'J1mf mcnR qovemment of India ~~~ Central Electricity Authority ~"i.f1l ~ ~ -wiiij Western Regional Power Committee ~ -3, "Q;f~~, ~mr(~), ~ - 400093 F-3, MIDCArea, Andheri (East), M mbai - 400 093 ~ Phone: 022-28361636, 2820 0194, 95, 96 ~ Fax: 022-2837 0193 Website: www.wrpc.gov.in E-mail:[email protected] ~ qB" i3TI g 9001- 2000 ISO: 9001-2000 No. WRPC/Comml-1/6/Alloc/20161 Date: 20.01.2016 General Manager =osoco WRLDC F-3, MIDC Area, Andheri (E) Mumbai - 400 093 Sub: Redistribution of State wise allocation 620MW power from RGPPL -reg. Sir, 1. MoP vide order NoAI22/2010-Th-1 (Vol-I) dated 18.01.2016 (Copy enclosed) in supersession to its order dated 23.12.2015 have intimated reallocation of 620 MW power from Ratnagiri Gas & power Pvt. Ltd (RGPPL) to Indian Railways on temporary basis under PSDF support scheme for the year FY 2015-16 and 2016-17, out of the power allocated to Maharashtra (Maharashtra State Electricity Distribution Company Limited). The revised power allocation from RGPPL to Indian Railways to be utilized in various states is as follows: - Maximum load in SI.No State Nodal Railway MW 1 Maharashtra CR 250 2 Gujarat WR 70 3 Madhya Pradesh WCR 200 4 Jharkhand SER 100 2. As stated in the above MoP letter, the total allocation of 620 MW power from RGPPL to Indian Railways is subject to the following conditions: a. This allocation is temporary i.e upto 31.03.2017. b. It is without prejudice to the issue of payment of fixed charges by MSEDCL to RGPPL, which is presently, sub-judice.

Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

  • Upload
    lamcong

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

'J1mf mcnRqovemment of India

~~~Central Electricity Authority

~"i.f1l ~ ~ -wiiijWestern Regional Power Committee

~ -3, "Q;f~~, ~mr(~), ~ - 400093F-3, MIDCArea, Andheri (East), M mbai - 400 093

~ Phone: 022-28361636, 2820 0194, 95, 96 ~ Fax: 022-2837 0193Website: www.wrpc.gov.in E-mail:[email protected]

~ qB"i3TI g 9001-2000

ISO: 9001-2000

No.WRPC/Comml-1/6/Alloc/20161 Date: 20.01.2016

General Manager=osoco WRLDCF-3, MIDC Area, Andheri (E)Mumbai - 400 093

Sub: Redistribution of State wise allocation 620MW power from RGPPL -reg.

Sir,

1. MoP vide order NoAI22/2010-Th-1 (Vol-I) dated 18.01.2016 (Copy

enclosed) in supersession to its order dated 23.12.2015 have intimated

reallocation of 620 MW power from Ratnagiri Gas & power Pvt. Ltd

(RGPPL) to Indian Railways on temporary basis under PSDF support

scheme for the year FY 2015-16 and 2016-17, out of the power allocated

to Maharashtra (Maharashtra State Electricity Distribution Company

Limited). The revised power allocation from RGPPL to Indian Railways to

be utilized in various states is as follows: -

Maximum load inSI.No State Nodal Railway

MW

1 Maharashtra CR 250

2 Gujarat WR 70

3 Madhya Pradesh WCR 200

4 Jharkhand SER 100

2. As stated in the above MoP letter, the total allocation of 620 MW power

from RGPPL to Indian Railways is subject to the following conditions:

a. This allocation is temporary i.e upto 31.03.2017.

b. It is without prejudice to the issue of payment of fixed charges by

MSEDCL to RGPPL, which is presently, sub-judice.

HCL
Typewritten text
204
Page 2: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

3. In continuation with the recent allocations in 15th Jan 2016 from RGPPL to

Indian Railways, Nac from Gujarat, Maharashtra, Jharkhand are already

received upto their allocations. In case of MP, NaC for enhanced

quantum is required (150 to 200 MW). Therefore, the above allocation

from RGPPL shall be effective from 00:00 Hrs of the following day of

intimation of Nac by MP SLDC to WRLDC (with a copy marked to

WRPC) for enhancement to 200MW to Western Central Railway.

4. The Revised percentage shares of RGPPL for the above allocation are

enclosed.

(S.. ande)Member Secretary

Copy to:1. Managing Director, RGPPL, New Delhi2. Dy.Chief Electrical Engineer(TRD),WR,Mumbai.3. Chief Engineer (PP), MSEDCL, Mumbai4. Chief Engineer (STU), MSETCL, Mumbai5. Chief Engineer (LD), LD, MSETCL, Kalwa6. Executive Engineer, Eelctricity Deptt, DD, Daman7. Secretary (Power), UT of DO & DNH, Daman8. Executive Engineer, Eelctricity Deptt, DNH, Silvassa9. Chief Electrical Engineer, Elect. Dept., Panjim, Goa10. DGM (Comml), RGPPL, 5th Floor, Samruddhi Venture Park, MIDC, Andheri (E), Mumbai-9311. Chief Engineer (GM),CEA, New Delhi12. CE SLDC,Jabalpur,Madhya Pradesh.13. CE SLDC,Gotri,Gujarat14. CE SLDC,Jharkhand.15. MS,ERPC,Kolkata.16. GM,ERLDC,Kolkata.

