205
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013 APRIL 2013 This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI and do not necessarily reflect the views of USAID or the United States Government.

QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

Embed Size (px)

Citation preview

Page 1: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

APRIL 2013

This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI and do not necessarily reflect the views of USAID or the United States Government.

Page 2: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

Cover Photo The Mayor of Tebing Tinggi City, Ir. H. Umar Zunaidi Hasibuan (in gray shirt) looks at photos of Hebat Program activities, with Gulbakhri Siregar, SIP, MSi, Head of the Regional Development Planning Board of Tebing Tinggi City (in government staff uniform) and Louis O'Brien (in Batik shirt) during a Partnership Workshop for the Hebat Program on February 27, 2013. The Hebat Program (Energetic, Clean and Healthy Living Program) is a USAID IUWASH grant program implemented by Yakmi, a non-governmental organization, to promote clean and healthy living by promoting the use of public bathing, washing and toilet facilities and communal wastewater treatment plant by local communities in Tebing Tinggi City. Photo credit: Sie Ket Liong, IUWASH North Sumatra.

Page 3: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE

QUARTERLY PROGRESS REPORT 8

JANUARY - MARCH 2013

Program Title: USAID Indonesia Urban Water Sanitation and Hygiene

Sponsoring USAID Office: USAID/Indonesia Office of Environment

Contract Number: AID-497-C-11-00001

Contractor: DAI

Date of Publication: APRIL 2013

Author: DAI

This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI and do not necessarily reflect the views of USAID or the United States Government.

Page 4: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through
Page 5: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

ii

TABLE OF CONTENTS

TABLE OF CONTENTS ...................................................................................................................... II

LIST OF ACRONYMS ......................................................................................................................... IV

COVER STORY ................................................................................................................................ VIII

A HAPPY-END FOR HEBAT PROGRAM ........................................................................................................................ VIII

EXECUTIVE SUMMARY ................................................................................................................... XI

INTRODUCTION ................................................................................................................................. 1

IUWASH IN BRIEF .................................................................................................................................................................... 2 SUMMARY OF ACHIEVEMENTS .......................................................................................................................................... 3

HIGH LEVEL RESULTS & COMPONENT LEVEL PROGRESS ....................................................... 4

INTRODUCTION .................................................................................................................................................................... 4 HIGH LEVEL RESULTS ............................................................................................................................................................. 5 WATER SUPPLY SECTOR ...................................................................................................................................................... 7

Program WS 1: Improved PDAM Operational Aspects ................................................................................................................... 9 Program WS 2: Improved PDAM Financial Aspects ...................................................................................................................... 12 Program WS 3: Improved PDAM Customer Engagement Aspects .......................................................................................... 13 Program WS 4: Raw Water Management and Climate Change Adaptation Planning ..................................................... 14 Program WS 5: Microfinance ................................................................................................................................................................ 16 Program WS 6: Master Meter .............................................................................................................................................................. 16 Program WS 7: Long-Term Finance .................................................................................................................................................... 17 Program WS 8: PDAM Institutional Support ................................................................................................................................... 18

SANITATION SECTOR ......................................................................................................................................................... 20

Program SAN 1. Increased access through Individual Sanitation Systems ............................................................................. 22 Program SAN 2. Increased sanitation access through communal systems ............................................................................ 24 Program SAN 3: Increase access through off-site sanitation (sewerage) ............................................................................... 25 Program SAN 4: Improved Urban Sludge Management .............................................................................................................. 27 Program SAN 5: Support for Pokja Sanitasi/AMPL ........................................................................................................................ 28

CROSSCUTTING SECTOR ................................................................................................................................................. 30

Program CC-1: Increased Number of PEMDA Policies ................................................................................................................. 30 Program CC-2: Increased Local Government Budget (APBD) ..................................................................................................... 31 Program CC-3: Improved Citizen Engagement................................................................................................................................ 32 Program CC 4: Increased Practices in Point of Use Water and Hand Washing with Soap ............................................. 33 Program CC 5: Gender Mainstreaming ............................................................................................................................................. 34 Program CC-6: Mobilize Corporate Social Responsibility (CSR) Funding ................................................................................ 36

GRANTS PROGRAM ............................................................................................................................................................. 38

NATIONAL ACTIVITIES & KEY UPCOMING EVENTS ................................................................ 43

1. General Project Management .................................................................................................................................................... 43 2. Project Communications and Reporting ................................................................................................................................. 44 3. Monitoring and Evaluation .......................................................................................................................................................... 45 4. Environmental Compliance ......................................................................................................................................................... 47

Page 6: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

iii

REGIONAL HIGHLIGHTS & CLUSTER REPORTS ........................................................................ 48

NORTH SUMATRA ................................................................................................................................................................ 50 Summary ...................................................................................................................................................................................................... 51 Success Stories ........................................................................................................................................................................................... 51 Regional highlights by sector .................................................................................................................................................................. 53 Upcoming Events ....................................................................................................................................................................................... 55 Cluster Report ............................................................................................................................................................................................. 56

WEST JAVA/DKI JAKARTA/BANTEN .............................................................................................................................. 66

Summary ...................................................................................................................................................................................................... 67 Success Stories ........................................................................................................................................................................................... 68 Regional highlights by sector .................................................................................................................................................................. 70 Upcoming events ....................................................................................................................................................................................... 72 Cluster Reports ........................................................................................................................................................................................... 73

CENTRAL JAVA ....................................................................................................................................................................... 81

Summary ...................................................................................................................................................................................................... 82 Success Stories ........................................................................................................................................................................................... 83 Regional Highlights by Sector ................................................................................................................................................................ 85 Upcoming events ....................................................................................................................................................................................... 87 Cluster Reports ........................................................................................................................................................................................... 88

EAST JAVA ................................................................................................................................................................................ 94

Summary ...................................................................................................................................................................................................... 95 Success Stories ........................................................................................................................................................................................... 96 Regional highlights by sector .................................................................................................................................................................. 98 Upcoming events .................................................................................................................................................................................... 100 Cluster Report .......................................................................................................................................................................................... 101

SOUTH SULAWESI/EASTERN INDONESIA ................................................................................................................ 108

Summary ................................................................................................................................................................................................... 109 Success Stories ........................................................................................................................................................................................ 110 Regional highlights by sector ............................................................................................................................................................... 112 Upcoming Events .................................................................................................................................................................................... 114 Cluster Report .......................................................................................................................................................................................... 114

PROJECT MONITORING & EVALUATION .................................................................................. 124

INTRODUCTION ............................................................................................................................................................... 124 IUWASH PROGRESS BASED ON PMP .......................................................................................................................... 125

ANNEXES .......................................................................................................................................... 138

ANNEX 1: IMPLEMENTATION OF IUWASH PROGRAM FRAMEWORK ......................................................... 138 ANNEX 2: WATER SUPPLY MATRIX ............................................................................................................................ 139 ANNEX 3: SANITATION MATRIX ................................................................................................................................. 140 ANNEX 4: LIST OF POLICIES DEVELOPED ACROSS THE IUWASH REGION ................................................ 141 ANNEX 5: STATUS OF DEVELOPMENT OF PARTNERSHIP AGREEMENTS .................................................... 143 ANNEX 6: MATRIX MANAGEMENT CHART ............................................................................................................ 145 ANNEX 7: ACHIEVEMENT OF IUWASH PMP OUTCOMES, STATUS OF MARCH 2013 ........................... 146 ANNEX 8: TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF SECOND QUARTER OF THIRD

YEAR .................................................................................................................................................................. 178

Page 7: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

iv

LIST OF ACRONYMS The following is a list of acronyms commonly used in this report and on the project as a whole. ADB Asian Development Bank AIDAR Agency for International Development Acquisition Regulations Akatirta Wiyata Akademi Teknik Tirta Wiyata / Tirta Wiyata Technical Academy AMPL Air Minum dan Penyehatan Lingkungan / Drinking Water and Environmental

Health APBD Anggaran Pendapatan dan Belanja Daerah / Local Government Budget APBN Anggaran Pendapatan dan Belanja Negara / National Government Budget APOKSI Aliansi Kota Peduli Sanitasi / Alliance of Cities Concerned about Sanitation AusAID Australian Agency for International Development Bappeda Badan Perencanaan dan Pembangunan Daerah / Local Development Planning

Agency Bapemas Badan Pemberdayaan Masyaraka Bappenas Badan Perencanaan dan Pembangunan Nasional / National Development Planning

Agency Bawasda Badan Pengawas Daerah / Regional Supervisory Board BCC Behavior Change Communications BJB PT Bank Pembangunan Daerah Jabar Banten / Regional Development Bank of

West Java and Banten BKM Badan Keswadayaan Masyarakat/ civil society organization BNI Bank Nasional Indonesia BPKP Badan Pengawasan Keuangan dan Pembangunan / Finance and Development

Audit Board BPRS Bank Pembiayaan Rakyat Syariah / Sharia Rural Bank BRI Bank Rakyat Indonesia BSM Bank Syariah Mandiri BTPN Bank Tabungan Pensiunan Nasional / National Pensioners’ Savings Bank C1 Component One C2 Component Two C3 Component Three CBO Community-Based Organization CC Climate Change CCVA Climate Change Vulnerability Assessment CEM Citizen Engagement Mechanism CJ Central Java CLTS Community Led Total Sanitation COP Chief of Party COR Contracting Officer’s Representative CSO Civil Society Organization CSR Corporate Social Responsibility CSS Citywide Sanitation Strategy CWL Creditworthiness Ladder DAI Development Alternatives Inc. (IUWASH prime contractor) DAK Special Allocation Fund DD Diarrheal Disease DED Detailed Engineering Design DEWATS Decentralized Wastewater Treatment Systems DCOP Deputy Chief of Party DPIU District Project Implementation Unit

Page 8: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

v

DPRD Dewan Perwakilan Rakyat Daerah / Local House of Representatives EJ East Java ECO-Asia Environmental Cooperation – Asia (USAID) EE Enabling Environment (for improved service delivery, Component 3) EMMP Environmental Mitigation and Monitoring Plan ESP Environmental Services Program (USAID) FTL Field Technical Liaison GCM Global Circulation Model GEC Grant Evaluation Committee GIS Geographic Information Systems GUC Grants under Contract HWWS Handwashing with Soap IBL Indonesia Business Links IC Improved Capacity (for service delivery, Component 2) ICED Indonesia Clean Energy Development Project (USAID) IDR Indonesian rupiah IEE Initial Environmental Examination IndII Indonesia Infrastructure Initiative (AusAID) IPA Instalasi Pengelolaan Air Minum/ Water Treatment Plan IR Intermediate Result ISSDP Indonesia Sanitation Sector Development Program ITS Surabaya Technology Institute IUWASH Indonesia Urban Water, Sanitation and Hygiene JICA Japan International Cooperation Agency KSM Kelompok Swadaya Masyarakat (Community-based Group) KSR Kupedes untuk Sambungan Rumah / Rural Development Credit for Household

Connections Kupedes Kredit Umum Pedesaan/ Village Credit LG Local Government M&E Monitoring and Evaluation MBR Masyarakat Berpenghasilan Rendah / Low-income communities MC Microfinance Specialist MCK++ Mandi Cuci Kakus plus plus / Bathe, Wash, Latrine “plus plus” MD Mobilized Demand (for improved service delivery, Component 1) MFI Micro-Financing Institution MLD PT. Mitra Lingkungan Dutaconsult (IUWASH subcontractor) MOF Kementerian Keuangan / Ministry of Finance MOFA Kementerian Luar Negeri / Ministry of Foreign Affairs MOH Kementerian Kesehatan / Ministry of Health MOHA Kementerian Dalam Negeri / Ministry of Home Affairs MPSS Memorandum Program Sektor Sanitasi/ Sanitation Sector Programme

Memorandum MPW Kementerian Pekerjaan Umum / Ministry of Public Works MOU Memorandum of Understanding

MSMHP Metropolitan Sanitation Management and Health Project Musrenbang Musyawarah Perencanaan Pembangunan / Development Planning Consultation

process NGO Non Governmental Organization NRW Non-Revenue Water O&M Operations and Maintenance PDAM Perusahaan Daerah Air Minum / Local Drinking Water Company Pefindo Pemeringkat Efek Indonesia (Rating Firm) PEMDA Pemerintah Daerah / Local Government

Page 9: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

vi

PERPAMSI Persatuan Perusahaan Air Minum Seluruh Indonesia / Union of Indonesian Water Supply Enterprises

Perbup Peraturan Bupati / Regent Regulation Perpres Peraturan Presiden / Presidential Regulation Perwal Peraturan Walikota / Mayor Regulation PII Penjaminan Infrastruktur Indonesia / Indonesia Infrastructure Assurance PKK Pemberdayaan Kesejahteraan Keluarga / Family Welfare Empowerment PKS Perjanjian Kerja Sama / Cooperation Agreement PMK Peraturan Menteri Keuangan / MOF Decree PMP Performance Monitoring Plan PNPM Mandiri Program Nasional Pemberdayaan Masyarakat Mandiri / National Program for

Community Self-Empowerment Pokja Kelompok Kerja / Working Group Pokja PUG Pokja Pengarusutamaan Gender/ Gender Mainstreaming Working Group Pokja-San Kelompok Kerja Sanitasi / Sanitation Working Group Posyandu Pos Pelayanan Terpadu / Integrated (health) Services Post POU Point of Use PPKM Program Peningkatan Keberdayaan Masyarakat / Increased Community

Empowerment Program PPP Public Private Partnership PPRG Perencanaan dan Penganggaran Responsif Gender PPSP Percepatan Pembangunan Sanitasi Perkotaan / Accelerated Urban Sanitation

Development PTI Participant Training Information PU Pekerjaan Umum / (Ministry of) Public Works QPR Quarterly Progress Report RAD Rencana Aksi Daerah / Local Action Plan RT Rukun Tetangga / Neighborhood Association RW Rukun Warga / Community Association, equal to Ward Sanimas Sanitasi Berbasis Masyarakat / Community-Based Sanitation SDG Sanitation Donor Group SLBM Sanitasi Lingkungan Berbasis Masyarakat/ Community-Based Environmental

Sanitation SME Small and Medium Enterprises SMI Sarana Multi Infrastruktur (Infrastructure finance intermediary) SOP Standard Operating Procedures SOW Scope of Work SS/EI South Sulawesi and Eastern Indonesia SSK Strategi Sanitasi Kota / Citywide Sanitation Strategy (see CSS) SSLT Sludge Service System STBM Sanitasi Total Berbasis Masyarakat / Community-Based Total Sanitation STTA Short Term Technical Assistance TA Technical Asistance TAMIS Technical and Administrative Management Information System TMG The Manoff Group (IUWASH subcontractor) UPTD Unit Pelaksana Teknis Daerah/ Regional Technical Unit USAID United States Agency for International Development USD United States dollars USDP Urban Sanitation Development Program USRI Urban Sanitation and Rural Infrastructure WASPOLA Water Supply and Sanitation Policy Formulation and Action Planning Watsan Water and Sanitation WES Water, Environment and Sanitation

Page 10: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

vii

WRM Water Resource Management WSP Water and Sanitation Program (World Bank) WTP Water Treatment Plant WWTP Wastewater Treatment Plant YLKI Yayasan Lembaga Konsumen Indonesia / Indonesian Consumer Institute

Foundation

Page 11: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

viii

COVER STORY

A HAPPY-END FOR HEBAT PROGRAM

The boy took a deep breath as he got ready. The stage for the closing ceremony of the Hebat Program in Tanjung Marulak Hilir Village, Tebing Tinggi City was awaiting his arrival. Twleve-year-old Rocky Rangkuti quickly climbed up onto the stage. where he recited a poem he had written. “..You take us to play and to have fun And you also teach us knowledge We didn’t care about health But now we do We didn’t dare to speak out But now we do.” Rocky’s short poem expressed his appreciation for the Hebat Program (Hebat is an acronym for Energetic, Clean and Healthy Living) implemented by Yakmi, a non-governmental organization that received grants from USAID-IUWASH to promote clean and healthy living in the local communities of Tebing Tinggi City through the use of public bathing, washing and toilet facilities and a communal wastewater treatment plant. Rocky learned about the Hebat Program from a group of local women. As users of public bathing, washing and toilet facilities, they had been involved with Hebat Program for some time. The women asked Rocky to join the program since it included activities for children. Under the Hebat Program, Yakmi encouraged people living in the local community to stop defecating in the open by using existing public bathing, washing and toilet facilities in the neighborhood. It also encouraged the people to form a community group to manage and maintain these facilities. Each family using the facilities pays Rp 1,000 per day, regardless of the number of visits or the size of the family. A unique feature of the Hebat Program was its focus on children. They were taught basic hygiene, were remidned to wash their hands properly at five important times each day, and were educated as to why open defecation needs to stop. These children became active agents of change who urged their families and other children to lead clean and healthy lifestyles. As an active participant in the program, Rocky understood that defecating in the fields (a common behavior for kids his age) brought shame and disease. He also practiced washing his hands properly at home. The Hebat Program was appreciated by both the community and the local government. In Tebing Tinggi and Tanjungbalai, where the program was active in six urban villages, the local government was keen to scale up the Hebat Program to include other locations.

IUWASH Nort Sumatra

Rocky Rangkuti takes the stage and reads a poem of appreciation for the Hebat Program during a Partnership Workshop for the Hebat Program on February 27, 2013 in Tebing Tinggi City.

Page 12: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

ix

Ir. H. Umar Zunaidi Hasibuan, the Mayor of Tebing Tinggi said, “The community groups will become agents of change in their communities. We are planning to scale up the Hebat Program under the watch of the related Local Government Work Unit (SKPD).” By the time the program ended in January 2013, the Hebat Program had ensured that 1,205 people living in Tebing Tinggi and Tanjungbalai gained access to improved sanitation services, 354 households were willing to pay for sanitation improvements, 13 civil society groups had implemented programs to mobilize improved access to safe drinking water and adequate sanitation, and 954 people had participated in training activities.

Page 13: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

x

Page 14: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through
Page 15: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

xi

EXECUTIVE SUMMARY This is the eighth Quarterly Progress Report (QPR) of the USAID Indonesia Urban Water, Sanitation and Hygiene (IUWASH) project, covering the period from January through March 2013. IUWASH is a five-year program aimed at substantially increasing access to safe water supply and improved sanitation across Indonesia’s urban landscape, with a particular focus on improving access to these services for the urban poor. With USAID funding of US$33.7 million dollars, the Project is expected to result in the following benefits to Indonesia:

• Two million people in urban areas gain access to improved water supply; • 200,000 people in urban areas gain access to improved sanitation facilities; and • The per-unit water cost paid by the poor in targeted communities decreases by at least 20%.

This report covers the second quarter under what is referred to as IUWASH Project Year 3 (PY3) which runs from October 2012 through September 2013. The Annual Workplan for PY3 is designed to take advantage of the platform that IUWASH put into place in previous project years through further engaging and supporting stakeholders in: matching sector needs at the local level with resources available from local budgets, national programs and the private sector; substantially advancing in the process of increasing coverage rates; and improving the ability of local partners to sustainably manage sector improvements. This focus recognizes that there is currently a ‘window of opportunity’ within which to make substantive progress in the sector and that IUWASH is uniquely placed to facilitate such progress on a broad range of fronts. Main Achievements Notable achievements during the reporting period as concerns the High Level results targeted by IUWASH included: 501,670 people gaining access to safe water supply (note that this is a result registered over a six month period and not only the past quarter); 11.990 people gaining access to improved sanitation; and a decrease of 35% in water costs for poor people. A total of 3,559 people were also trained in IUWASH-related areas, with women accounting for 34.36% of all training participants. Additional information on the above and other results targeted by IUWASH is provided in the main body and annexes to this report. Partnerships During the Quarter, IUWASH continued to expand and build upon relationships with key partners among central government agencies, local governments and service providers, donors, the private sector and CSOs in all work areas. This notably involved the establishment of formal agreements with:

· Bank Syariah Mandiri (BSM) in support of microfinance lending to improve the ability of low income populations to pay for piped water and sanitation facility installation costs; and

· Perum Perhutani, the state-run forestry company, to support programs aimed at improviiong the recharge of springs that serve important urban populations.

· Additional municipalities for overall cooperation with IUWASH, bringing the total number of Partnership Agreements signed with local governments to 47.

In addition to the above, IUWASH began providing assistance in the development of an MOU which may be used to engage Miya, a private sector company, in support of Non-Revenue Water (NRW) work. As concerns specific programmatic areas which contribute to overall IUWASH progress these are divided into four (4) main areas: water supply, sanitation, cross-cutting areas, and grants. Specific progress under each is detailed below.

Page 16: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

xii

Water Supply (WS) Programs One of the primary objectives of IUWASH is to increase access to improved water for two million people. This involves supporting local water utilities (PDAMs) in improving their overall operational issues, as well as addressing important concerns related to governance, customer feedback, raw water availability, long-term finance, and similar areas. Grouped under eight programmatic areas of intervention, some highlights during the Quarter included:

· Initiation of four (4) Energy Efficiency Audits for PDAMs in North Sumatra, as well as agreement with Ministry of Public Works and USAID Indonesia Clean Energy Development (ICED) project on the development of Energy Efficiency Audit (of EEA) Guidelines.

· In the area of Non-Revenue Water (NRW) reduction, introduction to several municipalities of a possible Performance Based Contracting (PBC) mechanism for NRW reduction, as well as review with key stakeholders of a final draft of a report on a NRW study conducted in DKI Jakarta.

· Work on Master Meter (MM) programs in Sidoarjo and Tangerang, as well as discussions with PDAM Surabaya on MM systems development and with a potential CSR partner, HSBC bank.

· Completion of a Climate Change Vulnerability Assessment (CCVA) in East Java, along with substantial progress in all other locations.

· On-going support to the development of PDAM business plans and which includes: work on nine debt restructuring plans, five tariff reviews and eight customer satisfaction surveys.

· Support in long-term financing for ten (10) PDAMs to increase raw water production by a combined total of 3,500 liters/second (enough for 260,000 households or 1.3 million people).

· Technical support for regionalization of raw water provision for two PDAMs in Banten and two Central Java.

· On-going preparation of Standard Operating Procedures (SOP) for financial affairs, customer relations and administration for 5 five PDAMs.

· On-the-job training in Distribution Network Improvement (DNI) for 10 PDAMs in North Sumatra and four in South Sulawesi / Eastern Indonesia.

Sanitation (SAN) Programs Another key objective of IUWASH is to increase access to safe sanitation for 200,000 people and which involves supporting local governments on a wide variety of fronts: from the promotion of individual, communal and citywide systems, to putting in place the support systems and structures upon which such systems depend. The following summarizes main achievements and progress registered in the sanitation sector during this quarter and within the five (5) technical areas within which IUWASH contributes. These include:

· Support to the training of 1,140 MOH, Public Works and community cadres who will be involved in the implementation of a large communal sanitation system program (ADB/USRI), as well as capacity building for MOH facilitators involved in the STBM program in all IUWASH regions.

· Introduction of the Total Sanitation and Sanitation Marketing (TSSM) approach in East Java to improve the availability and capacity of SMEs and microfinance institutions to provide needed complementary support.

· Initiation of the development of guidelines for triggering and behavior change processes in the urban sanitation context and which is being undertaken in close collaboration with the MOH, PU/PLP, High Five, USDP, and others such as Plan International.

· Continued advocacy for the establishment of local technical implementation units (or “UPTD”) as an integral part of a sustainable sanitation policy (in association with the Ministry of Home Affairs, USDP and AusAID/IndII

Page 17: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

xiii

· Substantial assistance to Medan, Surakarta and Kota Bogor in the promotion of household connections to citywide sewerage systems and, in Medan in particular, in the improvement of current infrastructure

· Development of a second phase of Urban Sludge Management programming which will focus on practical implementation of key recommendations identified during the initial phase.

· Initiation of microfinance programming for sanitation in Kota Probolinggo, Kab. Mojokerto, Kab. Jombang and Kab. Gresik.

· Ongoing Support to twelve (12) municipalities in the development of City Sanitation Strategies (SSKs)

Cross-Cutting (CC) Programs While the division between water supply and sanitation is often quite clear, there are likewise very many programs of common concern to each. These are grouped under the heading of “Crosscutting Programs” and for which highlights during the Quarter included:

· Conducting of several Visioning Workshops to build consensus among local leadership as concerns policy development and budgetary priorities.

· Ongoing analysis of current local government budget (APBD) allocations to the sector and advocacy for related increases.

· Conducting of assessments of Citizen Engagement Mechanisms (CEMs) in multiple locations to identify ways in which local governments can practically yet effectively improve the level of involvement of citizens in sector deliberations.

· Production of communications materials in support of handwashing with soap (HWWS) and Point of Use (POU) water treatment campaigns to complement other programming.

· Implementation of multiple activities aimed at addressing specific gender programming issues or ensuring, more broadly, progress in gender mainstreaming throughout IUWASH and the sector in general. Work also involved close coordination with the Ministry of Women’s Empowerment and Child Rights Protection.

· Continued work in the realm of Corporate Social Responsibilities (CSR) programming which notably included ongoing work with Coca-Cola, exploratory discussions with HSBC, as well as support to several local governments in promoting the sanitation program to the local private sector.

Grants Program Finally, the IUWASH Grants Program continued to be very active. Designed to serve as a supports to the project’s technical components, as well as make a contribution to the USAID FORWARD initiative, work largely focused on overseeing the implementation of eight (8) grant programs valued at $809,705 and the development of four (4) new programs valued at $244,686. These grants are generally geared towards community-level activities and the majority of funding currently targets the sanitation sector. Plans for the Next Quarter For the coming Quarter, IUWASH will capitalize on progress registered above by both continuing to support local level demand for assistance as well as further engaging central-level agencies in program development and monitoring. Areas of special emphasis will include: NRW reduction, energy efficiency audits, long-term finance and microfinance support, climate change vulnerability assessments, support of key national sanitation programming initiatives, policy development, and the development of improved citizen engagement mechanisms.

Page 18: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through
Page 19: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

Section 1

INTRODUCTION This is the eighth Quarterly Progress Report (QPR) of the USAID Indonesia Urban Water, Sanitation and Hygiene (IUWASH) project. This QPR covers the period from January through March 2013, which is the second quarter under what is referred to as Project Year 3 (PY3). Work in PY 3 is designed to take advantage of the platform that IUWASH has put into place in previous project years and to further engage and support stakeholders in the process of: matching sector needs with resources; substantially advancing in the process of increasing coverage rates; and improving the ability of local partners to sustainably manage sector improvements. The theme recognizes that there is a window of opportunity available and that IUWASH is uniquely placed to facilitate substantial progress on a broad range of fronts. This QPR follows the project’s work planning format which, while maintaining a focus on achieving outcomes set forth in the project’s design, shifts the description of strategies and approaches from being based on the project’s three Components to being based on the project’s two main sectors of intervention—water supply and sanitation—as well as “crosscutting areas” that are common to each. A “map” of how the project’s sector based activities align with IUWASH Component Outcomes can be found in Annex 1. This report also sets forth in detail progress registered under: 1) “Anchor Projects” which tend to target more substantial project resources towards activities that provide the greatest contribution to higher level results and outcomes; and 2) “Signature Programs” that test more innovative, “out-of-the-box” approaches that have the potential to be brought to scale and engender significant impact. Subsequent chapters of this report include:

Section 2, High-Level Results and Sector Progress: The section describes key achievements and issues addressed during this Quarter within: a) the water supply sector; b) the sanitation sector; c) among cross cutting areas of activity; and d) under the Grants program. It further sets forth key activities conducted under “Anchor Projects” and “Signature Programs” as well as collaboration with other partners. Section 3, National-Level Activities: This section details progress, issues and plans for the next quarter that are related to overall project management, including: general project management; project communications and reporting; monitoring and evaluation; and environmental compliance. Section 4, Regional-Level Activities: This section summarizes the progress and challenges registered within each IUWASH region during the Quarter, and their plans for the following quarter. Within each regional section, there is also much additional detail of local level progress and issues in “Cluster Reports” which serve as stand-alone reports of issues, activities and plans for each municipality (or group of municipalities with which IUWASH works. Section 5, Project Monitoring and Evaluation: This section explores in greater detail the project’s progress and achievements registered to date and during the reporting period with regard to each targeted IUWASH Outcome.

Page 20: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 2

IUWASH IN BRIEF

The USAID Indonesia Urban Water, Sanitation and Hygiene (IUWASH) Project, Contract No. AID-497-C-11-00001, is a 60-month effort designed to support the Government of Indonesia (GOI) in making significant progress towards achieving its safe water and sanitation Millennium Development Goal (MDG) targets by expanding access to these services. The IUWASH Project works with Indonesian government agencies (central, provincial, and local), local government-owned water utilities (PDAMs), sector associations, NGOs, communities, universities, and the private sector. With USAID funding of USD 33.7 million, the Project is expected to result in the following benefits to Indonesia:

• Two million people in urban areas gain access to improved water supply as a result of US Government assistance;

• 200,000 people in urban areas gain access to improved sanitation facilities as a result of US Government assistance; and

• The per-unit water cost paid by the poor in targeted communities decreases by at least 20% through more participatory, transparent, accountable, and financially enabled services.

To contribute to more equitable access, IUWASH emphasizes expanding access among Indonesia’s urban poor, who are currently the people with the most limited access to these services. To ensure that access improvements are sustained, IUWASH implements activities that contribute to the achievement of three distinct types of intermediate results, namely:

• Increased demand for safe drinking water access and improved sanitation among urban communities and households with currently unimproved access;

• Improved water and sanitation services provided by public and private sector institutions in urban areas where there is sufficient sustainable capacity to meet increased demand; and

• Improved governance and finances that create an enabling environment supporting equitable access to safe drinking water and improved sanitation in urban areas.

Corresponding to these intermediate results are three technical components that together will lead to increased access to water and sanitation services (see IUWASH Conceptual Framework). Component 1 focuses on the mobilization of demand; Component 2 aims to increase capacity for service delivery; and Component 3 seeks to improve the enabling environment. These components are mutually reinforcing, and the outcomes targeted in each are inextricably linked, such that success under one component cannot be achieved without commensurate success in the other two. These components are further supported by a small grants program to promote innovation and scaling-up of successful approaches to increasing access. While operating within this overall framework, project planning, coordination and monitoring and evaluation also takes place on a “sector basis” wherein tasks are organized as related to the water supply sector, sanitation sector or cross cutting areas that are common to each.

Figure 1. IUWASH Conceptual Framework

Page 21: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 3

Operationally, IUWASH is a regionally based project supported by a central office in Jakarta and regional offices in Medan, Semarang, Surabaya and Makassar, as well as satellite and liaison offices in 35 other locations (see Map on page x). Through this structure, IUWASH aims to assist 50 local water companies (PDAMs) to improve access to safe water, and 54 local governments to improve access to adequate sanitation.

SUMMARY OF ACHIEVEMENTS

In addition to general project development, IUWASH measures progress based on the project’s achievement of outcomes and higher-level results as defined in the IUWASH Performance Monitoring Plan (PMP). IUWASH achievements during the last quarter, based on PMP outcomes, were as follows:

· 501,670 people gained increased access to safe water supply, and there was a 1.72% increase in households gaining access to safe water supply in areas where IUWASH PDAM partners operate.

· 11,990 people gained increased access to improved sanitation services and there was a 23.26% increase in households with access to improved sanitation services in areas where IUWASH is supporting the development of improved sanitation facilities;

· 2,278 households showed willingness to pay for sanitation improvements;

· Decrease of 35% in water costs for poor people;

· 3,559 people were trained at IUWASH training activities, with women accounting for 34.36% of all training participants. The total budget spent on these training sessions was USD 78,757.61;

· 3.64% increase in the amount leveraged to support expansion of improved water and sanitation (Watsan) services; and

· 163 households obtained new water connections and improved sanitation facilities under the IUWASH microcredit program.

More details on progress towards achieving the IUWASH outcomes can be found in Annex 7.

Page 22: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

Section 2

HIGH LEVEL RESULTS & COMPONENT LEVEL PROGRESS

INTRODUCTION

In this Section we present a detailed account of the project’s overall progress towards the achievement of the High Level Results, as well as much additional detail on the progress, issues encountered, and plans within each Outcome area of the three project Components and within the Grant Program, which complements work in all other areas. As indicated in Section 1, IUWASH recognizes that all three Components and the Grant Program are mutually reinforcing. The Component Outcomes are inextricably linked, such that success under one Component cannot be achieved if there is not commensurate success in the other two. Accordingly, we have attempted to highlight important linkages between the work under the Components and specific areas of collaboration. This Section is divided into the following Sub-Sections:

Section 2.1. High Level Results

Section 2.2. Component 1: Mobilizing demand for service delivery

Section 2.3. Component 2: Improving and expanding capacity for service delivery

Section 2.4. Component 3: Strengthening the enabling environment

Section 2.5. Grant Program

Page 23: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 5

Section 2.1

HIGH LEVEL RESULTS

Results that directly and significantly contribute to the achievement of MDGs in water supply and sanitation are at the heart of IUWASH. Represented in the form of “High Level Results,” which are shown in the table below and further detailed in the Project’s Performance Monitoring Plan (PMP), the first two results directly contribute to the number of people that benefit from improved access to water supply and sanitation; while the third result directly contributes to decreasing costs of water for the poor, which in turn influences people’s access to water supply. The final result relates to the number of people trained on issues related to increasing access to clean water and sanitation. These results are achieved through realizing the outcomes of the IUWASH technical components of the project. IUWASH High Level Results Indicator Target

HR.1: People gain access to improved water supply and sanitation services as a result of US Government assistance

Number of people in urban areas gain access to improved water supply as a result of US Government assistance

2,000,000

HR.2: People gain access to improved sanitation services as a result of US Government assistance

Number of people in urban areas gain access to improved sanitation facilities as a result of US Government assistance

200,000

HR.3: Per unit water cost paid by poor in targeted communities decreases by at least 20% through more participatory, transparent, and financially enabled services

Percentage of per unit water cost paid by the poor in targeted communities decreases by at least 20% through more participatory, transparent, accountable and financially enabled services

20

HR.4: Participants trained Number of people trained in IUWASH training type of activities 50,000

IUWASH program efforts toward achieving the High Level Results resulted in substantial gains this quarter. These achievements were contributed by a series of program activities in water supply, sanitation and cross cutting sectors. This quarter IUWASH is at the mid-year reporting stage, when the achievements of all outcome indicators are reported. IUWASH moved forward with mobilizing most activities in ‘full gear’ mode to meet the targets set for the High Level Results. In the water supply sector, IUWASH national and regional teams provided substantial support to PDAM partners to improve their performance so that they can contribute to increased access for people to a safe water supply. These contributions towards increased access to improved sanitation services were mostly contributed by the development of individual and communal sanitation systems. In implementing these programs, IUWASH worked in close collaboration with other GOI programs such as Community-Based Total Sanitation (STBM), SLBM and Urban Sanitation and Rural Infrastructure (USRI). For the STBM program, IUWASH worked closely with local health offices (Dinas Kesehatan), especially on Community Led Total Sanitation (CLTS) triggering programs to increase access to individual sanitation systems. IUWASH collaboration with the SLBM and USRI programs covers all non-technical aspects, starting with increasing awareness in the community on the need to connect to and use improved sanitation facilities, followed by capacity building for GOI officers and community cadres to manage and maintain the communal facilities, and, finally, developing sanitation management units at city level to support community groups, including providing financing where required. For these programs, IUWASH collaborated closely with the local public works office (Dinas Pekerjaan Umum) and Satker PLP-PU. By the end of this quarter, the High Level Result achievements included:

Page 24: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 6

· 501,670 people obtained access to safe water supply, covering 100,056 households. The total number of households within PDAM coverage areas rose to 8,684,843 households, representing a 1.72% increase in the number of households with increased access to clean water;

· 11,990 people (2,398 households) obtained increased access to improved sanitation services. This figure represents 23.37% of total households in the locations where sanitation systems are being supported;

· 2,278 households showed willingness to pay for sanitation improvements, measured by tracking actual commitments from households to pay for sanitation connections and/or monthly maintenance fees;

· There was a decrease of 35% in water costs paid by poor people (resulting from microfinance connections in three locations);

· 3,559 people benefitted from IUWASH training-related activities, with 34.36% participation by women and a total expenditure of USD 78,757.61.

Page 25: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 7

Section 2.2

WATER SUPPLY SECTOR

One of the primary objectives of IUWASH is to increase access to improved water for two million people (400,000 households). Beginning in the previous quarter, IUWASH has been providing direct support to 51 local water utilities (PDAMs), covering not only internal aspects of PDAM operations (technical, financial and institutional) but also external factors, such as (i) good governance by PDAM owners and other local decision makers; (ii) protection and enhancement of raw water sources combined with climate change adaptation planning; and (iii) mobilizing long-term finance for sustainable expansion of services. The result of these combined efforts is expected to be improved services for all PDAM customers, and particularly for low-income families. Details of this ongoing support can be found in the Water Supply Matrix in Annex 2. Within the IUWASH Water Sector, all IUWASH interventions are now grouped under eight programs, which are listed in the accompanying box. While the achievements of the eight programs this quarter are described separately in this section, they are closely interconnected and all have a crucial role in improving PDAM performance and service delivery. Main Achievements this Quarter This section summarizes main achievements in the water supply sector during this quarter, arranged by the four signature programs and other achievements. More details can be found in subsequent sections and in the five regional reports, along with updates on the eight Anchor Projects in the water supply sector.

Signature Programs: IUWASH has defined four signature programs in the water supply sector. These are innovative approaches that can be used as examples by the GOI and/or donor agencies. Signature programs are implemented with direct assistance from IUWASH experts and subcontracted third parties.

During this quarter, the achievements of the signature programs in water supply were as follows:

· PDAM Energy Efficiency:

o Energy audits of four new PDAMs in North Sumatra commenced with local vendors; IUWASH conducted the program introduction and assessment while the vendor will perform the detailed audit

o Agreement with Ministry of Public Works on Energy Efficiency Audit (EEA) guidelines with Indonesia Clean Energy Development Project (ICED) to start in April 2013

o Agreement with PDAM Bekasi for pilot energy audit by ICED

· PDAM Non Revenue Water (NRW)

o Introduced Miya (an international company specializing in NRW reduction) to three IUWASH PDAMs to discuss innovative approach of performance-based contracts for NRW reduction

IUWASH programs in Water Supply Sector WS 1 Improve PDAM Operational Aspects WS 2 Improve PDAM Financial Aspects WS 3 Improve PDAM Customer Engagement WS 4 Raw Water & Climate Change Adaptation WS 5 Water for the Poor – Microfinance WS 6 Water for the Poor – Master Meters WS 7 PDAM Long-Term Finance WS 8 PDAM Institutional & Governance Aspects

Page 26: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 8

· Water for the Poor:

o Master Meter program ongoing in Sidoarjo, begun in Tangerang (several locations), and under discussion for Surabaya with a potential CSR partner (HSBC bank)

o Microfinance introduction and promotion continued in new locations

o Three new water connections made using microfinance

· Climate Change Adaptation Plans:

o Climate Change (CC) Inception Report circulated amongst local and national stakeholders and well received

o Climate Change Vulnerability Assessment (CCVA) completed in East Java, almost completed in North Sumatra, Central Java and ready to start in West Java.

Other Achievements · PDAM NRW reduction program success stories are under development for five locations, final

reports discussed with DKI Jakarta and Miya were introduced to three PDAMs to conduct NRW analysis for possible Performance-Based Contracts

· Facilitated development of 13 PDAM business plans, including nine debt restructuring plans, five tariff reviews and eight customer satisfaction surveys

· Technical support continued for long-term financing in 10 PDAMs, with new raw water capacity totaling 3,500 liters/second and serving around 260,000 new households (1.3 million people)

· Technical support for regionalization for two PDAMs in Banten and two Central Java locations where sharing of raw water sources is ongoing, with a positive response

· Standard Operating Procedures (SOP) for financial affairs, customer relations, and administrative aspects are in preparation for five PDAMs in Java and five in North Sumatra

· IUWASH has been conducting classroom and on-the-job training at six PDAMs in North Sumatra and four in South Sulawesi/Eastern Indonesia in order to improve distribution network operations and management

Collaboration with other parties IUWASH’s ambitious targets can only be achieved through strong partnerships with key national government ministries, other donor agencies, and other institutions, both public and private. This collaboration can take many forms, including regular exchanges to share lessons learned and avoid duplication of effort, and the development of joint programs. The following table summarizes the main collaborative efforts this quarter:

Partner Summary of activities this quarter (Jan-Mar 2013)

USAID Indonesian Clean Energy Development (ICED)

Discussion on Energy Efficiency guidelines and joint program for PDAM Energy Efficiency, and introduction of ICED to PDAM Bekasi for pilot project

PACOM (US Pacific Command)

Meeting in February 2013 resulted in agreement to provide possible initiatives for next year’s budget cycle

Miya Collaboration to prepare pre-feasibility study for PBC scheme for NRW Reduction at three PDAMs

Page 27: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 9

Partner Summary of activities this quarter (Jan-Mar 2013)

WATERLINKS Reviewed possibility of twinning program for NRW reduction at PDAM Balikpapan (West Kalimantan), with experience to be shared with IUWASH

Ministry of Public Works/Water Supply

Collaboration on PDAM Energy Efficiency Audits, NRW reduction (DKI Jakarta), and long-term financing

Ministry of Finance Discussions on monitoring PDAM debt restructuring proposals

Perhutani MOU signed on January 16, 2013 at IWWEF Conference

HSBC Discussed possibility of CSR for Master Meters in Kabupaten Tangerang

BPPSPAM Continued discussion and exchange of experience and emerging issues related to PDAM long-term financing (PPP, Perpres 29, etc.)

Asian Development Bank Two meetings to exchange programs on PDAM Energy Efficiency, Urban Sanitation, and Water and Waste Water operator certification program

IndII/AusAID Informal communication and sharing of experience between the two programs

PERPAMSI – PDAM Association

Participated in PERPAMSI international conference (IWWEF) in January 2013, with a full day’s program on Climate Change Adaptation and long-term financing

Coca-Cola Foundation Indonesia (CCFI)

Close collaboration to develop infiltration ponds (Sumur Resepan) in North Sumatra and East Java

Bank Syariah Mandiri (BSM) Joint expansion of microfinance for low-income (MBR) households to PDAM connections, including MOU signing at IWWEF Conference

Program WS 1: Improved PDAM Operational Aspects

The focus of this program is to improve PDAM performance and expand improved water supply to communities. By implementing this program, it is expected that (i) water availability for existing and new customers will increase (through NRW reduction and optimization of production capacity); (ii) PDAM financial performance will be improved (through Energy Efficiency and MIS); and (iii) technical performance, including water flow and pressure, will be improved (through distribution network improvement, application of GIS, etc.). A summary of progress this quarter follows. PDAM Performance Index PDAM improvements are measured using the PDAM Performance Index (PI), which measures five aspects influencing PDAM performance: financial, technical and operational affairs; raw water protection; customer relations; good governance; and human resources management. Reporting is done twice a year, in March and September, and the results are discussed with the PDAM management. During this quarter the PDAM PI was measured for 47 PDAMs, with an average increase on the baseline figure of 17%. PDAM PI data were obtained from four PDAMs (Makassar, Medan, Bandung, and Kab. Tangerang) this quarter, and these will be reported in the next quarter. Detailed information can be found in the PMP information reported in Annex 7. Energy Efficiency Audits A final report on the Energy Efficiency Audits (EEAs) at five PDAMs (Gresik, Lamongan, Surakarta, Kudus and Karawang) was submitted by the Surabaya Technology Institute (ITS). Results were reviewing by ICED, which will collaborate with IUWASH to prepare financial options to implement the audit findings.

Page 28: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 10

The EEA for PDAM Kab. Bekasi was expected to be performed by a third party. However, since this was not possible in the short term, ICED and IUWASH will discuss with the PDAM the possibility of performing the audit directly.

IUWASH is collaborating with the Ministry of Public Works (MPW) and ICED to develop PDAM Efficiency Energy Guidelines, and this quarter they agreed on the draft contents of these guidelines. Preparations will commence in mid-April with IUWASH focusing on technical aspects and ICED focusing on financial aspects.

To raise awareness of the importance of reducing energy costs, IUWASH arranged a workshop on EEA in Medan that was attended by four PDAMs from North Sumatra. Non-Revenue Water Reduction To support NRW reduction programs for PDAMs this quarter, IUWASH initiated and helped Miya to introduce PBCs for NRW reduction at three PDAMs. All three water utilities agreed to work together, allowing Miya to complete and fully finance the first stage (NRW audit). Depending on the results of these audits, which will take place over the next three months, decisions will be made on follow-on actions. If any of these audits results in realization of a PBC contract for NRW, it will be the first in Indonesia. To raise awareness among PDAM management and staff, IUWASH conducted a one-day workshop on NRW reduction for five PDAMs in North Sumatra. Steps for handling NRW, practices to reduce NRW in the field, and NRW reduction action plans were all discussed at the workshop. For other cities already undertaking in NRW reduction programs with IUWASH support (especially in Eastern Indonesia and Central Java), success stories are under development to show the benefits and impact as well as the commitment of the local PDAM and PEMDA to invest in these programs. Initiatives include analyzing customer bills with zero or small water volumes, replacing water meters, encouraging customers to pay their bills, and investments in meters and pipe replacements. IUWASH field staffs continue on-the-job training for PDAM operational staffs in all NRW reduction programs, especially for programs that do not require a high level of investment, but focus instead on improved meter accuracy and readings, and management of water pressure. The NRW reduction program for DKI Jakarta in conjunction with Palyja and Aetra is now coming to a close. The draft final report was discussed and agreed this quarter, and will cover the impact of reducing NRW, the economic level of leakage, and recommendations for future activities with PAM Jaya, Palyja and the Directorate General of Cipta Karya at the MPW. The study has highlighted new approaches for evaluating the detailed causes of NRW, and for calculating the economic level of leakage, resulting in a request for IUWASH to continue supporting this program, in particular by training operational staff and NRW management teams. Distribution Network Improvements Beginning in the previous quarter, in an effort to improve water flow and water pressure in the distribution network and to anticipate future expansion, IUWASH has been supporting distribution network improvements at PDAMs across North Sumatra, West Java and South Sulawesi. A final report evaluating and suggesting improvements to the distribution networks of four PDAMs in North Sumatra was submitted by a third party, and IUWASH is now supporting these PDAMs to implement the report’s findings. In addition, draft final reports on network studies in Ambon and Jayapura were discussed with the respective public works units (Satker). In light of the study findings, both units will propose funding construction from the 2014 national budget. To support PDAM staff in making distribution network improvements, IUWASH has provided classroom and on-the-job training for six PDAMs in North Sumatra. Topics included tracking lines

Page 29: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 11

and elevation of distribution pipes, distribution pipe mapping, measuring water flow and pressure, hydraulic modeling calculations by Epanet, and planning future distribution pipes. A third party began implementation of distribution network improvements at PDAM Kota Makassar in March 2013. PDAM staff are involved in all stages in order to improve their knowhow and skills so that they can perform the network analysis themselves in the future. Also this quarter, a Scope of Work (SOW) was prepared for optimizing the distribution networks of PDAM Rembang and Batang, which will commence next quarter. Production Capacity Optimization This quarter, the production capacity optimization program focused on conducting preliminary assessments of existing water treatment plants (WTPs) and new WTPs needed to increase PDAM production capacity. PDAM Kendal plans to increase production capacity by 210 lps to serve 31,500 connections in 13 subdistricts (Kecamatan). Detailed designs for spring capture, transmission pipes and the main distribution network were completed this quarter. For PDAM Lebak the plan is to increase production capacity by uprating the WTP by 50 lps, and an SOW is now being prepared. At PDAM Tanjung Balai, IUWASH has been mentoring PDAM staff and the consultant hired by the PEMDA in reviewing the WTP design, including preparation of drawings and cost estimates. The WTP will be constructed this year using a PEMDA budget of IDR 11 billion. To support the national program to expand water access by constructing new WTPs, IUWASH has been working with third parties to prepare DED for water supply systems in Paso, Ambon (30 lps) and Kutaraja Dalam and Kutaraja Luar in Jayapura (30 lps), with each design serving around 2,250 new connections that will support 22,500 people. Based on discussions on the draft final report, the related drinking water work units will finance the cost of construction from the national budget. GIS/MIS support IUWASH GIS/MIS support focuses on improving PDAM capacity to use and manage spatial data on customers and the distribution network. GIS systems will improve the operation and maintenance of the network, improve customer service through more effective water billing, and accelerate network expansion. Since 2012, IUWASH has been supporting PDAM Kota Bogor in setting up a GIS/MIS system using open source software, and has trained PDAM staffs to understand the system sufficiently to improve it without relying on other parties. This quarter a Customer Management Information System was developed for PDAM Kota Bogor. At PDAM Kota Bekasi, IUWASH conducted further GIS training and mentoring on customer spatial data and data entry. Next quarter, IUWASH will continue support for this PDAM by monitoring the development of customer spatial data. To follow up GIS training for seven PDAMs in South Sulawesi on how to use GPS, a third party under contract to IUWASH is now supporting three of the PDAMs in developing distribution network spatial data. In the next quarter, IUWASH will provide GIS training for nine new PDAMs in Central Java, to be followed by the development of distribution network spatial data at three PDAMs. IUWASH will also hold GIS training for PDAM Pematang Siantar staff in North Sumatra and for PDAM Jayapura staff in Eastern Indonesia.

Page 30: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 12

Program WS 2: Improved PDAM Financial Aspects

PDAM business planning PDAM business planning is a critical component of the IUWASH project. It enables PDAMs to continually monitor technical and financial objectives envisioned in their five-year road maps, thereby improving financial performance. Continuing the previous year’s program, this quarter several business plans were drafted and submitted for local government approval in the coming months. The project uses a participatory approach, with full involvement of PDAM staffs to ensure sustainability of the process. More details can be found in the accompanying table.

IUWASH PDAMs receiving business planning support

Location Progress through QPR 8/PY3

1 Tanjung Balai

Developing existing situation analysis 2 Tebing Tinggi 3 Pematang Siantar 4 Langkat 5 Kab. Labuhan Batu 6 Kab. Karawang Final draft for discussion with Dewan Pengawas (Supervisory Board) 7 Kab. Bekasi Developing existing situation analysis 8 Kota Bogor Developing investment plan 9 Kab. Serang

Final draft for discussion with local government 10 Kab. Lebak 11 Kab. Kendal 12 Kab. Kudus 13 Kab. Semarang 14 Kab. Probolinggo Developing investment plan

PDAM tariff review and billing and accounting programs IUWASH has been supporting tariff adjustments at PDAMs to enable them to improve revenue management. This quarter, the Parepare tariff adjustment proposal was approved by the mayor, and IUWASH continued support to Mojokerto, Probolinggo, Lamongan and Gresik in preparing their tariff adjustment calculations and proposals. Two PDAMs in West Java – Serang and Lebak – began installing the billing and accounting programs. Three PDAMs in North Sumatra – Langkat, Asahan and Labuhan Batu – will complete the program next quarter. More details can be found in the accompanying table.

IUWASH PDAMs receiving tariff adjustment support

Location Progress through QPR 8/PY3

1 Kota Parepare, South Sulawesi Approved by mayor in January 2013 2 Kab. Mojokerto, East Java Proposal now being developed 3 Kab. Probolinggo, East Java

Final draft has been prepared for discussion with local government 4 Kab. Lamongan, East Java

5 Kab. Gresik, East Java

Page 31: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 13

PDAM debt restructuring Debt restructuring is a crucial program as it enables PDAMs to reduce their outstanding debt to the central government and restore the financial stability needed to serve their customers. A recent regulation issued by the MOF (MOF Regulation No. 114/05/2012) simplifies the terms and conditions for PDAMs to participate in the program. This quarter IUWASH supported PDAMs in Parepare, Enrekang, Takalar and Jeneponto to prepare their business plans for MOF review and approval. In East Java, IUWASH assisted PDAMs in Kabupaten Probolinggo to prepare business plans that they then submitted to the MOF for approval. The accompanying table provides program details for participating PDAMs. This quarter IUWASH also evaluated business plan achievements at PDAMs already participating in the debt restructuring program. The analysis was prepared in collaboration with the MOF, in line with MOF Decree No. 120 of 2005. The preliminary monitoring results indicate that most PDAMs are facing difficulties achieving the targets in their business plans. IUWASH will integrate these findings in the technical guidance tool for consideration by the MOF as the MOF prepares to issue a decree on permanent debt write-offs.

IUWASH PDAMs receiving debt restructuring support (status as of March 2013)

Location Debt restructuring stage Progress

1 Medan Approved First monitoring will use 2012 financial report 2 Tanjung Balai Monitoring

Second monitoring by IUWASH 3 Tebing Tinggi Monitoring 4 Pematang Siantar Monitoring 5 Sibolga Monitoring 6 Langkat New Proposal being prepared by IUWASH and

PDAM 7 Asahan New 8 Karawang Monitoring

Second monitoring by IUWASH

9 Tangerang (Kab.) Monitoring 10 Semarang (Kota) Monitoring 11 Semarang (Kab.) Monitoring 12 Surakarta Monitoring 13 Grobogan Monitoring 14 Lamongan New Proposal undergoing minor revisions 15 Probolinggo (Kab.) New Proposal submitted to MOF 16 Gresik Monitoring

Second monitoring by IUWASH 17 Mojokerto (Kab.) Monitoring 18 Makassar Monitoring 19 Jayapura Monitoring 20 Parepare New

Draft ready for submission to MOF 21 Enrekang New 22 Maros New Re-approval meeting required 23 Jeneponto New

Draft ready for submission to MOF 24 Takalar New

Program WS 3: Improved PDAM Customer Engagement Aspects

Customer Satisfaction Survey A Customer Satisfaction Survey (CSS) provides crucial information on the level of satisfaction with PDAM services, which is a key consideration in the preparation of PDAM business plans. The survey covers technical aspects (water quantity, quality, continuity and pressure), general services, customer complaints, and water tariffs. IUWASH has been collaborating with PDAMs to develop the survey, prepare the questionnaire, select respondents, procure third parties to conduct the survey, join the enumerator training, and evaluate the survey results.

Page 32: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 14

CSS surveys were conducted this quarter in five cities in North Sumatra (Tebing Tinggi, Pematang Siantar, Tanjung Balai, Langkat and Labuhan Batu) with 3,346 respondents, and in three cities in East Java (Jombang, Probolinggo and Kota Batu) with 1,910 respondents. CSS surveys are ongoing in two cities in Central Java (Klaten and Sukoharjo) with 1,770 respondents. Customer Census and Reclassification Survey A customer census is conducted to obtain information on customer data and perceived problems relating to water quantity, quality and continuity of service. The census also provides data on the social-economic conditions of customers (allowing reclassification of the tariff group of each customer), the level of technical services, the condition of customers’ water meters, and the level of administrative services. The census is also a key input for the GIS/MIS customer database. A large customer census began this quarter in PDAM Kota Semarang, which has 138,572 households, with 47,789 respondents being financed with PDAM Kota Semarang funds and 90,783 respondents being financed by IUWASH. The results will be used for a customer database, to reclassify tariffs, and to improve services. A tariff reclassification survey in PDAM Klaten for 28,063 customers aims to obtain data on customer property as a consideration for reviewing the water tariffs of customers. The survey began this quarter and will be completed by June 2013. Facilitation of PDAM customer participation IUWASH has targeted the establishment of 20 civil society organizations (CSOs) that regularly report on PDAM performance. The initial plan for PY3 was to assist five PDAMs – one in each region. But following intensive discussions at both national and regional level, it became clear that in order to achieve 20 customer forums by the end of the project, more PDAMs will need to receive support during PY3. Following discussions this quarter with the PDAMs and regional teams, the following list of PDAMs was agreed:

o West Java/Banten/DKI: Bandung, Purwakarta, Kota Bekasi o Central Java: Surakarta o East Java: Kab. Mojokerto o South Sulawesi/East Indonesia: Maros, Sidrap, Jayapura o North Sumatra: Not yet decided, as the assessment is not yet complete.

