QUALITY CONTROL MANUAL
FOR
POWER BOILERS, POWER PIPING, PRESSURE VESSELS & PARTS
CONSTRUCTED IN ACCORDANCE WITH
ASME SECTION I, ASME B31.1 AND
ASME SECTION VIII DIV. 1
&
REPAIRS & ALTERATIONS TO PRESSURE RETAINING ITEMSIN ACCORDANCE WITH THE NATIONAL BOARD INSPECTION CODE
AND JURISDICTIONAL REQUIREMENTS.
AT THIS LOCATION AND ALL FIELD SITES CONTROLLED BY THIS LOCTION
Edition Number 1: July 17, 2014
Revision Number 1: July 17, 2014
CONTROLLED COPY #1
ISSUED TO OFFICE
DATE:
QCM: Date:
AI: Date:
I
8/10/2019 QC Manual 7-17-2014.pdf
2/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
STATEMENT OF AUTHORITY AND RESPONSIBI LI TY
THIS MANUAL OUTLINES AND DEFINES THE QUALITY CONTROL PROGRAM TO ENSURE THAT
THE COMPANY IS AT ALL TIMES IN COMPLIANCE WITH THE APPLICABLE REQUIREMENTS OF
THE APPLICABLE ASME BOILER AND PRESSURE VESSEL CODE AND THE NATIONAL BOARD
INSPECTION CODE; HEREAFTER REFERRED TO AS THE CODE.
THE PRESIDENT FULLY SUPPORTS THIS QUALITY CONTROL SYSTEM AND GIVES THE
QUALITY CONTROL MANAGER COMPLETE AUTHORITY, RESPONSIBILITY, AND THE
ORGANIZATIONAL FREEDOM TO IDENTIFY QUALITY CONTROL PROBLEMS AND TO PROVIDE
SOLUTIONS. ALL PERSONNEL ARE HEREBY INSTRUCTED TO GIVE FULL COMPLIANCE TO
THIS MANUAL AND THE CODE.
ANY PROBLEMS CONCERNING CODE COMPLIANCE THAT CANNOT BE RESOLVED BY THE
QUALITY CONTROL MANAGER SHALL BE BROUGHT TO THE PRESIDENT FOR FINAL
RESOLUTION WITHOUT COMPROMISE OF THE CODE OR THIS QUALITY CONTROL MANUAL.
___________________________________ ____________________________
PRESIDENT DATE:
II
8/10/2019 QC Manual 7-17-2014.pdf
3/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
TABLE OF CONTENTS
Section Title
I Title Page
II Statement of Authority and Responsibility
III Table of Contents
IV Organizational Chart
V Abbreviations and Definitions
1 Quality Control Responsibilities
2 Drawings, Calculations, and Specifications
3 Material Control
4 Examination and Inspection
5 Correction of Non-Conformances
6 Welding
7 Non-Destructive Examination
8 Heat Treatment
9 Calibration Testing
10 Record Retention
11 Authorized Inspector
12 Repairs and Alterations
13 Field Sites
14 Exhibits
III
8/10/2019 QC Manual 7-17-2014.pdf
4/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
ORGANIZATIONAL CHART
PRESIDENT
Engineer Quality Control Manager Purchasing Manager Production Manager
Shop/Field QC Inspector Shop/Field Superintendent
Consultant NDE/HT
Engineer or Sub-Contractors
Customer
Engineer
Responsibility
Communication
IV
8/10/2019 QC Manual 7-17-2014.pdf
5/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
Abbreviations and Definitions
Abbreviations, if used, are defined as follows:
ASME American Society of Mechanical Engineers
ASME CODE American Society of Mechanical Engineers Boiler and Pressure Vessel CodeA.I. Authorized Inspector
A.I.A. ASME Accredited Authorized Inspection Agency
B.O.M. Bill of Material, Exhibit 14.7
C of C Certificate of Compliance
CODE American Society of Mechanical Engineers Boiler and Pressure Vessel Code and /or The National Board Inspection Code
COMPANY Refers to the Organization whose name is as indicated on the title page of THIS
manual and Certificates of Authorization.
HT Heat Treatment
MTR Material Test Report
NBIC National Board Inspection Code
NCR Non-Conformance Report
NDE Non-Destructive Examination
RTRadiographic Examination
UT-Ultrasonic ExaminationMT-Magnetic Particle Examination
PT-Liquid Penetrant Examination
VT-Visual Examination
PQR Procedure Qualification RecordPWHT Post Weld Heat Treatment
QA Quality Assurance
QC Quality Control
QCI Quality Control Inspector
QCM Quality Control Manager
QUALITY CONTROL When indicating a function to be performed shall mean that it is to performed bythe QCM or QCI
SECTION When followed by a roman numeral, shall mean that section of the ASME Boiler
and Pressure Vessel Code
SUPERINTENDENT When used alone, shall indicate shop superintendent or field superintendent, asapplicable
SWPS Standard Welding Procedure Specification
WPQ Welder or Welding Operator Performance Qualification
WPS Welding Procedure Specification
VESSEL All Items to be stamped with the ASME Certification Mark
V
8/10/2019 QC Manual 7-17-2014.pdf
6/37
8/10/2019 QC Manual 7-17-2014.pdf
7/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
2.0 DRAWINGS, CALCULATIONS, AND SPECIFICATIONS
2.1 Drawings, Bill of Materials, Calculations, and Specifications may be prepared by Company
Engineer, Consultant Engineer, or Customer Engineer. When computer programs are used in thedesign, the responsibility for input of correct data and verification of output shall be controlled by a
company engineer. Prior to Code edition becoming mandatory, a company engineer shall perform a
review of the revisions to determine if computer programs are affected. This review and anychanges made to computer programs shall be documented by a company engineer. Hand
calculations to verify output will be provided when requested by the A.I. In either case, all design
documents shall be reviewed for Code compliance by a company engineer and will indicateapproval by signature and date. The Quality Control Manager will indicate his review by signature
and date on the Traveler (Exhibit 14.9). Engineering and the Quality Control managers shall add to
the drawing all required data such as Job No., Unique Serial Number for each vessel or unit, WPS
numbers, Joint design and weld sizes for all joints, NDE Requirements, PWHT Requirements,Hydrostatic Test Pressure, Certification Mark stamping details, and any additional Code
Requirements.
