Quiz 1
Review and Instructions
Review
Create a new project file and enter a project date
Enter properties about the project file
Save the project file
Review (cont)
Enter task information
Enter task durations
Link tasks/predecessors
Add & delete tasks
Review (cont)
Set up calendars
Create a milestone
Creating WBS
Quiz 1
Two different files will be returned to me before session 9• One as the original
• Another with the modifications (i.e., deleting of tasks, various linking, etc)
Quiz 1 Instructions
1. Use the data from the word file entitled “Quiz 1 data” to build a schedule in MS Project.
2. You will be submitting two (2) files. The first file will be the original schedule. The second file will demonstrate you know how to delete a task and make the logical connections different.
3. Name the files with your last name-quiz1-file1; last name-quiz1-file2
4. Make sure to save your work frequently. You can ask questions.
Grading for Quiz 1
Enter the task names, durations, and logical connections – 60 points
Add a WBS column, enter the WBS structure, and levels – 20 points
Create the milestones correctly – 15 points
Deleting a task and changing the logical connections – 15 points