QP Dialogue 2018/02 7 th March 2018 9:00AM Dewan Indera Pahlawan, MODTC 2018/02

QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

QPDialogue2018/027th March20189:00AMDewanInderaPahlawan,MODTC

2018/02

Page 2: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

AGENDA

• GeneralHousekeeping&Reminders• Process&FormUpdates• InspectionChecklistRequirement• QPScaleofFees• Q+A

2018/02

Page 3: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

GeneralHousekeeping

ALL attachments uploaded on OneBiz are official submissionsand will be electronically stamped upon approval.

• File Naming (i.e LOT XXXX – BORANG A)• Correct and required documentation (i.eArchitectural Drawings for Borang C submission notrequired)• All Bomba fees are to be paid during OP stage

Reminders

2018/02

Page 4: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

GeneralHousekeeping

QPs are to submit the names of 2 representativesto ABCi as requested on 18 January 2018• Copy of IC• Passport size photographs

Reminders

2018/02

Page 5: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesGeneral- Borang A/C /E

2018/02

PleasenotethatwhenfillingouttheQPparticularsweareaskingforthePracticingCertificateNo. notBAPEQSRegistrationNo.:

00XXXAr

2018BAPEQS/XXXX✔

Page 6: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesBuildingApproval(Borang A)- Changes

QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)Additionally,QPswillberequiredtodeclarewhetherapprovalfromHousingDevelopmentDepartmenthasbeenobtainedforRPN/STKRJapplications(ifapplicable)

2018/02

Page 7: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesBuildingApproval(Borang A)- Reminders

PleaseberemindedthatthesubmittingQPforBorang Aisdeclaringthefollowing:

2018/02

Page 8: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes

QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)

2018/02

Page 9: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes

QPswillneedtofilloutthesefieldsbydeclaringiftheyaretobesupervisingduringconstruction,orifanAccreditedCheckerhasbeenengaged(ifapplicable)

2018/02

Page 10: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Reminders

2018/02

PleaseberemindedthatthesubmittingQPforBorang Cisdeclaringthefollowing:

Page 11: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

InspectionChecklist

InadditiontosubmittingtheBuilder’sCertificateofCompletion(viaemail)whenbookinganinspection,anInspectionChecklistsignedbytheContractorandverifiedbytheQPistobesubmitted.

TheinspectionchecklistwillbeemailedtoallQPsandalsoavailabletodownloadfromtheMODwebsite.

General

2018/02

Page 12: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

InspectionEtiquette

• Checklistmustbecompletelyfilledoutandincompliance.• QPrepresentativeandContractorrepresentativemustbepresentforALL inspections

General

2018/02

Page 13: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

2018/02

Page 14: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

2018/02

QPSCALEOFFEES

Page 15: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

2018/02

Q+A

Page 16: QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 · verified by the QP is to be submitted. The inspection checklist will be emailed to

THANKYOU

2018/02