2.2 The Bill of Material (Exhibit 14.7) prepared and approved by a company engineer from designdocuments, shall include all Code ordering requirements for the material to comply with Section II
and to any additional requirements as required by the fabrication code using SA or SB Specification
Designations.
2.3 Any revisions to the above documents shall be reviewed and approved the same as the originals.
2.4 The Quality Control Manager shall maintain the drawings, BOM, calculations, and specifications inthe job file and issue a copy of approved drawings and their revisions to the Shop/Field
Superintendent and a copy of the approved BOM to purchasing. As revisions are issued, the
Quality Control Manager shall recover and destroy all obsolete copies, maintaining one copy
marked VOID in the job file.
2.5 When the Quality Control Manager is unable to physically deliver drawings, BOM, calculations,
specifications, or any other required documentation to the Field Superintendent at the field site, hewill deliver required documents using the Transmittal Form (Exhibit No. 14.6). When received, the
Field Superintendent will issue the new documents, destroy the old documents (if applicable), sign
and date the transmittal form, and return the form to the Quality Control Manager to indicate his
receipt.
2
8/10/2019 QC Manual 7-17-2014.pdf
8/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
3.0 MATERIAL CONTROL
3.1 Purchasing Manager shall verbally order all code welding material/consumables from data on the
approved B.O.M. or, for welding consumables, by written request of the Superintendent per ASMESpecifications. (See Section 13 for Material purchased in the field)
3.2 No substitution of material is allowed until all affected documents have been revised as describedin this Manual and are approved by Engineering and Quality Control managers and accepted by theA.I.
3.3 All Code material received will be inspected by the Shop/Field Quality Control Inspector forcompliance to the B.O.M. and the Code. This inspection shall include the Quantity, Dimensions,
Code Identification, Physical Defects, Documentation and any Evidence of damage. The results of
this inspection shall be recorded on the B.O.M. Welding consumables shall be inspected Shop/Field
Quality Control Inspector for conformance to the ASME SFA Specification or AWS Classificationincluding Identification Markings and Shipping Damage.
3.4 All Material Test Reports (MTR) shall be reviewed for Code compliance to ASME Section II by the
Quality Control Manager or Shop/Field Quality Control Inspector who will sign and date the MTRwhen acceptable. These MTRs shall become part of the job file and be presented to the A.I. for his
review.
3.5 Code acceptable material will be marked with the job and / or Serial Number and stored in a Code
designated area. If Code acceptable materials are too small to be marked individually, they shall beplaced in a container marked with the job and / or Serial Number and stored in a Code designated
area.
3.6 A Hold Tag (Exhibit 14.12) shall be placed on unacceptable material. A Non-Conformance Report
(Exhibit 14.2) shall be completed by Quality Control for disposition per Manual Section 5. Thismaterial will be segregated form Code Acceptable Material.
3.7 All Code Material will be issued to the Shop/Field Superintendent by Quality Control afterverification that it is acceptable and complies with the applicable Code and the drawings.
Identification may be recorded on the drawing or Traveler (Exhibit 14.9) by the Shop/Field Quality
Control Inspector at time of fit-up examination.
3.8 Material delivered to subcontractors for rolling and / or forming shall be tagged with a metal tag orstamped with the job or Serial Number and any other required identifying number to permit
traceability to MTRs.
3.9 Customer supplied material may be used. If customer supplied material is used, the Quality Control
Manager shall be responsible for obtaining MTRs or certificates of compliance as required, and all
required identification.
3.10 Any additional material testing required shall be identified on the drawings.
3
8/10/2019 QC Manual 7-17-2014.pdf
9/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
4.0 EXAMINATION AND INSPECTION
4.1 The Quality Control Manager, prior to fabrication, shall prepare the Traveler (Exhibit 14.9.1) for
each Code vessel and present it to the A.I. with the applicable drawings and calculations for hisreview and acceptance and to allow insertion of his required inspection hold points.
4.2 All applicable examination points are mandatory for Quality Control. The A.I.s designated holdpoints may not be passed without his initial and date as acceptable or by obtaining a verbal waiver
of a hold point and documenting such waiver on the Traveler (Exhibit 14.9) indicating the person
who received the waiver and the date.
4.3 When Material Identification Markings are located where they will be removed during fabricationor the material is divided into two or more pieced, the Shop/Field QCI shall transfer the markings or
verify their correct transfer prior to cutting. Alternatively, subject to the acceptance or the A.I., a
documented Coded Marking System traceable to the MTR or to the material specification, when no
MTR is required, may be used.
