Upload
rainer
View
28
Download
3
Embed Size (px)
DESCRIPTION
QA/QC for AQ data flows Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC). Contents. QA/QC adhoc actions in 2004 QA/QC in the DEM QA/QC feedback EoI2004 Future QA/QC actions. QA/QC adhoc actions in 2004. Phantom stations and questionable station coordinates - PowerPoint PPT Presentation
Citation preview
Training workshop 09-10 June 2005 1
QA/QC for AQ data flows
Wim Mol
European Topic Centre on Air and Climate Change (ETC/ACC)
Training workshop 09-10 June 2005 2
ContentsContents
• QA/QC adhoc actions in 2004• QA/QC in the DEM• QA/QC feedback EoI2004• Future QA/QC actions
Training workshop 09-10 June 2005 3
QA/QC adhoc actions in 2004QA/QC adhoc actions in 2004
• Phantom stations and questionable station coordinates
• PM10 correction factors
Training workshop 09-10 June 2005 4
QA/QC in the DEMQA/QC in the DEM
• Inspection meta data in the screens and in DEM Meta info export files
• Controls on import• Errors and warnings on mandatory, essential
and desired meta data; on the units etc.• Visual inspection• Reports and export files• Outlier checks
Training workshop 09-10 June 2005 5
QA/QC in the DEMQA/QC in the DEM
• You are strongly requested to perform these checks
Training workshop 09-10 June 2005 6
QA/QC feedback EoI2004QA/QC feedback EoI2004
• The MS are responsible for the quality of the data
• The checks performed by ETC/ACC are extra service to improve the quality of AirBase
• The checks on mandatory/essential data and outliers can also be performed by the data supplier
Training workshop 09-10 June 2005 7
QA/QC feedback EoI2004QA/QC feedback EoI2004
• 1 October: all DEMs are received• 1 Oct-Jan next year: Uploading in AirBase;
QA/QC reports are sent; reactions from the MS
• Jan- 1 Mar: reactions processed• March: calculations statistics and
exceedances• 1 April: New data available in AirBase:
AirView and XML dumps
Training workshop 09-10 June 2005 8
QA/QC feedback EoI2004QA/QC feedback EoI2004
Feedback reports:
• Components
• Missing mandatory/essential meta info
• Re-submitted data
• Deletion stations/meas. conf. with data
• Deletion stations/meas. conf. without data
Training workshop 09-10 June 2005 9
QA/QC feedback EoI2004QA/QC feedback EoI2004
Calculation statistics/exceedances:
• Consistency between raw data and statistics
• Same algorithms
• Always statistics calculated independent of data coverage
Training workshop 09-10 June 2005 10
Current/Future QA/QC actionsCurrent/Future QA/QC actions
• Filling time gaps (historical data)• Checking station coordinates and
characteristics (spec. Urban stations)• More information about measurement
methods (including PM10 correction factors)• Checks (including outliers) on historical
AirBase data• Heavy metals (4th DD) reported in wrong units