QAD Production Scheduling Workbench (QAD PSW)

Carianne Nieuwstraten – Sr. Product Manager – MFG/SCBrent Shooltz – Sr. Business Systems Analyst – MFG/SC

MMUG - 03/22/2010

Page 2: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Agenda

MFG/SC - Key Strategic InitiativeProduction Scheduling Objective &

ChallengesWorkbench Framework IntroductionRoadmapProduction Scheduling FuturesDemo Early Adopter ProgramWrap Up

Page 3: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Key Strategic Initiative

Provide a workbench for each key role in the

Manufacturing and Supply Chain areas

Page 4: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Planning & Execution

Production Scheduling Workbench (PSW)

Master Schedule Workbench (MSW)

Production Scheduling Release To shop Floor ExecutionMaster Scheduling

Months-Weeks-Days Day-Shift-IntervalsDays

Component Available Check (CAC) Integration

Maximize Production Efficiency

Release to production with verification of

available materials

Create a master schedule balanced to Supply /Demand /Resources

Production Planning & Execution

Page 5: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Scheduler’s ObjectiveEstablish a Production Schedule that

Meets Requirements– Measurements :

• On Time Production Deliveries– Minimize order lateness

• Short Lead Times– Better Customer Responsiveness

• Minimal Work-In-Process– Reduced inventory investment– Improving quality

• Maximum Utilization of Resources– Machines– Materials– Manpower

» Reduced set up costs/time

Page 6: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Scheduler’s Challenge

Finance

Engineering

Materials

Manufacturing

Quality

Work-In-Process inventory is too high and there seems to be

excessive labor costs.

Engineering Change Orders must be

implemented smoothly to the shop floor.

Are all production compliance issues

and procedures being followed

and met? Why are scrap costs rising?

Do you have all the material to start

production? Supplier “X” will be late with their

order!

There are too many last minute changes! Have

you planned for machine downtimes? Will you meet production due

dates? Five workers are out sick!

Page 7: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Scheduling Challenge

Page 8: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Common Scheduling Situation

Page 9: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

MSW & PSW Framework Introduction

Page 10: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Planning & Scheduling – Future Flow

Period - > Month - > Week - > Day - > Shift - > Interval - > hour

Production Planned

Production Scheduled

Production Dispatched

Production ReportedDemand received

MSW MSW PSW Base Base

CAC

MSW/PSW/CAC Together- Consolidation of 50 maintenance, report and inquiry programs- New capabilities (production scheduling, integrated component checking)

Page 11: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Framework Introduction

Master Scheduling (MSW)Scheduling view designed for the purpose of master scheduling

Page 12: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Framework Introduction

Production Scheduling (PSW)Scheduling view designed for the purpose of production scheduling

Page 13: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Framework Introduction

Search Panel extracts content for both workbench views

Search Panel extracts content for both workbench views

Navigator Panel drives content focus of both

workbench views

Navigator Panel drives content focus of both

workbench views

Supporting Frames apply seamlessly to both workbench views

Supporting Frames apply seamlessly to both workbench views

Page 14: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

PSW:Layout

Introduction

Page 15: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Order BrowseLocate un-sequenced production orders by attributes (red/yellow) (large/small)

Production Order Sequence GridSchedule and sequence production orders by item attributes- Create a schedule by (release date, shift, sequence)

Drag & Drop the orders to the desired position on the Sequence Grid

Production Order MaintenanceView and maintain all order details

Page 16: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Page 17: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

PSW:Views

Create customized workbench layouts

Page 18: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

ViewsProvides ability to create different user defined workbench layouts and save them for quick access

Saves Filter/Sort/Group Settings of each Panel

Saves Panel Size

Page 19: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side

Page 20: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

2010 2012 2014 20152011 2013

Standard Edition

June 2010 : QAD 2010 SE release

Core Functionality : - Production Scheduling Workbench (PSW) Order Based- PSW integrated Component Check Capabilities

PSW Roadmap

Page 21: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

2010 2012 2014 20152011 2013

Enterprise Edition

September 2010 : QAD 2010.1 EE release

Core Functionality : - Production Scheduling Workbench (PSW) Order Based

- PSW integrated Component Check Capabilities

PSW Roadmap

Page 22: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Op 10

Work Center Extrude

Day 1 Day 2 Day 3

Routing Operations

Pacemaker – Flow rate across all operations

Day 4

WO Release Date

Op 20

Work Center Assemble

Op 30

Work Center Paint

Op 40

Work Center Inspect

Pacemaker-OP

WO Due Date

OP 20Release/Due

Order Based Scheduling

Single Operation

Scheduling

Multi Operation Scheduling

WO Release Date

WO Due Date

Scheduled-OPOPRelease/Due

Order Release Date

WO Due Date

Scheduled-OPOPRelease/Due

Production Line / Process

Page 23: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

2010 2012 2014 20152011 2013

Enterprise Edition

March 2011 : QAD 2011 EE release*

Core Functionality : - Production Scheduling Workbench (PSW) Operational Scheduling

* Subject to change

PSW Roadmap

Page 24: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

WO & Date

Conflict!

WO Due Date

Anchored?Operation Conflict!

DueRelease

DueRelease

Release Due

1 2

ReleaseDue

4 days(WO Duration)

.8 days(Inter-OP Duration)

1.5 days(OP Duration)

3 4

Operation Sequence

d? No

Back

Sch

ed

ul

e

Date Conflict! Yes

5 days(WO Duration)

No

Alternate Scenario

Operational Scheduling

Page 25: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

Demo

Page 26: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Production Scheduling Workbench Value

Reduces production scheduling time and complexity

Increases shop floor optimizationAbility to simulate changes Removes need for spreadsheets

Page 27: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Interested In Being An Early Adopter? Early Adopter Criteria:

– .Net use with QAD Enterprise Applications– eB2.1, SP4 or higher– Using QAD Enterprise Applications Discrete Work Orders

or Advanced Repetitive• No or verified customizations

– High data integrity/accuracy • BOM’s, inventory records, clean MRP data etc.

– Verified business need for MSW, PSW and integrated component check capabilities

– Resource availability from May 10th through around July 12th

• Project Manager, Master Scheduler, Production Scheduler, Material Planner availability

– Go live within the May 10th – July 12th time period

Page 28: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

QAD Demo Center

MSW and PSWTuesday, March 23rd: 8:30 – 11:30amStep through specific business scenarios

• You ask, we showCome talk to us!

Page 29: QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC

QAD Proprietary

Contact Information

Carianne NieuwstratenE-mail: [email protected]: 503-236-0025

Brent ShooltzE-mail: [email protected]: 616-285-6617