The PDAMs are being selected in various ways, including FGDs and assessment tools developed by the IUWASH customer participation specialist (STTA). The specialist has also prepared Training of Trainer (ToT) activities for Regional Urban Water Specialists, BCC specialists, and staff from the selected PDAMs. The training, which will begin in April 2013, will be conducted in four regions, with East Java and Central Java being combined for one of the training sessions. Program WS 4: Raw Water Management and Climate Change Adaptation Planning

Supporting PDAMs and local governments in safeguarding and managing the quantity and quality of water provided to customers is a key IUWASH program, especially considering the impacts of climate change on raw water sources and PDAM infrastructure. IUWASH has developed a nine-step program to implement the Climate Change Vulnerability Assessment and Adaptation Planning (CC VAAP). This program is described in the CC VAAP inception report, which was finalized in both English and Indonesian during the previous quarter and distributed to USAID and GOI partners. These nine steps form the basis of the IUWASH program in at least 20 locations. CC VAAP progress during this quarter is shown in the accompanying table:

Page 33: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 15

Progress and Planning for IUWASH Climate Change Adaptation Planning (March 2013)

PDAM Progress this Quarter Planning for next Quarter

Kota Medan North Sumatra

· CCVA ongoing (internal) · Construction of 800 infiltration

ponds ongoing (CCFI and JKM)

· Second stakeholder workshop (mid-April)

· Complete infiltration ponds Kota Pematang Siantar North Sumatra

· Draft final report CCVA discussed · Construction of 50 infiltration

ponds completed

· Finalize CCVA · First stakeholder workshop (mid-

April)

Kota Sibolga North Sumatra

· Preliminary assessment completed · Prepare SOW for third party

Kab. Serang, Kab. Karawang West Java

· SOW for CCVA being tendered · Commence CCVA assessment

Kab. Bandung West Java

· SOW for CCVA being tendered · Commence CCVA assessment

Kota Bogor West Java

· Continue field measurements · Complete preliminary assessment

Kudus, Kab. Semarang, Kota Salatiga Central Java

· Interim report on CCVA discussed · Discussions ongoing on

regionalization of raw water

· Final report for CCVA · Further discussions with Province on

regionalization of bulk water Kab. Mojokerto East Java

· CCVA completed · Conducted first stakeholder

workshop · Construction of 650 infiltration

ponds ongoing (CCFI and NGO)

· Finalize CCVA report and analysis · Conduct second stakeholder

workshop · Continue constructing infiltration

ponds Kota & Kab. Probolinggo East Java

· Draft SOW under development · Complete preliminary assessment and SOW for third party

Kota & Kab. Malang, Batu East Java

· Draft SOW under development · Complete preliminary assessment and start CCVA (internal/STTA)

Kota Parepare, Kab. Pinrang, Kab. Enrekang, Kab. Sidrap South Sulawesi

· Completed preliminary assessment · Discussions with all PDAMs and

Province completed

· Prepare SOW for third party

The collaboration with Coca-Cola Foundation Indonesia (CCFI) continued this quarter with projects to construct infiltration ponds in Kab. Mojokerto and Sibolangit (Medan). Mojokerto PEMDA and PDAM are remain very supportive, and the first stakeholder workshop was conducted this quarter, at which the impact of CC was discussed with local participants. The program in Sibolangit (800 ponds) is still ongoing, and while the internal management problems experienced in the previous quarter have now been resolved, the construction of 99 new infiltration ponds by a local contractor under the supervision of JKM (a local NGO) has not been of the expected quality. The work in Sibolangit is now expected to be completed next quarter. IUWASH has solidified a collaboration with Perhutani to use its protected forests to construct small infiltration ponds, with the signing of an MOU between Perhutani and IUWASH during the IWWEF conference in January 2013. The pilot location will be Kab. Mojokerto. If this initiative is successful, it will be extended to other areas. During this quarter, IUWASH also began preliminary assessments in four cities in South Sulawesi and one in North Sumatra, and in the next quarter a SOW will be developed and tendered for a further five CCVAs. The five remaining locations are in East Java and Kendal, Central Java. Due to staff limitations and time constraints, the IUWASH team has not yet followed up with the ICCTF Secretariat and Bappenas (Directorate of Forestry and Water Source Protection) on the proposal on “Climate change and urban water management – Creating resilience and water security” to be financed by ICCTF. This initiative will be followed up next quarter.

Page 34: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 16

Program WS 5: Microfinance

The microfinance for water supply program began in PY2 in Kudus, involving the PDAM, cooperative, and Bank Syariah Mandiri (BSM), and in Mojokerto, involving the PDAM, cooperative, and three local banks. This experience provides a solid basis for the PY3 program as IUWASH expands into new cities. During this quarter, further promotion and marketing training was conducted in selected cities in all IUWASH regions, including Mojokerto, Probolinggo, Jeneponto, Lebak, Serang and Langkat. In all cities, collaboration has been sought with the local cooperative to implement the partnership between the PDAM and BSM. During this period, three new water supply connections were made using microfinance, along with 160 sanitation connections (discussed in more detail in Section 2.3). In the next quarter, the PDAMs that have undergone the promotion and marketing training will begin promotion campaigns, supported by IUWASH. IUWASH regional teams will continue their assessments to identify PDAMs ready to increase the number of connections. They will focus on water availability, the cost of new connections, and the level of PDAM interest. During the IWWEF Conference in January 2013, an MOU was signed between the IUWASH Chief of Party and a BSM Director for the joint promotion of microfinance for water connections. The signing was witnessed by USAID and the GOI. This umbrella MOU will make it easier for PDAMs and BSM local branches to implement partnerships. Program WS 6: Master Meter

Installation of Master Meter (MM) systems is one of two key IUWASH strategies to increase water access to low-income families (with promotion of microfinance being the other, as discussed above). With an MM system, a group of households have individual meter connections, but the network is connected to a PDAM bulk meter. In the community, a CBO manages the system, collects monthly tariff payments, and handles the operation and maintenance (O&M) of the MM system. During this quarter, the master meter evaluation report was finalized. One of its main conclusions was that wherever PDAM can provide water of sufficient quantity and pressure, households are very satisfied with the system and are prepared to pay the stipulated tariff. But if the PDAM service deteriorates, as has been the case in Belawan (Medan), the satisfaction level drops and the CBO faces problems collecting the fees from households. Another conclusion became evident this quarter – the tariff charged by the PDAM to the CBO should not be too low (social tariff), as this does not encourage the PDAM to take the system seriously. At a minimum, the first household group tariff should be used, as this is more reasonable for the PDAM yet still much cheaper for households than purchasing vended water. This has been done in Jakarta and Sidoarjo, and both water utilities are enthusiastic to expand the MM service. Meanwhile, in Jayapura and Medan only a social tariff is being charged for political reasons, and the PDAMs are not putting sufficient effort into keeping the water flowing. In Makassar, where CARE constructed several master meters, supply has been erratic, causing households to complain to the CBO. Because there are still many poor residents of Jakarta who do not receive piped water, the MPW asked IUWASH to identify whether Master Meters could be installed to expand water services for the poor – potentially utilizing the water saved under the NRW reduction program (see Section 2.2.2). As a preparatory step, IUWASH has conducted a survey of the 25 “master meters” in Aetra’s service area. The final report will be discussed next quarter, but preliminary observations suggest that these are not true master meters, but public taps where poor households can collect water using hosepipes at relatively high tariffs.

Page 35: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 17

The program with PDAM Kab. Tangerang to serve 450 connections through 12 master meters began this quarter following IUWASH capacity building in the community to establish a CBO to manage the meters. This quarter, the grant to support MMs for 400 connections in Sidoarjo continued, with expanded connections in existing areas and pipe laying for new locations. An MM program with PDAM Surabaya to serve up to 500 connections is now under preparation, for implementation in collaboration with PNPM. Also this quarter, discussions began with HSBC to utilize its CSR funding to construct several master meters in Tangerang. Program WS 7: Long-Term Finance

While the debt restructuring program improves the financial stability of PDAMs, the long-term finance program enables PDAMs to access growth capital from diverse sources including both the public and private sector in order to serve more customers. In a continuation from the last quarter, IUWASH is supporting 10 PDMs in various stages of developing long-term financing options. In North Sumatra, IUWASH is supporting feasibility studies for a regionalization project in Tebing Tinggi and a water treatment plant in Medan. In Central Java, IUWASH is currently assisting two PDAMs (Kendal and Surakarta). PDAM Surakarta is receiving technical assistance to conduct feasibility studies from the MPW, while PDAM Kendal’s projects will receive a subsidized loan under Perpres 29 in an estimated amount of IDR 25-30 billion. IUWASH will conduct DED for the survey and facilitate discussions with stakeholders, GOI and potential lenders. Under this project, 31,500 new water connections will be established in the region.

Progress in PDAM Long-term Financing Program (March 2013)

PDAM Project Description Progress through Quarter 8/PY3

Kota Tebing Tinggi North Sumatra

- 200 lps regionalization project (Tebing Tinggi and Serdang Bedagai)

- Anticipated financing: PPP (B2B) or Perpres 29

Consultation with local governments in progress; Pre-FS to be prepared

Kota Medan North Sumatra

- 1000 lps new WTP – Belawan (MBR) area - Anticipated financing: Perpres 29

Technical aspects of WTP’s capex complete; capex for distribution line in preparation

Kota Bekasi West Java

- Bekasi Barat: 200 lps production and distribution

- Anticipated financing: PPP Draft FS (by IUWASH) ready for discussion with PDAM - Pondok Gede: 300 lps new WTP and

distribution - Anticipated financing: PPP

- Jati Asih: 100 lps new WTP with PJT - Anticipated financing: PPP

PJT completed Pre-FS (technical and financial); bulk water price negotiation postponed as more discussion needed to agree on terms of cooperation

- Mustika Jaya: 200 lps production and distribution

- Jatibening: 200 lps production and distribution - Anticipated financing: PPP

Draft FS ready for discussion with PDAM

Kab. Tangerang Banten

- New WTP in Tangerang (Cibogo project) - Anticipated financing: PPP

IUWASH completed and submitted new draft FS to PDAM; awaiting PDAM feedback

Kab. Lebak Banten

- WTP renovation and distribution line construction to serve Kab. Tangerang

- Anticipated financing: PPP

Activity postponed due to complication in negotiations between PDAM Kabupaten Tangerang (buyer) and private sector

Page 36: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 18

PDAM Project Description Progress through Quarter 8/PY3

Kab. Serang Banten

- Greenfield water supply project for Ciruas/Cibaja

- Anticipated financing: PPP or Perpres 29

Pre-FS under revision with IUWASH; PDAM submitted request letter for GOI grant to MPW

Kota Surakarta Central Java

- 300 lps bulk water supply project - Anticipated financing: PPP or Perpres 29

MPW facilitated preparation of financial analysis of Perpres 29; IUWASH to facilitate next steps

Kab. Kendal Central Java

- 300 lps Telogo Mili (Spring) - Anticipated financing: Perpres 29 plus GOI

loan

FS and DED completed by IUWASH and presented to provincial water office (BBWS); potential national bank identified for funding

Kota Gresik East Java

- 200 lps water supply project - Anticipated financing: PPP

FS complete and discussed with Bupati; PT Drupadi appointed as private partner; discussions in process on bulk water tariff

Kab. Mojokerto East Java

- 500 lps water supply project - Anticipated financing: PPP

FS review complete; PDAB appointed as partner for PPP; FS discussed with PDAB

Creditworthiness Ladder Development of the Creditworthiness Ladder (CWL) and its translation into Indonesian were completed this quarter. IUWASH presented the CWL to MOF, MPW, BPPSPAM and BPKP at a national debt restructuring event held in February 2013. Positive responses and inputs were received during the meeting, and these will be incorporated in the manual. Program WS 8: PDAM Institutional Support

The PDAM institutional support program assists PDAMs to become strong, professional institutions that can achieve sustainable performance. This program has two parts:

(1) Strengthening PDAM structures and capacity building for stakeholders (DP, DPRD, PEMDA)

(2) Regionalization of raw water sources and/or PDAMs During this quarter various activities took place in all IUWASH regions to support these two subprograms. These activities are summarized below. Strengthening PDAM structures and capacity building for stakeholders The institutional support program includes several activities that aim to strengthen institutional aspects of PDAMs and local governments in an effort to increase water supply to customers. In PDAM institutional support, this quarter IUWASH continued to provide technical assistance to PDAM Kota Binjai in North Sumatra to support its organizational restructuring in order to optimize efforts by its staff to provide municipal water supply services. This organizational restructuring will help the PDAM to restructure its current staff in the workplace and improve their skills.

A continuing focus of IUWASH is capacity building for PDAM Supervisory Boards (Dewan Pengawas or DP), as a key link between the PDAM’s management and their local government owners. DP capacity building is seen

Key Functions of the PDAM Supervisory

Board (Dewan Pengawas)

In line with Permendagri 2/2007, the functions of the PDAM Supervisory Board are to: 1. Monitor, control and assist PDAM

management; 2. Provide advice and counsel to the local

government in improving PDAM performance (including the selection of PDAM directors, financial and legal matters, and reviews/approvals of reports); and

3. Examine and approve PDAM business plans and annual budgets.

Page 37: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 19

as the foundation for other PDAM institutional support. During this quarter, IUWASH continued training programs for DP members from PDAMs in three IUWASH regions (West Java, North Sumatra and Central Java). Follow-up training has been requested, including training on evaluating the current state of the PDAM.

Regionalization of raw water sources and/or PDAMs The regionalization of the water supply system is a crucial program that now has robust support from the central government. This quarter IUWASH continued to follow up this national program, including support for PDAM Kab. Tangerang to supply water to both Kab. Tangerang and Kota Tangerang Selatan. Both PEMDA see IUWASH as an independent party supporting the regionalization process. Follow-up steps in the next quarter will include further discussions with both municipalities on a draft MOU on regionalization, which is expected to be signed by both mayors. Another water supply regionalization project has been initiated with the PDAMs of Kab. Serang and Kota Serang. A preliminary meeting with PEMDA Kab. Serang was held this quarter, with the local government demonstrating keen interest in water services in Kota Serang that are currently provided by the district PDAM. The program aims to resolve persistent issues concerning water service territory, which have affected the water supply to the district PDAM’s customers.

Many PDAMs face increasing difficulty in obtaining sufficient raw water to expand their services. Improving efficiency through increased cooperation among regions, including the potential regionalization of raw water sources, is often the best solution, especially considering the negative impact of climate change on raw water sources. During this quarter IUWASH continued assisting PDAM Kab. Semarang and PDAM Kota Salatiga (in Central Java) to implement raw water regionalization. IUWASH will continue discussions in the next quarter, hopefully leading to a formal agreement. This positive momentum was shared at the IWWEF conference held in Jakarta in January 2013.

The regionalization program also concerns raw water issues. This quarter South Sulawesi began the Ajatapareng regionalization for water services in four municipalities. Kota Parepare and Kab. Enrekang, Pinrang and Sidrap are expected to benefit from this the raw water regionalization program, with IUWASH conducting preliminary assessments and holding meetings with all stakeholders, including the provincial government responsible for coordinating raw water management. Next quarter, an SOW will be developed for the CCVA that will include activities supporting raw water regionalization.

Page 38: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 20

Section 2.3

SANITATION SECTOR

To achieve the IUWASH sanitation target of improving access to sanitation for 200,000 people or 40,000 households, IUWASH has integrated the three project components (increasing demand, improving service provider capacity, and supporting an enabling environment) into an Urban Sanitation Sector program with a portfolio of five urban sanitation programs (see box). Through these programs, IUWASH provides support to all types of urban sanitation infrastructure through either direct technical assistance or grant programs, depending on the ongoing and planned activities of the local and/or national government. For more details of the ongoing sanitation programs in IUWASH locations, see Annex 3 (Sanitation Matrix). Main achievements this quarter This section summarizes the main achievements in the urban sanitation sector this quarter under the four signature programs, followed by other achievements. More details can be found in subsequent chapters of this report and in the five regional reports, including updates on the 10 anchor projects in this sector. Signature Programs IUWASH has defined four signature programs in the sanitation sector, involving innovative approaches that can be used as examples by the GOI and donor agencies. These signature programs are implemented with direct assistance from IUWASH experts and subcontracted third parties. In this quarter the following signature programs resulted in the following achievements in the sanitation sector:

· Demand creation for individual and communal systems o Capacity building was provided for sanitarians and STBM facilitators in all five IUWASH

regions o Sanitation marketing training (TSSM) was introduced in East Java to develop SME and

microfinance institutions for sanitarians and community members o USRI and PU/PLP were supported with 11 training courses for 1,140 community cadres

and sanitarians o Guidelines for triggering and behavior change processes in the urban sanitation context

were finalized under the leadership of the MOH, with extensive input from IUWASH, PU/PLP, High Five and USDP

o First draft of individual and communal sanitation system guidelines is now ready for review and trial

· Sanitation management units (UPTD, etc.) o Advocated establishment of UPTD as an integral part of sustainable sanitation policy

IUWASH programs in the Urban Sanitation Sector SAN 1 Increase access through individual systems SAN 2 Increase access through communal systems SAN 3 Increase access through off-site (sewerage) systems SAN 4 Improved urban sludge management SAN 5 Institutional support for Pokja AMPL/Sanitasi and

Sanitation Management Units (UPTDs)

Page 39: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 21

o Held several meetings with MoHA (Bangda), USDP and IndII on national support for UPTD

o Developed several SOWs for the IUWASH Grant Program or PO activity to support establishment of UPTDs

· Promotion of citywide sewerage o Sanitation promotion and marketing were provided for PDAM and PEMDA staff to

provide new household connections in Surakarta, Medan and Kota Bogor o SPEAK subcontract on sewerage promotion was completed, and discussions are ongoing

with FORKALIM to share this approach with all FORKALIM members o Interim report was published on DED for the sewerage system of Kota Medan, targeting

3,000 new connections, with finance for piping being arranged through the state budget (APBN) and finance for connections coming from the local budget (APBD)

· Urban Sludge Management o The second phase of improved Urban Sludge Management began by applying the concept

to the potential partners o The results of the first phase will be shared at a workshop in early April with PU, WSP and

USDP Other Achievements · Microfinance for sanitation

o Initiation of Jamban Sehat microfinance promotion in Kota Probolinggo, Kab. Mojokerto, Kab. Jombang and Kab. Gresik to increase number of users.

· Training in Urban Sludge Management o Training for 24 participants from 13 cities, in collaboration with PU/PLP, USDP and WSP

· Roadshow promoting readiness for small-scale sewerage systems o Roadshow held in seven cities in East Java

· Completion of City Sanitation Strategies (SSKs) o Supported eight cities on development of EHRA, Sanitation White Book and SSK and all of

these documents are completed o Support four cities with reviews of existing SSKs o

Collaboration with other parties IUWASH’s ambitious targets can only be achieved through strong partnerships with key national government ministries, other donor agencies, and other institutions, both public and private. This collaboration can take many forms, including regular exchanges to avoid duplication of effort and to share lessons learned, as well as developing joint programs. The following table summarizes the main collaborations in the urban sanitation sector this quarter.

Partner Summary of activities this quarter

USAID/High Five program Joint meeting on collaboration to develop urban sanitation “community triggering” guidelines Meetings on collaboration to develop media advocacy program in Makassar, Medan and Surabaya on urban sanitation

Page 40: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 22

Ministry of Public Works Regular meetings on development of urban sanitation programs: · Capacity building for community-based systems · Training on improved Urban Sludge Management · Finalizing program on DED for modular IPLT

Ministry of Health Regular meeting on development of training module on urban STBM

Asian Development Bank Support capacity building and promotion of USRI program, including around 10 large-scale trainings in Central Java, East Java and South Sulawesi

World Bank/Water & Sanitation Program

Meetings on next steps for improved Urban Sludge Management programs Discuss joint capacity building for SMEs in sanitation marketing

PU/Satker for Jabotabek region

Joint programs to develop community-based sanitation systems in DKI Jakarta, Tangerang, Bekasi and Bogor

Program SAN 1. Increased access through Individual Sanitation Systems IUWASH undertakes the development of individual sanitation systems by adhering to the Implementation Manual and Technical Manual of the National Secretariat for the STBM Program. Both manuals have been widely used as a main reference for triggering techniques and activities in the rural community. The manuals contain principles and strategies for triggering techniques and activities, including no subsidies for construction, and the principle that triggering activities should begin with an unimproved sanitation ladder, since the community’s ability to trigger changes in sanitation behavior is highly valued. IUWASH adapts the CLTS method to encourage participation by the entire community in targeted areas identified by the local Department of Health as having the greatest need for increased access to improved sanitation systems. A community-triggering program in conjunction with a behavior change program is always the initial entry point. Once community awareness has been raised, the next step is to organize small groups to raise community funds and employ other financing mechanisms such as microfinance and revolving funds, combined with integration with other government and donor programs. The following table summarizes the steps in the triggering activities for individual sanitation systems.

Step Activities

Pre-triggering

a) Identifying potential target areas, where toilet coverage is low and open defecation high

b) Identifying potential partners (sanitarians, community cadres) who can become triggering facilitators in the community

c) Introducing and advocating program implementation plans to PEMDA d) Training of CLTS triggering facilitators for sanitarians and sanitation cadres

Triggering

e) Sanitarians and facilitators conducting triggering activities intensively for community groups at the neighborhood or village level

f) Sanitarians and sanitation facilitators conducting hygiene promotion at schools and in the community

Post-triggering

g) Providing technical assistance to the community and capacity building for facilitators using alternative financing through microfinance and SMEs

h) Preparing program sustainability, such as replication funded by PEMDA

This quarter, IUWASH gathered STBM facilitators and sanitarians in three regions to improve their capacity, and facilitated the participants in sharing their experiences and identifying challenges in order to develop strategy for future triggering activities. In addition, to boost access to sanitation

Page 41: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 23

facilities, sanitation marketing training (TSSM) was introduced in East Java to stimulate sanitation entrepreneurship amongst participants. STBM facilitators and sanitarians were encouraged to develop SMEs and microfinance institutions for community members with changed hygiene behaviors.

Urban sanitation implementation guidelines were also developed this quarter. The following guidelines reached the draft stage and are now ready for review and trial:

· Individual Sanitation System Guidelines and training modules for urban areas, developed with High Five and acknowledged by the MOH (in English and Indonesian).

· Communal Sanitation System Guidelines and training modules, developed with ADB and acknowledged by the MPW (in English and Indonesian).

Four activities have been carried out to support production of modules that will be used extensively.

· Document review – IUWASH reports, GOI documents, Urban CLTS references, other CLTS references.

· Interviews and workshop with IUWASH staff in the national office, and meetings with staff in Makassar and Surabaya.

· Meetings with key partners and actors (at different levels and in different locations): WB Sanitation Coordination Group, Ministry of Planning, PLAN International, SHAW project, MPW, Bappeda, UPTD, High Five, CARE, MOH, subcontractor ITS.

· Field visits to communities: Kota Bogor – two communities; Kota Surabaya – community health training; Kota Probolingo – two communities; Kabupaten Jeneponto – one community; Kota Makassar – one community.

SMEs and Microfinance Financing for sanitation facilities through microfinance was rolled out in several IUWASH sites – Probolinggo and Mojokerto in East Java, Lebak in Banten, and Bogor in West Java. By the end of this quarter, 180 healthy toilets (“Jamban Sehat”) had been constructed through microfinance. The microfinance scheme uses the Grameen Bank model. It is organized by MFI/SME and implemented by a local facilitator for lower-income families who need microfinance loans of between IDR 800,000 and IDR 1,200,000, with weekly installments being collected by the village facilitator over a period of up to 50 weeks.

The sanitation microfinance site with the greatest potential is Kabupaten Tangerang, where around 30,000 families do not have a Jamban Sehat but are members of the Tangerang cooperative Abdi Kerta Raharja (AKR). AKR will provide a microfinance Grameen model for Jamban Sehat supported by IUWASH. In East Java, “Pelatihan Wirausaha Sanitasi program STBM” training was conducted. In an effort to promote SMEs that had just begun operating, IUWASH helped five SMEs to develop promotional leaflets – HIPPAMs (Kab. Lamongan), CV. N-Vitec (Kab. Mojokerto), CV.

Wahana Tirta and Koperasi SANIMAN (Kota Probolinggo), and Empat Sekawan (Kab. Gresik). The accompanying illustration of one of the leaflets clearly shows the construction of a healthy toilet, the costs involved, and a contact person for interested households.

Page 42: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 24

Sanitation marketing is one strategy that sanitarian cadres and sanitarians are being encouraged by IUWASH to implement in order to expand public access to healthy toilets through microcredit. Program SAN 2. Increased sanitation access through communal systems

IUWASH is actively involved in preparing a module to promote public access to a system being constructed under the Urban Sanitation and Rural Infrastructure (USRI) Program run by the MPW and ADB. A small team of authors included MoH (as coordinator), USDP, High Five, MPW, and an ADB consultant. A series of discussions were held throughout this quarter to establish a curriculum and develop the modules to be used to support communal sanitation programs. The team produced a final draft which is now being finalized by a small MOH team and is being tested by a team of USRI Program training facilitators in Makassar, Manado, Yogyakarta, Semarang, Solo, Surabaya and Malang. Healthy Behavior Education (Edukasi Perilaku Sehat or EPS) is the trigger for communal sanitation systems. EPS is intended to increase awareness and understanding of the importance of sanitation facilities so that the targeted community is prepared to build, use and maintain the sanitation facilities as community property. At present, IUWASH applies triggering as the entry point for facilitation training for sanitation cadres from local CBOs (KSM and BKM) that are part of the USRI Program, DAK/SLBM, and the MPW’s Sanimas (Community-Based Sanitation) program. IUWASH is documenting results to extract lessons learned for further development of modules and guidelines to standardize EPS triggering. These guidelines will be used in IUWASH target areas and the sanitation development programs of other sanitation actors and institutions. During this quarter, IUWASH actively supported the USRI Program by conducting 10 facilitation trainings for KSM, BKS and village facilitators, and by supporting routine meetings held by PMU USRI at the national level, and by DPMU at the regional level. So far, IUWASH has trained around 1,140 facilitators and sanitation cadres in Makassar, Central Java and East Java as well as in Yogyakarta (following a specific request by the MPW, since Yogyakarta is not an IUWASH-supported province). In the next quarter, the IUWASH national and regional teams will continue developing the community triggering and behavior change guidelines for CBS systems in urban areas in close collaboration with the MOH and High Five and with assistance from an IUWASH STTA. Triggering steps for communal sanitation systems are described in the table below. Step Activities

Community preparation

a) Trigger EPS and obtain support and commitment from the community b) Community meeting 1: Establishing a Community-based Organization c) Capacity building/KSM training

Community planning

d) Community sanitation mapping e) Community meeting 2: Site Selection and Community Action Planning f) Choosing technology options and technology standards g) Developing activity proposal and funding

Construction

h) Construction preparation i) Monitoring/supervision of construction work j) Training in O&M and KSM management k) Introducing use of facilities and community hygiene behavior change

Post-construction

l) Inauguration of sanitation facilities built by the community m) Establishing UPTD to undertake technical monitoring n) Monitoring effluents, O&M, sludge removal, KSM, facilities usage, and so on

Page 43: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 25

IUWASH support for Sanimas programs in Jabotabek region During this quarter IUWASH expanded the sanitation program in the Jabotabek region, especially in DKI Jakarta, Bekasi and Tangerang. Construction of a communal system in DKI Jakarta (funded by Satker/APBN) is ongoing while materials have been procured for communal systems in two locations in Kab. Tangerang (financed by APBN and APBD) and Kab. Bekasi (financed by a property developer), providing a total of 600 connections. IUWASH support has focused on preparatory steps, designs and community organizing through grants to Kab. Tangerang and a series of events in DKI Jakarta and Bekasi. Preparations for grantee selection were completed this quarter, and the work will start next quarter. Both the software approach and technical designs of these three programs will become examples for a much larger CBS program financed by IDB (Islamic Development Bank) and starting in 2013, with at least 250 CBS systems planned in the Jabotabek area over the next three years. Program SAN 3: Increase access through off-site sanitation (sewerage)

IUWASH programs to support increased access to sewerage connections are being implemented in cities that already have a sewerage system (Medan, DKI Jakarta, Bogor and Surakarta) and those that have concrete plans to develop small- or large-scale sewerage systems (Makassar, and selected cities in East Java). IUWASH does not finance physical construction, since construction costs for sewerage expansion, including household connections, are usually covered by the central and local government, but project support does include institutional strengthening, promotion campaigns for new connections, introducing GOI programs to selected IUWASH cities and, in a few cases, technical designs to leverage construction financing from central and local government. During this quarter IUWASH conducted activities in all of these areas. These activities are summarized below. Promotion and campaign for new household sewerage connections This program employs two approaches: a) subcontracting to third parties (like a grant) at PDAM Surakarta and PDAM Medan, and b) direct technical support for the PEMDA (UPTD) of Kota Bogor. Connection fees for sewerage systems are IDR 3 million in Surakarta and Bogor (paid by the household) and IDR 6 million in Medan (paid by PEMDA). During this quarter, 21 new connections were made in Surakarta and 50 in Bogor. The promotion programs are implemented by the PDAM/UPTD staff, supported by IUWASH through capacity building, development of promotion materials, and media discussions. In the next quarter, IUWASH will support UPTD to promote an additional 50 connections. In Medan, IUWASH (through SPEAK, a third party) has been supporting promotion campaigns for sewerage connections implemented by PDAM Tirtanadi through capacity building and joint materials development. SPEAK introduced the 10 Step Promotion Toolkit to PDAM Tirtanadi. Dinas Tata Ruang dan Pemukiman Kota Medan is constructing the household connections, while the provincial public works office is building the network. In this quarter, 1,200 connections funded by the local budget were established. 10-Step Promotion Toolkit This logical, step-by-step method provides a well-structured guideline for the promotion team to plan, design, prepare, develop, implement and evaluate the success of a promotion program for behavior change in target audiences. The 10 steps are:

1. Define: Lay groundwork – problem, audiences, behaviors 2. Gather: Examine audiences – customers, providers, supporters 3. Focus: Establish audience behavior – current and desired 4. Strategize: Shape long-term – goal and objectives

Page 44: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 26

5. Plan: Formulate short-term – promotion effort 6. Develop: Develop materials – reflect and influence 7. Pretest: Confirm materials – acceptability, comprehension, appropriateness 8. Implement: Execute plan – launch and follow-through 9. Monitor: Follow progress – process and outcomes 10. Evaluate: Evaluate promotion – outcomes and impact

Technical support During this quarter the third party implementing the study and DED for the sewerage system of Kota Medan submitted an interim report that was discussed with IUWASH, the PDAM and GOI (PU/PLP) and will be finalized in the next quarter. The DED is intended to support 3,000 additional household connections from 2013 to 2015, with financing already arranged by IUWASH through the APBN (for piping) and APBD (for household connections). Good progress was made in the small-scale sewerage system for Kota Tebing Tinggi in North Sumatra, including finalizing the DED, securing APBN funding of IDR 3.7 billion for IPAL construction and piping, and securing APBD funding of IDR 500 million for household connections. A third party tender process will be prepared and conducted in the next quarter. Roadshow for small-scale sewerage systems, communal systems and IPLT During this quarter and at the request of PU/PLP, IUWASH conducted a roadshow in seven locations in East Java to promote small-scale sewerage systems and IPLT using a combination of APBN and APBD financing. Kota Malang was discovered to have the best potential for involvement in the IPLT program, communal systems, and capacity building for the UPTD to manage the sanitation facilities. During the roadshow, the following “readiness criteria” were identified as prerequisites for a city to obtain state funding to develop small-scale sewerage systems and/or IPLT:

Page 45: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 27

· Letter of Interest from PEMDA (mayor and DPRD head) · City Sanitation Strategy (in line with PPSP program)

· Project being included in RPJM document · DED and environmental study · Availability of a sufficient area of land · Local institution (such as UPTD) to maintain and manage the facilities

· APBD funds to operate the system The state budget will be used for construction of the IPAL and the main or secondary piping network, while the local budget will be used for household connections and lateral/service pipes. In the next quarter, IUWASH will facilitate preparation of the readiness criteria for cities interested in participating during the 2014 budget cycle. Program SAN 4: Improved Urban Sludge Management

With the completion of Phase 1, which included an initial technical and financial analysis on the feasibility of improved Urban Sludge Management (USM) in collaboration with WSP, IUWASH has begun implementing the concept of a sludge service system (SLLT) in three cities (Surakarta, Probolinggo and Bogor). Improved USM is an integrated desludging management system for urban areas where all operational, financial and institutional components (collection, retributions, sludge processing and utilization) are combined to provide a sustainable system with adequate infrastructure, institutional and financial support, administrative management, and proper regulation. Besides these three cities, Makassar will also be facilitated since the local government is very interested and eager to implement this program. The SLLT concept will include seven aspects in order to ensure a sustainable sewerage management service system. These seven aspects of USM have been discussed with the local government and key stakeholders in each pilot city. The accompanying diagram illustrates the seven aspects of USM.

Page 46: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 28

A change in approach from the current “on-call” method to regular/scheduled desludging was discussed and agreed in principle by all local stakeholders. The accompanying illustration presents a four-year cycle of desludging. This scheduled sludge service system combined with a regular payment system will be piloted in four cities.

To support improvements in the USM program, the DED IPLT module has been completed and is now ready for use by cities and districts. DED was supported by IUWASH and has now been handed over to PPLP Dep. PU. A workshop with local governments and key stakeholders will be held in April 2013 to build a common understanding of SLLT. During the event, the findings of the improved sludge management study supported by IUWASH and the WSP study will be presented and discussed. At a PPLP Dep. PU workshop scheduled for June 2013, SLLT will be presented to 130 cities and districts that have IPLTs which are not functioning optimally (currently less than 5% of IPLTs function properly).

Program SAN 5: Support for Pokja Sanitasi/AMPL

This quarter, IUWASH regional teams continued facilitating the Sanitation Working Groups in 12 locations to complete their SSKs on time and of the quality required by PPSP. The IUWASH national team provided back-up support and maintained contact with the PPSP National Secretariat and Project Implementing and Management Units (PIU and PMU) in Jakarta. IUWASH facilitated various training programs and joined monitoring and evaluation sessions arranged under the PPSP program. By the end of March 2013, ten of the 12 locations had completed their Sanitation White Book and EHRA, and seven had also completed their SSK. The remainder will be completed in April 2013. Public consultations have been held at the seven sites where SSKs have been completed. IUWASH will continue facilitating the other five cities in finalizing updates to their existing SSKs, followed by public consultations. In future assistance to the Sanitation Working Group/AMPL and support for the PPSP program, IUWASH will focus on the implementation of SSK and MPSS. Since there are plenty of sanitation programs now being implemented (including Sanimas, USRI, SLBM-DAK, household toilets, and small scale sewerage systems), there is a need to establish management institutions that are able to provide and manage sanitation services in an integrated and sustainable manner.

Page 47: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 29

UPTD development It is critical to establish a Sanitation Management Unit (Unit Pelaksana Teknik Daerah or UPTD) responsible for providing and managing the sludge and sewerage system as well as the co-management function for all community-based systems that have been constructed. Therefore, starting in PY3, IUWASH is focusing its resources on the establishment and development of a Waste Water Management UPTD, which has been identified as the most suitable institution to carry out the wastewater management function, based on an example in Makassar. Involving Pokja Sanitasi and the relevant PEMDA and GOI institutions is crucial, as the institution will need to obtain funding and regulatory support. As noted above, developing and strengthening UPTD is a strategy to push the PEMDA to prioritize budgeting for the sanitation sector. This quarter, all IUWASH regional teams conducted initial assessments to identify existing UPTDs that can be improved and expanded to support the sanitation system, including assessing PEMDA willingness to support this. In South Sulawesi/Eastern Indonesia, initial meetings took place with key stakeholders in Makassar and Jayapura. In West Java, East Java, North Sumatra and Central Java, the assessments are still ongoing at the city level, involving key stakeholders in the targeted cities. The results of the assessments will be used to develop a Scope of Work for potential grant and program activities under a PO. In the next quarter, several activities are planned under this program, including:

· Assessing the capacity of the existing agency (sanitation facilities, management and institutional aspects)

· Serial workshops, FGDs and comparative studies to obtain buy-in from the local government · Draft regulations for the new agencies · Promotion of UPTD to expand connections

Page 48: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 30

Section 2.4

CROSSCUTTING SECTOR

While the division between water supply and sanitation is often quite clear, there are many programs of common concern under the IUWASH project, or that are more effectively undertaken when consideration is simultaneously given to both sectors. These are grouped under the “Crosscutting Programs” heading and, in the majority of cases, multiple project specialists may contribute. As set out in the PY3 Workplan (see accompanying box), there are six crosscutting programs under IUWASH that are mutually reinforcing to a varying extent. Main achievements this quarter This quarter, IUWASH crosscutting activities were mostly at the preparatory stage. Support for the two technical sectors included creating a positive enabling environment with local and national stakeholders in order to improve the state of both sectors through increased budgets (APBD), involving private institutions, policy support, and raising awareness of improved hygiene behavior and gender issues. The following sections provide more details on the activities and main achievements of each of the six crosscutting programs. Program CC-1: Increased Number of PEMDA Policies

Developing local policies that support safe drinking water and sanitation lies at the heart of the governance process. Understanding the challenges in improving and expanding provision of safe water and sanitation, IUWASH has been supporting local stakeholders to develop new or improve existing Watsan-related policies. This quarter, IUWASH work in this area was largely focused on advancing policy development work among its initial target municipalities and developing a consensus among local policy makers on policy development needs in newly added municipalities. As an important element of the above process, IUWASH conducted numerous Visioning Workshops, each of which was prepared in close collaboration with local government agencies under the leadership of Mayors or District Chiefs. These Visioning Workshops are designed to (i) provide an overview of key sector issues and concerns, (ii) relate these issues and concerns to broader sector efforts at the national level (including MDG targets), and (iii) seek clear support from local government leaders (Mayors, District Chiefs, local legislative leaders, department heads and others) to begin addressing these issues in an assertive and professional manner through increased local budget allocations and improved policies. In all cases, Visioning Workshops are concluded with the signing of a joint declaration by all local government leaders to work together to ensure their commitment is followed by concrete action. This quarter IUWASH conducted eight Visioning Workshops across the regions, in Kota Sibolga and Kab. Labuhan Batu (North Sumatra); Kab. Purwakarta (West Java); Kab. Batang and Kota Salatiga (Central Java); and Kab. Bantaeng, Kota Jayapura and Kab. Jayapura in Eastern Indonesia. The Visioning Workshops provide a critical first step and important reference point in ensuring local buy-in and commitment to the IUWASH activities that follow.

IUWASH programs in Crosscutting Sector CC 1 Increased PEMDA policies CC 2 Increased PEMDA/APBD budget CC 3 Improved citizen engagement CC 4 Increased practices in Point of Use

(POU) water and handwashing with soap CC 5 Gender mainstreaming CC 6 Mobilizing Corporate Social

Responsibility (CSR) funding

Page 49: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 31

Policy development Local policy to support greater access to water and sanitation, in particular local government policy, continues to be supported by IUWASH. The EE-1 outcome mandates that development of local policies that support safe drinking water and sanitation is one of the project goals to be accomplished in each municipality or district. The policy developed by each city and district was reviewed this quarter and continued for further phases. A total of 70 policies have been identified for development by IUWASH regional teams. A recent list of PEMDA policies that IUWASH has targeted for development can be found in Annex 4. These 70 policies are grouped by policy topic in the accompanying table.

Policy topic Number of locations

1 Establishment of Sanitation Management Unit (UPTD) 20

2 Adoption of PDAM Business Plan, including investment 12

3 Raw Water Protection 9

4 Tariff Adjustment/Customer Classification 8

5 PDAM Equity 7

6 Citizen Engagement Mechanisms 5

7 Urban Sludge Management (USM) 2

9 PDAM regionalization 3

10 RAD AMPL 2

11 PDAM illegal connections 1

12 PDAM organizational structure 1

IUWASH will continue to support the development and/or signing of these PEMDA policies in the next quarter. Program CC-2: Increased Local Government Budget (APBD)

In many respects, the extent of support that local governments accord any sector is directly reflected in their local budget allocations. Accordingly, advocacy for increased APBD sector allocations is an important preoccupation of IUWASH. Tools at IUWASH’s disposal include the Visioning Workshops mentioned above; PDAM business plans which, among other things, provide clear roadmaps for local government investment; and well-conceived feasibility studies and DEDs that clarify how funds will be spent and their expected impact. Crucially, IUWASH is also working to better integrate water and sanitation issues into the Musrenbang participatory planning process that local governments follow each year. Not only does this align with established GOI practice, it also affords an opportunity to socialize issues within civil society. In this respect, other advocacy tools may include media discussions, customer forums and other platforms that maintain focus on the importance of backing up commitments with actual investment. IUWASH has almost completed its analysis of water and sanitation budget allocations for all local governments for 2012, and is now also close to completing the 2013 analysis. Based on the 2012 analysis, only Kota Medan in North Sumatra and Kota Malang in East Java are outstanding. For the 2013 APBD analysis, more than 75% of IUWASH municipalities have already reported, with data still being gathered for a handful of locations, including Kota Bogor in West Java, Kota Jeneponto in South Sulawesi, and Kota Malang in East Java. Overall, a lack of transparency of local government budgets continues to hamper the analytical process, as budget documents are consistently difficult to obtain. While a small handful of more progressive local governments such as Kota Parepare post their APBD documents directly online, most of these documents only exist in hard copy form.

Page 50: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 32

Further, many local governments refuse to provide hard copies or allow existing copies to be removed from their offices. Consequently, recording of water and sanitation line items often has to be carried out at the PEMDA office. Despite these challenges, broader budget trends are emerging from the data gathered by IUWASH field staff. For instance, the graph illustrated below tracks the percentage of the APBD budget allocated to water and sanitation services for 11 local governments over a six-year period (note that expenditures for drainage and solid waste are not included in this analysis). From 2008 through 2011 the average budget allocation for water and sanitation programs (shown in red) was approximately 1.5% of total APBD. While this portion dipped slightly in 2012, the analysis of 2013 data shows that it is now increasing again, approaching 2% of budgeted items. This chart also demonstrates how spending levels can change dramatically from year to year, particularly when large capital expenditures are incurred for treatment plant upgrades and distribution network improvements. We can therefore only make meaningful conclusions by looking at multi-year trends, making the annual analysis of each IUWASH municipality much more important.

Municipal Finance staff will complete the 2013 analysis of APBD allocations for water and sanitation in the next quarter, also revising the overall baseline to include the newest local government partners. As we approach the end of PY3, we will compile a more in-depth analysis of water and sanitation budgeting in an IUWASH Technical Note, given that we are already starting to see trends in budget allocation levels. Notably, no other government or non-government entity in Indonesia is currently tracking budget allocations in the water and sanitation sector. Program CC-3: Improved Citizen Engagement

In PY3, IUWASH has rolled out programs to strengthen existing Citizen Engagement Mechanisms (CEMs) and develop new ones to support the sustainability of water supply and sanitation services as a crucial aspect of IUWASH governance. These programs have now been initiated in several cities in IUWASH regions, mainly to identify the mechanism with the greatest potential to be established or strengthened to develop strong citizen engagement that supports PEMDA mechanisms in the Watsan sector. Besides CEM program sustainability, these programs also aim to increase PEMDA performance accountability in these sectors.

Page 51: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 33

This quarter, IUWASH conducted several follow-up activities following the inventorying of existing CEMs. IUWASH regional teams developed frameworks and steps to strengthen existing or develop new CEMs. A total of 22 IUWASH cities will be supported with improved CEMs across all regions. Under the revised framework, several additional preliminary actions will need to be conducted to improve the mechanisms:

· Strengthen the frameworks by clearly defining the potential activities to be implemented and describing in detail the activities to be conducted at each stage. The framework also includes expanding assessment activities to identify communication patterns and review the function and use of existing mechanisms in target cities.

· Develop strategy for program implementation. IUWASH regional teams will identify and compare the potential of engaging third parties to improve the CEMs in several cities in each region so as to achieve the target in each city more effectively. This strategy is being implemented based on the results of an initial assessment that showed substantial variations in existing mechanisms in different cities.

This quarter, all IUWASH regional teams conducted assessments to identify existing CEMs that can be improved and expanded in the water supply and sanitation sectors. In West Java, meetings took place with key stakeholders in Bandung and Purwakarta. In Central Java, FGDs were conducted in Semarang city, Sukoharjo, Klaten and Kudus to assess existing CEMs. In Tanjung Balai city in North Sumatra, the IUWASH team conducted a survey on patterns of citizen communication as baseline information to identify the most effective way to involve citizens. In the next quarter, this will be continued with an assessment of the key institutions to implement the improved mechanisms. In East Java and South Sulawesi/Eastern Indonesia, the assessments are still ongoing at the city level, with involvement of key stakeholders in the targeted cities. The results of the assessments will be used to develop SOWs for potential grants and program activities under POs. Several activities are planned for the next quarter:

· Develop several SOWs for IUWASH Grant Program and PO activity to support improvements to CEMs for the water supply and sanitation sectors;

· Identify key and supporting institutions to implement the improved CEMs based on the results of the CEM assessment;

· Engage key institutions to initiate implementation of the CEMs in targeted cities; and

· Roll out and launch CEM activities for the water supply and sanitation sectors. Program CC 4: Increased Practices in Point of Use Water and Hand Washing with Soap

The implementation of campaigns on POU water and hand washing with soap will support behavior change among people benefitting from increased access to safe water supply and sanitation services. IUWASH has developed and produced related communication materials to support these campaigns, including banners, posters and leaflets on hand washing with soap and POU Water. These materials have been produced in limited quantities in order to stimulate Local Government institutions and other actors to develop and produce them themselves. The institutions will use the template materials prepared by IUWASH. This strategy will leverage more support for these activities from several partners. The materials have already been distributed to Tangerang district and in the East Java region. IUWASH will conduct several activities to support this program during the next quarter:

Page 52: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 34

· Develop a training curriculum and campaign strategy to support existing community-based activities in both the water supply and sanitation sectors;

· Roll out the training and campaign activities in several cities. These training and campaign activities will be integrated into several existing program activities, including individual and communal sanitation systems, water-for-the-poor programs, and other training and campaign activities at the city level to raise awareness of the importance of promoting hand washing with soap and POU Water practices.

Program CC 5: Gender Mainstreaming

Under the initial strategy of the IUWASH gender mainstreaming program, the focus was on supporting improved hygiene behavior practices. To do this most effectively, IUWASH decided to engage PKK and Posyandu cadres as close local partners to support gender mainstreaming. As a result, the focus is no longer only on hygiene behavior; it also includes supporting the sanitation triggering activities implemented by sanitarians under the community-based sanitation programs discussed in Section 2.3. Usually, local sanitarians work with STBM facilitators, who are often also cadres of Posyandu or other community groups such as PKK.

Understanding Gender Perspectives Helps Sanitarians Promote Improved Behavior

Gender is still an important issue at the community level. Gender roles are still unequal between men and women at the community level, especially in domestic, reproductive and public aspects. In general, women are responsible for domestic affairs, including managing water supply and sanitation facilities at the household level, while men tend to play a role in decision making. In the public arena, women still have fewer opportunities to become involve in social activities at the community level. Based on this point, gender perspectives being introduced to sanitarians who mostly promote improved community behavior in terms of health and

Example of Communication Materials.

Dwi Hermawati/IUWASH Central Java

“Roleplay during gender training in Kota Salatiga on understanding gender roles at household level”

Page 53: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 35

hygiene. In February 2013, the IUWASH Central Java team held trainings in Batang and Semarang districts and in Kota Salatiga so that sanitarians could improve their skills at facilitation, motivation and advocacy. In this training, a gender session was held to improve sanitarians’ understanding of gender mainstreaming in promotional activities. The 95 training participants included sanitarians, Pokja AMPL members, Health Office staff, and PKK members from these cities. The gender topics discussed included gender definitions, gender roles in the sanitation program, and plans to integrate gender in the promotion of an improved sanitation system. Topics were introduced in presentations, followed by small group discussions and role plays. Ms. Lilis, a staff at the Health Office of Kota Salatiga, commented: “The role play primarily helped us to understand the assignment of roles between men and women at the household level.”

Progress in gender mainstreaming this quarter at the regional level occurred in North Sumatra, Central Java and East Java. Activities included technical activities, gender training at the community level, and gender orientation for new IUWASH staff. Details of the achievements are presented in the accompanying table.

Activity City Integrated Program Results

North Sumatra Gender training for community members who will be the beneficiaries of the program for improved sanitation system through bio-filter septic tanks in the Belawan region

Kota Medan Individual sanitation system

· Gender understanding has been introduced and discussed with the community members

· Criteria for construction of individual toilets using bio-filter tanks developed and agreed among the community members. These criteria were developed with gender perspectives.

Central Java Training on increased facilitation, advocacy and motivational skills for sanitarians

Kab. Batang and Semarang, and Kota Salatiga

Communal sanitation system

· Gender awareness and integration in promotion of behavior changes in the sanitation sector, introduced to and discussed among participants

Workshop on Edukasi Perilaku Sehat (Education on Healthy Behaviors)

Kab. Sukoharjo Communal sanitation system

· Gender issues related to development of communal sanitation systems were introduced to workshop participants

East Java Orientation on IUWASH gender mainstreaming for new staff in IUWASH East Java

Kota Surabaya General Crosscutting Program

· Brainstorming on general gender perspectives

· Overview of IUWASH gender mainstreaming (objective and strategy)

· Implementation of IUWASH gender mainstreaming program

As part of the coordination with the Ministry for Women’s Empowerment and the Protection of Children’s Rights, which is also a member of the IUWASH technical team, IUWASH held a discussion with the Ministry on the development of a pilot collaboration program. The pilot program will be integrated with the key PEMDA agencies, which are the key partners of IUWASH in PY3 2013. IUWASH will identify the potential programs and coordinate with PEMDA to strengthen gender aspects of program implementation. At least one program will be implemented in each region.

Page 54: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 36

Gender-related activities in the next quarter will focus on the following activities:

· Integrating a gender perspective into the criteria for development of communal sanitation facilities in Kota Tebing Tinggi and Tanjung Balai;

· Conducting follow-up discussions with the Ministry for Women’s Empowerment to develop the concept of a potential pilot program involving the local government agency in gender mainstreaming in the water supply and sanitation sectors; and

· Developing a success story on gender mainstreaming activities.

Program CC-6: Mobilize Corporate Social Responsibility (CSR) Funding

Increased participation by the private sector through CSR programs presents an important opportunity to improve access to water supply and sanitation services, especially in Indonesia, where the private sector is generally performing well and has an interest in such programs. Within the framework of mobilizing CSR funding, IUWASH sees its role as threefold: (i) facilitating increased participation by the private sector in Watsan programming through awareness building; (ii) establishing linkages between private sector entities interested in providing CSR and appropriate local NGOs and with PEMDA forums active in the Watsan sector; and (iii) serving as a technical resource for local stakeholder groups interested in implementing CSR programs. In PY3, IUWASH continued to implement a collaborative program with Coca-Cola Foundation Indonesia (CCFI) with a Water Replenishment Program in Sibolangit, North Sumatra and Mojokerto, East Java. Under this program, IUWASH and CCFI worked closely with two local NGOs – Jaringan Kesejahteraan Masyarakat (JKM) for Sibolangit and Yayasan Pendidikan Lingkungan Hidup Seloliman (YLHS) for Mojokerto. To support the implementation this program in Mojokerto, East Java IUWASH developed a partnership with Perum Perhutani under an MOU signed on January 16, 2013. After the signing of the MOU, IUWASH will continue to develop concrete actions with Perum Perhutani in East Java. This MOU needs to be developed because the construction of infiltration ponds in the catchment area of Mojokerto district will be conducted in Perhutani forests. This collaboration should support replication of this activity in the future. This quarter IUWASH initiated a collaborative program with HSBC Bank under its CSR Program. HSBC Bank’s strategy this year is to develop a program related to increased access of people to safe water, and to improve the quality of drinking water. Besides supporting this CSR program, IUWASH has also supported several PEMDA in promoting the sanitation program to the local private sector. During this reporting period, IUWASH undertook and supported several activities related to CSR, including:

· Construction of 113 infiltration ponds in Mojokerto, East Java by YLHS Mojokerto;

· Commenced construction of an additional 99 infiltration ponds and improved the quality of the existing 92 infiltration ponds in Sibolangit, North Sumatra;

· Signed an MOU with Perum Perhutani on January 16, 2013 during the IWWEF Conference; and

· Conducted several initial meetings with HSBC Bank in Indonesia, followed by a site visit to a Master Meter system in Penjaringan. The Bank is interested in developing a master meter program. IUWASH has identified several potential areas in which HSBC Bank can be supported, including Tangerang, Jakarta, Bandung, Semarang and Surabaya.

In the coming quarter, IUWASH will continue to provide the assistance outline above through several activities as follow:

Page 55: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 37

· Continue to support implementation of the Water Replenishment Program in Kab. Mojokerto for a second quarter of program implementation. The second quarter workplan developed by YLHS has been approved by CCFI and is now ready for the implementation;

· A series of meetings were held with the Perum Perhutani Unit in Surabaya to develop a collaborative agreement on implementation of a Water Replenishment Program in Mojokerto;

· Continue to monitor implementation of the Water Replenishment Program in Sibolangit, North Sumatra and Kab. Mojokerto; and

· Continue to develop a collaborative program with HSBC Bank Indonesia on the development of a Master Meter Program.

Page 56: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 38

Section 2.5

GRANTS PROGRAM

The IUWASH grants program is a major project resource that supports the project’s technical components and makes an important contribution to the USAID FORWARD initiative, which seeks new partnerships, emphasizes innovation, and maintains a steady focus on results. With funding of USD 2.5 million, the Grants under Contract (GUC) activity is being implemented in accordance with USAID rules and regulations and complies with the requirements under ADS 303 and 22 CFR 226. The grant program is administered in line with the guidelines stipulated in the USAID-approved IUWASH Grants Program Manual and Grants Implementation Plan, and is synchronized with and supports the project’s technical components. Important grant programs implemented this quarter included: • North Sumatra: Sustainable Community-based Total Sanitation: The grant agreement with

YAKMI (Lembaga Pelayanan Kesejahteraan Masyarakat Indonesia) to implement the program for the urban poor in Tanjung Balai and Tebing Tinggi in North Sumatra, which was signed on May 24, 2012, was completed on February 28, 2013. The program is called HEBAT, which stands for “Hidup Energik, Bersih dan Sehat”. YAKMI has completed all activities mandated under the Grant Agreement. The main obstacle facing this program was a lack of clean water, since the PDAMs have low capacity in clean water. The local government and PDAM came up with an alternative solution to make new or improved MCK facilities fully functional in Tebing Tinggi. The project closing was conducted in Tebing Tinggi and Tanjung Balai on 26 and 27 February 2013, respectively, with full participation by all parties involved in the program.

• North Sumatra: Community-Based Desludge System Preparation: The grant agreement with SMI (Suluh Muda Indonesia) to prepare a community-based desludge system in Belawan, Medan under the program for the urban poor, which commenced on October 15, 2012, expires on October 14, 2013. Under this grant, SMI receives IDR 765,950,000 (approximately USD 85,100, excluding cost-sharing) to improve the desludging system for offshore communities in Belawan that use floating septic tanks. A study tour to Bekasi had found a similar project implemented by Mercy Corps, with “Kedoteng” (a small cart to desludge waste from septic tanks) being introduced. SMI adapted this idea and assembled a similar prototype called “Gedotin” (Gerobak Sedot Tinja) for Belawan. This prototype was tested and then modified to meet all technical and local requirements.

• West Java: Jakarta Urban Community-Based Sewerage System: The grant agreement with Forkami, which was signed on April 2, 2012, was originally scheduled to expire on March 29, 2013. This program, which focuses on improving access to safe sanitation facilities in two districts in the metropolitan urban area of Jakarta, and which supports efforts by Perusahaan Daerah Pengelolaan Air Limbah DKI Jakarta (PD PAL Jaya, the regional wastewater management company serving Jakarta), has been progressing slowly. A grant agreement modification was issued for a no-cost extension until May 17, 2013 to cover completion of the survey and mapping, completion of development of the detailed engineering design (DED) and budget (BoQ), and supervision of the piping network, which is being implemented under a PO. Other modifications include a budget line item re-alignment to match activity requirements. To speed up progress, Forkami has been holding intensive coordination meetings every month with partners including IUWASH, PD PAL Jaya, BPLHD and Sudinkes.

• West Java: Integrated Services for Infrastructure and Sanitation Technology (INSIST): This grant program has been progressing well. Mercy Corps is developing an affordable, sustainable, and context-appropriate waste management system in poverty-affected high-density communities in Jakarta. The grant agreement with Mercy Corps was signed on April 27, 2012

Page 57: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 39

and will expire on April 30, 2013. The total value of this one-year grant program is USD 99,972, with cost sharing of USD 25,000. One of the two Kedoteng prototypes was constructed using recycled materials but is now being modified to increase its capacity. Based on market research, potential MFI and other potential loan providers have been identified that can support kedoteng business services. Mercy Corps has also introduced a simple method of constructing community-based septic-tanks that can be installed by the community themselves. Project progress has been on track, and this grant activity should be completed on schedule.

• West Java: Access to Drinking Water Supply through Master Meter Connections in Rajeg, Tangerang: This program is being implemented by Forum Komunikasi Pengelolaan Kualitas Air Minum Indonesia (Forkami) with a grant of USD 61,620 and cost sharing of USD 6,390. The grant agreement was signed on March 4, 2013 and expires on February 3, 2014. The program is designed to install nine master meter systems and develop a DED and budget (BoQ) for potential sanitation improvement programs in two locations – Desa Mekarsari and Desa Sukamanah in Kec. Rajeg, Kab. Tangerang. The master meters will connect at least 130 houses in Mekarsari and 168 houses in Sukamanah. A kick-off meeting with all stakeholders in the project locations will be conducted in following quarter..

• West Java: Community Empowerment to Improve Sanitation Conditions in Kronjo, Tangerang: This program is implemented by Bina Ekonomi Sosial Terpadu (BEST) with a grant of USD 48,859.82 and cost sharing of USD 15,182.40. The program has received co-funding from the local government for the construction of 12 Waste Water Treatment Plants in a total amount of USD 638,888.89. The grant agreement has just been signed and will run for 10 months, from March 25, 2013 to January 24, 2014. The project will improve sanitation conditions at the community level in Kronjo, while the Tangerang government provides 12 waste water treatment plants to the area.

• West Java: Improving Access to Sanitation through Installation of Community-Based Sanitation Systems in Teluk Naga, Tangerang: This 12-month project is being implemented by Bina Swadaya Konsultan (BSK) with a grant of USD 30,061.11 and cost sharing of USD 6,451.33. The grant activity began on March 25, 2013 and ends on March 24, 2014. This project will connect at least 50 houses in Desa Kampung Melayu Timur to a communal IPAL, and 26 houses in Desa Sukamanah to four shared septic tanks. The kick-off meeting for this project is scheduled for early April.

