60
QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING RISK ASSESSMENT LOWER DEAN HEAD, BACUP, LANCASHIRE FEBRUARY 2014

QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

QUIET REVOLUTION

MANUFACTURING LIMITED

COAL MINING RISK

ASSESSMENT

LOWER DEAN HEAD, BACUP,

LANCASHIRE

FEBRUARY 2014

Page 2: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

DATE ISSUED: February 2014

JOB NUMBER: 1049

REPORT NUMBER: 1049R001i1 FINAL

CLIENT’S REFERENCE:

QUIET REVOLUTION MANUFACTURING LIMITED

COAL MINING RISK ASSESSMENT

LOWER DEAN HEAD, BACUP, LANCASHIRE

Issued By DN Date February 2014

Revision 0

Page 3: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

Copyright and Non-Disclosure Notice The contents and layout of this report are subject to copyright owned by DBS Environmental Limited (© DBS Environmental Limited 2012) save to the extent that copyright has been legally assigned by us to another party or is used by DBS Environmental Limited under licence. To the extent that we own the copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose indicated in this report.

The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of DBS Environmental Limited. Disclosure of that information may constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be subject to the Third Party Disclaimer set out below.

Third-Party Disclaimer

Any disclosure of this report to a third-party is subject to this disclaimer. The report was prepared by DBS Environmental Limited at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third-party who is able to access it by any means. DBS Environmental Limited excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability.

Page 4: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

CONTENTS

1 INTRODUCTION

2 SOURCES OF INFORMATION

3 ENVIRONMENTAL SETTING

4 IDENTIFICATION AND ASSESSMENT OF SITE SPECIFIC COAL MINING RISKS

5 MITIGATION STRATEGY PROPOSED

6 CONCLUSIONS

TABLES

1 Coal Mining Issue and Risk Assessment

APPENDICES

1 Site Location Plan

2 Mining Report

3 Groundsure GeoInsight Report

Page 5: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

1. INTRODUCTION

Quiet Revolution Manufacturing Limited (QRML) are submitting a planning application to

Rossendale Borough Council (RBC) for a proposed new wind turbine development at Lower

Dean Head, Dean Lane, Bacup, Rossendale, Lancashire (the site).

DBS Environmental Limited (DBS) has been commissioned by QRML to prepare a Coal

Mining Risk Assessment report for the proposed development site, in order to provide the

Local Planning Authority (LPA) with information on coal mining and an assessment of its

potential impact on land stability in relation to the proposed development.

This report has been prepared in accordance with the requirements of the Coal Authority

guidance document, "Risk Based Approach to Development Management, Resources for

Developers (2013)".

1.1 Background

The Coal Authority is a statutory consultee on planning applications for new development

within coal mining areas, as they have a specific responsibility to manage the environmental

legacy of coal mining.

The Coal Authority has used its mining records to provide LPAs within coalfield areas with

GIS data to identify if a development site falls within an area of potential concern with

regards to risks from shallow mining. The coalfield within any one location is divided up into

two spatial areas, "High Risk" and "Low Risk". If a site falls within a low risk area, no

mining information needs to be provided to the LPA to support a planning application. If a

site falls within a high risk area, then a desk based coal mining risk assessment report is

required and the Coal Authority will be consulted by the LPA as to the findings of the report,

and any proposed measures to make the site safe during redevelopment.

RBC therefore require a desk based risk assessment for the proposed wind turbine site to

support a planning application for a change of use at the site, as it falls within a

development high risk area for mining.

1.2 Site Location and Description

The site is located at Lower Dean Head, Dean Lane, Bacup, Rossendale, Lancashire, OL13

8RG. Turbine 1 is situated at National Grid Reference 385574, 425995, turbine 2 is located

at National Grid Reference 385596, 425990.

Page 6: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

The site is located in an area described as an “enclosed upland”, comprising moorland

enclosed with grit stone walls, with the surrounding landscape dotted with numerous remote

small farms. The site itself currently comprises open ground, and there are features of

historical industrial activity in the surrounding area comprising disused coal mines and

quarries, reflecting the sites location within the mineral rich moors.

A site location plan is presented in Appendix 1.

Access to the site is gained via existing access to the field, with the nearest named road

being Dean Lane.

There is a network of pylons and high voltage cables to the north of the site at the top of

the slope, the pylons are orientated approximately east/west.

1.3 Description and Layout of the Proposed Development

The development proposal involves the erection of two micro wind turbines mounted on two

fifteen metre towers with grid connection. The turbines will provide Lower Dean Head with

a source of renewable, sustainable energy. Once operational the turbines are expected to

deliver an annual output of 11.70 MWh and provide an annual carbon saving of 6.29 tonnes.

Each turbine will be constructed on a helical pile foundation system that will replace

traditional concrete design foundations. The mast is mounted on a tripod which is located

on three helical piles. The piles are secured into the ground by rotation to a depth of

around three to four metres below ground level. Each foot rests on a pad, excavated to a

depth of 0.25m, and measuring approximately 0.6m by 0.5m. The piles are located

approximately 3m apart and can be removed by the same method, leaving no residual

structure upon decommissioning of the turbine. No concrete is used in any of the

installation process, the helical pile solution therefore presents minimal ground disturbance

and/or long term damage to the local environment.

1.4 Scope of the Coal Mining Risk Assessment

The purpose of this Coal Mining Risk Assessment Report is to:

Present a desk based review of all available information on the coal mining issues

which are relevant to the application site;

Use the information to identify and assess risks to the proposed development from

coal mining legacy, including the cumulative impact of issues;

Page 7: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

Set out likely appropriate mitigation measures to address the coal mining legacy

issues affecting the site, including any necessary remedial works and/or demonstrate

how they have influenced the proposed development; and

Demonstrate to RBC that the application site is, or can be made safe and stable to

meet the requirements of the National Planning Policy Framework (NPPF) with

regard to development on unstable land.

2. SOURCES OF INFORMATION

The following information sources have been used to inform this report.

Mining Report (Coal Search+ Report, Appendix 2);

BGS Published Geological Plans (Groundsure GeoInsight Report, Appendix 3);

Coal Authority guidance document “Risk Based Approach to Development

Management, Resources for Developers (2013)”; and

Windcrop Natural Energy, Design and Access Statement for Proposed Renewable

Energy System at Lower Dean Head, Dean, Bacup. 6th March 2013.

3. ENVIRONMENTAL SETTING

3.1 Geology

3.1.1 Made Ground

Information provided in the Groundsure GeoInsight report (see Appendix 2) indicates that

Made Ground is not present at the site.

3.1.2 Superficial Deposits

The site is shown to be underlain by drift deposits comprising Glacial Till of Devensian age.

3.1.3 Bedrock

The bedrock beneath the site comprises the Pennine Lower Coal Measures formation of

Langsettian (Westphalian A) age. This comprises a sequence of mudstone, siltstone and

sandstone. Coal seams are recorded beneath the site.

Page 8: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

3.2 Coal Mining

The coal mining report (see Appendix 2) obtained for the site identifies that coal has been

worked beneath the site in the past, with workings present in the Lower Mountain seam, the

last date of working being pre 1964. The depth to the seam is not provided, but, possible

shallow workings are noted within potential influencing distance of the site. The seam has

been worked to a thickness of 1.06m. The mining report states that all ground settlement

associated with the workings should have now ceased.

The mining report also notes that there are possible unrecorded ancient coal workings within

influencing distance of the site.

There are no known shafts or adits on, or within 20m of the site boundary. There are no

recorded tips or lagoons in the vicinity of the site.

3.3 Ground Workings

Information provided in the Groundsure GeoInsight report (see Appendix 3) identifies

numerous historic and current ground workings in the vicinity of the site, but not on the site

itself.

There are nine historic surface workings within 100m of the site to the north and north west,

comprising quarries and pits. Collieries are recorded within 150m to the north west of the

site at the closest point, and the greater site area features numerous air shafts relating to

coal workings.

4. IDENTIFICATION AND ASSESSMENT OF SITE SPECIFIC COAL

MINING RISKS

Table 1 summarises the potential risks associated with coal mining legacy for the proposed

development site, identified from the Coal Search+ mining report and the preceding

information.

Page 9: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

Table 1

Coal Mining Issue Yes No Risk Assessment

Underground coal mining (recorded at shallow depths) x Potential for unstable ground at surface due to

shallow mining impact. Mining report identifies

that the site is at risk from workings in 1 seam of

coal, last worked pre-1964.

There is also the potential for ancient (i.e.

unrecorded) shallow workings

Underground coal mining (probable at shallow depths) x Potential for unstable ground at surface from

possible ancient shallow mining impact. Due to

the presence of potentially workable seams at

shallow depth it is possible that unknown workings

exist beneath the site area.

Mine entries (shafts and adits) x No mine entries (shafts/adits) recorded on, or

within 20m of the site boundary.

Coal mining geology x Faults not recorded on site.

Record of past mine gas emission or potential x Potential for mine gas emissions at surface. No

record of past mine gas emissions, but, worked

shallow seams are present that have the potential

to act as a pathway for mine gas to reach surface.

Recorded coal mining surface hazard x No surface hazard recorded.

Surface mining (opencast workings) x No past, present or future opencast sites recorded.

5. MITIGATION STRATEGY PROPOSED

5.1 Shallow Coal Mining

Intrusive investigation is required at the site to quantify the presence or otherwise of

worked shallow seams that have the potential to impact surface development. A rotary

borehole(s) will be sunk at the site to determine the exact depth to rockhead and the

amount of drift cover compared to rock.

In the event that subsurface voids are identified during the investigation that could impact

surface development, a subsequent drilling and grouting scheme may be required should

the voids be considered shallow enough to impact any future development.

5.2 Mine Gas

Due to the presence of shallow worked seams on the site, mine gas is a potential issue.

Mine gas predominantly comprises methane and carbon dioxide and has the potential to

affect surface development through explosion potential and asphyxiation risks.

In order to mitigate potential risks from mine gas (property and human health risks), the

development will have no subsurface features present where gas could collect and build up.

Page 10: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

The turbines will be constructed on helical piles with pads constructed to an approximate

depth of 0.25m, any mine gas that reaches surface will vent to atmosphere and not impact

the development. The subsurface connection cable trench will be designed to mitigate

potential for gas build up.

5.3 The Coal Authority Permission

Coal Authority permission is required for drilling and treatment of mine workings for stability

purposes. An application for permission to enter or disturb Coal Authority interests will

therefore need to be submitted ahead of intrusive works being undertaken at the site.

6. CONCULSIONS

The site has possibly been impacted by coal mining and potential risks to surface stability

are present on the site in the form of a recorded worked coal seam (Lower Mountain seam,

worked to a thickness of 1.06m), and also from possible ancient coal workings that are not

recorded.

In order to quantify this further, intrusive investigation of the site will be implemented ahead

of development to determine if shallow workings are present that have the potential to

affect ground stability. If workings are identified within influencing distance of surface, then

a programme of drilling and grouting may be required.

Due to the possible presence of worked coal seams mine gas is also a potential issue.

