eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm- No. QIR-112
Report No.
STATIC EQUIPMENT PRESERVATION CARD
( Periodic checks )
Page : 1 of
Reference Procedure: Material Equipment Preservation Procedure No.
Item No.P.O. No.Req.No.
Unit No:Manufacturer :
Item Description:
1. General Inspection -Weather protection / Painting Monthly
2. Flange faces - protected with denso tape and dust blinds in place. Monthly
3. Instruments protected if installed (If advised by the vendor). Monthly
4. All non painted parts protected with preventative grease. Monthly
5. Check Nitrogen pressure on Vessel ( if recommended by Vendor) Weekly
6. All bolts and nuts protected with preventative grease . Monthly
7. Anchor bolts covered with grease. Monthly
8. Replace all VCI paper and desiccant capsule at six months interval ( if not otherwise indicated by Supplier) N.A.
Weekly Monthly Periodic Preservation Checks
Weekly No.12345678
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
For Non Aplicable Items indicate in the box N.A. eni Iraq b.v. - Zubair Oil Field Development ProjectWork Package of Existing DGS ModificationForm- No. QIR-112
Report No.
STATIC EQUIPMENT PRESERVATION CARD
( Periodic checks )
Page : of
Item No.P.O. No.Req.No.
Unit No:Manufacturer :
Item Description:
Weekly No.12345678
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign
Sign