and Straw
init, L0tp
TTCex & LTUsAll the requested TTCex available since Feb
2013MK I typeNo new production in the near futureFew spare modules available in PH-ESE, but more
could come at the end of the year, due to some dismantling in CMS
Occasion to procure a reasonable number of spares
Preparation of the final LTU crate(s)See Marian talk
CratesLong saga following the initial failures in 2012
Problem not understood on sysreset lineFiltering ok for LAV
Several checks done on the existing cratesA test board prepared to check voltages and
sysreset functionality Indeed, one PS found with a problem on 48 V (not going
immediately to zero after power off) Other two with sysreset problem All three were damaged in 2012 (badly repaired?) These three sent back to Wiener as the first ones to have
the filtering upgraded
CratesIt is anyway time now to make the order
Sent from the pool coordinator at the end of March
6 crates on hold, 5 prepared in DecemberOrganize a set of hot spares
Two full LAV-type crates in Valeri’s labIt should be safe to have in addition one PS
LAV type + 1 PS TEL type as additional sparesAvailable at the experiment for a first line
intervention
Crate summaryPrototype crates
1 LAV type (Frascati) + 1 TEL type (Roma2, now at CERN)2011 order
8 LAV type: LAV1, LAV2, LAV3, CEDAR,MUV, CHOD, Straw, spare
2012 order (on hold, to be unblocked)6 LAV type: LAV4, LAV5, LAV6, LAV7, LAV8, LAV9However one filtered LAV PS has been delivered
2013 order (prepared, wait for our ok)4 LAV type: LAV10, LAV11, 2*CHANTI4 TEL type: 3*L0/LKR, 1 RICH
CHOD was originally RICH, it will be LAV12
Items for the next meetingsDecision on the PC farm purchasesTuning of the PC farm software
Rates, merger output rate, diagnostics, documentation
Review of the requirements of the various detectorsGTK, Straw, TEL62s, Gandalf, LKrAs far as network, PC farm, etc
Scheduling of common and private dry runsSynergy with computing WG for CDR and storage
Together with IT in the newly formed coordination meetings