4.4 The fit up of all weld joints prior to welding shall be examined by the Shop/Field QCI, and when
acceptable, recorded on the Traveler (Exhibit 14.9). At this time the Shop/Field QCI shall record allMaterial Identification as built into the Vessel on the Traveler (Exhibit 14.9) and Drawing.
4.5 The Quality Control Inspector shall monitor all fabrication operations and all non-conformances
shall be handled per Section 5 of this Manual.
4.6 The Hydrostatic test shall be conducted by the Shop/Field Superintendent as specified on the
drawing. The Quality Control Inspector shall witness and accept the Hydrostatic test and notify theA.I. so that he may be present during the test. After acceptance at the Hydrostatic test pressure, the
Quality Control Inspector and the A.I. will make a close visual examination of all weld joints at the
pressure required by the applicable Code. Pressure Gauges used for the Hydrostatic test shall beapproximately twice the pressure but no less than 1 times the test pressure, or more than 4 times
that of the test pressure.
4.7 All repairs to Code Materials shall be referred to the A.I. for his acceptance or the method of repair
prior to performing such repairs.
4.8 The Quality Control Manager is responsible for the Name plate stamping or stamping on the Vessel
or part as specified on the drawing with the review and acceptance of the A.I. They shall record this
on the Traveler (Exhibit 14.9) to verify review of the stamping and its application to the propervessel or part.
4.9 The Certification Mark shall be in the custody and control of the Quality Control Manager and the
Certification Mark may be applied to the Name Plate, Vessel, or Part only with the concurrence of
the A.I. For stamping see Exhibit 14.3.4.10 When internal inspections of a Vessel cannot be made by entering the vessel after the final closure
weld is made, a complete as possible examination shall be made prior to the final closure.
4
8/10/2019 QC Manual 7-17-2014.pdf
10/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
5.0 CORRECTION OF NON-CONFORMANCES
5.1 A Non-conformance is any condition which does not comply with the Code, this Quality Control
Manual, or customer specifications. There are normally two types of Non-conformances: Those found in material or parts at receiving inspection such as documentation, markings,
dimensions, or physical damage.
Those found on items during fabrication, examination, inspection or final testing.
5.2 When a Non-conformance is discovered, the Shop/Field QCI shall be notified for preparation of a
Non-conformance Report (Exhibit 14.2) and marking of the item or material with the wordHOLD. This HOLD marking may only be removed by the Shop/Field QCI or Quality Control
Manager after correction of the Non-Conformance.
5.3 The Quality Control Manager shall approve the proposed disposition on the Non-conformance
Report after consultation with Engineering, Superintendent, Purchasing, and Customer as required,and then present the approved disposition to the A.I. for his acceptance prior to corrective action
being taken and for the insertion of any hold points
5.4 When the Non-conformance has been resolved to be USE AS IS, the reasons for accepting theNon-conformance is stated by the Quality Control Manager on the Non-conformance Report andsubmitted to the A.I. for his concurrence and acceptance. When any required Revisions to
Drawings, Calculations, or other Manual required documents are made as described in this Manual,
require the same approvals as the Original.
5.5 When the Non-conformance requires rework or repair, the Quality Control Manager prepares therework or repair procedure and presents it to the A.I. for his review, acceptance, and designation of
Hold Points.
5.6 The Shop/Field QCI shall be responsible for all inspection of rework or repair of the Non-
Conformance. When the inspection reveals that the work is acceptable, the Non-conformance report
shall be signed by the Shop/Field QCI with his approval of the final disposition of the Non-Conformance. The A.I. will be notified of the correction of the Non-conformance and presented the
Non-conformance Report for his review and acceptance of the final disposition. The Non-
conformance Report shall be filed in the job file.
5.7 When the Non-conformance requires the rejection of material or items, those items or materials shallbe completely removed from the code work area and clearly marked as to eliminate the possibility
of them being mistakenly used on code work.
5.8 Welding defects determined by NDE are not documented on a Non-conformance Report but, will be
repaired using a WPS specified by engineering or the Quality Control Manager and re-inspected bythe Original NDE (If applicable) used to detect the defects.
5.9 Only the Quality Control Manager or Quality Control Inspector may remove the Hold Tag (Exhibit
14.12) after correction of the Non-conformance. It shall include the verification of the implementedcorrective action by QCM/QCI and AI before removing the Hold Tag (Exhibit 14.12).
5
8/10/2019 QC Manual 7-17-2014.pdf
11/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
6.0 WELDING
6.1 All Welding procedures, Welders, and Welding Operators shall be qualified and certified to ASME
Section IX with any additional requirements of the Construction Code.
6.2 The Quality Control Manager shall prepare the WPSs which will be revised whena Nonessential
Variable change and will be re-qualified when there is a change in Essential or SupplementaryEssential (When Applicable) Variables.
6.3 The Quality Control Manager shall assign and supervise personnel to perform the Procedure
Qualification Tests. The required welded specimens may be mechanically prepared and tested
either in house or by an acceptable testing Laboratory. Reports of the tests will be reviewed forcode compliance by the Quality Control Manager, who will complete and certify the PQR when
acceptable per the Code.