However, it is considered that the development is not sensitive to mine gas, as it has no

subsurface features where gas could build up, and there is no point of entry on the structure

to humans, any gas reaching surface in the vicinity of the development would vent to

atmosphere.

It is considered that all potential risks associated from coal mining at the site can be

mitigated through the use of traditional engineering methods to make the site safe for

surface development.

Page 11: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

APPENDIX 1 – SITE LOCATION PLAN

Page 12: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Lower Dean Head OL13 8RG - Area Plan

C1491/1492

Lower Dean Head, Dean, Bacup, OL13 8RG.

This Plan includes the following Licensed Data: Plans Ahead PDF Printed Plan 25K by the

Ordnance Survey National Geographic Database and incorporating surveyed revision

available at the date of production. Reproduction in whole or in part is prohibited without the

prior permission of Ordnance Survey. The representation of a road, track or path is no

evidence of a right of way. The representation of features as lines is no evidence of a

property boundary. © Crown copyright, All rights reserved 2013. Licence number

0100031673

Prepared by: Graham Cook, 12-06-2013

Lower Dean HeadOL13 8RG

Scale: 1:10000, paper size: A4

Page 13: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

APPENDIX 2 – MINING REPORT

Page 14: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

David Bellis Consulting Surveyors Ltd. – Registered in England no. 5034580Registered Address : 10 Bolton Street, Ramsbottom, Bury, BL0 9HX

���� ������ ��� �����

������������� � � �� ���� ��������

����� ����� ���������� ������� ���

�� ���������� �����

��������

��� !��"� ��

�#$ %��

&�' ()*+%) ��������,

�- *$.)+ %)//$$ 0- *$.)+ %)//))

�- �������1�������� 2����2��3

4- 5552�������� 2����2��3

By

Page 15: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������������

�� ����������������������������������

������������� �� � �

���

��

��������������� ��!���∀����#� ∀���� ��������#�∃�����������������������������������������������

����� ��!�������∀��#���∀������������#����∃�����%������&����%����&������������%&���

��� ������%�& � ��% �& ���� �����∋�

∋�∀���(������ ��) ������)� ��������������∀�∀��#���

�������������� ���∀�����������∀�∀���∀����#� ∀���� ��������#�∃�∗����������������������� ����&��������������∀��#��+������&���������∀��#�������������������+�����!����������������∀��#+�∀������������#����

∃�����%������&����%����&������������%&������������������������������

��� ������%�& � ��% �& ���� �����∋�

,�����������!��−����∀��#����&�����������������

.��∀�����(��#�#� � #(�∃�

∗��������������������������������%�∋�∀���,���(������+���������������������

)∗� !������� ��������#�∃�

,��/��&�����0����1!���2������,���������/��!������∋��3�(���������∗���&�4�����5�����6��#�����47���14�18�� �.� �4�����

∗������ .�� �����9���� .�� ��

/��&�������&������(�:���&�

,������������;

12/�<�!����������∋����=������>�1�9%����������������2�������/��������∗�������>��/?.�.8>

!������+�,������∃� �

∋����∋�∀���1���4��1��2&��≅∋�.�3?7

(������−�∃��

!�� ������∃��

.��,���∃�� �

���� ��,�� ��/����+���������� �������� ��0�,�12�����314)�/����0������� ��,���������,��� ��,���−� ���������/��∋������,���0����,������������/��������� ���������������������5��� ���������������������������0���������+���,� �������������−����/��∃

Page 16: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ ����������������� �����

�� ����������������������������������

������������� �� � �

����≅���&���>��#����;�∗���������������������������∀�������������������%��%����������&���&���������������

��������≅���&���>��#����;�∗���������������������������∀������ �����%��������������%��&���������������������&���&���������������

�������≅���&���>��#����;�∗���������������������������∀������3�����%��������������%�������&��������%���∀��&�����&���������9��&��&����������&�������������������������������&�����������������&��������������������������

�6∗�7���8������%�����������&����������� ������� ����� ��∃�

>���!�����#��∀������%������%�����������∀������ ����������%������������������������������%���������������

∗��������������������������������!�&�������%���������������

∗������������������&�����&���������∀��#����∀������������#����∃�����%���%����&������������%&���������!�&�������%�������������+�%���∀��&�����&&���������������&������9�����

9∗�� �������������� ��� ��∀�∀���� ��������#�����.��(�∃�

>���!�����#��∀������%�����������������∀��#�&�������������������������∀��������%����&��������&������������%&���������!�&�������%��������������%���∀��&������&����!������������������������,���(�����/�������&��=&��������

:∗�!���� ��������#���������∀��������∃�

≅�����!�����������!�����∀������!����&���%�&������������������������&��&����������������������������������������������������

;∗�� ���∀� ��%� ��������#&�∃��������������−��������0��−� ���/�� �� ��,����������������������

����������∃�

≅���∀��#��������������������������������������#��������!��&����������������������������������������#��������&���∀�������∀��#����������%���������%�������

� ��������#���<���.���∃��=���� �����,���������������� ��������������,����∃�

>�������������������������������%�����!����������������������&������������������∀��������������������∀�&��&�����������∀���������%���������&��+�&���∀��#��������������#��%��������������

!���������������������0������ �������������∋���0������0���������,���������������������−�����,������,���−��������� �������,����������,+��−�����������∗��������∋�����������������������,���� ��>�� �����/��������,������,�������∗

�−�,�0����������−������������+��������� ����,���,������������ �����+�������������,���0����������������,���� �������,�������������� ����� �������−�/��∋�����������������

Page 17: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������.�����

�� ����������������������������������

������������� �� � �

����������−����/���,�������������� �� ��−���,�0�����������������������∗������������������+������/���������−��������� ���8� ����������%����� ���������,�,�����,&���,� ������������−�����,��,���∗�� ��0������������������ �8����������,���������+��−������������������+?������������������������/�������������������−�������������+∗

��+�,�0������������������������,� ����,������∋���������,�0��������8�����,>� �����������+8��−�������������,����� �����,������,������/����� �������������−������������/��∋������,�������,∗��������,�−����−−� ��0�����������������0����������������������� �����������������,�����������,���,��������+��,,�����,∗�������� ������������ �����+�,���������������� ���−��+������ ��������−�,�0������������������ �� ������ ��∗

�7�7�����������≅������ ����� ����� ��∃

∗�����������������������������,��������2�����,�����������1�����&��������&�������������,��������2�������������,�����������%���/�������&� �=&����� ��

>���������&�����&�������������������������������!�����&��������������������������!��������%�����,���(�����/�������&��=&���������������Α��������������+����������������������%��������������,���=��������������������&�������∀������&��������&&�����������������������&����������������%���������������&��

�%�������Α��������%���������%���������������%�&�����������&���&��,��/��&�����0������� .�� ��������!������∀�������∀∀∀�&�����&�������&���

∗�������������������������&&����&��∀��������,��/��&�����0����������&�����������������������������,��/��&�����0�∀��������∀∀∀�&�����&�������&�� �������������%��������%�������������

∗��������,���(�����/��&��?����������������������������������������������%���<�!����������=�����������%���������������>��&�������������������������%�������&&��&���%�������%�����������!�������������������������������������∗�����%���������������������������������&��������%�������������������&������������������������&������%�!���������������%������������������>��&�������������������������%�������&&��&���%���&����%��������

∗�������&�����������������������������!������∀����,��/��&�����0���������&������������������������&�����������&���!������������������%������&�����%��������,���=��������+���&������2�������7�����&��/��!������≅����&��/��!�������≅���������������!��������������!�������������������������������������������%����������������������∀�����������������&���!�������!������������,���(��������������&� �=&��������������,������������=&�������

,���=���������=�������;�∗���,���=��������+� ���∋�&�%�����∋���2�����4���+�(��%����+�5������������+�47�3��?72�������7�����&��/��!���=�������;�2�������7�����&��/��!��+�Β�������1�����,�����+�Β��∀����+�5��������57� ��77

∗�����%��������&������������������������������������������������������!��������������!��������������������������������������>��������������&�������������������&����������������������������∀��������������&���������������������������������%���������>�������������������������������������������������������������&���������%�������������&���!����������������=�����������������������������������������%�����������&���������������������!����������%�����������������%��������������

�,,������������������� ������������,�����������������������������+��∃�

1!���2������,���������/��!������∋����������∀����%���������������������������������������∀���������������&����&����������������������&�����������������!��!���������������%���������������

∗������������������#��������%��9���������������������&�����&�����������&������������,��/��&�����0�&����������������������������&���������������������Α��������!�������������������������%����∀���;

����,���(�����Χ������9�����&���%�������!�������∀��#���������%�&���∀��������%����&��������&������������%&����������������

���������������&������������&������%�������&����+�������������%�����∀��#���+

��������,���(�����−������9�����&���%����&���������∀��#���������%�&���∀��������%����&��������&������������%&����������������

���������������&������������&������%�������&����+�������������%�����∀��#�����∗����9�����&���%�&�������&��������∀��#����������������������%������∀���������Α���������������������%��������!�����&���������&������∀�����!������

∆���������7������−����������������������%��������������∀���������!��∀����������%������&��������������������&���������

≅���&���,���(�����−������9�����&���%����������������%����������&���&��������+����&�%�&����;

Page 18: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������������

�� ����������������������������������

������������� �� � �

• �%�������������������������∀�������������������%��%����������&����������������&����%���������&���∀��#��������������������������������&���������%������&����������������������������������∀��#��������������������&�����∀���������!��∀�������!���������������%������9�����&���%�����!���%����������&���&���∀��#����

• �%�������������������������∀������ �����%��������������%��&���������������������&��������• �%�������������������������∀������3������%��������������%�������&���%���∀��&������������&���������9��&��&������

����&�������������������������������&�����������������&�������������������������

/�%��+�=������(����<������ ����=�����������%��������Χ������9�����&���%�����������������∀������ ����%���������������������

���������%������������������������&����������������������������%���������%��������������%�������������������������������������%���������!������������������������������������� ��>��������������������%���������9������������9�������&������%����������������∀�����������&���������������������!������������������&���������������������!������∗����9�����&���%���∀��#���&���∀���������Α���������������������������������������#���������%���������∀��#��������������������������∀��������!���∀���������!����=�������������!���&����������������%����������&�!�����∀�������������

5���&�����������������%������&���������&��!����Χ������9�����&���%�����&�������&�������������������∀��#�&�����������������

���������������%������

����&������������������������&����%���������&���!��������&���������&���&������������������������&��%%�&��������

����������������������������

,���(�����?��#�∋�!���Χ��������������%�1!���2������,���������/��!�������%��������#�����������������������%����&���������

�!������������%��������&�����������������������∗������#���������������������!����������������������Ε�������%���������������&#��������������������

,��������2������������&������%��������������������������������,��������2�����,�����������1�����&������������!�����%��������

������������������������������9��&�����

=�����������%�������+���&��������∀�����������%��Α��������#���Α��������+�&�����%������������,��/��&�����0�∀������+�∀∀∀�&�����&�������&��

�����������!�� �,����

1!���2������,���������/��!������∋����������������∀�����������������,�����,������&��2�����������&�������������/��&��,�����=�#���&��������������������,�����������%�����∀�������������&��������������������������%������

�%�����∀�������#���&�������+�∀��∀���;• =&#��∀��������∀��������∀��#��������%���&�����• 5�����������∀�������%�����������!�����%������������+����∀�����+�∀������ ��∀��#��������%���&�����• Β����������%���������������+���������������−���+����������%��+��%�∀������������������• ���!�����%������������+����∀�����+�������������∀���������∀��#��������%���&������• ∋����+����������Α����+�∀����������&����%�������������������%��

�%����������������%����∀��������%������������+�����%�∀���9&����������������������&���+����������%�������&�����������∗������������≅���������&������∗�≅� ;∗��;���� �....�)+�<−���;�����Φ�����&���#

>��∀����&�−�������%�����∀��������≅������������������!������������&������∀��������%������&�������

,��������������������������;�

(��(����&�+�1���&���+�1!���2������,���������/��!������∋��+�3�(���������∗���&�+�4�����+�5�����6��#�����+�47���14∗���;���� .�� ������9�;���� .�� �� �<����;�&���&�Φ&�����&�������&��

1���;�������� ��� � � � � � ��������/�����;�

Γ�&��������1!���2������,���������/��!������∋���Χ�=����� ��

Page 19: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������������

�� ����������������������������������

������������� �� � �

���������������������������������������� �

�������������������!���� �������−���������

∗�������&���������������&������1!���2������,���������/��!������∋��+�3�(���������∗���&�+�4�����+�47���14��∗;���� .�� ����+��;���� .�� �� +�<;�&���&�Φ&�����&�������&�� �∀��&���������������∀�����������������,�����,������&��2������,,2 ��������&�������������/��&��,�����∗����,,2��������������������������∀�����������%������������&������&��∀��������,�����

∗���/��&��,���;�• ���!����������&�����%�������������+��������+�����������+�&��!���&���������������������∀���������������

��%����������&���������������������&����������������#����������&������������������������&�����&������������∀����������∆������Β�����

• �������������������������∀��&��%�����&���������������������&�����������!���������• ��������������������&��&�����Α��������������∀�������������������%�����������%����%�&���������������������

���%��������• �������&������������������������%�������������!��&��%����&�����%�����∀��&������&������������&���+�������

�����&���������!�&���

2���!��������������%�������+��������&��%�������&��%���������������#���������������&�������%�����,�����∗�������!�������������������&�����%��������

������,�?�� �������� ������

������∀��&������&������������/��&��,����∀���;�• 1����������,��������������������������������&�����������• =&��∀����������������&��������∀��#�∀���������#���+�&������������&���• =��������������������Α�����������������������&����������&��&����������• ,����&����������������������+�%���������%���������������• 4�����&���������������������%������• <����������������&�����!�&���&������∀���������∀+������������������������������• (�������������&������&��∀��������,�����

����������

�%������!���Α��������&���������������������&�+������������������������&����∀�����������&��%���+�����%������������#�%������&��������������&����������������������%�������������&������������&��������%������������������%����∀��������%���Η��%������������+�%���������&����������������%�������&���������+�����%�����%��������9&������������������������&���+����������%��������&��������%���&������������������∗������������≅���������&������∗�≅� ��∗���≅��������&��∀���&������������%�������Ι�+������������%����%��������������!����%%�����&��������������������%���������&�����!�����%��������#�����������,�����

!������������������������������� ��������������,���+�������� �������,����,��� ��,����+�������� �����0�,����������−����������� �8���������! ������������!���∗�

�! ������� ���������∃

∗������������≅���������&����(��%����4�����.−���(��%����/�����/�������>���������/��� 2�∗��;���� �....�)�9;���� �.. �)<���;�����Φ�����&���#�

6���&������������%������������������,,2�%����∀∀∀���������&���������#��

!������<�( ∀������7�!� .��������( ∀�= ∀�����<����� !(� ���7������7�� ���

Page 20: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������)�����

�� ����������������������������������

������������� �� � �

��0�,��������������������0�+������,���,�������� �!���Α���������,����,�������%�0�����������������������+��������&

�� 1�%��������� ∗���/��!�&�����!��������1!���2������,���������/��!������∋��+���������,��/��&�����0�� ∗���=����&��������������!����+�≅��������+��������������%%�&����%�����≅�����������&����?�Α�����∀��������

/��!�&�����!�����& ∗���∗�������������!�����������≅���������%����∀��&������/��!�&�����!�����������������������%�����������

����%��%�����=����&����������������&�������%�%��%����������=����&����?�Α������ ∗�����Α���������%�����?�Α������������=����&���∀����,��/��&�����0����������!�����&�%�&����������

��%�������� � ,��/��&�����0�&&����?�Α�������������������������������=����&������&�����������&��������������&����������%���

��������%�������!��&�����&&�����.� ��������������&���%�,��/��&�����0���������!��&��%�����������∀����������������������������%%�����%�����&������������

�����9�������������������∀+����+����&������∀�������������!�&�����!�����+�∀����������Α�������9&����������������&�������%������������!�����������������������&������������

�� ∗�����&����%��?�Α������������=����&���∀����,��/��&�����0�&��%�����&&����&���%����������������&������������ =���≅���������������&������,��/��&�����0+������������������������������������,��/��&�����0�∀������+������

��!����������������∗���=����&����#������%%����������%����,��/��&�����0��������������������%��?�Α����+����Ε�&�����&���������=&&��������������%�������������%����?�Α��������%&���������%9 +����������+����&�����&������−��� +��������������������!������,��/��&�����0�∀�����������+�1�&������<9&�����18 +�?����(������&�����������������������=����&����

)� ≅������∀�������&&���������������%���������������,��/��&�����0�%�������∀�!���������∀�������&&�����������������������,��/��&�����0����������&��������������+����Ε�&�����,���������

�� ,��/��&�����0������!�����������������%�������?�Α�����3� ,��/��&�����0������!���������������&�&������?�Α����������������� ����%��%��������������%��?�Α������������=����&������������&��������������%��%���&��������,��/��&�����0���� ��������������������������%�����=����&�����������������&&��&�+����������+�&���������&�������������%�������������

��%�����������!��������,��/��&�����0��������%�����?�Α����+���&������������������������+�����+��������+���������+���&���������+������������������∗�����������∀�����������?�Α���������������������,��/��&�����0�������%����������������������������������������,��/��&�����0�∀�����������������=����&�����∀��������%����

��� ,��/��&�����0������Α������������������!��������������%��������%��������=����&����������&�������%�%��%�������?�Α����+���&�����+�������������������+�����+��������+���������+���&���������+�����������������

� � ,��/��&�����0������Α�����&���%�&������%������������%������������������������=����&����.� �%+������Α��������,����������������,������ �+���Α������������������%������������������!�����������&���%���+�

,��/��&�����0�&�������������������������%������������������������������� �%+������Α��������,����������������,������ �+���Α������������������%������������������!�����������&���%����

∀������������������������%�����+�,��/��&�����0������!���������������&�&�������?�Α��������∀����������������∗���=����&����������������%������%���+�∗9������1�������������&&������������������&�&��������

��� ,��/��&�����0������!������������������&����&�������������%��������������!���������&����≅��������������������!������,��/��&�����0����������Α�����������!�����������������%�����/��&����&������

�)� ,��/��&�����0�∀���+�����������&�����%�%��%������������Α����+�������!�������������%��������%���������&���������&�����&�����!����������&����������,��/��&�����0��������������∗�������&����%���������∀���������������������������∗���,���=�������������������������∀��������4��������/%����<9�&���!�+�����∀�����������2�������7�����&��/��!����������,��/��&�����0�������

��� =�,��/��&�����0��������������������������%��������������������%������������&�������)���������,��/��&�����0���%%��

�3� ,��/��&�����0�&������������&�������������������������������������&�����!������%�����������&���������������)������������������������∀�������&�����������������������������������������������������������!��������������!�������������������������������������������%����������������������∀�����������������&���!�������!������������,���(�����/�������&��=&���������,��/��&�����0�&�������������������������%���&������������%������������������������������%�∗������������

��� ∗�����%����������������������������������,��/��&�����0�&�������������������&��������%�����������+��������&���+���������������������&������%�!���������������%�������������������������������&�����������������������������&���� ���������&������%���,��/��&�����0�����#������������������������ϑ���������Η�����������%�������%��������������������������������%�,��/��&�����0�����������������#����������������%�������%������������������������������������&��!�������

�� ∗��������������%�������������&������������&�����������������������&����������������������=�,��/��&�����0�&������������&�����������������������������������������%��������!����������������������������������������&�����∀�!������&��������������������������%�����������������∀����������&��������������������������������%�������?��������������%���������������%�&&��������������������%�����������,��/��&�����0������∀������������������������������������������)�

�� =�,��/��&�����0�&������������&������������������������&��������������������∀��#�����������������&����������≅���������������������Α����������������������������������

� =�,��/��&�����0�&������������&����������������������������%����������!����������������������!����1���������������&��������%��&������������&��������+����∀���������!��������������������+�����=����&����������&����∀���������������!���������������������!��������Α������

.� ,��/��&�����0�&�����������������&������∀��������/��&��,����

Page 21: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

������������������������������ �����������������������

�� ����������������������������������

������������� �� � �

�� =���,��/��&�����0������������&�!�����������%������������������������&���∗���&��������%�,��/��&�����0�&������������&����������������������!�������%������&��������������������=����&������������,���=�����������������&���%�&������������������������&���

�� =������������������������&���%�������&�����,��/��&�����0����������������������������������������%�&���������������������������&�����������!�������%�&�����������������∀�����������������������9������%�����,��/��&�����0����%������������������������&���������!�����%����������&������������������&�+�∀��&��!������������∀���

)� =���,��/��&�����0�&������������&�����������!��������%��������������������������!�&�����&������%�����,��/��&�����0�∀��������������������������������������������9���������%��������%�����������!�������������7��������������������Α�������=�#���Κ��������������%�����,��/��&�����0�∀��������=�������!����&���&��,��/��&�����0�∀���∀����������������9���������&��������%���������

�� ∗���?�Α��������%��%������∀��������������+������������%����������Α��������������=����&����!�������������!���������&�����������,��/��&�����0��������!�����������&�����&�������−��� ����%9��������������&�������9&�����18 �����&�����������%�������������������Α�������������=����&����=�������!������!��������������������������&��������%�,��/��&�����0�

3� �%�?�Α������%�������������������+������������%������������������������������������∀������������������������%����������∀�������%��%����������!������������������!�����%������������+������������%�������������������&������!��������������������������������!�����?�Α�����

�� ,��/��&�����0��������������������%���������������������!�����%�������!��������������%��������&��������%�������%�1�&������<9&�����18 +�?����(������������������!�&�����!������(����������!��������������%������������&��!������,��/��&�����0�����&������������Α��������������=����&�����%����������������%��������&�������������&��!���,��/��&�����0������!��������������������������Α����������∀�?�Α�����

.�� 1���!���+����∀���!������������+�∀�������&&���������������!��&���1���!����������&�����&�����������%����∀������∀������������!��&�������������18��>�����=����&�����!�������&&�����%&��������∀����,��/��&�����0���!��&���������������������������������&��������=����&��������������!����,��/��&�����0�∀����������������%�������%�������������∀�����������!��&�+���&�������������+�∗9������1�������������

.�� ∗���=����&���∀�������������%�����������%�����%������!��&��������∀�������������%�������������%���&������%�������!��&���,��/��&�����0������!��������������&����%���&���������9���������&�����������&�!�����������������������&������������������������%�3Λ���!������2�#��%�<����������������������%�������%�������������������������������!�������

. � >�����%������������%�������!��&��������������������=����&���∀�������������%������&������%�������!��&��,���/��&�����0������!��������������∀�����∀�&&�����%&��������%��������=����&������&�&����������!��������������&��&������%�������������∗��������,������������������!��������������∀��������=����&������,��/��&�����0�

..� >������������������=����&���∀������&��!��=�!�&��5���&���%�����&�����%�����?�Α����+���&�������������+�∗9������1������������+������������&������%�������!��&���∗�����!�&������&��∀�����#������%�����%��������&��%����������!�&����Α��������������������������,��/��&�����0�∀������+�����������&��������!���������������∀����,��/��&�����0��������=����&����

.�� =�������������+�∗9������1�������������������������������&�������%������������%��������������!�+��!��������!��=�!�&��5���&��&����������&�����..��∗���=����&������������%��������&�����������&������>�������������+�����=����&����������%�����%����������&��������������%��%��������%�����?�Α�����

.�� �%�����=����&���������������!�&���%���&������%�������!��&�+����������=����&����������������%������������������

.)� =����!���������������������%�����=����&���∀���������%�������=����������%�����%�����������������&��−��−&�������+�����������&����������∀����,��/��&�����0��������=����&���

.�� ∗���=����&������&�&�������?�Α��������∀����������������������������������,����� ��

.3� �%�����=����&���&�&��������?�Α��������∀������������������������,����� �+�����=����&����������������%����������+�∗9������1�������������������&&������������������,�&��������

.�� ,��/��&�����0�&&����������������%�������������&�������������=����&����������=����&����&������∀���������=����&������&������������%����&�����+������������%��%��������������!�����%�����?�Α�����

��� ,��/��&�����0�&&����������������%������������������=����&��+��������=����&��Η��&������∀���������=����&������&������������%����&�����+���������������!�����&�����%������������!���������������&�����%�����&����&�����&&�����%��%��������%�����?�Α������

��� =�����������������������������!�������%�&������������&��������������������������������������&��&������&���+�,��/��&�����0��������%����������&���1��������∀���������������&&�������������,��/��&�����0�&������������&������������������&���������

� � ∗����������������&����&����∗��������,����������������������������������������&�������/���������&��%��&����������∀����,��/��&�����0�∗��������,�������������∗�������������/��&����&����∗��������,���������+������,��/��&�����0�∗��������,�������������!�������������������,��/��&�����0��9�������������������∀�������∀������������&�������%�<��������>������������������∀����

�.� 5��!����������������∗��������,��������������%%�&��!������������������,��/��&�����0��9����������������∀��������� ,�����&�����0������!�����������������������������������&���������������������+�∀�����������&�+������������

/�&���������∗��������,����������∀������&�����%%�&��!������������&������������,��/��&�����0�∀���������� ∗�����∗��������&����������������Ε�&�����<������∋∀���������9&����!��Ε������&������%�����&�������%�<��������

>����

Page 22: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Quiet Revolution Manufacturing Limited Coal Mining Risk Assessment Lower Dean Head, Bacup, Lancashire

1049R001i1 FINAL February 2014 Z:/Projects/1000 Projects/1049/Lower Dean Heads, Bacup/1049R001i1 Coal Mining Risk Assessment

APPENDIX 3 – GROUNDSURE GEOINSIGHT REPORT

Page 23: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

CENTREMAPS

Brockamin House, Worcester, WR6 5JU

Report Reference: CMAPS-CM-294133-15691-050214

Your Reference: 15691

Report Date 5 Feb 2014

Report Delivery Method:

Email - pdf

GroundSure Geoinsight

Address: LOWER DEAN HEAD,DEAN,WHITEWELL,BACUP, OL13 8RG

Dear Sir/ Madam,

Thank you for placing your order with GroundSure. Please find enclosed the GroundSure GeoInsight as requested.

If you need any further assistance, please do not hesitate to contact our helpline on 01886 832972 quoting the above CENTREMAPS reference number.

Yours faithfully,

CENTREMAPS

Enc.GroundSure GeoInsight

Page 24: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

GroundSureGeoInsight

Address: LOWER DEAN HEAD,DEAN,WHITEWELL,BACUP, OL13 8RG

Date: 5 Feb 2014

Reference: CMAPS-CM-294133-15691-050214

Client: CENTREMAPS

NW N NE

W E

SW S SE

Aerial Photograph Capture date: 26-Mar-2012

Grid Reference: 385577,425996

Site Size: 0.05ha

Page 25: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Contents Page Contents Page ...................................................................................................................................................................................................3

Overview of Findings......................................................................................................................................................................................4

1 Geology.............................................................................................................................................................................................................61.1 Artificial Ground Map...........................................................................................................................................................................................6

1.1 Artificial Ground.....................................................................................................................................................................................................71.1.1Artificial/ Made Ground.................................................................................................................................................................................................... 71.1.2 Permeability of Artificial Ground................................................................................................................................................................................. 7

1.2 Superficial Deposits and Landslips Map.......................................................................................................................................................8

1.2 Superficial Deposits and Landslips..................................................................................................................................................................91.2.1 Superficial Deposits/ Drift Geology............................................................................................................................................................................ 91.2.2 Permeability of Superficial Ground............................................................................................................................................................................. 91.2.3 Landslip................................................................................................................................................................................................................................... 91.2.4 Landslip Permeability........................................................................................................................................................................................................ 9

1.3 Bedrock and Faults Map...................................................................................................................................................................................10

1.3 Bedrock, Solid Geology & Faults...................................................................................................................................................................111.3.1 Bedrock/ Solid Geology................................................................................................................................................................................................. 111.3.2 Permeability of Bedrock Ground...............................................................................................................................................................................111.3.3 Faults..................................................................................................................................................................................................................................... 11

1.4 Radon Data.............................................................................................................................................................................................................131.4.1 Radon Affected Areas.................................................................................................................................................................................................... 131.4.2 Radon Protection............................................................................................................................................................................................................. 13

2 Ground Workings Map............................................................................................................................................................................14

2 Ground Workings.......................................................................................................................................................................................152.1 Historical Surface Ground Working Features derived from Historical Mapping.....................................................................15

2.2 Historical Underground Working Features derived from Historical Mapping..........................................................................16

2.3 Current Ground Workings...............................................................................................................................................................................17

3 Mining, Extraction & Natural Cavities Map....................................................................................................................................19

3 Mining, Extraction & Natural Cavities...............................................................................................................................................203.1 Historical Mining.................................................................................................................................................................................................20

3.2 Coal Mining............................................................................................................................................................................................................21

3.3 Johnson Poole and Bloomer............................................................................................................................................................................21

3.4 Non-Coal Mining..................................................................................................................................................................................................21

3.5 Non-Coal Mining Cavities................................................................................................................................................................................22

3.6 Natural Cavities...................................................................................................................................................................................................22

3.7 Brine Extraction...................................................................................................................................................................................................22

3.8 Gypsum Extraction.............................................................................................................................................................................................22

3.9 Tin Mining...............................................................................................................................................................................................................22

3.10 Clay Mining..........................................................................................................................................................................................................23

4 Natural Ground Subsidence..................................................................................................................................................................244.1 Shrink-Swell Clay Map.......................................................................................................................................................................................24

4.2 Landslides Map.....................................................................................................................................................................................................25

4.3 Ground Dissolution Soluble Rocks Map.....................................................................................................................................................26

4.4 Compressible Deposits Map...........................................................................................................................................................................27

4.5 Collapsible Deposits Map.................................................................................................................................................................................28

4.6 Running Sand Map..............................................................................................................................................................................................29

4 Natural Ground Subsidence..................................................................................................................................................................304.1 Shrink-Swell Clays...............................................................................................................................................................................................30

4.2 Landslides...............................................................................................................................................................................................................30

4.3 Ground Dissolution of Soluble Rocks..........................................................................................................................................................31

4.4 Compressible Deposits.....................................................................................................................................................................................31

4.5 Collapsible Deposits...........................................................................................................................................................................................31

4.6 Running Sands.......................................................................................................................................................................................................31

5 Borehole Records Map..........................................................................................................................................................................................32

5 Borehole Records.......................................................................................................................................................................................33

6 Estimated Background Soil Chemistry.............................................................................................................................................34

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

3

Page 26: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Overview of FindingsThe GroundSure GeoInsight provides high quality geo-environmental information that allows geo-environmental professionals and their clients to make informed decisions and be forewarned of potential ground instability problems that may affect the ground investigation, foundation design and possibly remediation options that could lead to possible additional costs.

The report is based on the BGS 1:50,000 Digital Geological Map of Great Britain, BGS Geosure data; BRITPITS database; Shallow Mining data and Borehole Records, Coal Authority data including brine extraction areas, PBA non-coal mining and natural cavities database, Johnson Poole and Bloomer mining data and GroundSure's unique database including historical surface ground and underground workings.

For further details on each dataset, please refer to each individual section in the report as listed. Where the database has been searched a numerical result will be recorded. Where the database has not been searched '-' will be recorded.

Section 1:Geology

1.1 Artificial Ground 1.1.1 Is there any Artificial Ground/ Made Ground present beneath the study site?

No

1.1.2 Are there any records relating to permeability of artificial ground within the study site* boundary?

No

1.2 Superficial Geology and Landslips

1.2.1 Is there any Superficial Ground/Drift Geology present beneath the study site?

Yes

1.2.2 Are there any records relating to permeability of superficial geology within the study site boundary?

Yes

1.2.3 Are there any records of landslip within 500m of the study site boundary?

No

1.2.4 Are there any records relating to permeability of landslips within the study site boundary?

No

1.3 Bedrock, Solid Geology & Faults

1.3.1 For records of Bedrock and Solid Geology beneath the study site* see the detailed findings section.

1.3.2 Are there any records relating to permeability of bedrock within the study site boundary?

Yes

1.3.3 Are there any records of faults within 500m of the study site boundary?

Yes

1.4 Radon data 1.4.1 Is the property in a Radon Affected Area as defined by the Health Protection Agency (HPA) and if so what percentage of homes are above the Action Level?

The property is not in a Radon Affected Area, as less than 1% of properties are above the Action Level

1.4.2 Is the property in an area where Radon Protection Measures are required for new properties or extensions to existing ones as described in publication BR211 by the Building Research Establishment?

No radon protective measures are necessary

Section 2:Ground Workings On-site 0-50m 51-250 251-500 501-1000

2.1 Historical Surface Ground Working Features from Small Scale Mapping

0 4 8 Not Searched Not Searched

2.2 Historical Underground Workings from Small Scale Mapping 0 0 3 6 16

2.3 Current Ground Workings 0 0 1 4 12

Report Reference: CMAPS-CM-294133-15691-05021415691 4

Page 27: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Section 3:Mining, Extraction & Natural Cavities On-site 0-50m 51-250 251-500 501-1000

3.1 Historical Mining 0 0 3 6 16

3.2 Coal Mining 1 0 0 0 0

3.3 Johnson Poole and Bloomer Mining Area 0 0 0 0 0

3.4 Non-Coal Mining 0 0 0 0 0

3.5 Non-Coal Mining Cavities 0 0 0 0 0

3.6 Natural Cavities 0 0 0 0 0

3.7 Brine Extraction 0 0 0 0 0

3.8 Gypsum Extraction 0 0 0 0 0

3.9 Tin Mining 0 0 0 0 0

3.10 Clay Mining 0 0 0 0 0

Section 4:Natural Ground Subsidence On-site

4.1 Shrink Swell Clay Very Low

4.2 Landslides Low

4.3 Ground Dissolution of Soluble Rocks Null

4.4 Compressible Deposits Negligible

4.5 Collapsible Deposits Very Low

4.6 Running Sand Very Low

Section 5:Borehole Records On-site 0-50m 51-250

5 BGS Recorded Boreholes0 0 0

Section 6:Estimated Background Soil Chemistry On-site 0-50m 51-250

6 Records of Background Soil Chemistry2 3 5

Report Reference: CMAPS-CM-294133-15691-05021415691

5

Page 28: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1 Geology

1.1 Artificial Ground MapNW N NE

W E

SWS

SE

Artificial Ground Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

6

Page 29: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1 Geology

1.1 Artificial Ground1.1.1Artificial/ Made Ground

The following geological information represented on the mapping is derived from 1:50,000 scale BGS Geological mapping, Sheet No:076

Are there any records of Artificial/Made Ground within 500m of the study site boundary? No

Database searched and no data found.

1.1.2 Permeability of Artificial Ground

Are there any records relating to permeability of artificial ground within the study site boundary? No

Database searched and no data found.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

7

Page 30: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1.2 Superficial Deposits and Landslips Map

NW N NE

W E

SWS

SE

Superficial Deposits and Landslips Legend

© Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

8

Page 31: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1.2 Superficial Deposits and Landslips1.2.1 Superficial Deposits/ Drift Geology

Are there any records of Superficial Deposits/ Drift Geology within 500m of the study site boundary? Yes

IDDistance

(m)Direction LEX Code Description Rock Description

1 0.0 On Site TILLD-DMTN TILL, DEVENSIAN DIAMICTON

2 219.0 SE TILLD-DMTN TILL, DEVENSIAN DIAMICTON

3 430.0 SW HEAD-DMTN HEAD DIAMICTON

1.2.2 Permeability of Superficial Ground

Are there any records relating to permeability of superficial ground within the study site boundary? Yes

Distance (m) Direction Flow Type Maximum Permeability Minimum Permeability

0.0 On Site Mixed High Low

1.2.3 Landslip

Are there any records of Landslip within 500m of the study site boundary? No

Database searched and no data found.

This Geology shows the main components as discrete layers, these are: Artificial / Made Ground, Superficial / Drift Geology and Landslips. These are all displayed with the BGS Lexicon code for the rock unit and BGS sheet number. Not all of the main geological components have nationwide coverage.

1.2.4 Landslip Permeability

Are there any records relating to permeability of landslips within the study site** boundary? No

Database searched and no data found.

* This includes an automatically generated 50m buffer zone around the site

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

9

Page 32: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1.3 Bedrock and Faults MapNW N NE

W E

SWS

SE

Bedrock and Faults Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

10

Page 33: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1.3 Bedrock, Solid Geology & FaultsThe following geological information represented on the mapping is derived from 1:50,000 scale BGS Geological mapping, Sheet No:076

1.3.1 Bedrock/ Solid Geology

Records of Bedrock/ Solid Geology within 500m of the study site boundary:

ID Distance (m) Direction LEX Code Description Rock Age

1 0.0 On Site PLCM-MDSSPennine Lower Coal Measures Formation -

Mudstone, Siltstone And SandstoneLangsettian (westphalian A)

2 76.0 NE GAS-SDST Great Arc Sandstone - Sandstone Langsettian (westphalian A)

3 101.0 N GAS-SDST Great Arc Sandstone - Sandstone Langsettian (westphalian A)

4 133.0 S PLCM-MDSSPennine Lower Coal Measures Formation -

Mudstone, Siltstone And SandstoneLangsettian (westphalian A)

5 205.0 SE GAS-SDST Great Arc Sandstone - Sandstone Langsettian (westphalian A)

6 275.0 SE PLCM-MDSSPennine Lower Coal Measures Formation -

Mudstone, Siltstone And SandstoneLangsettian (westphalian A)

7 324.0 E GAS-SDST Great Arc Sandstone - Sandstone Langsettian (westphalian A)

8 434.0 SW WH-SDST Woodhead Hill Rock - Sandstone Langsettian (westphalian A)

1.3.2 Permeability of Bedrock Ground

Are there any records relating to permeability of bedrock ground within the study site* boundary? Yes

Distance (m) Direction Flow Type Maximum Permeability Minimum Permeability

0.0 On Site Fracture High Low

1.3.3 Faults

Are there any records of Faults within 500m of the study site boundary? Yes

ID Distance (m) Direction Category Description Feature Description

20 1.0 SW ROCK Coal seam, inferred

21 15.0 NE ROCK Coal seam, inferred

22 37.0 N FAULT Normal fault, inferred

23 133.0 S FAULT Normal fault, inferred

24 275.0 SE FOSSIL_HORIZON Fossil horizon, marine band

25 324.0 E FAULT Normal fault, inferred

26 434.0 SW ROCK Coal seam, inferred

* This includes an automatically generated 50m buffer zone around the site

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

11

Page 34: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

The geology map for the site and surrounding area are extracted from the BGS Digital Geological Map of Great Britain at 1:50,000 scale.

This Geology shows the main components as discrete layers, these are: Bedrock/ Solid Geology and linear features such as Faults. These are all displayed with the BGS Lexicon code for the rock unit and BGS sheet number. Not all of the main geological components have nationwide coverage.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

12

Page 35: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

1.4 Radon Data1.4.1 Radon Affected Areas

Is the property in a Radon Affected Area as defined by the Health Protection Agency (HPA) and if so what percentage of homes are above the Action Level? The property is not in a Radon Affected Area, as less than 1% of properties are above the Action Level

1.4.2 Radon Protection

Is the property in an area where Radon Protection are required for new properties or extensions to existing ones as described in publication BR211 by the Building Research Establishment? No radon protective measures are necessary

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

13

Page 36: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

2 Ground Workings MapNW N NE

W E

SWS

SE

Ground Workings Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

14

Page 37: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

2 Ground Workings

2.1 Historical Surface Ground Working Features derived from Historical Mapping

This dataset is based on GroundSure's unique Historical Land Use Database derived from 1:10,560 and 1:10,000 scale historical mapping.

Are there any Historical Surface Ground Working Features within 250m of the study site boundary? Yes

The following Historical Surface Ground Working Features are provided by GroundSure:

ID Distance (m) Direction NGR Use Date

1A 30.0 N385566426100

Unspecified Quarry 1931

2A 30.0 N385566426100

Unspecified Quarry 1909

3A 43.0 N385559426111

Unspecified Quarry 1950

4D 48.0 N385571426115

Unspecified Quarry 1893

5B 86.0 NW385508426086

Unspecified Ground Workings 1909

6B 86.0 NW385508426086

Unspecified Ground Workings 1931

7B 91.0 NW385515426098

Unspecified Pit 1893

8B 93.0 NW385514426099

Unspecified Pit 1988

9B 93.0 NW385514426099

Unspecified Pit 1968

10C 151.0 NW385272426107

Colliery 1909

11C 151.0 NW385272426107

Colliery 1931

12C 152.0 NW385274426120

Colliery 1893

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

15

Page 38: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

2.2 Historical Underground Working Features derived from Historical Mapping

This data is derived from the GroundSure unique Historical Land Use Database. It contains data derived from 1:10,000 and 1:10,560 historical Ordnance Survey Mapping and includes some natural topographical features (Shake Holes for example) as well as manmade features that may have implications for ground stability. Underground and mining features have been identified from surface features such as shafts. The distance that these extend underground is not shown.

Are there any Historical Underground Working Features within 1000m of the study site boundary? Yes

The following Historical Underground Working Features are provided by GroundSure:

ID Distance (m) Direction NGR Use Date

13C 151.0 NW385272426107

Colliery 1931

14C 151.0 NW385272426107

Colliery 1909

15C 152.0 NW385274426120

Colliery 1893

16E 318.0 NW385253426132

Unspecified Disused Mine 1988

Not shown

461.0 S385511425526

Air Shaft 1909

Not shown

462.0 S385515425524

Air Shaft 1950

Not shown

473.0 S385514425513

Air Shaft 1931

Not shown

483.0 SW385023425756

Unspecified Mine 1988

Not shown

483.0 SW385023425756

Unspecified Mine 1968

Not shown

545.0 S385759425462

Old Air Level 1950

Not shown

553.0 S385753425452

Air Level 1931

Not shown

553.0 S385753425452

Air Level 1909

Not shown

584.0 SE385831425449

Air Level 1909

Not shown

653.0 SW385169425467

Unspecified Old Level 1950

Not shown

666.0 SW385167425453

Unspecified Old Level 1931

Not shown

668.0 NE386202426285

Unspecified Old Shaft 1931

Not shown

674.0 NE386202426296

Unspecified Old Shaft 1950

Not shown

820.0 NE385966426731

Air Shaft 1931

Not shown

820.0 NE385966426731

Air Shaft 1909

Not shown

820.0 SW384918425478

Old Air Shaft 1950

Not shown

828.0 SW384908425474

Disused Air Shaft 1989

Not shown

831.0 NE385970426742

Air Shaft 1950

Not shown

832.0 SW384911425466

Old Air Shaft 1931

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

16

Page 39: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

ID Distance (m) Direction NGR Use Date

Not shown

832.0 SW384911425466

Air Shaft 1909

Not shown

980.0 SW385050425054

Colliery 1909

2.3 Current Ground Workings

This dataset is derived from the BGS BRITPITS database covering active; inactive mines; quarries; oil wells; gas wells and mineral wharves; and rail deposits throughout the British Isles.

Are there any BGS Current Ground Workings within 1000m of the study site boundary? Yes

The following Current Ground Workings information is provided by British Geological Survey:

IDDistance

(m)Direction NGR

Commodity Produced

Pit Name Type of working Status

38D 121.0 N385575426130

Sandstone Clifton CloughA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

39E 325.0 NW385262426130

Coal, Deep Nabb Colliery

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

40 389.0 NW385222426193

Coal, Deep Nabb Colliery

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

Not shown

414.0 NW385249426277

Sandstone NabbA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

455.0 S385516425534

Coal, Deep Dean Air Shaft

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

Not shown

575.0 NW385132426388

Sandstone NabA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

619.0 NW385108426427

Sandstone NabA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

661.0 SW385167425463

Coal, Deep Dean Coal Pit

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

Not shown

716.0 SW385303425326

Coal, Deep Dean Coal Pit

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

Not shown

809.0 NE386286426418

Coal, Surface Mined Higher Deerplay OCCSA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

17

Page 40: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

IDDistance

(m)Direction NGR

Commodity Produced

Pit Name Type of working Status

Not shown

828.0 SW384914425476

Coal, Deep Carr Air Shaft

Working is wholly underground, access by shaft, adit or drift. Working may be

termed Colliery, Mine, Drift Mine, Slant, Level, Adit or Ingoing Eye (Ingaun Ee -

Scots)

Ceased

Not shown

843.0 NW384897426523

Sandstone North PointA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

906.0 SE386041425198

Coal, Surface Mined Higher Deerplay OCCSA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

910.0 E386504425943

Coal, Surface Mined Dean Head OCCSA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

912.0 N385568426921

Sandstone Bent HillA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

923.0 N385456426926

Coal, Deep Clough Bottom Coal PitA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Not shown

958.0 E386527426223

Coal, Surface Mined Higher Deerplay OCCSA surface mineral working. It may be termed Quarry, Sand Pit, Clay Pit or

Opencast Coal SiteCeased

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

18

Page 41: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

3 Mining, Extraction & Natural Cavities Map

NW N NE

W E

SW S SE

Mining, Extraction and Natural Cavities Legend

© Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

19

Page 42: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

3 Mining, Extraction & Natural Cavities

3.1 Historical Mining

This dataset is derived from GroundSure unique Historical Land-use Database that are indicative of mining or extraction activities.

Are there any Historical Mining areas within 1000m of the study site boundary? Yes

The following Historical Mining information is provided by GroundSure:

IDDistance

(m)Direction NGR Details Date

1A 151.0 NW385272426107

Colliery 1931

2A 151.0 NW385272426107

Colliery 1909

3A 152.0 NW385274426120

Colliery 1893

4 318.0 NW385253426132

Unspecified Disused Mine 1988

5B 461.0 S385511425526

Air Shaft 1909

6B 462.0 S385515425524

Air Shaft 1950

7B 473.0 S385514425513

Air Shaft 1931

8C 483.0 SW385023425756

Unspecified Mine 1968

9C 483.0 SW385023425756

Unspecified Mine 1988

Not shown

545.0 S385759425462

Old Air Level 1950

Not shown

553.0 S385753425452

Air Level 1909

Not shown

553.0 S385753425452

Air Level 1931

Not shown

584.0 SE385831425449

Air Level 1909

14 653.0 SW385169425467

Unspecified Old Level 1950

Not shown

666.0 SW385167425453

Unspecified Old Level 1931

16D 668.0 NE386202426285

Unspecified Old Shaft 1931

17D 674.0 NE386202426296

Unspecified Old Shaft 1950

Not shown

820.0 NE385966426731

Air Shaft 1931

Not shown

820.0 NE385966426731

Air Shaft 1909

20E 820.0 SW384918425478

Old Air Shaft 1950

21E 828.0 SW384908425474

Disused Air Shaft 1989

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

20

Page 43: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

IDDistance

(m)Direction NGR Details Date

Not shown

831.0 NE385970426742

Air Shaft 1950

Not shown

832.0 SW384911425466

Air Shaft 1909

Not shown

832.0 SW384911425466

Old Air Shaft 1931

Not shown

980.0 SW385050425054

Colliery 1909

3.2 Coal Mining

This dataset provides information as to whether the study site lies within a known coal mining affected area as defined by the coal authority.

Are there any Coal Mining areas within 1000m of the study site boundary? Yes

The following Coal Mining information provided by the Coal Authority is not represented on Mapping:

Distance (m) Direction Details

0.0 On SiteThe study site is located within the specified search distance of an identified mining area. Further details

concerning this can be obtained from the Coal Authority Helpline on 0845 762 6848.

3.3 Johnson Poole and Bloomer

This dataset provides information as to whether the study site lies within an area where JPB hold information relating to mining.

Are there any JPB Mining areas within 1000m of the study site boundary? No

The following information provided by JPB is not represented on mapping: Database searched and no data found.

3.4 Non-Coal Mining

This dataset provides information as to whether the study site lies within an area which may have been subject to non-coal historic mining.

Are there any Non-Coal Mining areas within 1000m of the study site boundary? No

Database searched and no data found.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

21

Page 44: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

3.5 Non-Coal Mining Cavities

This dataset provides information from the Peter Brett Associates (PBA) mining cavities database (compiled for the national study entitled “Review of mining instability in Great Britain, 1990” PBA has also continued adding to this database) on mineral extraction by mining.

Are there any Non-Coal Mining cavities within 1000m of the study site boundary? No

Database searched and no data found.

3.6 Natural Cavities

This dataset provides information based on Peter Brett Associates natural cavities database.

Are there any Natural Cavities within 1000m of the study site boundary? No

Database searched and no data found.

3.7 Brine Extraction

This dataset provides information from the Brine Compensation Board which has been discontinued and is now covered by the Coal Authority.

Are there any Brine Extraction areas within 1000m of the study site boundary? No

Database searched and no data found.

3.8 Gypsum Extraction

This dataset provides information on Gypsum extraction from British Gypsum records.

Are there any Gypsum Extraction areas within 1000m of the study site boundary? No

Database searched and no data found.

3.9 Tin Mining

This dataset provides information on tin mining areas and is derived from tin mining records. This search is based upon postcode information to a sector level.

Are there any Tin Mining areas within 1000m of the study site boundary? No

Database searched and no data found.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

22

Page 45: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

3.10 Clay Mining

This dataset provides information on Kaolin and Ball Clay mining from relevant mining records.

Are there any Clay Mining areas within 1000m of the study site boundary? No

Database searched and no data found.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

23

Page 46: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4 Natural Ground Subsidence

4.1 Shrink-Swell Clay MapNW N NE

W E

SW S SE

Shrink Swell Clay Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

24

Page 47: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.2 Landslides MapNW N NE

W E

SW S SE

Landslides Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

25

Page 48: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.3 Ground Dissolution Soluble Rocks Map

NW N NE

W E

SW S SE

Ground DissolutionSoluble Rocks Legend

© Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

26

Page 49: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.4 Compressible Deposits MapNW N NE

W E

SW S SE

Compressible Deposits Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

27

Page 50: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.5 Collapsible Deposits MapNW N NE

W E

SW S SE

Collapsible Deposits Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

28

Page 51: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.6 Running Sand MapNW N NE

W E

SW S SE

Running Sand Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

29

Page 52: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4 Natural Ground Subsidence

The National Ground Subsidence rating is obtained through the 6 natural ground stability hazard datasets, which are supplied by the British Geological Survey (BGS).

The following GeoSure data represented on the mapping is derived from the BGS Digital Geological map of Great Britain at 1:50,000 scale.

What is the maximum hazard rating of natural subsidence within the study site** boundary? Low

4.1 Shrink-Swell Clays

The following Shrink Swell information provided by the British Geological Survey:

ID Distance (m) Direction Hazard Rating Details

1 0.0 On Site Very Low

Ground conditions predominantly low plasticity. No special actions required to avoid problems due

to shrink-swell clays. No special ground investigation required, and increased construction

costs or increased financial risks are unlikely due to potential problems with shrink-swell clays.

4.2 Landslides

The following Landslides information provided by the British Geological Survey:

ID Distance (m) Direction Hazard Rating Details

1 0.0 On Site Very Low

Slope instability problems are unlikely to be present. No special actions required to avoid

problems due to landslides. No special ground investigation required, and increased construction

costs or increased financial risks are unlikely due to potential problems with landslides.

2 0.0 On Site Low

Possibility of slope instability problems after major changes in ground conditions. Consideration

should be given to stability if changes to drainage or excavations take place. Possible increase in

construction cost to reduce potential slope stability problems. Existing property - no

significant increase in insurance risk due to natural slope instability problems.

* This includes an automatically generated 50m buffer zone around the site

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

30

Page 53: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

4.3 Ground Dissolution of Soluble Rocks

The following Compressible Deposits information provided by the British Geological Survey:

Distance (m) Direction Hazard Rating Details

0 On site Null-Negligible

Soluble rocks are not present in the search area. No special actions required to avoid problems due to soluble rocks. No special ground investigation required, and increased construction costs or increased financial risks are unlikely due to potential problems with soluble rocks.

4.4 Compressible Deposits

The following Compressible Deposits information provided by the British Geological Survey:

IDDistance

(m)Direction Hazard Rating Details

1 0.0 On Site Negligible

No indicators for compressible deposits identified. No special actions required to avoid problems due to compressible deposits. No special ground investigation required, and increased construction costs or increased financial risks are unlikely due to potential

problems with compressible deposits.

4.5 Collapsible Deposits

The following Collapsible Rocks information provided by the British Geological Survey:

IDDistance

(m)Direction Hazard Rating Details

1 0.0 On Site Very LowDeposits with potential to collapse when loaded and saturated are unlikely to be

present. No special ground investigation required or increased construction costs or increased financial risk due to potential problems with collapsible deposits.

4.6 Running Sands

The following Running Sands information provided by the British Geological Survey:

ID Distance (m) Direction Hazard Rating Details

1 0.0 On Site Negligible

No indicators for running sand identified. No special actions required to avoid problems due to

running sand. No special ground investigation required, and increased construction costs or

increased financial risks are unlikely due to potential problems with running sand.

2 0.0 On Site Very Low

Very low potential for running sand problems if water table rises or if sandy strata are exposed to

water. No special actions required, to avoid problems due to running sand. No special ground

investigation required, and increased construction costs or increased financial risks are unlikely due

to potential problems with running sand.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

31

Page 54: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

5 Borehole Records MapNW N NE

W E

SW S SE

Borehole Records Legend © Crown copyright and database rights 2013. Ordnance Survey license 100035207.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

32

Page 55: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

5 Borehole Records

The systematic analysis of data extracted from the BGS Borehole Records database provides the following information.

Records of boreholes within 250m of the study site boundary: 0

Database searched and no data found.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

33

Page 56: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

6 Estimated Background Soil Chemistry

Records of background estimated soil chemistry within 250m of the study site boundary: 10

For further information on how this data is calculated and limitations upon its use, please see the GroundSure GeoInsight User Guide, available on request.

Distance (m) Direction Sample Type Arsenic (As) Cadmium (Cd) Chromium (Cr) Nickel (Ni) Lead (Pb)

0.0 On Site Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

0.0 On Site Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

10.0 NE Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

12.0 E Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

27.0 N Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

63.0 N Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 30 - 45 mg/kg <150 mg/kg

64.0 N Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

138.0 S Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

150.0 SE Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kg

155.0 NE Sediment <15 mg/kg <1.8 mg/kg 60 - 90 mg/kg 15 - 30 mg/kg <150 mg/kgc

*As this data is based upon underlying 1:50,000 scale geological information, a 50m buffer has been added to the search radius.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

34

Page 57: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Contact DetailsCENTREMAPS

Telephone: 01886 [email protected]

CENTREMAPS, Brockamin House, Leigh, Worcester, London, WR6 5JU

Directors: M C Walker, MInst C.E.S., C M Walker,S J Hawkins BSc (Hons), S E Stewart BSc (Hons)

Registered No. 1890261 Registered in England and WalesRegistered Company: Laser Surveys Limited

Brockamin House, Leigh, Worcester, WR6 5JU.British Geological Survey Enquiries

Kingsley Dunham CentreKeyworth, Nottingham NG12 5GG

Tel: 0115 936 3143.Fax: 0115 936 3276.

Email:[email protected]:www.bgs.ac.uk

BGS Geological Hazards Reports and general geological enquiries

British Gypsum

British Gypsum LtdEast Leake

LoughboroughLeicestershire

LE12 6HX

The Coal Authority

200 Lichfield LaneMansfield

Notts NG18 4RGTel: 0845 762 6848

DX 716176 Mansfield 5 www.coal.gov.uk

Public Health England

Public information access officePublic Health England, Wellington House

133-155 Waterloo Road, London, SE1 8UGhttps://www.gov.uk/government/organisations/public-health-england

Email: [email protected] switchboard: 020 7654 8000

Johnson Poole & Bloomer Limited

Harris and Pearson Building, Brettel LaneBrierley Hill, West Midlands

DY5 3LHTel: +44 (0) 1384 262 000

Email:[email protected]: www.jpb.co.uk

Ordnance Survey

Romsey RoadSouthampton SO16 4GU

Tel: 08456 050505Website: http://www.ordnancesurvey.co.uk/

Getmapping PLC

Virginia Villas, High Street, Hartley Witney,Hampshire RG27 8NW

Tel: 01252 845444Website:http://www1.getmapping.com/

Peter Brett Associates

Caversham Bridge HouseWaterman Place

ReadingBerkshire RG1 8DN

Tel: +44 (0)118 950 0761 E-mail:[email protected]:http://www.peterbrett.com/home

Acknowledgements: Ordnance Survey © Crown Copyright and/or Database Right. All Rights Reserved. Licence Number [03421028].This report has been prepared in accordance with the GroundSure Ltd standard Terms and Conditions of business for work of this nature.

Report Reference: CMAPS-CM-294133-15691-050214Client Reference: 15691

35

Page 58: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

Standard Terms and Conditions

1 Definitions

In these terms and conditions unless the context otherwise requires:“Beneficiary” means the person or entity for whose benefit the Client has obtained the Services.“Client” means the party or parties entering into a Contract with GroundSure.“Commercial” means any building or property which is not Residential.“Confidential Information” means the contents of this Contract and all information received from the Client as a result of, or in connection with, this Contract other than

(i) information which the Client can prove was rightfully in its possession prior to disclosure by GroundSure and

(ii) any information which is in the public domain (other than by virtue of a breach of this Contract).“Support Services” means Support Services provided by GroundSure including, without limitation, interpreting third party and in-house environmental data, providing environmental support advice, undertaking environmental audits and assessments, Site investigation, Site monitoring and related items.“Contract” means the contract between GroundSure and the Client for the provision of the Services, and which shall incorporate these terms and conditions, the Order, and the relevant User Guide.“Third Party Data Provider” means any third party providing Third Party Content to GroundSure.“Data Reports” means reports comprising factual data with no accompanying interpretation.“Fees” has the meaning set out in clause 5.1.“GroundSure” means GroundSure Limited, a company registered in England and Wales under number 03421028.“GroundSure Materials” means all materials prepared by GroundSure and provided as part of the Services, including but not limited to Third Party Content, Data Reports, Mapping, and Risk Screening Reports.“Intellectual Property” means any patent, copyright, design rights, trade or service mark, moral rights, data protection rights, know-how or trade mark in each case whether registered or not and including applications for the same or any other rights of a similar nature anywhere in the world.“Mapping” means a map, map data or a combination of historical maps of various ages, time periods and scales. “Order” means an electronic, written or other order form submitted by the Client requesting Services from GroundSure in respect of a specified Site. “Ordnance Survey” means the Secretary of State for Business, Innovation and Skills, acting through Ordnance Survey, Adanac Drive, Southampton, SO16 0AS, UK. “Order Website” means the online platform through which Orders may be placed by the Client and accepted by GroundSure.“Report” means a Risk Screening Report or Data Report for Commercial or Residential property.“Residential” means any building or property used as or intended to be used as a single dwelling.“Risk Screening Report” means a risk screening report comprising factual data with an accompanying interpretation by GroundSure. “Services” means any Report, Mapping and/or Support Services which GroundSure has agreed to provide by accepting an Order pursuant to clause 2.6."Site" means the area of land in respect of which the Client has requested GroundSure to provide the Services.“Third Party Content” means data, database information or other information which is provided to GroundSure by a Third Party Data Provider."User Guide" means the user guide, as amended from time to time, available upon request from GroundSure and on the website (www.GroundSure.com) and forming part of this Contract.

2 Scope of Services, terms and conditions, requests for insurance and quotations

2.1 GroundSure agrees to provide the Services in accordance with the Contract.2.2 GroundSure shall exercise reasonable skill and care in the provision of the Services.2.3 Subject to clause 7.3 the Client acknowledges that it has not relied on any statement or representation made by or on behalf of GroundSure which is not set out and expressly agreed in writing in the Contract and all such statements and representations are hereby excluded to the fullest extent permitted by law. 2.4 The Client acknowledges that terms and conditions appearing on a Client’s order form, printed stationery or other communication, or any terms or conditions implied by custom, practice or course of dealing shall be of no effect, and that this Contract shall prevail over all others in relation to the Order.2.5 If the Client or Beneficiary requests insurance in conjunction with or as a result of the Services, GroundSure shall use reasonable endeavours to recommend such insurance, but makes no warranty that such insurance shall be available from insurers or that it will be offered on reasonable terms. Any insurance purchased by the Client or Beneficiary shall be subject solely to the terms of the policy issued by insurers and GroundSure will have no liability therefor. In addition you acknowledge and agree that GroundSure does not act as an agent or broker for any insurance providers. The Client should take (and ensure that the Beneficiary takes) independent advice to ensure that the insurance policy requested or offered is suitable for its requirements.2.6 GroundSure's quotations or proposals are valid for a period of 30 days only unless an alternative period of time is explicitly stipulated by GroundSure. GroundSure reserves the right to withdraw any quotation or proposal at any time before an Order is accepted by GroundSure. GroundSure's acceptance of an Order

shall be binding only when made in writing and signed by GroundSure's authorised representative or when accepted through the Order Website.

3 The Client’s obligations

3.1The Client shall comply with the terms of this Contract and (i) procure that the Beneficiary or any third party relying on the

Services complies with and acts as if it is bound by the Contract and(ii) be liable to GroundSure for the acts and omissions of the

Beneficiary or any third party relying on the Services as if such acts and omissions were those of the Client.3.2 The Client shall be solely responsible for ensuring that the Services are appropriate and suitable for its and/or the Beneficiary’s needs.3.3 The Client shall supply to GroundSure as soon as practicable and without charge all requisite information (and the Client warrants that such information is accurate, complete and appropriate), including without limitation any environmental information relating to the Site and shall give such assistance as GroundSure shall reasonably require in the provision of the Services including, without limitation, access to the Site, facilities and equipment.3.4 Where the Client’s approval or decision is required to enable GroundSure to carry out work in order to provide the Services, such approval or decision shall be given or procured in reasonable time and so as not to delay or disrupt the performance of the Services.3.5 Save as expressly permitted by this Contract the Client shall not, and shall procure that the Beneficiary shall not, re-sell, alter, add to, or amend the GroundSure Materials, or use the GroundSure Materials in a manner for which they were not intended. The Client may make the GroundSure Materials available to a third party who is considering acquiring some or all of, or providing funding in relation to, the Site, but such third party cannot rely on the same unless expressly permitted under clause 4.3.6 The Client is responsible for maintaining the confidentiality of its user name and password if using the Order Website and the Client acknowledges that GroundSure accepts no liability of any kind for any loss or damage suffered by the Client as a consequence of using the Order Website.

4 Reliance

4.1The Client acknowledges that the Services provided by GroundSure consist of the presentation and analysis of Third Party Content and other content and that information obtained from a Third Party Data Provider cannot be guaranteed or warranted by GroundSure to be reliable.4.2 In respect of Data Reports, Mapping and Risk Screening Reports, the following classes of person and no other are entitled to rely on their contents;

(i) the Beneficiary, (ii) the Beneficiary's professional advisers, (iii) any person

providing funding to the Beneficiary in relation to the Site (whether directly or as part of a lending syndicate),

(iv) the first purchaser or first tenant of the Site, and (v) the professional advisers and lenders of the first purchaser or

tenant of the Site. 4.3 In respect of Support Services, only the Client, Beneficiary and parties expressly named in a Report and no other parties are entitled to rely on its contents. 4.4 Save as set out in clauses 4.2 and 4.3 and unless otherwise expressly agreed in writing, no other person or entity of any kind is entitled to rely on any Services or Report issued or provided by GroundSure. Any party considering such Reports and Services does so at their own risk.

5 Fees and Disbursements

5.1GroundSure shall charge and the Client shall pay fees at the rate and frequency specified in the written proposal, Order Website or Order acknowledgement form, plus (in the case of Support Services) all proper disbursements incurred by GroundSure. The Client shall in addition pay all value added tax or other tax payable on such fees and disbursements in relation to the provision of the Services (together “Fees”).5.2 The Client shall pay all outstanding Fees to GroundSure in full without deduction, counterclaim or set off within 30 days of the date of GroundSure’s invoice or such other period as may be agreed in writing between GroundSure and the Client ("Payment Date"). Interest on late payments will accrue on a daily basis from the Payment Date until the date of payment (whether before or after judgment) at the rate of 8% per annum.5.3 The Client shall be deemed to have agreed the amount of any invoice unless an objection is made in writing within 28 days of the date of the invoice. As soon as reasonably practicable after being notified of an objection, without prejudice to clause 5.2 a member of GroundSure’s management team will contact the Client and the parties shall then use all reasonable endeavours to resolve the dispute within 15 days.

6 Intellectual Property and Confidentiality

6.1 Subject to (i) full payment of all relevant Fees and (ii) compliance with this Contract, the Client is granted (and is

permitted to sub-licence to the Beneficiary) a royalty-free, worldwide, non-assignable and (save to the extent set out in this Contract) non-transferable licence to make use of the GroundSure Materials.6.2 All Intellectual Property in the GroundSure Materials are and shall remain owned by GroundSure or GroundSure's licensors (including without limitation the Third Party Data Providers) the Client acknowledges, and shall procure acknowledgement by the Beneficiary of, such ownership. Nothing in this Contract purports to transfer or assign any rights to the Client or the Beneficiary in respect of such Intellectual Property.6.3 Third Party Data Providers may enforce any breach of clauses 6.1 and 6.2 against the Client or Beneficiary.

Page 59: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

6.4 The Client shall, and shall procure that any recipients of the GroundSure Materials shall:

(i) not remove, suppress or modify any trade mark, copyright or other proprietary marking belonging to GroundSure or any third party from the Services;

(ii) use the information obtained as part of the Services in respect of the subject Site only, and shall not store or reuse any information obtained as part of the Services provided in respect of adjacent or nearby sites;

(iii) not create any product or report which is derived directly or indirectly from the Services (save that those acting in a professional capacity to the Beneficiary may provide advice based upon the Services);

(iv) not combine the Services with or incorporate such Services into any other information data or service;

(v) not reformat or otherwise change (whether by modification, addition or enhancement), the Services (save that those acting for the Beneficiary in a professional capacity shall not be in breach of this clause 6.4(v) where such reformatting is in the normal course of providing advice based upon the Services);

(vi) where a Report and/or Mapping contains material belonging to Ordnance Survey, acknowledge and agree that such content is protected by Crown Copyright and shall not use such content for any purpose outside of receiving the Services; and

(vii) not copy in whole or in part by any means any map prints or run-on copies containing content belonging to Ordnance Survey (other than that contained within Ordnance Survey’s OS Street Map) without first being in possession of a valid Paper Map Copying Licence from Ordnance Survey,6.5 Notwithstanding clause 6.4, the Client may make reasonable use of the GroundSure Materials in order to advise the Beneficiary in a professional capacity. However, GroundSure shall have no liability in respect of any advice, opinion or report given or provided to Beneficiaries by the Client.6.6 The Client shall procure that any person to whom the Services are made available shall notify GroundSure of any request or requirement to disclose, publish or disseminate any information contained in the Services in accordance with the Freedom of Information Act 2000, the Environmental Information Regulations 2004 or any associated legislation or regulations in force from time to time.

7.Liability: Particular Attention Should Be Paid To This Clause

7.1 This Clause 7 sets out the entire liability of GroundSure, including any liability for the acts or omissions of its employees, agents, consultants, subcontractors and Third Party Content, in respect of:

(i) any breach of contract, including any deliberate breach of the Contract by GroundSure or its employees, agents or subcontractors;(ii) any use made of the Reports, Services, Materials or any part of them; and (iii) any representation, statement or tortious act or omission

(including negligence) arising under or in connection with the Contract.7.2 All warranties, conditions and other terms implied by statute or common law are, to the fullest extent permitted by law, excluded from the Contract.7.3 Nothing in the Contract limits or excludes the liability of the Supplier for death or personal injury resulting from negligence, or for any damage or liability incurred by the Client or Beneficiary as a result of fraud or fraudulent misrepresentation.7.4 GroundSure shall not be liable for

(i) loss of profits; (ii) loss of business; (iii) depletion of goodwill and/or similar losses; (iv) loss of anticipated savings; (v) loss of goods;(vi) loss of contract; (vii) loss of use; (viii) loss or corruption of data or information; (ix) business interruption;(x) any kind of special, indirect, consequential or pure economic

loss, costs, damages, charges or expenses; (xi) loss or damage that arise as a result of the use of all or part of

the GroundSure Materials in breach of the Contract;(xii) loss or damage arising as a result of any error, omission or

inaccuracy in any part of the GroundSure Materials where such error, omission or inaccuracy is caused by any Third Party Content or any reasonable interpretation of Third Party Content;

(xiii) loss or damage to a computer, software, modem, telephone or other property; and

(xiv) loss or damage caused by a delay or loss of use of GroundSure’s internet ordering service.7.5 GroundSure’s total liability in relation to or under the Contract shall be limited to £10 million for any claim or claims. 7.6 GroundSure shall procure that the Beneficiary shall be bound by limitations and exclusions of liability in favour of GroundSure which accord with those detailed in clauses 7.4 and 7.5 (subject to clause 7.3) in respect of all claims which the Beneficiary may bring against GroundSure in relation to the Services or other matters arising pursuant to the Contract.

8 GroundSure’s right to suspend or terminate

8.1 If GroundSure reasonably believes that the Client or Beneficiary has not provided the information or assistance required to enable the proper provision of the Services, GroundSure shall be entitled to suspend all further performance of the Services until such time as any such deficiency has been made good.8.2 GroundSure shall be entitled to terminate the Contract immediately on written notice in the event that:

(i) the Client fails to pay any sum due to GroundSure within 30

days of the Payment Date; or(ii) the Client (being an individual) has a bankruptcy order made

against him or (being a company) shall enter into liquidation whether compulsory or voluntary or have an administration order made against it or if a receiver shall be appointed over the whole or any part of its property assets or undertaking or if the Client is struck off the Register of Companies or dissolved; or

(iii) the Client being a company is unable to pay its debts within the meaning of Section 123 of the Insolvency Act 1986 or being an individual appears unable to pay his debts within the meaning of Section 268 of the Insolvency Act 1986 or if the Client shall enter into a composition or arrangement with the Client’s creditors or shall suffer distress or execution to be levied on his goods; or

(iv) the Client or the Beneficiary breaches any term of the Contract (including, but not limited to, the obligations in clause 4) which is incapable of remedy or if remediable, is not remedied within five days of notice of the breach.

9. Client’s Right to Terminate and Suspend

9.1 Subject to clause 10.1, the Client may at any time upon written notice terminate or suspend the provision of all or any of the Services. 9.2 In any event, where the Client is a consumer (and not a business) he/she hereby expressly acknowledges and agrees that:

(i) the supply of Services under this Contract (and therefore the performance of this Contract) commences immediately upon GroundSure's acceptance of the Order; and (ii) the Reports and/or Mapping provided under this Contract are

(a) supplied to the Client's specification(s) and in any event (b) by their nature cannot be returned.

10 Consequences of Withdrawal, Termination or Suspension

10.1 Upon termination of the Contract: (i) GroundSure shall take steps to bring to an end the Services in

an orderly manner, vacate any Site with all reasonable speed and shall deliver to the Client and/or Beneficiary any property of the Client and/or Beneficiary in GroundSure’s possession or control; and

(ii) the Client shall pay to GroundSure all and any Fees payable in respect of the performance of the Services up to the date of termination or suspension. In respect of any Support Services provided, the Client shall also pay GroundSure any additional costs incurred in relation to the termination or suspension of the Contract.

11 Anti-Bribery

11.1 The Client warrants that it shall:(i) comply with all applicable laws, statutes and regulations

relating to anti-bribery and anti-corruption including but not limited to the Bribery Act 2010;

(ii) comply with such of GroundSure's anti-bribery and anti-corruption policies as are notified to the Client from time to time; and

(iii) promptly report to GroundSure any request or demand for any undue financial or other advantage of any kind received by or on behalf of the Client in connection with the performance of this Contract.11.2 Breach of this Clause 11 shall be deemed a material breach of this Contract.

12 General

12.1 The Mapping contained in the Services is protected by Crown copyright and must not be used for any purpose other than as part of the Services or as specifically provided in the Contract.12.2 The Client shall be permitted to make one copy only of each Report or Mapping Order. Thereafter the Client shall be entitled to make unlimited copies of the Report or Mapping Order only in accordance with an Ordnance Survey paper map copy license available through GroundSure.12.3 GroundSure reserves the right to amend or vary this Contract. No amendment or variation to this Contract shall be valid unless signed by an authorised representative of GroundSure. 12.4 No failure on the part of GroundSure to exercise, and no delay in exercising, any right, power or provision under this Contract shall operate as a waiver thereof.12.5 Save as expressly provided in this Contract, no person other than the persons set out therein shall have any right under the Contract (Rights of Third Parties) Act 1999 to enforce any terms of the Contract.12.6 The Secretary of State for Business, Innovation and Skills (“BIS”) or BIS’ successor body, as the case may be, acting through Ordnance Survey may enforce a breach of clause 6.4(vi) and clause 6.4(vii) of these terms and conditions against the Client in accordance with the provisions of the Contracts (Rights of Third Parties) Act 1999. 12.7 GroundSure shall not be liable to the Client if the provision of the Services is delayed or prevented by one or more of the following circumstances:

(i) the Client or Beneficiary’s failure to provide facilities, access or information;

(ii) fire, storm, flood, tempest or epidemic;(iii) Acts of God or the public enemy; (iv) riot, civil commotion or war;(v) strikes, labour disputes or industrial action;(vi) acts or regulations of any governmental or other agency; (vii) suspension or delay of services at public registries by Third

Party Data Providers;(viii) changes in law; or(ix) any other reason beyond GroundSure’s reasonable control.

In the event that GroundSure is prevented from performing the Services (or any part thereof) in accordance with this clause 12.6 for a period of not less than 30 days then GroundSure shall be entitled to terminate this Contract immediately on written notice to the Client.12.8 Any notice provided shall be in writing and shall be deemed to be properly

Page 60: QUIET REVOLUTION MANUFACTURING LIMITED COAL MINING …

given if delivered by hand or sent by first class post, facsimile or by email to the address, facsimile number or email address of the relevant party as may have been notified by each party to the other for such purpose or in the absence of such notification the last known address.12.9 Such notice shall be deemed to have been received on the day of delivery if delivered by hand, facsimile or email (save to the extent such day is not a working day where it shall be deemed to have been delivered on the next working day) and on the second working day after the day of posting if sent by first class post.12.10 The Contract constitutes the entire agreement between the parties and shall supersede all previous arrangements between the parties relating to the subject matter hereof.12.11 Each of the provisions of the Contract is severable and distinct from the others and if one or more provisions is or should become invalid, illegal or unenforceable, the validity and enforceability of the remaining provisions shall not in any way be tainted or impaired.12.12 This Contract shall be governed by and construed in accordance with English law and any proceedings arising out of or connected with this Contract shall be subject to the exclusive jurisdiction of the English courts.12.13 GroundSure is an executive member of the Council of Property Search Organisation (CoPSO) and has signed up to the Search Code administered by the Property Codes Compliance Board (PCCB). All Risk Screening Reports shall be supplied in accordance with the provisions of the Search Code.12.14 If the Client or Beneficiary has a complaint about the Services, written notice should be given to the Compliance Officer at GroundSure who will respond in a timely manner.12.15 The Client agrees that it shall, and shall procure that each Beneficiary shall, treat in confidence all Confidential Information and shall not, and shall procure that each Beneficiary shall not (i) disclose any Confidential Information to any third party other than in accordance with the terms of this Contract; and (ii) use Confidential Information for a purpose other than the exercise of its rights and obligations under this Contract. Subject to clause 6.6, nothing shall prevent the Client or any Beneficiary from disclosing Confidential Information to the extent required by law

© GroundSure Limited June 2013