GOVERNMENT OF ODISHA
DEPATMENT OF WATER RESOURCES
ANNUAL REPORT: 2018-19
OF
QUALITY CONTROL DIVISION, NAYAGARH
EXECUTIVE ENGINEER
QUALITY CONTROL DIVISION
NAYAGARH
CONTENT
1. INTRODUCTION
2. Name of Equipments available at Quality Control Division,
Nayagarh
3. Samples received and revenue collection at Quality Control
Division, Nayagarh
4. Name of the working divisions under Quality Control Division,
Nayagarh
5. Staff Strength of Quality Control Division, Nayagarh
6. Expenditure
7. Type of Test conducted
8. Site visit details
1. INTRODUCTION
This Division has been newly created in the year 2015 restructuring of Water Resources
Department. This office is temporarily functioning with hiring of private building at
Baramasi Danda road, College square, Nayagarh. This office has recently established
Quality Control testing Laboratory. Sanction has been accorded of functioning of office
the Executive engineer, Quality Control Division, Nayagarh vide letter no.5824 dated
15.03.2017 of Joint Secretary, Department of Water Resources.
ORGANISATION SET UP
Following two no’s AEE’s have joined to this division on dated 20.06.2016
1. Biswadeep Singh
2. Markandeya Dash
However one no.of AE (Civil) has been joined in this division on 01.08.2015 and
another one no.of AE has been joined in this division on 03.04.2017 and 5 no’s peon are
working in this division. Several correspondences have made with higher authorities for
posting of minimum no’s of ministerial staffs and technical staffs for smooth functioning
of this Division.
The work distribution of AEE(C) have been made as follows.
1. Biswadeep Singh, AEE(C)- Nayagarh Minor Irrigation Division, Nayagarh
Kandhamal Minor Irrigation Division, Phulbani
Boudh Irrigation Division,Boudh
2. Markandeya Dash, AEE(C)- Nayagarh Irrigation Division, Nayagarh
Boudh Minor Irrigation Division, Boudh
Inspection Vehicle
Two no’s Inspection vehicle has been provided to this division on hiring basis for
inspection of developmental work of above five no’s Divisions. One vehicle for Executive
Engineer and other is for two no’s A.E.E.s for inspection of site work.
The undersigned has been requested to the Director, Research and Quality
Control, Bhubaneswar to provide one more private vehicle on hiring basis.
