INSPECTION DEPARTMENT JIZAN PROJECT INSPECTION DIVISON Jizan Economic City, Baish, Jizan Tel: +966-13-880-7634 DOCUMENT REVIEW RESPONSE JPIS Log No: JPIS-IGCC- PKG01-T-10/2015 To submitting Saudi Aramco Organization: Review Status: Name: Khalid S. Gazlan,Company Representative Status Review Definitions 0- Info Only (Review not required) 1- Approved 2- Approved with comment 3- Partial Approval (see below) 4- Not Approved 5- Reviewed No Comments 6- Reviewed, comments included 7- Reviewed, JCC’s enclosed 8- JCC’s Received 9- Concurred Department: Jazan Refinery and Terminal Projects Department 6 Address: VialeAlcide De Gasperi, 16, 20097 San Donato, MIL.se (MI) Telephone: Correct and Re- submit Yes No Fax: Attachments: Yes No Attention: BI/JO: Project: Contractor: BI: 10-01525- 0007 IGCC- Gazification Block Project (Package 1) SAIPEM S.p.a. Transmittal / Letter No.: Date: Document No: Rev.: Document Description: SMGFB-AOGFB-PM-T- 01288 April16, 2015 0 Quality Control Specification for Insulation Work at Site. REVIEW COMMENTS Revise the Procedure to confirm the requirements of related SATIP, SAIC & SATR all Rev-07.

QCS for Insulation

Embed Size (px)

DESCRIPTION

DRR

Citation preview

INSPECTION DEPARTMENT

INSPECTION DEPARTMENTJIZAN PROJECT INSPECTION DIVISONJizan Economic City, Baish, JizanTel: +966-13-880-7634

DOCUMENT REVIEW RESPONSEJPIS Log No:

JPIS-IGCC-PKG01-T-10/2015

To submitting Saudi Aramco Organization:Review Status:

Name:Khalid S. Gazlan,Company RepresentativeStatusReview Definitions

0- Info Only (Review not required)1. Approved1. Approved with comment1. Partial Approval (see below)1. Not Approved1. Reviewed No Comments1. Reviewed, comments included1. Reviewed, JCCs enclosed1. JCCs Received1. Concurred

Department:Jazan Refinery and Terminal Projects Department6

Address:VialeAlcide De Gasperi, 16, 20097 San Donato, MIL.se (MI)

Telephone:

Correct and Re-submit|X|Yes|_| No

Fax:

Attachments:|_|Yes|X| No

Attention:

BI/JO:Project:Contractor:

BI: 10-01525-0007IGCC- Gazification Block Project (Package 1)SAIPEM S.p.a.

Transmittal / Letter No.:Date:Document No:Rev.:Document Description:

SMGFB-AOGFB-PM-T-01288April16, 20150Quality Control Specification for Insulation Work at Site.

REVIEW COMMENTS

Revise the Procedure to confirm the requirements of related SATIP, SAIC & SATR all Rev-07.

ReviewCoordinator:Signature:Date::

Majed B. MutairiProject Quality Manager

Reviewer:cc / eccRouting Sheet No.:Page 1 of 1

Biplab PalN/A