QA/QC & Field Engineering Action Item List
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
03/Mar/15: HEC will submit montly report from march. On other hand, HEC confirmed that final connections will be done when excavation works
finish.
10/Mar/15: The submission of the monthly report will start from March.
03/Mar/15: This Document was already submitted by HEC and TT2 already commented.
10/Mar/15: TT2 mentioned as a general comment that hydro package must be submitted before hydrotest and the information which must be
included is the information already agreed between TT2 and HEC; besides that, TT2 insisted that QA/QC team from HEC must verify that drawings
match with site condition. On the other hand, HEC must inform dates to hydrotest because TT2 wants to witness tests.
17/Feb/15: HEC informed that it is ongoing, and that Final connections will be done when excavation work finish.
17/Feb/15: HEC informed that it is on-going, and that some Hydro test is going now. After they finish, hand over ASAP, but TT2 requested HEC to
arrange a meeting to check pending documentation for the hydrotest ASAP.
03/Feb/15: It is ongoing.
In relation with the package for WWS, HEC is preparing complete information to deliver it to TT2.
03/Feb/15: It is ongoing.
06/Jan/15: HEC is including the comments to the documentation and the submission will be within this week.
20/Jan/15: HEC informed that there are three comments pending to be included therefore, the submission will be done within this week
13/Jan/15: It is ongoing; HEC will include the comments to close this issue this week.
23/Dic/14: it is ongoing. HEC is aware of the documentation required for every hydrotest
Ongoing10/Feb/15: TT2 will submit to HEC a chart indicating missing information of hydro package submitted by HEC.Hydrotest Quality
Documentation for WWS
Mr. Lee
(piping)Piping 210 30/Sep/1423/Sep/14 WWS
ElectricalReport of grounding cable
repairs General Ongoing8/Jul/14157 Mr. Kim
10/Feb/15: It is ongoing.
06/Jan/15: Some points which require improvement were identified, the condition of them and the solution to be taken must be checked by HEC
ASAP.
1/Jul/14
13/Jan/15: HEC is checking 22 points that must be repaired and informed that 15 of them cannot be repaired soon due to some interferences with
materials, excavations, and some others.
20/Jan/15: HEC commented that the repairs will be done after finishing civil works but TT2 is concerned because this situation can cause problems in
future. HEC replied that this will be checked between QA/QC, civil and electrical team after meeting and final solution will be informed to TT2.
March 10, 2015Remark
23/Dic/14: TT2 commented that there are some issues to be checked about grounding mesh, as for example, the cables are in some areas over
ground, so, they can suffer damages. HEC will verify proper condition and maintenance of the grounding mesh.
Building 229 21/Oct/14 STGRepair of slab (Generator and
Turbine)Mr. Chung
06/Jan/15: Repair is ongoing. Bottom was already repaired rest of repairs will be finished within January.
23/Dic/14: It is ongoing
20/Jan/15: HEC informed that due to some interferences the repairs are delayed, notwithstanding, this issue is ongoing.
28/Oct/14 Ongoing
13/Jan/15: Pending repairs will be finished within January.
27/Jan/15: TT2 insisted that grounding mesh must be ready to the energizing. HEC informed that this is under continuous checking and improving.
TT2 commented that the commissioning of the air compressor system could be affected because of grounding mesh missing.
27/Jan/15: TT2 pointed out that red line drawings have some mistakes about coordinates which donot match with location at site so, it was
suggested HEC to verify if people who is changing the drawings is updating the coordinates, too. HEC replied that this will be checked after meeting
and the information about this will be submitted by an email.
27/Jan/15: Repairs are ongoing (77% of repair progress)
24/Feb/15: HEC informed that excavation work will be planned next month. That time, they can make repair works also. TT2 insisted that report of
grounding cable repairs must be submitted monthly but so far HEC had not submitted any report. HEC replied that this will be checked.
24/Feb/15: HEC informed that it will be sent to TT2 today. TT2 commented that mill certificate must be included.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
03/Mar/15: HEC informed that repairs of the STG could start second middle of March. It depends on negotiation with subcontractor .
10/Mar/15: HEC informed that next week repair works will start and other pending works will start at end of March.
03/Mar/15: This work was started today and finish date is March 7th. HEC will submit the information from vendor (material of the protection,
procedure to install protection..)