6.4 The Quality Control Manager or his designee shall supervise welders and welding operators in the
performance of their qualification test. The required welded specimens may be mechanically
prepared and tested either in house or by an acceptable testing laboratory. Reports of the tests will
be reviewed for code compliance by the Quality Control Manager, who will complete and certifythe WPQ Report when acceptable per the Code.
6.5 Copies of WPS, PQR, WPQ, and WOPQ shall be available to the Superintendent, Quality Control
Manager, and the A.I.
6.6 The Quality Control Manager shall maintain on file the Welders Qualification Record (Exhibit
14.10) with welder/welding operators qualification listed by process and make a copy available to
the superintendent. The welders qualification record (for evidence of welding process continuity)shall be compiled every 6 months, at a minimum, by the Quality Control Manager to maintain
current Qualification. Welders shall be re-qualified if they do not weld in a specific process for a
period of six months, when there is a change in a performance essential variable, or at any timetheir ability to perform Code Welding is questionable.
6.7 The Superintendent shall assign qualified welders or welding operators to Code welding from theWelders Qualification Record. He shall make the applicable WPS available to the Welder or
Welding Operator as specified on the approved drawing, maintaining supervision and control
throughout production welding.
6.8 All company tack welds shall be made to a qualified WPS. They shall be removed prior to welding
the joint unless welded by a qualified welder in which case, they will be prepared properly for
incorporation into the final weld and inspected for defects by the welder prior to incorporatingthem into the finished weld (if defective they shall be completely removed). Subcontractors tack
welds shall be made using a company WPS or the subcontractors WPS may be used after review
and acceptance by the Quality Control Manager. Subcontractors tack welds shall be removed.
6.9 The Quality Control Manager shall assign each Welder or Welding operator a unique symbol stamp
to identify his welds. All Code welds shall have the welder's symbol stamped adjacent to the weld
at intervals of not more than 3 feet. If stamping is not permitted or in lieu of stamping, theShop/Field QCI shall record the welder's symbol for each weld on the Engineered Drawings.
6
8/10/2019 QC Manual 7-17-2014.pdf
12/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
6.10 All welding consumables shall be ordered and received as required in the Material Control Section 3
of this Manual. They shall be stored in warm dry areas or heated ovens as recommended by ASME
Section II Part C and/or the welding consumable manufacturers recommendation.
6.11 All Low Hydrogen electrodes, after containers are opened, shall be stored in heated ovens.
6.12 Low Hydrogen electrodes are issued for a maximum of 4 hours use, after which, or at completion of
welding or shift, they are returned to the oven prior to re-issue. Unidentified, damaged or dirtyelectrodes are scrapped.
6.13 The Authorized Inspector may require requalification of a WPS, Welder, or Welding Operator at
any time.
7
8/10/2019 QC Manual 7-17-2014.pdf
13/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
7.0 NON-DESTRUCTIVE EXAMINATION
7.1 Non-destructive Examination may be subcontracted or performed in house.
7.2 The types of Nondestructive Examination used shall be Radiographic, Ultrasonic, MagneticParticle, Liquid Penetrant, and Visual examinations.
7.3 Subcontract Personnel responsible for performing RT, UT, PT, MT, and VT examination shall be
qualified and certified to their Written Practice, using SNT-TC-1A (Latest Code Accepted Edition
and ADDENDA) as a guideline, and/or the applicable Code.
7.4 The NDE subcontractor's Written Practice shall contain provisions for training, experience,
qualification, and certification. This Written Practice and the certification and examination records
of personnel shall be reviewed and approved by the Quality Control Manager for compliance with
the Code.
7.5 The NDE Subcontract Level III Qualifications and certifications shall be reviewed by the QualityControl Manager who will, upon acceptance, issue a letter of appointment for the Level III to act as
the Company Level III Examiner for RT, UT, MT, PT, and VT.
7.6 When applicable, in house personnel responsible for performing Magnetic Particle or Liquid
Penetrant Examination shall be qualified and certified by the Company in accordance with ASME
CODE and the company qualification and certification requirements.
7.7 When applicable, in house personnel responsible for performing Visual Examination shall be
qualified and certified by the Company in accordance with ASME B31.1, paragraph 136 and the
company qualification and certification requirements.
7.8 All NDE Documentation shall be on file and available to the Authorized Inspector for review.
7.9 Radiograph Film and Interpretation Technique Sheets and other NDE examination records shall be
reviewed and accepted by the Shop/Field QCI prior to making them available to the AuthorizedInspector for review.
7.10 The NDE subcontractorsRadiographic film viewing facilities and density comparing equipment
shall be available for review of film for Code compliance by the Shop/Field QCI and the
Authorized Inspector.
7.11 NDE Procedures (methods and techniques) shall be demonstrated to the satisfaction of theAuthorized Inspector and so documented.
7.12 The Authorized Inspector may request requalification of NDE Procedures or examiners wheneverthere is a reason to question their Code compliance.
8
8/10/2019 QC Manual 7-17-2014.pdf
14/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
8.0 HEAT TREATMENT
8.1 All PWHT will be performed by an outside contractor either on field site, in shop, or at contractor's
location. Engineering Manager shall prepare and approve the heat treating procedure or review andaccept the subcontractors Heat Treating Procedure which describes the placement of
thermocouples, temperature gradients for heating and cooling, time at temperature, all specialrequirements, and required records.