• Central Java: Communal Septic Tank and Communal Latrine in Dukuh Ngaklik, Kutoharjo, Kendal: This program is being implemented by CB-Tech-LPTP (Community-Based Technology – Lembaga Pengembangan Teknologi Pedesaan) Yogyakarta with a grant of USD 64,269.89 and cost sharing of USD 18,257.93. The grant activity began on October 17, 2012 and ends on June 16, 2013. This program is designed to (i) improve access to sanitation services in the urban area of Kutoharjo in Kendal, (ii) enhance the knowledge and ability of the community in domestic wastewater management, (iii) implement behavior change promotion related to community sanitation and hygiene practices, (iv) strengthen CBO capacity to manage sanitation improvements, and (v) conduct community-based monitoring and evaluation. The program only began recently. The program will construct a communal septic tank, but negotiations over the location where the tank would be constructed have only recently been successfully concluded with the community. The communal septic tank will now be constructed beneath a walkway.

• East Java: Solving Community Sanitation Problems Through STBM: This program is being implemented by LPPM ITS (Lembaga Penelitian dan Pengabdian Kepada Masyarakat, Institut Teknologi Sepuluh November) with a total grant value of USD 92,726 and cost sharing of USD 9,395 to (i) implement community-led total sanitation programs, install small-scale sewerage system networks, (ii) conduct a behavior change promotion related to community sanitation and hygiene practices, (iii) strengthen the capacity of CBOs to manage sanitation improvements, and (iv) support community-based monitoring and evaluation. The grant agreement was signed on

Page 58: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 40

May 28, 2012, and the expiry date has been extended from February 28 to May 31, 2013 to allow completion of the DED for the piping installation following changes to the initial design and more effective coordination with Ponpes An-Nur, as the main partner. The WWTP will be connected to the WWTP built under the SLBM program using the special allocation fund (DAK) budget. The STBM program has just begun in Kota Surabaya and Kab. Sidoarjo, and is now progressing.

• East Java: Optimizing Coverage of Existing Master Meters and Triggering STBM/CLTS Program in Sidoarjo: A grant agreement was awarded to SPEKTRA (Studi Pengembangan Keberdayaan Rakyat) on June 7, 2012 to (i) optimize the coverage area of existing master meters, (ii) install new master meters for 400 household connections, (iii) implement community-led total sanitation (CLTS), (iv) promote behavior change relating to community sanitation and hygiene practices, (v) strengthen the capacity of CBOs to manage sanitation improvements, and (vi) support community-based monitoring and evaluation. The value of the grant program is IDR 511,292,433, or approximately USD 56,810 (excluding cost sharing). Grant activities have been progressing well. STBM triggering has been successful in all target locations, with development of the community action plan in Lemah Putro and implementation of community action plans in three other target areas (Karanggayam, Pecantingan and Celep). The project’s original expiry date was March 1, 2013, but this has been extended to May 31, 2013 to allow sufficient time to procure all necessary pipes and accessories and have a test run of the installation.

• South Sulawesi/Eastern Indonesia: City of Ambon Sanitation Improvement Project: Under a grant agreement with MURKELE, this program began on August 28, 2012 and ends on August 27, 2013. The value of the grant program is approximately USD 88,072.34 (excluding cost sharing of USD 10,675.53). The program is designed to prepare a Waste Water Master Plan that can be used to plan construction of wastewater facilities in the city of Ambon in line with the city’s topography and demography. The draft of the Waste Water Master Plan has been completed and is now being circulated for review and input from all stakeholders to improve the document. The best location to install the wastewater facility (communal septic tank) to promote increased access to safe sanitation for 200 households is now being discussed by all stakeholders and will be decided shortly. Once completed, this facility will be a model for replication by the PEMDA using APBN or APBD funds. The program is progressing well.

These 12 grants are summarized in the following table. Approved and Signed Grant Agreements

No Grant No. Title Region Sector Grant

Amount (USD) NS WJDB CJ EJ SSEI WS SAN

1 G-NS-2012-001

Optimize Communal Latrine/WWTP in T. Tinggi and T. Balai

√ √ $57,217

2 G-NS-2012-002

Community-Based Desludge System Preparations

√ √ $85,106

3 G-WJ-2012-001

Jakarta Urban Community-Based Sewerage

√ √ $66,662

4

G-WJ-2012-002

Access to Water Supply via "Master Meter" in Tangerang

√ √ $61,620

5 G-WJ-2012-003

Community Empower-ment to Improve

√ √ $48,859

Page 59: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 41

No Grant No. Title Region Sector Grant

Amount (USD) NS WJDB CJ EJ SSEI WS SAN

sanitation in Kronjo, Tangerang

6 G-WJ-2012-004

Improving Access to Sanitation through Community-Based Sanitation Systems in Tangerang

√ √ $30,061

7 G-NAT-2012-001

Integrated Services for Infrastructure and Sanitation Technology (INSIST)

√ √ $99,972

8 G-EJ-2012-002 Optimizing Coverage of Master Meters and Triggering CLTS (STBM) in Sidoarjo

√ √ √ $58,328

9 G-EJ-2012-001 Solving Community Sanitation Problems via STBM in East Java

√ √ √ $92,726

10 G-CJ-2012-001 Communal Septic Tank and Communal Latrine in Kendal

√ √ $64,270

11 G-CJ-2013-002 Kampung Sanitasi Solo √ √ √ $89,127 12 G-SS-2012-001 City of Ambon

Sanitation Improvement Project

√ $88,072

TOTAL $809,705

Other important grant-related activities during the reporting period included the following: • SSEI: Urban Sanitation Advancement in Jayapura: The negotiation memorandum has been

approved by USAID but IUWASH has delayed execution of the grant while CV. Geoteknik completes another IUWASH activity under a PO, which is anticipated to be completed by mid-April. IUWASH therefore expects the grant activities to commence in late April 2013.

• Central Java: The scope of work for the communal septic tank grant program in Jomblang, Central Java has been approved by USAID, with pre-application not being conducted under the approved RFA since the target community prefers to have access to water before sanitation is developed. IUWASH is working with the PDAM to ensure water availability, and this part of the activity is being implemented through a PO and is almost complete. IUWASH will continue with the pre-application meeting, which is scheduled to be held in Semarang on April 3, 2013.

• West Java: Sanitation for community and schools in Margasana, Serang: The scope of work for this project has been completed and will be sent to USAID for approval. The project will pilot a sanitation improvement program for the community and schools in Margasana through the installation of individual and communal latrines and construction of a wastewater treatment plant facility with a small-scale piping system for the local community and schools. The grant amount is USD 99,993.47 (IDR 899,941,200). The anticipated outputs are: (1) 78 households receiving access to better sanitation; (2) 20 houses being directly connected to the wastewater treatment plant; (3) 280 students gaining better access to sanitation; and (4) two CBOs being developed to manage the facilities post-construction. The implementation period will be 12 months.

Page 60: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 42

• West Java: This project involves an in-kind grant of fiberglass and cement ring molds to two local organizations involved in the development of improved sanitation facilities in Kab. Tangerang. A set of ten ring molds will be provided to Koperasi Abdi Kerta Raharja (AKR) and two ring molds will be provided to CBO Kelompok Sanitasi Desa Saga. The total cost of assembling these molds is approximately USD 9,000. With these ring molds, it is anticipated that AKR will install 500 septic tanks while the CBO will install six septic tanks. The cost of all construction work will be borne by AKR and the CBO, while IUWASH will provide training in promotion, advocacy, monitoring and evaluation, and maintenance. IUWASH anticipates engaging in direct solicitation (sole source) because the two institutions have leading capabilities for constructing septic tanks under microcredit programs.

• Grant/PO Monitoring Form for Field Use: The existing Grant/PO Monitoring Form for Field Use is being used by the technical specialist to provide an update on grant project progress and an early indicator for management to take necessary action.

• Grant/PO Tracking: The existing Grant and Purchase Order Tracker is being integrated into the automated TAMIS system.

The following table summarizes other grant programs in the project’s grant pipeline that are either pending execution by the grantee or pending submission to USAID.

No Title Region Sector Grant

Amount Current Status NS WJDB CJ EJ SSEI WS SAN

1 Communal Septic Tank in Jomblang, Semarang, Central Java

√ √ $83,333 Pre-application meeting scheduled for April 3, 2013

2 Urban Sanitation Advancement in Jayapura

√ √ $52,360 Execution pending com-pletion of a separate PO

3 Sanitation for Community and schools in Margasana

√ √ $99,993 SOW to be submitted to USAID

4 In-kind grant of fiberglass and cement ring molds

√ √ $9,000 SOW to be submitted to USAID

TOTAL $244,686

Page 61: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 43

Section 3

NATIONAL ACTIVITIES & KEY UPCOMING EVENTS INTRODUCTION In this section we present a more detailed account of activities and achievements at the national level within the areas of general project management, project communications and reporting, monitoring and evaluation, and environmental compliance. 1. General Project Management

General project management activities during this quarter focused on reviewing and ensuring proper progress in the implementation of activities set forth in the IUWASH Annual Workplan for PY3, further accommodating IUWASH’s expansion from 34 to 54 municipalities, as well as more stridently aligning project approaches with national-level initiatives (e.g., in sanitation programming and PDAM debt restructuring). Together with other areas requiring attention, general project management activities during the quarter included:

· Progress in establishing Partnership Agreements (PAs) with additional local government partners, resulting in the execution of 46 new PAs. Nine PAs are still under review by partner local governments. The list of all partner municipalities and the status of PAs entered into with their respective local governments is presented in the accompanying table.

· Coordination of high-level events with USAID, including:

o BSM Partnership Agreement Signing: On January 16, 2013, USAID/IUWASH entered into a partnership agreement with Bank Syariah Mandiri (BSM) to expand and deepen BSM’s involvement in improved access for low-income households to water supply and sanitation services through microfinance assistance. Work with BSM has already helped finance water connections for 3,750 households in Kudus in Central Java and Mojokerto in East Java. The agreement was witnessed by USAID Mission Director Andrew Sisson.

o Perhutani Partnership Agreement Signing: At the event mentioned above, the USAID Mission Director also witnessed the signing of a PA between IUWASH and Perhutani, a state-owned enterprise that administers more than 2.5 million hectares of public forest reserves. The agreement focused on collaboration in the development and safeguarding of these forests, which have a key role in the sustainability of safe raw water sources.

o Program review/multiple locations: IUWASH hosted a visit by a USAID Water Office specialist, Anthony Kolb, as well as the IUWASH ACOR, to several IUWASH locations with the goal of informing the Mission’s strategy development process.

· Convened a formal meeting of Tim Teknis to provide updates on project progress and review issues of specific concern.

· Held a meeting for USAID Watsan partners.

· Supported several sessions at the Indonesia Water and Wastewater Expo and Forum, including sponsoring sessions on climate change adaptation.

· Participated in meetings between USAID and DAI’s Senior Vice President, Betsy Marcotte. · Held regular (generally bi-weekly) meetings with the USAID COR to provide updates on

project progress, issues and challenges.

Page 62: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 44

· Developed an updated version of the project’s “Matrix Management Chart” to reflect the change in workplan approach from being component-based to sector-based (see Annex 5).

· Provided ongoing support from national team members for regional activities. These visits covered a variety of areas, ranging from workplan development and synchronization to administrative and financial management training, information management, baseline data collection, formative research, the development of SOWs for an array of project activities, and technical support across all components.

While many challenges and issues were encountered in accomplishing these activities, none are deemed especially noteworthy or outside of the normal course of business.

IUWASH locations by region

North Sumatra

West Java, Jakarta, Banten

Central Java

East Java

South Sulawesi/ Eastern Indonesia

· Medan city · Binjai city · Langkat district* · Pematang Siantar · Tanjung Balai city · Tebing Tinggi city · Sibolga city · Asahan district · Labuhan Batu

district

Total = 9

· Bekasi city · Bekasi district · Bogor city · Karawang district · Lebak district · Serang district · Tangerang

district · DKI Jakarta · Bandung district* · Purwakarta

district · South Tangerang

city Total = 11

· Semarang city · Semarang dist. · Kendal district · Kudus district · Surakarta city · Salatiga city* · Rembang

district · Sukoharjo

district* · Klaten district* · Batang district

Total = 10

· Gresik district · Lamongan district · Mojokerto district · Probolinggo district · Sidoarjo district · Surabaya city · Mojokerto city* · Probolinggo city · Jombang district* · Malang city* · Malang district · Batu city*

Total = 12

· Ambon city · Jayapura city · Jayapura district · Jeneponto · Makassar city · Maros district · Takalar district · Parepare · Enrekang · Pinrang district · Sidrap district

Bantaeng district

Total = 12 Note: * Indicates that a PA has not yet been signed. However, the process of concluding these agreements is well advanced in all such cases. In the next quarter, IUWASH will place special emphasis on several areas, including:

· Completing the process of establishing PAs with partner municipalities;

· Improving the capacity of regional Accountants and Office Managers through supplemental training;

· Undertaking several important planning and coordination events, including meetings of the Tim Teknis, IUWASH Regional Coordinators, and USAID Watsan partners;

· Further integrating staff designated as National Coordinators in particular technical areas into program development and monitoring processes; and

· Extending professional development and team building opportunities to staff to the maximum extent possible.

2. Project Communications and Reporting

During this quarter, the Program Communications team undertook the following: · Implemented a signing event for PAs between USAID-IUWASH and BSM on microfinance

for water and sanitation, and between USAID-IUWASH and Perum Perhutani on protection of important raw water sources through the construction of infiltration ponds, on January

Page 63: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 45

16, 2013. Around 25 invitees from water-related stakeholders attended the event. A separate press conference, held in collaboration with BSM was attended by journalists from 16 online media and resulted in 17 online articles;

· Finalized a longitudinal video documentary that recorded the process of the Water Replenishment Project in Sibolangit, North Sumatra, a collaborative effort between CCFI, IUWASH and a local NGO. The video has been uploaded to Vimeo.com (https://vimeo.com/62582772) and DVD copies will be distributed to regional offices;

· Organized a one-day national workshop on January 16, 2013 called “Practical Innovation for Better Water Utilities” as part of Indonesia Water and Wastewater Expo and Forum (IWWEF) 2013. The expo and forum were hosted by Perpamsi, an important partner of IUWASH. The workshop was divided into two sessions: “Steps to Climate Change Adaptation to Ensure Raw Water Supply of Water Utilities” and “Enabling Environment for Better Water Utilities”. Around 60 participants from various water utilities attended the workshop;

· Produced a short testimonial video on microfinance for access to water and sanitation in Mojokerto and Probolinggo in East Java. The video was presented at the press conference following the PA signing event during IWWEF 2013 in Jakarta and was well received by project stakeholders, especially USAID Indonesia;

· Produced an infography on open defecation free in six STBM villages in Jeneponto, South Sulawesi to support the Open Defecation Declaration on January 13, 2013;

· Finalized IUWASH Newsletter Vol. 4 in English, to be followed by a translation into Indonesian for further distribution; and

· Conducted nationwide Photography Skill Sharing Sessions in all IUWASH regional offices for IUWASH partners and staff. By the end of March 2013, 97 staff from NGO partners and IUWASH (23 women and 74 men) had learned basic photography skills to ensure adherence to USAID Branding Guidelines.

The Program Communications team will continue to provide broad support to IUWASH and partner agencies, maintain the IUWASH website, produce the IUWASH newsletter, technical notes and activity summaries, and develop social media links (on Facebook and Twitter accounts, in particular). Activities are expected to involve:

· Conducting a project-wide writing laboratory for IUWASH staff. The laboratory aims to improve much needed skills in writing articles that will feed into IUWASH publications such as newsletters and reports; also ensuring that they tie directly to project outcomes.

· Support for national-level events such as an upcoming workshop with the MPW and other partners on “Improving the Quality of Septic Management Services”.

· Publication of the next edition of the project newsletter, IUWASH News. · Production and distribution of IUWASH Quarterly Progress Report 8, covering the period

from January to March 2013.

· Production and distribution of Bi-Weekly Reports. · Activities in support of the project’s BCC work and other technical areas.

3. Monitoring and Evaluation

Monitoring and evaluation (M&E) is an essential part of project management and of the overall project cycle. The IUWASH M&E program focuses on clearly defining what needs to be measured to adequately gauge project progress, and then ensuring that appropriate data is collected, compiled and reported. The main M&E tool is the IUWASH Performance Monitoring Plan (PMP). The PMP is not only important in and of itself; it also provides the basis for workplan development, reporting

Page 64: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 46

and many other key functions. The IUWASH M&E system is further bolstered by the project’s web-enabled Technical and Administrative Monitoring Information System (TAMIS) and a host of data collection tools. This quarter, IUWASH reached the halfway stage of PY3, with the IUWASH Team now rolling out implementation of the program activities contained in the PY3 Workplan. This period is a good time for the project to establish a strong foundation to support routine M&E activities and implementation of M&E systems. This quarter, M&E activities included:

1. Facilitating training on M&E systems for IUWASH grantees (LPTP Solo);

2. Training for 101 enumerators of the Survey on Improved Hygiene Behavior (Outcome MD-5). The enumerators are sanitarians and community cadres;

3. Interviewing 1,525 respondents from 14 cities in five IUWASH regions;

4. Continuing to improve the PMP section of the IUWASH TAMIS with support from the Home Office TAMIS Specialist, Ms. Tanja Lumba. This quarter, support activities to improve the PMP section were mostly conducted from Manila in the Philippines, which is the home base of the specialist;

5. Conducting TAMIS PMP section training in four regions –West Java, Central Java, East Java and North Sumatra. The M&E Advisor used this opportunity to conduct refresher TAMIS training for the new City Coordinators.

6. Collecting data to support reporting of QPR 8 Outcomes using several methods, including specific surveys and the use of TAMIS. The PMP reporting this quarter is important since it is the mid-year report stage, when IUWASH reports on all targeted PMP outcomes.

Obtaining Facts on Community Perspectives from IUWASH Survey on Improved Hygiene Behavior in Kota Probolinggo

One IUWASH mandate is promotion of improved hygiene behavior. There are three aspects of this behavior: hand washing with soap, improved sources of safe water supply, and improved sanitation facility. To determine the status of people’s behavior in these three aspects, IUWASH conducted a household survey across the IUWASH regions to gather information on the recommended behavior. This survey will be conducted every six months with the same households. To date, 101 interviewers have been trained. They will survey 1,525 respondents across the regions. Respondents are selected from 14 IUWASH cities in five regions. The interviewers are sanitarians and community cadres involved in various community-based water supply and sanitation program activities. On February 8, 2013, the IUWASH East Java Team conducted training for enumerators in Kota Probolinggo. The training was opened by the Head of the city health office. In her speech, she mentioned that the training was important to improve the skills of health officers so that they could continue the surveys themselves. Mr. Bambang Ariyanto, a sanitarian from Puskesmas Kanigaran, said, “This training has increased my skills and knowledge about gathering information from people. This activity will enhance communication with the local people. The results will also indicate our performance in supporting the local people”.

IUWASH East Java

Training for Enumerators of Survey on Improved Hygiene Behavior.

Page 65: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 47

After the training, all sanitarians conducted surveys to obtain more information. A total of 100 respondents were interviewed. Ms. Diana Mardiana, a sanitarian at Puskesmas Ketapang, shared her experience in interviewing, reporting that the most difficult question concerned household incomes. A specific approach is needed to obtain correct information on incomes. Meanwhile, Mr. Badarul Taman, a sanitarian at Puskesmas Kedopok, said, “During the survey, most respondents did not understand several hygiene-related terms, including “cuci tangan pakai sabun (hand washing with soap)” and “sanitasi/sanitation”. That surprised me, so I then had to explain the meaning of the terms. Eventually, the respondents understood. This made me realize that as health officials, we cannot take it for granted that people already understand all things related to health. We have to be sure that they understand so that they can practice good health behavior.” These experiences all helped the health offices to improve their support in providing health services to the people. The survey results should also help them to improve their strategy to promote better behaviors and improve the health of people living in Probolinggo.

In the next quarter, IUWASH M&E activities will focus on the following:

· Conducting a water cost survey on beneficiaries of the microcredit programs in Kab. Mojokerto (East Java) and Kab. Kudus (Central Java) and on the beneficiaries of the MM program in Kab. Sidoarjo (East Java);

· Continuing to hold M&E training for IUWASH grantees including Bina Swadaya and Forkami, which will implement the grant program in Tangerang, Banten (Rajeg and Teluk Naga);

· Continuing refresher training on TAMIS for IUWASH staff in the SSEI region concerning the PMP module, and TAMIS training for new City Coordinators in the region;

· Developing an initial concept for IUWASH qualitative M&E; and · Continuing support for the development of GIS-based maps that better present project

activities and achievements. 4. Environmental Compliance

As a project aimed very much at improving the environmental health of Indonesian citizens, IUWASH understands the importance of ensuring that its own activities do not in any way negatively impact public health or environmental conditions in the areas where it operates. Guiding this process are USAID environmental regulation 22 CFR 216, the project’s Initial Environmental Examination (IEE) which is referenced as ASIA 09-86 IEE ETD (as amended on May 25, 2012), and the approved IUWASH Environmental Monitoring and Mitigation Plan (EMMP), which has been integrated into and approved as part of the project’s annual workplans. Important activities undertaken this quarter focused on initial development of monitoring forms for use by staff reviewing compliance at field sites, and continuing compliance training for staff. Environmental compliance activities planned for the coming period will involve:

· Development of additional environmental monitoring support tools and instruments, including training on the use of these management tools for regional staff;

· Completion of adjustments to the TAMIS environmental compliance module; and

· Ongoing supervision of the environmental compliance processes, with support provided as required by the national-level Environmental Officer and associated technical specialists.

In addition, IUWASH is expecting to host a visit by the USAID Regional Environmental Officer (REO) to Central Java in the next quarter and looks forward to any guidance the REO may be able to offer.

Page 66: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 48

Section 4

REGIONAL HIGHLIGHTS & CLUSTER REPORTS While IUWASH is a national initiative that works with a broad range of actors at all levels, the strength of the project ultimately lies in the support it provides to municipalities through its regional offices and staff. During this second quarter of PY3, these regional offices consolidated their approach to sector-based programming, while maintaining focus on improving local capacity to improve people’s access to safe water supply and improved sanitation services. This section provides detail on not only what programming was undertaken by each IUWASH regional office, but importantly, what was achieved within each municipality to which these regional offices provide assistance. In broad terms, each regional office continued to make substantive contributions to institutional and inter-agency coordination, with some more notable efforts involving:

· Implementation of triggering training for major GOI (PU and MOH, in particular) communal sanitation initiatives in Central Java, East Java and South Sulawesi;

· Design and implementation of communal wastewater treatment programs in collaboration with the MPW (PU PLP);

· USM implementation (including IPLT development) in North Sumatra, West Java, Central Java and East Java, in concert with the MPW and the World Bank WSP;

· Coordination with state forestry company Perum Perhutani to support raw water protection programs across IUWASH regions;

· Implementation of the Water Replenishment Program through development of infiltration wells supported by CCFI; and

· Support for the development of local government implementation units (UPTD) that can begin to provide an institutional foundation in the local government for the management of urban sanitation programs.

Program activities at the regional level to support the water supply, sanitation and crosscutting sectors are described below. Water Supply Sector

· Development of business plans; · DED development for Master Meter, WTP and SPAM;

· Support for NRW reductions and the energy audit program; · Climate Change programming including CCVAs, implementation of spring recharge programs

through infiltration pond development, and ongoing raw water assessments;

· Development of GIS/MIS and billing and accounting systems;

· Optimization of transmission and distribution networks; · Customer-related programs involving customer reclassification, CSS, and censuses;

· Debt restructuring plans; · Feasibility studies on water supply expansion projects to obtain alternative financing; · Capacity building for PDAM staff and members of their Boards of Supervisors; and · Introduction of microfinance to expand connections for low-income households.

Page 67: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 49

Sanitation Sector · Support triggering program activities, including training in community “triggering” in support

of GOI communal sanitation programing; · Promotion of sewerage connections; · Support for sanitation documents under the PPSP program; · Sanitation marketing training and sanitation entrepreneurship program;

· Community-based program supporting USM; · Support for development of UPTD program; · DED development for IPLT, communal IPAL, and small-scale sewerage; and

· Development of IPLT. Crosscutting Sector

· Implementation of visioning workshops;

· Development of regulations supporting water supply and sanitation sectors; · Implementation of CEM; · Gender integration in most sanitation program activities; and

· Support to PEMDA in promoting sanitation programs as a form of CSR. All IUWASH regional teams have also been implementing grant programs in support of the water supply and sanitation sectors. These programs are summarized in Section 2.5 (Grants Program) of this report, with further details provided below. The following section of this report provides details of specific programs pursued in each region, as well as “Cluster Reports” which describe in more detail the work undertaken in each IUWASH municipality.

Page 68: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 50

NORTH SUMATRA

Page 69: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 51

Section 4.1

NORTH SUMATRA

Summary

North Sumatra Province stretches across the island of Sumatra and lies between the Indian Ocean and the Strait of Malacca. It borders Aceh province to the northwest, and Riau and West Sumatra provinces to the southeast. It has an area of 70,787 km² and, with a population of 12,982,204 (2010), it is the most populous province outside Java. IUWASH began working in North Sumatra in May 2011, meeting with provincial and local government leaders, conducting assessments of water supply and sanitation conditions, and most importantly, gauging local commitment to address sector deficiencies. These assessments led to the selection of six municipalities as IUWASH target areas: Medan, Binjai, Tebing Tinggi, Pematang Siantar and Tanjung Balai, and Kab. Langkat. In PY2, IUWASH conducted site selection for continued implementation of the partnership between IUWASH and North Sumatra Province, and three additional regions were eventually selected: Asahan, Labuhan Batu, and Sibolga. In this quarter, the main programs of IUWASH in North Sumatra included: ó Capacity building for PDAM Dewan Pengawas of IUWASH partners, phase II, for four PDAMs

(PDAM Langkat, PDAM Sibolga, PDAM Labuhan Batu, and PDAM Asahan). This resulted in increased synergy with PDAM stakeholders for improved performance towards achieving MDG goals.

ó Training for PDAM on Business Plan development, followed by a customer satisfaction survey, on-the-job training, development of SOP, GIS/MIS, data collection for the NRW program, soft launching for microcredit and others, in order to promote PDAM financial and technical aspect.

ó Community empowerment and capacity building to optimize MCK in Tebing Tinggi and Tanjung Balai. This program was implemented under the grant program by YAKMI. After completion, there was an inaugural event to launch a CBO forum and exhibition of YAKMI activities. The workshop was successful and attended by the mayor, local parliamentarians and local communities.

ó Conducted two Visioning Workshops in Sibolga and Labuhanbatu, with the aim of sharing information on existing Watsan condition, and obtaining a commitment from the Mayors on the expectations of the vision for improving Watsan services. These workshops were attended by the mayor, DPRD head, and chairman of SKPD. A joint commitment was signed by the SKPDs and related institutions for an effort to realize water and sanitation improvements in the region.

Success Stories

Success Stories in Water Supply Sector: Local Government Increase Confidence To PDAM Tanjungbalai USAID IUWASH has been facilitating many improvements within Tirta Kualo Water Utility in Tanjungbalai City, including training on basic operation and maintenance of the water treatment plant and water supply system, capacity building for supervisory boards, conducting cross-visits to see good results in other locations, and maintaining close collaboration and communication with local government stakeholders.

Page 70: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 52

Several staff from Tirta Kualo Water Utility recently went to the Public Works Office in Bogor City. Following the visit, the director immediately formed a team to directly supervise and handle billing efficiency measures and customer complaints. The team will offer community service once every two weeks at the PDAM office. The water utility also improved its marketing activity by reaching out to local religious leaders to emphasize the importance of clean water in daily life. As a result of USAID IUWASH technical assistance, Tirta Kualo Water Utility is gaining prominence among local stakeholders in Tanjungbalai and the vicinity, especially from the DPRD, which has been actively involved in the water utility’s various activities. After a long delay, finally the local government and the DPRD approved an MOU for a capital funding contribution of IDR 11 billion. The MOU was signed by the mayor and the DPRD head in October 2012. It is an extension of Local Regulation No. 6/2007 on Capital Funding Contributions. These funds will be used to complete the construction of a water treatment plant and main distribution pipeline. IUWASH provided active mentoring during the preparation of terms of reference for the design review and supervision of construction of the water treatment plant and main distribution pipeline, and execution of the work by consultants. The water treatment plant is expected to be completed by 2013 and will benefit around 7,000 customers. At present, Tirta Kualo Water Utility in Tanjungbalai City has 17,967 customers and a 54 percent coverage level, with production capacity at 255 liters/second. Success Story in Sanitation Sector Visioning Workshop Strengthens Local Government Commitment to Water and Sanitation Sector Visioning workshops were conducted in three cities in North Sumatra – Binjai, Tebing Tinggi and Tanjungbalai, attended by the local mayors, DPRD speakers and SKPDs working in the water and sanitation sectors. Directors of the water utilities partnering with IUWASH were also present. The local governments have committed to follow up the visioning workshops. Binjai government has agreed to increase the service capacity of the water utility through an assessment of the structure, needs, and employee optimization aspects of Tirtasari Water. This effort will also help cut losses in line with MOHA Decree No. 47/1999 on performance appraisals. Tebing Tinggi has committed to expand

Sieket Liong/ IUWASH North Sumatra

Head of District Parliament of Kota Binjai is witnessing the signing of the letter of commitment by the mayor and other LG agencies.

IUWASH North Sumatra

WTP III, will be re-construction in 2013.

Page 71: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 53

Tirta Bulian Water Utility service coverage to 68.33 percent, and to increase the number of septic treatment plants to seven units, along with 100 percent coverage of sanitation advocacy for all urban areas by 2015. Meanwhile, on signing the agreement, Tanjungbalai government stated that they would improve water service coverage to 65.74 percent through Tirtakualo Water, and provide sanitation facilities to serve 37,400 individual septic tanks and 187 toilets by 2015. IUWASH and water and sanitation stakeholders have now held visioning workshops in 22 cities/districts in IUWASH working areas. The objective of these workshops is to disseminate information on the state of existing water and sanitation services in each city, as well as targets and policies at the national level, especially towards achieving the MDGs. They also discuss partnership opportunities and support available from IUWASH to address challenges in the water and sanitation sector, and advocacy to encourage local leaders to be more committed to developing water and sanitation by strengthening the enabling environment, including local policies and financing. The expected outcome was a strong commitment and statement from high-level leaders that they would improve water and sanitation access over the next five years. The workshop was successful because it gave stakeholders clear and transparent information about the existing state of the water supply and sanitation sector. At the end of the workshop, the mayors and local legislators signed a commitment to place greater priority on improved safe water supply and sanitation services. Regional highlights by sector

Regional Highlights in Water Supply Sector This summary of program highlights in the water supply sector is divided into two parts – Anchor Projects and other program highlights. Program highlights for Anchor Projects in the water supply sector: Anchor Project #1: Water for the Poor Program in Sibolga and Langkat: Conducted survey and pipe distribution analysis for implementation of master meter program in Sibolga. This activity will use grant funds. The SOW is being prepared for submission to the IUWASH national office and USAID for the approval process. Anchor Project #2: Long-Term Finance for Water Treatment Plants in Binjai and Tebing Tinggi: IUWASH has done a real demand survey and calculated investment for distribution network investment in the framework of the PPP of PDAM Tebing Tinggi for Serdangbedagai district. The next step is to make a presentation on funding schemes to the mayor to receive guidance and direction for further implementation. Other program highlights in the water supply sector:

· Completed Customer Satisfaction Survey for Business Plan for PDAM Labuhanbatu, Pematang Siantar, Tebing Tinggi and Langkat.

· Facilitated Final Report evaluation for review of construction design for Water Treatment Plant No. III and main distribution pipe for PDAM Tanjungbalai.

IUWASH North Sumatra

Capacity Building for Dewan Pengawas from four PDAMs in North Sumatra (Asahan, Labuhanbatu, Sibolga and Langkat).

Page 72: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 54

· Conducted capacity building workshop for Dewan Pengawas from PDAM Asahan, Labuhanbatu, Sibolga and Langkat.

· Conducted workshop on introduction of GIS, SOP and Energy Efficiency for PDAMs. · Conducted technical training on pipe network optimization and mapping of existing pipe

network of PDAM Labuhanbatu and PDAM Langkat. · Conducted soft launching for socialization of “Air Pro Rakyat” program in Kab. Langkat, being

a microcredit program for water supply to the community. Regional Highlights in Sanitation Sector This summary of program highlights in the sanitation sector is divided into two parts – program highlights for the Anchor Projects, and other progress in this sector. Program highlights for Anchor Projects in the sanitation sector: Anchor Project #1: Medan Sewerage System Development:

· Conducted sewerage training for community leaders and neighborhood heads in four neighborhoods of Medan.

· Completed promotion campaign for Medan sewerage system connections in subdistricts of Kota Medan and Kab. Medan for 1,200 household connections.

· Completed DED for Medan sewerage system rehabilitation. The final report was presented to the Directorate of PLP DJCK (MPW) in Jakarta on March 26, 2013.

· Supported PEMDA Kota Medan in planning budget allocations for development of DED IPLT in Medan and advocacy for APBN in FY 2014.

Anchor Project #2: Community-based Desludging in Belawan-Medan: · Implementation of Community Based Desludging Management in Belawan was supported by

many parties, including an SME as the operator, Dinas Perkim Kota Medan for technical support (sludge station development, replication), Dinas Kebersihan (desludging in sludge station, regulation, license), Dinas Perhubungan (sludge car route license), Bappeda (regulation), and Dinas Kesehatan (promotion campaign for behavior change).

· Conducted gender awareness workshop for community members as part of the socialization of the Community-based Desludging Management to the community. In this activity, the community developed selection criteria for households to receive bio-filter septic tanks.

Other program highlights in sanitation sector: · Development of small sewerage system in Tebing

Tinggi, supported by Dinas PU (replication), Dinas Kebersihan dan Pertamanan (regulation), Bappeda (regulation), and Dinas Kesehatan (promotion campaign for behavior change).

· Development of shallow sewerage system along Jl. Sudirman in Kota Binjai, supported by Dinas PU (rehabilitation), Dinas Kebersihan dan Pertamanan (regulation), Bappeda (regulation), Dinas Kesehatan (promotion campaign of behavior changes), and Satker PPLP (construction).

· Conducted training for the enumerators of a survey on improved hygiene behavior in Kota Tebing Tinggi, Tanjungbalai and Kota Medan.

IUWASH North Sumatra

A member of the community asks about the operation and maintenance of the sewerage system during training.

Page 73: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 55

· Completed a YAKMI grant on MCK optimization in Tanjungbalai and Tebing Tinggi, including advocacy for policymakers to enhance communal system utilization through sanitation DAK and Sanimas Program (workshop to wrap up HEBAT program, establishment of Forum KSM on management of MCK at city level, and socialization of household connection systems).

· Completed DED for development of communal IPAL in Tebing Tinggi, which is now being tendered by Satker PPLP for North Sumatra Province.

Regional Highlights in Crosscutting Sector · C onducted gender training for bio-filter septic

tank beneficiaries in Kel. Belawan Bahari, Kecamatan Medan Belawan.

· Conducted Visioning Workshops in Kota Sibolga and Kab. Labuhanbatu. The main topics of these workshops were presentations on existing conditions of the water supply and sanitation sectors, targets for increasing access to the water and sanitation program, coordination among city institutions, and targeting increased APBD funding.

· Completed identification/updating of existing policies and regulations in the Watsan sector.

· Completed assessment of Citizen Engagement Mechanism (CEM) for seven locations and finalized CEM data analysis in Kota Tanjungbalai.

· Collection and analysis of APBD 2013 data.

Upcoming Events

Event Title Date Type Event Venue

Launching Online Water Bill Payment system April Campaign Launch

PDAM Office Pematangsiantar

Internalization workshop for Sibolga, Labuhan Batu, Asahan and Binjai on Watsan program requirement to be internalized in APBN

April Workshop Medan

Workshop on Mechanism of Customer Forum April Workshop Tanjungbalai Kick-off Meeting and Information Sharing on Implementation of Billing and Accounting

April Workshop Medan

Visioning Workshop April Workshop Kisaran, Stabat Comparative Study on Assessment of Structure, Needs and Optimizing of PDAM Binjai Employees April Comparative

Study PDAM Bogor

Conduct Serial Training on GIS/MIS, NRW April Binjai, Tebing Tinggi, Pematang Siantar, Tanjungbalai

Workshop on grand design for school sanitation May Workshop Sibolga, Labuhanbatu Presentation to Tebing Tinggi Mayor on financial scheme for PPP in Water Supply Program

May Workshop Tebing Tinggi

Workshop on Community Based Desludging Management in Belawan June Workshop Medan

Training on promotion of microfinance for PDAM Labuhanbatu June Training Medan, Labuhanbatu

IUWASH North Sumatra

Labuhanbatu Bupati and related institutions attend a Visioning Workshop.

Page 74: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 56

Cluster Report

IUWASH understands that the key to achieving its targets lies in the successful implementation of activities at the local level. In order to better describe and track the project’s activities and progress in each target location, IUWASH has developed cluster reports (one page per city). The following pages present the following nine cluster reports for North Sumatra: · Kota Medan · Kota Binjai · Kota Tebing Tinggi · Kota Pematang Siantar · Kota Tanjung Balai · Kab. Langkat · Kab. Asahan · Kab. Labuhan Batu · Kota Sibolga

Page 75: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 57

NORTH SUMATRA, Medan City Summary

The City of Medan, with a total population of more than 2,200,000 people, has been very successful in expanding drinking water access for poor people over the last three years. Recent population growth and city development has increased the demand for the water, so PDAM Tirtanadi needs to quickly increase its production capacity. For this purpose, support has been received from the provincial government in the form of equity capital for business development. Regarding sanitation, around 4% of the area is served by an offsite sewerage system. IUWASH is supporting the PDAM with a network extension targeting 13,250 new household connections. Dinas Perkim also supports on-site systems for poor communities and is developing improved sludge collection systems together with IUWASH.

Activities

Water Supply Sector: · Continued construction of infiltration ponds in Sibolangit

area by JKM · Facilitated PDAM on Capex analysis regarding their plan to

develop 1,000 lps water distribution under PPP

Sanitation Sector: · Conducted Training for Enumerators Survey on Improved

Hygiene Behavior · Developed DED for Medan Sewerage System Rehabilitation

(Phase I) until Final Report Stage · Completed Promotion Campaign for Medan Sewerage

System Connection for 1,200 house connections · Conducted training on sewerage system for community

leaders and neighborhood heads

IUWASH North Sumatra

USAID Team interviews communities on water and sanitation services.

Plan for Next Quarter: · Conduct Workshop on Climate Change Vulnerability

Assessment · Finalize development of Infiltration Ponds in Sibolangit · Workshop on Community Based Desludging Management in

Belawan · Advocacy to local government for a regulation on domestic

waste management in Kota Medan

Partner Coordination: · PDAM Tirtanadi for Water and

Sewerage · Local Government for promotion

Campaign and DED discussion · Local Consultant for DED Medan

sewerage · NGO and Communities for training

and construction of infiltration ponds · Students as enumerators

Page 76: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 58

NORTH SUMATRA, Binjai City

Summary The city of Binjai has a low rate of PDAM service coverage, reaching 22.2% of a total population of 246,010 people, and PDAM operations need to improve significantly. With a low Full Cost Recovery rate (56.7%), support is needed on business planning and debt restructuring, in conjunction with the opportunity to connect 7,500 new connections. To improve performance at PDAM Tirtasari, the Mayor inaugurated a new Director in early 2012. Urban sanitation has not been a PEMDA priority, so there is no Pokja or CSS. The mayor has asked IUWASH to support the local government in developing all of these as quickly as possible.

Activities

Water Supply Sector: · Conducted Workshop on introduction of SOP and GIS/MIS

to support PDAM operations · Perform measurement on water pressure and reservoir

capacity to support NRW reduction activity · Conducted workshop on Energy Efficiency Audits · Inception and Interim Report on Assessment of Structure,

Needs and Optimizing of PDAM Tirtasari employees

Sanitation Sector: · Conducted assessment of household toilet coverage and

potential of STBM program · Prepared DED for Shallow Sewerage System in Jl. Sudirman · Advocacy to local government to prepare local regulation on

domestic waste management

Crosscutting Sector: · Preparation of draft mayoral regulation (Perwal) on PDAM

Organizational Structure

IUWASH North Sumatra

Discussion on final report of study on structure, needs and optimizing of staff at PDAM Kota Binjai.

Plan for Next Quarter: · Training in promotion of microfinance for PDAM Binjai · Comparative study on compatible PDAMs related to

Assessment of Structure, Needs and Optimizing of PDAM Tirtasari employees

· Advocacy to Pemko Binjai for UPTD and Kota Binjai regulation on domestic waste management

· DED development for Binjai Shallow Sewerage System

Partner Coordination: · Local Government for preparing

Perda and DED shallow sewerage system

· PDAM Tirtasari for training · Communities for toilet assessment · University for assessment of PDAM

employees

Page 77: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 59

NORTH SUMATRA, Tebing Tinggi City

Summary

PDAM Kota Tebing Tinggi currently serves 30.6% of a total population of 145,180 people, and has idle capacity for 1,870 new connections. The support needed includes DED development, the business plan, advocacy to obtain long-term finance, and capacity building to enhance the efficiency of water management. In the sanitation sector, the government has had a solid performance since Pokja Sanitasi was established and White Book and CSS plans have been produced. Eleven MCK and communal IPAL units have already been established under the Sanimas program. However, this sector still needs to promote the STBM program as part of the CSS plan.

Activities

Water Supply Sector: · Completed the Customer Satisfaction survey for preparation

of business plan · Completed Real Demand Survey to support PPP program

between Tebing Tinggi and Serdang Bedagai Districts · Conducted workshop on SOP and GIS/MIS to support

improvement of PDAM Operations · Performed measurement of pressure and reservoir capacity

to support NRW reduction activity Sanitation Sector: · Conducted training for enumerators of the Survey on

Improved Hygiene Behavior · Completed development of DED IPAL Komunal – Tebing

Tinggi, now in tender process in Satker PPLP – Province · Inauguration Workshop on CBO forum at City Level and

exhibition of the results of the HEBAT program Crosscutting Sector: · Conducted Preparation of Draft SK Walikota for PDAM

Business Plan document

IUWASH North Sumatra

Plan for Next Quarter: · Conduct Serial Training on GIS/MIS for PDAM · Presentation to Mayor of Tebing Tinggi and related

institutions regarding financial scheme for PPP for Water Supply Program

· Finalization of PDAM Business Plan · Advocacy to DPRD Tebing Tinggi for UPTD and Kota Tebing

Tinggi regulation on domestic waste management

Partner Coordination: · Local Government for workshop and

CBO forum establishment · PDAM Tirta Bulian for training and

survey · Local NGO for workshop and CBO

forum establishment · Students as enumerators · Communities for CBO forum

establishment

Page 78: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 60

NORTH SUMATRA, Pematang Siantar City

Summary The city of Pematang Siantar is the second largest city in North Sumatra, with a total population of 241,285 people and PDAM coverage of 76.4%. Yet the PDAM retains idle capacity for up to 7,335 new connections. The LG has ambitions to develop a citywide sewerage system to inspire other regional governments around Lake Toba. However, a Pokja AMPL has not yet been established to prepare the PPSP programs supported by the central government. This created an opportunity for IUWASH to support development of a CSS, including promotion of the STBM program to be implemented by the PEMDA in priority locations.

Activities

Water Supply Sector: · Completed customer satisfaction survey for preparation of

Business Plan · Performed measurement of water pressure and reservoir

capacity to support NRW reduction activity · Workshop on SOP and GIS/MIS to support improvement of

PDAM operations · Performed Raw Water Vulnerability Study for Climate

Change Vulnerability Assessment

Sanitation Sector: · Conducted Assessment of household toilet coverage and

potential of STBM program · Supported PEMDA in organizing Sanimas assistance from

central government · Rapid assessment on sanitation regulation and institution,

including existing ones on sludge management Crosscutting Sector: · Completed assessment of Citizen Engagement Mechanism · Completed advocacy for policy makers to prepare APBD for

Citywide Sludge Management Development

IUWASH North Sumatra

Customer Satisfaction Survey training for PDAM staff and students.

Plan for Next Quarter: · Launch online water bill payment system · Finalize Business Plan for PDAM · On-the-job training: Implementation of NRW Models, both

technical and non-technical aspects · Conduct serial training on GIS/MIS for PDAM staffs

Partner Coordination: · Local Government for advocacy · PDAM Tirta Uli for training and

survey · Students as Enumerators · Communities for household toilet

survey

Page 79: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 61

NORTH SUMATRA, Tanjung Balai City Summary The city of Tanjung Balai urgently requires additional water resources since the PDAM only has 2.5 lps of idle capacity while there is an immediate need for new connections for more than 3,000 households. Currently, service coverage is 51.3% of a total of 159,932 people. The Sanitation Working Group has not yet been established. While the White Book, CSS plan, Project Memorandum, Business Plan, Master Plan, and DED have all been drafted, they still need revising to be included in the national PPSP program. Promotion of STBM programs is ongoing but still requires continued support.

Activities

Water Supply Sector: · Mentored evaluation of Final Report on Review Design of

WTP III and installation of main distribution pipe · Conducted workshop on introduction of SOP and GIS/MIS

to improve PDAM operations

Sanitation Sector: · Conducted training for enumerators of Survey on Improved

Hygiene Behavior · Conducted assessment of household toilet coverage and

potential of STBM program · Inauguration Workshop on CBO forum at City Level and

exhibition of results of HEBAT program Crosscutting Sector: · Completed CEM Assessment and finalized CEM Data

Analysis for Tanjungbalai

Credit Photo

Deputy Mayor briefing community and CBO Forum on operation and maintenance of MCK.

Plan for Next Quarter: · Conduct Workshop on PDAM Customer Forum Mechanism · Mentoring of Management Consultant on Construction of

WTP III Including Tender Preparation · Conduct Serial Training on GIS/MIS for PDAM staffs · Conduct measurement, analysis of existing water treatment

Plant for PCI activity

Partner Coordination: · Local Government for CBO forum

establishment · PDAM TirtaKualo for design of WTP

III · Local NGO for exhibition · Forum CBO for inauguration · Communities for Assessment of

Household Toilets

Page 80: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 62

NORTH SUMATRA, Langkat District Summary

Stabat is the capital of Kab. Langkat, which has 23 subdistricts and a population of 1,080,000 (2010). Fifteen of these subdistricts have a water supply service through 13 service units under the management of the PDAM, but overall service coverage is still relatively low at 10.3%. Based on existing water production data, the PDAM has idle capacity of 45 lps (sufficient for an additional 3,000 households to be connected). Beginning in PY3, IUWASH is providing full support to this city to compliment an initial program established in PY2 to develop a microcredit program with the PDAM, which is still continuing. The region needs to expand its service coverage to reach more low-income people.

Activities

Water Supply Sector: · Completed Customer Satisfaction Survey for preparation of

Business Plan · Completed delineation of Stabat city mapping to complete

the distribution network analysis · Conducted Soft Launching of Socialization of “Air Pro

Rakyat” Program · Conducted Capacity Building Workshop for Dewan

Pengawas PDAM; this workshop was also attended by the Head of Bappeda and Head of PU

· Workshop introducing Energy Efficiency Audits

Sanitation Sector: · Conducted assessment of household toilet coverage and

potential of STBM program · Encouraged Bappeda and Dinas Pekerjaan Umum to take

part in 2014 PPSP Program · Rapid assessment of communal system needs in dense

settlements in Stabat and Tanjung Pura

Crosscutting Sector: · Conducted preparations for development of Draft SK

Walikota for PDAM Business Plan document

IUWASH North Sumatra

Soft Launching of Microcredit Program.

Plan for Next Quarter: · Finalize Business Plan for PDAM · Implement Billing and Accounting Integration (SISKA) · Conduct Visioning Workshop · Prepare SOP as a PDAM priority

Partner Coordination: · PDAM Tirta Wampu for microcredit and

PDAM training · Local Government for Dewan Pengawas

capacity building · Students for enumerators · Communities for Assessment of Household

Toilets

Page 81: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 63

NORTH SUMATRA, Asahan District Summary

Asahan District has a population of 668,272 (2010). Among its water supply challenges are debt restructuring, idle capacity, poor water quality, limited production capacity, and a water tariff that has not reached a full cost recovery (FCR) level. Meanwhile, sanitation is not a priority, there is no city sewerage system, and the STBM program needs to be improved. IUWASH plans to develop working groups in sanitation/drinking water and environmental health; develop a Sanitation White Book, City Sanitation Strategy, and project memorandum for the sanitation program; promote family toilets to encourage open defecation free; provide hand washing with soap materials; and conduct post-construction training and facilitation of the Sanimas program.

Activities

Water Supply Sector: · Completed preliminary assessment for implementation of

Billing and Accounting system · Conducted Capacity Building Workshop for Dewan Pengawas

PDAM; this workshop was also attended by the Head of Bappeda and Head of PU

· Conducted on-the-job training and survey on study area for pipe distribution area, including mapping

Sanitation Sector: · Conducted assessment of household toilet coverage and

potential of STBM program · Encouraged Bappeda and Dinas Pekerjaan Umum to take part

in 2014 PPSP program · Conducted rapid assessment for desludging system needed in

dense settlement in Kisaran

Crosscutting Sector: · Collected data to update/identify existing Watsan

policies/regulations that have been implemented

IUWASH North Sumatra

PDAM Director asks questions during a Workshop on capacity building for Dewan Pengawas.

Plan for Next Quarter: · Implement billing and accounting integration (SISKA) · Conduct Visioning Workshop · Prepare SOP as a PDAM priority · Conduct water capacity and pressure measurement for

reservoir under NRW Program

Partner Coordination: · PDAM for assessment and training · Local Government for capacity

building · Dewan Pengawas for capacity building · Communities for household toilet

assessment

Page 82: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 64

NORTH SUMATRA, Labuhan Batu District Summary

There are 547,802 people in Labuhan Batu District. The district’s water utility faces poor water quality, 50% idle capacity, a high NRW rate of 41%, and a water tariff that has not reached full cost recovery. The district lacks a wastewater management plant, with sludge being dumped in local rivers. It also lacks important sanitation-related documents such as a CSS and project memorandum, and there are no working groups on sanitation, drinking water and environmental health. IUWASH plan to conduct advocacy efforts to include the district in the PPSP program, promote individual toilets to achieve open defecation free, provide materials for hand washing with soap, and conduct training and facilitation for the Sanimas program.

Activities

Water Supply Sector: · Completed Customer Satisfaction Survey for preparation of

Business Plan · Completed preliminary assessment for implementation of

Billing and Accounting system · Conducted Capacity Building Workshop for Dewan Pengawas

PDAM; this workshop was also attended by the Head of Bappeda and Head of PU

· Conducted on-the-job training on measurement of Water Treatment Plant Units and mapping pipe network

Sanitation Sector: · Conducted assessment of household toilet coverage and

potential of STBM program · Encouraged the Bappeda and Dinas Pekerjaan Umum to take

part in 2014 PPSP program · Defined sanitation programs, namely, TA in MCK

development on 2013 APBD (two units) and MCK (10 units in elementary schools, one unit developed by 2011 APBD).

Crosscutting Sector: · Conducted Visioning Workshop on Water Supply and

Sanitation, attended by Bupati and related institutions

IUWASH North Sumatra

Distribution network training for PDAM staffs.

Plan for Next Quarter: · Finalize Business Plan for PDAM · Conduct training in promotion of PDAM microfinance · Conduct measurement, analysis of existing Water Treatment

Plant for PCI activity · Prepare SOP as a PDAM priority

Partner Coordination: · Local Government for Visioning

Workshop and Dewan Pengawas · PDAM for training and assessment · Students for enumerators · Community for assessment of

household toilets

Page 83: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 65

NORTH SUMATRA, Sibolga City Summary

Sibolga city has a population of 88,211 (2011). With service coverage at 60%, there are substantial opportunities for the water utility to gain new customers. However, raw water supply from a nearby river is only 50% during the dry season, and the NRW rate is 41%. In the sanitation sector, the city does not have medium- or long-term plans for citywide sanitation, the IPLT is no longer functioning, and the STBM program needs support. IUWASH’s approach includes triggering activities for individual toilets, providing materials for hand washing with soap, conducting advocacy efforts for a new IPLT, STBM training and facilitation, and post-construction training and facilitation of the Sanimas program.

Activities

Water Supply Sector: · Conducted Capacity Building Workshop for Dewan Pengawas

PDAM; this workshop was attended by the Head of Bappeda and Head of PU

· Performed calculations for distribution pipeline analysis, leading to the planned location of an MBR system

· Conducted on-the-job training and survey on study area and pipe distribution area mapping

Sanitation Sector: · Conducted assessment of household toilet coverage and

potential of STBM program · Encouraged the Bappeda and Dinas Pekerjaan Umum to take

part in 2014 PPSP program · Defined the sanitation programs, namely, TA in MCK

development under 2013 APBD (two units) and MCK optimization (10 units in elementary schools)

Crosscutting Sector: · Conducted Visioning Workshop on Water Supply and

Sanitation; This workshop was attended by the Mayor, Head of Local Parliament and related institutions

IUWASH North Sumatra

Communities collect water from the PDAM tank and walk home with it.

Plan for Next Quarter: · Facilitate PDAM to conduct Customer Satisfaction Survey · Finalize and implement water supply to MBR area · Climate Change Vulnerability Assessment Study · On-the-job Training: Implementation of NRW Models,

technical and non-technical aspects

Partner Coordination: · Local Government for Visioning

Workshop and Dewan Pengawas · PDAM for assessment and training · Communities for assessment of

household toilets · Dewan Pengawas for workshop

Page 84: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 66

WEST JAVA/DKI JAKARTA/BANTEN

Page 85: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 67

Section 4.2

WEST JAVA/DKI JAKARTA/BANTEN

Summary

This IUWASH region consists of West Java, DKI Jakarta and Banten provinces, which are home to a population of more than 63 million—nearly a quarter of Indonesia’s total population. This region covers an area of 44,600 square kilometers, or only 2.3% of Indonesia’s surface area. About six million people are classified as poor, of whom 5.49% live in DKI Jakarta, 12.95% in Banten, and by far the greatest share (81.56%) in West Java. In PY1 and PY2, IUWASH worked in eight municipalities, namely Kota Bekasi, Kota Bogor, Kab. Bekasi, Kab. Karawang, Kab. Lebak, Kab. Serang, Kab. Tangerang, and DKI Jakarta (see Regional Map). Following roadshows in West Java and Banten in the last quarter of PY2, IUWASH added three new cities in the region to the program – Kab. Bandung and Kab. Purwakarta in West Java, and Kota Tangerang Selatan in Banten. They responded very positively, showing strong interest in the many activities that IUWASH can support. IUWASH also upgraded its program to provide full support to two cities that had previously received only partial support – Kab. Bekasi and Kab. Lebak. As a result, in PY3 IUWASH is providing technical assistance to 11 cities in the region to improve their water supply and sanitation sectors. In the water supply sector, IUWASH is working with nine PDAMs to improve their management, operations and technical aspects and assisted the two water utilities in Jakarta (Aetra and Palyja) in conducting an NRW study. In support of the water-for-the-poor program, IUWASH supported master meter systems for 298 households in Kab. Tangerang, with the PDAM and Dinas Cipta Karya. IUWASH also facilitated regionalization for water supply between Kab. Tangerang and Kota Tangerang Selatan and between Kab. and Kota Serang as well as raw water regionalization between PDAM Kab. and Kota Bandung in the southern part of Kab. Bandung. With PDAM Kab. Serang and Kab. Lebak, IUWASH has also supported the development of accounting software that links with the billing software. In the sanitation sector, IUWASH focused on assisting local governments in implementing the following community-based sanitation programs:

· Seven Sanimas systems (five in Jakarta and two in Kab. Bekasi with Bappeda) funded by Satker PPLP

· Two ongoing grant programs on small-scale sewerage systems in Jakarta with Forkami and on community-based septage management program with Mercy Corps

· Two CBS models in Teluk Naga and Kronjo, Kab. Tangerang, also under grant program · Four communal IPAL and 22 school-based sanitation systems in Kab. Tangerang, with Dinas

Cipta Karya The PEMDA have a strong need and commitment to establish a sanitation institution (UPTD/AL) in Kab. Bekasi, Kota Bekasi and Kab. Bandung, following the successful example of Kota Bogor, which is now entering the final stage for approval through the issuance of a Mayoral Decree. IUWASH has also worked with Dinas Kesehatan Kab. Lebak and Dinas Kesehatan Kab. Tangerang for sanitation marketing and an STBM replication program.

