Quality Plan : introductive parts
2
• Documentation• Abbreviations• Reference Documents
• Introduction• Quality Management System (QMS)
• General Status• Items for integration into QMS• The prepartion work needed• The needs to conduct the work
• Positions important for QA/QC• Every member of the KM3NeT• Project Management and Working Group Coordinators• Technical Project Manager• Local Quality Supervisors• QAQC Manager
24.06.2014, QAQC group, 5th videomeeting, Laurence CAILLAT
Quality Plan : contents (§6)
3
• Documentation Management System• Document identification and control• Act of indemnity
• Processes• Definition and responsibilities• Overview – Processes and interacting activities• Design & Manufacturing• Assembly & Integration• Deployment & Commissioning• Operation & Maintenance• Decommissioning
• Tools to manage the activities during the processes• Identification and traceability of the product• Production review and documentation• Transport/Storage• Testing• Calibration• Qualification• Further QAQC tools
24.06.2014, QAQC group, 5th videomeeting, Laurence CAILLAT
Quality Plan - Overview
4
Design/Manufacturing
Assembly/Integration
Deployment/Commissioning
Operation/Maintenance
Decommisioning
Product Readiness
Review
Qualification
Identification/Traceability Production
Transport/Storage
Integration
Calibration
Testing
Processes and interacting activities
24.06.2014, QAQC group, 5th videomeeting, Laurence CAILLAT
Quality Plan - Processes
5
Design & Manufacturing
Assembly & Integration
Deployment & Commissioning
Operation & Maintenance Data Acquisition (DAQ) & Software
Decommissioning
Assembly Inspection Delivery Campaign operations
Integration
Deployment Connection Commissioning
24.06.2014, QAQC group, 5th videomeeting, Laurence CAILLAT
Design of Prototypes
Improvements/Changes
Resulting design of
item/product
Production/ Manufacturing of
item/product
Tools to manage the activities...(§ 6.3)
6
Identification and traceability Production review
and documentation
Transport and Storage
PBS
Shipping
Incoming
Labelling
DatabasePRR Checklist
Change Design Request
Non Conformity Report
Tools to manage the activities...(§ 6.3)
7
Testing
Calibration
Qualification
Test procedures
Test reports
Logbook
Detailed procedures
Specifications
Particular attention : HV , threshold
Qualification programs
Documentation : PTR...
Audit
Your role as LQS... (§5.1.4)
8
• BE the interface between local groups, project coordinators and the Quality Manager
• HELP to implement the Quality Management System... and to communicate on the Quality Plan and the tools to be used