10/Mar/15: HEC informed that they already requested information to vendor by e-mail and that the procedure with specifications will be submitted
to TT2 Today and installation will be finished on March 14th .
03/Mar/15: Marking was already finished at site notwithstanding, documents of the approval from manufacturers are still pending.
10/Mar/15: HEC informed that they are waiting for documents from vendor; those documents will be submitted to TT2 after receiving.
17/Feb/15: It is same as last week.
17/Feb/15: HEC informed that supervisor will come to TT2 in Feb-23
17/Feb/15: HEC informed that supervisor will come to TT2 in Feb-23
03/Feb/15: It is ongoing.
03/Feb/15: HEC informed that a new subcontractor will be in charged of this repair, as soon the schedule is ready it will be informed to TT2
Building
230 28/Oct/14 WTSprotection of PVC pipes in WTS
from UV radiation
Ongoing
Ongoing
20/Jan/15: HEC is marking all fittings of stainless steel pipelines.
229 21/Oct/14 STG
Piping
Piping 231 28/Oct/14 WTSTraceability of Stainless steel
pipelinesMr. Park 4/Nov/14
4/Nov/14Mr. Song
Repair of slab (Generator and
Turbine)Mr. Chung
06/Jan/15: This protection will be finished the last week of January.
06/Jan/15: The marking will be started next week
10/Feb/15: HEC informed that repairs on STG were stopped because there is no subcontractor to execute these works, and the current progress of
repairs are 77% .
10/Feb/15: HEC commented that vendor supervisor will arrive next week and he will bring the material to protect remaining areas.
10/Feb/15: TT2 commented that the support of the approval from vendor had not been delivered by HEC. TT2 insisted that this is a very important
document to keep guarantee of the pipelines from vendors. HEC must submit this ASAP.
28/Oct/14 Ongoing
13/Jan/15: The marking will be started from tomorrow.
13/Jan/15: Pending protection will be finished within January.
23/Dic/14: It is ongoing
27/Jan/15: HEC informed that vendor supervisor will bring some material for the insulation of remaining pipes.
27/Jan/15: HEC informed that the marking of the fittings is ongoing. TT2 requested HEC to submit the document where the vendor approved the
marking of the fittings at site before next meeting
24/Feb/15: It is same as last week.
24/Feb/15: HEC informed that Supervisor came yesterday. And the installation of the protection will be finished in 2 weeks ( March 6th).
24/Feb/15: HEC presented a copy of an email from supplier indicating that marking at site is allowed, however, TT2 requested this approval from
manufacturer in order to keep the guarantee from them. On the other hand, HEC informed that Supervisor came yesterday. And marking will be
finished in 2 weeks ( March 6th).
20/Jan/15: HEC informed that this will be ready at end of January.
03/Feb/15: HEC informed that marking will be finished today and that document of the approval from vendor will be submitted today after meeting
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
03/Mar/15: HEC confirmed that repairs were done but, during commissioning the clarifier will be filled to verify if there are new leakages.
10/Mar/15: HEC commented that final checking will be done during commissioning.
03/Mar/15: HEC informed that thickness, visual and adherence tests will be done to the paint of pipes next week.
10/Mar/15: HEC informed that they will make an internal inspection of painting at end of this week (Due date March 14th). TT2 pointed out that HEC
must take into account that welding of joints repaired should be without painting for hydrotest.
17/Feb/15: It is same as last week.
03/Feb/15: Repairs were stopped these will be finished for a new subcontractor
03/Feb/15: It is ongoing.
03/Mar/15: HEC informed that repairs of the STG could start second middle of March. It depends on negotiation with subcontractor .
10/Mar/15: HEC informed that next week repair works will start and other pending works will start at end of March.
17/Feb/15: HEC informed that painting work is on-going and that it will be finished around Feb-28th
10/Feb/15: Repairs were already done but HEC informed that checking is ongoing so this matter remains open
10/Feb/15: HEC informed that painting is ongoing and TT2 suggested making test in order to have under control the quality of the works
10/Feb/15: HEC informed that repairs on STG were stopped because there is no subcontractor to execute these works, and the current progress of
repairs are 77% .
17/Feb/15: It is same as last week.
