quickbridge

Embed Size (px)

Citation preview

  • 7/22/2019 quickbridge

    1/22

    V1.4

    Moment and shear envelopes

  • 7/22/2019 quickbridge

    2/22

    Truck definition

    Number of axles

    5

    Axle No X W1 0.0 62.5 X is the coordinate and

    2 3.6 156.3 W the weight of the axle

    3 4.8 156.3 Coordinate of axle 1 is 0.0

    4 11.4 218.8

    5 18.0 187.5

  • 7/22/2019 quickbridge

    3/22

  • 7/22/2019 quickbridge

    4/22

    Results

    Distance Vmax Mmin Mmax No Rmin Rmax

    0.00 342.4 0.0 0.0 1 -77.7 342.4

    1.00 300.5 -77.7 300.5 2 0.0 680.5

    2.00 271.1 -155.4 542.2 3 -23.9 433.7

    3.00 242.2 -233.1 726.54.00 213.9 -310.9 855.6

    5.00 186.4 -388.6 944.5

    6.00 159.8 -466.3 993.3

    7.00 126.1 -544.0 996.7

    8.00 152.7 -621.7 1003.5

    9.00 190.1 -699.4 960.2

    10.00 230.8 -777.1 855.6

    11.00 271.3 -854.9 688.3

    12.00 310.2 -932.6 465.9

    13.00 347.1 -1010.3 196.5

    14.00 382.0 -1088.0 0.0

    15.00 490.8 -1325.3 0.016.00 471.6 -911.8 0.0

    17.00 441.7 -527.4 0.0

    18.00 414.0 -429.5 48.1

    19.00 384.3 -405.6 336.1

    20.00 352.8 -381.8 571.8

    21.00 319.3 -357.9 802.5

    22.00 284.1 -334.0 1029.8

    23.00 248.6 -310.2 1213.4

    24.00 222.9 -286.3 1346.4

    25.00 195.3 -262.5 1422.1

    26.00 165.6 -238.6 1531.6

    27.00 134.0 -214.7 1606.5

    28.00 146.9 -190.9 1633.1

    29.00 178.5 -167.0 1608.6

    30.00 211.9 -143.2 1545.6

    31.00 247.2 -119.3 1420.4

    32.00 284.1 -95.4 1227.4

    33.00 322.5 -71.6 1012.6

    34.00 358.4 -47.7 728.5

    35.00 395.5 -23.9 395.5

    36.00 433.7 0.0 0.0

  • 7/22/2019 quickbridge

    5/22

  • 7/22/2019 quickbridge

    6/22

  • 7/22/2019 quickbridge

    7/22

  • 7/22/2019 quickbridge

    8/22

  • 7/22/2019 quickbridge

    9/22

  • 7/22/2019 quickbridge

    10/22

  • 7/22/2019 quickbridge

    11/22

  • 7/22/2019 quickbridge

    12/22

  • 7/22/2019 quickbridge

    13/22

    0 0 0

    1 -77.7147 300.4625

    2 -155.429 542.1519

    3 -233.144 726.52644 -310.859 855.6

    5 -388.573 944.5

    6 -466.288 993.3306

    7 -544.003 996.7475

    8 -621.717 1003.494

    9 -699.432 960.1811

    10 -777.147 855.5515

    11 -854.861 688.2675

    12 -932.576 465.8954

    13 -1010.29 196.5111

    14 -1088.01 0

    15.00001 -1325.27 3.73E-1416 -911.775 0

    17 -527.436 0

    18 -429.469 48.1301

    19 -405.61 336.0907

    20 -381.751 571.7754

    21 -357.891 802.4832

    22 -334.032 1029.786

    23 -310.172 1213.402

    24 -286.313 1346.374

    25 -262.454 1422.121

    26 -238.594 1531.613

    27 -214.735 1606.49

    28 -190.875 1633.092

    29 -167.016 1608.643

    30 -143.156 1545.609

    31 -119.297 1420.364

    32 -95.4377 1227.362

    33 -71.5782 1012.619

    34 -47.7188 728.5032

    35 -23.8594 395.5016

    36 -1.8E-12 8.03E-13

    4.44 -1.1E-14 694.86

    4.56 0 699.96

    4.68 0 704.34

    4.8 0 7084.92 -3.6E-15 710.94

    5.04 -8.9E-15 714.36

    5.16 -1.4E-14 719.46

    5.28 -2E-14 723.84

    5.4 -2.5E-14 727.5

    5.52 0 730.44

    5.64 0 732.66

    5.76 0 734.16

  • 7/22/2019 quickbridge

    14/22

    5.88 0 734.94

    6 0 735

    6.12 0 734.34

    6.24 -5.3E-15 732.96

    6.36 -1.1E-14 730.86

    6.48 -1.6E-14 728.04

    6.6 -2.1E-14 724.56.72 -2.7E-14 720.24

    6.84 0 715.26

    6.96 0 709.56

    7.08 0 703.14

    7.2 0 696

    7.32 0 688.14

    7.44 -1.8E-15 679.56

    7.56 -7.1E-15 670.26

    7.68 -1.2E-14 663.24

    7.8 -1.8E-14 658.5

    7.92 -2.3E-14 652.74

    8.04 0 645.968.16 0 638.16