Page 3: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

1967.08

Installed Capacity

E-BID RLNG

capacity in MW

% wrt Installed capacity

% wrt E-Bid Share capacity

Other than E-BID RLNG capacity in

MW% wrt Installed

capacity

% wrt Other than E-Bid Share

capacityMaharshtra 0 0 0.00 1248.73 63.4812 92.6990Indian Railways** 620 31.5188 100.00 0 0.00 0.0000DD 0 0 0.00 39.34 2.0000 2.9204DNH 0 0 0.00 39.34 2.0000 2.9204Goa 0 0 0.00 19.67 1.0000 1.4602RGPPL Total(MW) 1967.08 620 1347.08RGPPL Total(% Share) 100.00 31.5188 68.4812

100.0000

1967.08

Nodal Railway/StateInstalled Capacity

E-BID RLNG

capacity in MW

% wrt Installed capacity

% wrt E-Bid Share capacity

CR (Maharashtra) 250 12.7092 40.3226WR (Gujarat) 70 3.5586 11.2903WCR (Madhya Pradesh) 200 10.1674 32.2581SER (Jharkhand) 100 5.0837 16.1290

RGPPL Total(MW) 1967.08Total 620.00 31.5188 100.0000

Percentage shares of RGPPL for 620 MW share of Indian Railways from Maharashtra

E-BID RLNG Other Than E-BID RLNG

**The Revised Distribution of 620MW power from RGPPL to Indian Railways is further distributed to following Nodal Railways statewise as per MOP order dated 18.01.16:

E-BID RLNG

Page 4: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

«I.;q<1;l\M~

No.4!2212010-Th-1 (Vol-!)Government of India

Ministry of Power

Shrarn Shakti Bhawan, Rafi WlJrg. New Del hi.Dme:ll3anuary, 201 e

To,

i) The Chairperson,Central ElectricityAuthority, Sewa Bhawan,RK Purarn,New Delhi.

{ii} Managing Director, Ratnagiri . ii)Gas & Power Pvt. Ltd.(RGPPLJ,5th floor, GAILJubilee Tower, B-~5-36,Sector-l, Noida-2D1301,Dist. Gautam Budh Nagar (v.P)

Member Electrical,Min istry of Rail wa ys,Ran Bhawan, NewDelhi

Subject: Redistrtbutiou of State wise allocation of 620 MW power from RG PPL.

Sir,I am directed to Say that in supersession of this Ministry's letter dated 231'.1 December,

2015, it has now been decided to re-allocate 620 MW of power from R.atndg,iri Gas & PowerN!J,Ltd (RGPPL) to Indian Railways on temporary basis under PSDF support scheme for the :ycatFY 20 \5-! 6 and 2016-17 out of the power allocated to Maharashtra (Mah arash tra StaleElectricity Distribution Company Limited).

With this revision, RGPPL's power allocation to Indian Railways stand revised to 620M W which shall be utilized by Railways in various States as follows-

51. No. State Nodal Railway Maximum load in MWI Maharashtra CR 2502 Gujarat WR 703 Madhya Pradesh WCR 200 -'-4 Jharkhand SER 100, --

2. The total allocation of 620 MW POW\!f from RGPPL to Indian Railways is subject 10the following conditions:' . ,

i) This allocation istemporary, l.e, upto 31.03.2017.ji) It is without prejudice to the 'issue of payment of fixed charges by fvlSEDCL to

RGPPL which is, presently, sub- judice.

Page 5: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

{{

..

-2-

3. CEA is requested to implement this revised allocation with immediate effect or witheffect from the date from which additional power starts flowing to Indian Rai lways inrespective states, whichever is later.

4. Accordingly, RGPPL is advised to finalize the PPA!supplementary PPA withRailways immediately.

Yours faithfu Ily

~, (D~.¥k.sinha)Under Secretary to the Government of India

Telefax: 2371-97ID

Copy to:i) Member Secretary, Western Regiqn power Committee, Mumbaiii) Chief Engineer (Grid management). CEA, New DelhiHi} Director (OM), Ministry cf Power

Page 6: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

MADHYA PRADESH POWER TRANSMISSION CO. LTD.(A wholly owned Govt. of Madhya Pradesh Undertaking)

CIN: U40109MP2001SGC014880Block No.2, Shakti Bhawan, Rampur, Jabalpur (MP) 482008, Tel. :(0761) 270-2132, 2242

Fax No.: (0761) 2660908, e-rnail: [email protected] / [email protected]

04-02/PSP-219-H/185 Jabalpur, Date:20101/2016

To,

~ Gopal SinghVchi~f Electrical Distribution Engineer,

West Central Railway (WCR),General Manager's Office,Electrical Department,Jabalpur-482001 (MP)

Fax No.: 0761-2627629Email: [email protected]

Sub: NOC- for 200MW Power through Long .Terrn Access (LTA) by West Central Railway ,c. , -,

(WCR) - Interstate Transmission.