2. Equipment Available
Sl. No
Name of the Equipment Qnty Year of Purchase
1 Analogue Compression testing machine, capacity 1000 kn, Electricity operator,single gauge.
02 No March. 2016
2 Concrete mixture drum type capacity 1.00 Cu.ft. 02 No March. 2016
3 Vibrating table, 50 x50 CM for moulds of 150 ml cube
02 No March. 2016
4 Set of sieves for coarse aggregates 125mm,80mm,40mm,20mm,16mm,12.5mm,10mm, 4.75mm,2.36mm
01 Set March. 2016
5 Set of sieves for fine aggregates 10mm,2.36mm, 1.18mm,600microns,300microns, 150microns
01 Set March. 2016
6 Slump testapparatus with testing road and base plate
02 Set March. 2016
7 Steel scales 300mm 05 No March. 2016
8 Measuring cylinder, Graduated, poly carbonated, Capacity 1000ml
02 No March. 2016
9 Pan balance,capacity 10Kgx1G 01 No March. 2016
10 Elctronic balance,Capacity 10Kg x 0.5G 01 No March. 2016
11 Elctronic balance,Capacity 300g x 0.01g 01 No March. 2016
12 Mould, caste Iron for 150mm cube with ISI certification mark
12 No March. 2016
13 Tamping rod,steel 16mm dia with ISI certfication mark
06 No March. 2016
14 Sample tray, GI size 450x 450x 50mm 09 No March. 2016
15 Gauging trowel,Ref.standard IS:4031,100 to 150 mm long blade with straight edge,weight 210+210g.
06 No March. 2016
16 Thickness gauge with ISI certification mark IS:2386(part-1)
01 No March. 2016
17 Length gauge with ISI certification mark IS:2386(part-1)
01 No March. 2016
18 Speedy Moisture meter,Range 0-25%(GaugeDiv.:0.5%) with Digital Weighing balance
06 No March. 2016
19 Dolly for core cutter 06 No March. 2016
20 Rammer with steel rod 06 No March. 2016
21
Los angeles abrasion testing machinw with counter (Drum with RPM 30-33, Abrasion charge 48 mm dia-12 nos. conforming to IS 100770, for operation in 220v, 50hz single phase AC supply )
01 No January. 2018
22 Crushing Value Apparatus (as per reference standard IS-9376)
01 No January. 2018
23 Aggregate Impact Tester (coarse aggr-Cylindrical cup metal measure tempering rod with ISI mark automatic blow counter all conforming to IS-9377)
01 No January. 2018
24 Compaction Factor Apparatus 01 No January. 2018
25 Air Entrainment Meter Capacity 0.005m3 (5 Litres) suitable for aggregate size up to 38mm
01 No January. 2018
26 Laboratory Permeability Apparatus with overhead tank and rammer
01 No January. 2018
27 Vicat Apparatus with ISI Certification Mark,IS:5513,fitted in Aluminium Box
01 No January. 2018
28 Air Permeability Apparatus (Blaine type) with ISI Certification Mark,IS:5516,fitted in Aluminium Box
01 No January. 2018
29 Density Basket 01 No January. 2018
30 Evaporatating Dish,Flat Bottom with Pourout, size 150 x 80 mm
01 No January. 2018
31 Pycnometer 01 No January. 2018
32 Measuring Cylinder,Glass, Graduated,Capacity 500 ml
01 No January. 2018
33 Concrete test hammer 01 No March. 2017
34 Hot air oven, thermostatically controlled,Ampired to 250*, size 12''x12''x12'' chamber size
01 No July. 2018
35 POLYCAB make plastic beaker capacity 1000ml 05 No. July. 2018
36 POLYCAB make plastic beaker capacity 500ml 05 No. July. 2018
37 Measuring cylinder (Glass) with rubber stopper, capacity 500 ml
10 No. July. 2018
38 Knife for cutting 05 No. July. 2018
39 Parcelin dish( china dish) size 6'' dia 20 No. July. 2018
40 Glass plate size 8''x8'' 10 No. July. 2018
41 Glass bowl size 8'' dia 05 No. July. 2018
42 cube mould made of steel with base plate size 70.6mm
06 No. July. 2018
43 8'' dia brass sieve size 75 micro & 90 micro 02 No. July. 2018
44 8'' dia brass sieve size425 micro & 2mm 02 No. July. 2018
45 Glass bowl size 8'' dia 05 No. July. 2018
46 Plastic limit device, complete set 01 No. August. 2018
47 Liquid limit device (casagrande apparatus ) complete set
01 No. August. 2018
48 E.I.Tray (Enamel) size 8''x10'' 02 No. August. 2018
49 Stop watch digital 01 No. August. 2018
50 Hammer (C.I)with wpooden handle 01 No. August. 2018
51 Glass rod 02 No. August. 2018
52 Digital weighing machine , minimum 1 gms to 600 gms
01 No. August. 2018
53 S.S.Bowl for 10 kg physical Balance 01 No. August. 2018
54 12''dia G.I Seive 90mm,45mm,63mm,22.4mm,11.2mmand 1.70mm
06 No. August. 2018
55 12'' dia G.I lid & pan 01 No. August. 2018
56 8'' dia brass lid &pan 01 No. August. 2018
57 Compaction mould, 100mm diameter 01 No. Sept. 2018
58 Wash bottle (plastic) 01 No. Sept. 2018
59 Measure cylinder (plastic) capacity 500ml 02 No. Sept. 2018
60 Pycnometer 01 No. Sept. 2018
61 Digital thermomter -50◦c to +300◦c 01 No. Sept. 2018
62 Hygrometer (temp,humity &clock) 01 No. Sept. 2018
63 Air tight container (plastic) 02 No. Sept. 2018
64 Denesity bottle 100ml 02 No. Sept. 2018
65 Diamond stop watch 01 No. Sept. 2018
66 Bulk Density metal measure 03, 15 & 30 ltr (03 nos = 01 set)
01 set Nov. 2018
67 Elecrronic Weighing Scale Capacity 100kg 01 No. March.2019
68 Infra Red Moisture Meter 01 Set. March.2019
69 Universal Automatic Compactor with Mild Steel compaction mould as per IS.
01 Set. March.2019
70 Universal Penetrometer with penetration Test Cone and penetration Test cop, 55mm dia x 40mm deep
01 Set. March.2019
71 Consolidation Apparatus, Three Gang Electronic consisting of Consolidation test indicator 1no. And Displacement sensor range 0-20mm, 3nos.
