Project/Regional Level Corporate Level
Preparation of Quality Management Plan
(O - 2.2 / 09 - 01)
Internal QA/QC Audit & Reporting
(O - 2.2 / 09 - 12)
QA/QC Observation and Surveillance
(O - 2.2 / 09 - 02)
Internal Management Systems Audit & Reporting
(O - 2.2 / 09 - 13)
Issuance of Non Conformance Reports
(O - 2.2 / 09 - 03)
Management Review Committee Meeting
(O - 2.2 / 09 - 14)
Corrective & Preventive Actions
(O - 2.2 / 09 - 04)
Senior Management Visits to Projects
(O - 2.2 / 09 - 15)
Quality Reports
(O - 2.2 / 09 - 05)
Application for Awards & Certifications
(O - 2.2 / 09 - 16)
Quality Man of the Month
(O - 2.2 / 09 - 06)
Quality Walk
(O - 2.2 / 09 - 07)
Calibration of Test Equipment and Validation of Measuring
Aids
(O - 2.2 / 09 - 08)
Concrete Mix Design
(O - 2.2 / 09 - 09)
Laboratory Testing
(O - 2.2 / 09 - 10)
Preparation, Internal Inspection and Request for Approval forMock Ups
(O - 2.2 / 09 - 11)
QUALITY ASSURANCE/QUALITY CONTROL
QualityAssurance
Qu
alityControl