8.2 The Quality Control Manager shall review and accept the subcontractor's controls equipment and
calibration records to assure Code compliance before placement of an order.
8.3 The subcontractor shall provide the company with records of heat treatment consisting of heat
treatment charts which shall include date, item job and / or serial number, evidence of currentcalibration of recorders, the number, location and method of attachment of thermocouples and shall
be signed and dated by the operator or subcontractors personnel.
8.4 Items to be sent for heat treating shall be tagged with a metal tag or stamped with job and / or serialnumber and any other required identifying numbers. These numbers shall be verified by the
Shop/Field QCI prior to shipment to the outside contractor and upon return to the shop or field.
8.5 The Quality Control Manager shall review heat treatment charts and documentation for compliance
with the procedure and the Code, and indicate this review and acceptance by initials and date.
8.6 The heat treatment chart and documentation shall be submitted to the Authorized Inspector for
review and become part of the Job File.
8.7 Shop/Field QCI shall inspect all returned items for conditions and shipping damage. Unacceptableitems will be handled per Section 5.0 of this manual; acceptance of items will be recorded on the
Traveler (Exhibit 14.9).
9
8/10/2019 QC Manual 7-17-2014.pdf
15/37
8/10/2019 QC Manual 7-17-2014.pdf
16/37
8/10/2019 QC Manual 7-17-2014.pdf
17/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
11.0 AUTHORIZED INSPECTOR
11.1 The Authorized Inspector, as defined in the ASME Code, shall have been qualified by a written
examination under the rules of any State of the United States or Province of Canada which hasadopted the Code. He will be employed by an ASME Accredited Authorized Inspection Agency,
as defined by ASME Section I PG-91 & VIII, Div. 1 UG-91 (a)(1), with which the Company has a
current agreement for inspection service.
11.2 The Quality Control Manager or Quality Control Inspector shall act as liaison with the Authorized
Inspector, and shall notify the Authorized Inspector in advance of all Hold Points in sufficient time
for him to perform inspections and of all repairs to materials prior to performing the repairs.
11.3 Where Code work is in progress, whether in shop or field, the Authorized Inspector shall have free
access to perform all required inspections and monitoring, and to those subcontractors facilities andCode material suppliers as he may request.
11.4 The Authorized Inspector shall have free access to all documentation required to performinspections.
11.5 A current controlled copy of the Quality Control Manual shall be made available to the Authorized
Inspector.
11.6 All access given to the Authorized Inspector shall be extended to his supervisor to perform anyrequired audits or reviews.
11.7 Proposed changes to the Quality Control Manual shall be submitted to the Authorized Inspector forreview and acceptance prior to implementation.
11.8 The Quality Control Manager shall furnish the Authorized Inspector with a Traveler (Exhibit 14.9)
prior to any fabrication for review and placement of Hold Points. No work shall proceed beyondthe Authorized Inspector's Hold Points until he accepts them by signature and date OR A VERBAL
WAIVER OF THE HOLD POINT PER PARAGRAPH 4.2 IS OBTAINED.
11.9 The Quality Control Manager shall prepare, certify and submit the appropriate Manufacturer's DataReports to the Authorized Inspector for review for compliance with the applicable Code
requirements. The A.I. will review and sign the Manufacturer's Data Report when he has assured
himself that all Code requirements have been met.
11.10 The Quality Control Manager will assist the Authorized Inspector's Supervisor during his required
audits and the Authorized Inspector while he is monitoring the Quality Control System.
12
8/10/2019 QC Manual 7-17-2014.pdf
18/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
12.0 REPAIRS AND ALTERATIONS
DEFINITIONS OF SOME TERMS USED IN THIS SECTION
ALTERATION ANY CHANGE IN THE ITEM DESCRIBED ON THE ORIGINAL MANUFACTURERS DATAREPORT WHICH AFFECTS THE PRESSURE CONTAINING CAPABILITY OF THE PRESSURE
RETAINING ITEM. NON- PHYSICAL CHANGES SUCH AS AN INCREASE IN THE MAWP
(INTERNAL OR EXTERNAL), OR DESIGN TEMPERATURE OF A PRESSURE RETAINING ITEM
SHALL BE CONSIDERED AN ALTERATION. A REDUCTION OF THE MDMT SUCH THAT
ADDITIONAL MECHANICAL TESTING IS A REQUIREMENT SHALL BE CONSIDERED AN
ALTERATION.
A.I.A. AN A.I.A. SHALL BE EITHER A JURISDICTION AUTHORITY AS DEFINED IN THE NATIONALBOARD CONSTITUTION OR AN ENTITY THAT IS ACCREDITED BY THE NATIONAL BOARD
MEETING NB369; QUALIFICATION AND DUTIES FOR AUTHORIZED INSPECTION
AGENCIES.
INSPECTOR AN INDIVIDUAL WHO HOLDS A VALID AND CURRENT NATIONAL BOARD COMMISSIONAND EMPLOYED BY AN ACCREDITED IN-SERVICE AUTHORIZED INSPECTION AGENCY.
JURISDICTION A GOVERNMENTAL ENTITY WITH THE POWER, RIGHT, OR AUTHORITY TO INTERPRETAND ENFORCE LAW, RULES, OR ORDINANCES PERTAINING TO BOILERS, PRESSURE
VESSELS, OR OTHER PRI. IT INCLUDES NATIONAL BOARD MEMBERS JURISDICTIONS
DEFINED AS JURISDICTIONAL AUTHORITIES.
