31
DEPARTMENT OF FASHION TECHNOLOGY QUALITY MANUAL KUMAR & TYAGI CLOTHING Training and Development of Supervisor 5 May 2014 [The document contains the Quality Manual for a self assumed company] Faculty In-charge – Mohammad Umar DFT Submitted By – Neetek Kumar Prashant Tyagi DFT SEM VI

Quality Manual Madura

Embed Size (px)

DESCRIPTION

quality control used at madura garment maufacturing unit

Citation preview

1

Madura Garments Exports Ltd Quality Manual

DEPARTMENT OF FASHION TECHNOLOGY

QUALITY MANUAL

KUMAR & TYAGI CLOTHING

Training and Development of Supervisor

5 May 2014

[The document contains the Quality Manual for a self assumed company]

1. Quality Assurance

1.1 QUALITY POLICY

MADURA GARMENTS EXPORTS LTD. is committed to comply with requirements and continuosly improve the Quality management system and supply high quality garments on time to enhance customer satisfaction through training and involvement of employees.

1.2 QUALITY OBJECTIVES

1. To increase the Production from the existing level every year.

2. Continuous improvement

a) Productivity

b) Waste elimination

c) House keeping

3. To make employees multiskilled through training and development.

4. To maintain and improve Workorder throughput time

5. To reduce seconds percentage

2. Quality checkpoints

NOT OK

Fabric 100% Visual inspection &

trims 10% inspection

OKQuality check at the beginning of the lay

NOT OK

.

OK

Check for the first ply NOT OK

OK

aaa

NOT OK

Quality check in between lay

NOT OK

NOT OK After laying Check the following points at the start and end of cutting process.

NOT OK

OK

Cut parts; check the following points

NOT OK

NOT OK

OK

NOT OK

OK

NOT OK

Collar visual

OK

Standard, measurement collar

NOT OK

Left and right front parts.

Visual standard, measurement

NOT OK OK

Assembled shirt,

Measurement,

NOT OK OK visual Standard.

OK

NOT OK

Identify first quality

Seconds and rejects

NOT OK

OK

R

OK

E

J

AQL

NOT OK

C

T

S

OK

ACCEPT

3. Quality Procedures

3.1 Fabric Inspection

No sooner Fabric is in house, The Fabric inspection report, Shrinkage report & 100% Shade bands should be submitted within 48 hours. Fabric is to be cut only after the above reports are submitted & only if they are approved for bulk production. 100% of the Fabric is to be inspected on a 4 point system & if the fabric is in doubt, further 100% should be Inspected. While submitting the Fabric Inspection reports, all trim inspection reports should be submitted too. If Fabric is cut without been Inspected, Total responsibility will be on this department as it is a violation of a critical aspect. (Annexure 1)3.1.1 Fabric Inspection. ( Inspection on 4 point system )

Purpose: To decide acceptance or rejections of fabric roll (For Wovens)ActivityRequirement

1. Take the roll.

2. Check the roll as per 4 points system.

3. Give penalty points for defects.

4. Calculate index for each individual roll.

5. Calculate final average index for the total no. of rolls inspected.

6. Decide acceptance or rejectance of the fabricRoll to be chosen at random

Points / 100 sq. yd. =

Total points in roll * 36 * 100

Total length in yards * width in inches.

Record: Fabric inspection report

Classification P E N A L T Y P O I N T S

1 point 2 points 3 points 4 points

Faults showing in the warp direction of fabric. (Except Holes and tears). Less than 3inch. Over 3 inch but less than 6 inch. Over 6 inch but less than 9 inch. Over 9 inch.

Faults showing in the weft direction of fabric. (Except Weave stripes, weft irregularities, holes and tears). Less than 3inch.Over 3 inch but less than 6 inch. Over 6 inch but less than 9 inch. Over 9 inch.

I). Length of the faults is to be measured in the warp or weft direction and the direction in which the fault is longest is the fault direction. However when the warp and weft length are same and when the penalty of the shorter direction is heavier, take the fault of the direction in which the penalty is heavier. ii). When the fault in the warp direction is over 1yd, the part which is over 1yd is deemed as fault of the same kind of others. iii). When two or more faults overlap, apply only the faults which penalty is the heaviest. iv). When there are two or more faults within the length of 1yd and the penalty points come over 4 points, the points over 4 points are not added. v). The inspector needs to be at a distance of 3 feet away from the inspection table and the linear speed of inspection not to be less than 0.1mtrs per second.

