“ eni Iraq b.v. - Zubair Oil Field Development Project” Work Package of Existing DGS Modification Form No. QIR -123 Report No.: COLD / SPECIAL SUPPORTS INSTALLATION Sheet of Reference : Piping Fabrication & Erection Procedure No. 00250600DBPC4066M LINE NO.: ____________________________ DRAWING No.: __________________________SUPPORT No..____________ LOCATION: ___________________________________ELEVATION.:________________________________________________ ITEM DESCRIPTION (INSTALLATION OF LOWER PORTION OF SUPPORT) SIGNATURE AND DATE NO. Construction QCI 1. CORRECT AND FULL PAINTING SYSTEM APPLIED AT SUPPORT LOCATION 2. PIPE SURFACE DRY AND FREE FROM DIRT, OIL OR GREASE 3. LOWER PORTION OF HD SUPPORT DRY AND FREE OF DEFECTS 4. LOWER PORTION OF SUPPORT INSTALLED WITHOUT DAMAGE 5. LOWER PORTION OF SUPPORT INSTALLED AT CORRECT LOCATION NOTE: WEATHER PROTECTION SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD AS REQUIRED. ITEM No. DESCRIPTION (INSTALLATION OF UPPER PORTION OF SUPPORT) Insulation S/C Construction 1. UPPER PORTION HD SUPPORT DRY AND FREE OF DEFECTS 2. FOAM SEAL APPLIED TO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION WHEN HORIZONTAL JOINTS ARE TIGHT FITTING 3. COMPRESSED MINERAL WOOL INSULATION INSTALLED INTO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION IF GAPS APPEAR BETWEEN LOWER AND UPPER PORTIONS OF THE HORIZONTAL SUPPORTS 4. UPPER PORTION OF SUPPORT POSITIONED CORRECTLY 5. OVERLAPPING VAPOUR BARRIER OF LOWER PORTION ADHERED TO UPPER PORTION 6. UPPER PORTION PROTECTION PLATE INSTALLED 7. UPPER AND LOWER CRADLES FIT ACCEPTABLE 8. CORRECT AMOUNT OF NUTS, BOLTS AND SPRING WASHERS INSTALLED 9. NUTS TORQUED TO CORRECT N/M AS PER REQUIREMENTS 10. FULL VAPOUR STOP APPLIED TO BOTH ENDS OF COMPLETED SUPPORT THE SUPPORTS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS: SIGNED : ________________________ NAME:_____________________________________________DATE:_____________________

QIR-123-Cold Special Supports Installation

Embed Size (px)

DESCRIPTION

QIR-123-Cold Special Supports Installation

Citation preview

CONSTRUCTION

eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm No. QIR -123

Report No.:

COLD / SPECIAL SUPPORTS INSTALLATIONSheet of

Reference : Piping Fabrication & Erection Procedure No. 00250600DBPC4066M

LINE NO.: ____________________________ DRAWING No.: __________________________SUPPORT No..____________

LOCATION: ___________________________________ELEVATION.:________________________________________________ITEMDESCRIPTION

(INSTALLATION OF LOWER PORTION OF SUPPORT)SIGNATURE AND DATE

NO.ConstructionQCI

1.CORRECT AND FULL PAINTING SYSTEM APPLIED AT SUPPORT LOCATION

2.PIPE SURFACE DRY AND FREE FROM DIRT, OIL OR GREASE

3.LOWER PORTION OF HD SUPPORT DRY AND FREE OF DEFECTS

4.LOWER PORTION OF SUPPORT INSTALLED WITHOUT DAMAGE

5.LOWER PORTION OF SUPPORT INSTALLED AT CORRECT LOCATION

NOTE: WEATHER PROTECTION SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD AS REQUIRED.

ITEM

No.DESCRIPTION

(INSTALLATION OF UPPER PORTION OF SUPPORT)Insulation S/CConstruction

1.UPPER PORTION HD SUPPORT DRY AND FREE OF DEFECTS

2.FOAM SEAL APPLIED TO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION WHEN HORIZONTAL JOINTS ARE TIGHT FITTING

3.COMPRESSED MINERAL WOOL INSULATION INSTALLED INTO HORIZONTAL JOINTS ON OUTER LAYERS OF INSULATION IF GAPS APPEAR BETWEEN LOWER AND UPPER PORTIONS OF THE HORIZONTAL SUPPORTS

4.UPPER PORTION OF SUPPORT POSITIONED CORRECTLY

5.OVERLAPPING VAPOUR BARRIER OF LOWER PORTION ADHERED TO UPPER PORTION

6.UPPER PORTION PROTECTION PLATE INSTALLED

7.UPPER AND LOWER CRADLES FIT ACCEPTABLE

8.CORRECT AMOUNT OF NUTS, BOLTS AND SPRING WASHERS INSTALLED

9.NUTS TORQUED TO CORRECT N/M AS PER REQUIREMENTS

10.FULL VAPOUR STOP APPLIED TO BOTH ENDS OF COMPLETED SUPPORT

THE SUPPORTS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS & SPECIFICATIONS:SIGNED : ________________________NAME:_____________________________________________DATE:_____________________

CONSTRUCTION

SIGNED: ___________________________NAME:_________________________________________ DATE:_____________________

PIPING QCI

SIGNED: ________________________NAME:______________________________________ DATE:__________________

COMPANY