    8.28 -7.1E-15 629.34

    8.4 -2.5E-14 619.5

    8.52 0 610.74

    8.64 -3.6E-15 603.96

    8.76 -2.1E-14 596.16

    8.88 0 587.34

    9 0 577.5

    9.12 -1.8E-14 566.64

    9.24 0 554.76

    9.36 0 541.86

    9.48 -1.4E-14 527.94

    9.6 0 513

    9.72 0 497.04

    9.84 -1.1E-14 480.06

    9.96 -2.8E-14 462.06

    10.08 0 443.04

    10.2 -7.1E-15 423

    10.32 -2.5E-14 401.94

    10.44 0 379.86

    10.56 0 356.76

    10.68 -2.1E-14 332.64

    10.8 0 307.5

    10.92 -5.7E-14 281.34

    11.04 -1.8E-14 254.1611.16 0 225.96

    11.28 -5.3E-14 196.74

    11.4 -1.4E-14 166.5

    11.52 0 135.24

    11.64 -5E-14 102.96

    11.76 -1.1E-14 69.66

    11.88 0 35.34

    12 -4.6E-14 6.06E-12

  • 7/22/2019 quickbridge

    15/22

    97.6129 -722.85 1706.299

    98.3871 -677.672 1729.27

    99.16129 -632.493 1724.946

    99.93548 -587.315 1692.137

    100.7097 -542.137 1653.972

    101.4839 -496.959 1616.864

    102.2581 -451.781 1595.948103.0323 -406.603 1548.899

    103.8065 -361.425 1474.44

    104.5806 -316.247 1371.38

    105.3548 -271.069 1238.617

    106.129 -225.891 1075.14

    106.9032 -180.712 919.066

    107.6774 -135.534 734.2258

    108.4516 -90.3562 519.8688

    109.2258 -45.1781 275.3239

    110 -7.7E-11 1.64E-11

  • 7/22/2019 quickbridge

    16/22

    Bridge moment envelopes

    -1500.0

    -1000.0

    -500.0

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    0 5 10 15 20 25 30 35 4Moment

    Span

  • 7/22/2019 quickbridge

    17/22

    0

  • 7/22/2019 quickbridge

    18/22

    Bridge shear envelope

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0

    0 5 10 15 20 25 30 35 4

    Shear

    Span

  • 7/22/2019 quickbridge

    19/22

    0

  • 7/22/2019 quickbridge

    20/22

    HELP

    Partial help is provided on each worksheet.

    Procedure

    Truck worksheetUse the scroll bar to choose the number of axles. Input axle Xcoordinates inascending order beginning with 0.0 for the first axle. Input the axle weights

    Bridge worksheetUse the scroll bar to choose the number of spans. For each span, input thespan length L, uniform load q and number of divisions.

    Click the compute button to run the truck

    Do not forget to u se cons is tent uni ts throughout .

  • 7/22/2019 quickbridge

    21/22

    HELP - continued

    Program

    Tips and tr icks

    2 to 20 axles and 1 to 5 spans with EI constant throughout. Truck willmove from left to right with the first axle in front. Critical values of

    shears (absolute values) and moments will be computed on eachdivision point. Total number of divisions must be less then 500.Results and graphs are displayed on Results, MEnvelopeandVEnvelope worksheets.

    Reverse the truck geometry to simulate moving from right to left.Instead of axle loads, use wheel loads multiplied by impact andlateral distributions factors to obtain quickly design moments, shearsand support reactions.Use q(uniform load) to simulate lane load. Dead load or any otheruniform load may be simulated by using zero axle loads.

    For a simple span, for example, AASHTO users may simulate laneload by choosing 2 axles with the 2nd axle weight set to 0.0.

  • 7/22/2019 quickbridge

    22/22

    DISCLAIMER

    In using this program, the user accepts and understands that no

    warranty is expressed or implied by me (N. Turkkan) on the accuracy

    or the reliability of the program. The users must clearly understand

    the program and must verify their own results.

    Please report all bugs and suggestions to :

    [email protected]