QAD Production Scheduling Workbench (QAD PSW)
Carianne Nieuwstraten – Sr. Product Manager – MFG/SCBrent Shooltz – Sr. Business Systems Analyst – MFG/SC
MMUG - 03/22/2010
QAD Proprietary
Agenda
MFG/SC - Key Strategic InitiativeProduction Scheduling Objective &
ChallengesWorkbench Framework IntroductionRoadmapProduction Scheduling FuturesDemo Early Adopter ProgramWrap Up
QAD Proprietary
Key Strategic Initiative
Provide a workbench for each key role in the
Manufacturing and Supply Chain areas
QAD Proprietary
Production Planning & Execution
Production Scheduling Workbench (PSW)
Master Schedule Workbench (MSW)
Production Scheduling Release To shop Floor ExecutionMaster Scheduling
Months-Weeks-Days Day-Shift-IntervalsDays
Component Available Check (CAC) Integration
Maximize Production Efficiency
Release to production with verification of
available materials
Create a master schedule balanced to Supply /Demand /Resources
Production Planning & Execution
QAD Proprietary
Production Scheduler’s ObjectiveEstablish a Production Schedule that
Meets Requirements– Measurements :
• On Time Production Deliveries– Minimize order lateness
• Short Lead Times– Better Customer Responsiveness
• Minimal Work-In-Process– Reduced inventory investment– Improving quality
• Maximum Utilization of Resources– Machines– Materials– Manpower
» Reduced set up costs/time
QAD Proprietary
Production Scheduler’s Challenge
Finance
Engineering
Materials
Manufacturing
Quality
Work-In-Process inventory is too high and there seems to be
excessive labor costs.
Engineering Change Orders must be
implemented smoothly to the shop floor.
Are all production compliance issues
and procedures being followed
and met? Why are scrap costs rising?
Do you have all the material to start
production? Supplier “X” will be late with their
order!
There are too many last minute changes! Have
you planned for machine downtimes? Will you meet production due
dates? Five workers are out sick!
QAD Proprietary
Production Scheduling Challenge
QAD Proprietary
Common Scheduling Situation
MSW & PSW Framework Introduction
QAD Proprietary
Planning & Scheduling – Future Flow
Period - > Month - > Week - > Day - > Shift - > Interval - > hour
Production Planned
Production Scheduled
Production Dispatched
Production ReportedDemand received
MSW MSW PSW Base Base
CAC
MSW/PSW/CAC Together- Consolidation of 50 maintenance, report and inquiry programs- New capabilities (production scheduling, integrated component checking)
QAD Proprietary
Framework Introduction
Master Scheduling (MSW)Scheduling view designed for the purpose of master scheduling
QAD Proprietary
Framework Introduction
Production Scheduling (PSW)Scheduling view designed for the purpose of production scheduling
QAD Proprietary
Framework Introduction
Search Panel extracts content for both workbench views
Search Panel extracts content for both workbench views
Navigator Panel drives content focus of both
workbench views
Navigator Panel drives content focus of both
workbench views
Supporting Frames apply seamlessly to both workbench views
Supporting Frames apply seamlessly to both workbench views
PSW:Layout
Introduction
QAD Proprietary
Production Order BrowseLocate un-sequenced production orders by attributes (red/yellow) (large/small)
Production Order Sequence GridSchedule and sequence production orders by item attributes- Create a schedule by (release date, shift, sequence)
Drag & Drop the orders to the desired position on the Sequence Grid
Production Order MaintenanceView and maintain all order details
QAD Proprietary
PSW:Views
Create customized workbench layouts
QAD Proprietary
ViewsProvides ability to create different user defined workbench layouts and save them for quick access
Saves Filter/Sort/Group Settings of each Panel
Saves Panel Size
QAD Proprietary
Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side
QAD Proprietary
2010 2012 2014 20152011 2013
Standard Edition
June 2010 : QAD 2010 SE release
Core Functionality : - Production Scheduling Workbench (PSW) Order Based- PSW integrated Component Check Capabilities
PSW Roadmap
QAD Proprietary
2010 2012 2014 20152011 2013
Enterprise Edition
September 2010 : QAD 2010.1 EE release
Core Functionality : - Production Scheduling Workbench (PSW) Order Based
- PSW integrated Component Check Capabilities
PSW Roadmap
QAD Proprietary
Op 10
Work Center Extrude
Day 1 Day 2 Day 3
Routing Operations
Pacemaker – Flow rate across all operations
Day 4
WO Release Date
Op 20
Work Center Assemble
Op 30
Work Center Paint
Op 40
Work Center Inspect
Pacemaker-OP
WO Due Date
OP 20Release/Due
Order Based Scheduling
Single Operation
Scheduling
Multi Operation Scheduling
WO Release Date
WO Due Date
Scheduled-OPOPRelease/Due
Order Release Date
WO Due Date
Scheduled-OPOPRelease/Due
Production Line / Process
QAD Proprietary
2010 2012 2014 20152011 2013
Enterprise Edition
March 2011 : QAD 2011 EE release*
Core Functionality : - Production Scheduling Workbench (PSW) Operational Scheduling
* Subject to change
PSW Roadmap
QAD Proprietary
WO & Date
Conflict!
WO Due Date
Anchored?Operation Conflict!
DueRelease
DueRelease
Release Due
1 2
ReleaseDue
4 days(WO Duration)
.8 days(Inter-OP Duration)
1.5 days(OP Duration)
3 4
Operation Sequence
d? No
Back
Sch
ed
ul
e
Date Conflict! Yes
5 days(WO Duration)
No
Alternate Scenario
Operational Scheduling
Demo
QAD Proprietary
Production Scheduling Workbench Value
Reduces production scheduling time and complexity
Increases shop floor optimizationAbility to simulate changes Removes need for spreadsheets
QAD Proprietary
Interested In Being An Early Adopter? Early Adopter Criteria:
– .Net use with QAD Enterprise Applications– eB2.1, SP4 or higher– Using QAD Enterprise Applications Discrete Work Orders
or Advanced Repetitive• No or verified customizations
– High data integrity/accuracy • BOM’s, inventory records, clean MRP data etc.
– Verified business need for MSW, PSW and integrated component check capabilities
– Resource availability from May 10th through around July 12th
• Project Manager, Master Scheduler, Production Scheduler, Material Planner availability
– Go live within the May 10th – July 12th time period
QAD Proprietary
QAD Demo Center
MSW and PSWTuesday, March 23rd: 8:30 – 11:30amStep through specific business scenarios
• You ask, we showCome talk to us!
QAD Proprietary
Contact Information
Carianne NieuwstratenE-mail: [email protected]: 503-236-0025
Brent ShooltzE-mail: [email protected]: 616-285-6617