Q&A on T2K. construction of beam line near detectors budget collaboration (contribution from each) T2KK. Bird’s-Eye View (Feb. 2006). Hadron Experimental Hall. 50 GeV MR A round=1,600m. Materials & Life Experimental Hall. 3NBT. Neutrino. 3-50BT. 3GeV RCS A round=350m. Linac - PowerPoint PPT Presentation

Citation preview

Page 1: Q&A on T2K

Q&A on T2KQ&A on T2K

• construction of beam line• near detectors• budget• collaboration (contribution from each)• T2KK

Page 2: Q&A on T2K

Bird’s-Eye View (Feb. 2006)

Hadron Experimental Hall50 GeV MR50 GeV MRA round=1,600mA round=1,600m

Materials & LifeExperimental Hall

3GeV RCS3GeV RCSA round=350mA round=350m

LinacLinac(330m)(330m)

NeutrinoNeutrino3NBT

3-50BT

Page 3: Q&A on T2K
Page 4: Q&A on T2K
Page 5: Q&A on T2K

Primary Beam-line

3NBT3NBT

DVDV

ARCARC

Preparation Preparation SectionSection

Material Life Material Life & Science& Science

50GeV50GeVPreparation SectionPreparation Section

July, 2006

March, 2006

Page 6: Q&A on T2K

planw/ LINAC upgrade

0

500

1000

1500

2000

2500

3000

2008 2008.5 2009 2009.5 2010 2010.5 2011 2011.5 2012 2012.5 2013J FY

Beam

pow

er (k

W)

RCS power

MR power

MR powerx2 Np

MR powerx2 Npx1.5 rep rateMR powerx2 Npx2 rep rate

Be

am P

ow

er

(MW

)

0

1

2

3

2008 2009 2010 2011 2012

RCS power

h.n.RF mod

h.n.+RFx2

0.5MW

0.1MW   >0.5MW >0.75MW  

RF400MeVLinac

commissioning

Page 7: Q&A on T2K

decay volume

Near detector

TargetStation

Beam dump/-pit280m

Neutrino Beam Line for T2K Experiment

ComponentsComponents Primary proton beam line

Normal conducting magnets

Superconducting arc

Proton beam monitors

Target/Horn system

Decay pipe

Beam dump

muon monitors

Near neutrino detector

Special FeaturesSpecial Features

Superconducting Superconducting combined combined

functionfunction magnets magnets

Off-axis beamOff-axis beam

To Super-Kamiokande

Page 8: Q&A on T2K

Iron Block Shield inside

concrete

Remote coupling here

Horns

• 1st horn– Successful operation at 320kA– Long-term current operation test

• 2nd horn design / 3rd horn prototype in FY06

• Support module– Conceptual design done on

• Remote coupling of horns and water / He pipes.

• Kinematic alignment system

– R&D• Remote coupling of strip-lines• Water circulation system (7m pumping up)• Support module itself

• Produce everything in FY2007

Page 9: Q&A on T2K

ND280 Neutrino Detector(Experimental Hall with 3 floors)

Current design37m

2.5deg beam center28.5m

Ground level

Off-Axis Neutrino Detector

On-Axis Neutrino Monitor

Page 10: Q&A on T2K

Schedule of beam line

2004.4-2006.32005.4-2007.32006.4-2008.32007.4-2009.3

Target station•const.: ’06~’07•Install: ’08

Proton beam line•const.: ’05~’06•Install: ’08

half of Decay volume•const.: ’04~’05•Install: ’04

Buildings•Const.: ’07

Near detector•const.: ’07~’08•Install: ’08

Beam dump &half of Decay vol.•const.: ’07~’08•Install: ’08

Primary line tunnelNC mags (Prep. Sect.)SC/NC in FFCryogenics

TS civil/buildingEquipments in TSDecay volumeBeam dump

Neutrino monitor

Secondary

Prim

ary

101 7

Facility Design

H214 7 10

20062004 2005 2009

7 10 11st yr 2nd yr 3rd yr

14 7 10 44

2008

4 7 10 1Last yr

2007

4 7 10 14th yr

Inst.Inst.

Inst.Comm.

Inst./Test ope.

Civil Civil Inst.

Inst.CivilInst.Civil mag

inst

Page 11: Q&A on T2K

Japanese funding situation

Beamline, detector hall civil (~80-oku\)Equipments (~72-oku\)Proton, muon, neutrino monitor (~ 4-oku\)

Foreign Contributions ~20M$ from Canada, France, Italy, Korea, Poland, Russia, Spain, Switzerland, UK, USA

Page 12: Q&A on T2K

T2K Collaboration

• 11 Countries (number of members)

–Canada(24), France(8), Italy(11), Japan(46), Korea(9), Poland(1), Russia(8), Spain(12), Switzerland(3), UK(25), USA(42)

–58 Institutes, 189 Ph.D. members, still growing

Page 13: Q&A on T2K

• Canada– Damper system, OTR beam monitor, Remote handling, Actuator, Vacuum c

hamber, Fine-Grained-Detector (FGD), TPC• France

– SC quench detection system, TPC electronics, TPC• Italy

– UA1 magnet, Side-Muon-Ranger (SMRD), 2km ND• Korea

– Beam Monitor electronics, neutrino monitor, • Poland

– Neutrino MC• Russia

– Neutrino Monitor, Photo-sensor, SMRD, • Spain

– UA1 magnet, TPC, software• Switzerland

– UA1 magnet, TPC, neutrino monitor• UK

– Target, target remote handling, Dump, Beam window, UA1 magnet, Electromagnetic Calorimeter, Basket, Electronics, Photo-sensor

• USA– SC correction magnets, 2nd horn, CT beam monitor, beam monitor electronic

s, GPS system, pi-zero detector (P0D), SMRD, 2km ND, Super-K(1)Accelerator (2) Beam Line, (3) Near Neutrino Detector, (4) Super-K

Page 14: Q&A on T2K

• One of the future options of T2KOne of the future options of T2K• 0.5Mton at Kamioka and 0.5Mton at Korea0.5Mton at Kamioka and 0.5Mton at Korea• Aim to Aim to

– resolve q13, d digeneracyresolve q13, d digeneracy– Discriminate mass hierarchyDiscriminate mass hierarchy

• Studies and discussions have been doneStudies and discussions have been done– Hagiwara et al. Phy.Rev.B 637 (2006) 266Hagiwara et al. Phy.Rev.B 637 (2006) 266– Ishizuka et al., PRD 72 (2005) 033033Ishizuka et al., PRD 72 (2005) 033033– 2 International workshop on a Far Detector 2 International workshop on a Far Detector

in Korea for the J-PARC Neutrino Beam in Korea for the J-PARC Neutrino Beam