REPAIR THE WORK NECESSARY TO RESTORE PRESSURE RETAINING ITEMS TO A SAFE ANDSATISFACTORY OPERATING CONDITION.
RE-RATING SEE ALTERATION
ROUTINE REPAIRS THOSE REPAIRS LISTED AND DEFINED IN THE NBIC AS ACCEPTABLE ROUTINEREPAIRS AND/OR THOSE ACCEPTED BY THE JURISDICTION WHICH HAS CONTROL OVERTHE PRI.
ORIGINAL CODE
OF
CONSTRUCTION
(OCC) - DOCUMENTS PROMULGATED BY RECOGNIZED NATIONAL STANDARDS
WRITING BODIES THAT CONTAIN TECHNICAL REQUIREMENTS FOR CONSTRUCTION OF
PRESSURE RETAINING ITEMS OR EQUIVALENT TO WHICH THE PRESSURE RETAINING
ITEM WAS CERTIFIED BY THE ORIGINAL MANUFACTURER.
NON-CODE ITEM A PRESSURE RETAINING ITEM WHICH WAS NOT DESIGNED OR CONSTRUCTED TO ANYCODE OF CONSTRUCTION OR AN ITEM WHICH WAS DESIGNED IN ACCORDANCE WITH
THE ASME CODE BUT NOT INSPECTED, CERTIFIED, AND STAMPED WITH THE CODE
SYMBOL R.
NBICNATIONAL BOARD INSPECTION CODE
13
8/10/2019 QC Manual 7-17-2014.pdf
19/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
12.1 This section defines the requirements established for repairs and alterations as defined by the
National Board Inspection Code (NBIC) for Pressure Retaining Vessels
NOTE: When the rules of a jurisdictional authority impose the use of an earlier edition of theNBIC and the following paragraphs are in conflict with those requirements then, the requirements
of the imposed edition shall prevail. (I.E. Routine Repairs, Stamping, NBIC Report Forms, their
preparation, their distribution, etc.)
12.2 Repairs and alterations to ASME Code items shall be carried out in accordance with the
requirements of the NBIC, this Quality Control Manual, and Jurisdictional requirements (whenapplicable) and shall conform to the applicable ASME Code.
Repairs and alterations to Non-Code items shall be carried out in accordance with the
requirements of the NBIC, this Quality Control Manual, and Jurisdictional requirements (whenapplicable) and shall conform, insofar as possible, to the current mandatory Edition of the most
applicable ASME Code provided the Company has the concurrence of the Inspector and the
jurisdiction where the pressure retaining item is installed.
Routine Repairsshall be carried out on ASME Code items only. Routine Repairs to ASME Code
items shall be carried out in accordance with the requirements of the NBIC, this Quality Control
Manual, and Jurisdictional requirements (when applicable) and shall conform to the applicableASME Code; however, the requirement for in-process involvement of the Inspector and stamping
are waived provided all of the following conditions are met:
The Company shall verify, to the satisfaction of the Inspector, that routine repairs are
acceptable to the jurisdiction. Prior approval for routine repairs shall be obtained from the Inspector.
Routine repairs shall be documented on a Form R-1 with a statement In Remarks:
Routine Repair.
12.3 The Quality Control Manager shall assume overall responsibility for the performance of repairs andalterations and for originating the construction procedures necessary to direct the course of the
work.
12.4 The method of repair or alteration shall be made available to the Authorized Inspection Agency
(A.I.A) responsible for the in-service inspection of the item or the A.I.A of record.
The QCM shall prepare and make available to the Inspector a proposed Repair Plan (Exhibit
14.8) for the method and extent of repairs or alterations. If applicable, drawings andcalculations shall also be made available.
Under no circumstances shall work be started without authorization of the Inspector. The
Inspector making the acceptance inspection should be the same Inspector who authorized
the repair or alteration, but, in all cases, shall be an employee of the same organization as
that of the Inspector that authorized the repair or alteration.
14
8/10/2019 QC Manual 7-17-2014.pdf
20/37
8/10/2019 QC Manual 7-17-2014.pdf
21/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
12.10 When a repair or alteration requires the removal of that part of the item bearing the original
Certification Mark, the Inspector shall witness, subject to the approval of the Jurisdiction, the
making of a
Facsimile of the stamping, the obliteration of the old stamping, and the transfer of such stamping tothe new item. When the stamping is on a nameplate, the Inspector shall witness the transfer of the
nameplate to the new location.
Any relocation is to be reported on the applicable NBIC Report Form. All re-stamping shall be
done in accordance with the original Code of Construction, and as noted in the NBIC.
12.11 The QCM shall be responsible for the custody and use of the National Board R Repair Symbol
stamp. REPAIR, ALTERATION, or RE-RATING stamping or nameplate information, size,
location, and attachment (nameplates) shall conform to the requirements of the NBIC and will only
be applied with the concurrence of the Inspector.
12.12 A copy of the original Manufacturers Data Report for the item being altered or re-rated shall be
required and attached to the completed Form R-2. When this is not possible, agreements on the
method of establishing design basis for the alteration shall be obtained from the Inspector and thejurisdiction.
12.13 The QCM or his/her designee shall initiate the applicable NBIC Report Form and sign theapplicable Certification before presenting it, together with all supporting documentation, to the
Inspector for review and signature.
