CONSTRUCTION
eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm No. QIR -123
Report No.:
COLD / SPECIAL SUPPORTS INSTALLATIONSheet of
Reference : Piping Fabrication & Erection Procedure No. 00250600DBPC4066M
LINE NO.: ____________________________ DRAWING No.: __________________________SUPPORT No..____________
LOCATION: ___________________________________ELEVATION.:________________________________________________ITEMDESCRIPTION
(INSTALLATION OF LOWER PORTION OF SUPPORT)SIGNATURE AND DATE
NO.ConstructionQCI
1.CORRECT AND FULL PAINTING SYSTEM APPLIED AT SUPPORT LOCATION
2.PIPE SURFACE DRY AND FREE FROM DIRT, OIL OR GREASE
3.LOWER PORTION OF HD SUPPORT DRY AND FREE OF DEFECTS
4.LOWER PORTION OF SUPPORT INSTALLED WITHOUT DAMAGE
5.LOWER PORTION OF SUPPORT INSTALLED AT CORRECT LOCATION
NOTE: WEATHER PROTECTION SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD AS REQUIRED.
ITEM
No.DESCRIPTION
(INSTALLATION OF UPPER PORTION OF SUPPORT)Insulation S/CConstruction
1.UPPER PORTION HD SUPPORT DRY AND FREE OF DEFECTS
2.FOAM SEAL APPLIED TO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION WHEN HORIZONTAL JOINTS ARE TIGHT FITTING
3.COMPRESSED MINERAL WOOL INSULATION INSTALLED INTO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION IF GAPS APPEAR BETWEEN LOWER AND UPPER PORTIONS OF THE HORIZONTAL SUPPORTS
4.UPPER PORTION OF SUPPORT POSITIONED CORRECTLY
5.OVERLAPPING VAPOUR BARRIER OF LOWER PORTION ADHERED TO UPPER PORTION
6.UPPER PORTION PROTECTION PLATE INSTALLED
7.UPPER AND LOWER CRADLES FIT ACCEPTABLE
8.CORRECT AMOUNT OF NUTS, BOLTS AND SPRING WASHERS INSTALLED
9.NUTS TORQUED TO CORRECT N/M AS PER REQUIREMENTS
10.FULL VAPOUR STOP APPLIED TO BOTH ENDS OF COMPLETED SUPPORT
THE SUPPORTS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS:SIGNED : ________________________NAME:_____________________________________________DATE:_____________________
CONSTRUCTION
SIGNED: ___________________________NAME:_________________________________________ DATE:_____________________
PIPING QCI
SIGNED: ________________________NAME:______________________________________ DATE:__________________
COMPANY