Page 86: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 68

In the crosscutting program, IUWASH began assessments and discussions with relevant institutions in Kab. Bandung, Purwakarta and Kota Bogor to identify CEMs. IUWASH has also conducted visioning workshops and PA signings in Purwakarta and Lebak. The Anchor Projects to centralize sanitation management in Kota Bogor have already led to recruitment of four additional technical staffs following the increased responsibility and budget of UPTD/AL. In the climate change adaptation program in Kab. Bandung, a field survey and transect walk have been conducted, and IUWASH is now procuring a third party to support the water supply vulnerability study, including a raw water assessment in Kab. Serang. Success Stories

Success Story in Water Supply Sector Translating Local Wisdom into Action to Ensure Fair Access to Drinking Water H. Dedi Mulyadi, SH was only 37 when he first stepped into the Local Government Office of Kabupaten Purwakarta as District Head in 2008. The father of two young sons really values and applies cultural values in his life. He entered his second term as District Head on March 13, 2013. In his first term, he made water supply one of the key development strategies for the welfare of the people, particularly those living in rural areas. Access to piped water was also an emphasis, as local government equity increased to IDR 40 billion and the outstanding debt of IDR 20 billion was paid off to give the local water utility space to expand its service. “God entrusts His love to mankind through and in the water. Therefore people are obliged to protect the trees, the spring and the river,” he said in his remarks during the visioning workshop on March 6, 2013. Dedi Mulyadi understands that the basis of belief lies in the message of protecting the environment and life. “In Indonesia and here in West Java, culture is highly valued. Using local wisdom is the easiest way to encourage people to protect the spring and to share water in a fair and equitable manner,” he explains with passion. The local government is now putting a lot of money into water supply infrastructure improvements, including investment in the reservoir, distribution and piping system for around 9,000 new household connections, at a cost of IDR 17.4 billion, in four new service areas – Purwakarta (Panorama and Griya Mukti), IKK Tegalwaru-Plered, Wanayasa and Pasir Angin. “The water utility cannot simply take upstream water and distribute it to people in the cities. All areas from the intake down to the city have to be served. We are really pushing the water utility to make this happen, and in my view this is how local wisdom is put into action,” he said as he ended his speech.

Jeni Sukmara/IUWASH West Java

H. Dedi Mulyadi, SH (in white) with Head of Bappeda, Ir H. Tri Hartono, MM (far left), Head of DPRD, H. Ucok Ujang Wardi, SH (on the left) and Louis O’Brien, Purwoko Hadi and Nur Endah Shofiani (on the right) after the visioning workshop and PA signing ceremony in Aula Janaka at the Kabupaten Purwakarta Local Government Office Complex.

Page 87: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 69

Success Story in Sanitation Sector Power of Persuasion in Scaling up Community-based Total Sanitation (STBM) I UWASH has been supporting Tangerang District Health Office to implement Community-based Total Sanitation (STBM) in three villages since 2011. Seeing the successful results from two villages in the first batch, the local health office has since replicated STBM in three other locations – Kresek, Teluk Naga and Jati Mulya. In Teluk Naga, 42 individual toilets were built in two weeks in Kebon Cau and Babakan Asem villages, where 70% of the 18,000 residents practiced open defecation at a nearby river. “It’s the power of persuasion,” said Dr. Yully Soenar Dewanti, Head of the Disease Prevention and Environmental Sanitation Division, acknowledging the efforts and hard work of Junaidi Jatmiko, a sanitarian in Teluk Naga who mobilized and conducted triggering activities in Kebon Cau Village within a month after participating in an IUWASH-supported STBM gathering. “The people here defecate in this river using this floating toilet. They also use water from the same river to bathe because the groundwater is brackish,” said Jatmiko, pointing at a nearby small brownish river during an STBM monitoring and supervision visit by IUWASH. “The character of this community doesn’t allow us to adopt traditional Community-led Total Sanitation or CLTS. We added a stimulus to the traditional CLTS approach by providing a toilet bowl costing 55,000 rupiah for each household that committed to change its sanitation behavior,” he added. He admitted that it had not been an easy process. One of the main challenges was a provocative local leader who discouraged households from participating unless all construction costs were paid for. Nevertheless, 52 individual sanitation facilities had been built by March 2013. “We let the households to decide the toilet type and model, depending on their capacity and needs,” he explained while showing several different sanitation models in Teluk Naga, including simple toilets with a toilet bowl, a concrete floor and wooden walls, toilets with tiles, and water containers. “One lady even borrowed two million rupiah from a relative to improve her toilet,” he said proudly. Junaidi Jatmiko will continue promoting improved sanitation practices together with his health promotion colleagues. They aim to improve sanitation access with 100 toilets and septic tanks. He appreciates the commitment and financial contributions of households, but will continue to improvise and adopt innovative strategies, including the use of a stimulus and microcredit facilities. These two approaches have proved very effective in Teluk Naga.

Harod Novandi /IUWASH West Java

Junaidi Jatmiko during a regular monitoring and evaluation visit to Teluk Naga. He closely supervises the local community in installing proper toilets and septic tanks.

Page 88: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 70

Regional highlights by sector

Regional Highlights in Water Supply Sector Highlights this quarter in this sector include the Anchor Projects and other program highlights, as described below. Program highlights for Anchor Projects in water supply sector:

· Anchor Project #1 (Climate Change Adaptation Program in Cisangkuy Watershed Area): From a transect walk along Cisangkuy River and the upstream area and discussions with PDAM and Bappeda Kab. Bandung in January, IUWASH found that the water quality had fallen. The suspended solids concentration reached up to 4,000 NTU in the rainy season while in the dry season, in addition to the decline in water discharge, increased contamination is seen from household waste, pesticide and fertilizer. IUWASH is developing a water supply vulnerability assessment and baseline study for this catchment area. “There are no instant solutions to overcome these issues, but the study will allow us to understand the vulnerability of water supply as a result of human activities and climate change. We can then develop strategy and recommendations for adaptation measures and to encourage development of policy on water conservation at the kabupaten level,” explained Agus Nugraha, IUWASH Urban Water Specialist, in a coordination meeting with PDAM, Bappeda and Dispertasih.

Other program highlights in the water supply sector: · IUWASH has been supporting development of Business Plans in Serang, Karawang, Bogor,

Purwakarta, Lebak and Kab. Bekasi. For Kab. Tangerang and Kota Bekasi, Business Plan development is on hold until feasibility studies for new service areas are completed and approved.

· Facilitated discussion and agreement on regionalization of water supply between Kab. Tangerang and Kota Tangerang Selatan. An MOU was drafted and is now awaiting approval from the Mayor and Bupati. IUWASH also participated in discussions with the Sekda Kab. Serang for water

Sabdo Sumartono/IUWASH Jakarta

The Cisangkuy Catchment Area,where two PDAM intakes are located, in Nagrak (18 lps) and in Cikalong (300 lps). The upstream headwaters include two lakes, Situ Cileunca and Situ Cipanunjang, and water springs in Leuweung Citere and Cigadog. The discharge from these springs hasdecreased by 80-90%. Leuweung Citere discharged 90 lps of water in 1990, but only 15 lps now, and the Cigadong intake was initially designed for 10 lps while its maximum current capacity is only 0.6 lps.

Sabdo Sumartono/IUWASH Jakarta

Cisangkuy River, near the PDAM intake in Nagrak, is surrounded by cultivated areas that contribute substantial amounts of pollutants into the river.

Page 89: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 71

supply regionalization between PDAM Kab. Serang and PDAM Kota Serang. A regionalization task force has been established to facilitate further discussion between the two cities. IUWASH is also involved in regionalization of raw water between Kota and Kab. Bandung, particularly for the Cileunca and Cipanunjang lakes in Pangalengan, which is in the southern part of Kab. Bandung.

· Facilitated an initial assessment as part of IUWASH support to develop new accounting software that can be linked to the current billing system for PDAM Kab. Serang and PDAM Kab. Lebak. Both PDAMs have procured new desktop computers (two in Lebak and three in Serang) specifically for the new accounting systems.

· Facilitated kick-off meeting and initial evaluation of construction progress for two master meter systems in Rajeg under the small grant program.

Regional Highlights in Sanitation Sector This summary of program highlights in the sanitation sector is divided into two parts – program highlights for the Anchor Projects, and other progress in this sector. Program highlights for Anchor Projects in the sanitation sector: · Anchor Project #1 (Centralized Sanitation Management in Kota Bogor): After conducting a series of

discussions and developing a new organizational structure, job descriptions and SOP, 14 new staffs are needed to accommodate UPTD PAL taking on a bigger role and providing broader services. Four new officers are being recruited in 2013. IUWASH will continue to work with Bappeda, Dinas Kebersihan dan Pertamanan and UPTD PAL to support the formalization of UPTD PAL’s upgraded function through the issuance of a mayoral decree.

· Anchor Project #2 (Integrated Sanitation Improvement in Cisangkuy Watershed): IUWASH, Bappeda, Dinas Kesehatan and Dinas Perumahan, Kab. Bandung conducted a joint observation on existing Sanimas and potential locations. While the facilities are being used by the community, there are currently no O&M systems in place. Following changes in the APBD budget and the community-based sanitation program sites, IUWASH will facilitate a sanitation workshop to develop a roadmap and timeframe for both the Cisangkuy Watershed area and Kab. Bandung as a whole.

Other program highlights in sanitation sector: · Five new Sanimas systems in Jakarta plus two systems in Kab. Bekasi funded through Satker PPLP

are being implemented this year (with a budget of IDR 2.4 billion) for both physical and community mobilization. IUWASH supported site selection, technology options and designs for shared septic tanks for 400 households in Bekasi. For the communal wastewater facilities in Jakarta, IUWASH will support supervision and monitoring of construction, and post-construction capacity building.

· Two ongoing grant programs in Jakarta implemented by Forkami and Mercy Corps are entering their final stage. Forkami is overseeing construction and installation of 118 house connections to the sewerage system of PD PAL Jaya, which will be completed in May 2013. Mercy Corps is now constructing knock-down septic tanks (KDST) in Kel. Pademangan. Thirty of the targeted 103 KDSTs have been installed. Two new grants for CBS in Teluk Naga (Bina Swadaya) and IPAL Kronjo (BEST) have just started, with both these NGOs mobilizing their staffs and resources. The kick-off will take place in April.

· As part of the PEMDA commitment to implement City Sanitation Strategy, Kab. Tangerang has allocated IDR 1.8 billion for school sanitation improvements and IDR 3.4 billion for construction of four new communal wastewater treatment facilities. IUWASH is developing the typical DED for school sanitation and will also support community mobilization and capacity building activities for the construction of communal IPAL. IUWASH will allocate the unused budget of IDR 50 million from the Sanimas activity in Jakarta, as everything is already covered by Satker PPLP Jabodetabek.

Page 90: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 72

· IUWASH has received a commitment from Bappeda Kab. Bekasi to establish a UPTD PAL, and Kota Bekasi has agreed that the Sludge Treatment UPTD will be upgraded to a UPTD PAL.

· IUWASH supported Dinas Kesehatan Kab. Tangerang and Lebak to implement sanitation marketing. After facilitating a training workshop attended by 25 participants in Lebak and Tangerang, sanitarians have been very active in promoting technology options for sanitation improvements as well as providing a microcredit scheme. So far, 26 families have installed individual septic tanks. PEMDA support has been strong in both cities, and budget revisions will be made in June to support sanitation marketing in Tangerang, while IDR 200 million has been allocated by Lebak Bappeda to support septic tank microcredit promotion.

Regional Highlights in Crosscutting Sector · Conducted visioning workshop and PA signing with the Bupati of Kab. Lebak on February 5,

2013, and with the Bupati of Kab. Purwakarta on March 6, 2013. · Conducted initial assessment of the existing citizen engagement mechanism in Kab. Bandung and

Purwakarta. In Bandung, the feedback mechanism and information sharing are being facilitated through a radio talkshow, quarterly bulletin, website and SMS gateway. In Purwakarta, the active mechanism is the SMS gateway, which is being managed directly by the Bupati. IUWASH plans to develop an SMS administrator system in Purwakarta so that information and feedback can be categorized and recorded to help improve public service performance.

· Facilitated discussion and information sharing with HSBC and its NGO partner PKPU regarding the master meter approach, and facilitated a cross visit to the master meter program in Penjaringan, Jakarta.

Upcoming events

Event Title Date Type of Event Venue

FGD Citizen Engagement Mechanism 26-27 March Discussion Bapapsi Kab. Bandung Presentation of final tender document for IPA Katulampa

End of March Meeting PDAM Kota Bogor

Installation of wastewater piping system

March-April PO construction Karet Kuningan, Jakarta

MOU finalization and signing for water supply regionalization

April Event Kab. Tangerang and Kota Tangerang Selatan

Present customer satisfaction survey 1st week of April Discussion PDAM Purwakarta FGD Citizen Engagement Mechanism 1st week of April Discussion Diskominfo Purwakarta FGD sanitation mapping and program integration

1st week of April Discussion Bappeda Purwakarta

Visioning Workshop and Signing of Partnership Agreement

1st week of April

Workshop

Hotel Aston Bandung

Sanitation Workshop 1st week of April Workshop Kab. Bandung Kedoteng Training for community facilitators in STBM areas

10 April Training Kota Bogor

Sanimas system upgrade/optimization 10 April Survey Kota Bogor Hygiene promotion (Stop BABS, CTPS, PAM RT)

15 and 17 April Training Kota Bogor & Kab. Tangerang

Visioning Workshop 2nd week of April Workshop Pemda Kab. Bekasi Cross visit to Makassar for UPTD PAL set up in Kab. Bekasi

2nd week of April Cross visit Makassar

Socialization of PDAM Business Plan 3rd week of April Workshop Pemda Kab. Serang Septic Tank Construction Training 26-27 April Training Kab. Tangerang

Page 91: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 73

for community facilitators in STBM areas FGD UPTD PAL Kota Bekasi 4th week of April Discussion Bappeda Kota Bekasi Socialization of Business Plan for Bupati and DPRD approval

End of April Workshop Kab. Karawang

Socialization of PDAM Business Plan 10 May Workshop Pemda Kab. Lebak Sanitation Award June Event Pemda Kota Bekasi

Cluster Reports

This quarter, seven cluster reports are presented for the IUWASH West Java/DKI Jakarta/Banten region. Some of these reports combine two cities because most IUWASH activities in the newly added cities are still at a preparatory stage. The seven cluster reports cover the following regions:

· Bogor City, West Java

· Bekasi City and Bekasi District, West Java · Karawang District, West Java · Purwakarta District and Bandung District, West Java · DKI Jakarta

· Tangerang District and Tangerang Selatan City, Banten · Serang District and Lebak District, Banten

Page 92: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 74

WEST JAVA, Bogor City Summary PEMDA Bogor City has been very effective in the Watsan sector. PDAM water supply coverage has reached 63% of the total population of 985,352, and Pokja Sanitasi is also very active, with a City Sanitation Strategy (CSS) produced in 2010 and a Wastewater Master Plan developed with AusAID-IndII. The PEMDA has allocated more than two percent of its budget to support implementation of the CSS and Master Plan. There are 20 Sanimas units, and a wastewater treatment plant (IPAL) in Tegal Gundil is now serving 300 households, with an additional 60 connections targeted in 2012-13.

Activities

Water Supply Sector: · Provided assistance to PDAM for migration of GIS to CIS data · Finalized development of tender document for IPA Katulampa · Facilitated discussion regarding long-term financing through PPP

between USAID delegations and PDAM directors · Facilitated two days of workshop to socialize and obtain feedback

from stakeholders on PDAM operations as part of PDAM corporate plan development

Sanitation Sector: · Finalized and presented first draft of septage management study · Facilitated STBM evaluation meetings with sanitarians, health

promoters and community facilitators · Conducted semi-annual hygiene behavior change monitoring in

STBM locations

Crosscutting Sector: · Assisted and monitored progress in drafting a mayoral decree for

the newly upgraded UPTD PAL

Nurisnindah Kurniawan/IUWASH West Java

A sludge vacuum motor has been purchased by UPTD PAL to support desludging services in densely populated areas with narrow lanes in five neighborhoods (kelurahan) under the STBM program.

Plan for Next Quarter: · Digitalization of piping system through to house connections · Assessment of existing citizen engagement mechanism · Support development of PDAM corporate plan · Presentation and finalization of tender document for IPA Katulampa · Training for CBO for community-based septage management using

Kedoteng and assisted by Mercy Corps · Survey and FGD for Sanimas system upgrade in two locations · Hygiene promotion for Stop BABS, CTPS and PAM RT · FGD on promotional materials for household sanitation

connections

Partner Coordination: · Dinas Kesehatan, Puskesmas, PNPM,

sanitarians and community facilitators for STBM triggering, marketing and monitoring

· Bappeda, Dinas Kebersihan dan Pertamanan, UPTD PAL, Dinas Kesehatan, Wasbangkim and Ortala for the issuance of a mayoral decree on new UPTD PAL and additional budget allocation for UPTD PAL operation

· PDAM and consultant for GIS/MIS training, PPP tender document preparation and development of corporate plan

Page 93: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 75

WEST JAVA, Bekasi City and Bekasi District Summary Bekasi City is a relatively new city that split from Bekasi District in 1997. Two PDAMs share responsibility for providing access to piped water for 28 percent of the city population of 2 million and 17 percent of the district population of 2.6 million. IUWASH has provided full support to the city government since the outset and began supporting the district government in PY3, including the PDAM. Kota Bekasi developed a CSS (SSK) in 2010, and community-based septage management was piloted under a USAID program. Kab. Bekasi has engaged developers to pilot communal septic tanks for low-cost housing, and this program is now being replicated with IUWASH support in collaboration with Satker PPLP Jabodetabek, Bappeda and REI Kab. Bekasi. In 2013, Kab. Bekasi has allocated more funds for sanitation activities, including APBN funds for replication of Sanimas in four locations, APBD funds for Sanimas in four locations, and an additional IDR 24 billion of APBD funds for a housing improvement program for 4,000 houses that includes a sanitation component.

Activities

Water Supply Sector: · Conducted a one-day workshop to socialize Business Plan

development, attended by around 100 staffs, managers and directors of PDAM Kab. Bekasi

· Supported Business Plan development (now at chapter 3) and preparations for customer satisfaction survey in Kab. Bekasi

· Finalized FS for Jatiasih and revised FS for Bekasi Utara, Bekasi Barat, Mustika Jaya and Pondok Gede (total capacity 800 lps)

Sanitation Sector: · Supported site selection and technical observation for

CBS/ICWRMIP program in three villages, and for Sanimas in three locations in Kab. Bekasi

· Provided construction supervision for installation of communal IPAL in Perumahan Bukit Indah Pratama Kab. Bekasi

· Facilitated meetings to gain commitment for establishment or strengthening of UPTD, and conducted assessment of existing roles and responsibilities of relevant SKPDs in Kota and Kab. Bekasi

Adri Ruslan/IUWASH West Java

Socialization of Business Plan Development to approximately 100 PDAM staffs, managers and directors at Hotel Horizon, Bekasi on January 14, 2013.

Plan for Next Quarter: · Finalization of FS Jatiasih, Pondok Gede, Mustika Jaya, Bekasi

Utara and Bekasi Barat with PDAM Kota Bekasi · Follow up to discuss establishment of UPTD and analysis of

existing roles and responsibilities of relevant SKPD in Kota Bekasi · Follow up new request for support to establish Public Works

SKPD in Kota Bekasi · Customer Satisfaction Survey with PDAM Kab. Bekasi · Socialization of Sanimas program, establishment of CBO, and

selection of appropriate sanitation technology options prior to development of DED

· Coordination and evaluation of ongoing collaboration with Bappeda, Satker PPLP Jabodetabek, Dinas Kesehatan and REI Kab. Bekasi

· Capacity building for field facilitator of house improvement project in Kab. Bekasi

· Cross visit to Makassar for UPTD set up in Kab. Bekasi

Partner Coordination: · PDAM Kota Bekasi for development of

Feasibility Study and PDAM Kab. Bekasi for development of Business Plan

· REI Kab. Bekasi, Bappeda and Satker PPLP Jabodetabek for piloting small-scale sewerage system in low-cost housing area

· Bappeda, Dinas Kesehatan, Dinas Tata Ruang dan Permukiman for implementation of ICWRMIP, Sanimas, house improvement program and UPTD establishment in Kab. Bekasi

· Bappeda and BPLH for UPTD set up in Kota Bekasi

Page 94: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 76

WEST JAVA, Karawang District Summary The emerging industrial sector has led to the rapid development of residential areas in Karawang. Rice fields that used to occupy most of the land have diminished along with the water catchment area. PDAM Tirta Tarum serves 11 percent of the 2.1 million population of Karawang. Ninety percent of raw water sources for this PDAM consist of surface water. The continued conversion of green fields into housing and industrial estates, combined with climate change, threatens the quality and quantity of surface water. In 2013, the central government will allocate IDR 25 billion to construct two new PDAM treatment plants that can serve up to 10,000 household connections, while in the sanitation sector, the central government has allocated IDR 1.8 billion for a sanitation program plus two Sanimas.

Activities

Water Supply Sector: · Conducted internal socialization of final draft of PDAM Business

Plan to PDAM and Dewan Pengawas (Supervisory Board) · Facilitated discussion and developed scope of work for tariff

reclassification survey, and finalized the questionnaire · Conducted initial discussion for development of PDAM master

plan · Coordinated new microcredit location and target of 400

households in Palem Kondang Asri housing complex

Sanitation Sector: · Coordinated with Dinas Cipta Karya and Bappeda for Sanimas

and CBS program in Purwakarta · Supported quality assurance and finalization of SSK document

PDAM Kab. Karawang

Internal socialization of final draft of Business Plan at PDAM and Dewan Pengawas on March 4, 2013. Four new service areas were identified and investment options are now being discussed – i.e., Perpres 29 loan or PPP.

Plan for Next Quarter: · Workshop on socialization of Business Plan to Bupati and DPRD · Survey for customer reclassification · Development of PDAM long-term investment/master plan · FGD for new microcredit scheme plus marketing and promotion · NRW and distribution network improvement program follow-up · Development of DED and sanitation technology option for

Sanimas and CBS program · Finalization and approval of SSK document by Bupati

Partner Coordination: · Bappeda and Dinas Cipta Karya for

implementation of Sanimas and DAK Sanitation

· Pokja AMPL, Bappeda and Dinas Kesehatan for finalization of CSS

· Bappeda, REI Kab. Bekasi and Satker PPLP Jabodetabek for construction of small-scale sewerage system

· PDAM Kab. Karawang and BTN for development of Business Plan and master plan, customer reclassification, and microcredit for water supply

Page 95: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 77

WEST JAVA, Purwakarta and Bandung Districts Summary Kab. Purwakarta and Kab. Bandung are two new locations for IUWASH. PDAM Kab. Bandung now serves three areas – Kab. Bandung Barat, Kota Cimahi and Kab. Bandung itself, with a combined population of 5.2 million. PDAM coverage in Kab. Bandung is now 9.41 percent, while coverage in Kab. Purwakarta is 15 percent of a total population of 850,000. Both PDAMs rely on a combination of springs, surface and ground water as their raw water sources. PDAM Bandung relies heavily on raw water from four main rivers, including Cisangkuy River, which has suffered from a reduced flow due to changes in upstream land use. In the sanitation sector, Bandung has one IPAL in Soreang serving 60 households (of 400 households in the area) and two underutilized IPLTs with a capacity of 20 m3 per day, including one IPLT in Babakan that has never been operated. To support the development of an integrated sanitation approach, both cities are slated to receive GOI assistance in 2013 to develop a City Sanitation Strategy. Activities

Water Supply Sector: · Facilitated development of the Business Plan and completed the

customer satisfaction survey with PDAM Kab. Purwakarta · Participated in a discussion between PDAM Kota and Kab.

Bandung on regionalization of raw water · Facilitated an initial meeting for replication of risk management

program using the example from PDAM Kab. Bandung · Conducted site observation and a transect walk along Cisangkuy

River and the upstream area in preparation for Climate Change Vulnerability Assessment in Kab. Bandung

Sanitation Sector: · Facilitated cross-sector meeting on sanitation program integration

for STBM, Sanimas and sanitation improvement in Islamic Boarding School in Kab. Purwakarta

· Conducted field observations on existing Sanimas and on new potential locations

Crosscutting Sector: · Conducted visioning workshop with Bupati, DPRD Chairman and

heads of SKPD in Kab. Purwakarta · Conducted initial assessment and meeting with Bapapsi and

Dispertasih for existing CEMs in Kab. Bandung

IUWASH Jakarta

Situ Cileunca Lake, located upstream of Cisangkuy River in Kec. Pangalengan, 45 km from Bandung. The lake, which covers 1,400 hectares, is now used for ecotourism and as water supply for a hydropower plant.

Plan for Next Quarter: · Presentation of customer satisfaction survey in PDAM Purwakarta · FGD on CEM in Purwakarta and Bandung · FGD on sanitation mapping and program integration in

Purwakarta · Development of Business Plan with PDAM Purwakarta · Visioning workshop, PA signing and sanitation workshop in Kab.

Bandung · Survey for customer reclassification with PDAM Kab. Purwakarta · Development of DED for transmission system in Kertasari, Kab.

Bandung · Implementation of CCVA along Cisangkuy , Kab. Bandung

Partner Coordination: · Bappeda, Dinas Kesehatan, Dinas

Kebersihan dan Pertamanan, BLH, BKBPIA and Dinas Cipta Karya dan Tata Ruang Kab. Purwakarta for STBM, Sanimas and Sanitation in Islamic Boarding School

· PDAM Kab. Purwakarta and STIE Zainal Mutaqien for Business Plan development and tariff reclassification

· Bappeda, Dinas Kesehatan, Dispertasih and BPLH for STBM and Sanimas program

· Bappapsi Kab. Bandung and Diskominfo Kab. Purwakarta for CEM

Page 96: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 78

DKI Jakarta Summary As the capital city of Indonesia, Jakarta is home to 10.2 million people. Despite having the biggest local budget of all cities and districts in Indonesia, the city faces the challenge of prioritizing its budget and policies to increase support for sustainable Watsan services. In Jakarta, half the population has access to piped water, but with high NRW levels. In the sanitation sector, only 2.3 percent of the population is connected to the sewerage system (IPAL-Setiabudi). Based on the master plan, 64 percent use septic tanks that do not meet technical standards. This violates PerGub No. 122/2005 on Wastewater Management, which requires every house and institution to properly treat wastewater prior to discharging it into a water body. PD PAL Jaya as the wastewater management company is now diversifying its business and providing a desludging service. Four trucks of various capacities are currently serving several pilot areas in Jakarta on a regular and on-call basis. PD PAL Jaya also collaborates with Dinas Kebersihan, which operates sludge treatment facilities in Duri Kosambi and Pulo Gebang.

Activities

Water Supply Sector: · Conducted data collection and coordination meetings with Aetra

and Palyja for continuation of the NRW study · Conducted coordination meeting, surveys and observations to 25

master meter locations with Aetra · Facilitated meeting and information sharing with HSBC and its

NGO partner PKPU on a master meter program to be funded through CSR funds, and visited master meter in Penjaringan

Sanitation Sector: · Conducted O&M training for CBO in Karet Kuningan for the

small-scale sewerage system with Forkami · Conducted technical site observation to potential Sanimas

program in Kebagusan, Cipinang Besar Utara and Lenteng Agung in South and East Jakarta funded by Satker PPLP Jabodetabek

· Provided technical supervision for INSIST grant program of Mercy Corps, where 30 of the targeted knock-down septic tanks have been installed

Harod Novandi/IUWASH West Java

One of the master meter locations administered by Aetra in Kalibaru Cilincing, North Jakarta. Most of the systems are modifications of public hydrants previously operated by individuals or groups of people, distributed by cart or rubber pipe, and charged by cubic meter.

Plan for Next Quarter: · Follow up potential replication of master meter in Tanah Merah

Jakarta with Aetra and in a location yet to be determined with HSBC and PKPU

· Installation of wastewater piping system in Karet Kuningan with PD PAL Jaya, Forkami and PT Tessa Express

· Technical supervision and capacity building for CBO Lenteng Agung with BPLHD

· Finalization of NRW study with Aetra and Palyja and completed assessment of master meter with Aetra

Partner Coordination: · PAM Jaya, Aetra and Palyja for NRW

study and master meter evaluation · PD PAL Jaya, Forkami and PT Tessa for

construction of small-scale sewerage system

· BPLHD and Satker PPLP Jabodetabek for construction of five communal IPAL

· Mercy Corps, BPLHD and Satker PPLP Jabodetabek for community-based septage management program

Page 97: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 79

BANTEN, Tangerang District and Tangerang Selatan City Summary The City of Tangerang Selatan is a new city that split from Tangerang District in 2008. It has a population of 1.4 million and an annual economic growth rate of 8.84 percent (one of the highest in Indonesia). From the City Sanitation Strategy and Program Memorandum developed in 2011-2012, eight villages are categorized as sanitation high-risk areas. Kota Tangerang Selatan plans to develop a sludge treatment facility to serve 6.1 percent of its population with a total budget of IDR 1.7 trillion. The budget allocation for sanitation is also one of the highest in Indonesia, at around 6.7 percent of the total budget of IDR 1.4 trillion. Kab. Tangerang District covers 865 km2 – six times the size of Tangerang Selatan. PDAM Kab. Tangerang is the only drinking water utility for Tangerang District, Tangerang City and Tangerang Selatan City. It is difficult to increase this PDAM’s coverage (currently 17.01 percent) due to limited production capacity. PDAM Kab. Tangerang is now developing a Feasibility Study for SPAM Cibogo (500 lps) to serve around 40,000 house connections for 20 residential areas in Curug, Kelapa Dua, Legok and Pagedangan. As part of its commitment to implementing the CSS, Kab. Tangerang has allocated IDR 23.5 billion to the sanitation program, or 1.2 percent of the 2013 APBD. Around IDR 5.2 billion has been allocated for a community- and school-based sanitation program.

Activities

Water Supply Sector: · Conducted initial coordination meeting and technical observations for

master meter grant program in Rajeg in Kab. Tangerang with Forkami · Finalized feasibility study for SPAM Cibogo (500 lps) in Kab. Tangerang · Facilitated meeting and prepared MOU for water supply regionalization

between Pemda Kab. Tangerang and Kota Tangerang Selatan

Sanitation Sector: · Conducted post-triggering and construction supervision and monitoring

for sanitation marketing for STBM program in Saga and Kedaung Barat in Kab. Tangerang

· Conducted technical site observation for community- and school-based sanitation program in Kab. Tangerang

· Facilitated inaugural meetings for two grant programs on CBS – in Teluk Naga with Bina Swadaya, and in Kronjo with BEST in Kab. Tangerang

· Facilitated sanitation marketing and microcredit training for 100 field facilitators of AKR Cooperative in Kab. Tangerang

· Supported preparation of DED and conducted field technical observations for a communal IPAL in Cimanggis, Ciputat and Setu, Kota Tangerang Selatan

Harod Novandi/IUWASH West Java

IUWASH facilitated a coordination meeting with Bappeda, DTKBP, Badan Penanaman Modal Daerah and Pokja AMPL regarding future water supply system in Kota Tangerang Selatan and preparation of MOU between Kota Tangerang Selatan and Kabupaten Tangerang for water supply regionalization.

Plan for Next Quarter: · Finalization and signing of MOU on water supply regionalization · Technical supervision and DED development for Sanimas program in

Kota Tangerang Selatan and community- and school-based program in Kab. Tangerang

· Technical supervision for implementation of two CBS programs in Kab. Tangerang under small grants with Bina Swadaya and BEST

· Technical supervision for implementation of master meter program · Finalization of FS for SPAM Cibogo with PDAM Kab. Tangerang · Technical supervision of individual sanitation systems and sanitation

marketing and implementation of hygiene promotion campaign in STBM working areas in Kab. Tangerang

Partner Coordination: · Bappeda, Dinas Penanaman Modal, Sekda

of Kab. Tangerang and Kota Tangerang Selatan for water supply regionalization

· PDAM, Dinas Cipta Karya in Kab. Tangerang and Forkami for master meter program in Rajeg

· Dinas Kesehatan and Bappeda Kab. Tangerang for STBM and sanitation marketing

· AKR Cooperative in Kab. Tangerang for sanitation microcredit

· Bappeda and DTKBP for piloting CBS/communal IPAL

Page 98: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 80

BANTEN, Serang and Lebak Districts Summary Serang (population: 1.4 million) and Lebak (1.2 million) face two similar challenges in the provision of water and sanitation access – low awareness of hygiene behavior, and low levels of piped water coverage (11.4 percent in Serang and 7.8 percent in Lebak). In Serang, STBM programs are ongoing in 10 subdistricts, and 10 villages have been declared ODF. Only 42.23 percent of the population has access to adequate sanitation, all through individual systems. Starting in PY3, IUWASH will provide full support to Lebak in both the water supply and sanitation sectors. Similarly, PEMDA Lebak has been actively implementing STBM triggering. So far, only two of the 27 villages being triggered have been declared ODF. In both cities, IUWASH also promotes sanitation marketing to strengthen the entrepreneurship skills of sanitarians and facilitators in order to promote simple and affordable sanitation products and technologies.

Activities

Water Supply Sector: · Conducted observation and survey of billing and accounting followed by

initial development of accounting software in PDAM Kab. Serang and Kab. Lebak

· Conducted field observation and survey for FS Cipasauran and FS Pamarayan Kab. Serang

· Facilitated meeting between BSM and Cooperative of PDAM Kab. Serang for microcredit program

· Participated in water supply regionalization meeting between PDAM Kab. Serang and PDAM Kota Serang

· Participated in meeting on PPP potential with PT Moya Indonesia, together with PDAM Kab. Serang and Bappeda

· Conducted technical survey for uprating WTP Rangkasbitung Lebak · Supported development of Business Plan with PDAM Kab. Lebak

Sanitation Sector: · Conducted mini workshop on technical approach and simulation of cash

flow for sanitation marketing and microcredit program with sanitarians and Dinkes in Kab. Lebak, followed by supervision of the development of SME and marketing strategy

· Conducted field observation and technical supervision for STBM locations in Kab. Serang and communal IPAL in Kab. Lebak

Crosscutting Sector: · Conducted visioning workshop and PA signing with Kab. Lebak Bupati

Ahmad Rohendi/Kab. Serang

Lebak Bupati, Mulyadi Jayabaya, shakes hands with IUWASH COP Louis O’Brien during a PA signing ceremony on February 5, 2013 in Aula Multatuli, Rangkasbitung

Plan for Next Quarter: · Socialization and signing of MOU on microcredit between BSM and

Cooperative of PDAM Kab. Serang · Socialization and multi-stakeholder consultation meeting on PDAM

Business Plan with Bupati and DPRD of Kab. Serang, and finalization of Business Plan with PDAM Kab. Lebak

· Uprating of WTP Rangkasbitung, Lebak · Development of FS for Cipasauran and Pamarayan in Kab. Serang · Assistance to PDAM Kab. Lebak on debt restructuring · Technical supervision of SME for marketing strategy for individual toilets

and septic tanks in Kab. Lebak · Accounting software development in PDAM Kab. Lebak and Serang · Water supply Vulnerability Assessment in Kab. Serang

Partner Coordination: · Pokja AMPL, Dinas Kesehatan and

Bappeda of Kab. Serang and Lebak for STBM and sanitation marketing

· PDAM Kab. Lebak and Kab. Serang for Business Plan development, uprating WTP Rangkasbitung, FS Cipasauran and Pamarayan Kab. Serang, and development of accounting software

· AKR Cooperative and PDAM Kab. Serang Cooperative for microcredit for water supply

· Bappeda Kab. Serang and Pemda Kota Serang for water supply regionalization

Page 99: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 81

CENTRAL JAVA

Page 100: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 82

Section 4.3

CENTRAL JAVA

Summary

With a total population of 32,380,687 (based on BPS preliminary data for 2010), Central Java is the third most populous province in Indonesia after West Java and East Java (which lie on its western and eastern borders). Its land area of 32,801 km2 is about a quarter of the total land area of Java. Central Java also completely surrounds Yogyakarta, which is a separate administrative area. IUWASH began working in the region in June 2011, meeting with a wide range of provincial and local government leaders, conducting numerous municipal-level assessments of water supply and sanitation conditions, and gauging the extent of local government commitment to address sector deficiencies. These assessments led to the selection of five municipalities as IUWASH target areas – the cities of Semarang and Surakarta (Solo), and the districts of Semarang, Kendal and Kudus. Entering PY3, IUWASH widened its area of support in Central Java by adding five more districts and cities: Kab. Rembang, Batang, Sukoharjo, and Klaten, and Kota Salatiga. Besides these five new areas, this year Kab. Semarang (which initially received only partial assistance under the program) began receiving full support (see Regional Map for further information). Along with the widening of IUWASH assisted areas, the number of PDAMs increased to 10. IUWASH assistance for improved urban water services is now in place in both the five existing and the five new PDAMs, and is receiving a positive response from all PDAMs. In the sanitation sector, IUWASH Central Java has focused on supporting the USRI program, which is currently being implemented in six cities also being assisted by IUWASH. IUWASH support for the USRI program is seen as critical for the future sustainability of the sanitation infrastructure, with IUWASH focusing especially on preparing the community along with capacity building for communal system management institutions (KSMs). The support for the development of a communal sanitation system has also ben implemented by supporting SLBM programs in Kab. Klaten and Sukoharjo. As part of the support to this program, IUWASH promoted improved hygiene behavior using the Edukasi Perilaku Sehat approach. This quarter, IUWASH Central Java launched a new Grant Program for Kampung Sanitasi in RW 23, Kelurahan Semanggi, Pasar Kliwon Subdistrict in Kota Surakarta. This program will primarily contribute to sanitation sector improvements, and will also work on the water-for-the-poor program through the master meter system. In the crosscutting sector, progress made in this quarter covered several programs including: · Finalized preparation of several policies supporting the water supply and sanitation sectors

· Conducted several FGDs to identify potential government mechanisms to be improved while also being involving in strengthening the Watsan sector. The FGDs were conducted in Kota Semarang, Kab. Sukoharjo and Kab. Semarang.

· Conducted gender sessions at several trainings and workshops for sanitarians and community facilitators on improved hygiene behavior in Kab. Batang, Kab. Sukoharjo, Kab. Semarang and Kota Salatiga.

· Conducted gender training for an IUWASH Grantee (LPTP Solo) to support implementation of the Grant Program on Kampung Sanitasi in Kelurahan Semanggi, Kota Surakarta.

Page 101: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 83

Success Stories

Success Story in Water Supply Sector PDAMs Committed to Replicate the NRW Reduction Pilot Project High NRW levels are detrimental to the financial viability of water utilities, since this figure reflects huge volumes of water being lost to leaks, theft or metering inaccuracies that are not invoiced to customers. This will increase operational costs. Moreover, NRW may also have an adverse quality on the water being “produced” by PDAM before it reaches the customer. To tackle this challenge, IUWASH facilitated the PDAMs of Semarang, Kendal and Kudus Districts in piloting NRW reduction projects from April 2012 to February 2013. The support provided to PDAM staff in each district included technical assistance, training and hands-on field practices to detect the locations of leakages and reduce the rate of water loss. Following this technical support and capacity building, the PDAMs formed an NRW reduction team to bolster their pilot projects. By February 2013, based on collaborative monitoring of NRW pilot project implementation in the three districts, IUWASH and the PDAMs’ NRW teams had reduced the NRW rate by 2 percent in Banyu Biru housing estate (Semarang District), by up to 13 percent in Purwokerti Indah housing estate and 37 percent in PERUMDA (Kendal District), and by around 8 percent in Muria Indah housing estate (Kudus District). These results patently motivated the three PDAMs to replicate the NRW reduction pilot project in other targeted locations of their service areas. IUWASH encouraged the PDAMs to set aside a budget to undertake NRW reduction programs independently in the near future. Considering the substantial impact of NRW reduction efforts on financial viability, the Semarang District PDAM agreed to set aside IDR 2.1 billion, Kendal District PDAM allocated IDR 725 million, and Kudus District PDAM set aside IDR 840 million in the 2013 fiscal year. These budgets will be used to cover NRW zone formation, equipment purchases, installation of tools and accessories, network monitoring, and other operational budgets. Zainal, head of the technical division of Kudus District PDAM, says: “Through the pilot project, capacity building and technical assistance provided by IUWASH, we have gained skills and are optimistic that we can achieve our district’s NRW reduction target by the end of 2013; especially now we have dedicated budget support to replicate the NRW reduction program”.

IUWASH Central Java

Training on using water leakage detectors for NRW reduction activity in PDAM Kudus.

Page 102: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 84

Success Story in Sanitation Sector Revitalizing IPLT for Better Sanitation in Batang District The Head of Batang District, Yoyo Riyo Sudibyo, is fervently committed to developing sanitation in his district. This commitment was evident at a recent visioning workshop on water supply and sanitation, also attended by SKPD heads from Batang District and the IUWASH Chief of Party, Louis O'Brien. Yoyo is very concerned about the inadequate state of sanitation in Batang District, and has highlighted the condition of Randukuning sewerage treatment plant (IPLT), which has not functioned for the last two years. “I am deeply concerned at the state of the IPLT. How many billions of rupiah have been spent building it? Yet everything appears futile. We need to immediately deal with this issue by revitalizing the IPLT and sludge management system before it affects our environmental health”, Yoyo said. The government of Batang District is delighted to be receiving IUWASH support. They specifically requested that the first technical assistance undertaken in Batang District should revitalize IPLT Randukuning. “With IUWASH support, we really want to operate IPLT Randukuning again. I will instruct my staffs, Bappeda, the Public Works Office and other agencies to support IUWASH. If there is difficulty coordinating with them, please don’t bother to contact me directly”, Yoyo emphasized. He also used the opportunity to ask IUWASH to provide the best support possible, in the hope that Batang District can become a good example for the sanitation sector after this pilot project. In revitalizing IPLT Randukuning, IUWASH has been working closely with Dinas Cipta Karya, Tata Ruang dan Energi Sumber Daya Mineral (DCKTR & ESDM). IUWASH has been facilitating improvements to the IPLT facilities in coordination with the Environmental Health Unit for Housing Development (Satker PPLP) of Central Java Province, leading to a funding commitment from the central government. Through Satker PPLP Central Java Province, the central government has agreed to provide financial support to revitalize IPLT Randukuning in fiscal year 2014. This commitment gives cause for optimism about the future of sanitation in Batang. If the district head had not been so concerned about the problems facing IPLT Randukuning during the Visioning Workshop, the IPLT would be much less likely to be functioning again in 2014.

IUWASH Central Java

Head of Batang District, Yoyo Riyo Sudibyo.

Page 103: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 85

Regional Highlights by Sector

Regional Highlights in Water Supply Sector This summary of program highlights in the water supply sector is divided into two parts – Anchor Projects and other program highlights. Program highlights of Anchor Project in water supply sector: Anchor Project #1: (Long-Term Finance to Expand Connections for PDAM Kab. Kendal): IUWASH has been providing technical assistance for the development of a new water supply system with a capacity of 310 lps in Kab. Kendal to develop services for 31,000 house connections. The technical assistance to prepare DED and FS has been completed. IUWASH is now advocating the development of alternative funding sources, with plans for IDR 155 billion from the APBN-SDA budget, IDR 160.7 billion from APBN-Cipta Karya, IDR 15 billion from APBD-II, and IDR 22 billion from a bank loan under the Perpres 29 mechanism. Other program highlights in the water supply sector: · TA for development of water supply for 1,000 households in Jomblang, Kota Semarang, including

the construction of a 50 m3 reservoir, which is currently at the preparatory stage. · Technical assistance for a Customer Satisfaction Survey (SKP) for PDAM Kab. Klaten and

Sukoharjo, with the survey having just begun. · Technical assistance for development of PDAM Kab. Sukoharjo Business Plan. Advocacy includes

capacity building for the Business Plan Team.

· TA and capacity building for development of SOP for PDAM Salatiga, Kab. Semarang, Batang, and Kab. Kendal. This support includes advocacy on SOP implementation.

· TA and capacity building on customer reclassification program for PDAM Klaten. This support includes training for enumerators, implementation of a customer survey, and advocacy for the revision of the local regulation on customer classification. The survey is now being conducted in the field.

Regional Highlights in Sanitation Sector This summary of program highlights in the sanitation sector is divided into two parts – program highlights for the Anchor Projects, and other progress in this sector. Program highlights for Anchor Projects in the sanitation sector: Anchor Project #1: Wastewater Task Force/Satgas Air Limbah in Kota Semarang: · Hygiene Behavior Education (Edukasi Perilaku Sehat or EPS) in Kota Semarang has been

conducted to improve community access to improved sanitation services. The EPS program is being implemented by sanitarians from seven Puskesmas at USRI program locations in Kota Semarang. 192 households and 450 people have so far been involved in EPS.

· Preparations for establishment of UPTD on wastewater management. This program is being performed through a series of discussions with Bappeda, Dinas Tata Kota dan Permukiman Kota Semarang, and Dinas Kebersihan dan Pertamanan (DKP) Kota Semarang. Kota Semarang has been receiving USRI assistance from the GOI to improve sanitation access. To guarantee sustainability of the communal sanitation system, the system has to be well maintained by the community, with support from PEMDA. In this case, PEMDA Semarang has agreed to develop a technical unit (UPT) to support communal sanitation facility management.

· Conducted FGDs on the development of Wastewater UPTD. FGDs were held to build the same perceptions and commitment for the establishment of the UPTD. The FGDs involved members

Page 104: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 86

of Pokja AMPL, Bappeda, Dinas Tata Kota dan Permukiman, Dinas Kebersihan dan Pertamanan, Badan Lingkungan Hidup, and related SKPD, and the Legal Section of Setda Kota Semarang.

· Workshop on communal septic tank grant program at RW-11 Kampung Jomblang, Candisari, Kota Semarang. The involvement of Pokja AMPL and DPRD Kota Semarang is significant for encouraging communities, especially community leaders, to implement the communal septic tank grant program.

Anchor Project #2: Kota Surakarta as a Sanitation City · The “Kampung Sanitasi” Grant Program has begun in RW 23, Kelurahan Semanggi, Kecamatan

Pasar Kliwon, Kota Surakarta. LPTP Surakarta has been appointed as grantee, and the kick-off meeting was held with all related stakeholders.

· Conducted preliminary assessment of existing IPLT and a meeting with the Mayor of Surakarta. The city has an IPLT in Kelurahan Putri Cempo, Kecamatan Mojosongo. The IPLT is next to a final waste disposal site (Tempat Pembuangan Akhir Sampah or TPA). The IPLT is managed by PDAM Kota Surakarta, but has not been operating for the last three years because the access road was blocked by garbage. Now that access has been restored, the Surakarta Mayor has made a firm commitment to put the IPLT back into operation. IUWASH will support the PEMDA and PDAM to operate the IPLT, with funds from the GOI through the Central Java Satker PPLP.

Other program highlights in sanitation sector: · Conducted training to improve the facilitation skills of sanitarians, PKK cadres and USRI

facilitators. This training was performed to improve community access to improved sanitation in Kab. Batang, Kab. Semarang, Kota Salatiga and Kab. Rembang.

· Held meeting with the Sukoharjo Sekda. The Pokja AMPL in Sukoharjo is committed to obtaining financial support from the GOI through Central Java Satker PPLP to build an IPLT in Sukoharjo, while the Sekda is committed to developing the necessary regulation and institution to manage the IPLT.

· Kab. Batang is now obtaining funding to rehabilitate its IPLT, which has been abandoned for three years. The central government plans to support this initiative through the Central Java Satker PPLP in 2014.

Regional Highlights in Crosscutting Sector · Visioning Workshops were conducted in Kab. Batang and Kab. Rembang. · A mayoral regulation (Perwal) was developed on community-based water supply and sanitation

management in Kota Semarang. · Marketing and promotion training was held for the PDAM to expand its customer base for

water and wastewater connections. The training showed the marketing teams of the PDAMs for Kab. Semarang, Kota Semarang, Kab. Rembang, Batang, Kendal, Sukoharjo, Klaten and Kota Surakarta the importance of a PDAM customer forum.

· Conducted assessment of CEM program in Kota Semarang, Kab. Sukoharjo, Klaten and Kudus to support the sanitation sector.

· Conducted advocacy for the development of a Kab. Klaten regulation on PDAM customer reclassification.

· Held a gender awareness session to improve the facilitation skills of sanitarians, PKK cadres and USRI facilitators. The program had 140 participants from Batang, Semarang, Salatiga, and Rembang.

Page 105: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 87

Upcoming events

Event Title Date Type of Event Venue

Workshop on optimization of PDAM customer forum

April 4 Workshop PDAM Kota Surakarta

Kick-off meeting for assessment of communal sanitation system

April 5 Meeting Bappeda Kota Surakarta

Enumerator training for assessment of sanitation facilities

April 6 Training Susdec-LPTP office, Kota Surakarta

Community Behavior Change Education (Edukasi Perilaku Sehat) implementation in Kab. Rembang

April 12- May 10

FGD 38 locations of USRI and SLBM in Kab. Rembang

MOU signing and Visioning Workshop on watsan development

April 16 Workshop Kab. Sukoharjo

Advocacy for regulation on local government equity participation (Perda Penyertaan Modal) in PDAM Kab. Semarang

April 18 Workshop PDAM Kab. Semarang

Evaluation of NRW Reduction replication in PDAM Kab. Semarang, Kendal, Kudus, and Kota Semarang

April 23 FGD IUWASH Office

Planning follow-up action on sludge management

April 23 FGD PDAM Kota Surakarta

Gender training for PO partner and grantee

April 24-25 Training Tawangmangu, Surakarta

KSM strengthening on sanitation management and SMEs

April 25 Training Dinas Kesehatan, Kota Semarang

Workshop on results of CSS (SKP) for PDAM Sukoharjo

April 27 Workshop Kab. Sukoharjo

Audience with Semarang Mayor on UPTD Sanitation institution

April 30 Meeting Semarang mayor’s office

Workshop on results of CSS (SKP) for PDAM Klaten

May 2 Workshop Kab. Klaten

Audience with Rembang Bupati on development of UPTD Sanitation institution

May 7 Meeting Kab. Rembang Bupati office

Pre-bid Meeting for PO on development of CEM

May 7 Meeting IUWASH office

Capacity building for Dewan Pengawas (PDAMs in Sukoharjo, Klaten, Salatiga, Batang and Rembang)

May 15 Workshop Hotel Sunan, Solo

Improvement of PDAM customer forum role

May 21 FGD PDAM Kabupaten Semarang

Advocacy for sanitation sector funding (Kota Surakarta, Kota Semarang, Kab. Semarang, Kudus and Kendal)

May 28 Workshop Hotel Sunan, Solo

Audience with Kudus Bupati on development of UPTD Sanitation institution

May 29 Meeting Kab. Kudus Bupati’s office

Technical review of Putri Cempo IPLT May 30 FGD PDAM Kota Surakarta Improvement of PDAM customer forum role

June 11 FGD PDAM Kab. Kendal

Workshop on Water Supply Vulnerability Assessment

June 27 Workshop Kab. Semarang, Kab. Kudus

Page 106: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 88

Cluster Reports

IUWASH understands that the key to achieving its targets lies in the successful implementation of activities at the local level. In order to better describe and track the project’s activities and progress in each target location, IUWASH has developed cluster reports. The following pages present the following five cluster reports for Central Java:

· Semarang City · Semarang District and Salatiga City · Kendal and Batang Districts · Kudus and Rembang Districts · Surakarta City, Sukoharjo District and Klaten District

Page 107: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 89

CENTRAL JAVA, Semarang City Summary Semarang City is the capital of Central Java Province. The city has a population of around 1.6 million. The PDAM in Semarang City has 140,000 connections with service coverage of 57 percent. The NRW rate is very high (at around 50 percent), forcing the PDAM to focus on an NRW reduction plan. The PDAM is also interested in programs to increase access for MBR. In the sanitation sector, Semarang City will receive support from the USRI program, including 31 communal sanitation systems in 2013. Semarang City is also committed to establishing a Sanitation UPTD.

Activities Water Supply Sector: · FGD to develop planning for replication of NRW reduction

program (together with PDAMs in Kab. Semarang, Kudus and Kendal)

· Pre-bid meeting for PO on construction of distribution reservoir (50 m3) in Jombang to improve MBR access

Sanitation Sector: · Kota Semarang EPS by sanitarians from seven Puskesmas,

implemented in USRI program locations · FGD on development of questionnaire for communal sanitation

assessment with Pokja AMPL · FGD on formulation of Sanitation UPTD management institute Crosscutting Sector: · Development of mayoral regulation on community-based water

supply and sanitation management · Training on marketing and promotion (along with six other

PDAMs in Tawangmangu) · Assessment of communal sanitation system facilities

FGD on assessment of CEM for government sanitation services

IUWASH Central Java

FGD to develop planning for replication of NRW reduction program in four PDAMs, held in IUWASH office.

Plan for Next Quarter:

· FGD on follow-up/implementation to replicate NRW reduction program at four PDAMs

· Meeting with Semarang Mayor on development of Sanitation UPTD institution

· CBO strengthening on sanitation management and SMEs Training on gender mainstreaming

Partner Coordination:

· AKATIRTA for NRW reduction program · Bappeda Kab. Semarang on APBD

indexing · PDAM Kota Semarang for PDAM indexing · PU Cipta Karya, Kota Semarang for

assessment of communal sanitation system facilities

Page 108: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 90

CENTRAL JAVA, Semarang District and Salatiga City

Summary

Semarang District is south of Semarang City, with a population of around 1 million people. The PDAM has 25,178 connections with 16.1 percent coverage and an NRW rate at around 37 percent. IUWASH will support the PDAM with its NRW reduction program, and will also support the Pokja AMPL in strengthening sanitation.

Salatiga City is 30 km south of Semarang City, with a population of 171,327 in 2010, while the PDAM has 26,000 connections (64 percent coverage). The main challenge for the PDAM is a scarcity of raw water. IUWASH will support a raw water vulnerability assessment and a Semarsalat raw water regional program. Salatiga City has already prepared most of the sanitation documents, including the BPS and SSK.

Activities

Water Supply Sector: · Workshop on development of Business Plan for PDAM Kab.

Semarang (document finalization) · Workshop on capacity improvement for Badan Pengawas

PDAM Kab. Semarang · FGD to identify potential of local banks to provide a

microcredit program in PDAM Kab. Semarang · FGD on Water Supply Vulnerability Assessment for PDAM

Kab. Semarang (secondary data and field survey presentation) · FGD on follow-up planning to replicate NRW program in

PDAM Kab. Semarang · Kick-off meeting for SOP development for the PDAMs of Kab.

Semarang and Kota Salatiga

Sanitation Sector: · Training to improve sanitarians’ advocacy and motivation skills

in Kab. Semarang and Kota Salatiga

Crosscutting Sector: · Workshop on initiation of PPSP 2013 for Kab. Semarang · Visioning Workshop on development of water supply and

sanitation services in Kota Salatiga

IUWASH Central Java

Training to improve sanitarians’ advocacy and motivation skills in Kab. Semarang, including practical lessons.

Plan for Next Quarter:

· FGD on Water Supply Vulnerability Assessment for PDAM Kab. Semarang and Kota Salatiga (technical analysis aspects)

· FGD on development of SOP for PDAMs of Kab. Semarang and Kota Salatiga

· Assessment of communal sanitation system facilities in Kab. Semarang and Kota Salatiga

· FGD on follow-up planning to replicate NRW program in four PDAMs

· Training on gender mainstreaming

Partner Coordination: · CV. JAS UTAMA for development of

business plan PDAM · PT. Miranthi Permai for Water Supply

Vulnerability Assessment · AKATIRTA for NRW reduction program · Bappeda Kab. Semarang and Kota Salatiga

for APBD index · PDAM Kab. Semarang and Kota Salatiga · Dinkes Kab. Semarang and Kota Salatiga

for sanitarian training and EPS program · PU Cipta Karya Kab. Semarang and Kota

Salatiga for assessment of communal sanitation system facilities

Page 109: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 91

CENTRAL JAVA, Kendal and Batang Districts

Summary

Kab. Kendal is 30 km west of Semarang City, with a population of 900,000. The PDAM has 46,000 connections and service coverage of 24 percent. The Kendal LG has a strong commitment to increasing water supply access. Kendal already has a Pokja AMPL to develop a citywide sanitation strategy and Regional Action Plan, which are expected to provide strong support for increased access to improved sanitation services.

Batang District is 80 km from Semarang City and had a population of 710,423 people in 2010. With 25,753 connections, PDAM service coverage in Batang is 34.4 percent. Batang district already has a Pokja AMPL and sanitation documents, including BPS and SSK.

Activities

Water Supply Sector: · FGD on Business Plan development for PDAM Kab. Kendal · NRW reduction program for PDAM Kab. Kendal · Finalization of DED for PDAM Kendal water supply system · Workshop on investment fund alternatives for water supply

development from springs (Wilodo, Brebes, Kencen and Dlimas) for PDAM Kab. Kendal

· FGD on follow-up planning to replicate NRW program in PDAM Kab. Semarang

· Analysis of feasibility and preparation of financial projections for PDAM Kab. Batang

· Kick-off meeting for development of SOP for PDAM Kab. Batang and Kendal

Sanitation Sector: · Training to develop sanitarians’ facilitation and motivation skills

in Kab. Batang · Kick-off meeting on communal septic tank grant program for

50 households in Kab. Kendal · Assessment of communal sanitation facilities

Crosscutting Sector: · Visioning workshop on development of water supply and

sanitation in Kab. Batang · Advocacy for development of Perbub RAD AMPL Kab. Kendal

IUWASH Central Java

Spring capacity measurement with current meter on DED water supply system development of PDAM Kabupaten Kendal.

