    CONFIDENTIAL AP/APR 2009/QSD231/201

    UNIVERSITI TEKNOLOGI MARAFINAL EXAMINATION

    COURSECOURSE CODEEXAMINATIONTIME

    : MEASUREMENT OF CONSTRUCTION WORKS III(PAPER 2): QSD231/201: APRIL 2009: 3 HOURS

    INSTRUCTIONS TO CANDIDATESThis question paper consists of two (2) pa rts : PART A (1 Question)PART B (1 Question)

  • 7/29/2019 QSD231_201_PAPER2 (1)

    2/7

    CONFIDENTIAL 3 AP/APR 2009/QSD231/201

    P A R T B

    Please refer to Appe ndix 2 for costing information.

    QUESTION 1Built-up rate for the following items wh ich are extracted from the Bill of Quantities;

    a) 300m m x 300m m approved plate glass mirror fixed with 6mm thick waterproof plywoodbacking rubber gasket with aluminium channel strip edging and fixing with chromiumplated hea ded screws to tiled wall. - NO(10 marks)

    b) Formw ork to horizontal soffit of suspende d slab. - M2 (10 marks)c) Reinforced in-situ concrete Grade 30 in suspen ded slab, thickness exceeding 300m mthick. - M3 (By Machine) (15 marks)

  • 7/29/2019 QSD231_201_PAPER2 (1)

    3/7

    CONFIDENTIAL APPENDIX 2(1) AP/APR 2009/QSD231/201

    COST INFORMATION

    MATERIAL

    CementSand (1520 kg per m3)Aggregate (1600 kg per m3)RM 13.00 per bagRM 15.00 per tonneRM 35.00 per tonne

    Plywood (1.20mx2.40m)Timber (1.42 m3 per tonne)Nails (0.35kg per m2)Quantity of timber for s trut and supportFabric Reinforcement Ref. A 252LappingTying wire & Spacer block300mm x 300mm x 6mm thick glass m irrorWaterproof plywoodChrome Plated screws (2 nos.)

    RM 52.00 per pieceRM 1,200.00 per tonneRM 4.50 per kg0.06 m3 per m2RM 15.00 per m212%10%RM 100.00 per noRM 70.00 per m2RM 1.20 per no

  • 7/29/2019 QSD231_201_PAPER2 (1)

    4/7

    CONFIDENTIAL APPENDIX 2(2) AP/APR 2009/QSD231/201

    COST INFORMATION

    LABOUR CONSTANT

    ConcreteTransporting and placing of concreteLabour for concrete mixing operationFabric ReinforcementUnloading and StoringBending, Cutting, Fixing & TyingFormworkErectingDismantlingPlumbingJointing & Fixing

    8.00 hours per m3 (1 general labour)4 general labour

    1 general labour (0.15 hours per m2)1 skilled labour (0.33 hours per m2)

    1 skilled labour (1.00 hours per m 2)1 general labour (0.75 hours per m2)1 general labour (0.75 hours per m2)

    1 skilled labour (0.25 hours per m)1 general labour (0.25 hou rs per m)

  • 7/29/2019 QSD231_201_PAPER2 (1)

    5/7

    CONFIDENTIAL APPENDIX 1 (1) AP/APR 2009/QSD231/201 (PAPER 2)

    3400

    20Sf G.I DOWN SERVICE PIPEDROP TO SERVE BATH 3.

    > L

    - > '

    ma.a.CDzioozC5fit

    - 3 < -

    < x> |_ -

    At 77~

    UTILITY

    I RISING MAIN.

    LIVING DININGjj # i i i i ii

    TERRACE

    ^

    CARPORCH

    >METERI3400

    < $

    3600 1S00-

    GROUND FLOOR PLAN

    - > ' -

    - > <

    >20t,G.I DOWN PIPE

    H SERVICE PIPE DROPTO SERVE BATH 1

    FIRST FLOOR PLAN

    YOU MAY MAKE ALL NECESSARY ANDREASONABLEASSUMPTIONS WHEREAPPLICABLE

    PROJECT TITLE :

    PROPOSED NEW BUNGALOW HOUSEAT PINGGGIRAN RAPAT, IPOHFOR EN. HAI KARL

    DRAWING TIT LE:GROUND FLOOR PLANAN DFIRST FLOOR PLAN

    ELEMENT:

    QSD231(PAPER2) |CHECKED BY :

    NATASHA KHALILDRAWN BYSCALEDATE

    HISHAM1: 100APRIL 2009

    DRAWING NO. :PUB/QSD231/201/P2/1

    Hak Cipta Universiti Teknologi MARA CONFIDENTIAL

  • 7/29/2019 QSD231_201_PAPER2 (1)

    6/7

    CONFIDENTIAL APPENDIX 1 (2) AP/APR 2009/QSD231/201 (PAPER 2)

    YOU MAY MAKE ALL NECESSARY ANDREASONABLE ASSUMPTIONS WHEREAPPLICABLE

    SECTION X-X SECTION Y-Y

    PROPOSED NEW BUNGALOW HOUSEAT PINGGGIRAN RAPAT, IPOHFOREN.HAIKARL

    SECTION X-XANDSECTION Y-YELEMENT:

    QSD231(PAPER2)CHECKEDBY:

    NATASHA KHALILDRAWNBYSCALEDATE

    HISHAM1: 100APRIL 2009

    DRAWING NO. :PUB/QSD231/201/P2/2

    Hak Cipta Universl ti Teknologi MARA CONFIDENTIAL

  • 7/29/2019 QSD231_201_PAPER2 (1)

    7/7

    CONFIDENTIAL APPENDIX 1 (3) AP/APR 2009/QSD231/201 (PAPER 2)

    200 GALLONS WATERSTORAGETANK.

    200 GALLONS WATERSTORAGETANK.

    NO T E S :1. ALL COLD WATER SUPPLY PIPESHALL BE GALVANISED MILDSTEEL (gms) to BS 1387 WITH SCREWED.

    2. ALL PIPE INTERNALLY SHALL BECONCEALED UNLESS TO OTHERWISEINDICATED.

    3. PIPES BURIED UNDERGROUND SHALLBE AT DEPTH OF 400mm.4. ALL VALVES & TAPS SHALL BE BRASSTO BS 1018.

    -200

    & ^-1S0^- /Sq s< ^

    AS0

    BATH1

    SCHEMATIC DIAGRAM FOR COLD WATER SUPPLY

    UNIVERSITI TEKNOLOGI MARA

    NOTES:

    YOU MAY MAKE ALL NECESSARY ANDREASONABLE ASSUMPTIONS WHEREAPPLICABLEPROJECT TITL E:

    PROPOSED NEW BUNGALOW HOUSEAT PINQGGIRAN RAPAT, 1POHFOR EN. HAIKARL

    DRAWING TITLE :

    SCHEMATIC DIAGRAMFOR COLD WATER SUPPLYELEMENT:

    QSD231(PAPER2)CHECKED BY :

    NATASHA KHAULDRAWN BYSCALEDATE

    HISHAMNO TO SCALEAPRIL 2009

    DRAWING NO. :PUB/QSD231/201/P2/3