Upload
nguyendien
View
220
Download
2
Embed Size (px)
Citation preview
(Results-Framework Document)for
R F D
Ministry of Petroleum and Natural Gas
(2012-2013)
17/10/2012 11.15 AMGenerated on
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2012-2013)
To address India's energy security needs in the hydrocarbons sector and to ensure availability of petroleum products atreasonable prices.
Mission
To accelerate domestic Exploration & Production (E&P) of hydrocarbons as well as equity oil & gas abroad. To develop
the hydrocarbon sector through technology up-gradation and capacity building in production, refining, transportation and
marketing sectors. To develop supply and distribution infrastructure for petroleum products, to serve the needs of the
economy, including households.To enhance service standards and to maximize customer satisfaction.Promote fuel
conservation, clean & green fuels and development of alternative sources of energy.
Objective
1 Increase in exploration coverage
2 New policy initiatives for E&P; sector
3 Domestic oil and gas production
4 Overseas oil and gas production
5 Making the sensitive petroleum products viz. Diesel, PDS Kerosene and Domestic LPG available at reasonable prices
6 Increasing Refinery capacity
7 Improvement of Refinery Performance
8 To encourage use of Natural Gas
9 Promoting cleaner and environment friendly fuels
10 Ensuring availability of petroleum products across the nation with respect to marketing and distribution
11 To promote fuel conservation
12 Research & Development
Functions
Exploration and production of petroleum resources including all forms of hydrocarbons in any state i.e. crude oil, natural gas, coal bed
methane, gas from gas hydrates, shale gas etc.
1
Production, supply, distribution, marketing and pricing of petroleum products including natural gas.2
Vision
17/10/2012 11.15 AMGenerated on
Page : 2 of 24
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2012-2013)
Oil refineries, including Lube Plants, additives for petroleum and petroleum products.3
Blending and blending prescription for bio- fuels including laying down the standards for such blending.4
Marketing, distribution and retailing of bio-fuels and its blended products.5
Conservation of petroleum products.6
Planning, development, control and assistance to all industries dealt with by the Ministry.7
Strengthening energy security by acquiring oil and gas equity abroad and participation in transnational oil & gas pipeline projects.8
Supervision and monitoring of public sector undertakings (PSUs), all attached or subordinate offices, including Directorate General of
Hydrocarbons (DGH), Oil Industry Development Board (OIDB), Petroleum Planning and Analysis Cell (PPAC), Centre for High
Technology (CHT), Petroleum Conservation Research Association (PCRA), Oil Industry Safety Directorate (OISD) under MoP&NG.;
9
Planning, development and regulation of oilfields services.10
Administration of various Acts on the subjects allocated to the Ministry and the Rules made there under: a. The Oilfields (Regulation and
Development) Act, 1948 b. The Oil & Natural Gas Commission (Transfer of Undertakings and Repeal) Act, 1993. c. The Petroleum &
Minerals Pipelines (Acquisition of Right of User in Land) Act, 1962. d. The ESSO (Acquisition of Undertakings in India) Act 1974. e. The
Oil Industry (Development) Act, 1974. f. The Burmah- Shell (Acquisition of Undertakings in India)Act, 1976. g. The Caltex (Acquisition of
Shares of Caltex Oil Refinery (India) Limited and of the Undertakings in India of the Caltex (India) Limited Act, 1977. h. The Petroleum
Act, 1934 (30 of 1934) and the Rules made there under.
11
Creation and administration of strategic petroleum reserves through Indian Strategic Petroleum Reserve Limited (ISPRL).12
Oversee the Petroleum & Natural Gas Regulatory Board (PNGRB) established under the Petroleum & Natural Gas Regulatory Act, 2006.13
17/10/2012 11.15 AMGenerated on
Page : 3 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Increase in exploration coverage 20.00 Exploration of Shale Gasareas
No of basins forwhich study ofShale Gas areashas beencompleted.
Number 6 4 3575.00[1] [1.1] [1.1.1]
Exploration of Additionalarea of sedimentary basins
2D LKM 11000 7000 50009000129404.00[1.2] [1.2.1]
3D SKM 6500 5500 5000600074104.00[1.2.2]
Progress in exploration inNELP blocks
Paper to be put upto COS fordesignating aframework forquicker statutoryclearances andapprovals forexploration inallotted NELPblocks.