01 Set. March.2019
72 Unconfined Compression tester with ring 2KN,Dial Gauge 0.01 x 25mm with plain platen with adaptor of new model
01 Set. March.2019
73
Laboratory Electric Oven, with Digital indicator cum controller with safety alarm, Range 50° C to 250° C +/- 1° C with Air Circulating Fan, Inside size 600x900x450mm
01 Set. March.2019
74 Water Still Mounting type,Output 6lt/hr, 4.5 KW 01 Set. March.2019
75
Water bath Rectangular, Double walled , Inside Stainless Steel, Thermostatically Controlled, Temp. Range Amp. +5° C to 95°C +/- 0.5° C ,Size 425x325x100mm (12 holes of 75mm dia)
01 Set. March.2019
76 PH meter digital, Auto Buffer Ph range 0-14 (Table top model)
01 No. March.2019
77 Digital Thermometer, Range 50° C to 280° C 01 No. March.2019
78 Stop watch Digital 1/10 sec. Racer make 01 No. March.2019
79 Liquid limit device with counter and one casagrande 01 Set. March.2019
80 Shrinkage Limit Set 01 Set.
81
Plastic Limit Set comprising of glass plate 450x450x10mm thick with round edge 3mm dia brass rod, Spatula 6'', Moisture tin and porcelain Dish.
01 Set. March.2019
82 Sieve brass frame 20cm dia x 90 microns 01 No. March.2019
83 Sieve brass frame 20cm dia x 75 microns 01 No. March.2019
84 Sieve brass frame 20cm dia x 4.75mm 01 No. March.2019
85
Sieve brass frame 20cm dia of 10mm, 4.75mm, 4mm, 3.35mm, 2.36mm, 1.18mm, 600microns, 300microns, 150microns, 75microns, lid pan and cover.
01 Set. March.2019
86 Sieve G.I. Frame 30mm dia of 125mm,80mm, 40mm, 20mm, 12.5mm, 10mm, 4.75mm, 2.36mm, lid pan and cover.
01 Set. March.2019
87 Swell test Apparatus with ring 2.5KN and Dial Gauge, 0.01 x 25mm.
01 Set. March.2019
88 Le-Chatelier mould with ISI Certification mark, IS: 5514 (Each)
03 Nos. March.2019
89 Measuring Cylinder, Glass, Graduated, Capacity 25ml
02 Nos. March.2019
90 Measuring Cylinder, Glass, Graduated, Capacity 50ml
02 Nos. March.2019
91 Measuring Cylinder, Glass, Graduated, Capacity 100ml
02 Nos. March.2019
92 Measuring Cylinder, Glass, Graduated, Capacity 500ml
02 Nos. March.2019
93 Beaker, Glass, Graduated, Capacity 250ml. 02 Nos. March.2019
94 Glass trough, Capacity 5ltr (Borisilicate material) 01 No. March.2019
95 Polythene wash Bottles, Capacity 1 litre 01 No. March.2019
96 Wash bottle, Polyyhene, Capacity 500ml. 01 No. March.2019
97 Evaporating Dish, Flat bottom with pourout, Size 80 x 45mm
02 Nos. March.2019
98 Moisture Content tin, Size 65mm dia x 20mm deep 02 Nos. March.2019
99 Moisture Content tin, Size 90mm dia x 20mm deep 02 Nos. March.2019
100 Porcelin Bowel 6'' dia 05 Nos. March.2019
101 Pycnometer 02 Nos. March.2019
102 Buoyancy Balance 01 No. March.2019
103 Pycnometer (Specific gravity bottle) 01 No. March.2019
104 Weighing Bottle, Glass with stopper, Size 50 x 35mm, Capacity 20ml
01 No. March.2019
105 Sample tray (Enamel tray), Size 660 x 560 x 80mm 01 No. March.2019
106 Sample tray (Enamel tray), Size 600 x 450 x 50mm 01 No. March.2019
107 Sample tray (Enamel tray), Size 450 x 300 x 40mm 01 No. March.2019
108 Sample tray (Enamel tray), Size 300 x 250 x 40mm 01 No. March.2019
109 Sample tray (Enamel tray), Size 200 x 150 x 30mm 01 No. March.2019
110 Electronic Balance 100 kg x 10gm, DZ-100, Pan size 500 x 500mm
01 No. March.2019
111 Electronic Balance 600gm x 0.01gm, MWP-600, Pan size 116mm dia.
01 No. March.2019
112 Sieve Shaker, Motorised with built-in Digital timer. 01 No. March.2019
113 Digital Compression testing machine, Capacity 2000KN (Tough Screen model)
01 Set. March.2019
114 Mould, Steel for 70.6mm cube with ISI Certification mark, IS : 10080 with base plate.
06 Nos. March.2019
115 Relative Density Apparatus (New model) 01 No. March.2019
3. Status of Samples and Revenue collection
Sl.No Sample Receive up to March 2019
Test Conducted up to March 2019
Revenue Collection up to March 2019 ( in Rs.)