Minimum fault sizes are shown on the Sears Fabric defect scale :-KnotsSlubs

A do not countA - do not count

B- Count as 1 pointB - do not count

C- Count as 1 pointC- Count as 1 point

D- Count as 1 pointD- Count as 1 point

E- Count as 3 pointsE- Count as 1 point

F- Count as 3 points

G- Count as 3 points

Standards for Passing Fabric:-

Average index for inspected rolls not to exceed 28 points / 100yd.

Maximum index for any roll not to exceed 40 points / 100yd.

3.1.2 100% Shade Bands

If the style is a wash garment, Before & after wash Blankets should be submitted ( 3 sets each ) covering all rolls and it has to attached in the shade continuity card (Annexure 2)A 100% shade band covering all rolls & all colours pertaining to a certain style / Consignment should be made & approved prior to cutting of bulk Fabric. Process.

No sooner the Fabric is in house, The Q/A department must ensure they get the panels representing all rolls within 6 hours from Stores.

Cut 6 from end of each roll. Over lock & join all panels in correct grain line direction to be in a Blanket form.

If the Style is a non-wash program, two sets should be prepared.

If the Style consists of a certain wash, Then 4 Blankets should be prepared. 02 Blankets non-washed & 2 Blankets with the exact approved wash of the style.

Once the Shade bands are ready, Dye lot or colour segregation has to be done. If the Shade Band consists of 2-3 different shades, such shades should be segregated In to families marked A, B, C Etc. A copy of the Segregation of shades should be handed over to the Stores, Cutting, and Merchandising & Production departments.

Stores will issue & the cutting / Production will proceed as per the segregated shades without getting mixed.3.1.3 Shrinkage reportA 100% Shrinkage report should be submitted for all styles and the washing shrinkage has to be performed as per the wash type required for the bulk. (Annexure 3)3.2 Trim Inspection report

All trims been In house should be inspected ( 10% ) & the reports submitted accordingly.

3.2.1 Trims Inspection

Purpose: To check defects and to decide Acceptance / Rejectance of trims.

Scope: Interlining, Collar bone, Label, Button, Packing Materials, Swing Ticket, Poly bag, Product box.

ActivityRequirement

A. Interlining

1. meters of lining to be sent to lab.

a. Bond strength

1. Take 10 * 4 of fabric strip and lining strip.

2.Cut rectangular slit 6*1 in Tissue paper of

8 * 4.

3. Sandwich Tissue paper between interlining and fabric then fuse.

4. Check Pull strength.

If by varying fusing conditions sufficient strength is not achieved the lot is rejected.

b. Shrinkage Test.

1. Send two collars to lab every day for shrinkage test.

c. Visual Inspection

1. Select the roll as per sampling plan.

Reject the lot is not ok.

EPI / PPI and GSM

Note the temperature, pressure and speed.

Pull strength to be at least 1 kg / sq.cm.

Check for uniformity, micro dots, uniformity of shade.

Record: Interlining Inspection report.

ActivityRequirement

B. Labels

a. Visual Examination

1. Check lettering, color, edges as per the Master and Specifications.

b. Color fastness test

1. Take few labels get it stitched on the white fabric.

2. Wash with soap and wash petrol.

If color bleeds rejects the lots.

No weaving defects.

Shade continuity.

Smooth and straight edges.

Centered labels.

No color bleeding.

Note: Selection Of all trims for the inspection to be as per sampling plan.

ActivityRequirement

C. Buttons

1. Check buttons for shade, chip around the edge.

2. Get stitched 10 buttons breaks stitched in machine.

3. If any one button breaks, then check for 10 more buttons.

If there is breakage reject the lot.

D. Packing Material

1. Check edges, slots and slot spacing.

Uniform in shade, gauge.

No chip.

NO breakage

No breakage.

Even edges for all the trims.

Slots and Slot spacing as per the specifications.

ActivityRequirement

E. Swing ticket

1. Inspect visually the lettering.

F. Product Box

1. Check for lettering, hinge, marks and color.

G. Polycovers

1. Check for lettering, uniformity and scratches.

H. Collarbones

1. Check for edges and points.

2. Stick few collarbones on fabric to check for glue.

If gum is insufficient, reject the lot.

No stains and misprints.

No misprints and spread hues

No misprinting and spread hues. Shade continuity to be maintained.