Ref: (i) This office letter no. 04-02/PSP-219-H/3349 dated 30.12.2015(ii) I ,Iur letter No. WCR/Ll03/7508/2015-16 dated 19.01.2016

On the subject matter and as desired vide your letter cited under reference (ii), the NOC

for transfer of 150MW power issued vide this office letter dated 30.12.2015 has been amended

for transfer of 200MW power through Long Term Access (LTA) from Ratangiri Gas and Power

Pvt. Ltd.(RGPPL) for 29 Nos. RTSS point where ABT Metering is available. Remaining 7 Nds.,. -. _.

, RTSS point connected through tapping arrangement shall be consider after installation of ABT~ >

meters at interfacing point. The NOC is enclosed herewith for further needful.

Encl: NOC in format LTA-3.

~-Chief Engineer("f'TQ.& Design)MPPTCL:JABALPUR

Copy to:

1. Chief Operating officer (CTU-Plg.), Power Grid Corporation of India Ltd.,

Saudamini, Plot No.-2, Sector-29, Gurgaon-122001 (Haryana).

2. Chief Engineer (Commercial), MPPMCL, Jabalpur.

3. Chief Engineer (SLDC), MPPTCL, Jabalpur.

4. Chief Engineer (T&C).MPPTCL,Jabalpur

Regd. Off.: Shakti Bhawan, Rampur, Jabalpur (MP) 482008 Tel.:(0761) 2661234, Fax:(0761) 2664141, e-rnail: [email protected], website: mptransco.nic.in

Page 7: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

FORMAT-LTA-3

No Objection Certificate of Madhya Pradesh Power Transmission Company Limited

04-02/PSP-219-H/185 Date: 20101/2016

1. Name of the STU issuing NOC : M.P. Power Transmission Co. Ltd.

2. Region : Western Region

3. Name of the Entity : West Central Railway (200MW)

4. Status of Entity (e.g.; State Utility/CPP/lPP/Discom etc.) : Deemed Licensee

5. Point(s) of Connection : 29 Nos. RTSS point where ABTMetering is available.

,,"r! 1,""/.),1,

(Remaining 7 Nos. RTSS point ,c.

connected through tappingarrangement shall be consider

J~,t after installation of ABT meters at' , "interfacing points)

6. Max. MW ceiling allowed for Injection*

7. Max. MW ceiling allowed for Drawal*

8. Validity Period

:200 MW

: N.A.

: 12 Years

9.Transmission losses (besides Regional Transmission losses)

WhetherParticulars Applicable or not % Loss

(Yes/No)State Transmission Yes As per Actual on Year to Year basislossesDistribution Licensees

,.,', ,

losses No N.A.

Any other losses Yes As per Actual on Year to Year basis

10. Transmission charges (besides Regional Transmission charges)

WhetherParticulars Applicable or not Rate (Rs/MWh)

(Yes/No)State Transmission Yes As determined by MPERC on Year toCharges year basisDistribution Licensees

r/

Charges No N.A.

Any other Charges Yes As determined by MPERC on Year toyear basis

Page 8: Q;f~~, ~mr(~),~ Allocation/share_allocation... · Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 3. ... of Connection : 29. ... The Reactive Energy Charges shall be governed by the

Declaration:

It is hereby certified that:r-

a) We have "No Objection" to seeking and availing Open Access by M/s West Central Railway

(WCR), through ISTS up to the MW ceiling as specified above, in accordance with applicable

regulations of CERC/MPERC.

b) We do not have the required infrastructure for energy metering and time block wise accounting in

place. The developer shall have to ensure the availability of infrastructure and other facilities

before commencement of Open Access. The State/ Distribution licensee network has thet ••~

. required transfer capability for transfer of power as per specified ceiling.

c) The Transmission Charges for the use of State!Distribution Licensee network and Operating

Charges for the State Load Despatch Centers shall be directly settled by Power Exchange with-.

us.

d) The State Utility designated for the purpose of collection/disbursement of UI charges shall be

res~thsible for timely payment of State's composite dues into the Regional Pool Account, . ' , ' .

e) Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall

be determined by us and will be covered in the intra-State UI accounting scheme, or as

applicable.

f) The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

g) We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network

to the State Transmission Utility !Distribution Licensee directly.

h) We shall inform the total import and export capability of the State as a whole to all concerned.

Attempt shall be made to declare this in advance through our website.

i) Any change in the contents of the NOC sh,3"1Ibe conveyed to the PCln.y to whom NOC was given,

at least 180 days prior to the day of transaction. In such cases, the RLDC(s)/NLDC shall also be

informed simultaneously.

Signature : ~- ..-..-..-. -- ....•.

Name: R. S. Shrivastava

Designation: Chief Engineer (Pig. & Design)

MPPTCL-Jabalpur

(Authorized Signatory of STU)

Place: Jabalpur r/

Phone No.: 0761 - 2702242

Date: 20/01/2016