1 271 229 808740.00
4. Name of the working Divsions
Jurisdiction of this division is as follows-
1. Nayagarh Irrigation Division, Nayagarh
2. Nayagarh Minor Irrigation Division, Nayagarh
3. Kandhamal Minor Irrigation Division, Phulbani
4. Boudh Minor Irrigation Division, Boudh
5. Boudh Irrigation Division, Boudh
5. Staff Strength
Sl No
Name of the
Division
Category of posts
Sanctioned Strength
No of Vacancy
Name of the Officer (SE/EE/AEE/AE/JE &
N.G. employees holding the post)
1
Qu
alit
y C
on
tro
l Div
isio
n, N
ayag
arh
Executive Engineer 1 Nil Sri Mrutyunjay Sethi 2 Asst. Executive
Engineer
3
1
Sri Biswadeep Singh
3 Asst. Executive Engineer
Sri Markandeya Dash
4 Asst. Executive Engineer
Vacant
5 Asst. Engineer 2
Nil
Sri Subash Chandra Panda
6 Asst. Engineer Sri Dibakar Behera 7 Senior Clerk 1 Nil Smt.Krishnanjali
Tripathy 8 Junior Clerk 2 2 Vacant 9 Embankment
Inspector 1 1 Vacant
10 Asst. Embankment Inspector
1 1 Vacant
11 Laboratory Assistant
1 1 Vacant
12 Laboratory Attendant
2 2 Vacant
13 Peon
5
1
Sri Prafulla Kumar Bisoi
14 Peon Sri Susanta Pradhan 15 Peon Smt.Triveni Gouda 16 Peon Sri Santosh Kumar
Nayak 17 Peon Vacant 18 Night Watchman-
cum-sweeper 1 Nil Smt.Mani Pradhan
6. Expenditure Details
Sl.No. Name of the Division
Name of Head Allotment Issued
in Rs
Progressive Allotment
received in RS
Expenditure Incurred
1 Quality Control Division, Nayagarh
Demand no 20-4701-Capital outlay on
Medium Irrigation Programme Exp-
State sector scheme-State sector-80-
General-800-other expenditure
programme for Medium Irrigation during 2018-2019
20,000,00 15,000,00 15,000,00
2 Quality Control Division, Nayagarh
20-2700-80-052-0851-08001-397-11-
1-0
6,15,000 6,15,000 6,13,000
7. A. Type Of Test Conducted at Quality Control Laboratory
Sl.No Test Conducted 1 Consistency, Initial setting & Final setting time of Cement
2 Compressive Strength of cement 3 Fineness of cement
4 Soundness of cement
5 Sieve Analysis of Coarse Aggregate
6 Impact Value of Coarse Aggregate
7 Water Absorption Coarse Aggregate 8 Specific Gravity Coarse Aggregate 9 Flakiness & Elongation Index 8 Sieve Analysis of Fine Aggregate 9 Silt Content of sand
10 Bulking of sand 11 Specific Gravity of sand
12 Cube Compressive Strength 13 Mix Design 14 Liquid Limit of Soil
15 Plastic Limit Of Soil
16 Grain Size Analysis of Soil
17 Standard Proctor Compaction Test
18 Silt Load Test of River Water
B. Type of Test Conducted during Site Visit
1 Concrete Rebound Hammer Test, Slump Test
2 Cement Checking of Manufacturing Date, Fineness of Cement, Float test
2 Coarse Aggregate Sieve Analysis 3 Fine Aggregate Sieve Analysis, Silt Content,
Bulking of sand 4 Soil Core Cutter Test
8. FIELD VISIT
Inspection the different work site along with Sri M.Dash, AEE and Sri S.C.Panda, AE of QCD, Nayagarh and Concerned Sri D.K.Sahoo, AEE ,Sri P.K Meher, JE and Sri R.C.Majhi, JE of Boudh Minor Irrigation sub- Division, Boudh. Dt.-09.08.2019.