No cut edges, point to be as per specification.

Should fix firmly to the fabric.

Record: Trims inspection report.

3.3 Size set

Bulk production cannot be started without the QA Department approving the Size set for each new style. Once the size set is approved, The Pattern should be checked & authorized by this department for utilization.

3.4 PP Meeting

A PP meeting should be organized & conducted prior to bulk production including Buyers Representative, Merchandiser, Production Manager & all sectional heads, Supervisors & Q/Cs involved with the particular style. No Production is to start without a PP Meeting & all points to be discussed & documented in the PP meeting format (Annexure 4). The QA Manager or the Technical Manager should write down the minutes & file the PP meeting comments in the style file Technical, Quality, Packing, Washing, Shipping ETC.

3.5 Pilot Run

Once the Production submits the Pilot run, Bulk production should be approved based on the performance of this cut. If it is not satisfactory, a new pilot run should be made.

3.6 Mock-ups preparation

After the handover meeting of the style to the production floor, the style requirements as discussed in the meeting should be converted into the visual standards and displayed at all relevant work stations as guide for the work.

3.7 Test to failure Purpose Testing mock up pieces (36) to demonstrate consistency in fabric, threads, machinery. The test pieces are pulled with a force until they are destroyed establishing the kilograms at which they are break apart.

Results details- are recorded as = Z factor.

Where there is a consistent result the Z factor will be 4 or above Pass.

Where there is inconsistency the Z factor will be less than 4 Fail.

Importance

These tests and the documentation are our evidence of the control to ensure the product we make is safe. It also allows us to identify if there is any inconsistency which we need address to improve the product safety.The TTF results are required to accompany the master style file and should be discused at the time of hand over meeting.

3.8 Pull Tests

Purpose

To ensure the application is button, stud, snap can withstand a set kilogram of pulling. The recommendations are specified by our customer at 7 kg per single pull but as a safe guard MGEL recommend our procedure is pulled at 8 kg.ImportanceTo ensure the application can withstand the desired amount of strain in normal wearing conditions. 5 Pcs randomly must be monitored closely due to product safety.

3.9 Durability Wash

Purpose

This wash test is carried out in the laboratory to ensure the garments construction is robust (strong). The laboratory test highlights any change to the following areas: Seam breakdown, fused components, change to colour appearnace, optical brightner and fabric handle, effects on accessories, colour fastness, pleat sharpness and any wadding. The wash is carried out at 10 degrees higher than the recommended label wash tempreture. The laboratory also need a garment reference- for the pre-wash inspection and then the after wash inspection. 3 garments minimum requirement.

Importance

To ensure all our methods, fabric and trim accessories are suitable to the style and will perform over numerous times of wear. To prevent customer returns and customer dissatisfaction.3.10Cutting Department3.10.1 Laying & Cutting area Rolls segregated & lay as per shrinkage option or shade band separation in case of wash & non wash program respectively.

Relaxation of Fabric for Stretch & Knit at least for 12 Hours and fabric relaxation report maintained.3.10.2 Markers Check

1. Marker Way

2. All parts All parts are there in the marker.

3. Ratio Size ratios as written on the marker.

4. Shrinkage whether made as per shrinkage option mentioned.

5. Skip whether any cut line is skipped.

6. Overlap check for any part overlapped.

7. Grain line all parts in grain line as per required.

8. Marker length as per mentioned. 3.10.3 Prior to Spreading

1. Fabric Quality report.

2. Shrinkage report.

3. Rolls width to be laid.

4. Rolls shrinkage to be laid.

5. Rolls shade to be laid.

3.10.4 Spreading

1. Table marks check for the table marks as per the lay length.2. Bowing check for bowing in the fabric3. Narrow goods check for any narrow goods.4. Mis-alignment of plies plies alignment at both ends.

5. Leaning check at the edges for leaning6. Ply Tension check for ply tension7. Count whether plies are counted correctly.8. Nap direction whether required nap direction is followed.9. End loss check for end losses.While spreading all the defects identified in the fabric inspection stage should be marked using a contrast color waste fabric stripe. (Annexure 5)3.10.5 after cutting

1. Grain direction

2. Notches

3. Ragged cut

4. Selvedge

5. Bowing

Ticketing (numbering) should be done on the same cutting table.

The cut panel having contrast colour stripe should be inspected before ticketing for the defects.