20/Jan/15: HEC informed that this will be ready at end of January.
13/Jan/15: Activities are ongoing this will be finished last week of January.
03/Feb/15: These will be finished by CONSALFA
25/Nov/14 STG OngoingSlabs in STG 2/Dec/14
Environmental 237 11/Nov/14 WWT Paint for pipes Mr. Song 18/Nov/14 Ongoing
Architecture 241 Mr. Chung
233 OngoingCivil 4/Nov/14 Clarifier Repairs Ms. Kim 11/Nov/14
27/Jan/15: HEC informed that thickness, visual and adherence tests will be done to the paint of pipes. Finish date for painting will be on Feb 15 (Jan
31)
27/Jan/15: Repairs are ongoing (77% of repair progress)
24/Feb/15: It is same as last week.
24/Feb/15: HEC confirmed that painting work is on-going and that it will be finished around Feb-28th
24/Feb/15: It is same as last week.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
10/Mar/15: HEC informed that inspection was started yesterday and there are some issues to be improved in welding and installation of steel
structure.
03/Mar/15: HEC will make a visual inspection to verify condition and if it is proper, HEC will arrange the inspection between TT2 and HEC.
03/Feb/15: HEC informed that inspection of ladders and platforms will be probably next week after visual inspection by HEC
03/Feb/15: Repair works will start.
251
03/Mar/15: HEC informed that due to the lack of subcontractors works are stopped however, TT2 requested HEC to look for a solution because some
cables are already energized wich is a high risk. HEC will submit an email informing the solution Today and an schedule for works will be submitted
later
10/Mar/15: HEC informed that they gave site instruction to Intricon and pumping out water is on-going now; however, TT2 emphasized that it is not
possible to continue energizing if the EMH and Trenches continue with leakages because of the risk of electrical shock, therefore, TT2 requested HEC
to look for a proper and a prompt solution before next meeting. HEC will submit the causes of water leakages and repair procedure and schedule.
10/Feb/15: HEC informed that repair work of ladders and platforms are ongoing.
23/Dic/14: HEC will make a PT test of the 10% of the welding; but if any point tested fails the test must be done to other 10% of the weldings, and so
on. The welding point to be tested will be defined by TT2.
13/Jan/15: The PT of welding joints (10% ) of the platforms will be started next week.
16/Dic/14: TT2 and HEC will check after meeting the proper percentage of ladders and platforms to be tested by NDT.
06/Jan/15: HEC has not submitted the documentation yet, this will be submitted within this week.
Mr. Sun 9/Dec/14 Ongoing
10/Feb/15: Repairs of EMH and trenches had not started because there is not subcontractor to execute these works
17/Feb/15: It is same as last week.
Ongoing
17/Feb/15: HEC informed that this is on-going. An inspection with TT2 will be arranged by HEC next week.
2/Dec/14 ChimneyType of welding test for Ladders
and platforms of chimneyCivil
Civil 244 25/Nov/14 EMHLeakages in manholes and cable
trenchesMs. Kim 2/Dec/14
27/Jan/15: HEC and TT2 already made an inspection to the first level but , due to the bad condition of the welding, HEC decided to submit an NCR in
order to rework under the AWS code.
24/Feb/15: It is same as last week.
24/Feb/15: HEC informed that this is on-going. And an inspection with TT2 will be arranged by HEC after hydrotest.
20/Jan/15: HEC and TT2 will check the welding points to be tested on January 23rd at 15:00
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
17/Feb/15: HEC informed that Site team is discussing with Head office to bring a NFPA engineer; TT2 pointed out that this issue must be speeded
ASAP.
17/Feb/15: It is ongoing. HEC and TT2 will check at site on Friday afternoon (3:00p.m)
17/Feb/15: It is same as last week.
03/Feb/15: TT2 commented that there are some pipes improperly stored; HEC will check this at site and they will improve
16/Dic/14: HEC informed that the design will be modified and the detail will be discussed between TT2 and HEC after meeting.
9/Dic/14: TT2 insisted that the design must be checked ASAP, and HEC must take the actions immediately.
06/Jan/15: It will be cheked by TT2 and HEC in a separate meeting
23/Dec/14: It is being checked by TT2 and HEC. TT2 insisted that this is a critical issue which must be defined ASAP
02/Dic/14: Cables to feed fire fighting system must be under regulation NFPA 70. HEC must check the design and inform to TT2.