1) Name of the Work:- Construction of Bandhamunda-I check dam in Boudh block vide agreement No.-19p1/2018-19. Observation and Suggestion
- Work stopped due to rainy season. - Check dam is completed in all respect except embankment filling and U/S and D/S
approne stone packing. - Field engineers are unable to produce Q.C. testing register and Laboratory test
report at site. - Loose earth available at site for U/S and D/S of the check dam to be removed
immediately. - H.G. Stone available at site for U/S and D/S packing is not of good quality i.e. full of
skin - Guard wall of length 40m at both U/S and D/S to be done.
Advised to do needful are as follows. - U/S and D/S loose earth to be removed immediately. - At the time of construction of Guard wallcare should be taken by the field
engineers regarding centring and shuttering . - Stacked h.g.stone for U/S and D/S packing to be removed with good quality. - Check Dam embankment to be filled with good quality of earth with proper
compaction and proper slope. - Proper curing the guard wall should be done.
2) Name of the Work:- Repair to Ainthapada M.I.P. in Boudh block of Boudh distt. vide agreement No.-124p1/2017-18.
Observation and Suggestion - Canal lining from RD 800m to RD 900m has been done (earth Canal) - Back filling of the canal not be done properly. - Field engineers are unable to produce Q.C register and laboratory test report at
site. - Advised to back filling of the lined canal to be done properly. - Advised to do needful Q.C register and laboratory test report to be produced
before Sri M.dash, AEE QCd Nayagarh.
3) Name of the Work:- Improvement to Rajmunda M.I.P. in Boudh block of Boudh distt. vide agreement No.-05p1/2018-19.
Observation and Suggestion - No proper compaction to canal bank from RD 180m to RD 270m - Proper sectioning of canal with designed slope to be maintained. - Unable to produce Q.C register and laboratory test result report at site. - Advised to proper compaction to canal bank.
Inspection the work site along with Director, Research & Quality Control ,BBSR, AEE and AE of QCD, Nayagarh.
date 06.12.2019. Name of the Work:- Protection to Kusumi right embankment near Tarini Temple village Sikharpur vide agt. No. 49p1/2018-19. Observation and Suggestion
- The smaller stones be replaced with large size stone
- The smaller stones be used for filling interstices.
- The top edge of berm should be brought to same level and depth 0.6m - 1.0m.
- Small stones be removed from certain section
- Stones having skins to be removed only by ones to be retained.
Inspection the different work site along with Sri M.Dash, AEE and Sri S.C.Panda, AE of QCD, Nayagarh and Concerned SDO and AE of Nayagarh Irrigation Division.
Dt. 03.01.2019 1 . Name of the Work:- Improvement of Left distributary with C.C. Lining and repair of structures near village Nahakapada of KIP for 2019-20 vide agt.No.-57p1/2018-19 Observation and Suggestion
- 45m length C.C. lining work has been completed. - Work is continuing from RD 3600m during time of inspection. - Slump test conducted at site result come to be 35mm. - Three cubes has been casted at site for 28 days curing.
- Cement used at site KONARK Brand. - Sand are good quality and comes under zone-III. - Gradation of sand and C.A has been done at the site and found Satisfactory. - Q.C. register maintained by field engineers. - Quality Control test report are not received to till date. - Advised Curing should be done properly. - Area pass register and OK card is not maintained at site. - Plate vibrator to be used frequently.
2.Name of the Work:- Improvement of Right Distributary with C.C. lining and repair of structure near village Krushnaprasad of KIP for 2019-20.
Observation and Suggestion
- Canal lining from RD 3700m to 3730m and RD 3400m to RD 3540m has been completed
during day of inspection.
- Lining has been completed with C.C.(1:1.5:3)
- Curing for RD 3540m is not adequate.
- Quality Control test result yet to be received. - Unable to provide Q.C. register at site. - Ok card is not maintained.
- Advised curing should be done properly. - Advised curing from RD 3400m to RD 3540m to be done . - Q.C. Register to be maintained with required frequency.
Inspection the different work site along with Sri M.Dash, AEE and Sri S.C.Panda, AE of QCD, Nayagarh and Concerned SDO and AE of Nayagarh Irrigation Division. On Date 16.02.2019
1 .Name of the Work:- Protection to Kusumi left embankment & drainage sluice of chindera for 2018-19
Observation and Suggestion .
- Slab casting of sluice barrel is under progress. - Sand and coarse aggregate available at site are good quality. - Cement used at site Konark Brand. - Q.C. register maintained by field engineers. - Slump cone test has been carried out at site and found to be 38mm. - Three cubes has been casted at site for 28 days curing. - Steel used in the slab is SAIL,MAJBOOT & KAMDHENU. - Vibrates with six 40mm needles used at site - Feildengineers to be ensured for 28 days standing water curing.