3.10.6 Fusing Procedures

Fusing has to be carried out as per the conditions specified by the interlining supplier, every four hours one sample of the fused component has to sent for washing and peel bond strength testing and also the testing of the temp, pressure and time has to be carried out. In case of failure on any of these all the bundles fused in last 4 hours on that machine has to be recalled and refused. During fusing the fusing operator has to follow work instructions as mentioned in the work instructions sheet for fusing (Annexure 6). SHAPE \* MERGEFORMAT

3.10.6.1 Testing procedures for fusing

Testing procedure for various test mentioned above are as follows

Temperature

Using three thermo-paper strips take the temperature across the width of the press or machine belt.

Check and record the temperature with the recommended speed and fusing time.

The press will need to be adjusted if variation of more than 5C below or 10C above the recommended fusing temperature is recorded.

Time

Check time with a stopwatch for the actual period for which temperature and pressure is applied on the fused composite.

Washing

Carry out durability wash test daily on the fused components per fabric per colour.

Peel Bond Strength

Use three strips of fabric, each15x5cms, placed evenly across the belt, position the interlining to cover the fabric with no overlap

Set the recommended fusing conditions for bulk production and allow it to cool.

Conduct peel bond strength test

Ensure an even bond and acceptable peel bond strength before production.

Fusing all Interlining fusing has to be ready finished (block cut)

a. Woven interlining Sewing allowance to be .

b. Non fusible woven - ----do---------

The entire interlining pattern has to be aligned with shell pattern 1/8" less all around

For order size more than 2000 pcs for lining cutting die should be used.

3.10.7 Assorting & Bundling

The ready to feed bundle should be checked for the following defects Whether numbers are correct.

Actual quantity as compared to mentioned

Cut parts check against hard pattern.

Shade variation in cut parts with same number.

Fusing defects etc.

3.11 Sewing floorQuality control on the product, Packing & stacking should be maintained at the highest level.

A full functional traffic light system (Annexure 7) should be maintained at all times. Statistical process controlling ( SPC ) should be implemented for every line to minimize rejections. No Garment should be passed with inferior quality & rectification to be made with immediate effect & documented.

3.11.1 Traffic Light System.

This System is a very affective approach in curtailing & discontinuing defected panels & garments with discrepancies from moving in the Line. There are three colors to identify the progress of the operator & the quality.

Green, Amber & Red bag with the Instructions of Operation descriptions to be audited.

* Green If this color is flagged by the Line Q/C on top of a machine, it indicates that the Operation is under control & of good standing & could proceed to the next operation or machine.

* Amber - If this color is flagged, it high lights that the Operation produced by the Operator is in a tolerance margin & needs close observation from Superiors.

* Red If the Line Q/C has flagged this color on top of a machine, you should halt the machine & the operation immediately & rectify same without any delay & ensure the productivity is not affected. In the same time the Line Q/C must record Instruction paper what is in color bag & her operation file to follow up & same Q/C will issue a Pink token to the Supervisor to rectify same & to follow up in three consecutive instances in the same Operation (To Ensure 0 defects are maintained in a particular Operation) & cross check with the Q/A.

The roaming Q/C must continue for each & every machine Incorporating the same process in the Line (Not more than 32 machines per line), Minimum four times a day.

Each Line Q/A dept should have two In process Audit stations for 100% components check with the defect statistics (In line Inspection report Annexure 8) maintained which could be analyzed hourly on each Operation to rectify prior to an Assembling Garments.

Each end Line should have a QA Audit station performing 100% Inspection of Garments prior to moving to the next Process & the Defects to be maintained in the Defect Analysis Report (Annexure 9).

No inline & end line checkers should have trimmers.

3.11.2 AQL Audit.

Apart from the 100% Inspection at End Line, the Q/A Dept should Audit the Merchandise randomly to ensure the Quality standard set by MGEL. Each Auditor should cover 5 Production lines & every hour as per the given AQL (Annexure 10). If the Standard is acceptable as per the below stipulated table, The Goods can be processed for the next Operation. However if the Merchandise is not up to the required Criteria, Total Qty should be returned back to the Production Line for immediate rectification & the same Auditor should closely Monitor until the rectification is complete. You have to strictly adhere to maintain an AQL level of 1.5 during Inline Inspections.

