“ eni Iraq b.v. - Zubair Oil Field Development Project” Work Package of Existing DGS Modification Form- No. QIR-113 Report No. Material / Instruments - Electrical Equipments Monthly Preservation Inspection report Page : of Reference: Material – Equipment Preservation Procedure No.00250600DBPF4056M Storage Location Description of Materials Inspected A. Valves E. Cement Lined Materials B. Random Piping F. Steel Structure C. Fittings G. Electrical Equipments D. Fabricated Spools H. Instruments Equipments Description of Checks Indicate with X the item checked Remarks A B C D F G H 1 Item Identification acceptable 2 All opening closed and protected 3 Flanges protection acceptable 4 Material stored properly 5 Installed material protected. 6 Painting conditions acceptable 7 Non painted areas protected properly 8 Moisture retention acceptable 9 Protective coating acceptable 10 Silica protection acceptable 11 Space heaters connected 12 Installed bolts & nuts properly greased Inspector Name Signature Date

QIR-113-Monthly Preservation Inspection Report

Embed Size (px)

DESCRIPTION

QIR-113-Monthly Preservation Inspection Report

Citation preview

Page 1: QIR-113-Monthly Preservation Inspection Report

“ eni Iraq b.v. - Zubair Oil Field Development Project”

Work Package of Existing DGS Modification

Form- No. QIR-113

Report No.

Material / Instruments - Electrical Equipments Monthly Preservation Inspection report Page : of

Reference: Material – Equipment Preservation Procedure No.00250600DBPF4056M

Storage LocationDescription of Materials Inspected

A. Valves E. Cement Lined Materials

B. Random Piping F. Steel Structure

C. Fittings G. Electrical Equipments

D. Fabricated Spools H. Instruments Equipments

Description of Checks Indicate with X the item checked Remarks

A B C D F G H

1 Item Identification acceptable

2 All opening closed and protected

3 Flanges protection acceptable

4 Material stored properly

5 Installed material protected.

6 Painting conditions acceptable

7 Non painted areas protected properly

8 Moisture retention acceptable

9 Protective coating acceptable

10 Silica protection acceptable

11 Space heaters connected

12 Installed bolts & nuts properly greased

Inspector Name Signature Date

Corrective Action Required :