Ongoing
10/Feb/15: HEC informed that they are looking for the support of an Authorized person to verify current design of the fire fighting and if a
modification is required. TT2 suggested speeding up this.
13/Jan/15: TT2 suggested HEC to find an authorized person who can check and certify the proper design under NFPA 70
Ms. Chung 6/Jan/14 Ongoing
23/Dec/14. HEC will check the condition at site of the outlet of rain water in operating floor.
06/Jan/15: HEC is pushing to solve this ASAP, target date given by them is middle of January
Electrical 252 2/Dec/14 F.F Fire fighting design (NFPA 70) Mr. Oh 9/Dec/14
256 23/Dec/14 STG Rain water
Material control 253 9/Dec/14 GeneralMaterial control and
warehousingMr. Choi
27/Jan/15: HEC informed that the material to be installed will arrive tomorrow.
Architecture
16/Dec/14 Ongoing
9/Dec/14: TT2 requested HEC to improve the condition of the storage at jobsite in order to keep the proper condition of the material.
13/Jan/15: It will be verified by QA/QC team.
10/Feb/15: It is ongoing.
10/Feb/15: It is ongoing; HEC informed that the material will arrive this week
03/Feb/15: It is ongoing.
13/Jan/15: It will be solved ASAP
03/Mar/15: HEC informed that this is on-going. And TT2 pointed out that this must be checked ASAP
10/Mar/15: HEC is searching the proper person to check this.
10/Mar/15: TT2 presented some pictures indicating the improper condition of the material stored in all areas in the project. Rebars, tubes, pipes,
steel structures, so on. HEC replied that this will be checked and improved.
03/Mar/15: It is on-going. HEC and TT2 make a walkdown to check this week.
20/Jan/15: HEC and TT2 will make a walk down to check condition of the materials at jobsite every Friday (15:00).
20/Jan/15: HEC informed that the pipe was already installed; TT2 will verified.
27/Jan/15: TT2 insisted that an authorized person must define if the current condition of fire fighting is under NFPA requirements or if it is necessary
to make some modification to the design.
27/Jan/15: It is ongoing
23/Dec/14: HEC reorganized the material control team. Material control and warehousing will be continuously improved
16/Dec/14: Material control and warehousing will be improved, in fact from tomorrow a person incharge of this matter will arrive at site.
24/Feb/15: HEC informed that this is on-going but, TT2 requested HEC to speed this up. HEC replied that this is being checked by Head office.
24/Feb/15: It is on-going. HEC and TT2 will check at site on Friday afternoon (3:00p.m)
24/Feb/15: It is same as last week.
03/Feb/15: This had not been finished yet by HEC, because the material is not at jobsite, yet.
06/Jan/15: It will be checked in construction meeting tomorrow
20/Jan/15: HEC and TT2 electrical areas will check this issue Today at 13:30.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
03/Mar/15: HEC informed that outlet of rain water in operating was already solved but outlet of rain water in lower roof is still pending.
10/Mar/15: it is on-going
10/Mar/15: HEC submitted the procedure last week and the repair will be finished this week and thickness will be checked.
03/Mar/15: HEC will submit the procedure this week (March 7th) and the repair will be finished on March 14th
17/Feb/15: It will be repaired ( Finish date February 28th)
Ms. Chung 6/Jan/14 Ongoing256 23/Dec/14 STG Rain waterArchitecture
Environmental 258 20/Jan/15 Slurry tankWelding of slurry tank bottom
and shell plateMr. Mateo 27/Jan/15 Ongoing
20/Jan/15: TT2 commented that welding of slurry tank bottom and shell plate does not comply with the welding code; HEC replied that they will
check this and inform.
27/Jan/15: HEC will verify this issue at jobsite and the information will be submitted by an email and if necessary the solution.
10/Feb/15: HEC and TT2 agreed to verify condition at site
24/Feb/15: It will be repaired ( Finish date February 28th)
03/Feb/15: HEC will inform about this issue by an email ASAP.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
03/Mar/15: Reheater package was already submitted. HEC informed that Calculation sheet of blind flanges will be submitted to TT2 today.
10/Mar/15: HEC is getting pending information related to the hydro package and after that it will be delivered to TT2
03/Mar/15: HEC informed that Supervisor will come on March 10th and that in that time, They can clearly solve this matter.
10/Mar/15: HEC informed that Supervisor will come at end of March and that in that time, They can clearly solve this matter.
03/Mar/15: HEC made an inspection to check registers of the water level , HEC will submit the inspection report. TT2 wants to receive the report with
the topographic survey of altimetric in drum, and besides, the verification of the visual levels in relation with the normal water level according to the
drawings
10/Mar/15: HEC will submit pending information to TT2 before Friday.
10/Feb/15: Supervisor will arrive at the middle of March to check condition of the equipment. TT2 requested HEC to speed this inspection because it
is required for Boiler initial firing.
10/Feb/15: HEC informed that the drum inspection will be done today afternoon, so inspection time must be informed to TT2 because it wants to
attend to this inspection.
24/Feb/15: It is the same as last week.
17/Feb/15: HEC will submit the solution to be applied by an email to TT2
17/Feb/15: HEC will check this after meeting with TT2
10/Feb/15: HEC and TT2 will discuss this after meeting.
17/Feb/15: Inspection with TT2 was already done. But TT2 is still waiting for the survey topographic records.
20/Jan/15: TT2 requested HEC to submit the registers of the water level verification.
24/Feb/15: HEC informed that Supervisor will come on March 10th and that in that time, They can clearly solve this matter.
27/Jan/15 Ongoing
20/Jan/15: TT2 pointed out that the package of the information for Hydrostatic test of the Reheater has not been submitted to TT2 yet. HEC replied
that this will be checked by HEC.
27/Jan/15: This will be checked and submitted by HEC. Note:
TT2 wants to remind you that the package of the information for any hydrotest must be submitted by HEC before testing
03/Feb/15: It will be submitted today.
Mechanical 259 20/Jan/15 Boiler
Package of the information for
Hydrostatic test of the
Reheater
Mr. Choi
Mechanical 261 20/Jan/15 Drum Registers of the water level
verification.Mr. Choi 27/Jan/15
Mechanical 260 20/Jan/15 ID Fan Motor
Mechanical
Ongoing
Solution of the mechanical NCR Mr. Choi 27/Jan/15 Ongoing
20/Jan/15: TT2 suggested HEC to check the equipment and to inform the solution for NCR submitted last September (TT2-MEC-0070).
27/Jan/15: HEC informed that the ID fan installation will be restarted next month. HEC will check and inform real condition of the ID fan by an email
before next meeting.
03/Feb/15: It is ongoing.
263 27/Jan/15 General Drawing referenced in P&ID Mr. Park 3/Feb/15 Ongoing
27/Jan/15: HEC already submitted the void drawings for waste water system but TT2 pointed out that air compressor system p&ID must be checked
too.
03/Feb/15: HEC had not checked the P&ID drawings to define if it is necessary to void some drawings due to the problem of reference drawings
10/Feb/15: It is ongoing.
17/Feb/15: HEC informed that FCN training will be implemented. Also, TT2 and HEC will check P&ID during commissioning walk-down.
27/Jan/15: It is under checking. HEC must inform by an email before next meeting.
03/Feb/15: TT2 requested the NORFI of location of the water level verification (Drum)
24/Feb/15:HEC informed that it will be sent to TT2 today. TT2 requested calculation sheet of thickness and size welding to assure that blind flange will
resist high pressure of test
24/Feb/15: HEC informed that the registers will be requested to B&W, notwithstanding, TT2 clarified that the registers of the location of water level
check are required in order to verify location of these instruments in drum ASAP. HEC replied that they will ask for this information and it will be
submitted ASAP.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
10/Mar/15: HEC already gave reports to TT2 , They are under TT2s review.
03/Mar/15: Drawings of Air compressor system will be checked during commissioning.
10/Mar/15:HEC will give reports to TT2 before Friday
03/Mar/15: HEC will give inspection data to TT2.
10/Mar/15: HEC commented that drawings of Air compressor system will be checked during commissioning. TT2 pointed out that drawings must be
updated according with site condition and P&ID drawings of CCW, HVAC, Raw water and Air Compressor system should be checked because they do
not match with current condition at site.
10/Mar/15: HEC informed that they already gave a new ITP format to Ismocol. But ITP updated had not been submitted to TT2.
03/Mar/15: HEC will check and change this week (before this Friday).
03/Mar/15: TT2 requested the location where NORFI data was taken (opening of the tube panels or seal box). HEC will provide this information.
17/Feb/15: To be discussed with TT2 after meeting.
17/Feb/15: Piping report of the inspection from vendor is still pending from HEC
24/Feb/15: HEC wants to check this with TT2 in site, so that, it will be checked within Today.
Mechanical
27/Jan/15: TT2 pointed out that the seal air piping weld must be accordance with the drawing which indicates that this must be under ANSI B 31,1
03/Feb/15: HEC informed that the repairs are ongoing.
10/Feb/15: HEC informed that the seal air piping weld will be repaired by cutting and then rewelding.
Mechanical 264 27/Jan/15 Boiler Seal Air piping weld Mr. Choi 3/Feb/15 Ongoing
27/Jan/15 Boiler-STGITP for piping control and
erectionMr. Lee
27/Jan/15
3/Feb/15 Ongoing
27/Jan/15: TT2 requested HEC to submit the ITP for piping and control erection. HEC will submit this ASAP.
03/Feb/15: It will be submitted today.
10/Feb/15: HEC delivered the information, it is under TT2s review. But, TT2 commented that the format of the ITP from ISMOCOL must be unified
under the quality system of HEC
Mechanical
Ongoing
27/Jan/15: TT2 requested the submission of the WPS for chinesse material for pressure and non pressure parts. HEC will submit this ASAP.
263 27/Jan/15 General Drawing referenced in P&ID Mr. Park 3/Feb/15 Ongoing
17/Feb/15: HEC will check and inform to TT2
17/Feb/15: It is on-going
17/Feb/15: HEC informed that Inspection will be started after installation is done; however, TT2 pointed out that HEC must inform current location
before installation. HEC will do.
10/Mar/15: HEC will submit pending information to TT2 before Friday.
03/Mar/15: HEC gave WPS to TT2 yesterday. It is under revision
267 27/Jan/15 Boiler NORFI of location of Burners
10/Feb/15: The report is still pending.
Piping 266
Ash Handling
System
Piping report of the inspection
from vendorMr. Choi 3/Feb/15 Ongoing
27/Jan/15: HEC will submit the report of the vendor inspection including tests to be performed and procedure for repairing.
03/Feb/15: HEC had not submitted the report yet.
Mr. Lee 3/Feb/15 Ongoing
27/Jan/15: HEC will submit the NORFI of location of burners before installation of seal box.
Mechanical 268 27/Jan/15 BoilerWPS for pressure and non-
pressure partsMr. Sun 3/Feb/15
24/Feb/15: HEC will standardize the ITP under HEC format
24/Feb/15: HEC wants to check this with TT2 in site, so that, it will be checked within Today.
24/Feb/15: HEC wants to check this with TT2, so that, it will be checked within Today.
24/Feb/15: HEC commented that after repair works are done, HEC will have inspection. But, TT2 commented that the report is from last vendor
inspection where the method of repairing should be informed. HEC replied that it will be checked with supervisor.
03/Feb/15: HEC had not submitted the information yet. This WPS is about unlisted Chinese material in ASME code as windbox, and seed plates
which were qualified by SCA so TT2 needs to know the procedures of testing.
10/Feb/15: It will be reviewed by TT2 and HEC after meeting
03/Feb/15: HEC had not submitted the information yet.
10/Feb/15: It is still pending. TT2 requested this document because there is a concern about final location of the burners.
Piping 269
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
Updated Discipline No. Issued Issue Details Action by Target Date Last Rev. Status
March 10, 2015Remark
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum
03/Mar/15: HEC informed that Repair works arenot finished. HEC will check method of repairing work. But, TT2 insisted that HEC must submit the
report of the vendor inspection including tests to be performed and procedure for repairing before starting works.
10/Mar/15: Mechanical team and TT2 will have a meeting today about this matter.
27/Jan/15Ash Handling
System
Piping report of the inspection
from vendorMr. Choi 3/Feb/15 Ongoing
Piping 272 2/Mar/15 CCW Hydrotest CCW Mr. Choi 9/Mar/15 Ongoing
03/Mar/15: TT2 requested HEC to check if all equipments are properly connected and after that, red lines must be presented being that, the
information in red lines must match with inlet and outlet connections of all equipments.
10/Mar/15: HEC informed that It is on-going; notwithstanding, TT2 commented that all equipments must be checked and an NCR will be submitted to
HEC.
Piping 269
Mechanical 273 2/Mar/15 WWSProcedure for repairing the
Recycle slurry storage tankMr. Choi 9/Mar/15 10/Mar/15 Closed
03/Mar/15: HEC informed that repairing procedure of the recycle slurry storage tank will be submitted within this week (March 7th)
10/Mar/15: Procedure already gave to TT2
Mechanical 274 2/Mar/15 CCW
Reply from vendor about the
guarantee of the Expansion
joint (expanded because of the
misalignment)
Mr. Choi 9/Mar/15 Ongoing
03/Mar/15: HEC is waiting for guarantee letter from vendor. Expected date is this week.
10/Mar/15: letter from vendor for guarantee is still pending. HEC is waiting vendor reply.
Mechanical 275 2/Mar/15 BoilerX-Ray examination results of
P91 (report and film to verify )Mr. Choi 9/Mar/15 10/Mar/15 Closed
03/Mar/15: HEC will submit the X-ray results of P-91 joints (reheater and superheater)
10/Mar/15: Check welding-reports
Mechanical 276 2/Mar/15 AHS
Increasing of the damage
during welding to the base
material
Mr. Park 9/Mar/15 Ongoing
03/Mar/15: TT2 requires corrective actions to be taken by HEC to avoid the damage of the base material during welding. HEC replied that they will
submit an email indicating corrective actions to be followed in order to improve this situation.
10/Mar/15: HEC and TT2 checked last week. TT2 commented that HEC must check proper corrective actions for this matter.
NONCONFORMANCE & CORRECTIVE ACTION REPORT CONTROL LOG
(1) NONCONFORMANCE REPORT SUMMARY
NCR status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 46 10 0 31 5 46 0 9 37
Building 41 6 22 13 41 0 11 30
Mechanical 53 14 22 13 49 4 23 30
Environmental 25 3 13 9 25 0 12 13
Piping 14 8 5 13 1 11 3
Fire Fighting 3 3 3 0 1 2
Plumbing 1 1 1 0 0 1
Electrical 20 2 2 13 3 20 0 8 12
Summary 203 35 2 110 51 198 5 75 128
NCR CLOSED THIS WEEK 0 2
(2) CORRECTIVE ACTION REPORT SUMMARY
CAR Status is as below.
USE AS IS. REJECTED REPAIR OTHER SUM
Civil 6 6 6 0 0 6
Building 5 1 4 5 0 1 4
Mechanical 1 1 1 0 1 0
Environmental 0 0 0 0 0
Electrical 1 1 1 0 0 1
Piping 2 2 2 0 1 1
Quality 1 1 1 0 0 1
Head Office 1 1 1 0 0 1
Document Control 1 1 1 0 0 1
Summary 18 0 0 1 17 18 0 3 15
CAR CLOSED THIS WEEK 0 0
DAYS TO BE
CLOSEDAREA
Mechanical 11 15%
Environmental 1 1% 25%
Piping 1 1%
Electrical 0 0%
Civil 4 5%
Building 2 3%
Mechanical 4 5%
Environmental 1 1%
Piping 3 4% 20%
Electrical 1 1%
Civil 3 4%
Building 3 4%
Mechanical 9 12%
Environmental 10 13%
Piping 7 9% 55%
Electrical 7 9%
Civil 2 3%
Building 6 8%
75 100% 100%
AMOUNT OF NCRs PERCENTAGE
NCRs
0-49 19
50-100 15
Over 100 41
CAR CLOSED LAST WEEK
NCR CLOSED LAST WEEKNCR OPEN THIS WEEK 1
CAR OPEN THIS WEEK 0
Closed
SumResponsible Org.
No. of
CAR
Isuued
Approved DispositionNot yet
Dispositioned
On Going
Sum
No. of
NCR
Isuued
Responsible Org.Approved Disposition
Closed
Sum
Not yet
Dispositioned
On Going
Sum