Plan for Next Quarter: · Development of SOP for PDAM Kab. Batang and Kendal · Community Behavior Change Education (EPS) implementation

in Kab. Kendal · Advocacy for water supply development through Perpres 29

mechanism · Capacity building workshop for PDAM Dewan Pengawas

Partner Coordination: · PDAM Kab. Kendal and Batang for PDAM

index · Bappeda Kab. Kendal and Batang for

APBD index · CV JAS for development of Business Plan · AKATIRTA for NRW reduction program · Damar Kumala for DED for water supply

development in Kab. Kendal

Page 110: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 92

CENTRAL JAVA, Kudus and Rembang District

Summary

Kab. Kudus is 50 km east of Semarang City, with a population of 800,000. PDAM Kudus has 23,756 connections and service coverage of 18.5 percent. The PDAM faces a raw water supply problem, with all production units being deep wells. PEMDA has committed to increasing water supply access. Kudus is also receiving USRI support, including up to 50 communal sanitation systems through 2014. Kab. Rembang is 110 km west of Semarang City, with a population of 591,617 people in 2010. PDAM Rembang has 16,608 connections and service coverage of 21.6 percent. Rembang has a Pokja AMPL and sanitation documents, including BPS and SSK, MPS and RAD AMPL. Rembang is now receiving USRI support for 23 communal sanitation facilities and plans to build four more of these facilities under the SLBM program.

Activities

Water Supply Sector: · Training in marketing and promotion for PDAM Rembang · Debt restructuring monitoring for PDAM Rembang

Sanitation Sector: · Community Behavior Change Education (EPS) in USRI

program location in Kab. Kudus · Training to develop sanitarians’ facilitation and motivation skills

in Kab. Rembang · Kick-off meeting for assessment of communal sanitation

facilities in Kab. Kendal · Assessment of IPLT in Kab. Kudus · Advocacy to Kab. Rembang Bupati regarding proposal to

central government for development of IPLT fund. · FGD on formulation of UPTD sanitation management

institutions in Kab. Rembang and Kudus

Crosscutting Sector: · Visioning Workshop on development of water and sanitation

services in Kab. Rembang · Workshop on increasing cooperation between central,

provincial and district governments · FGD on CEM assessment for government sanitation services

in Kab. Kudus

IUWASH Central Java

Training to improve skills in advocacy and motivation of sanitarians in Kab. Rembang.

Plan for Next Quarter: · Development of sludge management regulation in Kab. Kudus · Implementation of EPS in USRI and SLBM locations in Kab.

Rembang · Distribution network analysis at PDAM Rembang · Development and implementation of citizen engagement

program with PEMDA Kab. Kudus

Partner Coordination: · Rembang for visioning workshop · Dinas Kesehatan Kab. Rembang for

sanitarian training · PDAM Kab. Rembang for debt

restructuring program · Bappeda Kab. Kudus for development of

IPLT regulation · Dinas Kesehatan Kab. Kudus for EPS

implementation

Page 111: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 93

CENTRAL JAVA, Surakarta City, Klaten District and Sukoharjo District

Summary

Surakarta City has a population of 500,000. The PDAM has 55,513 connections with 78.2 percent service coverage. IUWASH plans to assist PDAM Surakarta in monitoring its business plan, while Surakarta’s sewerage system only uses 50 percent of its capacity.

Sukoharjo District had a population of 824,238 in 2010. The water utility service covers only 13 percent of the population. Sukoharjo has three community-managed wastewater treatment plants.

Klaten District had a population of 1,307,562 in 2010. The water utility is continuously seeking new sources of raw water supply. A sewage treatment system is not used, and only 52 percent of the population has a toilet. IUWASH plans to support improvements to the financial, administrative and technical capacity of the PDAMs, and capacity improvements among USRI facilitators.

Activities

Water Supply Sector: · CSS (SKP) of PDAM Klaten and Sukoharjo and business plan

development for PDAM Kab. Sukoharjo (pre-bid meeting and kick-off meeting)

· PDAM marketing and promotion training to increase new connections

· Training for enumerators of CSS (SKP) at PDAM Kab. Sukoharjo and PDAM Kab. Klaten

Sanitation Sector: · Training to improve sanitarians’ advocacy and motivation skills

in Kab. Sukoharjo and Kab. Klaten · Workshop to improve sanitation program cooperation

between local, provincial and central government. · Cross visit by community from Kampung Semanggi RW 23 to

a communal septic tank system in Warga Pajang, Surakarta · EPS implementation in communities at USRI locations in Kab.

Klaten and SLBM locations in Kab. Sukoharjo · Kick-off meeting on “Kampung Sanitasi” grant program in

Kelurahan Semanggi, Kota Surakarta

Crosscutting Sector: · FGD on development of Bupati decree regarding PDAM

customer reclassification · FGD on assessment of CEM for government sanitation

services in Kab. Klaten and Sukoharjo

IUWASH Central Java

Marketing and promotion training for seven PDAMs was held in Tawangmangu.

Plan for Next Quarter: · Survey for customer reclassification at PDAM Klaten · MOU signing and Visioning Workshop on development of

water supply and sanitation services · Implementation of CSS at PDAM Kab. Sukoharjo and Klaten · Workshop on review of Putri Cempo IPLT in Surakarta · Capacity building workshop for Dewan Pengawas at PDAM

Kab. Sukoharjo and Klaten

Partner Coordination: · PDAM Surakarta, Sukoharjo and Klaten · Bappeda Kota Surakarta, Kabupaten

Sukoharjo and Klaten · CV JAS Utama for CSS and Business Plan · LPTP Surakarta for Kampung Sanitasi

grant program

Page 112: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 94

EAST JAVA

Page 113: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 95

Section 4.4

EAST JAVA

Summary

East Java is the second largest province in Indonesia, with a population of 37,476,757 (2010 BPS data) spread across 29 districts and nine cities. In May 2011, IUWASH began working with five districts and cities in this region – Lamongan, Gresik, Mojokerto, and Sidoarjo Districts, and Probolinggo City. The respective Local Governments and PDAMs are committed to implementing IUWASH programs, as can be seen from the many programs implemented in PY2, some of which will continue in PY3. In this second full year of program implementation, IUWASH East Java is working with 12 cities divided into six clusters. All cities apart from Surabaya and Kota Mojokerto will receive full support from IUWASH. In Surabaya, IUWASH will continue to support the water supply sector while the support provided to Kota Mojokerto will focus on the sanitation sector. The six clusters in East Java are as follows: 1) Gresik and Lamongan; 2) Surabaya and Sidoarjo; 3) Kota and Kab. Mojokerto; 4) Kab. Jombang; 5) Kota and Kab. Probolinggo; and 6) Kota and Kab. Malang and Kota Batu. This quarter, during development of the workplan for PY3/2013, the IUWASH East Java regional team held discussions with Local Governments to develop program priorities for PY3, mostly for the new cities. For existing cities, IUWASH reviewed progress and determined continuation activities for PY3. This quarter, Partnership Agreements (PAs) were signed with Batu and Jombang. The remaining two PAs are either now awaiting signing (Kota Mojokerto) or still under discussion between IUWASH and the LG (Kota Malang). The main progress of IUWASH in the East Java water supply sector relates to support for PDAM financing and management aspects through PDAM business plans for debt restructuring and obtaining long-term financing for the PDAM. A significant achievement this quarter was the support for tariff adjustments at PDAM Kab. Gresik (the first adjustment in over 10 years), which have already been presented to the PDAM Supervisory Board and now require approval from the Mayor. IUWASH East Java continued to implement the water for the poor program through microcredit and master meter programs in several cities. The sanitation program is mainly focusing on implementation of individual sanitation system and institutional building to support sanitation programs at the city level. The support for development of individual sanitation systems mainly involved capacity building for sanitarians and health officers to implement the STBM program, especially the 1-CLTS pillar in Kota Probolinggo, Kab, Mojokerto, Kab. Jombang and Kab. Malang. Support for the STBM program involves not only triggering activity but also sanitation marketing, including the development of SMEs to support construction of individual toilets. Institutional building for the sanitation program was implemented through initiation of UPTD development in seven cities and septage management in Kota Probolinggo and Kab. Gresik. Progress in the crosscutting sector included a gender program integrated with the water and sanitation sectors, with several policies being initiated in these two sectors.

Page 114: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 96

Success Stories

Success Story in Water Supply Sector Feasibility Study on PDAM Public Private Partnership (PPP) in Central Gresik PDAM Gresik serves 70,000 household connections, or 33 percent of the total population of Gresik District of 1,177,201. Its current service area coverage is 60 percent, divided among four regions – North Gresik, Gresik City, Central Gresik and South Gresik. Limited water resources and funding are major challenges facing PDAM Gresik in expanding its service area. The water rate, which has not changed in ten years, also affected the performance of PDAM Gresik, since it is detrimental to internal financial viability. This problem inspired the Director of PDAM Gresik, Muhammad SE, to make a breakthrough by partnering with the private sector under a Public Private Partnership (PPP) scheme. The director of PDAM Gresik District discussed with IUWASH how to facilitate a feasibility study on PPP opportunities for the central region of PDAM Gresik. The PDAM issued a director’s decree to establish a team of 11 people, including division and subdivision heads, to implement the PPP program. Based on the FS findings, PDAM Gresik brought in PT. Drupadi Agung Lestari as its PPP partner through an RUOT (Rehabilitation, Uprating, Operate and Transfer) scheme with investment of 86 billion rupiah under a 25-year contract, with a bulk water price of 2,085 rupiah per cubic meter. PT. Drupadi Agung Lestari has built a new IPA with capacity of 100 liters per second (lps) and is now ready for operation. Meanwhile, the uprating of IPA Krikilan from 150 to 300 lps is still at the design planning analysis stage. These two IPAs, which are located in Krikilan Village in Driyorejo Subdistrict, will serve Benjeng and Balungpanggang Subdistricts, and will also improve local water services in Cerme, Menganti and Kedamean Subdistricts. Through increasing the water discharge by a total of 250 lps, PDAM Gresik will be able to provide new connections for 20,000 households by 2016. In Balungpanggang and Benjeng Subdistricts, where most of the prospective customers are low-income households, an estimated 3,000 new connections will require microfinancing support from Bank Rakyat Indonesia and Bank Syariah Mandiri, facilitated by IUWASH.

Photo Credit

Workshop participants are discussing the results of feasibility study to support the obtaining longterm finance of PDAM Kabupaten Gresik.

Page 115: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 97

Success Story in Sanitation Sector Small and Medium Enterprises Support Increased Access to Improved Sanitation Systems in East Java I UWASH collaborated with the World Bank funded Water and Sanitation Program (WSP) and the Indonesia Sanitation Management and Empowerment Association (APPSANI) to hold a sanitation entrepreneur workshop in Kota Batu in January 2013. The four-day workshop aimed to increase the capacity of Health Office staffs, sanitarians, community cadres and CSOs in individual toilet and septic tank construction, and marketing strategy for the sanitation sector. It was attended by 34 participants from nine IUWASH-supported cities and districts in East Java – Surabaya, the Greater Malang Area (Batu City, Malang City and District), Probolinggo City, Probolinggo District, Gresik District, Lamongan District and Mojokerto District. At the end of the workshop, participants joined a field visit to learn about individual toilet and septic tank construction, and to learn about sanitation marketing from successful sanitation entrepreneurs. Kiswanto, as the Head of HIPPAMS (Association of Drinking Water and Sanitation Community) in East Java, was pleased to join the workshop, “In HIPPAMS, we didn’t use to have a suitable theoretical and practical manual for our sanitation activities. We usually provide support to community members who want to build individual toilets. However, we did not know how to build adequate septic tanks. This training has developed our knowledge, particularly on good practices in community-led total sanitation. Soon after the sanitation entrepreneur training in Batu, Kiswanto shared this knowledge with HIPPAMS members, who decided to develop their sanitation business by purchasing four septic tank molds from APPSANI members in Kediri District and Sidoarjo District. Each mold costs between 4.5 and 5 million rupiah. HIPPAMS found it easy to obtain a loan from Bank Rakyat Indonesia (BRI) to purchase the four molds, since HIPPAMS and BRI often collaborate in pre-financing water supply construction.

IUWASH East Java

Said Kiswanto Head of HIPPAMS Kabupaten Lamongan.

Page 116: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 98

Regional highlights by sector

Regional Highlights in Water Supply Sector This summary of program highlights in the water supply sector is divided into two parts – Anchor Projects and other program highlights. Program highlights of Anchor Projects in water supply sector: · Anchor Project #1 (Increase production capacity through PPP in Lamongan and Gresik): IUWASH

facilitated PDAM Kab. Gresik in preparing a feasibility study for a PPP between PDAM and PT. Drupadi Agung Lestari (B2B contract). PT. Drupadi Agung Lestari has completed construction of a Water Treatment Plant (WTP) with a capacity of 100 lps which will begin operating this year, while the uprating of the existing WTP from 150 to 300 lps is still ongoing. To expand services in the central area, especially in the Districts of Benjeng and Balongpanggang, a microcredit scheme will be introduced by IUWASH.

· Anchor Project #2 (Water for the poor anchor project in Surabaya, Sidoarjo and Kab. Mojokerto): The

grant program being undertaken by Spektra (an NGO) in Sidoarjo is now around 70% complete. Procurement of materials has been completed, and the downstream distribution pipeline is now under construction. PDAM will install the master meter once the distribution pipeline is almost finished. Microcredit programs for new PDAM connections in Sidoarjo and Mojokerto are ongoing. IUWASH has introduced BSM as a new partner for PDAM Sidoarjo, and this quarter facilitated development of the scheme until it was approved by both parties. The MOU between PDAM Sidoarjo and BSM will be signed in the next quarter.

· Anchor Project #3 (Restoration of Water Resources as part of Climate Change Adaptation Action Plan): The Water Supply Vulnerability Assessment prepared by Brawijaya University in Malang was finalized and followed by a workshop on the Asset Risk Matrix for related SKPDs in Kab. Mojokerto. The implementation of a Raw Water Management & Climate Change Adaptation Program in Kab. Mojokerto, involving the construction of infiltration wells financed by CCFI, is still ongoing, with 113 of the 650 wells already constructed.

Other program highlights in the water supply sector: · The PDAM Kab. Probolinggo Business Plan was completed, presented to Pokja and submitted to

the MOF for the debt restructuring program.

· Proposal for tariff adjustments at PDAM Kab. Gresik was completed and presented to the Supervisory Board in March 2013.

· The final tariff adjustment plan for PDAM Kab. Lamongan has been presented to the Bupati and obtained agreement in principle from the Bupati.

· PDAM Lamongan’s Business Plan for the debt restructuring program has been revised and submitted to the MOF.

· IUWASH facilitated the monitoring of debt restructuring programs at three PDAMs, with the following results: ü PDAM Kab. Gresik needs assistance to revised the targets in the Business Plan; ü PDAM Kab. Mojokerto proposes to write off the debt; and ü PDAM Kab. Malang – since Kab. Malang is a new IUWASH-supported location, monitoring

activity will commence in the next quarter.

· This quarter IUWASH continued facilitating the preparation of Business Plans through serial training for the PDAMs in Kab. Jombang, Kab. Probolinggo, Kota Batu and Kab. Mojokerto. Activities include a Customer Satisfaction Survey.

Page 117: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 99

· As recommended by IUWASH, the Local Government of Kota Mojokerto has allocated an APBD budget of 360 million rupiah for the PDAM’s water meter replacement program. These funds can be used to replace 3,000 water meters.

Regional Highlights in Sanitation Sector This summary of program highlights in the sanitation sector is divided into two parts – program highlights for the Anchor Projects, and other progress in this sector. Program highlights for Anchor Projects in sanitation sector:

· Anchor Project #1 (STBM/ CLTS activity to support increased access to individual sanitation system facility in Kota and Kab. Mojokerto and Kab. Jombang) ü In Kab. Mojokerto, 96 households built individual toilets after triggering and sanitation

marketing were combined with a microfinance program by a newly established SME (CV. N-Vitec).

ü Eight government cadres from the Health Office and sanitarians from Kab. Mojokerto and Jombang actively collaborated with IUWASH on sanitation activities.

ü In Kab. Jombang, monitoring has followed triggering by sanitarians in collaboration with Dinas Kesehatan, with 39 households in Mojoagung Subdistrict now having new toilets.

ü Assisted sanitarians and community cadres from Kab. Mojokerto in enhancing their capacity to provide adequate individual septic tanks.

· Anchor Project #2 (Sanitation access for urban community to communal system with special focus on promotion, training/capacity building and triggering in Kota and Kab. Probolinggo) ü The PEMDA implementing CSS/SSK for sanitation in Kota Probolinggo, especially in urban

sludge management. Pokja Sanitasi agreed to implement this in office and commercial areas during the first year, followed by two subdistricts (Mayangan and Kanigaran) in the second year as a pilot project.

ü Support for Dinas PUCK and BLH in providing readiness criteria for small-scale sewerage systems (IPAL) in Jrebenglor and Sumbertaman.

· Anchor Project #3 (Access to Communal Sanitation Facilities, with focus on supporting Pokja Sanitasi in the implementation of CSS and government programs in the Greater Malang Area) ü This quarter IUWASH continued facilitation to establish a UPTD for sanitation management

in the Greater Malang Area. Several FGDs have been held. ü IUWASH also facilitated a workshop on identifying and mapping sanitation problems in Kota

Batu, Kab. Malang and Kota Malang. The workshop resulted in a sanitation management action plan for each region.

Other program highlights in the sanitation sector:

· Supported provision of readiness criteria in the sanitation program, allocating APBN funds to build sanitation infrastructure (IPLT and small-scale sewerage system). This quarter, IUWASH facilitated PEMDA in two cities – Gresik and Kota Probolinggo.

· Septage Management Program in Kota Probolinggo and Jombang. This quarter, IUWASH facilitated serial FGDs to implement the concept. As a first step, the Pokja agreed to choose a pilot area in the office and commercial area, to be followed by a residential area.

· Facilitating Establishment/Capacity Building of UPTD. The need for sanitation management institutions has become urgent as the workload of the SKPD becomes heavier. IUWASH facilitated workshops and FGDs for UPTD establishment/capacity building in several cities, especially in cities and districts involved in the USRI program and proposing sanitation programs using APBN funds. IUWASH facilitated seven cities and districts – Gresik, Sidoarjo, Kab. Malang, Kota Malang, Batu, Jombang and Kota Probolinggo.

Page 118: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 100

· Support for Pokja Sanitasi Kab. Malang, Kota Batu and Kota Malang to establish/provide capacity building for wastewater UPTD through workshops and serial FGDs.

· Implemented STBM pillar 1 – ODF in all IUWASH locations. Activities include capacity building for sanitarians, health office staffs and community cadres, and collaborating with these partners to conduct triggering, a survey on community hygiene behavior, and post-triggering monitoring.

· Collaboration with WSP and APPSANI in holding “Sanitation Entrepreneur Training for the STBM Program” with 34 participants from nine cities and districts where IUWASH is working.

· Developed three SMEs that will provide individual septic tank services in Kota Probolinggo, Kab. Mojokerto, and Kab. Lamongan.

· The microfinancing scheme for individual septic tank construction has been going well in Kota Probolinggo, Kota Surabaya, Kab. Sidoarjo, Kab. Jombang and Kab. Mojokerto.

· Implemented STBM pillar II – Hand Washing with Soap at SD Dinoyo 2, Kota Malang for 90 students in collaboration with sanitarians and teachers.

· Strengthened collaboration among sanitarians and CBOs to support SLBM/USRI in implementing communal sanitation systems with various SKPD offices in Kota Malang.

Regional Highlights in Crosscutting Sector

· This quarter IUWASH East Java started a Survey on Improved Hygiene Behavior in Kab. Sidoarjo, Kab. Malang and Kota Probolinggo. One hundred respondents were interviewed in each city/district.

· Facilitation of Citizen Engagement Mechanism for the local governments of Kota Probolinggo, Kab. Sidoarjo and Kab. Mojokerto is still ongoing. IUWASH facilitated Radio Suara Kota, the local government radio station in Probolinggo, to introduce a regular monthly broadcast on the topic of water and sanitation. The program has been agreed on and is now being prepared, being targeted to commence in April. Draft regulations of the Mayor on "Laporo Rek" have been prepared and now need to be signed.

· This quarter, IUWASH facilitated Dinkes Kota Malang in conducting POU and HWWS education activities for 90 students at SDN 01 and 02 Dinoyo.

· As planned, water and sanitation issues will become part of the “Laporo Rek” broadcast scheduled fro the first day of the month. In April 2013, these broadcasts will begin with water issues, hosted by IUWASH and PDAM Probolinggo.

· Support was provided for the institutionalization of sanitation in Kab. Malang, Kota Batu and Kota Malang by establishing and providing capacity building for a Wastewater UPTD, through a workshop and serial FGDs.

· Support was provided to the legislative drafting process for ODF village regulations in Kecamatan DAU, Kab. Malang.

Upcoming events

Event Title Date Type of Event Venue

Serial FGD: Establishment of UPTD April-June Workshop Seven cities Business Plan Workshop April 3, 10 and

24 Workshop Kab. Mojokerto, Batu,

Jombang Visioning Workshop April Workshop Kab. Probolinggo Workshop on WSVA Results April Workshop Mojokerto

Page 119: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 101

Event Title Date Type of Event Venue

GIS/NRW Training for nine PDAMs April/May Training Surabaya Visioning Workshop May Workshop Mojokerto, Jombang Set up City Forum for community Watsan networks

May Workshop Hotel Grand Mahkota, Lamongan

Workshop on Hand Washing with Soap and Point of Use Water

May Workshop Five cites

O&M training for Communal Sanitation Systems for KSM

May Training Seven cities

ToT on Hand Washing with Soap and Point of Use Water for sanitarians

May Workshop Kota Malang

Business Plan Workshop for PDAM Kab. Probolinggo

May 7 Workshop Hotel Bromo View, Probolinggo

Training in Billing and Accounting for SAK ETAP

May 14-16 Training Hotel Harris, Malang

Workshop on Finalization of Business Plan for PDAM Kab. Lamongan

May 15 Workshop Lamongan

Socialization workshop for SME May 22 Workshop Hotel Harris, Malang Workshop to introduce CSR June 12 Workshop Surabaya Workshop on Hand Washing with Soap and Point of Use Water for KSM

June Workshop Six cities

Cluster Report

IUWASH understands that the key to achieving its targets lies in the successful implementation of activities at the local level. In order to better describe and track the project’s activities and progress in each target location, IUWASH has developed cluster reports. The following pages present the following six cluster reports for East Java:

· Gresik and Lamongan Districts · Sidoarjo District and Surabaya City · Mojokerto District and City · Probolinggo District and City · Jombang District · Greater Malang Area (Batu City, Malang City and Malang District)

Page 120: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 102

EAST JAVA, Gresik and Lamongan Districts Summary

Gresik and Lamongan have a combined population of 1.2 million people. PDAM Gresik has 26% coverage, while in Lamongan development of the Watsan sector is unbalanced between the northern and southern regions. One constraint to sanitation services in Gresik is lack of water, whether from PDAM or individual sources. IUWASH has been facilitating PDAM Gresik to increase community access to the water supply, and has provided training for PDAM staffs. In Lamongan district, the support from PEMDA in the sanitation sector needs to be improved, in terms of both financing and technical support. The same applies to the water supply sector, where service coverage is still low and the PDAM still has debt. In PY3, IUWASH is continuing support to both districts, especially to obtain long-term finance for water supply and CLTS triggering activities for sanitation. For Lamongan, implementation of the sanitation program under the SSK will commence in 2013.

Activities

Water Supply Sector: · Monitoring progress of Debt Restructuring Program for PDAM

Kab. Gresik · Facilitation in preparation of PDAM Lamongan Business Plan · Facilitation for preparation of PDAM Tariff Adjustment and

presentation to Bupati and District Secretary, for Kab. Gresik and Lamongan

Sanitation Sector: · Conducted workshop on “Sanitation Management System” in Kab.

Gresik · Facilitation of FGD for Pokja Sanitasi, Bappeda and related SKPDs

for UPTD establishment · Participated in training for sanitation entrepreneurs · Meeting for integration in sanitation sector supporting USRI/SLBM

program implementation among Dinas Kesehatan, Bappemas, and Dinas PU Cipta Karya

Crosscutting Sector: · Facilitating establishment of city forum for water and sanitation

community network

Plan for Next Quarter: · GIS/MIS and NRW Training for PDAM Lamongan and Gresik · Facilitation for PDAM Long-Term Financing in Lamongan · Triggering activity in Lamongan and Gresik · Training in SOP for staffs at PDAM Lamongan · Development of Citizen Engagement Mechanism for Watsan

Community Network (HIPPAMS) in Kab. Lamongan · Capacity Building for Pokja Sanitasi in Lamongan and Gresik

IUWASH East Java

Presentation of PDAM Tariff Adjustment to Lamongan Bupati and District Secretary.

IUWASH East Java

Facilitation of FGD to Pokja Sanitasi and related SKPDs for UPTD formation.

Partner Coordination: · Coordination with Dinkes Kab. Lamongan and

Gresik for facilitation of triggering activities · Bappeda, Pokja Sanitasi and related SKPDs for

planning of UPTD formation · Coordination of PY3 implementation plan with

PDAM Gresik and Lamongan

Page 121: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 103

EAST JAVA, Sidoarjo District and Surabaya City Summary Sidoarjo District is an area that supports Surabaya City, with most of the people working in Surabaya. While the PDAM coverage area in Surabaya is about 70 percent, PDAM Sidoarjo coverage is still low at 33 percent. IUWASH facilitates access to water supply in several informal areas through grants for four master meter schemes, with a total target reach of about 400 households served. In the sanitation sector, IUWASH supports STBM program implementation including CLTS triggering in several communities. IUWASH also facilitates capacity building for Pokja AMPL and implementation of SSK. Surabaya has many slum areas that need to be improved. The main problem in this city is urbanization. Many people live in illegal areas with minimum water and sanitation infrastructure.

Activities

Water Supply Sector: · Construction of new master meters in three locations in

Sidoarjom, with 243 of 400 targeted households having committed to connect, and 37 of 44 households in Lemahputro

· Facilitated PDAM Delta Tirta Kabupaten Sidoarjo to collaborate with Bank Syariah Mandiri to implement a microcredit scheme for new PDAM connections

· Development of PDAM master meter scheme in Kota Surabaya in collaboration with PNPM Mandiri program

Sanitation Sector: · Training for enumerators and implementation of Behavior

Change and Hygiene Education survey with 100 respondents in Lemahputro, Karanggayam, Pecantingan and Celep

· Monitoring and supervision of STBM activities by LPPM ITS, where 111 individual toilets out of the target of 150 have been constructed

· Training for sanitation entrepreneurs by LPPM-ITS in Kab. Sidoarjo and Kota Surabaya.

· Meeting with sanitarians from three Puskesmas in Kota Surabaya (Kecamatan Wonokromo, Tenggilis and Kedurus) to improve access to adequate sanitation, with the sanitarians preparing an action plan

Crosscutting Sector: · Facilitated the formation of a UPTD for sanitation management

in Kab. Sidoarjo · Conducted workshop for development of Citizen Engagement

Mechanism in Kab. Sidoarjo

IUWASH East Java

Construction of PDAM Master Meter scheme distribution pipeline in Kelurahan Celep, Kabupaten Sidoarjo.

IUWASH East Java

FGD for development of UPTD for sanitation management.

Plan for Next Quarter: · Facilitate finalization of a cooperation agreement between

PDAM Delta Tirta Sidoarjo and BSM for a microcredit program · Follow up the collaboration with PDAM Surabaya and PNPM

Mandiri to develop a master meter scheme in Kota Surabaya · Support triggering activity in Sidoarjo and Surabaya · Facilitation and capacity building for sanitation entrepreneurs · Facilitation and support for SLBM program in Kab. Sidoarjo and

KSM USRI in Kota Surabaya.

Partner Coordination: · Coordination with Dinas PU, Bappeda, Dinas

Kesehatan for DAK SLBM support in Kabupaten Sidoarjo

· Coordination with PDAM Surya Sembada and PNPM Mandiri for master meter development

· Coordination with PDAM Delta Tirta Sidoarjo and BSM for microcredit program

· Coordination meeting with Dinas Kesehatan for triggering activities

Page 122: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 104

EAST JAVA, Mojokerto District and City Summary Since IUWASH began providing support to Kab. Mojokerto, many activities have been implemented in the Watsan sector, including a microcredit scheme that resulted in 368 new PDAM connections in the last quarter. In sanitation, IUWASH supported CLTS triggering activities and facilitated the Pokja AMPL in preparing the application documents for the PPSP 2013 program. Documents were completed, signed and submitted to the Provincial Sanitation Working Group. IUWASH also facilitated a school sanitation and hygiene assessment at 10 elementary schools. Following site selection, this quarter IUWASH will support the PEMDA of Kota Mojokerto.

Activities

Water Supply Sector: · Conducted training on development of PDAM Business Plan

(Section 3) in Kab. Mojokerto · Staff from USAID Washington visited Dusun Jiyu, Desa Jiyu, Kec.

Kutorejo, Kab. Mojokerto to see the progress in the water and sanitation program

· Conducted ToT for construction of infiltration wells in Celaket Village, Kab. Mojokerto

· Supported Workshop on Asset Risk Matrix related to Climate Change Adaptation program in Kab. Mojokerto

Sanitation Sector: · Facilitated triggering activities and construction of toilets in the

villages of Bangsal, Gayam, Trowulan, Jatipasar, Tunggal Pager and Jiyu in Kab. Mojokerto.

· Facilitated sanitation entrepreneurs to access funds from BSM through a microcredit program for construction of individual toilets and septic tanks

· In collaboration with PNPM Mandiri, facilitated behavior change and hygiene education for the community in Sambiroto Village, Kab. Mojokerto

· Participated in Training for Sanitation Entrepreneurs

Crosscutting Sector: · Comparative Study to Kota Probolinggo on Citizen Engagement

Mechanism program · Facilitated development of Citizen Engagement Mechanism in

Kab. Mojokerto

IUWASH East Java

Workshop on Asset Risk Matrix related to Climate Change Adaptation program in Kab. Mojokerto.

IUWASH East Java

Behavior Change and Hygiene education in Sambiroto Village, Kab. Mojokerto.

Plan for Next Quarter: · Facilitation for PDAM Kota Mojokerto in preparation of PDAM

Corporate Plan and tariff adjustment · Facilitation/training for PDAM Kab. Mojokerto for development

of Business Plan · Facilitating a regulation on raw water conservation · Facilitating triggering activities in several locations in Kab.

Mojokerto · Monitoring HWWS and POU in six locations in Kab. Mojokerto.

Partner Coordination: · PDAM Kab. Mojokerto and Perhutani for

development of infiltration wells · Bappeda Kota Mojokerto and Bidang Kerjasama

for MOU signing · PDAM Kota Mojokerto to identify problems and

solutions · Bappeda Kab. Mojokerto for planning Raw

Water Conservation Regulation.

Page 123: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 105

EAST JAVA, Probolinggo District and City Summary Probolinggo City, with a population of 216,967, faces problems in both water and sanitation. PDAM coverage is still low because most people still use individual water sources. Most residents also have inadequate sanitation facilities. In PY2, IUWASH facilitated the PDAM in preparing its Business Plan. In sanitation, IUWASH facilitated CLTS triggering and many communities built latrines with their own resources through credit or arisan jamban. IUWASH facilitated the establishment of sanitation entrepreneurs and the PEMDA constructed a communal sewage treatment plant. IUWASH also facilitated community development and construction of a small sewerage system, including household connections. The work in both sectors implemented in the City will now be expanded to the District. Starting in PY3, IUWASH has coordinated with the PEMDA to implement the program, with assessments and discussions to identify program priorities for PY3.

Activities

Water Supply Sector: · Facilitated Comparative Study for Infiltration Well Development

to Kab. Bandung in West Java related to Climate Change and Vulnerability of Water Supply Program for Kab. and Kota Probolinggo

· Facilitated and provided training in SOP development for PDAM Kota Probolinggo staffs

· Facilitated and provided training in Business Plan Development for PDAM Kab. Probolinggo staffs

Sanitation Sector: · Training for sanitation entrepreneurs in Kota Probolinggo · Implemented survey on Behavior Change and Hygiene Education

in community in Kota Probolinggo · Conducted FGD on Urban Sludge Management Program for

Kota Probolinggo · Continued construction of sewerage system for IUWASH grant

program in Sumber Taman community, Kota Probolinggo · Facilitated FGD for Pokja Sanitasi, Kota Probolinggo for

preparation of readiness criteria in channeling APBN funds for construction of area/sector-based sewage treatment plant

· Conducted ToT for enumerators and facilitated implementation of a survey on Behavior Change and Hygiene Education with 100 respondents in locations with individual and communal sanitation facilities in Kota Probolinggo

Crosscutting Sector: · Facilitated CEM program to Radio Suara Kota in Kota

Probolinggo to provide regular monthly broadcasts on water and sanitation topics

· Preparation of Visioning Workshop for Kab. Probolinggo

IUWASH East Java

Facilitation/training for PDAM staffs in the development of SOP.

IUWASH East Java

Survey on Behavior Change and Hygiene Education.

Plan for Next Quarter: · Continue facilitation of PDAM SOP in Kota Probolinggo · Hold Visioning Workshop in Kab. Probolinggo · Workshop on Finalization of Business Plan (2013-2017) for

PDAM Kab. Probolinggo

Partner Coordination: · Coordination with Dinas Kesehatan for Behavior

Change and Hygiene Education · Coordination with Dinas Kominfo for CEM

program implementation.

Page 124: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 106

EAST JAVA, Jombang District Summary Serving a population of 1,201,557 (2010), the Jombang District water utility has accumulated a 40 percent loss in its total assets despite profits being earned in the past two years. The district does not have any city sewerage system and only uses on-site and off-site systems, while about 80 percent of sanitation facilities consist of simple flush toilets with septic tanks. However, the district’s ODF campaign has resulted in 75 percent of households now having toilets. IUWASH plans to assist the district government to maximize the use of the sewage treatment system, providing support for the USRI and SLBM programs, and media advocacy for STBM and water utilities.

Activities

Water Supply Sector: · Trained 20 enumerators and five coordinators for PDAM

Customer Satisfaction Survey, and facilitated implementation of the survey

· Conducted serial training for the preparation of the PDAM Business Plan. Progress has now reached Chapter 6, with the remaining chapters now being prepared for discussion at the next training

Sanitation Sector: · Monitored STBM Program after triggering in Kecamatan

Mojoagung · Facilitated and supported preparations for the development of

UPTD for sanitation management

Crosscutting Sector: · Held workshop on visioning the future of water and sanitation in

preparation for a Visioning Workshop · Held workshop to identify sanitation problems in Kab. Jombang

IUWASH East Java

Training for enumerators for PDAM Customer Satisfaction Survey.

IUWASH East Java

Workshop on “Identification of Sanitation Problems in Kabupaten Jombang”.

Plan for Next Quarter: · Finalization of PDAM Business Plan · Facilitation of training on NRW for PDAM staffs · Facilitation of triggering activity in several locations and practicing

construction of hygienic individual toilets · Facilitation and capacity building for sanitarian entrepreneurs and

channeling to microcredit program · Facilitation of FGD for development of UPTD for sanitation and

sludge management.

Partner Coordination: · Coordination with Dinas PU, Dinas Kesehatan

and Bappeda for USRI Program support · Coordination with Bappeda, Pokja Sanitasi for

preparation of Visioning Workshop · Coordination with PDAM for planning of

NRW training.

Page 125: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 107

EAST JAVA, Greater Malang Area (Malang City and District, Batu City) Summary Batu City and Malang City are located within the borders of Malang District, and the water supplied to all three locations is sourced in Malang District. The water utility’s service coverage in Malang District is 36 percent, in Malang City it is 77 percent, and in Batu City it is just 30 percent. IUWASH plans to develop a business plan for the water utilities and a workshop on reducing NRW rates. The sanitation sector in all three areas is quite good, despite open defecation practices. The three areas have a good STBM program, and some villages are already ODF. IUWASH assistance includes facilitating village regulations on ODF and water and sanitation issues, as well as communal sanitation management and sludge management.

Activities

Water Supply Sector: · Conducted training for PDAM Batu Business Plan – progress has

reached Chapter 6, with the next chapters now in preparation · Coordination with PDAM Kota Malang on plan for Water Supply

Vulnerability Assessment in Greater Malang area · Coordination with PDAM Kota Malang on plan for implementation

of Customer Satisfaction Survey

Sanitation Sector: · Conducted ToT for enumerators and facilitated Behavior Change

and Hygiene Education to 100 individual and communal sanitation facility users in Kab. Malang

· Facilitated comparative study for sanitarians and sanitation cadres from Kota Batu to Kab. Kediri

· Facilitated PEMDA Kota Malang with readiness criteria for development of sewage treatment plant funded by APBN

· Participated in training for sanitation entrepreneurs

Crosscutting Sector: · Conducted workshop visioning the future of water and sanitation

for Kab. Malang and Kota Batu to support the local government’s participation in the Visioning Workshop

· Conducted workshop on preparation of Village Regulation to support ODF in Kecamatan Dau, Kab. Malang

· Facilitated the establishment of UPTD for sanitation management in Kab. Malang

IUWASH East Java

Behavior Change and Hygiene Education survey in Kecamatan Turen, Kab. Malang.

IUWASH East Java

Practicing construction of individual toilets and septic tanks.

Plan for Next Quarter: · Finalization of PDAM Business Plan in Kota Batu · Facilitate NRW training for PDAM Kab. Malang · Support triggering activities in several locations in Greater Malang · Mentoring and capacity building for sanitation entrepreneurs · Facilitation and support for STBM pillar II – Hand Washing With

Soap (HWWS) in Greater Malang

Partner Coordination: · Coordination with Dinkes for

implementation of HWWS in schools in Kab. Malang

· Coordination with Bappeda Kota Batu for preparation of Visioning Workshop

Page 126: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 108

SOUTH SULAWESI/EASTERN INDONESIA

Page 127: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 109

Section 4.5

SOUTH SULAWESI/ EASTERN INDONESIA

Summary

This IUWASH region has the largest expanse, including South Sulawesi Province, the City of Ambon in Maluku Province, and the City and District of Jayapura in Papua Province. Their combined population is approximately 8,638,147 with a total surface area of approximately 72,881 km2. (See map for more details.) IUWASH began working in the region in June 2011, meeting with provincial and local government leaders, conducting assessments of current Watsan conditions, and gauging the extent of local government commitment to address sector deficiencies. These assessments led to the selection of nine municipalities as IUWASH target areas beginning in PY1 – the Cities of Makassar, Parepare, Ambon and Jayapura, and the Districts of Maros, Takalar, Jeneponto, Enrekang and Jayapura. This quarter, the IUWASH regional team held discussions with PEMDA to develop program priorities for the next year, mostly with new cities. With existing cities, IUWASH is continuing activities from the previous year and initiating several new programs. In the last quarter, Partnership Agreements (PAs) were signed with all 12 IUWASH locations in the region. The main progress in the water supply sector in South Sulawesi has involved support for technical on-the-job training for PDAM, debt restructuring business plans, and initial assessments of raw water problems in Parepare, Enrekang, Sidrap and Pinrang. Another achievement has been the start of a distribution network analysis for PDAM Makassar. IUWASH has continued to implement the water for the poor program through microcredit programs in several cities. The sanitation program is focusing on supporting individual and communal sanitation systems to support sanitation programs at the city level. The support for individual sanitation systems has mostly been in Jeneponto and Takalar, with intensive training of sanitarians and health officers to implement the STBM program. The support for communal systems is for the USRI program in Makassar, but there has also been direct technical support for Sanimas systems in all IUWASH locations. In terms of institutional support, IUWASH has continued strengthening UPTD Makassar as an exemplar of best practices for the whole of Indonesia. Progress in the crosscutting sector has included identifying and supporting the development of several local policies and citizen engagement mechanisms. Gender awareness programs are included in ongoing water and sanitation sector activities.

Page 128: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 110

Success Stories

Success Story in Water Supply Sector Water Utility of Jeneponto Steps Up its Water Quality Monitoring water quality is a very important daily routine in a water utility to ensure that water distributed to customers is of the best quality. With the water utility of Jeneponto District (PDAM Kab. Jeneponto) striving to improve its water quality, USAID IUWASH conducted Water Quality Monitoring Training on November 28-30, 2012 for 40 staff of the water utility. The customers of PDAM Kab. Jeneponto often complain that their tap water produces murky water. Based on water quality analysis by the local health office, the water also contains E-Coli. PDAM Kab. Jeneponto is now improving its management and services to win more customers through microfinance for access to water, so monitoring the quality of its water is essential. The staffs at PDAM Kab. Jeneponto understand the importance of good water quality. However, they lack sufficient knowledge of the exact measurement of chemical components needed to treat raw water to produce clean water. The training introduced a water laboratory, and the use and handling of laboratory tools, and refreshed staff knowledge of water quality testing methods and raw water treatment methods. The most important training topic was the specific formula of chemical components for laboratory staff to use, along with the use of a daily log book for water analysis and doses of chemical components. IUWASH also stressed the importance of adherence to the raw water treatment steps, and regular cleaning of water treatment plants. Following the training, H. Burhan, Director of PDAM Kab. Jeneponto, has assigned several staff to work three times a week in the laboratory. He will also increase the number of staff working on three shifts and ensure that water operators and laboratory team work closely to carry out routine water quality monitoring. The director also prompted cleaning of all water treatment plants, which was done in January 2013. Two months after the training, the water of PDAM Kab. Jeneponto had met health department standards. PDAM Kab. Jeneponto has 6,643 water connections, with production capacity currently at 113 liters per second, serving only 12 percent of the district population.

Nur Sudibyo/IUWASH South Sulawesi

Training participants practice analyzing water quality and determining the alum dose required.

Page 129: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 111

Success Story in Sanitation Sector Sanitation Commitment to Support Makassar Global City Sanitation issues have never been as popular as drinking water issues. In general, people put more thought into drinking water than sanitation, especially when it comes to toilets. The budgets of national and city/district governments also allocate more to the drinking water sector than to sanitation. Based on data from the Working Group on Drinking Water and Environmental Health of Makassar City, since 2009 the city has been receiving a significant level of assistance in the sanitation sector, which has greatly contributed to improvements in on-site and off-site sanitation systems and communal sanitation systems in Makassar City. In 2010, the local government worked with the AusAID funded Indonesia Infrastructure Initiative (IndII) to produce a Wastewater Master Plan for Makassar City. In 2011, the Community-based Environmental Sanitation (commonly abbreviated as SLBM) program developed communal wastewater treatment plants in three sites. In the same year, Makassar was part of the Metropolitan Sanitation Management and Health Project, funded by Asian Development Bank. The project successfully established a Regional Technical Unit on Wastewater (known as UPTD). Now, Urban Sanitation Rural Infrastructure (USRI, also funded by Asian Development Bank) and USAID-IUWASH aim to further improve the sanitation sector in Makassar City. The government of Makassar City recently approved the construction and a budget for Losari City Sewerage Plant – a project costing more than 600 billion rupiah. Currently, 85 percent of the land needed for the sewerage plant is available, while the remaining 15 percent is still in negotiation. The Losari City Sewerage Plant is expected to become operational in 2014. Imbang Muryanto of the Public Works Office and Hasanudin of the Regional Development Planning Board of Makassar say: “The City Government of Makassar is committed to making Makassar free from open defecation practices by providing 35 percent of city budget funds to achieve that goal.” The Public Works Office of Makassar City is also working hard to obtain a larger sanitation budget allocations from the city budget. With current improvements and developments in the sanitation field, Makassar aims to become the first city in eastern Indonesia to have a city sewerage plant, as it gears up to become “Makassar Global City”.

IUWASH South Sulawesi

Drs. Agar Jaya, Sekda of Kota Makassar, leads a meeting to determine the sanitation budget for Kota Makassar.

Page 130: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 112

Regional highlights by sector

Regional Highlights in Water Supply Sector This summary of program highlights in the water supply sector is divided into two parts – Anchor Projects and other program highlights. Program highlights of Anchor Project in water supply sector: Anchor Project #1: 40 lps water treatment plan combined with microcredit in Jeneponto: Progress this quarter involved several activities, including (a) encouraging Satker to quickly hand over the PIU water treatment plants to the PEMDA, (b) PDAM continuing to monitor water quality from source to distribution, and (c) continuing the GIS program to facilitate improved service to the community. By year-end, up to 3,000 new households are expected to be served. Other program highlights in the water supply sector: · Technical assistance for the development of DED for the water supply system in Passo Ambon

through the PO mechanism. The consultant has submitted a draft final report and discussed it with Satker Air Bersih for Maluku Province, Dinas PU Kota Ambon, PDAM Kota Ambon and others.

· Finalized the DED for the water supply system in Kotaraja Dalam and Luar through the PO mechanism, submitting the report to Satker Air Minum for Papua Province and PDAM Jayapura.

· Finalized technical assistance on PDAM spatial data development (GIS system) to PDAM Parepare, Enrekang and Jeneponto by PO Personal. While the same program activities in PDAM Ambon and Jayapura were implemented directly by City Coordinators of Ambon and Jayapura.

· Support for pipeline installation for water supply system in Enggros and Tobati Island, Kota Jayapura has already been completed, with 140 new household connections.

· Began support to PDAM Makassar on optimalization of distribution pipe network under the PO mechanism.

· Participated in water source and climate change vulnerability assessment in Parepare, attended by four PDAMs (Parepare, Pinrang, Sidrap and Enrekang). This quarter, a Climate Change and Vulnerability Assessment will be processed under the PO mechanism.

· NRW reduction program implementation in PDAM Jayapura, reducing the NRW rate by 0.16 percent in a program supported by IUWASH.

· IUWASH supported development of PDAM Business Plans in Parepare, Jeneponto and Enrekan, all of which were signed by the local mayor and DPRD, while PDAM Takalar is still awaiting approval. PDAM Kota Ambon is also still awaiting a positive response within the PDAM.

· IUWASH has supported a new tariff adjustment for PDAM Kota Parepare (from 1,400 to 2,000 rupiah), while similar support to PDAM Jeneponto is ongoing.

· In Jeneponto, progress in microcredit for water supply is limited to Koperasi Pasar (KOPPAS). In Takalar and Maros, we are still identifying financial institutions and potential access. In Pinrang, we are collaborating with KSU Koperasi, which has now installed three house connections for MBR.

· Provided support on the scope of work for formulation of SOP for PDAM. Regional Highlights in Sanitation Sector This summary of program highlights in the sanitation sector is divided into two parts – program highlights for the Anchor Projects, and other progress in this sector.

Page 131: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 113

Program highlights for Anchor Projects in the sanitation sector: Anchor Project #1 (Strengthening Sanitation Institute (UPTD) to support construction of communal system in Kota Makassar): The focus this quarter has been on community development activities, especially on providing support to the USRI, SLBM DAK and programs under the AusAID Budget and Grants Program. The USRI program is being implemented in Makassar with 39 Community-Based Sanitation locations this year, which will increase to 80 locations next year. IUWASH has also conducted a workshop for sanitarians and cadres in all USRI and SLBM locations, particularly related to triggering activity for communal systems (EPS), to provide understanding on how to use communal systems and increase willingness to pay. The workshop was attended by 39 sanitarians and 78 KSM cadres. After the workshop, they will conduct triggering in their own sites. USRI in six locations have already been completed the construction of the communal sanitation facilities and are being used by 300 households (1,500 people). The remaining construction works in 33 locations will be completed in May 2013 and are expected to serve 1,650 households. For the SLBM and Sanimas programs in Makassar, IUWASH has been strengthening the CBO. Progress in construction of the sanitation facilities has reached between 60 and 80 percent, with completion scheduled for June 2013. Sanimas and SLBM access in 12 locations serves 800 households. To optimize the program, IUWASH has also provided guidance to the working group (Pokja AMPL) in drafting the Sanitation White Book and Citywide Sanitation Strategy (SSK). They held a public consultation on February 26, attended by 45 people. To sustain the program, IUWASH has been strengthening the wastewater institution (UPTD) in Kota Makassar, beginning with the communal waste water treatment plant management, including campaign activities to increase connections. IUWASH has also conducted an assessment of sanitation microcredit schemes for low-income households.

Other program highlights in sanitation sector: · Assisted program development for USRI, SLBM DAK – AusAID and Grants in Parepare, Sidrap,

Pinrang, Ambon and Jayapura, with UPTD only being established in Parepare, Ambon and Jayapura. A workshop was held in Jayapura on March 25, opened by the Mayor and attended by relevant SKPD, DPRD, NGOs, donors and Pokja AMPL for Papua Province.

· Provided technical assistance to Pokja AMPL/Sanitation for making or reviewing APML/Sanitation documents in Maros, Ambon and Jayapura. The White Books are 90 percent complete while the Sanitation Strategy is at 80 percent. In Ambon and Maros, public consultations will be conducted in April.

· For the SLBM and Sanimas program outside Makassar City, IUWASH is also supporting Parepare, Sidrap, Pinrang, Ambon and Jayapura, especially in technical monitoring and CBO strengthening. Construction is 60-80 percent complete, with completion expected in June.

· Supported increased access to on-site sanitation systems (individual) in Jeneponto. IUWASH has encouraged the achievement of ODF in six villages, with sanitation facilities constructed in 14 villages for a total of 7,651 facilities. Access to on-site sanitation systems for people living in urban villages totaled 2,169 septic tanks and 507 cubluk, while the remainder are located in rural areas.

· Microfinance to support the sanitation sector in Jeneponto showed some progress, in collaboration with the KOPPAS program. Twenty-eight sanitation facilities have been constructed under this program.

Regional Highlights in Crosscutting Sector · Finalized CEM in Jeneponto. Every SKPD related to Watsan services has a complaints unit, and

an SMS gateway is being prepared by Bappeda. Activities will be coordinated by Pokja AMPL as

Page 132: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 114

Satgas. It was agreed that after the flow mechanism has been revised by all participants, it will be discussed with the legal section (Kabag Hukum) and signed by the Bupati.

· The CEM regulation in Parepare (Mayoral Regulation No. 52 of 2011) has been improved and an agreement was reached to execute the implementation of the Mayoral Regulation on the SOP for handling complaints from the people of Kota Parepare.

· Held a Visioning Workshop for 35 participants in Bantaeng to increase the commitment of SKPDs, DPRD and NGOs to support water and sanitation services in Kab. Bantaeng.

Upcoming Events

Key events planned for the coming quarter in the SSEI Region are detailed in the following table:

Event Title Date Type of Event Venue

Monitoring PO program activities and development of distribution pipe network in PDAM Makassar

April-June Monitoring and Evaluation Kota Makassar

STBM Workshop April-June Workshop and implementation Kota Takalar

Advocacy and campaign for sanitation access April-June Workshop and

implementation Kota Jeneponto, Makassar

Finalizing DED for Water Supply in Ambon, and handing it over to Satker Province and PDAM Kota Ambon

April Monitoring PO Progress

Kota Ambon

DNI training for nine PDAMs in South Sulawesi

April 19-20 Training Kota Makassar

Monitoring PO program activities for preparation of new SOP April-June Monitoring and

evaluation Maros, Parepare, Takalar and Jeneponto

Support PDAM Jayapura in NRW reduction program

April-June

Technical Support, FGD & Workshop

Kota Jayapura

Public consultation on Sanitation White Book and SSK

April Workshop Kab. Maros and Kota Ambon

Training in KS /BPS collaboration with Tim Mobile UPTD, especially for USRI, SLBM and Sanimas program

April-May Workshop Six cities

Capacity Building for Dinas Kesehatan on triggering training for USRI program

May-June Workshop Kota Makassar

Capacity Building for Pokja Sanitation at Kelurahan level to support USRI program

April Workshop Kota Makassar

Capacity building for Pokja AMPL to support Urban Sludge Management and Small-Scale Sewerage

April-July Workshop Seven cities

Capacity Building for LG in preparation of UPTD

April-June Workshop Kota Parepare, Kota Jayapura and Kota Ambon

Capacity Building for UPTD Kota Makassar April-June Training Kota Makassar Preparation of LG to assess community for USRI, SLBM and Sanimas in FY2013

April-June Workshop All cities

ToT in PDAM customer facilitation at five PDAMs May 20-22 Monitoring and

Evaluation Maros, Parepare, Takalar and Jeneponto

Cluster Report

IUWASH understands that the key to achieving the results it targets lies in the successful implementation of activities at the local level. In order to better describe and track the project’s activities and progress in each target location, IUWASH has developed cluster reports (one page each). In this quarter, there are two types of cluster report, one for a single city, and another that combines cities. The cluster report for the combined cities covers the new cities, since only limited activities took place there in this quarter.

Page 133: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 115

The following pages contain the cluster reports for the South Sulawesi and Eastern Indonesia Region, namely:

· Makassar City · Maros District · Takalar District · Parepare City and Siddrap District · Enrekang and Pinrang Districts · Jeneponto and Bantaeng Districts · Ambon City · Jayapura City and District

Page 134: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 116

SOUTH SULAWESI – EAST INDONESIA, Makassar City Summary Makassar City is part of Mamminasata Metropolitan Area and has a population of 1,272,349. PDAM coverage is 66.2 percent, with a total of 140,457 connections. The private sector is already supporting operations at WTP Panaikang (1,000 lps), and there are plans for WTP Tallo (2x500 lps) to be operated by private investors. The PDAM also aims to reduce NRW to 25 percent over eight years. In the sanitation sector, the PEMDA is implementing the SLBM program in four locations funded by APBN/AusAID, with software support from IUWASH serving 425 households, and 80 new CBS systems (under USRI) set to be installed over the next three years. A UPTD has been set up to manage all city sanitation programs, including Tim Mobile, supported by IUWASH.

Activities

Water Supply Sector: · Began support for PDAM Makassar on optimization and

development of distribution pipe network

Sanitation Sector: · Conducted workshops on sanitation perception of "Edukasi Perilaku

Sehat" to Sanitarians and Cadres for the KSM Health Campaign at 39 USRI and SLBM locations from 28 Puskesmas, and 78 KSM cadres. They will conduct triggering with support from Dinas Kesehatan, Dinas PU and facilitators.

· The construction of sanitation facilities of USRI program has reached 70% at 33 locations and 80% at three locations and one location under SLBM. The target is to construct sanitation facilities accessible to 12,000 people.

· Conducted public consultation on SSK with Pokja AMPL, Satker PLP of South Sulawesi province, LG of Kota Makassar, DPRD and NGO, with a total of 45 participants

Crosscutting Sector: · Supported the sanitation program through microcredit schemes · Supported the White Book on financial analysis and issues

Selviana Hehanussa / IUWASH SSEI

Public consultation on SSK with Pokja AMPL Kota Makassar on February 26, 2013, with 45 participants.

Plan for Next Quarter: · Development of initial report on optimization and development of

distribution pipe network in PDAM Makassar, using PO services · Continue O&M capacity building for KSM/BPS Sanitation · Assist Pokja AMPL in assessing the quality of the SSK · Community development for SLBM DAK APBN, AusAID Grant and

USRI program, FY 2012/2013 · Capacity building for UPTD, especially technical and management

aspects · Identification of potential access through microcredit.

Partner Coordination: · Collaboration with Satker PLP and USRI

program for implementation of sanitation program.

Page 135: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 117

SOUTH SULAWESI – EASTERN INDONESIA, Maros District Summary Kabupaten Maros is part of the Mamminasata Metropolitan Area and has a total population of 317,151 people. PDAM service coverage is 23 percent, with a total of 9,803 connections and NRW at 41.34 percent. PDAM Maros has accepted new WTP 20 LPS including main distribution pipes, supported by Satker Air Minum for the province. For secondary and tertiary distribution pipes, PEMDA Kab. Maros has allocated a budget from the 2012-2013 APBD, with pipe installation work completion planned for January 2013. PDAM Maros also plans for to establish a public-private partnership for the Bantimurung WTP through a BOT scheme, assisted by Bappenas. In 2012 IUWASH facilitated work on the city sanitation white book and sanitation strategy. The next step in MPS will be facilitated directly by PPSP.

Activities

Water Supply Sector: · Coordination meeting on preparation of new SOP for PDAM Maros

Sanitation Sector: · Assisted Pokja AMPL in writing Chapters 3-5 of SSK. The Sanitation

White Book (SWB) is already completed, with public consultation scheduled for April 2013.

· Conducted capacity building for Satker PLP of Dinas PU to prepare sanitation technology for the SLBM program in FY2013. They have three locations for SLBM program and Pamsimas.

Crosscutting Sector: · Conducted financial analysis for White Book

IUWASH South Sulawesi

Meeting of Pokja AMPL Kab. Maros to discuss 2013 sanitation program.

Plan for Next Quarter: · Support new SOP preparation, implemented through PO services · Continue support for Pokja Sanitasi for public consultation on SWB

and SSK · Preparation of community for SLBM program

Partner Coordination: · Collaboration with PDAM for finalization

of business plan

Page 136: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 118

SOUTH SULAWESI – EASTERN INDONESIA, Takalar District Summary Kabupaten Takalar is another part of the Mamminasata Metropolitan Area. In 2011, the total service coverage of the PDAM was 16.11 percent of a total population of 269,603. There are 7,237 PDAM connections and the NRW rate is 18.95 percent. PDAM Takalar has accepted a new 2x20 lps WTP including main distribution pipes supported by Satker Air Minum for the Province, and secondary and tertiary distribution pipelines supported by the APBD of Kab. Takalar and PDAM funding. Takalar has nine subdistricts (kecamatan), 14 public health centers, and 28 sanitarians. Limited STBM activities have been underway since 2009, and IUWASH began supporting this program last year.

Activities

Water Supply Sector: · Coordination meeting with PDAM Takalar on preparation of new

SOP

Sanitation Sector: · Conducted capacity building for KSM members of SLBM DAK

APBN at three locations. IUWASH supported socialization of the MCK++ system to KSM, with a target of 100 households or 500 people.

Crosscutting Sector: · Supported debt restructuring program with financial projection

IUWASH South Sulawesi

Mini Workshop of Pokja AMPL Kabupaten Takalar to introduce the implementation of sanitation program.

Plan for Next Quarter: · Support preparation of new SOP through PO services · Strengthen new GIS team for GIS system development · Conduct technical training for KSM to build MCK++ in three

locations of SLBM 2012 · Capacity building for Pokja AMPL to support sanitation program

Partner Coordination: · Satker PU PLP of South Sulawesi Province

for implementation of SLBM Program · PDAM Kab. Takalar for implementation of

water supply program

Page 137: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 119

SOUTH SULAWESI – EASTERN INDONESIA, Enrekang & Pinrang Districts Summary In 2011, PDAM coverage in Kab. Enrekang was 26 percent of a population of 208,300, with 6,234 connections. The PDAM primarily uses surface water. The Water Supply Master Plan for PDAM Parepare includes a requirement to obtain raw water from Kab. Enrekang, and IUWASH agreed to support Parepare and Enrekang to develop a raw water regionalization plan. PDAM Enrekang has accepted a new 20 lps WTP including main distribution pipes supported by Satker, and secondary and tertiary distribution pipelines supported by APBD Kab. Takalar and PDAM funding. Pinrang District is a new area selected in PY3. The total population of Pinrang District is 345,962. PDAM service coverage is 9.4 percent with 6,516 connections, and NRW is around 25.7 percent.

Activities

Water Supply Sector: · Finalizing assistance to PDAM Kab. Enrekang on spatial data

development (GIS database), through PO personal services · Coordination meeting on preparation of PDAM Kab. Pinrang

spatial data development (GIS system)

Sanitation Sector: · Presented sanitation program to Pokja AMPL and developed

collaboration with Satker PLP Kab. Enrekang, which will prepare the sanitation program for FY2013

· Discussions with Pokja AMPL on SSK implementation, including IPLT development

· With Satker PLP Dinas PU, IUWASH held discussions with KSM at two locations of MCK++ and gave some technical support to help finish construction, which is now 80 percent complete, for access by 70 households.

Crosscutting Sector: · Supported debt restructuring/financial projections

IUWASH South Sulawesi

KSM/BPS training under Sanimas program and SLBM FY2012 in Kab. Pinrang.

Plan for Next Quarter: · Conduct classroom training on evaluation and optimization of main

distribution pipeline; population and water demand projections using EPANet simulation training, by event

· Training with PDAM Pinrang on spatial data development · Capacity building for KSM/BPS and support for community

development under sanitation program · Capacity building for Pokja AMPL Kab. Enrekang, especially for

implementation of sanitation program · Discuss with Satker PLP Dinas PU Pinrang on SLBM allocation and

community development for sanitation in FY2013 · Assist Kab. Pinrang in preparing UPTD for IPLT and planning for

DED under APBN for FY2014 · Support debt restructuring/financial projections and determine

potential cooperative for microcredit program in PDAM Kab. Pinrang

Partner Coordination: · PDAMs and LGs of Pinrang and Enrekang

districts for coordination of implementation of CCVA and Raw Water Resource

Page 138: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 120

SOUTH SULAWESI – EASTERN INDONESIA, Parepare City and Sidenreng Rappang District Summary PDAM coverage in Parepare City reaches 77 percent of the total population of 129,013, with 16,452 connections. The PDAM faces problems due to a shortage of raw water, which needs to be supplied by Kab. Enrekang. IUWASH has agreed to support expansion of raw water sources. IUWASH is also collaborating with Dinas PU Kota Parepare to promote MCK++ in three locations and socialize PHBS for behavior change in targeted communities. The BCC program will focus on building the capacity of sanitarians to improve hygiene behavior, and on implementing STBM (which began in 2010) through triggering training. Kabupaten Sidenreng Rappang (Sidrap) is a new IUWASH area, with PDAM coverage at 11.50 percent (of a population of 287,918 people), 5,514 connections and a high NRW rate. The main problem is a shortage of raw water supply from Kab. Enrekang.

Activities

Water Supply Sector: · Finalizing assistance to PDAM Kota Parepare on spatial data

development (GIS database), assisted by PO personal services · Coordination meeting on implementation of spatial data

development (GIS system) with PDAM Kab. Sidrap

Sanitation Sector: · Capacity buiding for two KSMs, with construction now 60 percent

complete and due to be finished in May · Discussed with Satker PLP Kota Parepare on preparing technology

for SLBM FY 2013 and DED for IPLT · Conducted assessment and workshop with Pokja AMPL Kab. Sidrap

to prepare for joining PPSP program · Promotion of sanitation technology for FY 2013

Crosscutting Sector: · Supported sanitation program through microcredit schemes in Kota

Parepare · Supported debt restructuring/financial projections

Abdul Muin/ IUWASH SSEI

Pokja AMPL workshop on February 19, 2013, where IUWASH presented the IUWASH and sanitation programs.

Plan for Next Quarter: · Training on evaluation and optimization of distribution pipeline

using EPANet simulation training, by event · Support for new SOP preparation, through PO personal services · Support PDAM Parepare with GIS database · Training in spatial data development for PDAM Sidrap · Support Pokja AMPL Parepare in sanitation program · Continue supporting BPS organizing in three locations · Discuss with Satker Sidrap on SLBM locations for FY2013

Partner Coordination: · PDAMs and LGs of Pinrang and Enrekang

districts for coordination on implementation of CCVA and Raw Water Resource.

Page 139: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 121

SOUTH SULAWESI – EASTERN INDONESIA, Jeneponto and Bantaeng Districts Summary PDAM Jeneponto has service coverage of 10.71 percent (5,702 connections) with a total population of 334,175 people. Under the 2011 APBN program, the PDAM received a Water Treatment Plant (10 lps) including distribution pipes, and will receive an additional plant under the 2012 APBN. STBM activities have been ongoing since 2010, but only became serious with the arrival of IUWASH. Progress in STBM activity has not been fully recorded, as there are still obstacles to improved sanitation in both urban and rural areas. Bantaeng District is a new area selected for PY3. The total population of Bantaeng District is 176,699, while PDAM coverage stands at 11.5 percent, with 9,739 connections and an NRW rate of around 18.6 percent.

Activities

Water Supply Sector: · Finalizing direct assistance for PDAM spatial data development (GIS

database) · Monitoring and evaluating implementation of water quality

monitoring in Jeneponto and Bantaeng · Coordination meeting to prepare PDAM Kab. Bantaeng for spatial

data development

Sanitation Sector: · Conducted presentation for sanitarians and Kopas Utama on

sanitation technology as part of sanitation microcredit program for 40 participants, who were very enthusiastic to understand the sanitation technology, especially thiose from Kopas, which will implement the microcredit program

Crosscutting Sector: · Supported sanitation program through microcredit schemes in Kab.

Jeneponto · Held second FGD on CEM in Kab. Janeponto · Supported debt restructuring/financial projections

IUWASH SSEI

New Water Treatment Plant serving microfinance customers in Kabupaten Jeneponto.

Plan for Next Quarter: · Training on evaluation and optimization of main distribution

pipeline; population and water demand projection using EPANet simulation training, by event

· Support for preparation of new SOP through PO personal · Discuss with Satker to plan SLBM locations for FY2013 · Conduct classroom training on PDAM spatial data development

through PO personal

Partner Coordination: · Collaboration with AJI for mobilizing

media to support Watsan issues

Page 140: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 122

SOUTH SULAWESI – EASTERN INDONESIA, Ambon City Summary The total population of Ambon City is 340,000 people, with PDAM coverage of 15.6% (8,857 connections) and a very high NRW rate in excess of 60 percent. In addition, PT. DSA, a private water supply service in Ambon, has around 9,000 connections.

PDAM Ambon has received intake facilities and main distribution pipelines for Desa Passo (out of the APBN), and the Satker guaranteed that the PDAM would receive additional distribution pipelines under the 2011/12 APBN, provided there was a good DED for the whole system.

There has been a substantial sanitation program financed by SLBM/APBN in Kayu Tiga, Kec. Sirimau and Kate-Kate, Kec. Teluk Baguala, serving 325 households, with house connections beginning in December 2011. Ambon has 22 health centers spread across five districts. STBM and PHBS activities will focus on providing insight to SKPDs and community leaders, who are then expected to increase their commitment to the STBM programs.

Activities

Water Supply Sector: · Monitored progress in the PO for the DED for the Water Supply

System in Desa Passo

Sanitation Sector: · Provided assistance to the Pokja AMPL to finalize the Sanitation

White Book and SSK. Progress is at 90 percent for SWB and 80 percent for the SSK. They plan to hold a public consultation in April.

· Held discussion with Satker PLP to prepare the SLBM program for FY2013. The Satker plan to construct sanitation facilities in four locations under the SLBM and AusAID program.

· Small Grant Program: Presented interim report to Pokja AMPL and LG, which will now prepare a draft Sanitation Master Plan

Crosscutting Sector: · Supported financial analysis and issues to support development of

Sanitation White Book.

Selviana Hehanussa / IUWASH SSEI

FGD the Pokja AMPL to finalize the Pokja AMPL document on Feb 28 to March 03, 2012.

Plan for Next Quarter: · Finalize DED for Passo’s Water Supply System, through PO services · FGD on KSM and community on SLBM DAK APBN 2012 in RT 01-

03 Dusun Kayu Tiga, and Kel. BatuMerah · Prepare public consultation on Pokja AMPL document · Assist PEMDA in preparing the UPTD IPLT · Assist Murkele in implementing the grant program.

Partner Coordination: · Collaboration with Satker PLP and Air

Minum in Maluku Province to coordinate development of sanitation program.

Page 141: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 123

SOUTH SULAWESI – EASTERN INDONESIA, Jayapura District and City Summary PDAM service coverage in Jayapura stands at around 50 percent, with 27,027 connections and a single PDAM serving both Jayapura District and City. The main problems are a high NRW rate (above 50 percent), poor billing efficiency, and a lack of raw water sources. Under the APBN, the PDAM has committed to develop the water supply in Kotaraja Timur and Dalam, contingent on the PDAM receiving technical support. Jayapura has few communal sanitation systems, and the population relies on individual septic tanks, which are often of poor quality. They still practice open defecation. Improved infrastructure is needed along with behavior change activities to protect the people’s health and environment, especially Lake Sentani as its future water source.

Activities

Water Supply Sector: · Finalized the DED for the Water Supply System in Kotaraja Dalam

and Luar, and delivered it to Satker Air Minum · Supported PDAM Jayapura to complete pipe installation for Enggros

and Tobati Island water supply · Supported PDAM in water tariff socialization and customer forum

development in new service areas · Conducted training and TA on NRW reduction, by CC

Sanitation Sector: · Assisted Pokja AMPL Kota Jayapura in finalizing Sanitation White

Book (90 percent complete) and SSK (80 percent), for public consultation in April

· Discussion with Satker PLP to prepare Sanimas FY2013 · Held training on EHRA data entry with Central Statistics Bureau

(Badan Pusat Statistik or BPS) of Kab. Jayapura. Data entry and analysis has been finished, and the BPS Kab. Jayapura has passed it on to Pokja AMPL and Bappeda

· Supported sanitation program through microcredit schemes in Kota and Kab. Jayapura

Crosscutting Sector: · Supported financial analysis and Sanitation White Book issues

Agung Kurniawan / IUWASH SSEI

The Bappeda Head as Ketua Pokja AMPL opened the FGD on completion of Pokja AMPL document on February 25-26, 2013 at Hotel Muspaco.

Plan for Next Quarter: · Support PDAM program for NRW reduction · FGD for KSM and community on Sanimas FY2012 · Assist Pokja AMPL to finish Pokja AMPL document · Arrange public consultation on Pokja AMPL document · Hold kick-off meeting for sanitation grant · Assist PEMDA in preparation of UPTD IPLT · Discuss with Satker to plan SLBM locations in FY2013 · Community development for sanitation facilities in FY2013

Partner Coordination: · Collaboration with Satker PLP and Air

Minum in Papua Province for implementation of sanitation program

Page 142: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 124

Section 5

PROJECT MONITORING & EVALUATION

INTRODUCTION

This section presents progress towards IUWASH Results and Outcomes based on indicators developed and presented in the IUWASH Performance Monitoring Plan (PMP). IUWASH progress in these areas is presented under the following headings:

· High Level Results/MDG Outcomes (HR) · Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD)

· Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC)

· Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE)

Starting this fiscal year, IUWASH changed the approach to implementation of program activities from a component-based program to a sector-based program. However, this change does not affect the tracking of the achievements of IUWASH outcome indicators. All program activities in all IUWASH sectors (water supply, sanitation and crosscutting) are contributing to the existing IUWASH outcome indicators. The linkage between the program frameworks of the sectors and the outcome indicators can be seen in Annex 1. Consequently, the achievement of IUWASH outcomes is still presented under the three IUWASH technical components listed above. Progress under the first heading, High Level Results, represents cumulative achievements by the project’s three technical components of the project’s main targets. Under each component, each outcome is described by indicator, annual target, and total target over the life of the project, and progress registered to date. The outcomes highlighted in yellow contribute to the USAID Operational Plan (USAID OP) indicators. This quarter takes us midway through FY 2013 of IUWASH program implementation. Under the IUWASH PMP, IUWASH should therefore report on almost all PMP outcomes. However, the status of achievements this quarter varies, depending on the stage of the program being implemented this quarter. Several programs are at the planning or assessment stage, especially those activities in the new cities. IUWASH reports most of the quantitative achievements this quarter. These quantitative achievements are accompanied by a narrative description of the current state of progress in each outcome indicator. The IUWASH team will continue working towards achievement of the remaining outcomes, and progress will be updated in the next reporting period.

Page 143: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 125

IUWASH PROGRESS BASED ON PMP

Period: January – March 2013

High Level Results (HR): MDG Outcomes HR.1. People gain access to improved water supply as a result of US Government assistance Indicator: a. Number of people in urban areas gain access to improved water

supply as a result of US Government assistance b. Percent of households in urban area gain access to improved drinking

water source as a result of US Government assistance

Third Year Target: a) 405,500 people; b) TBD Total Target over the life of project: a) 2,000,000 people; b) TBD Cumulative Achievement (up to last PY): a) 248,760 people; b) 1.10%

Progress: This outcome is reported semi-annually. In the last six months, new connections served 100,056 households, providing increased access to 501,670 people. This figure consists of people who access new connections from PDAM connections and from the water-for-the-poor program under a master meter program. The data on the number of people who have access to safe water supply through a PDAM connection was collected from 49 PDAMs. Twenty-five of these PDAMs are new PDAM partners of IUWASH, and this quarter IUWASH used the data from these new PDAMs only for the baseline calculation, since there have been no achievements to report yet from these new partners. IUWASH will continue to count new connections from new PDAM partners over the next six months for Annual Reporting (September 2013). This figure brings the total achievement to 37.52% of the target over the life of the project. The total coverage area of PDAM partners is 8,684,843 households. The urban population within the PDAM coverage area is based on Susenas 2010 and GOI standards data, with the following assumptions: (1) for cities (Kota), the entire population is considered urban, and (2) for districts (Kabupaten), 60% of the population is considered urban. The percentage increase in households with access to safe water supply has been 1.72% this year. Detailed results on the achievement of this outcome can be found in Annex 7.1.

Page 144: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 126

High Level Results (HR): MDG Outcomes HR.2 People gain access to improved sanitation services as a result of US Government assistance Indicator: a. Number of people in urban areas gain access to improved sanitation

facilities as a result of US Government assistance b. Percent of households in urban area gain access to improved

sanitation facilities as a result of US Government assistance

Third Year Target: a) 92,150 people; b) TBD Total Target over the life of project: a) 200,000 people; b) TBD Cumulative Achievement (up to second year): a) 13,730 people; b) 5.37%

Progress: The quantitative achievement of this year is 2,398 households gaining access to improved sanitation services. This benefits 11,990 people across the IUWASH Regions. These connections are made through improved sanitation systems, including individual, communal and city sewerage systems. This figure brings the total achievement to 12.86% of the total target over the life of the project. The total number of households living in areas where improved systems have been constructed is 22,119 households, meaning that around 23.267% of households have gained access to improved sanitation services. Detailed results on the achievement of this outcome can be found in Annex 7.2.

High Level Results (HR): MDG Outcomes HR.3 Per unit water cost paid by poor in targeted communities decreases by at least 20% through more participatory, transparent, and financially enabled services Indicator: The per unit water cost paid by the poor in targeted communities decreases by at least 20% through more participatory, transparent, accountable and financially enabled services.

Third Year Target: decrease of 20% Total Target over the life of project: decrease of 20% Cumulative Achievement (up to second year): decrease of 32% (cumulatively)

Progress: Since achievements under the IUWASH water-for-the-poor program this quarter have been limited, IUWASH did not conduct a Water Cost Survey in all regions. Consequently, current progress in this achievement is unchanged on the last quarter, which recorded a decrease of 39% in water cost. That figure was taken from the last Water Cost Survey conducted in Kab. Mojokerto for the Microfinance Program. For that survey, IUWASH interviewed 230 respondents from a total population of 575 households. The cumulative results including last year’s achievements show a 35% decrease in water costs in targeted communities. This figure represents the decrease in water cost for all water used by the households surveyed, including for bathing, cleaning, cooking and drinking, as well as additional drinking water consumed from water refills or mineral water. The detailed results of the achievement of this outcome can be found in Annex 7.3.

Page 145: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 127

High Level Results (HR): MDG Outcomes

HR.4 People trained in IUWASH training type of activities Indicator: Number of people trained in IUWASH training type of activities

Third Year Target: 17,300 people Total Target over the life of project: 50,000 people Cumulative Achievement (up to second year): 13,682 people

Progress: This quarter, a total of 3,559 people benefitted from IUWASH training-related activities, with a 34.36% average participation rate for women. In total, USD 78,757.61 was spent on training activities during this reporting period. This quarter’s achievement brings the total number of people trained this year to 8,172 people while the average rate of women’s participation this year is 34.03%, and the total budget spent on training activities in the year to date is USD 190,037.32. To-date achievement including last year’s achievement is 23,423 people benefitting from IUWASH training-related activities, with a 33.98% average participation rate for women. In total USD 562,498.87, has been spent on training activities in this reporting period. This achievement represents 46.85% of the total target over the life of the program. Detailed information on this achievement, disaggregated by province, can be found in Annex 7.4.

Page 146: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 128

Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) MD.1 Household willing to pay for sanitation improvements Indicator: Number of households willing to pay for sanitation improvements

Third Year Target: 17,130 households Total Target over the life of project: 40,000 households Cumulative Achievement (up to second year): 2,113 households

Progress: The achievement of willingness to pay for sanitation improvement (MD-1) usually follows the achievement of HR-2 (number of people with increased access to improved sanitation services). This quarter, the achievement under this outcome was 2,278 households showing willingness to pay for sanitation improvements. This figure brings the total achievement to date to 4,391 households that are willing to pay for sanitation improvements, or 10.28% of the target over the life of the program. This figure comes from several surveys conducted for individual and communal systems. Willingness is shown by commitment to support the establishment of improved sanitation facilities, and payment of a monthly fee for sanitation services received. Detailed information on achievement of this outcome can be found in Annex 7.5. MD.2 Civil society groups and/or government cadres implementing programs to mobilize improved access to safe drinking water and adequate sanitation Indicator: Number of civil society groups and/or government cadres implementing programs to mobilize improved access to safe drinking water and adequate sanitation

Third Year Target: 240 civil society groups and government cadres Total Target over the life of project: 100 civil society groups and government cadres Cumulative Achievement (up to second year): 35 civil society groups and government cadre

Progress: This quarter, IUWASH continued the development and improvement of the individual and communal sanitation systems. In this program, IUWASH conducted capacity building for GOI officers and CBOs. The GOI cadres are mainly sanitarians and health officers who implement the CLTS triggering and communal system triggering. This quarter, IUWASH increased the capacity of 94 government cadres and 11 CBOs (105 in total) in 16 cities in North Sumatra, West Java/DKI Jakarta/Banten, Central Java and East Java regions. This result brings the total achievement to 140% of the total target over the life of the program. The PY3 target is now higher than the life-of-project target. If by the end of PY3 we are able to achieve the PY3 target, we will modify our PMP on this target. Detailed information on achievement of this outcome can be found in Annex 7.6.

Page 147: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 129

Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) MD.3. Civil society groups that report on PDAM operations or performance Indicator: Number of civil society groups that report on PDAM operations or performance

Third Year Target: 6 civil society groups Total Target over the life of project: 20 civil society groups Cumulative Achievement (up to second year): 0 civil society group

Progress: Up to this quarter, the quantitative achievement of this outcome has been limited. However, IUWASH has already completed all assessment stages and has identified eight CSOs across the regions that will report on PDAM performance. These CSOs are PDAM Customer Forums in eight cities – Kab. Bandung, Kota Bekasi, Kab. Purwakarta, Kota Surakarta, Kab. Mojokerto, Kab. Maros, Kab. Sidrap and Kota/Kab. Jayapura. IUWASH already has an agreement with two of the related PDAMs (PDAM Kota Surakarta and Kab. Mojokerto) to implement capacity building for PDAM customers so they can report on PDAM performance. The next activity planned is to train the PDAM staffs on promotion strategy to address several issues, including customer participation, customer forum, leadership commitment, and so on. Further progress under this outcome will be reported in the next quarter. Detailed information on achievement towards this outcome can be found in Annex 7.7. MD.4. Sanitation for the poor toolkit developed Indicator: Number of sanitation for the poor toolkits developed Third Year Target: 0 toolkit

Total Target over the life of project: 1 toolkit Cumulative Achievement (up to second year): 0 toolkit

Progress: This quarter, IUWASH together with High Five and the MOH made good progress in coordinating several stakeholders to finalize the sanitation triggering guidelines. With support from IUWASH STTAs (Scott Tobias and Andre Kuncoroyekti), IUWASH worked with other partners including the MOH and MPW to finalize the guidelines for implementation of CLTS triggering/STBM program for individual and communal systems. This quarter IUWASH reached the third of five steps in the development of the Sanitation for the Poor Toolkit. Detailed information on achievement of this outcome can be found in Annex 7.8.

Page 148: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 130

Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) MD.5. Household increased adoption of improved hygiene practices Indicator: Percent increased of household that adopted improved health and hygiene practices

Third Year Target: 0% Total Target over the life of project: 20% Cumulative Achievement (up to second year): 0%

Progress: This quarter, IUWASH conducted an intensive survey to monitor improved hygiene behavior in all five IUWASH regions. For this survey, IUWASH interviewed 1,525 respondents from 14 cities across the five IUWASH regions. Before conducting the survey, IUWASH provided training for 101 enumerators who would interview respondents. The enumerators were mostly sanitarians and STBM facilitators. The respondents were IUWASH beneficiaries who have children of school age and are involved in watsan community-based activities (individual and communal sanitation system and master meter program). As of the preparation of this report, IUWASH was still analyzing the results of the survey, for reporting in the next quarter.

Page 149: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 131

Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.1. PDAMs with improved technical, financial and management performance Indicator: Number of PDAMs with improved technical, financial and management performance

Third Year Target: 13 PDAMs Total Target over the life of project: 50 PDAMs Cumulative Achievement (up to second year): 4 PDAMs

Progress: After expanding to the new IUWASH cities, IUWASH is now supporting 50 PDAMs, starting this year. The PDAMs will implement several activities to support improved performance. The quantitative achievement of this outcome is reported annually, but for this reporting period, since this is the mid-year point, IUWASH presents the initial status of the PDAM Performance Index. This index will be updated in September 2013, when IUWASH will assess improvement in PDAM performance. The figures presented in this quarter are also used for new PDAM partners as the baseline of the PDAM performance index. The details of the support provided by IUWASH can be found in the section of this Quarterly Report concerning Progress in the Water Supply Sector, especially tasks WS-1 (Improved PDAM Operational Aspects), WS-2 (Improved PDAM Financial Aspects), WS-3 (Improved PDAM Customer Engagement), WS-4 (Raw Water and Climate Change Adaptation), WS-7 (PDAM Long-Term Finance) and WS-8 (PDAM Institutional and Governance Aspects). Detailed information on achievement of this outcome can be found in Annex 7.9. IC.2. PDAMs in default of old debts are assisted in restructuring their outstanding debts Indicator: Number of PDAMs in default of old debts are assisted in restructuring their outstanding debts

Third Year Target: 6 PDAMs Total Target over the life of project: 20 PDAMs Cumulative Achievement (up to second year): 3 PDAMs

Progress: This quarter, IUWASH continued to count this achievement under two different parts: (1) development of new debt restructuring plan; and (2) monitoring implementation of debt restructuring plan. IUWASH is supporting 12 PDAMs developing new debt restructuring plans in four regions (North Sumatra, West Java/DKI Jakarta/Banten, East Java and South Sulawesi/Eastern Indonesia). Monitoring implementation of debt restructuring plans is continuing for 16 PDAMs. This quarter IUWASH completed development of four debt restructuring plans which are now ready for submission to the MOF. These plans were developed by PDAM Kota Parepare, Kab. Enrekang, Kab. Takalar and Kab. Jeneponto. Consequently, completed achievements are the same as in the previous quarter, with IUWASH having assisted in the submission of three debt restructuring plans. This achievement constitutes 15% of the total target over the life of the program. IUWASH will continue to report on achievements in monitoring debt restructuring programs in the next quarter. Detailed information on this achievement can be found in Annex 7.10.

Page 150: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 132

Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.3. PDAMs with improved creditworthiness Indicator: Number of PDAMs with improved creditworthiness Third Year Target: 7 PDAMs

Total Target over the life of project: 20 PDAMs Cumulative Achievement (up to second year): 0 PDAMs

Progress: This quarter, the quantitative achievement under this outcome was limited. The current status of PDAMs with improved creditworthiness remains the same as when last reported. During this quarter, the development of the Creditworthiness Ladder (CWL) and its translation in Indonesian were both completed. IUWASH presented the CWL to MOF, MPW, BPPSPAM and BPKP during a national debt restructuring event in February 2013. Several positive responses and inputs were received during the meeting, and these will be incorporated in the manual. Further progress under this outcome will be provided in the next Quarterly Report. Detailed information on this achievement can be found in Annex 7.11.

IC.4. Local government institutions implementing necessary climate change adaptation measures, based on preliminary raw water sources vulnerability assessment Indicator: Number of local government institutions implementing necessary climate change adaptation measures, based on preliminary raw water sources vulnerability assessment

Third Year Target: 12 Local Governments Total Target over the life of project: 20 Local Governments Cumulative Achievement (up to second year): 0 Local Governments

Progress: Significant achievements were made this quarter under this outcome, but are not yet quantifiable. IUWASH moved to intensify implementation of Climate Change Vulnerability Assessments (CCVAs) in 14 cities across four regions (North Sumatra, West Java/DKI Jakarta/Banten, Central Java and South Sulawesi/Eastern Indonesia) and one CCVA has been completed in Kab. Mojokerto (East Java). IUWASH is targeting work on developing the CCVA in 20 cities over the life of the project. Besides implementation of CCVA, this quarter IUWASH continued to support construction of 800 infiltration ponds in Sibolangit and 650 infiltration ponds in the upper catchment area of Kab. Mojokerto with financial support from CCFI. Further progress towards this outcome will be updated in the next Quarterly Report. Detailed information on this achievement can be found in Annex 7.12.

Page 151: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 133

Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.5. Local Governments implementing integrated sanitation and hygiene interventions reflected in their citywide sanitation strategic (CSS) plans Indicator: Number of local governments implementing integrated sanitation and hygiene interventions that reflect their citywide sanitation strategic plans

Third Year Target: 14 Local Governments Total Target over the life of project: 20 Local Governments Cumulative Achievement (up to second year): 0 Local Governments

Progress: This quarter, IUWASH continued to support implementation of LG sanitation programs in 53 cities. IUWASH mostly works with the Sanitation Working Groups (Pokja Sanitasi/AMPL) in several program areas, including development and review of the Sanitation White Book and City Sanitation Strategy (CSS), collaborating with the PPSP Program, which is also supporting a number of IUWASH cities to develop the White Book and SSK, and construction of several sanitation facilities. All sanitation programs should ideally be based on the City Sanitation Strategy. IUWASH will continue to urge LGs that do not yet have CSS to join with PPSP program. For LGs that already have CSS, IUWASH will start to support implementation of their sanitation programs based on the CSS. Annex 7.13 provides detailed information on IUWASH’s support for CSS development and implementation of the sanitation program, contributing to increased access for people to improved sanitation services. IUWASH will continue to measure achievement of this outcome in the next quarter. IC.6. Small and medium business providing affordable construction and sanitation facility management services Indicator: Number of small and medium businesses providing affordable construction and sanitation facility management services

Third Year Target: 9 SMEs Total Target over the life of project: 30 SMEs Cumulative Achievement (up to second year): 0 SMEs

Progress: This quarter, two Small Medium Enterprises (SMEs) were established to support the development of affordable sanitation facilities, one in Kab. Tangerang (CV Jati Mulya) and the other in Kab. Lamongan (Hippams). CV Jati Mulya supports the construction of individual latrine facilities (toilets and septic tanks) at a price of IDR 500,000 and using a credit system. Hippams support for the construction of individual latrine facilities comes at a price of IDR 1,200,000. IUWASH’s support to these SMEs is being provided through several activities, including promotion and marketing support, TA for sanitation technology, linkages with financial institutions, sanitation entrepreneur training, and facilitation of links with sanitarians and the health office (Dinkes). This achievement brings the total to 13.33% of the target over the life of the project. The progress under this outcome will be updated in the next quarter. Detailed information on achievements this quarter can be found in Annex 7.14.

Page 152: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 134

Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.7. Poor residents in targeted communities who report greater satisfaction with water and sanitation services Indicator: Increased percentage (%) of poor residents in targeted communities who report greater satisfaction with water and sanitation services

Third Year Target: 0% Total Target over the life of project: 20% Cumulative Achievement (up to second year): 0%

Progress: The quantitative achievement under this outcome is measured during surveys at the community level, and will be part of the survey on improved hygiene behavior, especially in locations with master meters and other sanitation programs. This quarter IUWASH was at the analysis stage for the survey. The results of the survey will be reported in the next quarter. In terms of program interventions to support this outcome, IUWASH plans to continue the master meter program in several provinces (North Sumatra, DKI Jakarta, Banten, Central Java and East Java). This quarter, a final version of the master meter evaluation report was completed. One of the main conclusions was that wherever the PDAM can provide water of sufficient quantity and pressure, households are very satisfied with the system and are prepared to pay the stipulated tariff. But if the PDAM service deteriorates, as has been the case in Belawan (Medan), the satisfaction level drops and the CBO faces problems collecting fees from households. Progress under this outcome will continue to be measured in the next quarter.

Page 153: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 135

Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) EE.1. Participating local governments that put greater priority on safe drinking water and sanitation through supportive local policies and budget allocation increases Indicator: Number of participating local governments that put greater priority on safe drinking water and sanitation through supportive local policies and budget allocation increases

Third Year Target: 17 Local Governments Total Target over the life of project: 50 Local Governments Cumulative Achievement (up to second year): 3 Local Governments

Progress: This quarter, achievement under this outcome continued to be monitored, especially in respect of increased Local Government (LG) budgets for water and sanitation programs. Based on the results of data collection on LG budgets (APBD), among the 54 LGs, IUWASH has only been able to present APBD data for FY 2012 for 48 cities. Efforts to compile APBD data for FY 2013 will continue, and will be reported in September 2013. In the APBD data on new cities, IUWASH has provided baseline data for the last three years (2010, 2011 and 2012). In the area of improved LG policy, IUWASH supported 20 cities to improve and develop policies that support Watsan sectors. The summary table for this outcome shows that achievements this quarter are unchanged since September 2012, when 3 cities (Kota Bogor, Kota Surakarta and Kab. Kendal) placed greater priority on safe drinking water and sanitation sectors. That achievement represents 6% of the total target over the life of the program. IUWASH will continue to monitor this achievement in the next quarter. Detailed information on this achievement can be found in Annex 7.15a, 7.15b and 7.15c. EE.2. PDAMs or local governments obtain access to long-term funding for water or sanitation investment plans Indicator: Number of PDAMs or local government obtain access to long-term funding for water or sanitation investment plans

Third Year Target: 7 PDAMs Total Target over the life of project: 15 PDAMs Cumulative Achievement (up to second year): 0 PDAMs

Progress: The quantitative achievement under this outcome has been limited. IUWASH continues to provide various technical assistance for PDAMs to obtain long-term finance, so that 11 PDAMs can support 14 projects in their areas. Progress this quarter is still at various stages. Detailed activities are described in Annex 7.16. The long-term financing scheme includes financing options such as Perpres 29, Business-to-business (B2B) and PPP. In Kendal district, it may also be combined with an LG loan. IUWASH will measure the achievement of this outcome in the next quarter.

Page 154: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 136

Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) EE.3. Percent increased (%) in financial resources accessed by service providers from public and private sources for expansion of improved Watsan services Indicator: Increased percentage (%) in financial resources accessed by service providers from public and private sources for expansion of improved water and sanitation services

Third Year Target: 10% Total Target over the life of project: 10% Cumulative Achievement (up to second year): 3.47%

Progress: During this reporting period, the financial resources accessed by service providers from public and private sources for expansion of improved water and sanitation services totaled $24,022.22. This figure is derived from microfinance programs for water connection and improved sanitation services implemented in West Java/DKI Jakarta/Banten, East Java and South Sulawesi/Eastern Indonesia. A detailed description of this achievement can be found in Annex 7.17. This figure represents 3.64% of the total target over the life of the program. The setting of a baseline figure to measure achievement of this outcome was one of the baseline activities under Outcome EE-1. The target for this outcome is USD 28 million (10% of the baseline figure) over the life of the project. This quarter, IUWASH tentatively uses the baseline for the old cities because data collection from the APBD is still ongoing. Starting next quarter, IUWASH will be able to present new baseline figures that will be used for the remainder of the program. More progress under this outcome will be reported next quarter. EE.4. Low income households accessing micro finance for household improvements in water and sanitation Indicator: Number of low-income households accessing microfinance for household improvements in water and sanitation

Third Year Target: 6,300 households Total Target over the life of project: 40,000 households Cumulative Achievement (up to second year): 2,848 households

Progress: This quarter, achievement under this outcome was three new PDAM connections for water supply using a microcredit scheme in Pinrang district (South Sulawesi) and188 households accessing improved individual sanitation services using a microcredit scheme in Kab. Lebak (Banten), Kab. Sidoarjo, Kota Surabaya and Kab. Jombang (all East Java) and Kab. Jeneponto (South Sulawesi). These figures mean that a total of 191 low-income households are accessing microfinance for household improvements in water supply and sanitation services. These connections will benefit at least 955 people. This achievement brings the total to 3,795 new household connections benefitting at least 18,975 people, representing 9.49% to the total target over the life of the program. Detailed achievements under this outcome can be found in Annex 7.18a, 7.18b and 7.18c.

Page 155: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 137

Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) EE.5. Local Governments adopt new or improved mechanisms for citizens to engage local government in water and sanitation Indicator: Number of Local Governments adopt new or improved mechanisms for citizens to engage local government in water and sanitation

Third Year Target: 12 Local Governments Total Target over the life of project: 20 Local Governments Cumulative Achievement (up to second year): 0 Local Governments

Progress: The quantitative achievement this year is limited. However, IUWASH has conducted specific activities supporting improvements to Citizen Engagement Mechanisms. This quarter, IUWASH conducted several activities, including several meetings and FGDs with stakeholders in North Sumatra, West Java/DKI Jakarta/Banten and Central Java regions. The meeting and FGD are part of the assessment to improve the existing CEM to support Watsan sectors. More progress under this outcome will be reported in the next quarter.

Page 156: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 138

ANNEXES

ANNEX 1: IMPLEMENTATION OF IUWASH PROGRAM FRAMEWORK

Lead Spec. Supporting Spec. Targeted Outcomes

Water Supply Programs (8) PDAM Operational Aspects UWSS MFS HR-1. IC-1 PDAM Financial Aspects MFS UWSS, GS HR-1, IC-1, IC-2, IC-3 PDAM Customer Aspects UWSS BCC HR-1, MD-3, IC-1 Raw Water & Climate Change UWSS GS IC-4, EE-1 Micro Finance Water Supply MFS BCC, UWSS HR-1, HR-3, EE-4 Master Meter program UWSS BCC HR-1, HR-3, MD-2, MD-5, IC-7 PDAM Long-Term Finance MFS GS, UWSS EE-2, EE-3, EE-1 PDAM Institutional support GS UWSS, MFS IC-1, EE-1 Sanitation Programs (5) Individual system BCC USS, GS, MFS HR-2, MD-1, MD-2, MD-5, IC-6, IC-7, EE-4 Communal system BCC USS, GS, MFS HR-2, MD-1, MD-2, MD-5, IC-6, IC-7, EE-4 Sewerage USS BCC, MFS, GS HR-2, MD-1, IC-5, EE-1 Urban Sludge Management USS BCC, MFS, GS HR-2, MD-1, IC-5, EE-1 Pokja Sanitasi/AMPL USS BCC, MFS, GS IC-5 Crosscutting Programs (5) PEMDA Policies GS BCC, UWSS, USS, MFS EE-1, EE-2, IC-4, IC-5 PEMDA/APBD budget MFS GS, UWSS, USS EE-1, EE-2, Citizen Engagement GS BCC, UWSS, USS EE-5, MD-3 Gender Mainstreaming Gender

Team BCC, UWSS,USS, MFS, GS

No specific targeted outcome

CSR BCC UWSS,USS, MFS, GS EE-3, MD-1, MD-2, IC-4, Point of Use & HWWS BCC UWSS, USS MD-5 Notes: Outcome HR-4 will be contributed by all training-related activities conducted by all sectors Outcome MD-4 will be achieved by a set of specific activities to produce a sanitation-for-the-poor toolkit

Page 157: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 139

ANNEX 2: WATER SUPPLY MATRIX

total

WS 5 WS 6

Energ

y Effic

iency

Non R

even

ue W

ater R

educ

tion

Distr

ibutio

n Netw

ork Im

prove

ment

Prod

uctio

n Cap

acity

Op

timaliz

ation

GIS

/ MIS

supp

ort

PDAM

Bus

iness

Plan

Tariff

revie

w / R

eclas

sifica

tion

Billing

& A

ccou

nting

Prog

rams

Debt

Restr

uctur

ing

Custo

mer S

atisfa

cion s

urvey

Real

Dema

nd S

urvey

/ Sen

sus

Custo

mer c

ompla

int ha

ndling

Media

relat

ion &

camp

aigns

CC V

ulnera

bility

asse

ssme

nt

Imple

menta

tion s

umur

Rese

pan

CCAd

aptio

n Acti

on P

lan

Micro

Fina

nce f

or Wa

ter S

upply

Maste

r Mete

r prog

rams

Analy

sis &

pre-F

S

Finan

cing o

ption

s

Proje

ct Pr

epara

tion

Cred

it Wort

hines

s Lad

der

PDAM

inter

nal/m

anag

emen

t

Cap B

. sen

ior: D

P, DP

RD, S

KPD

Regio

nalisa

tion R

aw W

ater

syste

mRe

giona

lizatio

n PDA

M

711 PDAM Kota Binjai O O C O C O 62 PDAM Kota Medan C O O O O O 63 PDAM Kota Tebing Tinggi C O O C O C O O 84 PDAM Kota Pematang Siantar O C O O O C O O C O O 115 PDAM Kota Tanjung Balai C C O O C O O O O 96 PDAM Kab. Langkat O O O O O O O O O O 107 PDAM Kota Sibolga O O O O O O O O 88 PDAM Kab Asahan O O O O O 59 PDAM Kab Labuhan Batu O O O O O O O O 8

6810 PDAM Kab. Karawang C O O O O O O O 811 PDAM Kota Bogor O O O O O O 612 PDAM Kota Bekasi O O O O O O O O O 913 PDAM Kab Bekasi O O O O 414 PDAM Kab Purwakarta O O O O O O O O 815 PDAM Kab. Bandung O O O O O O O 716 PDAM Kab. Serang O O O O O O O O O 917 PDAM Kab. Lebak O O O O O O O 718 PDAM Kab.Tangerang/TangSel O O O C O O O O 819 PT Palyja / AETRA O O 2

8620 PDAM Kota Semarang C O C C O C O O O O O O 1221 PDAM Kota Surakarta C O O O O O O O 822 PDAM Kab. Kudus C C C C O O O O O 923 PDAM Kab. Kendal C C C C O O C O O O O O 1224 PDAM Kab. Semarang C C O C O O O O O O O O O O 1425 PDAM Kota Salatiga O O O O O O 626 PDAM Kab Rembang O O O O O O 627 PDAM Kab Sukoharjo O O O O O O 628 PDAM Kab Klaten O O O O O O O 729 PDAM Kab. Batang O O O O O O 6

8930 PDAM Kab. Sidoarjo O O O O 431 PDAM Kota Surabaya O O O O 432 PDAM Kab. Gresik C O O O O C C O 833 PDAM Kab. Lamongan C O O O O O O O O O O O O 1334 PDAM Kota Probolinggo O O O O O O O O 835 PDAM Kab Probolinggo O O O O O O C O O O 1036 PDAM Kota Mojokerto O O O O 437 PDAM Kab. Mojokerto O O O O O C O O O O O 1138 PDAM Kab Jombang O O O O O C O 739 PDAM Kota Malang O O O O O 540 PDAM Kab Malang O O O O O O O 741 PDAM Kota Batu O O O O C O O O 8

6442 PDAM Kota Makasar O O 243 PDAM Kab Takalar O C O O O O O 744 PDAM Kab Maros C C O O C O O O 845 PDAM Kab Jeneponto O O C O C O O O O 946 PDAM Kota Pare-Pare O C C C O O O O 847 PDAM Kab Enrekang O C O C O O O O O 948 PDAM Kab Pinrang O O O O O 549 PDAM Kab Sidrap O O O O 450 PDAM Kab Bantaeng O O O 351 PDAM Kota Ambon O O O 352 PDAM Kab./Kota Jayapura O C C O O O 6

O : Ongoing / Planned 2 17 18 5 16 20 14 13 28 3 0 8 9 18 2 9 24 6 6 7 6 25 17 43 7 3 326C : Completed 5 4 6 2 7 3 3 4 4 6 2 0 0 1 1 0 0 0 3 1 0 0 0 0 0 0 52TOTAL 7 21 24 7 23 23 17 17 32 9 2 8 9 19 3 9 24 6 9 8 6 25 17 43 7 3 378

South Sulawesi & Eastern Indonesia

North Sumatra

West Java , Banten & DKI

USAID / IUWASH

Water Supply Programs

update: Oct 2012 - March 2013

Central-Java

East-Java

WS 1 WS 2 WS 3

Long Term Finance

PDAM Insitutional support

WS 4 WS 7 WS 8

PDAM Operational Aspects

PDAM financial Aspects

PDAM Customer Aspects

Raw Water / Climate Change

Water for Poor

Page 158: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 140

ANNEX 3: SANITATION MATRIX

Capa

city Bu

ilding

(cad

re, CB

O, et

c)

STBM

aware

ness

/ trigg

ering

Cons

tructio

n Ind

ividua

l latrin

es

micro

finan

ce (re

v. fun

d), SM

E, CS

R

Impro

ved H

ygien

e Prac

tices

Comm

unity

Prepa

ration

/ Trai

ning

Cons

tructio

n Com

m sys

tem

mobil

ize m

icrofi

nanc

e / SM

E/ CS

R

Post c

onstr

uctio

n sup

port

Impro

ved H

ygien

e Prac

tices

Promo

tion /

Mark

eting

Prog

rams

Tech

nical

supp

ort (F

S, DE

D, dll

)

Institu

tiona

l (lon

g term

) fina

nce

impro

ved s

ludge

syste

ms (p

ilots)

IPLT d

esign

(revie

w / ne

w)

mobil

ize m

icrofi

nanc

e / SM

E/ CS

R

Promo

tion /

mark

eting

camp

aigns

PPSP

-12 fa

cilitat

ion (n

ew / r

eview

)

PPSP

-201

4 prep

aratio

n

Stren

gthen

Pokja

(AMP

L/San

itasi)

CSR f

or Po

kja A

PML/S

anita

tion

Institu

tiona

l supp

ort (U

PTD,

PDAM

)

261 Kota Binjai O C O O 42 Kota Medan C O O O C O O O 83 Kota Tebing Tinggi O O O C C O O 74 Kota Pematang Siantar C O 25 Kota Tanjung Balai O O O 36 Kab Langkat 07 Kota Sibolga O 18 Kab Asahan 09 Kab Labuhan Batu O 1

8410 Kab. Karawang O O O O O 511 Kota Bogor O O O O O O O O O O O O O O O 1512 Kota Bekasi O O O 313 Kab Bekasi O O C O O 514 Kab Purwakarta O O O O 415 Kab Bandung O O O O O O O O O O 1016 Kab. Serang O O O O O O O O O O O 1117 Kab. Lebak O O O O O O 618 Kab. Tangerang O O O O O O O O O C 1019 Kab. Tangerang Selatan O O 220 DKI - Jakarta C O O C O O O O O C O O O 13

6021 Kota Semarang O O USRI O O O O O O C O 1122 Kota Surakarta O USRI O O O O O O O O O O 1223 Kab. Kudus O USRI O O O 524 Kab. Kendal O O O O C 525 Kab. Semarang O O O C 426 Kota Salatiga O O O 327 Kab Rembang O USRI O O O O 628 Kab Sukoharjo O USRI O O O 529 Kab Klaten O USRI O O O 530 Kab. Batang O O O O 4

11531 Kab. Sidoarjo O O O O O O O O O O O O 1232 Kota Surabaya O O O O O USRI 633 Kab. Gresik O O O O O USRI O O O O O 1134 Kab. Lamongan O O O O O O O C 835 Kota Probolinggo O O O O O O USRI O O O O O O O O O 1636 Kab. Probolinggo O O O O O O O O 837 Kota Mojokerto O 138 Kab. Mojokerto O O O O O O O 739 Kab Jombang O O O O O USRI O O O O O O 1240 Kota Malang O O O O O O USRI O O O O O 1241 Kab Malang O O O O O O USRI O O O O O 1242 Kota Batu O O O O O USRI O O O O 10

9943 Kota Makasar O O USRI O O O O O O O O O O O O 1544 Kab. Takalar O O O O O O O O O 945 Kab. Maros O O 246 Kab. Jeneponto O O O O O O O O O O O O O 1347 Kab.Bantaeng O 148 Kota Pare-Pare O O O O O O O O O O O O O O 1449 Kab. Enrekang O O 250 Kab. Pinrang O O O O O O O O O 951 Kab. Sidrap O O O O O O O O 852 Kota Ambon O O O O O O O O O O 1053 Kab Jayapura O O 254 Kota Jayapura O O O O O O O O O O O O O O 14

O : Ongoing/Planned 24 21 19 19 13 38 34 6 29 34 14 3 8 12 5 12 9 6 4 25 8 26 369C : Completed 0 1 0 0 1 0 0 0 0 0 2 2 0 0 1 0 0 6 1 0 1 0 15

24 22 19 19 14 38 34 6 29 34 16 5 8 12 6 12 9 12 5 25 9 26 384

total

West Java , Banten & DKI

Central-Java

East-Java

South Sulawesi & Eastern Indonesia

USAID / IUWASH

Urban Sanitation Programs

update: Oct - Dec 2012

Individual systems Off Site

North Sumatra

Communal systems Support Pokja Urban Sludge SAN 1 SAN 2 SAN 3 SAN 4 SAN 5

Page 159: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 141

ANNEX 4: LIST OF POLICIES DEVELOPED ACROSS THE IUWASH REGION

Location Policy Subject Progress Through QPR 8/PY3

1 Kota Tanjung Balai Business Plan Preliminary assessment (1.1) 2 Kota Tebing Tinggi Perda Urban Sludge

Management and Business Plan Both are in preparation of draft (3.1) for discussion with Pemda

3 Kota Pematang Siantar PDAM equity participation and

business plan

Preparation of draft for discussion for business plan. Preliminary assessment for equity participation (1.1)

4 Kab. Langkat Business Plan and Tariff adjustment.

Preparation of draft for discussion for business plan. Preliminary assessment for tariff adjustment (1.1)

5 Kab. Labuhan Batu Business Plan Preliminary assessment business plan 6 Kota Medan Perda Urban Sludge

Management Preliminary assessment for Urban sludge management (1.1)

7 Kota Sibolga Business Plan and Tariff adjustment.

Preliminary assessment business plan and tariff adjustment

8 Kab. Asahan - - 9 Kota Binjai - - 10 Kab. Karawang Water Tariff and reclassification

Household Prepare to develop discussion with stakeholder (2.1)

11 Kota Bogor UPTD Development and Organization structure PDAM

Completed finish (4.1)

12 Kota Bekasi UPTD Development Preliminary to review existing policy (1.1) 13 Kab. Bekasi UPTD Development Preliminary to discuss the new policy with

stakeholder (1.3) 14 Kab. Purwakarta Water Tariff and reclassification

Household Develop- coordinate with stakeholder to set up team.

15 Kab. Bandung UPTD Development Preliminary to review existing policy and compare (1.2)

16 Kab. Serang Regionalization/MOU Preliminary to review existing policy (1.1) 17 Kab. Lebak Water Tariff Preliminary to review existing policy (1.1) 18 Kab. Tangerang Bulk Water to PDAM Lebak Preliminary to review existing policy (1.1) 19 Kota Tangerang

Selatan Regionalization/MOU Preliminary to review existing policy (1.1)

20 Kota Semarang mmunity Based Watsan and TD establishment

Preliminary to review existing policy (1.1)

21 Kota Surakarta aste water Tariff Present the final report to related stake holders (3.3)

22 Kab. Kudus UPTD establishment Preliminary to review existing policy (1.1) 23 Kab Kendal RAD AMPL Present the final report to related stake

holders (3.3) 24 Kab Semarang Penyertaan Modal (equity

participation) Preliminary to review existing policy (1.1)

25 Kota Salatiga UPTD establishment Preliminary to review existing policy (1.1) 26 Kab. Rembang UPTD establishment Preliminary to review existing policy (1.1) 27 Kab. Sukoharjo UPTD establishment Preliminary to review existing policy (1.1) 28 Kab. Klaten Customer reclassification Present the final report to related stake

holders (3.3) 29 Kab. Batang UPTD establishment Preliminary to review existing policy (1.1) 30 Kab. Sidoarjo UPTD establishment and Perda

for sanitation operational. Preliminary to review existing policy (1.1)

31 Kota Surabaya -

Page 160: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 142

Location Policy Subject Progress Through QPR 8/PY3

32 Kab. Gresik Tariff adjustment and UPTD establishment.

Preliminary to discuss with stakeholders (1.3)

33 Kab. Lamongan Business Plan and equity participation

Develop content to be discussed with stakeholder (3.1)

34 Kota Probolinggo UPTD establishment Preliminary to review existing policy (1.1) 35 Kab. Probolinggo Business Plan, equity

participation and raw water protection (climate change).

Preliminary to review existing policy (1.1)

36 Kab. Mojokerto Business Plan and raw water protection (climate change).

Preliminary to review existing policy (1.1)

37 Kota Mojokerto - - 38 Kab. Jombang Perbup: UPTD establishment

and Business Plan. Preliminary to review existing policy (1.1)

39 Kota Malang Perwali : UPTD establishment Preliminary to review existing policy (1.1) 40 Kab. Malang Perbup: UPTD establishment,

CLTS and raw water protection. Preliminary to review existing policy (1.1)

41 Kota Batu Perwali : UPTD establishment and raw water protection.

Preliminary to review existing policy (1.1)

42 Kota Makassar Wastewater Management Unit Present the final report to related stake holders (3.3)

43 Kab. Takalar Perbup : Equity participation and CEM

CEM : Present the final report to related stake holders (3.3) Equity participation : Assessment existing policy and needs (1.1)

44 Kab. Maros Perbup : Equity participation Equity participation : Assessment existing policy and needs (1.1)

45 Kab. Jeneponto Perbup : Equity participation and CEM

CEM : Present the final report to related stake holders (3.3) Equity participation : Assessment existing policy and needs (1.1)

46 Kab. Bantaeng Perbup : CEM Assessment existing policy and needs 47 Kota Parepare Perwali : Regionalization of raw

water source, UPTD establishment and CEM.

CEM: Present the final report to related stake holders (3.3) others are assessment existing policy and needs (1.1)

48 Kab. Enrekang Perbup : Regionalization of raw water source, business plan and CEM.

All are assessment existing policy and needs (1.1).

49 Kab. Sidrap Perbup : Regionalization of raw water source

All are assessment existing policy and needs (1.1)

50 Kab. Jayapura Perbup : Illegal connection Present the final report to related stake holders (3.3)

51 Kota Jayapura Perwali : Waste water institution establishment

All are assessment existing policy and needs (1.1)

52 Kab. Pinrang Perbup : Regionalization of raw water source and business plan.

All are assessment existing policy and needs (1.1).

Page 161: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 143

ANNEX 5: STATUS OF DEVELOPMENT OF PARTNERSHIP AGREEMENTS

Status of Development of Partnership Agreement

No Province No City

Date of Signing of Partnership Agreement

(OLD CITIES)

Progress in Development/Date of Signing of Partnership

Agreement (NEW CITIES) 1 North

Sumatra 1 Kota Medan 26 September 2011 2 Kota Binjai 3 October 2011 3 Kota Tebing Tinggi 3 October 2011 4 Kota Pematang Siantar 3 October 2011 5 Kota Tanjung Balai 3 October 2011 6 Kabupaten Langkat Phase 1: 29 September

2011 In process of signing by the Bupati

7 Kota Sibolga 19 November 2012 8 Kabupaten Asahan 1 October 2012 9 Kabupaten Labuhan

Batu 31 October 2012

2 West Java 10 Kota Bogor 22 November 2011 11 Kota Bekasi 30 November 2011 12 Kabupaten Bekasi · 19 December 2011

(with LG) · 31 July 2012 (with

Bappeda) · 31 July 2012 (with

REI)

13 Kabupaten Karawang 30 November 2011 14 Kabupaten Bandung No need to develop PA with

LG Kab. Bandung. They refer to the SK Menkokesra No. 6/KEP/MENKO/KESRA/1/2011

15 Kabupaten Purwakarta 6 Maret 2013 3 DKI

Jakarta 16 DKI Jakarta 24 October 2011

4 Banten 17 Kabupaten Tangerang · 19 September 2011 (with GOI)

· 31 July 2012 (with Perpamsi Banten)

18 Kabupaten Serang · 10 November 2011 (with PDAM)

· 22 August 2011 (with GOI)

19 Kabupaten Lebak 16 August 2011 (with PDAM)

5 February 2013 (with LG)

20 Kota Tangerang Selatan 7 December 2012 5 Central

Java 21 Kota Semarang 20 December 2011 22 Kabupaten Semarang 24 October 2011 23 Kabupaten Kudus 22 December 2011 24 Kota Surakarta 1 February 2012 25 Kabupaten Kendal 9 December 2011 26 Kota Salatiga Under review by Bappeda 27 Kabupaten Rembang Final draft has been release by

Legal Office. Now is in process for translation

Page 162: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 144

No Province No City

Date of Signing of Partnership Agreement

(OLD CITIES)

Progress in Development/Date of Signing of Partnership

Agreement (NEW CITIES) 28 Kabupaten Sukoharjo Under review by Legal Office 29 Kabupaten Klaten Under review by Legal Office 30 Kabupaten Batang Under review by Bappeda

6 East Java 31 Kabupaten Lamongan 26 October 2011 32 Kabupaten Gresik 26 October 2011 33 Kabupaten Sidoarjo 26 October 2011 34 Kabupaten Mojokerto 26 October 2011 35 Kota Probolinggo 26 October 2011 36 Kota Surabaya N/A 37 Kota Mojokerto 1 November 2012 38 Kabupaten Probolinggo 1 August 2012 39 Kabupaten Jombang 1 November 2012 40 Kota Malang Still in the discussion with

Sekda 41 Kabupaten Malang 26 November 2012 42 Kota Batu 1 November 2012

7 South Sulawesi

43 Kota Makassar 16 November 2011 44 Kabupaten Maros 16 November 2011 45 Kabupaten Takalar 16 November 2011 46 Kabupaten Jeneponto 16 November 2011 47 Kota Parepare 16 November 2011 48 Kabupaten Enrekang 16 November 2011 49 Kabupaten Pinrang 24 October 2012 50 Kabupaten Sidrap 25 October 2012 51 Kabupaten Bantaeng 24 October 2012

8 Maluku 52 Kota Ambon 7 September 2011 9 Papua 53 Kota Jayapura 15 August 2011 54 Kabupaten Jayapura 15 August 2011

Summary:

· Total Partnership Agreement (PA) signed in cities of first batch (2011): 33 cities. Several cities received partial support, the PA signed by direct institution supported (PDAM or Bappeda).

· Total Partnership Agreement (PA) signed in cities of second batch (2012): 15 cities (including Kab. Lebak that renew the PA with LG. In 2011 since Kab. Lebak only receive support in water supply, the PA was signed directly by PDAM)

· Partnership Agreement (PA) in process: 7 cities (including Kab. Langkat that need to renew the PA signed by the Bupati. In 2011 the PA was signed by PDAM Kab. Langkat)

Page 163: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 145

ANNEX 6: MATRIX MANAGEMENT CHART

3-Apr-13 Implementation Area

/Lead Advisor

Team Lead /

Functional Area

National Coordinator North Sumatra West Java/

DKI/Banten

Central Java East Java South Sulawesi/

Eastern Indo

Program Coordination,

COP/DCOP

Louis O'Brien /

Foort BustraanAlifah Lestari Subahri Ritonga Endah Shofiani Jefry Budiman

Laksmi

CahyaniwatiBudi Raharjo

WS 1 - PDAM

Operational AspectsFoort Bustraan Hernadi Setiono Ferry Boyke Agus Nugraha Ronny Sutrisno Rudhy Finansyah Ridwan Habibie

WS 2 - PDAM Financial

AspectsPurwoko Hadi

Benny Djumhana / *Nugroho Andwiwinarno

Sigit PurwantoBlandina

MandianganArif Wibowo Rudy Jusdian Much Zuchry

WS 3 - PDAM

Customer AspectsSri Hardijanti Yulfarida Ferry Boyke Usniaty Umayah

Dwi Anggraheni

HermawatiRudhy Finansyah Ridwan Habibie

WS 4 - Raw Water &

Climate ChangeFoort Bustraan Adi Rahman Ferry Boyke Agus Nugraha Ronny Sutrisno Rudhy Finansyah Ridwan Habibie

WS 5 - Microfinance Purwoko Hadi Gusril Bahar Sigit PurwantoBlandina

MandianganArif Wibowo Rudy Jusdian Much Zuchry

WS 6 - Master Meter Foort Bustraan Hernadi Setiono Ferry Boyke Agus Nugraha Ronny Sutrisno Rudhy Finansyah Ridwan Habibie

WS 7 - PDAM Long

term FinancePurwoko Hadi

Benny Djumhana / *Nugroho Andwiwinarno

Sigit PurwantoBlandina

MandianganArif Wibowo Rudy Jusdian Much Zuchry

WS 8 - PDAM

Institutional supportPurwoko Hadi

Benny Djumhana / * Nugroho Andwiwinarno

Zulkifli Kahar Ahmad Rosyid Yudi WijanarkoKresna

BudidarsonoHanny Singgih

SAN 1 - Individual

systemSri Hardijanti Kuwat Karyadi Hetty Tambunan Usniaty Umayah

Dwi Anggraheni

HermawatiRistina Aprillia Suhartini

SAN 2 - Communal

systemSri Hardijanti Kuwat Karyadi Hetty Tambunan Usniaty Umayah

Dwi Anggraheni

HermawatiRistina Aprillia Selviana Hehanussa

SAN 3 - Sewerage

systemsFoort Bustraan Eri Arianto Mohammad Yagi Said Prijadi Oni Hartono Arief Riyadi Selviana Hehanussa

SAN 4 - Urban Sludge

ManagementFoort Bustraan Achdiat Antono Mohammad Yagi Said Prijadi Oni Hartono Arief Riyadi Selviana Hehanussa

SAN 5 - Pokja Sanitasi /

AMPLFoort Bustraan Achdiat Antono Mohammad Yagi Said Prijadi Oni Hartono Arief Riyadi Selviana Hehanussa

CC 1 - PEMDA policies Purwoko HadiBenny Djumhana / * Nugroho Andwiwinarno

Zulkifli Kahar Ahmad Rosyid Yudi WijanarkoKresna

BudidarsonoHanny Singgih

CC 2 - APBD budget Purwoko HadiBenny Djumhana / * Nugroho Andwiwinarno

Sigit PurwantoBlandina

MandianganArif Wibowo Rudy Jusdian Much Zuchry

CC 3 - Citizen

Engagement Purwoko Hadi Yulfarida Zulkifli Kahar Ahmad Rosyid Yudi Wijanarko

Kresna

BudidarsonoHanny Singgih

CC 4 - PoU Water and

Handwashing with SoapSri Hardijanti Kuwat Karyadi Hetty Tambunan Usniaty Umayah Dwi Hermawati Ristina Aprillia Suhartini

CC 5 - Gender

MainstreamingAlifah Lestari Alifah Lestari Mohammad Yagi Usniaty Umayah Dwi Hermawati Achmad Dardiri Suhartini

CC 6 - Corporate Social

ResponsibilitySri Hardijanti Sri Hardijanti Muhammad Yagi Usniaty Umayah Dwi Hermawati Rudy Jusdian Selviana Hehanussa

GIS Support Foort Bustraan Sabdo Sumartono Ferry Boyke Agus Nugraha Ronny Sutrisno Rudhy Finansyah Ridwan Habibie

Grant Management &

monitoringSie Ket Liong Esa Muharmis Nabawi Madjid Sihol Sinaga Chairun Nadirin

Monitoring / Evaluation

(PMP)Subahri Ritonga

Nur Endah

ShofianiJefry Budiman

Laksmi

CahyaniwatiBudi Raharjo

Finance Nelly Putri Tengku Afriyenni Lidia Lestari Sherly Tulung Chatarina Silvy Ira Leman

Administration Siti Wahyuni Zubaidah Maria Meyta Ylo Chatarina Meity Nana Noerhajati Ivonny Ndaparoka

Procurement Siti Wahyuni Sie Ket Liong Esa Muharmis Nabawi Madjid Sihol Sinaga Chairun Nadirin

Human Resources Romanna Renteria Zubaidah Nina Paramarta Chatarina Meity Nana Noerhajati Ivonny Ndaparoka

Inform. technology Agus Winarto Sie Ket Liong Agus Winarto Nabawi Madjid Fery Prastyan Chairun Nadirin

Travel Paulina Marpaung Melda Zang Maria Meyta YloEnggar Kusuma

HapsariKemala Purbani Lily Marlina

Publications,

GraphicsPryatin Santoso

Website Support Virgi Fatmawati

Media Relation Sri Hardijanti Andi Musfarayani Hetty Tambunan Usniaty Umayah Dwi Hermawati Ristina Aprillia Budi Raharjo

Environm. Compliance Mohammad Yagi Endah Shofiani Oni Hartono Ristina Aprillia Selviana Hehanussa

Water Supply Sector

Sanitation Sector

Cross Cutting Sector

Wouter Sahanaya

Alifah Lestari

Note: * Benny Djumhana will support North Sumatra & South Sulawesi ; Nugroho Andwiwinarno will support West Java/Banten, Central Java and East Java

Operations,

Ida Nurtam

Wouter Sahayana

Reg. Coord /

Office Man.

Communications

Ardita CaesariReg. Coord /

Office Man.

Reg. Coord /

Office Man.

Reg. Coord /

Office Man.

Reg. Coord /

Office Man.

Page 164: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 146

ANNEX 7: ACHIEVEMENT OF IUWASH PMP OUTCOMES, STATUS OF MARCH 2013 Annex 7.1. Mid-year Summary of Number of People (HR-1.a.) and Percent Increased of

Household (HR1.b.) Get Access to Safe Water Supply

Annex 7.2. Mid-year Summary of Number of People Get Access to Improved Sanitation Facilities (HR-2)

Annex 7.3. Mid-year Summary of Decreasing of Water Cost by the Poor (HR-3)

Annex 7.4. Mid-year Summary of People Trained in IUWASH Training Activities (HR-4)

Annex 7.5. Mid-year Summary of Household Have Willingness to Pay for Sanitation Improvement (MD-1)

Annex 7.6. Mid-year Summary of Civil society groups and/or government cadres implementing programs to mobilize improved access to safe drinking water and adequate sanitation (MD-2)

Annex 7.7. Mid-year Summary of CSO reporting on PDAM Customer (MD-3)

Annex 7.8. Mid-year Summary of Development of Sanitation for the Poor Toolkit (MD-4)

Annex 7.9. Mid-year Summary of Achievement of PDAM Management Index Score (IC-1)

Annex 7.10. Mid-year Summary of Development of Debt Restructuring Plan (IC-2)

Annex 7.11. Mid-year Summary of Improvement of PDAM Credit Worthiness (IC-3)

Annex 7.12. Mid-year Summary of Local Government Implementing Climate Change Adaptation Measurements for Protection of PDAM Raw Water (IC-4)

Annex 7.13. Mid-year Summary of Local Government Implementing Integrated Sanitation Program (IC-5)

Annex 7.14. Mid-year Summary of Achievement of Small and Medium Business Providing Affordable Construction and Sanitation Facility Management Services (IC-6)

Annex 7.15.a. Mid-year Summary of Annual Achievement of Local Government Priority to Support Watsan Sector (EE-1) - Local Government Budget

Annex 7.15.b. Mid-year Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-1) - Supportive Policy

Annex 7.15.c. Mid-year Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-1)

Annex 7.16. Annual Summary of Achievement of PDAMs or Local Government Obtain Access to Long-term Fuding for WatSan Sector (EE-2)

Annex 7.17. Mid-year Summary of Achievement of Financial Resources Accessed by Service Providers from PPP to Support the Expansion of Improved WatSan Services (EE-3)

Page 165: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 147

Annex 7.18.a. Mid-year Summary of Achievement of Low Income Households Accessing Microfinance Supported Improved Sanitation Services (EE-4)

Annex 7.18.b. Mid-year Summary of Achievement of Low Income Households Accessing Microfinance for New Household Water Connection (EE-4)

Annex 7.18.c. Mid-year Summary of Achievement of Microfinance Program Supported Improved Watsan Sector (EE-4)

Page 166: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 148

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.1. Mid-year Summary of Number of People (HR-1.a.) and Percent Increased of Household (HR1.b.) Get Access to Safe Water Supply Status: March 2013

Domestic Social Commercial Total Domestic Social Comercial Total

1 PDAM Kota Medan 362,870 5,610 42,887 411,367 377,980 5,671 46,608 430,259 N/A 481,275

2 PDAM Kota Binjai 10,107 173 1,232 11,512 10,223 174 1,398 11,795 N/A 56,674

3 PDAM Kota Tanjung Balai 15,556 348 1,806 17,710 16,653 355 1,909 18,917 N/A 33,022

4 PDAM Kota Tebing Tinggi 7,951 217 1,073 9,241 8,375 224 1,100 9,699 N/A 34,713

5 PDAM Kota Pematang Siantar 52,821 526 1,291 54,638 55,359 525 1,605 57,489 N/A 54,872

6 PDAM Kabupaten Labuhan Batu 6,346 99 673 7,118 6,346 99 673 7,118 N/A 56,143

7 PDAM Kabupaten Asahan 16,222 169 984 17,375 16,222 169 984 17,375 N/A 93,729

8 PDAM Kota Sibolga 12,435 248 866 13,549 12,435 248 866 13,549 N/A 18,128

9 PDAM Kabupaten Langkat 13,137 182 1,185 14,504 13,137 182 1,185 14,504 N/A 142,877

10 PDAM Kota Bogor 93,360 1,649 4,606 99,615 104,951 1,824 5,008 111,783 N/A 234,000

11 PDAM Kota Bekasi 12,597 48 69 12,714 16,901 59 90 17,050 N/A 599,061

12 PDAM Kabupaten Karawang 45,983 236 1,883 48,102 51,761 556 1,898 54,215 N/A 343,212

13 PDAM Kabupaten Bekasi 160,332 1,075 4,478 165,885 160,332 1,075 4,478 165,885 N/A 420,507

14 PDAM Kabupaten Bandung 63,290 641 2,476 66,407 63,290 641 2,476 66,407 N/A 491,648

15 PDAM Kabupaten Purwakarta 19,635 514 788 20,937 19,635 514 788 20,937 N/A 134,594

16 PDAM Kabupaten Tanggerang 103490 962 4307 108,759 110262 1065 4946 116,273 N/A 414,019

17 PDAM Kabupaten Serang 23073 364 3832 27,269 25109 381 2639 28,129 N/A 191,321

18 PDAM Kabupaten Lebak 16128 371 540 17,039 23053 369 4160 27,582 N/A 176,862

19 PDAM Kota Semarang 126,217 2,486 7,336 136,039 130,650 1,620 9,293 141,563 N/A 401,391

20 PDAM Kota Surakarta 48,921 1,015 5,239 55,175 49,782 1,025 5,879 56,686 N/A 141,289

21 PDAM Kabupaten Kudus 22,778 619 681 24,078 26,121 530 719 27,370 N/A 116,336

22 PDAM Kabupaten Kendal 44,043 1,143 630 45,816 49,021 965 967 50,953 N/A 147,067

23 PDAM Kabupaten Semarang 24,086 812 2,879 27,777 27,080 893 3,300 31,273 N/A 150,553

24 PDAM Kota Salatiga 22,888 623 1,620 25,131 22,888 623 1,620 25,131 N/A 46,994

25 PDAM Kabupaten Klaten 28,063 615 3,771 32,449 28,063 615 3,771 32,449 N/A 195,718

26 PDAM Kabupaten Sukoharjo 15,294 220 467 15,981 15,294 220 467 15,981 N/A 136,115

27 PDAM Kabupaten Batang 26,649 930 322 27,901 26,649 930 322 27,901 N/A 107,514

28 PDAM Kabupaten Rembang 15,454 567 852 16,873 15,454 567 852 16,873 N/A 97,561

TOTAL

Households In

PDAM Coverage

Area (*)

TOTAL increased

Households (per

Province)

D

18,917

18,960

Achievement of Year 2013

West Java

PDAM ConnectionNon PDAM / Comm Based

Connection (hh)

ProvincePDAM Connection

Baseline (Year 2012)

B

Central Java

BantenC

No

23,691

A

22,617

North Sumatra

Page 167: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 149

29 PDAM Kabupaten Gresik 63,778 866 2,373 67,017 66,754 1,051 2,772 70,577 N/A 179,128

30 PDAM Kabupaten Lamongan 11,392 149 710 12,251 11,166 149 817 12,132 N/A 182,006

31 PDAM Kabupaten Sidoarjo 93,802 810 5,217 99,829 99,368 903 4,582 104,853 185 309,295

32 PDAM Kabupaten Mojokerto 11,883 534 214 12,631 14,636 575 256 15,467 N/A 164,553

33 PDAM Kota Probolinggo 14,693 562 747 16,002 15,698 604 784 17,086 N/A 50,349

34 PDAM Kota Surabaya 445,714 5,283 34,172 485,169 445,714 5,283 34,172 485,169 N/A 756,869

35 PDAM Kota Mojokerto 4,246 44 118 4,408 4,246 44 118 4,408 N/A 31,665

36 PDAM Kabupaten Jombang 15,679 106 641 16,426 15,679 106 641 16,426 N/A 192,840

37 PDAM Kabupaten Probolinggo 15,476 520 1,593 17,589 15,476 520 1,593 17,589 N/A 186,167

38 PDAM Kabupaten Malang 76,047 2,041 1,922 80,010 76,047 2,041 1,922 80,010 N/A 400,485

39 PDAM Kota Malang 109,506 2,087 4,591 116,184 109,506 2,087 4,591 116,184 N/A 220,42940 PDAM Kota Batu 9,266 74 958 10,298 9,266 74 958 10,298 N/A 50,061

41 PDAM Kabupaten Enrekang 5,337 16 55 5,408 6,486 7 61 6,554 N/A 25,555

42 PDAM Kota Pare-Pare 16,046 87 316 16,449 16,812 96 355 17,263 N/A 28,888

43 PDAM Kabupaten Maros 9,905 192 842 10,939 9,905 192 842 10,939 N/A 42,664

44 PDAM Kabupaten Takalar 7,864 148 304 8,316 7,864 148 304 8,316 N/A 37,429

45 PDAM Kabupaten Jeneponto 6,378 83 182 6,643 6,378 83 182 6,643 N/A 46,602

46 PDAM Kabupaten Pinrang 5,770 115 176 6,061 5,770 115 176 6,061 N/A 49,150

46 PDAM Kabupaten Banteng 9,566 373 240 10,179 9,566 373 240 10,179 N/A 26,06147 PDAM Kabupaten Sidrap 5,242 176 550 5,968 5,242 176 550 5,968 N/A 38,540

48 PDAM Kota Ambon 8,145 257 273 8,675 8,814 280 282 9,376 N/A 73,296

49 PDAM Jayapura 24,005 542 2,480 27,027 24,628 532 2,692 27,852 N/A 75,616

2,379,466 37,527 157,447 2,574,440 2,468,047 37,558 168,891 2,674,496 185

11,897,330 750,540 787,235 13,435,105 12,340,235 751,160 844,455 13,935,850 925

501,670

248,760

750,430

2,000,000

37.52%

100,241

49,527

149,768

8,684,843

1.72%

1,960

TOTAL People access to Safe Water Supply up to September 2012

To-date achievement of People access to Safe Water Supply up to March 2013

TOTAL household access to Safe Water Supply up to September 2012

To-date achievement of household access to Safe Water Supply up to March 2013

TOTAL People access to Clean Water

E

TOTAL household in the coverage area of PDAM during in this reporting period

Percent increase of household increased access to Safe Water Supply during this reporting period

Percent of to-date Achievement Toward the Target over the life of project

TOTAL People access to Safe Water Supply during this reporting period

TOTAL Target over the life of project

TOTAL PDAM Connection

G Eastern Indonesia

(*) Based on Susenas Data 2010. For the district setting, based on common PDAM setting on the average of coverage area of PDAM located in district setting. PDAM working in district setting, usually can't cover all sub-districts are, and

usually it is about 60% of total households in the district.

East Java

1,526

TOTAL Household increased access to Safe Water Supply during this reporting period

12,570

F South Sulawesi

Page 168: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 150

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

A. Individual System

Individual

Toilet

Shared

Latrine

1 Kelurahan Sempur RT 6 RW 4 24 0 57

2 Kel Sempur RT3 RW 3 5 0 66

3 Kel Sempur RT2 RW 3 4 0 81

4 Kel Harjasari RT2 RW 10 32 0 83

5 Kelurahan Harjasari Rt1 RW 4 26 0 102

6 Kelurahan Harjasari RT3 RW 12 6 0 61

7 Kelurahan Harjasari RT 1 RW 13 5 0 52

8 kel. Cimahpar RT04 RW03 6 0 75

9 Kel. Cimahpar RT 03 RW07 6 0 72

10 Kel. Cimahpar Rt 01 RW 04 9 0 52

11 Kel Cimahpar RT 01 RW 10 9 0 133

12 Kel Cimahpar Rt 03 RW 04 6 0 72

13 Kel Cimahpar Rt 02 RW 07 6 0 70

14 Kel Cimpahpar Rt 02 RW 16 6 0 75

15 Kel Sindangsari Rt 03 RW 02 2 0 67

16 Kel Sindangsari RT 02 RW 03 12 0 59

17 Kel Sindangsari Rt 02 RW 07 10 0 62

18 Kel Sindangsari Rt 04 Rw 05 10 0 52

19 Kel Sindangsari Rt 01 RW 04 3 0 38

20 Kel SIndangsari RT 02 Rw 04 10 0 55

21 Kel Sindangsari RT03 RW 07 9 0 83

22 Kel SIndangsari RT04 RW 02 26 0 110

23 Kel Sindangsari RT 03 RW 01 10 0 54

24 Kel Sindangsari Rt 04 RW 06 24 0 72

25 Kel Sindangsari RT 03 RW 05 6 0 55

26 Kel Sindangsari RT 03 RW 02 2 0 67

27 Saga RT08 RW 01 7 0 114

28 Saga Rt 03 RW 01 3 0 66

29 Saga RT 06 Rw 01 10 0 68

30 Saga Rt 05 RW 01 12 0 105

31 Saga Rt04 RW 01 15 0 101

32 Saga Rt 02 RW 01 8 0 47

33 Saga RT 01 RW 01 18 0 64

34 Saga RT 07 RW 01 17 0 88

35 Jati MUlya RT02 RW 04 9 0 180

36 Dsn Damprit Kel Kedaung Brt 60 0 77

37 Kel Kebon Cau Rt 25 RW 08 36 0 80

38 Kel Babakan Asem RT 2 RW 07 32 0 70

Annex 7.2 Mid-year Summary of Number of People Get Access to Improved

Sanitation Facilities (HR-2)

Balaraja

Sepatan Timur

Teluk Naga

Kab.

Tangerang

Banten

Number of Household Benefiting from the Improved System

West Java

Bogor Utara

Bogor Timur

Kota Bogor

Total Household

in the Site where

the System

Developed

City/ District

Sub-District No

Bogor Tengah

Bogor Selatan

Specific site

Page 169: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 151

39 Kp Bojong Hilir RT 17 RW 06 1 0 179

40 Kp Tambak RT 12 RW 04 1 0 201

41 Kp Parung RT 09 RW 03 11 0 79

42 Kp Pengkolan Rt 12 RW 05 7 0 80

43 Kp Bojong Kondang RT15 RW 05 9 0 50

44 Kp Pasir Heulang RT 11 RW 04 10 0 74

45 Kel. Sukabumi 6 0 61

46 Kel. Mangunharjo 19 0 388

47 Kel. Kanigaran 2 0 56

48 Kel. Pakistaji 10 0 46

49 Kel Wonoasih 7 0 40

50 Kel. Jrebeng Kidul 10 0 164

51 Kel. Jrebeng Lor 22 0 150

52 Kel. Sumber Wetan 4 0 80

53 Kel. Jrebeng Kulon 9 0 65

Kademangan 54 Kel. Kademangan 14 0 132

55 Mangelo Kidul, Desa Sooko 6 0 179

56 Kedawung Etan, Desa Mojoranu 18 0 101

57 Desa Karangnongko 12 0 70

58 Desa Sumber Agung 3 0 103

59 Desa Mojorejo 16 0 105

60 Desa Medalem 12 0 208

61 Desa Kedung Pengaron 13 0 165

62 Desa Karobelah 6 0 33

63 Desa Dukuh Mojo 1 0 22

64 Desa Kali Bening 1 0 31

65 Desa Tanggalrejo 2 0 52

66 Desa Karangwinongan 3 0 47

67 Desa Janti 5 0 18

68 Desa Betek 7 0 27

69 Desa Kedunglumpang 14 0 36

70 Kel. Barengkrajan 25 0 269

71 Desa Watugolong 9 0 130

72 Kel. Tempel 12 0 150

Balong Bendo 73 Desa Penambangan 10 0 49

74 Desa Sukodono 2 0 101

75 Desa Ngares 20 0 340

Kab. Malang Dau 76 Desa Gading Kulon 4 0 110

Wonokromo 77 Kel. Wonokromo 24 0 955

Karangpilang 78 Kel Warugunung 5 0 428

873557

14308459

10.32%

Total Household Connected to individual systems up to September 2012To-date achievement of Household Connected to individual systems up to March 2013

Kab.

Sidoarjo

Krian

Sukodono

Kota

Surabaya

Kedopok

Sooko

Kab.

Jombang

Mojoangung

Total Household Connected to individual systems during this quarter

Cibadak

Kab. Lebak

Total Household in the site where he system developed through individual system

Banten

Kota

Probolinggo

Mayangan

Wonoasih

East Java

Kab.

Mojokerto

Kab.

Lamongan

Modo

Percent increased of Household in the site where he system developed through

Page 170: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 152

B. Communal System

Improved

Communal

Septic Tank

Improved

Public Toilet

1 Gondosari 61 0 230

2 Kedung Sari 51 0 69

3 Menawan 44 0 105

4 Getas Srabi 55 0 75

Jati 5 Jetis Kapuan 43 0 102

Bae 6 Ngembal Rejo 51 0 55

Besito 7 Besito 51 0 95

8 Mijen 51 0 120

9 Kedung Dowo 51 0 102

10 Karang Ampel 51 0 105

11 Setro Kalangan 51 0 65

12 Banget 51 0 55

13 Papringan 51 0 108

14 Sidorekso 50 0 102

15 Blimbing Kidul 51 0 60

Tanjung Mas 16 Tanjung Mas 30 0 150

Ngaliyan 17 Wates 26 0 124

Semarang 18 Tiber Sari Rejo 25 0 150

Tugu 19 Mangun Harjo 26 0 130

Gunung Pati 20 Sukorejo 30 0 98

Genuk 21 Muktiharjo 25 0 100

Tembalang 22 Sambung RT 2 RW 1 Rawasari 30 0 120

23 Singopuran 50 0 115

24 Ngabeyan 50 0 126

Grogol 25 Banaran 50 0 130

Palur 26 Palur 50 0 122

Sukoharjo 27 Dukuh 50 0 125

28 Baki Pandean 50 0 127

29 Baki Pandean 50 0 128

30 Kwarasan 50 0 125

Sukoharjo 31 Sukoharjo 50 0 122

Tegal Gondo 32 Tegal Made 50 0 120

Kab.

Sidoarjo

Sidoarjo 33 Kel. Lemah Putro 0 52 100

1507

1861693

3660

46.26%

Kab. Kudus

Kota

Semarang

Gebog

Kaliwungu

Kartosuro

Baki

Kab.

Sukoharjo

Total Household Connected to improved communal systems up to September 2012To-date achievement of Household Connected to improved communal systems up to March 2013

No Specific site

Number of Household Benefiting from the Improved System

Total Household

in the Site where

the System

Developed

Central Java

East Java

Total Household Connected to improved communal systems during this reporting period

City/ District

Sub-District

Total Household in the site where he system developed through improved communal systems during PY 2012

Percent Household increased access in the site where he system developed through communal system during PY2012

Page 171: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 153

C. City Sewerage System

City

Sewerage

Small-scale

Sewerage

Kota

Surakarta

IPAL Semanggi 1 PDAM Kota Surakarta 18 0 10000

1820032021

10000

20.21%

2398

27465144

22119

23.26%

11990

13730

25720

20000012.86%

Total Household Connected to improved sanitation systems up to September 2012To-date achievement of Household Connected to improved sanitation systems up to March 2013

Total people get increased access to improved sanitation facilities up to September 2012

Indicator HR-2.b. Percent Household Get Increased Access to Improved Sanitation Facilities

Number of Household Benefiting from the Improved SystemOperator

To-date achievement of people get increased access to improved sanitation services

Percent of to-date achievement over the life of the projectTarget of people get increased access to improved sanitation facilities

City/ District

Name of System

No

Percent Household get increased access to improved sanitation services through communal system during PY2012

Total Household Connected to improved sanitation systems during this reporting period

Total people get increased access to improved sanitation facilities during this reporting period

Total Household where the improved facilities constructed during this reporting period

Percent Household get increased access to improved sanitation services during this reporting period

Total Household

in the Site where

the System

Developed

Central Java

Total Household Connected to city sewerage systems during This reporting period

Total Household in the site where he system developed through city sewerage system during PY 2012

Indicator HR-2.a. Number of Peole Get Increased Access to Improved Sanitation Facilities

Total Household Connected to city sewerage systems up to September 2012To-date achievement of Household Connected to city sewerage systems up to March 2013

Page 172: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 154

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Annex 7.3. Mid-year Summary of Decreasing of Water Cost by the Poor (HR-3)

Status: March 2013

Micro Credit

Master Meter

TimeSample/

Population (HH)

Before Having

PDAM Connection

After Having

PDAM Connection

Clean Water 15877 25910 63%

Drinking Water 27255 15178 -44%

Total 43132 41088 -5%

Clean Water 75000 27000 -64%

Drinking Water 16250 11000 -32%

Total 91250 38000 -58%

-32%

Clean Water 25063 28583 14%

Drinking Water 62181 24479 -61%

Total 87244 53062 -39%

-39%-35%

Note:

Survey Period: July - Sep 2012East Java/

Kab

Mojokerto

Average of water cost decreased during PY 2012

(*) Clean Water defines as the water use for bathing, cleaning, cooking and drinking, while the drinking water is a specific water for drinking water to add to clean water they use for drinking and cooking.

Usually it is mineral water or refill water

Water cost for clean water use increase by 14% but we

include the drinking water the result shows total decrease

by 39%

230/575East Java/

Kab

Mojokerto

√ Dec-12

Indicator (*)

Type of Water for the Poor Program Developed

Water Cost Survey

RemarkDecreasing of Water

Cost

Province/ City

Sep-12 280/775

Water cost of clean water is decreased by 64% and 32%

for drinking water; Total combination of clean water and

drinking water shows a decrease of 58%

Water Cost (Rp.)

Average of water cost decreased during PY 2012Survey Period: Oct - Dec 2012

To-date of Average of Water Cost Decreased up to First Quarter of PY 2013

Sep-12 45/113Water cost for clean water use increase by 63% but we

include the drinking water the result shows total decrease

by 5%

Central Java/

Kab. Kudus

Page 173: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 155

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.4. Mid-year Summary of People Trained in IUWASH Training Activities (HR-4)Status: March 2013

Focus Group Training of Training Workshop Study Tour Advocacy TOTALNorth Sumatra 31 0 205 183 59 75 553

West Java/DKI Jakarta/Banten 77 0 169 314 69 0 629

National 60 0 10 0 0 0 70

Central Java 363 32 1262 236 50 0 1943

East Java 450 0 226 206 0 0 882

South Sulawesi/ Eastern Indonesia 34 18 109 359 16 0 536

Total 1015 50 1981 1298 194 75 4613

North Sumatra 0 0 82 583 63 0 728

West Java/DKI Jakarta/Banten 0 27 0 156 0 0 183

National 0 0 37 0 0 0 37

Central Java 973 120 220 367 19 0 1699

East Java 79 0 229 256 26 0 590

South Sulawesi/ Eastern Indonesia 105 26 30 161 0 0 322

Total 1157 173 598 1523 108 0 3559

3,559 34.36%

$76,757.61

19,864 33.59%

$ 485,741.26

23,423 33.98%

$ 562,498.87

50,000 46.85%

Second

Quarter (Jan -

Mar 13)

34.36% $76,757.61

Total Budget Spent for

First Quarter

(Oct - Dec 12)33.70% $113,279.71

Quarter Region Total People Trained based on Type of training Total Average of Women

Percentage of people trained in the IUWASH training training related activities

Total achievement of budget spent for the the IUWASH training training related activities during this quarter

Total achievement of people trained in the IUWASH training training related activities through previous quarterAverage of women participated in the IUWASH training training related activities through previous quarter

Total achievement of budget spent for the IUWASH training training related activities through previous quarter

To-date achievement of people trained in the IUWASH training training related activities

To-date achievement of average of women participated in the IUWASH training training related activities

To-date achievement of budget spent for the IUWASH training training related activities

Total Target of People Trained in the IUWASH training training related activities over the life of the project

Total achievement of people trained in the IUWASH training related activities during this quarterAverage of women participated in the IUWASH training training related activities during this quarter

Page 174: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 156

Individual/ STBM

Communal System

City SewerageSludge

removal

Kota Tanjungbalai 1 919

This figure comes from 5 communal systems developed

in the city. Each HH pay a monthly fee of IDR 20,000 to

IDR 30,000

Kota Tebing Tinggi 2 508This figure comes from 4 communal systems developed

in the city. Each HH monthly fee of IDR IDR 30,000

Kota Bogor 3 299

This figure comes from 21 sites of triggering activities

where the HH is supported to construct their individual

toilet mostly with support by DinKes.Community

membersprovide in-kind contribution equally to around

Rp 200,000 per HH

Kab. Lebak 4 39

This figure comes from HH that constructed their toilet

through self funding in Tambakbaya village-Cibadak sub-

district. The cost paid for the construction of the toilet is

around IDR 800,000

Kab. Tangerang 5 90

This figure comes from HH that constructed their toilet

through self funding in Saga village- Balaraja subdistrict.

The cost paid for the construction of the toilet is around

IDR 700,000-IDR 3,500,000

Kabupaten

Mojokerto6 36

The cost to construct individual toilet in 3 villages of

Sooko sub-district is between Rp. 650,000 and Rp.

1.150,000

Kota Probolinggo 7 122

The cost to construct individual toilet in 12 villages of 4

sub-districts (Mayangan, Wonoasih, Kademangan and

Kedopok) is between Rp. 650,000 and Rp. 1.150,000

Kabupaten

Sidoarjo4 78 52

The cost to construct individual toilet in 6 villages of 3

sub-districts (Krian, Balongbendo, Sukodono) is between

Rp. 1.150,000 and Rp. 1,850,000. For the communal

system, the HH beneficiearies pay monthly fee for

amount Rp. 25,000/HH

Kabupaten

Jombang4 39

The cost to construct individual toilet in 8 villages of

Mojoagung sub-district is between Rp. 650,000 and Rp.

1.150,000

Kab. Lamongan 5 63

The cost to construct individual toilet in 4 villages of

Modo sub-district is between Rp. 1,000,000 and Rp.

2.500,000

Kab. Malang 4The cost to construct individual toilet in Dau sub-district

is Rp. 1,500,000

Kota Surabaya 29

The cost to construct individual toilet in Wonokromo

and Karangpiang sub-districts is between Rp. 1,000,000

and Rp. 1.150,000

799 1479 0 02,278

2113

4391

40000

10.98%

To-date achievement of household have willingness to pay for sanitation improvement

Total Target of household have willingness to pay for sanitation improvement over the life of the project

Percent To-date Achievement of household have willingness to pay for sanitation improvement

Total household have willingness to pay for sanitation improvement during this quarter

Total household have willingness to pay for sanitation improvement up to previous quarter

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.5. Mid-year Summary of Household Have Willingness to Pay for Sanitation Improvement (MD-1)Status: March 2013

RemarksCity/DistrictRegionalInformation on Number of Household Have Willingness to

No

TOTAL

North

Sumatra

West

Java/DKI

Jakarta/Banten

Jawa Timur

Jawa Timur

Page 175: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 157

Government Cadre Civil Society Group

Kota Tebing Tinggi 2 0

Kota Tanjung Balai 6 0

Kab. Tangerang 7 0The government cadre are sanitarians who implement STBM triggering and

sanitation marketing Program funded by APBD budget

Kab. Lebak 4 0The government cadre are sanitarians who implement STBM triggering and

sanitation marketing Program using self funding

Kota Semarang 7 0

Kab. Kudus 15 0

Kab. Sukoharjo 10 0

Kota Probolinggo 7 5

Kab. Mojokerto 4 0

Kabupaten Gresik 4 0

Kota Surabaya 4 0

Kabupaten Malang 11 0

Kab. Sidoarjo 2 0The government cadre are sanitarians who implement STBM Program,

including micro finance for sanitation funded by IUWASH and APBN/BOK

Kab. Lamongan 2 1

The government cadre are sanitarians who implement STBM Program

funded by IUWASHand APBN/BOK. The CBO is implementing watsan,

incl. sanitation promotion program supported by HIPPAMS

Kota Malang 4 0

The government cadre mostly The government cadre are sanitarians who

implement STBM triggering activities incl sanitation marketing funded by

IUWASH and APBN (BOK)

East Java Kota Batu 5 5

The government cadre are sanitarians who implement STBM Program

funded by APBN/BOK (Bantuan Operasional Kesehatan) and IUWASH.

The CBOs are supported by USRI Program

94 11

105

35

140

100

140%

Total Target of government cadres implementing program to mobilize access to safe drinking water and adequate sanitation over the life of the project

Percent To-date Achievement of government cadres implementing program to mobilize access to safe drinking water and adequate sanitation

Total government cadres and CSOs implementing program to mobilize access to safe drinking water and adequate sanitation during this quarter

Total government cadres implementing program to mobilize access to safe drinking water and adequate sanitation up to previous quarter

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.6. Mid-year Summary of Civil society groups and/or government cadres implementing programs to mobilize improved access to safe drinking water and adequate sanitation (MD-2)

Status: March 2013

Remarks

To-date achievement of government cadres implementing program to mobilize access to safe drinking water and adequate sanitation

The government cadre are sanitarians who implement STBM Program

funded by APBN/BOK (Bantuan Operasional Kesehatan) and IUWASH

Total

East Java

City/DistrictRegionalNumber of

The government cadre are sanitarians who implement triggering activities

on improved hygiene behavior for communal sanitation systems funded by

APBD and IUWASH

Central Java

The government cadre mostly the health office (kes. Link) sanitarian, bidan,

perawat and puskesmas staff who implement STBM and SANIMAS/MCK

Umum Program funded by APBD

North Sumatra

West Java/

DKI/Banten

Page 176: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 158

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

Assessment & training of material

development

Agreement with

participating PDAM

Preparation for customer

participation mechanism

application by PDAM

Mechanism execution

Forum establishment

Customer forum

capacity building

Post intervention survery and

money

Kab. Bandung PDAM customer forum 1 C NYS NYS NYS NYS NYS NYS

Kab. Purwakarta PDAM customer forum 2 C NYS NYS NYS NYS NYS NYS

Kota Bekasi PDAM customer forum 3 C NYS NYS NYS NYS NYS NYS

Kota Surakarta PDAM customer forum 4 C C O NYS NYS NYS NYS

Kab. Mojokerto PDAM customer forum 5 C C NYS NYS NYS NYS NYS

Kab. Maros PDAM customer forum 6 C NYS NYS NYS NYS NYS NYS

Kab. Sidrap PDAM customer forum 7 C NYS NYS NYS NYS NYS NYS

Kota Jayapura/ Kab.

Jayapura

PDAM customer forum 8 C NYS NYS NYS NYS NYS NYS

0

0

0

20

0.00%Percent achievement of CSO reporting on PDAM Performance up to March 2013

Total CSO Reporting on PDAM performance during this reporting period

Target of CSO Reporting on PDAM Performance

Total CSO Reporting on PDAM performance up to September 2012

To-date achievement of CSO Reporting on PDAM performance up to March 2013

Annex 7.7. Mid-year Summary of CSO reporting on PDAM Customer (MD-3)

Progress on Development of CSO Reporting on PDAM Customer

West Java(NYS = Not yet Started; O = ongoing; C = Completed)

General ProgressCity/ District CSO Type No

Central Java

East Java

South Sulawesi/Eastern Indonesia

Page 177: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 159

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

Status To-date Progress

1 Development of the toolkit

outline

On-Going Continue to conduct inventory of reference

documents that consisted of implementation

manuals, technology references, promotional

guideline, and similar materials from a wide

array of organizations and projects active in

supporting the GOI in sanitation development

2 Writing of the toolkit On-Going N/A

3 Consultation of the toolkit

developed with IUWASH

partners

On-Going Conducted several consultancies to support

the consultancy works of Scott Tobias (TMG)

on the development of CLTS and handwashing

with soap guidelines. IUWASH take part as the

core team to develop the STBM Guideline

under the leadeship of the MOH. Part of this

guideline will be also part of the STBM

Guidelines.

4 Finalization of the toolkit

through editing and lay-outing

of the toolkit

Not Started Yet N/A

5 Launching of the toolkit

developed

Not Started Yet N/A

0

0

0

10.00%

Total Target of the development of Sanitation for the Poor Toolkit over the life of the project

Percent To-date Achievement of CSO Report on PDAM Operation and Performance

Steps of Development of Sanitation for the Poor Toolkit

Annex 7.8. Mid-year Summary of Development of Sanitation for the Poor Toolkit

Total Sanitation for the Poor Toolkit developed during this quarter

Total Sanitation for the Poor Toolkit developed up to previous Quarter

To-date achievement of Sanitation for the Poor Toolkit Developed

Page 178: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 160

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.9. Mid-year Summary of Achievement of PDAM Management Index Score (IC-1)

Status: March 2013

No 2016Mar Sep Mar Sep Mar Sep Mar Sep Mar

North Sumatra1 PDAM Kota Medan 50.5 57.7 - N/A N/A N/A N/A N/A N/A N/A 14.26 N/A N/A N/A N/A N/A N/A N/A2 PDAM Kota Binjai 25.3 26.9 23.1 N/A N/A N/A N/A N/A N/A N/A 6.32 (8.70) N/A N/A N/A N/A N/A N/A3 PDAM Kota Tanjung Balai 34.5 37.5 45.6 N/A N/A N/A N/A N/A N/A N/A 8.70 32.17 N/A N/A N/A N/A N/A N/A4 PDAM Kota Tebing Tinggi 26 27 37.1 N/A N/A N/A N/A N/A N/A N/A 3.85 42.69 N/A N/A N/A N/A N/A N/A5 PDAM Kota Pematang Siantar 29.4 29.8 35.3 N/A N/A N/A N/A N/A N/A N/A 1.36 20.07 N/A N/A N/A N/A N/A N/A6 PDAM Kota Sibolga N/A 26.3 23.0 N/A N/A N/A N/A N/A N/A N/A N/A (12.55) N/A N/A N/A N/A N/A N/A7 PDAM Kab. Asahan N/A 25 25.0 N/A N/A N/A N/A N/A N/A N/A N/A - N/A N/A N/A N/A N/A N/A8 PDAM Kab. Labuhan Batu N/A 21 20.0 N/A N/A N/A N/A N/A N/A N/A N/A (4.76) N/A N/A N/A N/A N/A N/A9 PDAM Kab. Langkat N/A 22.5 24.9 N/A N/A N/A N/A N/A N/A N/A N/A 10.67 N/A N/A N/A N/A N/A N/A

West Java10 PDAM Kota Bogor 61.1 69.3 - N/A N/A N/A N/A N/A N/A N/A 13.42 N/A N/A N/A N/A N/A N/A N/A11 PDAM Kota Bekasi 42.2 50.5 48.9 N/A N/A N/A N/A N/A N/A N/A 19.67 15.88 N/A N/A N/A N/A N/A N/A12 PDAM Kab. Karawang 27.9 42.6 43.6 N/A N/A N/A N/A N/A N/A N/A 52.69 56.27 N/A N/A N/A N/A N/A N/A13 PDAM Kab. Bandung N/A 0 - N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A14 PDAM Kab. Purwakarta N/A 46.7 50.9 N/A N/A N/A N/A N/A N/A N/A N/A 8.99 N/A N/A N/A N/A N/A N/A15 PDAM Kab. Bekasi N/A 45.4 51.8 N/A N/A N/A N/A N/A N/A N/A N/A 14.10 N/A N/A N/A N/A N/A N/A

Banten16 PDAM KabTanggerang 49.4 51.8 - N/A N/A N/A N/A N/A N/A N/A 4.86 N/A N/A N/A N/A N/A N/A N/A17 PDAM Kab. Serang 37.6 42.6 43.6 N/A N/A N/A N/A N/A N/A N/A 13.30 15.96 N/A N/A N/A N/A N/A N/A18 PDAM Kab. Lebak 34.3 35.6 33.1 N/A N/A N/A N/A N/A N/A N/A 3.79 (7.02) N/A N/A N/A N/A N/A N/A

Central Java19 PDAM Kota Semarang 47.7 53.1 61.8 N/A N/A N/A N/A N/A N/A N/A 11.32 29.56 N/A N/A N/A N/A N/A N/A20 PDAM Kota Surakarta 50.7 52.5 59.0 N/A N/A N/A N/A N/A N/A N/A 3.55 16.37 N/A N/A N/A N/A N/A N/A21 PDAM Kab. Kudus 56.3 63.7 61.7 N/A N/A N/A N/A N/A N/A N/A 13.14 9.59 N/A N/A N/A N/A N/A N/A22 PDAM Kab. Kendal 40.8 44.2 54.4 N/A N/A N/A N/A N/A N/A N/A 8.33 33.33 N/A N/A N/A N/A N/A N/A23 PDAM Kab. Semarang 45.4 55.3 60.6 N/A N/A N/A N/A N/A N/A N/A 21.81 33.48 N/A N/A N/A N/A N/A N/A24 PDAM Kota Salatiga N/A 49.8 53.7 N/A N/A N/A N/A N/A N/A N/A N/A 7.83 N/A N/A N/A N/A N/A N/A25 PDAM Kab. Klaten N/A 47.4 57.3 N/A N/A N/A N/A N/A N/A N/A N/A 20.89 N/A N/A N/A N/A N/A N/A26 PDAM Kab. Sukoharjo N/A 32.2 39.3 N/A N/A N/A N/A N/A N/A N/A N/A 22.05 N/A N/A N/A N/A N/A N/A27 PDAM Kab. Rembang N/A 36.5 37.3 N/A N/A N/A N/A N/A N/A N/A N/A 2.19 N/A N/A N/A N/A N/A N/A28 PDAM Kab. Batang N/A 36.1 40.5 N/A N/A N/A N/A N/A N/A N/A N/A 12.19 N/A N/A N/A N/A N/A N/A

Mar-16Sep-142013 2014

Mar-14 Mar-15

A

B

C

D

% INCREASED OF PDAM PERFORMANCE2012Province/PDAM

SCORING

Baseline Sep-12 Mar-13 Sep-13 Sep-142015

Page 179: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 161

East Java29 PDAM Kab. Gresik 41.7 51.4 54.0 N/A N/A N/A N/A N/A N/A N/A 23.26 29.50 N/A N/A N/A N/A N/A N/A30 PDAM Kab. Lamongan 38.3 40.3 48.2 N/A N/A N/A N/A N/A N/A N/A 5.22 25.85 N/A N/A N/A N/A N/A N/A31 PDAM Kab. Sidoarjo 58.9 69.3 63.1 N/A N/A N/A N/A N/A N/A N/A 17.66 7.13 N/A N/A N/A N/A N/A N/A32 PDAM Kab. Mojokerto 31.8 42.9 48.9 N/A N/A N/A N/A N/A N/A N/A 34.91 53.77 N/A N/A N/A N/A N/A N/A33 PDAM Kota Probolinggo 40.2 42.6 52.2 N/A N/A N/A N/A N/A N/A N/A 5.97 29.85 N/A N/A N/A N/A N/A N/A34 PDAM Kab. Probolinggo N/A 18.3 27.8 N/A N/A N/A N/A N/A N/A N/A N/A 51.91 N/A N/A N/A N/A N/A N/A35 PDAM Kota Surabaya N/A 57.8 65.9 N/A N/A N/A N/A N/A N/A N/A N/A 14.01 N/A N/A N/A N/A N/A N/A36 PDAM Kota Batu N/A 28.5 39.2 N/A N/A N/A N/A N/A N/A N/A N/A 37.54 N/A N/A N/A N/A N/A N/A37 PDAM Kota Malang N/A 67.2 73.6 N/A N/A N/A N/A N/A N/A N/A N/A 9.52 N/A N/A N/A N/A N/A N/A38 PDAM Kab. Malang N/A 46.4 61.5 N/A N/A N/A N/A N/A N/A N/A N/A 32.54 N/A N/A N/A N/A N/A N/A39 PDAM Kota Mojokerto N/A 15.4 14.8 N/A N/A N/A N/A N/A N/A N/A N/A (3.90) N/A N/A N/A N/A N/A N/A40 PDAM Kab. Jombang N/A 37.2 44.1 N/A N/A N/A N/A N/A N/A N/A N/A 18.55 N/A N/A N/A N/A N/A N/A

South Sulawesi41 PDAM Kab. Maros N/A 30.1 37.9 N/A N/A N/A N/A N/A N/A N/A N/A 25.91 N/A N/A N/A N/A N/A N/A42 PDAM Kab. Takalar N/A 23.7 29.4 N/A N/A N/A N/A N/A N/A N/A N/A 24.05 N/A N/A N/A N/A N/A N/A43 PDAM Kab. Enrekang 22.5 26.5 23.0 N/A N/A N/A N/A N/A N/A N/A 17.78 2.22 N/A N/A N/A N/A N/A N/A44 PDAM Kota Pare-Pare 29.8 35.6 34.7 N/A N/A N/A N/A N/A N/A N/A 19.46 16.44 N/A N/A N/A N/A N/A N/A45 PDAM Kab. Sidrap N/A 22.3 23.7 N/A N/A N/A N/A N/A N/A N/A N/A 6.28 N/A N/A N/A N/A N/A N/A46 PDAM Kab. Pinrang N/A 24.2 21.6 N/A N/A N/A N/A N/A N/A N/A N/A (10.74) N/A N/A N/A N/A N/A N/A47 PDAM Kab. Jeneponto N/A 25.3 27.0 N/A N/A N/A N/A N/A N/A N/A N/A 6.72 N/A N/A N/A N/A N/A N/A48 PDAM Kab. Bantaeng N/A 25.7 35.8 N/A N/A N/A N/A N/A N/A N/A N/A 39.30 N/A N/A N/A N/A N/A N/A

Eastern Indonesia49 PDAM Ambon Municipality 25.3 25.6 32.4 N/A N/A N/A N/A N/A N/A N/A 1.19 28.06 N/A N/A N/A N/A N/A N/A50 PDAM Jayapura 39 42 39.5 N/A N/A N/A N/A N/A N/A N/A 7.69 1.28

50 N/A N/A N/A N/A

12.83 N/A N/A N/A N/A

Total PDAM Supported by IUWASH

To Date of average of % increased of the PDAM

Performance Index

E

F

G

Page 180: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 162

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

No Region PDAM Status Remarks

1PDAM Tirtanadi Medan

Completed Approved by Ministry of Finance and first monitoring to

use 2012 financial report

2 PDAM Kab. Langkat In Progress Development of PDAM Business Plan

3 West Java/

DKI/ BantenPDAM Kab. Lebak

In Progress Development of PDAM Business Plan

4 PDAM Kab. Lamongan Completed Completed business plan; approved by mayor and DPRD;

submitted to MoF. Minor revision required.

5 PDAM Kab. Probolinggo In Progress Proposal is being prepared by IUWASH and PDAM

6 SSEI PDAM Kota Parepare In Progress

7 PDAM Kab. Enrekang In Progress

9 PDAM Kab. Jeneponto In Progress

10 PDAM Kab. Takalar In Progress

8 PDAM Kab. Maros Completed Completed business plan submitted to MoF and approved

by Technical Committee of MoF.

9 PDAM Kab. Sidrap In Progress In the initial step of development of debt restructuring

10 PDAM Kab. Pinrang In Progress In the initial step of development of debt restructuring

11 PDAM Kota Tanjungbalai In Progress

12 PDAM Kota Tebingtinggi In Progress

13 PDAM Kota Pematang In Progress

14 PDAM Kota Sibolga In Progress

15 PDAM Kab. Karawang In Progress

16 PDAM Kab. Tangerang In Progress

17 PDAM Kota Semarang In Progress

18 PDAM Kota Surakarta In Progress

19 PDAM Kab. Semarang In Progress

20 PDAM Kab. Grobogan In Progress

21 PDAM Kab. Gresik In Progress

22 PDAM Kab. Mojokerto In Progress

23 PDAM Kab. Malang In Progress

PDAM Kota Makassar In Progress

PDAM Jayapura In Progress

3

0

3

20

15.00%

Development of New Debt Restructuring Plan

Second monitoring by IUWASH in June 2013

North Sumatra

West Java/

DKI/ Banten

Central Java

East java

SSEI

Ready to submit to Monistry of Finance

North Sumatra

Percent To-date Achievement of PDAM Supported on the development of Debt Restructuring Plan

East Java

Annex 7.10. Mid-year Summary of Development of Debt Restructuring Plan (IC-2)

Total PDAM Supported on the development of Debt Restructuring Plan during FY 2012

Total PDAM Supported on the development of Debt Restructuring Plan during previous year

To-date achievement of PDAM Supported on the development of Debt Restructuring Plan

Total Target of PDAM Supported on the development of Debt Restructuring Plan over the life of the project

Monitoring of Implementation of Debt Restructuring Program

24

Page 181: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 163

Baseline (2011) Progress

North Sumatra

1

PDAM Kota

Pematang Siantar

1 Plus N/A • PDAM’s creditworthiness weaknesses include financial ratio and its poor tariff condition. No tariff adjustment for last

11 years and lack of stakeholder’s support impacted to some aspects. Raw water issue needs to be improved in term of

planning and protection.

• Strengths are contributed by customer size allows to have rapid grow.

West Java/ DKI/

Banten

2 PDAM Kota Bogor N/A The PDAM’s creditworthiness is bolstered by its very strong financial status, including debt repayment, cash flow, and

cost-recovery tariff. It also has extensive coverage and solid technical operations

The credit strength of PDAM include cost recovery tariff, regular tariff adjustments, and extensive existing coverage

accompanied by potential to add more customers, and strong management and planning capacity.

Credit weaknesses include recent missed debt repayments, poor cash flow, and lack of support from the local gov’t.

Credit strengths include no long term debt, adequate liquidity, strong financial ratios, and solid local gov’t. support;

The greatest credit weakness is that tariff adjustments have not been carried out on a regular basis in accordance with

the business plan. - Credit strengths include clean debt history, a strong customer base, and solid technical operations (including low

nonrevenue water);

- Credit weaknesses include low debt reserves, weak cash flow, and irregular tariff adjustments.

- Credit strengths include a strong customer base, regular tariff adjustments, and supportive operating procedures.

- Credit weaknesses include low cash flow, recently missed loan payments, and a high rate of nonrevenue water.

- Credit strengths include debt reserves and production capacity;

- Credit weaknesses include loan repayment rates over the last few years, cash flow, financial ratios, nonrevenue water,

and local government support.

0 00

200.00%

SSEI

PDAM Kab. Maros

2 Plus

2 Minus N/A

Central Java

3

4

PDAM Kota

Surakarta

N/A

SSEI

2 Plus N/A

PDAM Kabupaten

Kendal

3 Flat N/A

CWL RatingNoRegion PDAM Remarks

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

To-date achievement of PDAM with Improved Credit Rating Total Target of PDAM with Improved Credit Rating over the life of

Percent To-date Achievement of PDAM with Improved Credit Rating

Total PDAM with Improved Credit Rating during FY 2012Total PDAM with Improved Credit Rating during previous year

6

7

PDAM Kota

Parepare

5

East java

PDAM Kab. Gresik 2 Plus N/A

Annex 7.11. Mid-year Summary of Improvement of PDAM Credit Worthiness (IC-3)

Page 182: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 164

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

Climate Change

Vulnerability

Assessment

Development of

Climate Change

Adaptation Action

Plan

Implementation of

PDAM Raw Water

Protection Program

Kota Medan 1 O NYS O CCVA ongoing and construction of 800 infiltration ponds ongoing by

JKM funded by CCFI

Kota Pematang Siantar 2 O NYS C Draft final report CCVA discussed and construction of 50 infiltration

ponds completed

Kota Sibolga 3 O NYS NYS Preliminary assessment completed

Kab. Bandung 4 O NYS NYS CCVA activity being tendered

Kab. Karawang 5 O NYS NYS Continued to conduct field measurements

Kab. Serang 6 O NYS NYS CCVA activity being tendered

Kota Bogor 7 O NYS NYS Continued to conduct field measurements

Kota Salatiga 8 O NYS NYS

Kabupaten Semarang 9 O NYS NYS

Kabupaten Kudus 10 O NYS NYS

Kota Batu 11 NYS NYS NYS

Kota Malang 12 NYS NYS NYS

Kabupaten Malang 14 NYS NYS NYS

Kota Probolinggo 13 NYS NYS NYS

Kabupaten Probolinggo 15 NYS NYS NYS

Kabupaten Mojokerto 16 C O O CCVA completed and construction of 650 infiltration ponds ongoing by

YLHS (NGO) funded by CCFI

Kota Parepare 17 O NYS NYS

Kab. Pinrang 18 O NYS NYS

Kab. Enrekang 19 O NYS NYS

Kab. Sidrap 20 O NYS NYS

0

0

0

20

0.00%

Central Java

Interim report on CCVA discussed including possibility of

regionalization of raw water sources management

Draft SoW of CCVA under development

Completed preliminary assessment and conduct a series of discussion

with all PDAMs and Provincial Govt for potential of regionalization of

raw water source management

Percent achievement of Local Government Implementing Climate Change Adaptation to protect PDAM Raw Water Sources up to March 2013

Total Local Government Implementing Climate Change Adaptation to protect PDAM Raw Water Sources during this reporting period

Target of Local Government Implementing Climate Change Adaptation to protect PDAM Raw Water Sources

Total Local Government Implementing Climate Change Adaptation to protect PDAM Raw Water Sources up to September 2012To-date achievement of Local Government Implementing Climate Change Adaptation to protect PDAM Raw Water Sources up to March 2013

West Java/DKI Jakarta/Banten

East Java

South Sulawesi/Eastern Indonesia

Annex 7.12. Mid-year Summary of Local Government Implementing Climate Change Adaptation Measurements for

Protection of PDAM Raw Water (IC-4)

Progress on Development of CSO Reporting on PDAM

North Sumatra(NYS = Not yet Started; O = ongoing; C = Completed)

General ProgressCity/ District No

Page 183: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 165

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

City Sanitation Strategy (CSS)Implementation of Sanitation

Program1 Kota Medan Developed by LG of Kota Medan City Sewerage Program, Optimized IPLT

2 Kota Binjai Support PPSP 2012 by IUWASH ; completed Planning small scale sewerage

3 Kota Tebing Tinggi Already has CSS in 2010Communal system, city sewerage and

regulation for sanitation sector

4 Kota Pematangsiantar Support PPSP 2012 by IUWASH ; completed Planning for IPLT / sludge Management

5 Kota Tanjungbalai Already has CSS in 2011 Communal systems

6 Kota Sibolga Don't have CSS yet Not started yet

7 Kab. Labuhanbatu Don't have CSS yet Not started yet

8 Kab. Asahan Don't have CSS yet Not started yet

9 Kab. Langkat Don't have CSS yet Not started yet

10 Kota Bogor Already has CSS 2010Individual system, communal system

(UPTD) and sludge management

11 Kabupaten Bekasi Support PPSP 2012 by IUWASH ; completed Communal systems

12 Kabupaten Karawang Support PPSP 2012 by IUWASH ; completed Communal systems

13 Kota Bekasi Already has CSS 2010 Not started yet

14 Kabupaten BandungWill develop CSS in 2013 support by PPSP

ProgramNot started yet

15 Kabupaten PurwakartaWill develop CSS in 2013 support by PPSP

ProgramNot started yet

16 DKI Jakarta Already has CSS in 2011 Not started yet

17 Kabupaten Tangerang Support PPSP 2012 by IUWASH ; completed Individual and Communal systems

18Kota Tangerang

SelatanAlready has CSS in 2011 Not started yet

19 Kabupaten Serang Already has CSS 2011 Individual and Communal systems

20 Kab. Lebak Will develop CSS in 2013 by PPSP Not started yet

21 Kota Surakarta Already has CSS

Individual system, communal system,

sewerage (promotion) and sludge

management + USRI

22 Kabupaten Kendal Support PPSP 2012 by IUWASH ; completed Communal system + USRI

23 Kabupaten Batang Already has CSS 2012 communal system

24 Kabupaten Kudus Already has CSS 2011 communal system, USRI

25 Kabupaten Klaten Already has CSS 2011 communal system, USRI

26 Kabupaten Sukoharjo Already has CSS 2010 communal system, USRI

27 Kota Salatiga Already has CSS 2012 communal system

28 Kabupaten Rembang Already has CSS 2010 communal system, USRI

29 Kota Semarang Already has CSS 2010communal system, USRI, UPTD

development

30 Kab Semarang will develop CSS in 2013, by PPSP communal system

StatusCity/District

North

Sumatra

West Java/

DKI/Banten

Jawa Tengah

Annex 7.13. Mid-year Summary of Local Government Implementing Integrated Sanitation Program (IC-

NoRegional

Page 184: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 166

31 Kabupaten Lamongan Support PPSP 2012 by IUWASH ; completedSanimas, Individual System, capacity

building to KSM

32 Kabupaten Sidoarjo Already has CSS in 2011Support establishment of UPTD,

communal system, individual system

33 Kota Probolinggo Already has CSS in 2010

Individual and Communal System, USRI,

develop models of sludge management,

support capacity building of UPTD

34 Kota Mojokerto Will develop CSS in 2013 by PPSP Limited program in sanitation

35Kabupaten

ProbolinggoAlready has CSS 2011

individual system, communal system

(SANIMAS)

36 Kabupaten Mojokerto Will develop CSS in 2013 under PPSP Limited program in sanitation

37 Kota Batu Already has CSS 2009 USRI, individual system

38 Kota Malang Already has CSS 2010 USRI, Communal System by DAK/SLBM

39 Kabupaten Malang Already has CSS 2012

USRI, Communal System by DAK/SLBM,

indidual system, support establishment of

UPTD

40 Kabupaten Jombang Already has CSS 2010USRI, support UPTD, develop models

sludge management, individual and

communal system

41 Kabupaten Gresik Already has CSS 2011

USRI, support UPTD, readiness criteria

for IPLT and small scale sewerage,

individual system

42 Kota Makassar Review CSS by IUWASH - ongoingCommunal system and city sewerage

(promotion and UPTD) + USRI

43 Kabupaten Maros Support PPSP 2012 by IUWASH; ongoing Not started yet

44 Kabupaten TakalarWill develop CSS in 2013 supported by PPSP

programNot started yet

45 Kota Parepare Already has CSS Communal system , UPTD

46 Kab. EnrekangWill develop CSS in 2013 supported by PPSP

programNot started yet

47 Kab. SidrapWill develop CSS in 2013 supported by PPSP

programCommunal system (SLBM)

48 Kab. Pinrang Already has CSS 2012 by PPSP Communal system (SLBM)

49 Kab. Jeneponto Don't have CSS yet Not started yet

50 Kab. Bantaeng Don't have CSS yet Not started yet

51 Kota Ambon Review CSS by IUWASH - ongoing Communal system, UPTD

52 Kota Jayapura Review CSS by IUWASH - ongoing Communal system, UPTD

53 Kabupaten JayapuraReview CSS initiated by IUWASH, will be

continued by Satker PUNot started yet

0 00

200.00%

To-date achievement of Local Government Implementing Integrated Sanitation Total Target of Local Government Implementing Integrated Sanitation Program

Percent To-date Achievement of Local Government Implementing Integrated

Total Local Government Implementing Integrated Sanitation Program during Total Local Government Implementing Integrated Sanitation Program during

Jawa Timur

Indonesia

Timur

Sulawesi

Selatan

Page 185: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 167

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

1 West

Java/DKI

Jakarta/Bant

en

Kab. Tangerang Jati Mulya Support to the construction of

individual latrine facility (toilet

and septic tank) with the price

is Rp. 500,000, using credit

system

Promotion & marketing

support-TA for sanitation

technology, link with financial

institution,

2 East Java Kab. Lamongan Hippams Jatim Support to the construction of

individual latrine facility

Other-Sanitation Entrepreneur

Training; facilitated to link with

sanitarians and Dinkes Kab.

Lamongan

2

2

4

30

13.33%

Total SME Provided Affordable Construction and Sanitation Facility up to previous quarter

To-date achievement of SME Provided Affordable Construction and Sanitation Facility

Type of IUWASH Support

Annex 7.14. Mid-year Summary of Achievement of Small and Medium Business Providing Affordable Construction and Sanitation Facility Management Services (IC-6)

To-date percentage of the achievement of SME Provided Affordable Construction and Sanitation Facility

No Region City Name of SME Type of SME Support

Total Target over the life of the project on SME Provided Affordable Construction and Sanitation Facility

Total SME Provided Affordable Construction and Sanitation Facility during this Quarter

Page 186: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 168

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Annex 7.15a. Mid-year Summary of Annual Achievement of Local Government Priority to Support Watsan Sector (EE-1) - Local Government Status: March 2013

Baseline (*) Year 2012 Year 2013 Year 2014 Year 2015 Year 2016 A. North Sumatra1 Kota Medan 2,476,411 2,931,392 In process 18% Increase

2 Kota Binjai 445,157 652,252 In process 47% Increase

3 Kota Tebing Tinggi 367,582 347,610 347,610

4 Kota Pematang Siantar 526,023 657,341 789,237 25% Increase

5 Kota Tanjung Balai 401,608 484,903 In process 21% Increase

6 Kabupaten Langkat 526,745 652,252 In process 24% Increase

7 Kabupaten Asahan 774,674 837,000 1,057,746 8% Increase

8 Kab. Labuhan Batu In process In process In process

9 Kota Sibolga In process In process In process

B. West Java10 Kota Bogor 929,231 1,400,000 In process 51% Increase

11 Kota Bekasi 1,738,385 2,017,909 In process 16% Increase

12 Kabupaten Karawang 1,604,223 2,778,187 In process 73% Increase

13 Kabupaten Bekasi 1,311,867 In process In process

14 Kabupaten Bandung In process In process In process

15 Kabupaten Purwakarta 1,474,790 1,960,000 In process 33% Increase

C. Banten16 Kab. Tangerang 1,921,641 2,914,401 2,669,316 52% Increase

17 Kab. Serang 1,028,294 1,539,276 In process 50% Increase

18 Kota Tangerang Selatan 1,553,567 1,777,860 In process 14% Increase

19 Kab. Lebak 1,061,135 1,185,512 1,437,000 12% Increase

D. Central Java20 Kota Surakarta 911,568 1,198,484 1,402,670 31% Increase

21 Kota Semarang 1,768,258 2,418,386 2,657,023 37% Increase

22 Kab. Kudus 951,183 1,191,125 1,200,000 25% Increase

23 Kab. Kendal 950,402 1,164,277 1,383,805 23% Increase

24 Kab. Semarang 888,791 1,100,606 1,137,175 24% Increase

25 Kota Salatiga 981,533 1,076,690 1,233,781 10% Increase

26 Kab. Klaten 1,257,051 1,434,007 1,596,382 14% Increase

27 Kab. Sukoharjo 1,067,698 1,279,549 1,274,312 20% Increase

28 Kab. Rembang 854,135 966,747 1,121,778 13% Increase

29 Kab. Batang 832,467 1,017,263 1,049,361 22% Increase

E. East Java30 Kab. Gresik 1,178,051 1,474,708 1,810,426 25% Increase

31 Kab. Lamongan 1,019,315 1,432,606 1,550,103 41% Increase

32 Kab. Mojokerto 1,008,851 1,165,492 1,326,988 16% Increase

33 Kab. Sidoarjo 1,654,958 2,189,901 2,581,880 32% Increase

34 Kota Probolinggo 542,160 597,984 597,985 10% Increase

35 Kab. Probolinggo 1,083,482 1,279,589 1,355,852 18% Increase

36 Kota Mojokerto 437,879 487,642 571,108 11% Increase

37 Kab. Jombang 1,052,553 1,002,614 1,002,615

38 Kota Malang 1,028,420 1,212,364 1,543,987 18% Increase

39 Kab. Malang 1,934,094 2,157,429 2,385,081 12% Increase

40 Kota Batu 478,358 520,023 565,765 9% Increase

F. South Sulawesi41 Kota Makassar 1,368,496 1,678,886 1,859,313 23% Increase

42 Kab. Maros 559,667 708,902 930,312 27% Increase

43 Kab. Takalar 490,852 684,175 692,729 39% Increase

44 Kota Parepare 497,880 628,329 753,995 26% Increase

45 Kab. Enrekang 467,280 595,585 631,347 27% Increase

46 Kab. Jeneponto 510,984 566,603 730,007 11% Increase

47 Kab. Sidrap 596,929 658,927 685,248 10% Increase

48 Kab. Pinrang 656,947 702,498 804,968 7% Increase

49 Kab. Bantaeng 471,339 495,716 545,288 5% Increase

G. Eastern Indonesia50 Kota Ambon 571,060 771,523 848,675 35% Increase

51 Kota Jayapura 226,983 294,278 302,812 30% Increase

52 Kab. Jayapura no information no information no information

Total Local Government Budget/APBD (In Million IDR) No City

Decreased

Remarks

(*) The baseline figures are taken from last 3 years (2009, 2010 and 2011 for old cities in yellow highlight and 2010, 2011, 2012 for new cities in orange highlight)

of APBD budget to support the development of watsan sector.

No information

No information

No information

No information

Decreased

no information

Page 187: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 169

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)Annex 7.15b. Mid-year Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-1) - Supportive PolicyStatus: March 2013

Mar-12 Sep-12 Mar-13 Sep-13 Mar-14 Sep-14 Mar-15 Sep-15 Mar-16 Sep-16

A. North Sumatra

1Kota Tebing

TinggiPerda Urban Sludge Management

N/A N/A Ongoing

2 Kota Medan Perda Urban Sludge Management N/A N/A Ongoing

B. West Java

Perda No. 16 Tahun 2011 tentang

Perusahaan Daerah Air Minum

(PDAM) Tirta Pakian Kota Bogor

PDAM Organization C C C Signed on 7

December

2011

Perda no. 17 Tahun 2012 tentang

Pengelolaan Perusahaan Daerah

Air Minum (PDAM) Tirta Pakuan

Bogor

PDAM Management C C C Signed on 7

December

2011

Perda No. 20 Tahun 2011 tentang

Perubahan atas Perda Kota Bogor

No. 7 Tahun 2010 tentang

Penyertaan Modal Daerah kepada

PDAM Tirta Pakuan, PD BPR Bank

Pasar, PD Jasa Transportasi dan PD

Pasar Pakuan Jaya Kota Bogor

PDAM Equity from the Local

Government of Kota Bogor

C C C Signed on 20

December

2011

C. Central Java

4 Kota Surakarta SK Walikota Surakarta No.

653.2/48-B/1/2012 tentang

Penetapan Lokasi Pembangunan

Penataan Kawasan Kumuh dan

Pembangunan Sanitasi Perkotaan

Tahun 2012

Determination of the IUWASH

Grant Location on Sanitation

Program in Kota Surakarta

C C C Signed on 8

May 2012

5 Kab. Kendal Perda No. 7 Tahun 2012 tentang

Penyertaan Modal Pemerintah

Kabupaten Kendal kepada

Perusahaan Daerah Air

Minum"Tirto Panguripan"

Kabupaten Kendal

PDAM Equity from the Local

Government of Kendal District

C C C Signed on 5

September

2012

D. East Java

6 Kab. Sidoarjo Perda for sanitation operational Operation and managemnt of

sanitation systems developed

N/A N/A Ongoing

7 Kab. Jombang Perbup on UPTD establishment Establishment of UPTD sanitation,

and operation

N/A N/A Ongoing

8 Kota Malang Perwali on UPTD establishment N/A N/A Ongoing

Perbup on UPTD establishment Establishment of UPTD sanitation,

and operation

N/A N/A Ongoing

Perdes to Support CLTS Program Implementation of CLTS Program

and Stop Open Defecation

Declaration

N/A N/A Ongoing

Perwali on UPTD establishment Establishment of UPTD sanitation,

and operation

N/A N/A Ongoing

Perwali on raw water protection Management and protection of raw

water source

N/A N/A Ongoing

11 Kab.

Mojokerto

Perwali on raw water protection Management and protection of raw

water source

N/A N/A Ongoing

E. South Sulawesi

12 Kota Parepare Improvement of Perwalikota

Parepare No. 52 Tahun 2012

Development and implementation

of CEM

Ongoing Ongoing Ongoing

Perbub Development of Citizen

Engagement Mechanism (CEM)

Development and implementation

of CEM

N/A N/A Ongoing

Perbup on PDAM Equity

participation

PDAM Equity from the Local

Government of Takalar district

N/A N/A Ongoing

14 Kab. Maros Perbup on PDAM Equity

participation

PDAM Equity from the Local

Government of Maros district

N/A N/A Ongoing

15 Kab. Jeneponto Perbub Development of Citizen

Engagement Mechanism (CEM)

Development and implementation

of CEM

N/A N/A Ongoing

16 Kab. Bantaeng Perbub Development of Citizen

Engagement Mechanism (CEM)

Development and implementation

of CEM

N/A N/A Ongoing

17 Kab. Sidrap Perbup on Regionalization of raw

water source

Management and protection of raw

water source

N/A N/A Ongoing

F Eastern Indonesia

18 Kota Ambon Perwali on UPTD establishment Waste water institution

establishment

N/A N/AOngoing

19 Kab Jayapura

Kota Jayapura

Kota Jayapura Perwali on UPTD establishment Waste water institution

establishment Ongoing Ongoing Ongoing

10

Ongoing Ongoing

Kota Bogor

Kab. Malang

Kota Batu

Kab. Takalar13

20

3

Peraturan Bersama Walikota dan

Bupati Jayapura on Illegal

Connection PDAM Jayapura

Reducing the PDAM illegal

connectionOngoing

Management of implementation of

Urban Sludge Management

9

No RemarksAchievement of the Development of Improved Policy of Watsan Sector

Name of PolicyCity Subject of Policy

Page 188: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 170

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Annex 7.15c. Mid-year Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-Status: March 2013

Policy Improvement Budget Increased A. North Sumatra1 Kota Medan Ongoing Increased2 Kota Binjai NYS Increased3 Kota Tebing Tinggi Ongoing Decreased4 Kota Pematang Siantar NYS Increased5 Kota Tanjung Balai NYS Increased6 Kab. Langkat NYS Increased7 Kab. Asahan NYS Increased8 Kab. Labuhan Batu NYS N/A9 Kota Sibolga NYS N/AB. West Java10 Kota Bogor C Increased Achieved11 Kota Bekasi NYS Increased12 Kabupaten Bekasi NYS N/A13 Kabupaten Karawang NYS Increased14 Kabupaten Bandung NYS N/A15 Kabupaten Purwakarta NYS IncreasedC. Banten16 Kab. Tangerang NYS Increased17 Kab. Serang NYS Increased18 Kota Tangerang Selatan NYS Increased19 Kab. Lebak NYS IncreasedD. DKI Jakarta20 DKI Jakarta N/A N/AE. Central Java21 Kota Surakarta C Increased Achieved22 Kota Semarang NYS Increased23 Kab. Semarang NYS Increased24 Kab. Kudus NYS Increased25 Kab. Kendal C Increased Achieved26 Kota Salatika NYS Increased27 Kab. Sukoharjo NYS Increased28 Kab. Klaten NYS Increased29 Kab Rembang NYS Increased30 Kab. Batang NYS IncreasedF. East Java31 Kab. Gresik NYS Increased32 Kab. Lamongan NYS Increased33 Kab. Mojokerto NYS Increased34 Kab. Sidoarjo O Increased35 Kota Probolinggo NYS Increased36 Kota Surabaya NYS Increased37 Kota Mojokerto O Increased38 Kab. Jombang O Decreased39 Kab. Malang O Increased40 Kota Malang O Increased41 Kota Batu O Increased42 Kab. Probolinggo NYS Increased

No City Status

Remarks

Page 189: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 171

Policy Improvement Budget Increased

No City Status

Remarks

G. South Sulawesi43 Kota Makassar NYS Increased44 Kab. Maros O Increased45 Kab. Takalar O Increased46 Kota Parepare O Increased47 Kab. Enrekang NYS Increased48 Kab. Jeneponto O Increased49 Kab. Sidrap O Increased50 Kab. Pinrang NYS Increased51 Kab. Bantaeng O IncreasedH. Eastern Indonesia52 Kota Ambon O Increased53 Kota Jayapura O Increased54 Kab. Jayapura O N/A

0

3

3

50

6.00%

Note:

NSY = Not Started Yet; O = Ongoing; C = Completed

(*) This indicates the valid achievement of this year only because IUWASH will continue to monitor the budget allocation by

the LG until the end of the IUWASH program year

Total Local Government put priority in watsan sector during this quarter

Total Local Government put priority in watsan sector during previous year

To-date achievement of Local Government put priority in watsan sector

Total Target of Local Government put priority in watsan sector over the life of the project

Percent To-date Achievement of Local Government put priority in watsan sector

Page 190: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 172

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Annex 7.16. Mid-year Summary of Achievement of PDAMs or Local Government Obtain Access to Long-term Fuding for Watsan Sector (EE-2)Status: March 2013

Mar-12 Sep-12 Mar-13 Sep-13 Mar-14 Sep-14 Mar-15 Sep-15 Mar-16 Sep-16

A. North Sumatra

1 Kota Tebing

Tinggi

B-to-B Water Supply

Regionalization (200 lps

new treatment plant) for

Tebing Tinggi and Serdang

Bedagai

PDAM Kota Tebing

Tinggii

NSY O Consultation with local

governments in progress; Pre FS

to be prepared

2 Kota Medan Perpres 29 New WTP – Bingei: 1000

lps, target market is

Belawan (MBR) area

PDAM Medan NSY O Technical aspects of WTP’s

capital expenditure complete;

additional capex for distribution

line in preparation and to be

reviewed

B. West Java

3 B-to-B Pondok Gede: 300 lps new

treatment plant and

distribution lines

O O O

4 PPP Bekasi Barat: 200 lps

production and

distribution plant

O O O

5 PPP Mustika Jaya area, which

requires a 300 liters per

second (lps) new treatment

plant and distribution lines

O O O

6 PPP Jatibening: 200 lps

production and

distribution lines

O O O

7 PPP Jati Asih: 100 lps new

WTP with PJT

NSY NSY O PJT (potential private partner)

completed Pre-FS of technical

and financial components; bulk

water price negotiation is

postponed between parties;

more discussions needed to

agree on cooperation terms

No City Name of Project Partners InvolvedStatus of Achievement of Project Received Long-term Funding for Water Sector

PDAM Kota Bekasi

Draft FS ready for discussion

with PDAM

Draft FS ready for discussion

with PDAM

Kota Bekasi

Scheme of Long-term

FinanceRemark

Page 191: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 173

C. Banten

8 Kab. Tangerang Perpres 29 New WTP (300 lps) in

Kelapa Dua sub-district to

serve Southern Tangerang

PDAM Kab.

Tangerang

O O O Completed and submitted new

draft FS to PDAM; Awaiting

PDAM feedback

9 Kab. Lebak PPP WTP renovation and

distribution line

construction to serve Kopo

and Tigaraksa (Kabupaten

Tangerang)

PDAM Kab. Lebak and

PT Ciria Jasa

O O O Activity postponed due to

complication in negotiation

between PDAM Kabupaten

Tangerang (Buyer) and private

sector

10 Kabupaten

Serang

PPP/Perpres

29

Greenfield water supply

project for Ciruas/Cibaja

areas

PDAM Kab. Serang

and a private sector

(TBD)

O O O Pre FS under revision; PDAM

submitted request letter for

GOI grant to MPW

D. Central Java

11 Kota Surakarta Perpres 29 300 lps bulk water supply

project

PDAM Kota Surakarta

and PT Jasa Tirta (PJT)

O O O MPW facilitated preparation of

financial analysis of Perpres 29

financing in progress; IUWASH

will facilitate following steps

afterwards

12 Kab. Kendal Perpres 29

plus GOI loan

300 lps Telogo Mili

(Spring)

PDAM Kab. Kendal

and LG of Kendal

district

O O O FS and DED completed and

presented to provincial water

office (BBWS); Potential national

bank identified for funding

E. East Java

13 Kab. Gresik PPP 200 lps water supply

project

PDAM Kab. Gresik

and a private sector

(TBD)

O O O FS complete and discussed with

Bupati; Drupadi has been

appointed as private partner;

discussion for bulk water tariff

in process

14 Kab. Mojokerto PPP 500 lps water supply

project

PDAM Kab. Mojokerto

and a private sector

(TBD)

NSY O O FS review complete; PDAB

(provincial water source)is

appointed partner for PPP

scheme; FS to be discussed with

PDAB

0

0

0

150.00%

Note: NSY = Not Staretd Yet; OG = Ongoing; C = Completed

Total PDAMs or Local Government Obtain Access to Long-term Fuding for Watsan Sector during this Quarter

Total PDAMs or Local Government Obtain Access to Long-term Fuding for Watsan Sector during previous year

To-date achievement of PDAMs or Local Government Obtain Access to Long-term Fuding for Watsan Sector

Total Target of PDAMs or Local Government Obtain Access to Long-term Fuding for Watsan Sector over the life of the project

Percent To-date Achievement of PDAM Supported on the development of Debt Restructuring Plan

Page 192: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 174

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

A.1 Kab. Lebak Micro Credit Program for

Improved Sanitation

Sanitarians in the CLTS

triggering activiities

Public Funding 4,333.33 The micro credit program for sanitation is a result of the

triggering program activities

B.1 Kab. Pinrang Micro Credit Program for

Water Connection

PDAM Kab. Pinrang and KSU

Denas 66

Public Funding 333.33 The signing of the MoU between PDAM Kab. Pinrang

and KSU Denas 66 was conducted on January 18, 2013

C. East Java

5 Kab. Sidoarjo Micro Credit Program for

Improved Sanitation

Revolving fund under Grant

Program by LPPM-ITS

Private Funding 9,533.33 The micro credit program for sanitation is a result of the

triggering program activities

4 Kota Surabaya Micro Credit Program for

Improved Sanitation

Revolving fund under Grant

Program by LPPM-ITS

Private Funding 4,188.89

5 Kab. Jombang Micro Credit Program for

Improved Sanitation

Sanitarians in the CLTS

triggering activiities

Private Funding 5,633.33

24,022.22

10,193,047.45

10,217,069.67

280,782,160

28,078,216

3.64%

Annex 7.17. Mid-year Summary of Achievement of Financial Resources Accessed by Service Providers from PPP to Support the Expansion of Improved Watsan Services (EE-3)

Total Amount Leveraged during this quarter

Total Amount Leveraged up to previous quarter

To-date of Amount Leveraged

Total baseline of FY2012

RemarkAmount Leveraged

($)

The micro credit program for sanitation is a result of the

triggering program activities

To-date percentage of the achievement of amount leveraged to support the expansion of

No City Program Description Partners InvolvedType of Funding

Sources (Public or Private)

Total Target over the life of the project (10% of the baseline)

South Sulawesi/Eastern Indonesia

West Java/DKI Jakarta/Banten

Page 193: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 175

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

Name of Kelurahan/Village

Name of Sub-district

Dec-12 Mar-13 Jun-13 Sep-13 Dec-12 Mar-13 Jun-13 Sep-13

A. West Java/DKI Jakarta/Banten

1 Kab. Lebak Tambakbaya Cibadak 0 26 0 0 0 130 0 0

B. East Java

2 Kedung Galeng 19 0 0 0 95 0 0 03 Kademangan 8 0 0 0 40 0 0 04 Wonoasih 7 0 0 0 35 0 0 05 Jrebeng Kidul 8 0 0 0 40 0 0 06 Mangunharjo 18 0 0 0 90 0 0 07 Jrebeng Lor 12 0 0 0 60 0 0 08 Sumber Wetan 4 0 0 0 20 0 0 09 Kr. Kedawang 23 0 0 0 115 0 0 0

10 Mojoranu 24 0 0 0 120 0 0 011 Pucuk 8 0 0 0 40 0 0 012 Bareng Krajan Krian 0 25 0 0 0 125 0 013 Tempel Krian 0 12 0 6014 Ngares Sukodono 0 20 0 0 0 100 0 015 Watugolong Krian 0 9 0 0 0 45 0 016 Kab. Jombang Individual sanitarian 10 villages Mojoagung 0 39 0 0 0 195 0 017 Wonokromo Wonokromo 0 24 0 0 0 120 0 018 Warugunung Karangpilang 0 5 0 0 0 25 0 0

C. South Sulawesi/Eastern Indonesia

19 Empoang Utara Binamu 0 8 0 0 0 40 0 020 Biringkasi Binamu 0 4 0 0 0 20 0 021 Arungkeke Arungkeke 0 4 0 0 0 20 0 022 Bontoramba Bontoramba 0 10 0 0 0 50 0 023 Pallengo Bangkala 0 2 0 0 0 10 0 0

131 188 0 0 655 940 0 0

188 131 319

Kota Surabaya Revolving fund under

IUWASH Grant

Program by LPPM ITS

Total Low Income Household Accessing Micro Finance Supported Improved Sanitation during this quarter

Annex 7.18a. Mid-year Summary of Achievement of Low Income Households Accessing Microfinance Supported Improved Sanitation Services (EE-4)

Total Low Income Household Accessing Micro Finance Supported Improved Sanitation

Number of People Get increased Access to Improved Sanitation through Microfinance of

FY 2013

Kab. Mojokerto CV New Vitex

Kab. Jeneponto Koppas

Kab. Sidoarjo Revolving fund under

IUWASH Grant

Program by LPPM ITS

To-date achievement of the total Low Income Household Accessing Micro Finance Supported Improved SanitationTotal Low Income Household Accessing Micro Finance Supported Improved Sanitation up to previous FY

Household Address

Kota Probolinggo CV Wahana Tirta

No CityName of Institution

Providing Loan

Microfinance Supported Improved Sanitation Services

Number of Household Get increased Access to Improved Sanitation through Microfinance of

FY 2013

Page 194: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 176

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Status: March 2013

Dec-12 Mar-13 Jun-13 Sep-13 Dec-12 Mar-13 Jun-13 Sep-13

A. West Java

1 Kab. Serang PDAM Kab. Serang BRI Cabang

Serang

10-Nov-11 0 0 0 0 0 0 0 0

B. Central Java

2 Kab. Kudus PDAM Kab. Kudus Bank Syariah

Mandiri (BSM)

Cab, Kudus

9-Jan-12 50 0 0 0 250 0 0 0

3 Kab. Kendal PDAM Kab. Kendal BRI Cabang

Kendal

1-Oct-11 0 0 0 0 0 0 0 0

C. East Java

4 Kab. Mojokerto PDAM Kab.

Mojokerto

BRI Cabang Kab.

Mojokerto

10-Nov-11 575 0 0 0 2875 0 0 0

D. South Sulawesi/Eastern Indonesia

4 Kab. Pinrang PDAM Kab. Pinrang KSU Denas 66 18-Jan-13 0 3 0 0 0 15 0 0

625 3 0 0 3125 15 0 03

3,473 3,476

Total Low Income Household Accessing Micro Finance for new PDAM household connection during this quarter

Annex 7.18b. Mid-year Summary of Achievement of Low Income Households Accessing Microfinance for New Household Water Connection

Total Low Income Household Accessing Micro Finance for Household

To-date achievement of the total Low Income Household Accessing Micro Finance for new PDAM household connection

No City Name of PDAM Name of Bank

Microfinance Supported New Water Connection

Date of MoU Signing

Number of New PDAM Connections during in FY 2013

Number of People Benefiting from Safe Water Supply during FY 2013

Total Low Income Household Accessing Micro Finance for new PDAM household connection up to previour quarter

Page 195: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 177

Indonesia Urban Water, Sanitation and Hygiene (IUWASH)

Annex 7.18c. Mid-year Summary of Achievement of Microfinance Program Supported Improved Watsan Sector (EE-4)Status: March 2013

Water Supply Sanitation Water Supply Sanitation

A. West Java/DKI Jakarta/Banten

1 Kab. Lebak - 26 - 130

B. Central Java

2 Kab. Kudus - - - -

C. East Java

3 Kab. Mojokerto - - - -

4 Kota Probolinggo - - - -

5 Kab. Sidoarjo - 66 - 330

6 Kab. Jombang - 39 - 195

7 Kota Surabaya - 29 - 145

D. South Sulawesi/Eastern Indonesia

5 Kab. Pinrang 3 - 15 -

3 160 15 800 163

3,604

3,767

40,000 9.42%Percent To-date Achievement of Low Income Household Accessing Micro Finance Supported Improved

Watsan

Total Target of Low Income Household Accessing Micro Finance Supported Improved Watsan

No City

Number of Household Increase Access to Improved Watsan

Total

Number of People Increase Access to Improved Watsan

Total Total Low Income Household Accessing Micro Finance Supported Improved Watsan during this quarterTotal Low Income Household Accessing Micro Finance Supported Improved Watsan up to previous quarter

To-date achievement of Low Income Household Accessing Micro Finance Supported Improved Watsan

Page 196: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 178

ANNEX 8: TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF SECOND QUARTER OF THIRD YEAR

(Period of January - March 2013) Project Number: AID-497-C-11-00001

Instruction Trainee Travel Total Total 3,559 34.36% 868,496,000 150,314,098 404,909,965 135,594,468 690,818,531

Focus Group

Discussion

Central Java FGD Finalisasi Draft Perwal

Pengelolaan Air Bersih dan Sanitasi

Berbasis Masyarakat

RM Elryna Jalan

Pandanaran Kota

Semarang

1/15/2013 1/15/2013 13 23.08% 2,800,000 75,000 1,300,000 675,000 2,050,000

Central Java EDUKASI PERILAKU SEHAT

KEPADA MASYARAKAT di 15

LOKASI PROGRAM USRI

KABUPATEN KUDUS

USRI LOKATION in

Kudus District

1/15/2013 2/28/2013 752 40.82% 9,975,000 0 7,500,000 1,500,000 9,000,000

Central Java FGD Penyusunan SK Bupati tentang

Reklasifikasi Pelanggan

RM Murah Meriah,

Klaten

1/18/2013 1/18/2013 26 11.54% 3,150,000 7,500 1,700,000 900,000 2,607,500

Central Java FGD Finalisasi Penyusunan SK Bupati

tentang Reklasifikasi Pelanggan PDAM

Klaten

New Merapi Resto, Jl

Merapi Gayamprit,

Klaten

1/30/2013 1/30/2013 31 19.35% 3,450,000 525,250 1,517,550 1,400,000 3,442,800

Central Java FGD Kerjasama Bidang Air Limbah

(Kesiapan Keikutseraa Readiness

Criteria)

Ruang Meeting Sekda

Kabupaten Sukoharjo

2/19/2013 2/19/2013 14 21.43% 1,000,000 0 582,000 400,000 982,000

Central Java Program Penurunan Tingkat

Kehilangan Air (NRW) di 4 PDAM di

Jawa Tengah FGD Tindak Lanjut

Replikasi Penurunan NRW di PDAM

Kota Semarang, Kab. Semarang, Kab.

Kendal dan Kab. Kudus

Kantor IUWASH Jawa

Tengah

2/27/2013 2/27/2013 23 13.04% 1,580,000 0 770,000 900,000 1,670,000

Central Java Workshop Menjaring Komitmen

Pendanaan Untuk Pemanfaatan Mata

Air Tlogomili, Kencen dan Dlimas

Dalam Rangka Pengembangan SPAM

PDAM Kab. Kendal

RM Nglaras Rasa, Jl

Thamrin Semarang

2/28/2013 2/28/2013 20 5.00% 2,700,000 138,000 2,400,000 0 2,538,000

Actual Cost (Rp) Type Province Title Location

Starting Date

End Date Participants % Female Budget (Rp)

Page 197: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 179

Central Java FGD Penguatan/Inisiasi Pembentukan

Mekanisme Keterlibatan Warga

dalam Pembangunan Sanitasi Kota

Semarang, Kabupaten Kudus, Klaten

dan Sukoharjo

RM Nglaras Rasa

Semarang, Kantor

Bappeda Kab Kudus,

Sukoharjo dan Klaten

3/18/2013 3/21/2013 94 34.04% 9,800,000 772,900 5,312,700 3,350,000 9,435,600

East Java FGD and Field Visit sewer

construction in Sumber Taman

Village, Kec. Wonoasih-Probolinggo

City

Sumber Taman Village,

Kec. Wonoasih-

Probolinggo City

1/22/2013 1/29/2013 48 31.25% 19,450,000 6,789,663 2,338,500 0 9,128,163

East Java FGD Pembentukan UPTD Kab

Gresik

Kabupaten Gresik 2/18/2013 2/18/2013 9 44.44% 2,445,000 34,500 934,200 450,000 1,418,700

East Java FGD Pembentukan UPTD Kab

Sidoarjo

Rumah Makan

Handayani, Sidoarjo

2/25/2013 2/25/2013 7 14.29% 2,495,000 0 1,560,100 350,000 1,910,100

East Java FGD Urban Sludge Management Kota

Probolinggo

Hotel Bromo View,

Probolinggo

3/7/2013 3/7/2013 15 40.00% 5,005,000 123,000 4,048,250 750,000 4,921,250

South

Sulawesi/Easte

rn Indonesia

FGD with Pokja AMPL Kota Makassar

to completed the SSK document

Meeting Room

IUWASH Office

1/15/2013 2/5/2013 10 40.00% 1,190,000 0 495,000 0 495,000

South

Sulawesi/Easte

rn Indonesia

Technical Support and Capacity

Building of KSM/BPS of SLBM

Sanitation at Kabupaten Pinrang

Kantor Dinas PU Kab.

Pinrang

1/17/2013 1/17/2013 17 29.41% 1,445,000 100,000 200,000 450,000 750,000

South

Sulawesi/Easte

rn Indonesia

Capacity Building of Technical

Support the KSM/BPS Sanitation

SLBM Kota Parepare

Kantor Kelurahan

Simpang Minangae

1/19/2013 1/19/2013 4 0.00% 1,105,000 19,000 71,000 0 90,000

South

Sulawesi/Easte

rn Indonesia

Capacity Building of Pokja Sanitasi

Kab. Maros

IUWASH Office 1/23/2013 2/6/2013 5 20.00% 1,190,000 0 693,500 0 693,500

South

Sulawesi/Easte

rn Indonesia

Discuss and training to finalized the

Pokja document with Pokja AMPL

Kota Ambon

Meeting Room

Government Office

1/30/2013 2/1/2013 23 34.78% 5,800,000 100,000 815,100 2,300,000 3,215,100

South

Sulawesi/Easte

rn Indonesia

Capacity Building and promotion the

Sanitation program for Pokja AMPL /

Sanitasi Kab. Sidrap

Kantor Bappeda Kab.

Sidrap

2/19/2013 2/19/2013 29 48.28% 975,000 0 1,405,000 0 1,405,000

South

Sulawesi/Easte

rn Indonesia

Third FGD on Feedback Mechanism

for Drinking Water and Sanitation in

Kabupaten Jeneponto

Bappeda Meeting Room

Jeneponto

2/24/2013 2/24/2013 17 11.76% 4,815,000 350,000 1,100,000 150,000 1,600,000

Traning of

Trainers

West

Java/Banten/D

KI Jakarta

Training for Enumerators of the

Survey on Improved Hygiene

Behavior Kota Bogor and Kabupaten

Tangerang, 31 January 2013

IUWASH meeting

room, Jakarta office

1/31/2013 1/31/2013 27 48.15% 3,425,000 0 841,000 2,100,000 2,941,000

Page 198: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 180

Central Java PELATIHAN KETRAMPILAN

FASILITASI DAN MOTIVASI &

ADVOCACY BAGI SANITARIAN

KAB BATANG

Dinas Kesehatan Kab

Batang

2/5/2013 2/7/2013 42 47.62% 15,050,000 3,634,000 9,630,000 0 13,264,000

Central Java PELATIHAN KETRAMPILAN

FASILITASI DAN MOTIVASI &

ADVOCACY BAGI SANITARIAN

KOTA SALATIGA

Dinas Kesehatan Kota

Salatiga

2/26/2013 2/28/2013 40 70.00% 13,325,000 3,809,500 4,270,000 4,050,000 12,129,500

Central Java PELATIHAN KETRAMPILAN

FASILITASI DAN MOTIVASI &

ADVOCACY BAGI SANITARIAN

KAB REMBANG

Dinas Kesehatan Kab

Rembang, Jateng

3/13/2013 3/15/2013 38 55.26% 17,350,000 1,075,000 5,010,000 4,950,000 11,035,000

South

Sulawesi/Easte

rn Indonesia

Technical Support and capacity

Building for KSM/BPS Sanitation at

Kabupaten Sidrap

Dinas PU kabupaten

Sidrap

1/17/2013 1/17/2013 16 25.00% 1,445,000 100,000 200,000 450,000 750,000

South

Sulawesi/Easte

rn Indonesia

Penyusunan GIS (Spatial Data

Pelanggan) Wilayah pelayanan

Terpadu Jayaasri.

Aula PDAM Jayapura 3/13/2013 3/15/2013 10 0.00% 1,500,000 0 1,500,000 0 1,500,000

Traning

Course

National PELATIHAN ENUMERATOR

UNTUK SURVEY PERUBAHAN

PERILAKU DI LOKASI PROGRAM

KOTA SEMARANG DAN

SURAKARTA

Kelurahan Jomblang

Kota Semarang dan RM

Ramayana Kota

Surakarta

1/18/2013 1/19/2013 37 45.95% 5,900,000 1,314,250 1,300,000 1,150,000 3,764,250

North

Sumatra

Pendampingan Evaluasi Final Report

Review Design WTP III Beting

Semelur Dan Pemasangan Pipa

Distribusi Utama Sepanjang 600

meter Di PDAM Tirta Kualo Kota

Tanjungbalai 21 - 22, Januari dan 15

– 16 Februari 2013

aula rapat PDAM Tirta

Kualo Tanjungbalai

1/21/2013 2/16/2013 8 12.50% 4,200,000 1,940,000 630,000 600,000 3,170,000

North

Sumatra

Pelatihan Teknis Optimalisasi Jaringan

Perpipaan dan Pemetaan Jaringan Air

Minum Eksisting PDAM Tirta BIna

Kabupaten Labuhanbatu

PDAM Tirta Bina 1/21/2013 1/25/2013 10 0.00% 4,275,000 2,125,000 600,000 300,000 3,025,000

North

Sumatra

Pelatihan Teknis Optimalisasi

Jaringan Perpipaan dan Pemetaan

Jaringan Air Minum Eksisting PDAM

Tirta Wampu Kabupaten Langkat

PDAM Tirta Waampu

Langkat

1/22/2013 1/25/2013 13 0.00% 4,275,000 1,900,000 670,000 300,000 2,870,000

North

Sumatra

Training for Enumerators of the

Survey on Improved Hygiene

Behavior Kota Tebing Tinggi, Kota

Tanjungbalai dan Kota Medan

Kota Tebing Tinggi,

Kota Tanjungbalai dan

Kota Medan

2/5/2013 2/12/2013 33 48.48% 4,140,000 2,257,100 969,500 730,000 3,956,600

Page 199: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 181

North

Sumatra

Assesment CEm Tanjung Bala

(Asesement Pelayanan Air Minum)i

3/21/2013 3/21/2013 18 22.22% 1,135,000 75,000 113,000 50,000 238,000

Central Java [PINDAH KE PM-8.3] PELATIHAN

ENUMERATOR MONEV

PERUBAHAN PERILAKU DAN

PENGAMBILAN DATA PRIMER/

MONEV DI LOKASI PROGRAM,

SEMARANG KOTA DAN

SURAKARTA

Kalurahan Jomblang

Kota Semarang dan

Bappeda Kota Surakarta

1/18/2013 1/19/2013 37 45.95% 11,410,000 1,314,250 4,250,000 1,150,000 6,714,250

Central Java Pelatihan Program Penurunan

Tingkat Kehilangan Air (NRW) di 4

PDAM di Jawa Tengah Pelatihan

NRW PDAM Kota Semarang

PDAM Tirta Moedal

Kota semarang

2/12/2013 2/13/2013 45 26.67% 2,900,000 196,000 2,700,000 0 2,896,000

Central Java PELATIHAN KETRAMPILAN

FASILITASI DAN MOTIVASI &

ADVOCACY BAGI SANITARIAN

KAB SEMARANG

Dinas Kesehatan Kab

Semarang

2/20/2013 2/22/2013 34 50.00% 14,425,000 3,499,750 2,987,500 4,900,000 11,387,250

Central Java Pelatihan Enumerator Survey

Reklasifikasi Pelanggan PDAM Kab.

Klaten

PDAM Klaten 2/26/2013 2/26/2013 45 93.33% 9,050,000 4,652,700 2,336,900 2,250,000 9,239,600

Central Java FGD Tindak Lanjut Replikasi

Penurunan NRW di PDAM Kota

Semarang, Kab. Semarang, Kab.

Kendal dan Kab. Kudus

Kantor IUWAS Jawa

Tengah

2/27/2013 2/27/2013 23 13.04% 1,580,000 0 770,000 900,000 1,670,000

Central Java PELATIHAN MARKETING

&PROMOSI SAMBUNGAN BARU

AIR MINUM DAN SANITASI BAGI

TIM PROMOSI PDAM 7

KOTA/KABUPATEN DI JATENG

Kalisoro Tawang Mangu 1/30/2013 2/1/2013 36 19.44% 33,450,000 1,535,950 22,532,500 9,300,000 33,368,450

East Java Training of Customers Satisfaction

Survey-PDAM Kabupaten Jombang

Kabupaten Jombang 1/8/2013 1/14/2013 20 30.00% 9,950,000 8,798,200 0 1,072,000 9,870,200

East Java Pelatihan Wira Usaha Sanitasi di Jawa

Timur

Hotel Kusuma Agro

Wisata, Batu

1/29/2013 2/2/2013 40 72.50% 124,375,000 16,949,317 80,432,000 8,044,000 105,425,317

East Java Training for Enumerators of the

Survey on Improved Hygiene

Behavior Probolinggo City

Dinas Kesehatan Kota

Probolinggo

2/8/2013 2/8/2013 20 60.00% 4,875,000 778,000 750,000 650,000 2,178,000

East Java Training for Enumerators of the

Survey on Improved Hygiene

Behavior in Kabupaten Malang

Dinas Kesehatan

Kabupaten Malang

2/11/2013 2/11/2013 21 71.43% 4,875,000 534,250 637,000 700,000 1,871,250

East Java Training for Enumerators of the

Survey on Improved Hygiene

Behavior in Kabupaten Sidoarjo

Dinas Kesehatan 2/12/2013 2/12/2013 11 90.91% 5,600,000 268,000 1,747,200 450,000 2,465,200

Page 200: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 182

East Java Kampanye Gerakan Cuci Tangan

Pakai Sabun di Sekolah di Kota

Malang

SD Dinoyo Kota

Malang

3/13/2013 3/15/2013 117 55.56% 4,850,000 3,275,000 1,090,000 0 4,365,000

South

Sulawesi/Easte

rn Indonesia

Training of Entry Data EHRA

Questioner for Badan Pusat Statistik

(BPS) Kabupaten Jayapura

Kantor BPS Kota

Jayapura

1/19/2013 1/19/2013 4 25.00% 3,175,000 700,000 227,100 200,000 1,127,100

South

Sulawesi/Easte

rn Indonesia

Pelatihan Teknis Pengukuran Debit

Potensial dan Tracking Wilayah

Negeri Passo

Negeri Passo Teluk 1/22/2013 1/27/2013 7 0.00% 1,560,000 0 1,145,850 300,000 1,445,850

South

Sulawesi/Easte

rn Indonesia

Training For Enumerator of the

survey on improved hygiene Behavior

Makassar 2/7/2013 2/7/2013 19 78.95% 7,075,000 955,700 3,035,000 3,000,000 6,990,700

Workshop North

Sumatra

Workshop Pengembangan Kapasitas

Dewan Pengawas PDAM

Kota Medan 2/11/2013 2/13/2013 27 96.30% 58,290,000 2,327,200 36,288,015 9,078,468 47,693,683

North

Sumatra

Sosialisasi Program Kredit Air Pro

Rakyat

Kantor PDAM Tirta

Wampu

2/12/2013 2/12/2013 50 18.00% 8,200,000 3,952,500 1,323,000 2,470,000 7,745,500

North

Sumatra

Advocacy for Policy Maker for

Cooperation in Enhancing Communal

System Utilization Through Sanitation

DAK and Sanimas Program

(Pembentukan Forum KSM Pengelola

MCK komunal Tingkat Kota)

Aula MUI 2/19/2013 2/19/2013 55 60.00% 5,160,000 1,602,000 1,146,000 2,400,000 5,148,000

North

Sumatra

Workshop Pengenalan SOP Dan GIS

Untuk PDAM

Medan 2/20/2013 2/21/2013 0 0.00% 18,900,000 1,105,000 8,000,000 3,650,000 12,755,000

North

Sumatra

[MOVE TO SAN 2] Sosialisasi Teknis

Sambungan Rumah Instalasi

Pengolahan Air Limbah

Aula Kantor kelurahan 2/21/2013 2/21/2013 52 50.00% 5,370,000 1,235,000 1,063,500 2,250,000 4,548,500

North

Sumatra

[NON TRAINING EVENT-

EXHIBITIONS] Workshop Pelantikan

Forum KSM Kota dan Pameran

Program HEBAT

Jl. Sipori-pori gg.

Tamborih Lingkungan

VI Kel. Kapias Pulau

Buaya, Kec. Teluk

Nibung.

2/26/2013 2/26/2013 111 45.95% 17,510,000 11,172,000 5,634,000 500,000 17,306,000

North

Sumatra

Visioning Workshop Kota Sibolga Sibolga 2/27/2013 2/27/2013 40 7.50% 12,100,000 3,597,500 3,520,000 2,625,000 9,742,500

North

Sumatra

[NON TRAINING EVENT-

EXHIBITIONS] Workshop Wrap Up

Program HEBAT

Jl. Kebon Komplek

Mino lingkungan II Kel.

Tanjung Marulak Hilir

Kec. Rambutan

2/27/2013 2/27/2013 144 43.06% 15,265,000 10,200,000 4,518,000 400,000 15,118,000

North

Sumatra

Visioning Workshop Kabupaten

Labuhan Batu

Rantauprapat 3/5/2013 3/5/2013 46 19.57% 13,325,000 2,669,500 6,325,000 3,450,000 12,444,500

Page 201: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 183

North

Sumatra

Pengangkatan isu gender bagi calon

pengguna jamban individu di

kelurahan Belawan Bahari

Aula Kelurahan

Belawan Bahari, Medan

3/14/2013 3/14/2013 37 43.24% 4,275,000 759,000 1,080,000 1,600,000 3,439,000

North

Sumatra

Workshop Pengenalan Penurunan

NRW

Medan 3/26/2013 3/26/2013 21 0.00% 16,590,000 2,353,500 5,120,000 4,900,000 12,373,500

West

Java/Banten/D

KI Jakarta

Mini Workshop “Pembuatan Bisnis

Plan, Penyusunan Skema Kredit,

Pengembangan Strategy Pemasaran

dan Pengembangan Opsi Sanitasi

Aula Dinkes Kab Lebak 1/30/2013 1/30/2013 25 32.00% 5,600,000 2,184,500 1,313,200 1,550,000 5,047,700

West

Java/Banten/D

KI Jakarta

Diskusi dan Observasi Lapangan ke

Master Mater Rajeg Kabupaten

Tangerang

Desa Sukamanah, Rajeg 2/1/2013 2/1/2013 20 80.00% 2,200,000 400,000 962,500 400,000 1,762,500

West

Java/Banten/D

KI Jakarta

Diskusi dan Observasi Lapangan ke

INSIST Pademangan

Pademangan, North

Jakarta

2/2/2013 2/2/2013 22 63.64% 2,300,000 100,000 1,915,000 0 2,015,000

West

Java/Banten/D

KI Jakarta

Visioning Workshop Bidang Air

minum Dan Sanitasi, Pemerintah

Kabupaten Lebak Lebak, 5 Feb 2013

Pendopo Kabupaten

Lebak

2/5/2013 2/5/2013 89 11.24% 19,300,000 5,476,500 4,400,000 400,000 10,276,500

Central Java Lokakarya Menyongsong PPSP 2013

di Kabupaten Semarang

Kantor Bappeda

Kabupaten Semarang

1/16/2013 1/16/2013 23 39.13% 2,500,000 575,000 1,050,000 150,000 1,775,000

Central Java Lokakarya Kerjasama Bidang Air

Limbah Antara Pemerintah

Kabupaten, Provinsi dan Pusat

Hotel Sunan, Jl Ahmad

Yani Solo

1/21/2013 1/22/2013 29 24.14% 30,000,000 3,467,100 19,280,000 6,000,000 28,747,100

Central Java Penandatanganan MoU dan Visioning

Workshop Pembangunan Air Minum

dan Sanitasi Kabupaten Batang

Hotel Sendangsari, Jl

Jenderal Sudirman,

Batang

1/29/2013 1/29/2013 62 24.19% 12,300,000 4,066,500 5,600,000 2,700,000 12,366,500

Central Java Visionig Workshop Pembangunan Air

Minum dan Sanitasi Kabupaten

Rembang

RM Teras Kota,

Rembang

2/6/2013 2/6/2013 50 22.00% 12,525,000 4,439,400 5,750,000 1,450,000 11,639,400

Central Java PY3_Sarasehan ‘Penyamaan Persepsi

terkait Program Air Limbah dan Air

Bersih’ Di Kampung Jomblang – Kota

Semarang

Kampung Jomblang,

Kecamatan Candisari,

Kota Semarang

2/10/2013 2/10/2013 53 9.43% 2,250,000 0 1,745,800 350,000 2,095,800

Central Java WORKSHOP EPS TINGKAT

MASYARAKAT LOKASI PROGRAM

USRI dan SLBM KAB SUKOHARJO

Dinas Kesehatan Kab

Sukoharjo

2/16/2013 2/16/2013 29 37.93% 3,550,000 0 861,000 1,450,000 2,311,000

Central Java KICK OF MEETING PROGRAM

”KAMPUNG SANITASI” SEMANGGI

RW 23 KELURAHAN SEMANGGI

KEC PASARKLIWON

Bappeda Kota Surakarta 3/20/2013 3/20/2013 41 21.95% 4,250,000 619,000 2,500,000 750,000 3,869,000

Page 202: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 184

Central Java Penandangan MoU dan Visioning

Workshop Pembangunan Air Minum

dan Sanitasi Kota Salatiga

Ruang Eksekutif, Kantor

Walikota Salatiga, Jalan

Letjen Sukowati Salatiga

3/25/2013 3/25/2013 80 40.00% 10,350,000 5,275,000 4,875,000 0 10,150,000

East Java Workshop Penyusunan Perdes

Persiapan Kec. Dau Menuju

Kecamatan ODF di Kabupaten

Malang

Pendopo Kecamatan

Dau

1/7/2013 1/7/2013 25 16.00% 4,400,000 211,000 700,000 1,250,000 2,161,000

East Java Workshop Pengelolaan Sanitasi Kab

Gresik

Hotel Saptanawa, Kab

Gresik

1/10/2013 1/10/2013 16 31.25% 5,766,000 116,000 4,356,000 800,000 5,272,000

East Java Workshop Menggagas Masa Depan

Air dan Sanitasi oleh SKPD terkait

Kabupaten Probolinggo

Hall Meeting Bappeda 1/15/2013 1/15/2013 30 16.67% 5,570,000 372,500 1,200,000 200,000 1,772,500

East Java Workshop Citizen Engagement

Mechanism

Bromo View Hotel 1/16/2013 1/18/2013 23 21.74% 27,190,000 3,307,000 16,806,000 4,200,000 24,313,000

East Java Pengelolaan Sanitasi Kabupaten

Malang

Hotel Gajahmada

Graha, Malang

1/23/2013 1/23/2013 17 35.29% 5,410,000 49,000 3,000,000 850,000 3,899,000

East Java Lokakarya Menggagas Masa Depan

Air dan Sanitasi oleh SKPD terkait

Kabupaten Malang

Hotel Gajahmada

Graha Malang

1/23/2013 1/23/2013 23 26.09% 6,230,000 0 3,350,000 850,000 4,200,000

East Java Lokakarya restrukturirasi hutang -

tarif dan energy efficiency- Business

Plan PDAM Kab Lamongan dan

PDAM Kab Gresik

Hotel Mercure Surabaya 1/27/2013 1/27/2013 16 25.00% 8,130,000 905,000 4,000,000 500,000 5,405,000

East Java Workshop Initiate futured Water

supply and sanitation by SKPD

Related and CSO Batu City

Hall Kusuma

Agrowisata Batu

2/6/2013 2/6/2013 21 33.33% 6,030,000 0 4,000,000 1,100,000 5,100,000

East Java Workshop Identifikasi dan Pemetaan

Permasalahan Sanitasi Kota Batu

Hotel Kusuma

Agrowisata Batu

2/7/2013 2/7/2013 22 31.82% 6,107,000 48,000 4,000,000 1,100,000 5,148,000

East Java Menggagas masa depan air minum

dan sanitasi oleh SKPD dan CSO

Hotel Yusro Kabupaten

Jombang

2/15/2013 2/15/2013 22 22.73% 9,755,000 217,500 5,271,600 1,000,000 6,489,100

East Java Workshop Identiikasi Permasalahan

Sanitasi Kabupaten Jombang

Hotel Yusro, Jombang 2/26/2013 2/26/2013 15 20.00% 4,871,500 236,500 3,000,000 750,000 3,986,500

East Java Workshop Identifikasi Permasalahan

Sanitasi Kabupaten Probolinggo

Hotel Bromo View,

Probolinggo

3/6/2013 3/6/2013 16 12.50% 5,171,500 195,250 3,054,500 800,000 4,049,750

East Java Gender Workshop & TAMIS Training

untuk City Coordinators

EJRO, Kota Surabaya 3/27/2013 3/27/2013 10 30.00% 515,000 0 112,000 0 112,000

South

Sulawesi/Easte

rn Indonesia

Penyamaan Persepsi Pemanfaatan

Sarana Sanitasi Program USRI untuk

Sie Kampanye Kesehatan KSM

Hotel Singgasana Kota

Makassar

2/23/2013 2/23/2013 66 81.82% 18,450,000 1,035,000 11,250,000 3,050,000 15,335,000

South

Sulawesi/Easte

rn Indonesia

Visioning Workshop dengan

Pemerintah Kabupaten Bantaeng

Bupati meeting room

Kabupaten Bantaeng

2/26/2013 2/26/2013 26 26.92% 15,600,000 100,000 1,060,000 550,000 1,710,000

Page 203: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

QUARTERLY PROGRESS REPORT 8 JANUARY - MARCH 2013

USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID 185

South

Sulawesi/Easte

rn Indonesia

Penyelesaian Dokumen Pokja AMPL

Kota Jayapura

Hotel Maspagco Kota

Jayapura

2/26/2013 2/27/2013 12 41.67% 8,200,000 202,800 6,060,000 900,000 7,162,800

South

Sulawesi/Easte

rn Indonesia

Workshop Konsultasi Publik

Dokumen SSK Pokja AMPL Kota

Makassar

Hotel Singgasana Kota

Makassar

2/26/2013 2/26/2013 36 30.56% 8,550,000 390,000 7,800,000 0 8,190,000

South

Sulawesi/Easte

rn Indonesia

Penyelesaian Dokumen BPS dan SSK

Pokja AMPL Kota Ambon

Hotel Aston Natsepa

Ambon

2/28/2013 3/2/2013 21 33.33% 18,700,000 20,000 11,500,000 4,400,000 15,920,000

Study Tour North

Sumatra

Kunjungan Masyarakat Pelanggan

Saluran Air Limbah ke IPAL Cemara

IPAL Cemara PDAM

Tirtanadi

1/20/2013 1/20/2013 63 63.49% 3,650,000 450,000 0 2,600,000 3,050,000

Central Java KUNJUNGAN BELAJAR SEPTIC

TANK KOMUNAL WARGA

SEMANGGI RW 23 KE SEPTIC

TANK KOMUNAL WARGA

PAJANG

Kelurahan Pajang Kota

Surakarta

2/12/2013 2/12/2013 19 52.63% 5,000,000 750,000 748,000 1,000,000 2,498,000

East Java Studi Banding Pembelajaran Kisah

Sukses Program STBM dan Pengusaha

Sanitasi Kabupaten Kediri bagi

Fasilitator STBM dan Dinas

Kesehatan Kota Batu

Puskesmas Ngancar -

Kabupaten Kediri

2/21/2013 2/21/2013 14 35.71% 3,450,000 902,160 1,010,400 0 1,912,560

East Java Comparative Study to learn

operational and maintenance and

management for small sewerage

system in Kota Blitar

Kota Blitar 3/5/2013 3/7/2013 12 58.33% 14,100,000 2,508,408 3,244,000 0 5,752,408

Page 204: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through
Page 205: QUARTERLY PROGRESS REPORT 8 - IUWASH PLUS · QUARTERLY PROGRESS REPORT 8 . JANUARY - MARCH 2013. APRIL 2013 . This report is made possible by the support of the American People through

INDONESIA URBAN WATER SANITATION AND HYGIENE

Mayapada Tower 10th Fl. Jl. Jend. Sudirman Kav. 28

Jakarta 12920 Indonesia

Tel. +62-21 522 - 0540 Fax. +62-21 522 – 0539

[email protected] www.iuwash.or.id