Date 21/03/2013 27/03/2013 31/03/201325/03/201318/03/20134.00[1.3] [1.3.1]
Increase in exploration byPSUs in reserve accretion
Reserve accretion inMMTOE
MMTOE 65.73 59.41 56.2562.5767.123.00[1.4] [1.4.1]
New policy initiatives for E&P sector 6.00 Exploration of Shale gas Finalisation ofPolicy framework forShale Gasdevelopment.
Date 10/03/2013 20/03/2013 31/03/201315/03/201301/03/20133.00[2] [2.1] [2.1.1]
Further action onexploitation of CBM with oiland gas.
Finalisation of Policyfor exploitation ofCBM with oil andgas.
Date 31/12/2012 31/01/2013 10/02/201315/01/201315/12/20121.00[2.2] [2.2.1]
Percentage of coal bearingareas to be offered forexploration
Percentage of coalbearing areas to beoffered for
% 65.8 55.8 50.860.870.82.00[2.3] [2.3.1]
17/10/2012 11.15 AMGenerated on
Page : 4 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
and production of CBM exploration andproduction of CBM
Domestic oil and gas production 5.00 Oil production (Publicsector)
Oil production(Public sector)
MMT 29.00 26.00 25.0027.4931.492.50[3] [3.1] [3.1.1]
Gas production (Publicsector)
Gas production(Public sector)
BCM 26.47 24.00 23.0025.0028.472.50[3.2] [3.2.1]
Overseas oil and gas production 6.00 Overseas oil and gasproduction
Overseas oil andgas production
MMTOE 6.5 6.0 5.86.26.86.00[4] [4.1] [4.1.1]
Making the sensitive petroleum products viz.Diesel, PDS Kerosene and Domestic LPGavailable at reasonable prices
2.00 To modulate retail pricesand also to ensure thefinancial health of the publicsector oil marketingcompanies throughcompensation of priceunder-recoveries, if any
Submission of anote to EGoM oninternational crudeprice situation andpricing of sensitivepetroleum products.
Date 31/12/2012 28/02/2013 31/03/201331/01/201330/11/20121.00[5] [5.1] [5.1.1]
Processing the claims forbudgetary subsidy underthe schemes on “PDSKerosene and DomesticLPG Subsidy Scheme,2002” and “Freight subsidy(For Far Flung Areas)Scheme, 2002”
Percentage ofbudgetary allocationutilised
% 85 75 7080901.00[5.2] [5.2.1]
Increasing Refinery capacity 2.00 Monitoring physicalprogress of IOCL’sGreenfield Paradeeprefinery project
Achievements of85% of overallprogress
Date 15/02/2013 15/03/2013 31/03/201328/02/201301/02/20132.00[6] [6.1] [6.1.1]
Improvement of Refinery Performance 3.00 Finalisation and approval ofproject for implementation(PFI) in respect of 3
Approval to beobtained for all PFIsbased onassessment of
Date 31/01/2013 15/03/2013 31/03/201328/02/201331/12/20121.00[7] [7.1] [7.1.1]
17/10/2012 11.15 AMGenerated on
Page : 5 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
refineries:i) HPCL, Mumbai ii)BPCL,Mumbai iii) MRPL,Mangalore
IRBIP Phase IIrecommendations
Improvement ofperformance parameters i.Crude throughput-MMT ii.Distillate yield-percentageiii. Specific energyconsumption-Mbtu/Bbl/NRGF
Crude throughput ofPSU Refineries
MMT 118 114 1131151201.00[7.2] [7.2.1]
Average Distillateyield of PSURefineries
% 75.5 74.5 74.075.076.00.50[7.2.2]
Average specificenergy consumptionfor PSU refineries
MBTU/BBL/NRGF
65 67 6866640.50[7.2.3]
To encourage use of Natural Gas 10.00 Increase in cumulativecapacity of Gas pipelines inthe country.