3.11.3 Random Measurement Audit.The QA dept should inspect measurements of Garments randomly covering all styles, Color & Sizes to ensure the Merchandise is meeting the required Specification before & after wash. (Annexure11)3.11.4 Finishing AQL AuditThe QA dept should inspect packed pieces before it is packed into the cartons on the AQL basis. (Annexure 12)3.11.5 Pre Final Audit

Prior to handing over merchandise for final Audit to Buyers, the Q/C department should do an interim Inspection & submit copies of the reports to the G/M Production & marketing, Production Manager & the relevant Merchandiser for each P/O. This is Mandatory. A count & accuracy report should be submitted as well. ( Annexure 13)3.11.6 Outgoing Quality Level

All the external audit reports should be compiled into one final report with the defect penalty points will expressed as percentage of total defectives found over the total quantity shipped out for that month. Also a report of total external audits failed over total external audits faced in that month should also be prepared.(Annexure 14)3.11.7 Reports

All inspection in Production & finishing should be daily documented by using Inline reports & a copy of these reports should be submitted to the relevant Merchandiser at least twice a week without fail.

3.11.8 Samples

The QA Department should submit the following samples, T.O.P Within 3 days of bulk input as per buyers required size & Shipment samples as per buyers requirement, one day before final audit. This should be strictly adhered to.

i) It is mandatory that all Line Quality Supervisors & controllers should patrol their respective lines on a daily basis

prior to starting bulk production in the morning to ensure that the Line is geared to Produce high quality Apparels.

* The following aspects should be taken in to awareness,

a) Cleanliness of the Floor No Garments, Dust, Stickers, Stains etc to be on floor.

b) Cleanliness of Machines

1) Well cleaned without any dust.

2) Oil level & Stains on M/C to be checked.

3) Needles to be checked & should be fluff free & not blunt.

4) Any M/C with Red flags on & if, Mechanic to be questioned.

c) Check for Reject Garments No Reject garment is to be brought forward from the previous day without been rectified. All Reject Garments should be rectified on the same day & not kept separately inside the line.Check trims& fabric as per the Qty.

Cad checking against master copy, Shrinkage, marker length & width, proper scrambled sizes, all parts in marker, Line balancing?

Laying

Style descriptions, Fabric code, W.O. no, Design approval, Fabric one way or two ways?

Re-do

Shade, width-wise lay, Waviness, Bowing?

Fabric& Trims status

Issue to Cutting

RTS

Re-do

Is W.O .no, size, central line, notches, straight line, repeat width, Line balancing, pairing, shade ok, Fabric defects marked

Marker placement, Line balancing, No. of plies?

Re-do

Re -Do

Re-Do

Re-Do

Issue of Quality passed cut parts to sewing

Quality check during fusing

Check for W,O no, weaving defect, Style verification, Centre notch, Fabric Damage,pairing,shape,St line

Check forW.O no,bubbling,Fused thread,Stain,lining

Is W.O.no,size,parts bundleno,numbering,lay no okay?

Re-Do

Is W.O.no,Centre line,Repeat,Balancing,St line,one way okay?

Check for W.O no, bubbling, Fused thread, Stain, lining

Quality check during fusing

Issue of Quality passed cut parts to sewing

Is W.O .no, size, central line, notches, straight line, repeat width, Line balancing, pairing, shade ok, defects marked

Is W.O. no., Centerline,Repeat,

Balancing,St line,one way,shade OK ?

Is W.O .no, size, parts, bundle no, numbering, lay, shade OK?

Check for W.O. no., weaving defect, Style verification, Center notch, Fabric damage, pairing, shape, St line

Re-do

Re-do

Re-do

Re-do

Re-do

Display of reference shirt with comments & receive information for checking

Re-Work

Check point 1 Collar inspection

In- line inspection by Traffic light System

Re-Work

Check point 2 front pairing

Re-Work

Check point3 trimming & inspection

Re-Work

End Line AQL Audit at AQL 2.5

Release to finishing

Checkpoint 4 Final Inspection

Seconds & alterations

Trolley wise AQL audit (2.5)

Folding & Packing

Pre Final Audit/

Finished Stock Audit

(10%, 25% and 50%)

Offer for final inspection

Release to Warehouse

Fusing

Wash testing, temperature testing, pressure testing, time testing

Issue to sewing lines

Recall all bundles fused in last 4 hours

Faculty In-charge

Mohammad Umar

DFT

Submitted By

Neetek Kumar

Prashant Tyagi

DFT

SEM VI

PAGE 22