Inspection the different work site along with Sri M.Dash, AEE and Sri S.C.Panda, AE of QCD Nayagarh and concerned SDO, AE of Nayagarh Irrigation sub Division Nayagarh. Dt.19.02.2019
1. Name of the Work:- Name of the Work:- Protection to Left and Right Bank of
River Duanto near village Bandhasahi and Champapanderi for 2019-20.
Vide agt.no.-55p1/2018-19.
Observation and Suggestion
- Launching and packing at RD 460m and RD 612m is going on. - Some patches are packed with <0.30m H.G. stone - Area pass register not maintained. - Slope of the River embankment not maintained properly. - Advised to needful indicated patches packed with <0.3m H.G.Stones to be removed
and repacking to be done with > 0.30m Hard stones. - Slope of the River to be maintained properly at the time of packing.
- Material are tested at Govt. laboratory i.e. Q.C.D. Nayagarh
Dt. 12.03.2019
2. Name of the Work:- Protection to Mahanadi Right embankment near Nilamadhab temple at Kontilo vide agt.No. 111p1/2018-19.
Observation and Suggestion - The Stones used in the crates are not upto specified dimension. - Crates are used in the work is below section. - Interstices are not filled up properly. - Advise to needful small stones i.e< 0.3m should be removed. - Crates are used as per agreement laid down. - Interstices to be filled up properly. Inspection the work site along with Director, Research and Quality Control Division, BBSR, and concerned SDO, AE of Nayagarh Irrgation sub-Division Nayagarh Dt. 20.03.2019 Name of the Work:- Protection to Mahanadi Right embankment near Nilamadhab temple at Kontilo vide agt.No. 111p1/2018-19. Observation and Suggestion
- G.I crates are used at site is not up the section as per the agreement. Thin wires are being used without any stiching after filling the crates.
- The stones used at site are very small and not of approved size and weight. - The crates are not filled and lot of voids are noticed. - Many patches are only filled up with very small size stones.
Inspection the work site along with AEE and AE of QCD Nayagarh and concerned SDO,and JE of Nayagarh drainage subdivision, Nayagarh Dt. 07.02.2019. 1) Name of the Work:- Construction of check dam in dangua Nalla near village Khalipatna vide agreement No.-06p1/2018-19. Observation and Suggestion
- Centering and shuttering for raft foundation work has been checked and found satisfactory.
- Raft foundation work for M20a20 is under progress. - Slump cone test has been carried out at site and found to be 45 mm. - Steel used in the slab is SAIL and SEL. - 6 nos of cubes mould are casted for M20A20 concreteat site for testing
compressive strength for 7 days and 28 days. - There is slide of stone pitching work in the D/S of check dam which needs
restoration. - Verified the Q.C. test reports and found satisfactory. - Design mix of CC M20 A20 with ULTRATECH brand of cement has been tested in a
govt. lab and found satisfactory.
Photograph
Construction of Bandhamunda-I check dam in Boudh block vide agreement No.-19p1/2018-19.
Repair to Ainthapada M.I.P. in Boudh block of Boudh distt. vide agreement No.-124p1/2017-18.
Improvement to Rajmunda M.I.P. in Boudh block of Boudh distt. vide agreement No.-05p1/2018-19.
Protection to Kusumi right embankment near Tarini Temple village Sikharpur vide agt. No. 49p1/2018-19
Improvement of Left distributary with C.C. Lining and repair of structures near village Nahakapada of KIP for 2019-20 vide agt.No.-57p1/2018-19
Improvement of Right Distributary with C.C. lining and repair of structure near village
Krushnaprasad of KIP for 2019-20.
Protection to Kusumi left embankment & drainage sluice of chindera for 2018-19
Protection to Left and Right Bank of River Duanto near village Bandhasahi and Champapanderi for 2019-20. Vide agt.no.-55p1/2018-19.
Protection to Mahanadi Right embankment near Nilamadhab temple at Kontilo
vide agt.No. 111p1/2018-19.
Construction of check dam in dangua Nalla near village Khalipatna vide agreement No.-06p1/2018-19.
Construction of Sainara Check dam over Sainara Nalla near village Sarupada in Alami G.P of Phulbani Block of kandhamal District under MATY Grant. Agt. No- 172P1/2018-19.
Construction of Kumuriguda Check dam over Dakeni Nalla near village Kumuriguda in Phulbani of kandhamal District under MATY Grant. Agt. No- 187P1/2018-19.
re