QMWG 10/7/13
Generation Resource Energy and Regulation Deployment Performance
2
GREDP –NON-WIND Summary
• Conventional Resources - September– 311/312 scored above 90%
• 1 failure SCGT90
• Scored ½ hour for the month of September with average error of 2 MW.
• Non-wind resources scoring >85% in previous summer months were resources with very low Capacity Factors
• August 2013 316/319• July 307/308• June 313/315• May 287/292
3
CONTROL PERFORMANCE (September)
• CPS1(167) trending favorably
– Consistently scoring 160+ this summer
– Slightly lower than July and August 2013
• CPS2 (98.84) has improved from 2012
– August performance particularly impressive (99+)
• ½ of the days perfect score
• 2012 CPS2 trended very positively
• Passed 2012 CPS2 (ERCOT Waiver)
• Other ISO CPS2 performance declined over the same period
– Other Improvements observed
– Ramping periods RMS1 decreased
• Startup/shutdown improved performance
– Overall RMS1 declining in 2013
• Up slightly in September from August
4
WIND AND RENEWABLES Summer 2013
• Scoring consistent/above previous years in the summer– Reduced congestion (Slide 7) with similar or increased Energy
from Wind (Slide 5) and GREDP scores• SEPT 2013
– 58 scored/21exceeded 95% GREDP Monthly– 2,250 intervals scored, 1,950 intervals passed (86.5%)– July & August intervals ↓ sharply (slide 6)– 3 resources 100+ intervals/>95%: 94%(112), 71% (115),
92%(142)– Recent analysis indicates a very positive trend from previous
summers. • Significant issues reduced/mitigated
• Recent months indicate resources line up with technology
5
Wind Energy Ratios and Totals
Total Energy (GWH)
% Wind Energy
INTERVALS SCORED
MAY2011 2,700 10.20% 39,7002012 2,600 9% 19,3002013 3,700 13.60% 7,600
June2011 3,200 9.30% 46,4002012 2,400 7.50% 9,6002013 3,100 9.40% 4,000
July2011 1,900 5.30% 2,2002012 1,950 5.80% 1,2002013 2,100 6.20% 283
6
Congestion Management
• Congestion in wind areas has dropped off in 2013 – CREZ lines energized earlier in summer– Reduction in intervals scored
• No reported or observed issues regarding Congestion Management.– No Inter-zonal Interface limit issues in West
• No issues in Q2 or Q3 2013• One instance in Q1
– Forced outage initiated a unit-step drop in the west-north flowgate
– Immediately resolved by Wind redispatch
7
Summer IRR GREDP Summary and Congestion Trends
May June July
Average GREDP 91% 83% 94%
Scored 70 58 36
Scored < 95% 43 34 5
DEVIATION Average
3.8 3.9 3.1
INTERVALS 7,600 4,000 283
PASSED 7,000 3,300 266
85-95 19 7 0
>100 intervals 29 45 35