Expansion andupgradation of theexisting pipelinesand laying of newpipelines
MMSCMD
30 26 2428345.00[8] [8.1] [8.1.1]
Increase in cumulative gastrunk transportationnetwork in the country
Laying of new trunkpipelines andexpansion ofexisting trunkpipeline network
Km 600 400 3005007005.00[8.2] [8.2.1]
Promoting cleaner and environment friendlyfuels
7.00 Roll out BS IV MS & HSDin 10 more identified cities
Availability of BS IVMS & HSD in 10more identified cities
Numberof cities
9 7 68102.00[9] [9.1] [9.1.1]
17/10/2012 11.15 AMGenerated on
Page : 6 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Preparation of Auto FuelPolicy, 2020
Preparation of DraftAuto FuelPolicy,2020
Date 15/03/2013 -- --31/03/201301/03/20131.00[9.2] [9.2.1]
Ethanol Blended PetrolProgramme (EBP)
Weighted average ofethanol blending inpetrol over thecountry consideringthe prevailingscenario of limitedEthanol availability
% 1.60 1.40 1.301.501.702.00[9.3] [9.3.1]
Demonstration project onuse of Hydrogen CNGblends in AutomotiveVehicles
Completion ofProject andfinalization of reportby IOC(R&D)
Date 10/03/2013 30/03/2013 31/03/201320/03/201301/03/20132.00[9.4] [9.4.1]
Ensuring availability of petroleum productsacross the nation with respect to marketingand distribution
13.00 Ensure availability ofpetroleum products, i.e.petrol, diesel and LPG
Quantity of petrolmade available
MMT 15.19 14.30 14.0114.5915.53.30[10] [10.1] [10.1.1]
Quantity of Dieselmade available
MMT 65.23 61.39 60.1662.6566.593.30[10.1.2]
Quantity of LPGmade available
MMT 16.46 15.50 15.1915.8116.83.30[10.1.3]
Review requirement of PDSkerosene for States/ UTs inview of expansion of LPG
Implementation ofStrategy onrationalization ofPDS Keroseneallocation to States
Date 31/12/2012 28/02/2013 31/03/201331/01/201330/11/20121.60[10.2] [10.2.1]
Expanding the network ofdomestic LPG to ruralareas
Issuance of Letter ofIntent for RajivGandhi Gramin
Number 800 600 5007009001.50[10.3] [10.3.1]
17/10/2012 11.15 AMGenerated on
Page : 7 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
LPG Vitran Yojana
To promote fuel conservation 6.00 To evolve strategy forimplementing a sustainableprogramme for fuelconservation
To take up with BEEand other relevantagencies for energylabelling of LPGstoves.
Date 30/09/2012 30/11/2012 31/12/201231/10/201231/08/20123.50[11] [11.1] [11.1.1]
To take up with BEEand other relevantagencies /stakeholders forenergy labelling ofDG sets andAgricultural PumpSets
Date 15/10/2012 15/11/2012 30/11/201231/10/201230/09/20121.50[11.1.2]
Mass awarenesscampaign forconservation ofPOL
Date 15/02/2013 15/03/2013 31/03/201328/02/201331/01/20131.00[11.1.3]
Research & Development 5.00 Completion/Monitoring ofR&D projects
Development of amathematical modeland simulationpackage forgasification of amixture of IndianCoal and Pet Coke(through BPCL R&Dand IIT Madras)
Date 15/02/2013 15/03/2013 31/03/201301/03/201301/02/20133.00[12] [12.1] [12.1.1]
Patents to be filed Patents to be filedby PSUs ofMoP&NG
Number 11 9 810122.00[12.2] [12.2.1]
17/10/2012 11.15 AMGenerated on
Page : 8 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient Functioning of the RFD System 3.00 Timely submission of Draft forApproval
On-time submission Date 06/03/2012 08/03/2012 09/03/201207/03/201205/03/20122.0*
Timely submission of Results On- time submission Date 03/05/2012 05/05/2012 06/05/201204/05/201201/05/20121.0
Administrative Reforms 6.00 Implement mitigating strategiesfor reducing potential risk ofcorruption
% of implementation % 95 85 80901002.0*
Implement ISO 9001 as per theapproved action plan
Area of operations covered % 95 85 80901002.0
Identify, design and implementmajor innovations
Implementation of identifiedinnovations
Date 06/03/2013 08/03/2013 09/03/201307/03/201305/03/20132.0
Improving Internal Efficiency /responsiveness / service delivery of Ministry/ Department
4.00 Implementation of Sevottam Independent Audit ofImplementation of Citizen’sCharter
% 95 85 80901002.0*
Independent Audit ofimplementation of publicgrievance redressal system
% 95 85 80901002.0
Ensuring compliance to the FinancialAccountability Framework
2.00 Timely submission of ATNs onAudit paras of C&AG
Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG duringthe year.