Distribution of the applicable NBIC Report Forms is the responsibility of the Company and shallbe performed by the QCM as follows:
REPAIRS - Legible copies of the form R-1, together with all required attachments, shall be
distributed to the owner or user, the Inspector, the AIA responsible for the in-service inspectionof the item, and the Jurisdiction (if required). The Form R-1 may beregistered with the National
Board in accordance with the NBIC.
ALTERATIONS AND RE-RATINGS - Legible copies of the form R-2, together with all
required attachments, shall be distributed to the Inspector, the A.I.A responsible for the in-service
inspection of the pressure retaining item, the owner or user, and the Jurisdiction (if required).
If the item is registered with the National Board, the Form R-2 shall be registered with the
National Board in accordance with the NBIC.
If the item is not registered with the National Board, the Form R-2 may be registered with theNational Board in accordance with the NBIC.
R-Forms not registered with National Board shall be maintained for 5 Years.
The NBIC Report Forms shall not be used to record a repair or alteration unless the work
has been performed in accordance with the NBIC.
16
8/10/2019 QC Manual 7-17-2014.pdf
22/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
12.14 When the Form R Report is to be registered with the National Board, the Quality Control
Manager shall be responsible for assigning a Form R Number to each repair or alteration in
sequential order at or prior to the time of final acceptance. He shall keep a Form R Number Log
(exhibit 14.4) of all numbers used so there will be no missing or repeated numbers. The log shallshow the Job Number, whether it is a repair or alteration, date issued, and the Form RNumber
assigned. He will send the original Form R Report to the National Board for each item so
registered within 60 days of final certification.
17
8/10/2019 QC Manual 7-17-2014.pdf
23/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
13.0 FIELD SITES
13.1 ASME Code assembly AND/OR NBIC REPAIRS AND ALTERATIONS at field sites will be
controlled by the requirements of the Quality Control Manual from the shop facility as referencedon the organizational chart with the following modifications.
13.2 The field QCI and/or field Superintendent shall maintain a controlled copy of this Quality ControlManual and Job File on Site.
The Job File shall contain the following (as applicable): The QCM prepared and A.I. accepted Traveler (Exhibit 14.9) or the QCM approved and
Inspector accepted Repair Plan along with all applicable Calculations, Drawings, and
B.O.M. All applicable WPSs, PQRs, WPQs, and Welders Qualifications Records. Material Test Reports and/or Certificates of Compliance.
Radiographic film with interpretation and technique sheets. Ultrasonic, Magnetic Particle, Liquid Penetrant, and Visual Examination Reports. PWHT documentation
Non-conformance Reports
13.3 Material for the field may be purchased and received at the shop location in accordance withSection 3 of this Manual and shipped to the field site along with any required documentation. At
the field site the Field QCI will verify the correct materials and their quantities have been received
and inspect them for any shipping damage.
13.4 Purchasing of materials in the field will be performed by the Field Superintendent in lieu of
purchasing per the requirements of Sections 3.1 and 3.2. Material receiving inspection formaterials purchased in the field will be performed per Sections 3.3 and 3.4
13.5 Welding consumables will be stored, issued and controlled by the Field Superintendent in
accordance with Section 6 of this Manual. Also, during inclement weather a protective blind orshield shall be used while welding is in progress. Low hydrogen rods will be issued in portableheated rod containers or 10 pound sealed containers.
13.6 All field documentation will be controlled by the Field Quality Control inspector and returned to
the shop facility for review and retention by the Quality Control Manager in the Job File.
13.7 If a particular field assembly should require any modification to the Manual, the changes will be
documented by the Field Quality Control Inspector, approved by the President of the Company,and presented to the Authorized Inspector for acceptance. When accepted, On-Site Addenda shall
be initiated and are to be included in all Manuals on the site as well as the Quality Control
Manager's copy. Upon completion of the job at that site, a copy of any On-Site Addenda shall beretained in the Job File until the Manufacturer's Data Report/R Form has been certified by the
Quality Control Manager and Authorized Inspector/Inspector.
18
8/10/2019 QC Manual 7-17-2014.pdf
24/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
14.0 EXHIBITS
14.1 Quality Control Manual Issue Form
14.2 Non-Conformance Report
14.3 Code Stamping
14.4 Form R Number Log
14.5 Calibration Log
14.6 Transmittal Form
14.7 Bill of Material
14.8 Repair Plan
14.9 Quality Assurance Traveler
14.10 Welders Qualification Record
14.11 National Board Number Log
14.12 Hold Tag
14.13 On-Site Addenda
19
8/10/2019 QC Manual 7-17-2014.pdf
25/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.1
QUALITY CONTROL MANUAL ISSUE FORM
MANUAL
NUMBER
DATE
ISSUED
ISSUED TO
(TITLE)
SIGNATURE EDITION
NO.1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20
8/10/2019 QC Manual 7-17-2014.pdf
26/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.2
NON-CONFORMANCE REPORT
NCR No.: _________________________________ Date: _____________________________________
Workmanship: Materials: Calibration: Other:
Conditions Discovered By: ____________________________________________________________
Non-Conformance Description:
__________________________________________________________________________________________________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Proposed Disposition Description:
__________________________________________________________________________________________________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
QCM Approved: ____________________________A.I. Accepted_______________________________
Corrective Action Taken: (Indicate A.I. Hold Points If Any)
__________________________________________________________________________________________________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Verified And Closed:
Approved QCM: _____________________________________________ Date: ______________________
Accepted A.I.:_______________________________________________ Date: _____________________
21
8/10/2019 QC Manual 7-17-2014.pdf
27/37
8/10/2019 QC Manual 7-17-2014.pdf
28/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.4
FORM R NUMBER LOG
JOB NO. REP ALT DATE ISSUED FORM R
NO.
