4
Department of Energy Idaho Operations Office 1955 Fremont A venue Idaho Falls, ID 83415 September 20, 2010 Mr. Adam Schwartzman Performance Assessment Analyst U.S. Nuclear Regulatory Commission Mail Stop T8F5 11555 Rockville Pike Rockville, MD 20852 SUBJECT: Request for Accelerated Retrieval Project Radiation and Cost Information (OS-QSD-IO-060) REFERENCE: Letter (OS-QSD-IO-041), M. E. Brown to 1. R. Cooper, Subject: Contract No. DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20 J 0 Dear Mr. Schwartzman: The enclosed letter provides summary information on worker impacts, such as the collective radiation dose received by workers, total hours worked on Radiation Work Permits, total hours worked on the project, volume of waste excavated, volume of targeted waste removed, and project cost, for the Accelerated Retrieval Project CARP) II conducted at the Idaho ational Laboratory Site. As previously discussed with you, the information you originally requested for ARP I would have been more difficult to retrieve, as that phase of the project occurred during a period of transition from one contractor to another. If you have any questions, please feel free to contact me at (208) 526-0 I07. Sincerely, a'JtJ /. JJ~'k~ Richard L. Dickson Nuclear Safety Team Lead Enclosure

R. Dickson Ltr. re: Request for Accelerated Retrieval ... · DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: R. Dickson Ltr. re: Request for Accelerated Retrieval ... · DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20

Department of EnergyIdaho Operations Office1955 Fremont A venueIdaho Falls, ID 83415

September 20, 2010

Mr. Adam SchwartzmanPerformance Assessment AnalystU.S. Nuclear Regulatory CommissionMail Stop T8F511555 Rockville PikeRockville, MD 20852

SUBJECT: Request for Accelerated Retrieval Project Radiation and Cost Information(OS-QSD-IO-060)

REFERENCE: Letter (OS-QSD-IO-041), M. E. Brown to 1. R. Cooper, Subject: Contract No.DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiationand Cost Information, dated September 7, 20 J 0

Dear Mr. Schwartzman:

The enclosed letter provides summary information on worker impacts, such as the collectiveradiation dose received by workers, total hours worked on Radiation Work Permits, total hoursworked on the project, volume of waste excavated, volume of targeted waste removed, andproject cost, for the Accelerated Retrieval Project CARP) II conducted at the Idaho ationalLaboratory Site. As previously discussed with you, the information you originally requested forARP I would have been more difficult to retrieve, as that phase of the project occurred during aperiod of transition from one contractor to another.

If you have any questions, please feel free to contact me at (208) 526-0 I07.

Sincerely,

a'JtJ/. JJ~'k~Richard L. DicksonNuclear Safety Team Lead

Enclosure

Page 2: R. Dickson Ltr. re: Request for Accelerated Retrieval ... · DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20

c~IO ••••H=. '-'-0 ,7

CHm.wo Idaho,LLC

P.O. Bo. 1625

:1625 Nonh Fremon, Ave.

Idaho Falls. Idaho 83415

206.525.0111

September 7, 2010 CCN 310713

Mr. James R. Cooper, Acting ManagerIdaho Cleanup ProjectU. S. Department of EnergyIdaho Operations Office (DOE-ID)1955 Fremont AvenueIdaho Falls, In 83415-1222

SUBJECT: Contract No. DE-AC07-05ID14516- Request for Accelerated Retrieval Project ITRadiation and Cost Information (OS-QSD-1 0-041)

Reference: Letter, J. R. Cooper to J. C. Fulton, "Request for Accelerated Retrieval Project [Radiation and Cost Information (OS-QSD-I0-041)", dated August 10, 2010,CCN 310631.

Dear Mr. Cooper:

As directed, CWI bas compiled the Accelerated Retrieval Project (ARP) IIradiation and costinformation. This data (see below) includes the collective radiation dose received by workers, totalhours worked on Radiation Work Permits (RWP), total hours worked on the project, volume ofwaste excavated, volume of targeted waste removed, and project cost for ARP II.

Dose data and RWP hours were retrieved from the dose tracking data base used by CWI. Pleasenote that the dose reported in CY 2007 is from data collected from electronic dosimeters while thedose reported for CY 2008 and 2009 are from the collective TLD results of individuals working atARP.

Table 1: RWP Hours and DoseCY 2007 CY 2008 CY 2009

I RWP Hours 24,398 146,019 48,172Dose (mrem) 1,350 6,022 2,991

ARP IT commenced operation on July 31,2007 and ran concurrently with ARP I until April 2008, atwhich time, ARP I excavation was completed. The radiological data for CY 2007 and 2008 has

Safely delIVering the Idaho Cleanup Project

Page 3: R. Dickson Ltr. re: Request for Accelerated Retrieval ... · DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20

Mr. James R. CooperSeptember 7,2010CCN 310713Page 2 of 4

been adjusted to remove the ARP I data. In CY 2009 ARP ill operations commenced in Januaryand ARP II operations were completed in July. CY 2009 radiological data was also adjusted toremove ARP m data. Adjustments were needed because waste was being exhumed and processedin two facilities for some time. The radiological data adjustments consisted of: subtracting ARP I orillspecific data from the quarterly values obtained from the dose tracking data base; dividing thenet quarterly values by three (three months per quarter); dividing the net monthly value by two forthe months in which two facilities were in operations; and adding the ARP TI net values together.

The volume of waste excavated is the amount of material (soil, targeted waste, and non-targetedwaste) exhumed from the waste zone. The volume of targeted waste removed is the volume oftargeted material packaged in 55 gallon drums.

Waste volume quantities were derived from the Subsurface Disposal Area Buried WasteInformation data base.

Project hours worked and costs were derived from the CWT financial reporting system data base.Construction hours and costs were included in the data presented in Table 2. .

Table 2: Operational and Cost DataARPII I

I Project CostVolume of targeted waste removed

753,606 hours II Total hours worked on projectI Volume of waste excavated 8718 Cubic Yards

2087 Cubic Meters I$84,076,827 I

If you have any questions or need additional infonuation regarding the retrieval of transuranic wasteat the ARP II please contact me at 533-0624

srn;r711ce Brown, Vice PresidentARP/ER roject

ALN:jw

Page 4: R. Dickson Ltr. re: Request for Accelerated Retrieval ... · DE-AC07-05IO 14516 - Request for Accelerated Retrieval Project II Radiation and Cost Information, dated September 7, 20

Mr. James R. CooperSeptember 7,2010CCN 310713Page 3 of4