% 90 70 60801000.5*
Timely submission of ATRs tothe PAC Sectt. on PAC Reports.
Percentage of ATRSsubmitted within due date (6 months) from date ofpresentation of Report toParliament by PAC duringthe year.
% 90 70 60801000.5
* Mandatory Objective(s)
17/10/2012 11.15 AMGenerated on
Page : 9 of 24
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Early disposal of pending ATNson Audit Paras of C&AG Reportspresented to Parliament before31.3.2012.
Percentage of outstandingATNs disposed off duringthe year.
% 90 70 60801000.5
Early disposal of pending ATRson PAC Reports presented toParliament before 31.3.2012
Percentage of outstandingATRS disposed off duringthe year.
% 90 70 60801000.5
* Mandatory Objective(s)
17/10/2012 11.15 AMGenerated on
Page : 10 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
-- 6NumberNo of basins for whichstudy of Shale Gasareas has beencompleted.
Increase in exploration coverage Exploration of Shale Gasareas
-- -- --[1] [1.1] [1.1.1]
-- 11000LKM2DExploration of Additionalarea of sedimentarybasins
-- -- --[1.2] [1.2.1]
-- 6500SKM3D -- -- --[1.2.2]
-- 21/03/2013DatePaper to be put up toCOS for designating aframework for quickerstatutory clearancesand approvals forexploration in allottedNELP blocks.
Progress in exploration inNELP blocks
-- -- --[1.3] [1.3.1]
-- 65.73MMTOEReserve accretion inMMTOE
Increase in explorationby PSUs in reserveaccretion
-- -- --[1.4] [1.4.1]
-- 10/03/2013DateFinalisation of Policyframework for ShaleGas development.
New policy initiatives for E&P sector Exploration of Shale gas -- -- --[2] [2.1] [2.1.1]
-- 31/12/2012DateFinalisation of Policyfor exploitation ofCBM with oil and gas.
Further action onexploitation of CBM withoil and gas.
-- -- --[2.2] [2.2.1]
-- 65.8%Percentage of coalbearing areas to beoffered for explorationand
Percentage of coalbearing areas to beoffered for explorationand production of
-- -- --[2.3] [2.3.1]
17/10/2012 11.15 AMGenerated on
Page : 11 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
production of CBMCBM
-- 29.00MMTOil production (Publicsector)
Domestic oil and gas production Oil production (Publicsector)
-- -- --[3] [3.1] [3.1.1]
-- 26.47BCMGas production (Publicsector)
Gas production (Publicsector)
-- -- --[3.2] [3.2.1]
-- 6.5MMTOEOverseas oil and gasproduction
Overseas oil and gas production Overseas oil and gasproduction
-- -- --[4] [4.1] [4.1.1]
-- 31/12/2012DateSubmission of a noteto EGoM oninternational crudeprice situation andpricing of sensitivepetroleum products.
Making the sensitive petroleumproducts viz. Diesel, PDS Keroseneand Domestic LPG available atreasonable prices
To modulate retail pricesand also to ensure thefinancial health of thepublic sector oilmarketing companiesthrough compensation ofprice under-recoveries, ifany
-- -- --[5] [5.1] [5.1.1]
-- 85%Percentage ofbudgetary allocationutilised
Processing the claims forbudgetary subsidy underthe schemes on “PDSKerosene and DomesticLPG Subsidy Scheme,2002” and “Freightsubsidy (For Far FlungAreas) Scheme, 2002”
-- -- --[5.2] [5.2.1]
-- 15/02/2013DateAchievements of 85%of overall progress
Increasing Refinery capacity Monitoring physicalprogress of IOCL’sGreenfield Paradeeprefinery project
-- -- --[6] [6.1] [6.1.1]
-- 31/01/2013DateApproval to beobtained for all PFIsbased on assessmentof IRBIP
Improvement of RefineryPerformance
Finalisation and approvalof project forimplementation (PFI) inrespect of 3
-- -- --[7] [7.1] [7.1.1]
17/10/2012 11.15 AMGenerated on
Page : 12 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
Phase IIrecommendations
refineries:i) HPCL, Mumbaiii)BPCL, Mumbai iii)MRPL, Mangalore
-- 118MMTCrude throughput ofPSU Refineries
Improvement ofperformance parametersi. Crude throughput-MMTii .Distillate yield-percentage iii. Specificenergy consumption-Mbtu/Bbl/NRGF
-- -- --[7.2] [7.2.1]
-- 75.5%Average Distillate yieldof PSU Refineries
-- -- --[7.2.2]
-- 65MBTU/BBL/NRGF
Average specificenergy consumptionfor PSU refineries
-- -- --[7.2.3]
-- 30MMSCMDExpansion andupgradation of theexisting pipelines andlaying of new pipelines
To encourage use of Natural Gas Increase in cumulativecapacity of Gas pipelinesin the country.
-- -- --[8] [8.1] [8.1.1]
-- 600KmLaying of new trunkpipelines andexpansion of existingtrunk pipeline network
Increase in cumulativegas trunk transportationnetwork in the country
-- -- --[8.2] [8.2.1]
-- 9Number ofcities
Availability of BS IVMS & HSD in 10 moreidentified cities
Promoting cleaner and environmentfriendly fuels
Roll out BS IV MS & HSDin 10 more identifiedcities
-- -- --[9] [9.1] [9.1.1]
17/10/2012 11.15 AMGenerated on
Page : 13 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
-- 15/03/2013DatePreparation of DraftAuto Fuel Policy,2020
Preparation of Auto FuelPolicy, 2020
-- -- --[9.2] [9.2.1]
-- 1.60%Weighted average ofethanol blending inpetrol over the countryconsidering theprevailing scenario oflimited Ethanolavailability
Ethanol Blended PetrolProgramme (EBP)
-- -- --[9.3] [9.3.1]
-- 10/03/2013DateCompletion of Projectand finalization ofreport by IOC(R&D)
Demonstration project onuse of Hydrogen CNGblends in AutomotiveVehicles
-- -- --[9.4] [9.4.1]
-- 15.19MMTQuantity of petrolmade available
Ensuring availability of petroleumproducts across the nation withrespect to marketing and distribution
Ensure availability ofpetroleum products, i.e.petrol, diesel and LPG
-- -- --[10] [10.1] [10.1.1]
-- 65.23MMTQuantity of Dieselmade available
-- -- --[10.1.2]
-- 16.46MMTQuantity of LPG madeavailable
-- -- --[10.1.3]
-- 31/12/2012DateImplementation ofStrategy onrationalization of PDSKerosene allocation toStates
Review requirement ofPDS kerosene for States/UTs in view of expansionof LPG
-- -- --[10.2] [10.2.1]
-- 800NumberIssuance of Letter ofIntent for Rajiv GandhiGramin LPG VitranYojana
Expanding the network ofdomestic LPG to ruralareas
-- -- --[10.3] [10.3.1]
-- 30/09/2012DateTo take up with BEEand other relevant
To promote fuel conservation To evolve strategy forimplementing a
-- -- --[11] [11.1] [11.1.1]
17/10/2012 11.15 AMGenerated on
Page : 14 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
05/03/2010 06/03/2012DateOn-time submissionEfficient Functioning of the RFDSystem
Timely submission of Draft forApproval
-- --04/03/2011*
27/04/2011 03/05/2012DateOn- time submissionTimely submission of Results -- --26/04/2012
* Mandatory Objective(s)
agencies for energylabelling of LPGstoves.
sustainable programmefor fuel conservation
-- 15/10/2012DateTo take up with BEEand other relevantagencies /stakeholders forenergy labelling of DGsets and AgriculturalPump Sets
-- -- --[11.1.2]
-- 15/02/2013DateMass awarenesscampaign forconservation of POL
-- -- --[11.1.3]
-- 15/02/2013DateDevelopment of amathematical modeland simulationpackage forgasification of amixture of Indian Coaland Pet Coke (throughBPCL R&D and IITMadras)
Research & Development Completion/Monitoring ofR&D projects
-- -- --[12] [12.1] [12.1.1]
-- 11NumberPatents to be filed byPSUs of MoP&NG
Patents to be filed -- -- --[12.2] [12.2.1]
17/10/2012 11.15 AMGenerated on
Page : 15 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
-- 95%% of implementationAdministrative Reforms Implement mitigating strategiesfor reducing potential risk ofcorruption
-- ----*
-- 95%Area of operations coveredImplement ISO 9001 as perthe approved action plan
-- ----
-- 06/03/2013DateImplementation of identifiedinnovations
Identify, design and implementmajor innovations
-- ----
-- 95%Independent Audit ofImplementation of Citizen’sCharter
Improving Internal Efficiency /responsiveness / service delivery ofMinistry / Department
Implementation of Sevottam -- ----*
-- 95%Independent Audit ofimplementation of publicgrievance redressal system
-- ----
-- 90%Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG during theyear.
Ensuring compliance to the FinancialAccountability Framework
Timely submission of ATNs onAudit paras of C&AG
-- ----*
-- 90%Percentage of ATRSsubmitted within due date ( 6months) from date ofpresentation of Report toParliament by PAC during theyear.
Timely submission of ATRs tothe PAC Sectt. on PACReports.
-- ----
-- 90%Percentage of outstandingATNs disposed off during theyear.
Early disposal of pendingATNs on Audit Paras of C&AGReports presented toParliament before
-- ----
* Mandatory Objective(s)
17/10/2012 11.15 AMGenerated on
Page : 16 of 24
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
31.3.2012.
-- 90%Percentage of outstandingATRS disposed off during theyear.
Early disposal of pendingATRs on PAC Reportspresented to Parliament before31.3.2012
-- ----
* Mandatory Objective(s)
17/10/2012 11.15 AMGenerated on
Page : 17 of 24
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
AcronymSI.No Description
Page : 18 of 24
Results Framework Document (RFD) for Ministry of Petroleum and Natural Gas (2012-2013)
Section 4:
Description and Definition of Success Indicators
and Proposed Measurement Methodology
Page : 19 of 24
CBM
E&P
ECS
MMT
BS-IV
Rs.
PDS
MMTPA
MMSCMD
IRBIP
Km
LNG
MS
HSD
LPG
OIL
PFI
RGGLVY
DGH
MoP&NG
ONGC
ROs
COS
PSUs
BPCL
RLNG
EGoM
HPCL
CCEA
NOCs
PNG Rules
PLL
HLPL
GAIL
PPAC
PCRA
LKM
SKM
MMTOE
Mbtu/bbl/nrgf
Coal Bed Methane
Exploration and Production
Empowered Committee of Secretaries
Million Metric Tonnes
Bharat Stage-IV
Rupees
Public Distribution System
Million Tonnes Per Annum
Million Standard Cubic Meter Per Day
Integrated Refinery Business Improvement
Programme
Kilometer
Liquefied Natural Gas
Motor Spirit
High Speed Diesel
Liquefied Petroleum Gas
Oil India Limited
Project for Implementation
Rajiv Gandhi Gramin LPG Vitaran Yojana
Directorate General of Hydrocarbons
Ministry of Petroleum &Natural Gas
Oil &Natural Gas Corporation Limited
Retail Outlets
Quarterly Performance Reviews
Committee of Secretaries
Bharat Petroleum Corporation Limited
Re-gasified Liquefied Natural Gas
Empowered Group of Ministers
Hindustan Petroleum Corporation Limited
Cabinet Committee on Economic Affairs
National Oil Companies
Petroleum &Natural Gas Rules, 1956
Petronet LNG Limited
Hazira LNG Private Limited
Gas Authority of India Limited
Petroleum Planning and Analysis Cell
Petroleum Conservation Research Association
Line Kilometer
Square Kilometer
Million metric tonne of oil equivalent
MBTU/BBL/NRGF (MBN), where the term MBTU
refers to total heat value of fuel and loss in
Page : 20 of 24
NELP
IOC
R &D
2D
3D
BCM
EBP
BEE
IIT
thousand BTU, BBL refers to barrel of crude
processed and NRGF is a derived factor that
depends upon actual intake in both primary and
secondary processing units as per industry
standard
New Exploration Licensing Policy
Indian Oil Corporation
Research &Development
Two Dimensional
Three Dimensional
Billion Cubic Meter
Ethanol Blended Petrol
Bureau of Energy Efficiency
Indian Institute of Technology
Page : 21 of 24
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Section 5: Specific Performance Requirements from other Departments
1. Ministry of External Affairs (MEA) and Ministry of Finance’s (MOF) support and follow up is cruciallyrequired for oil diplomacy. Department of Public Enterprises, Ministry of Heavy Industries, Planning Commission, MEAand MOF support is required in ECS for acquisition of overseas assets. 2. State Government’s proactive support is required for timely issue of Petroleum Exploration Licenses (PELs)and Petroleum Mining Leases (PMLs), notification for acquisition of land. Normally 60 days time is required for issue ofPELs and PMLs from the date of submission of application and depositing requisite fees. 3. Timely clearance from Ministry of Environment and Forest to carry out Exploration and Production (E&P)operations.
17/10/2012 11.15 AMGenerated on
Page : 22 of 24
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 10/11 FY 12/13FY 11/12 FY 13/14 FY 14/15Unit
No of basins for which study ofShale Gas areas has beencompleted
Exploration of Shale Gasareas.
DGH1 -
Area Explored -
2DExploration of Additional areaof sedimentary basins.
ONGC & OIL2 -
3D -
TBDProgress in exploration inNELP blocks
DGH3 -
TBDExploitation of CBM with oiland gas
DGH4 -
% of coal bearing areas offeredfor exploration and productionof CBM
-
Oil production (Public sector)Domestic oil and gasproduction
ONGC & OIL5 -
Gas production (Public sector) -
Overseas oil and gasproduction
Overseas oil and gasproduction
OVL6 -
26.9 19.2Additional Capacity createdIncrease in Refining Capacity Oil Refineries 5.3 21.787 MMTPA
12 12No. of Patents filedResearch and Development IOCL (R&D) 12 12158 Number
0 300Extension of upgradation ofexisting pipelines
Increase in gas transportation Petroleum & Natural Gas RegulatoryBoard
500 70009 Km
17/10/2012 11.15 AMGenerated on
Page : 23 of 24
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2012-2013)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 10/11 FY 12/13FY 11/12 FY 13/14 FY 14/15Unit
capacity in the country
10600 11800Laying of New Trunk Pipelines 12000 1220010400Km
37011 37288PML area accretionArea with proven reserves foroil and Gas
TBD TBD3729110 Sq. Km
25.2 24.9%age of Crude Oil demandmet from domestic sources
Enhanced Oil and GasSecurity
26.5 24.724.211 %
37.6 41.3Domestic Crude oil production. 45.57 43.7638MMT
48.48 TBD%age of Natural Gas demandmet from domestic sources
TBD TBD41.03%
52.22 43.18Domestic Natural Gasproduction
43.77 47.1751.67BCM
9.68 12.12Domestic Production of Oil(Private Sector )
11.51 12.7010.69MMT
26.77 15.38Domestic Production of Gas(Private Sector)
14.50 16.5025.58BCM
34.8The extent of diversificationachieved in our importbasket.(TBD)- %age of Lowsulpher crude processed byrefineries
31.8%LS
65.2The extent of diversificationachieved in our importbasket.(TBD)- High Sulphercrude processed by refineries
68.2%HS
17/10/2012 11.15 AMGenerated on
Page : 24 of 24