NOTES:
23
8/10/2019 QC Manual 7-17-2014.pdf
29/37
8/10/2019 QC Manual 7-17-2014.pdf
30/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.6
TRANSMITTAL FORM
THE FOLLOWING LISTED DOCUMENTATION IS BEING SENT TO YOU FOR USE AS INDICATEDABOVE. REPLACE OLD DOCUMENTS (IF APPLICABLE) WITH THESE NEW DOCUMENTS AND
RETURN THE OLD DOCUMENTS TO THE QUALITY CONTROL MANAGER OR DESTROY THE OLD
DOCUMENTS AS APPLICABLE.
SIGN AND DATE BELOW TO INDICATE RECEIPT AND RETURN THIS FORM TO THE QCM.
NOTE: SENDER SHOULD INDICATE A COMPLETE DESCRIPTION OF DOCUMENTS SENTINCLUDING DOCUMENT IDENTIFYING NUMBERS AND REVISION LEVELS.
DOCUMENTATION RECEIVED BY:________________________________________________DATE:______________________
25
FROM: DATE:
TO: DATE:
JOB SITE:
JOB No.: SERIALNo.
8/10/2019 QC Manual 7-17-2014.pdf
31/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.7
BILL OF MATERIAL
Prepared By: Sheet: of
Approved By: ASME Code: Yes No
Description:
Item Qty. Mark Description Matl Spec Notes (*) Matl Accepted
NOTES (*):
MILL TEST REPORT REQUIRED
B. CERTIFICATE OF COMPLIANCE REQUIRED
C. SA-53 & 106 IF CUT TO LENGTH SHALL BE MARKED WITH THE PROCESSORS (SUPPLIERS) NAME
D. ASME B16.5 or B16.47 as applicable (FLANGES)
E. ASME B16.9 (WROUGHT BUTT WELD FITTINGS
F. ASME B16.11 (FORGED FITTINGS, SOCKET-WELDING AND THREADED)
G. CERTIFICATION IAW ASME I, PG-80(ROLLED SHELLS) OR PG-81(FORMED HEADS) H. CERTIFICATION IAW ASME VIII-1, UG-80(ROLLED SHELLS) OR UG-81(FORMED HEADS)
I. CERTIFICATION IAW ASME I, PG-19 or VIII-1, UCS-79 AND/OR UCS-85 AS APPLICABLE
J. OTHER:_____________________________________________________________________________
26
Dwg. No. Date: By:
8/10/2019 QC Manual 7-17-2014.pdf
32/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.8
REPAIR PLAN
A.
REPAIR ALTERATION NO. ____________ DATE: ____________ NBIC _____ EDITION ____________________
Original Mfr. ________________________________ Serial No. __________ Natl Bd No.___________ Yr Built _______
Job No._________________
Description of Repair Alteration:
Jurisdictional Approval Reqd? YES NO Verified by: __________________ Date: ____________ see back
Acceptance of Repair/Alteration Plan:
QCM: ___________________________ Date: ____________ Insp. ________________________ Date: __________
IN-PROCESS & FINAL * QC Date Inspection Date
A. Repair/Alteration Plan
B. WPS No.(s):
1) Welders Identification:
2) Welders Qualifications
C. Engineering
1)
Original Data Report reviewed
2)
Stamping checked to verify applicable Code
3)
Drawings & Calculations accepted
D. New Material Issuance (see back)
E. Fabrication: fit-up, prep, etc.
1) Shell:
2)
Head(s):
3)
Nozzles:
4)
Patch:5)
Tubes:
6)
Other:
F. NDE: RT1 RT2 RT3 RT4 PT MT UT Other
G. Heat Treatment:
H. Final InspectionInternal:
I. Final InspectionExternal:
J. Pressure Test
K. Name plate stamping and installation:
L. R-1 R-2 R-3 R-4 Report reviewed and signed
Asterisk (*) indicates Inspectors Hold Points - NOTES:
27
8/10/2019 QC Manual 7-17-2014.pdf
33/37
8/10/2019 QC Manual 7-17-2014.pdf
34/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.10
WELDERS QUALIFICATION RECORD
Name: Stencil No.:
Date QC Inspector WPS Filler Metal Joint Design Position Examination
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Inspector: Date:
29
8/10/2019 QC Manual 7-17-2014.pdf
35/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.11
NATIONAL BOARD NUMBER LOG
Job No. Client Date Issued Number Notes:
30
8/10/2019 QC Manual 7-17-2014.pdf
36/37
James & Luther, Inc. 7100 Westwind Dr, Suite 130 El Paso, TX 79912 Phone: 915-581-5020
EXHIBIT 14.12
HOLD TAG
31
8/10/2019 QC Manual 7-17-2014.pdf
37/37
EXHIBIT 14.13
On-Site Addenda
Section: Date:
Reason for addition/change:
Description of change:
QCM Approved: Date:
President Approved: Date: