22
PZ "5/07|» C| TMs. ' Ci( V * - Application for Development Approval 0 SJ1AVS, .. '' O/v. QuoV^ OWNER DETAILS ftoRfcL too^ltes 4fe) LTb ABN (if applicable): _ ^ ^ bl 00^ b^h 9 OY* U^/A Address - tevei i 63-fcl v ^flSUlCirsI < <4 A, Postcode: , Rhone: _ Fax: Mobile: _ Ouci 3 s" b Email: = £Xy#\ V-x0 i'Vvj . J^)iv4-S Ok <§> Ipi ra[. (^ )hn/ < <x U Contact person for correspondence: A HTit-o fJ ^ IAAITS a <vJ Signature: /SjJrfrfcj Date:. , _ U'll' 29)5 Signature: / Date: The signature of the owner(s) is required on ail applications. This application will not proceed without that signature. For the purposes of signing this application an owner includes the persons referred to in the Planning and Development (Local Planning Schemes) Regulations 2015 Schedule 2 Clause 62(2). APPLICANT DETAILS Name ' Mw. touftun (uti) Lrl> Address: . , , n touiiu 1 M 'b°l AWhJiTHV <(V» /^\ (K Postcode: z ^ z (Q\ QU Phone: ^ _ ibzu Fax: Mobile: CM0\ 8°|3 3.V? Email: Wcjtob#> U. ' CsiVx . au. Contact person for correspondence: vj Ml^axh ,;Wti?orxj The information and plans provided with this application may be made available by the local government for public viewing in connection with the application. Yes izf No D M Signature: Date: 4 - li- 2c |5

PZ 5/07|» C| TMs. - consultation.epa.wa.gov.au · I Location: 33 King Street, Bayswater 2 DESCRIPTION OF PROPOSAL 2.1 Site Location The location of the existing Bayswater batch plant

  • Upload
    lenhu

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

PZ "5/07|» C| TMs. ' Ci(V *

- Application for Development Approval

0SJ1AVS,

.. '' O/v. QuoV^

OWNER DETAILS

ftoRfcL too^ltes 4fe) L T b ABN (if applicable): _ ^ ^ bl 00^ b^h 9 OY* U /̂A

Address-

tevei i 63-fcl v ^flSUlCirsI < <4 A,

Postcode: ,

Rhone: _ Fax:

Mobile: _ Ouci 3 s" b Email: = £Xy#\ V-x0 i'Vvj . J^)iv4-S Ok <§> Ipi ra[. (^)hn/ < <x U

Contact person for correspondence: A HTit-o fJ ̂ IAAITS a <vJ

Signature: / S j J r f r f c j Date:. , _ U ' l l ' 2 9 ) 5

Signature: / Date:

The signature of the owner(s) is required on ail applications. This application will not proceed without that signature. For the purposes of signing this application an owner includes the persons referred to in the Planning and Development (Local Planning Schemes) Regulations 2015 Schedule 2 Clause 62(2).

APPLICANT DETAILS

Name' Mw. touftun (uti) Lrl> Address: . , , n touiiu 1 M'b°l AWhJiTHV <(V»

/̂ \ (K Postcode: z ^ z

( Q \QU Phone: ^ „ _

ibzu Fax:

Mobile: CM0\ 8°|3 3.V?

Email: W c j t o b # > r £ U . ' C s i V x . a u .

Contact person for correspondence: vj

Ml^axh ,;Wti?orxj The information and plans provided with this application may be made available by the local government for public viewing in connection with the application. •

Yes izf No D M

Signature: Date: 4 - li- 2c |5

PROPERTY DETAILS Lot No: j House/ Street No: 3.3 Location No:

Diagram orPtsffNo: Certificate of Title Vol No: Folio: 050 Title encumbrances (e.g. easements, restrictive covenants):

Street name: , /• . KI-NIC Suburb:

Nearest street intersection:

PROPOSED DEVELOPMENT Nature of development:

/AiS'fALLA-Tio^ Of 0^ S^cor^fyvR-V

&ATUA ?LAMT /fo G./xJ $>1T ii .

Ef'vvorks

D Use

D Works and use

Is an exemption from development claimed for part of the

development?

• Yes

\̂ { No If yes, is the exemption for:

D Works

• Use Description of proposed works and/or land use: m{ALU^lofl 0p HoUutktMl,-

|k<TM,LU ^CU fLwJT< s' LO AuiClLIMlY l4ePMd AN/ VS CQ^&^OI ,

Description of exemption claimed (if relevant):

4*" u/-^ '

Nature of any existing buildings and/or land use: n

Orl^Urie^At- <Wcc4Wu (?A/ Approximate cost of the proposed development: 1 z ^ _

#60,00O (W 6^( Estimate time of completion:. „

Acceptance Officer initials:

Local government reference No:

OFFICE USE ONLY

Date Received:

II

*1 I u Build something great™ BORAL

Boral Resources (WA) Bayswater Concrete Batch Plant

i

Bayswater Concrete Batch Plant -Plant Upgrade

Supporting Documentation

Boral Resources (WA)

November 2015

h

Contents 1 INTRODUCTION 2

1.1 Background 2

1.2 Proponent Details 2

1.3 Environmental Performance 2

1.4 Premises Details 2

2 DESCRIPTION OF PROPOSAL 3

2.1 Site Location 3

2.2 Plant Specifications 3

2.3 Site Layout 3

2.4 Construction 3

2.5 Operation 3

2.6 Traffic Movements 5

2.7 Raw Materials 5

2.8 Plant Capacity 5

2.9 Timeframes 5

3 POTENTIAL IMPACTS AND MANAGEMENT MEASURES 6

3.1 Air Quality 6

3.2 Noise 6

3.3 Wastewater Management 7

3.4 Waste Management 7

4 CONCLUSION 7

5 FIGURES 8

6 APPENDIX A - PLANT SPECIFICATIONS 10

APPENDIX B - TRAFFIC MOVEMENTS 11

Figures Figure 1: Site Location

Figure 2: Site Layout

Appendices Appendix A - Plant Specifications

Appendix B - Traffic Movements

1

I .

1 INTRODUCTION

1.1 Background

Boral Resources (WA) Ltd operates a concrete batch plant at 21 King Street, Bayswater. Concrete batching operations commenced at this site more than 30 years ago. The plant currently operates under a Development Approval issued by the City of Bayswater.

The plant also operates under Department of Environment Regulation Registration No. 00185 (issued October 1996), and in accordance with the Environmental Protection (Concrete Batching and Cement Product Manufacturing) Regulations 1998.

Boral Resources is proposing to upgrade and install a secondary batch plant to support the current plant and enhance production efficiency. It is intended that the secondary plant be dedicated for the production of decorative concrete mixes, eg. exposed aggregate products.

With current markets shifting toward decorative concrete products the over-all production capacity of the site is not anticipated to increase significantly.

1.2 Proponent Details

Name: Boral Resources (WA) Ltd ABN: 57 008 686 904 Contact: Anthony Watson

Planning & Development Manager-WA Boral Property Group 63-69 Abernethy Road BELMONT WA 6104 (08) 9333 3624 0401 893 357 [email protected]

1.3 Environmental Performance

Boral's Environmental Policy affirms our commitment to complying with environmental legislation, regulations, standards and codes of practice relevant to the particular business as the absolute minimum requirement in each of the communities in which we operate.

The Bayswater Batch Plant has historically demonstrated a high level of environmental performance. Environmental audits and assessments are completed by Boral on a regular basis to monitor performance and compliance against legislative requirements. Opportunities for improvement are identified and actioned where possible.

All potential dust sources onsite are effectively managed in accordance with the Environmental Protection (Concrete Batching and Cement Product Manufacturing) Regulations 1998. It is not usual practice to conduct environmental dust monitoring and therefore no past monitoring has been undertaken nor proposed for the future.

1.4 Premises Details

Site Name: Boral Concrete - Bayswater

2

I

I

Location: 33 King Street, Bayswater

2 DESCRIPTION OF PROPOSAL

2.1 Site Location

The location of the existing Bayswater batch plant premises as shown in Figure 1.

2.2 Plant Specifications

It is proposed that a secondary portable batch facility be added to the current production plant. The additional plant will consist of:

• Portable batch plant • Mobile cement silo • Auxiliary weigh hopper and conveyor

This plant will have a production capacity of up to 80 tonnes of concrete per hour.

Detailed plant specifications as provided by the manufacturer are provided in Appendix A.

2.3 Site Layout

The additional plant will be positioned to complement the current layout and activities onsite. The site is adequately sized to accommodate the new plant without any existing plant or infrastructure being dismantled or moved. Figure 2 provides a site plan showing existing plant and facilities and proposed location of the new plant.

By locating the mobile facility adjacent to the aggregate bins that store decorative stone, the potential for emissions (noise and dust) is greatly reduced, as opposed to the situation of transporting the decorative stone to the fixed plant for processing.

2.4 Construction

The plant components will be transported to site on semi-trailers. Minimal site works and ground works will be required. As shown in Figure 2, open ground currently exists within the premises for the plant to be located. The assembly of the plant will not require any significant earthworks or other construction works. Assembly to operational standard can normally be completed within approximately four weeks.

2.5 Operation

The plant is controlled by a dedicated Batch Operator from the batch cabin/office.

The process of the portable batch plant is as follows:

3

I

I

1. Aggregates are loaded from existing ground bins into the auxiliary weigh hopper according to product specification.

2. The aggregates are then transferred via conveyor to the portable batch plant.

3. Cement is transferred from the mobile silo to the mobile batch plant via an enclosed auger.

4. The batch plant combines raw materials to required mix specifications and delivers them to the agitator truck in the load out bay.

5. Final product mixing and water addition at existing slump stand area.

This secondary plant will operate to complement current production on site. The plant will be dedicated to the production of decorative concrete mixes.

The over-all production rate of the site will not increase significantly. It should be noted that there is excess capacity in the current infrastructure and a great deal of the additional production would be able to be undertaken by the current plant should Boral wish to pursue this option. However, for the sake of efficiency and management of the site, the installation of the mobile facility is the most prudent option.

Existing infrastructure on site has been assessed and will have adequate capacity to be utilised in conjunction with the secondary plant, including:

• Ground bins • Slump stand • Washout pits • Water/waste recycling process • Truck wash bay

There will be no alterations or additions to the activity types currently approved on site and therefore no change to the nature or type of emissions.

The secondary plant will be installed to in compliance with the Environmental Protection (Concrete Batching and Cement Product Manufacturing) Regulations 1998 and all potential fugitive and point source emission sources will be managed in accordance with these regulations.

The current management procedures for the storage bins will be maintained post the installation of the additional plant. The contents and quantity of the ground bins will remain unchanged from their current capacity. The only additional storage will be the mobile cement silo which will have a capacity of 75 tonnes.

2.6 Traffic Movements

The traffic flows for the current plant setup and the proposed flows with the additional plant are included in Appendix B. It should be noted that there is a considerable reduction in distance for the movement of the Decorative Materials to the proposed portable batch plant as opposed to the current movement from the Decorative Materials bins to the existing plant.

4

I

There will be no material increase in deliveries to the site as a direct result of the installation of the additional plant.

2.7 Raw Materials

The current raw materials stored onsite are as per the following:

• Bulk Cement - 180 tonnes • Coarse Aggregates - 320 tonnes • Sand - 200 tonnes • Decorative Aggregates - 650 tonnes • Admixtures - 25,000 litres

There will be no additional materials stored onsite as a result of the additional mobile plant, save for the mobile cement silo.

2.8 Plant Capacity

The existing plant has a potential capacity to produce 2,000 tonnes of concrete a day. Historical records show that the average production for the existing plant is 1,400 tonnes per day.

The additional plant facilities will have a maximum capacity of 300 tonnes per day, with the expectation that the average output will be 100 tonnes per day.

2.9 Timeframes

The secondary plant is proposed to be assembled on site as soon as possible following approval. Assembly to operational standard is expected be completed within approximately four weeks.

5

I

3 POTENTIAL IMPACTS AND MANAGEMENT MEASURES

3.1 Air Quality

The operation of the secondary batch plant will have potential to generate fugitive and point source dust emissions typical to that of current activities on site.

The following dust management practices will be utilised in relation to the proposed plant, as appropriate:

• Ground bins - raw materials will be stored in existing ground bins within allowable height limits.

• Traffic areas - will be sealed or treated with water, eg. sprinklers, and maintained free from loose material. Travel distance between ground bins and hopper minimised.

• Weigh hopper - fitted with wind shields.

• Conveyor - product is pre-moistened (before transferring to weigh hopper). Wind shields will be fitted if deemed to be necessary.

• Cement silo: - fitted with reverse pulse air cleaning system

pressure relief valve dusted to within 1 m of ground high level alarm system with audible and visual alarms

- test circuit for alarms to ensure working correctly

• Load out bay - fitted with water sprays controlled by batching computer.

• All pollution control equipment will be inspection and maintained in accordance with the manufacturer's specifications.

Given the secondary plant will operate complimentary to the existing batching plant with all necessary control in place, no significant impacts are anticipated.

3.2 Noise

The operation of the secondary batch facility will not significantly alter current noise levels on the premises.

Vehicle movements, ie. front loader and agitator trucks, will not alter from current activities on site.

The premises is zoned General Industrial and is located within the Bayswater industrial area, with no sensitive receptors nearby. The closest residential property is over 450m away.

The premises will comply with assigned noise levels as outlined in Environmental Protection (Noise) Regulations 1997.

6

I

3.3 Wastewater Management

The existing water management facilities currently in operation on site will have more than adequate capacity to capture and treat the small amount of washdown water that will be generated at the site of the secondary plant.

Washdown water from the cleaning of agitator trucks in the loading bay (before they leave site) will be collected in a below ground wedge pit. Overflow from this settlement pit will drain via an open concrete spoon drain to the adjacent existing washout pit, approximately 10m away. Water the washout pit is continually recycled through a series of sediment pits and storage tanks for re-use in washout and production processes onsite.

The storage of admixtures associated with the secondary plant will be in accordance with the Department of Mines and Petroleum's Code of Practice for the storage and handling of dangerous goods.

Spill kits will be placed in close proximity to the plant for use should any spills or leaks occur.

3.4 Waste Management

There will be no additional waste types associated with the operation of the secondary plant.

Agitator trucks will washout into the existing washout pits in accordance with current practices.

Any hardened returned product or 'out of specification' product is dried onsite for collection and recycling at an approved facility.

4 CONCLUSION

Concrete batching activities are currently approved at the Bayswater Batch Plant. The proposed secondary batch process will be installed and also operate in accordance with these approvals.

As outlined above all environmental aspects and potential impacts will be effectively managed on the premises.

The proposed secondary batch process will not alter the nature or type of emissions, or the types of materials or processes used onsite.

7

I

5 FIGURES

FIGURE 1 - SITE LOCATION Bayswater Batch Plant

C i t y o f B a y s w a t e r - G e o g r a p h i c L a y o u t f . —. 4 A A ni F-1CSR M7-»li02»56FU Bayswater Concrete Plant IMM

n_rxj 1 I v— T

I

8

I

FIGURE 2 - SITE LAYOUT - EXISTING AND PROPOSED

9

I

0

n n n D D a n D fl II II II II II U II u II II

BAYSWATER CONCRETE BATCH PLANT PROPOSED PLANT UPGRADE

Existing Site as at Oct 2015.

II

BORAL C

Proposed New Site Layout;

Addition of a secondary loadout point closer to Decorative aggregate

stockpiles to reduce loader operations and movement.

1 6 APPENDIX A - PLANT SPECIFICATIONS

I i

1 0

I '

BORAL BAYSWATER ADDITIONAL LOADING FACILITY

EQUIPMENT ENVIRONENTAL/SAFETY SPECIFICATIONS

Portabatch Batch plant

1. 45 tonne capacity horizontal cement storage silo, manufactured from 6mm mild steel plate complete with:

1.1. Reverse jet pulse filter with 20m2 of cloth area and pressure relief valve ducted to within 1m of the ground. This filter is insertable to enable re-positioning for work or travel.

1.2. Additional inlet and high level monitor for connection to a 75t mobile silo. 1.3. 100mm fillpipe with butterfly valve operated by the overfill protection system to

shut off filling when the silo is full. A standard camlock coupling is fitted to the fill pipe for cement tanker hose connection.

1.4. Overfill protection system with audible and visual alarms.

2. An aggregate weigh hopper, manufactured from 6mm mild steel plate, with sufficient capacity to batch 6 cubic metres of concrete is fitted with:

2.1. Four lock down bolts positioned alongside each of the four shear beam load cells in order to simplify the locking process and ensure the transport stability of the weigh hopper.

2.2. Two pneumatically operated geared discharge gates with greaseable hinge pins designed for ease of replacement. Inching control solenoids allow for variable door opening.

3. A batch conveyor, 750mm wide, will transfer the aggregates from the aggregate weigh hopper to the transit mixer through the gob hopper. The conveyor is manufactured from hot rolled channel and fitted with:

3.1. Transoms 45° and flat return rollers. 3.2. 3-ply belting with 3mm and 1.5mm covers. 3.3. The conveyor drive has a flat, rubber lagged head drum 3.4. The take-up has a crowned tail drum with cadmium plated screw type take-up,

weighted scraper at the head end and vee plough at the tail will clean the conveyor belting. Necessary skirting and guarding is fitted at the tail of the conveyor.

4 A cement weigh hopper, manufactured from 6mm mild steel plate with a capacity of approx. 3.2 cubic metres (4.5 tonne) is fitted with:

4.1. Inspection hatch that incorporates the reverse pulse filter.

75 Tonne Mobile Cement Silo

1. One horizontal storage silo, 53 Cubic Metre capacity (approx. 75 tonne cement with adequate freeboard), manufactured from 6mm mild steel plate complete with.

1.1. Reverse jet pulse filter with 20mz of cloth area and pressure relief valve ducted to within 1m of the ground. This filter is insertable to enable re-positioning for work or travel.

I

1.2. Two quick release inspection hatches - one for ventilation and emergency evacuation and the other with internal ladder.

1.3. the silo. The external slide ladder is manual winch operated at the front of silo

1.4. 100mm fillpipe with butterfly valve operated by the overfill protection system to shut off filling when the silo is full. A standard camlock coupling is fitted to the fill pipe for cement tanker hose connection

1.5. Overfill protection system with audible and visual alarms

2. This unit carries D.O.T.A.R.A compliance plate and V.I.N number.

Auxiliary Weigh Hopper And Conveyor

1. Aggregate weigh hopper, with a capacity of 8 cubic metres (15 tonnes), manufactured from 6mm plate, discharging through 3 pneumatically operated clamshell gates on greaseable hinge pins, suspended on 4 shear beam 5000kg load cells in a structural steel frame.

CITY OF BAYS WATER

1 k DEC

20 2 ADMIX TANKS 800 LF MK U050-800 13 1 ELECTRICAL CONTROL SYSTEMS & CABINET MK MOSO 900A 6 1 BATCH CONVEYOR 750W MK M050-700A

26 1 HORIZONTAL SCREW GUARD MK II050-15SK 19 1 TRI-AXLE ASSEMBLY ADR.APP YORK 12 1 SECONDARY WATER SYSTEM IK M050-263A 5 1 CEMENT WEIGH HOPPER 2.8m3 MK M050-200A

25 1 WATER METER GUARD MK U050—I59L IS 2 CEMENT SHUT OFF PLATE MK N050-I08C 11 1 WATER METERING SYSTEM IK M050-262A 4 1 AGGREGATE WEIGH HOPPER 8.5m J MK M050-300A

24 2 SOLENOID VALVE GUARD W II050-15BN 17 1 FOLDING HANDRAIL MK M050-IQ9 10 1 WATER STORAGE TANK 8700 L MK H050-260A 3 1 CEMENT SILO 50T NCM MK U050-100A

23 1 LADDER MK M050-II2A 16 1 AIR COMPRESSOR CF15P 9 1 CEMENT DISCHARGE SCREW •350 IK M050-2WA 2 1 FOLDING RAMP PLATE «K M050-;60C,04£

22 1 COLLAPSABLE FILTER FRAME MW 11050-115A 15 1 GENERATOR 8 1 3LO INCUNED SCREW #250 MK M05C-2j0A 1 1 CHASSIS ASSEMBLY MK M050-I5CA

21 1 REVERSE JET PULSE FILTER OCT BV20 IIOV DtlSTCOTEO) H 1 TOOLBOX 452* 803 453 HIOI 7 1 3L0 HORZONTAL SCREW K250 UK M050-220A ITEM OTY DESCRIPTION LENGTH GRADE WT(lcg) REMARKS

UATE Q» LASr miI=23/lO/2QUfi-l4.ai

CMQ Engineering Pty Ltd. *jfsAi-ttg CewwH IMlcMrf-qworning-MatetaM Mirxfrrg CqulpsmM

157-in ccbalt snerr, c*taz ?*v. <xa ereowc. motoc (or) */i -iTM r*x (or) »r» 3m

- ALL DIMENSIONS ARE IN MLLJMETRES UNl£SS 01>€RWSt NOIED - PROJECTION IS THRO ANGLE THIS COPY REMAINS THE INTELLECTUAL PROPERTY OF CMQ ENCNEEWNG PTY LTD AND IS FOR IfS SOLE USE

TCUQ Engineering Pty Ltd. COPTWCHT PROTECTS MS PUBUCATXti EXCEPT FOR PURPOSES ran TIED BY THE COP WIGHT ACT, REPRODUCTION BY WATE^R MEANS 15 PROHHTED WINOUT THE PRIOR WRITTEN PERMS30* OF CUQ EJMJNEEHWG ENQUIRES TO BE ORECTED TO CMQ ENCNEERWC. 157-16! COBALT STREET. CAROLE PARK WOO BRISBANE TELEPHONE (07) 3879 3288

E CWH A SCREW ROTATED TO MOVE OUTLET OVER COB HOPPER SW 5-99 SCALE 1:30 CMQ Engineering Pty Ltd. ORAWN5 No. | Al

M050-001 _D_

C

HORZ/NCL SCREWS BACK TO 250NB SW 1-S9

26-8

DRAW iflH 13-12-95 CMQ Engineering Pty Ltd. ORAWN5 No. | Al

M050-001 _D_

C UPDATED FOR 300NB HCRG/WCL SCREW SW 1-S9

26-8 CHECKED - " MOBILE CONCRETE BATCHING PLANT

GENERAL ARRANGEMENT

ORAWN5 No. | Al

M050-001 B MOOS MADE MACHINE NO. 16 cw MO OE9GNEO MOBILE CONCRETE BATCHING PLANT

GENERAL ARRANGEMENT

ORAWN5 No. | Al

M050-001 L WATER P1PEWRK WOOFIED ERB 05.12 L AW CHANGED TO 210 DOORS; MOVED CLOSER TO BELT J.8X 6-96 APPROVED - "

MOBILE CONCRETE BATCHING PLANT

GENERAL ARRANGEMENT

ORAWN5 No. | Al

M050-001 No. REVISION DRAWN DATE No REVISION DRAWN DATE JOB COST No

MOBILE CONCRETE BATCHING PLANT

GENERAL ARRANGEMENT

ORAWN5 No. | Al

M050-001

I

n o D D 0 B 0 [1 0 u II D y u LI u II

REFER MS75-154 FOR SKID PLATE DETAILS

REMOVE THIS SECTION OF TRANSFER SCREW AND STORE BESIDE SILO FOR TRANSPORT

INCLINE SCREW

75 tonne STORAGE SILO GENERAL ARRANGEMENT

INCLINE SCREW

AUXILIARY INLET -COVER BOLT TO HAVE WASHER AND SEALED WITH SILICON SEALANT

REFER MS75-235 TRANSPORTATION COVER

PLATES REFER MS75—221 FOR HORIZONTAL SCREW DRIVE ARRANGEMENT

SCREW TRANSPORT POSITION MCUNE SCREW TRANSPORT POSIHON

REFER MS75-231 FOR INCUNE SCREW DRIVE ARRANGEMENT

12997

13497 OVERALL TRAVELING

UK MS75-220 DUCTING IK MS75-140AW SILO HORIZONTAL SCREW IIK MS75-I52B COLLAPSABLE FRAME BRACE INDICATOR SUPPORT UK US75-I068 I* US75-I55A AIR TANK BRACKETS DUNNAGE BASKET UK US75-152A COLLAPSABLE FILTER FRAME REMOVABLE BEAM UK US75-106A IKUS75-IHA XISTCOTECH DCTBV70 BUMPER BAR UK US75-I5IA SHUT OFF PLATE ACTUATOR CHASSIS ASSEMBLY IK US7S-I52F BRAKING SYSTEM UK MS75-109A ACCESS LADDER WTH CAGE MKUS75-MHC IK US75-152E CEMENT TRANSFER INCLINE SCREW UK US75-230 INDICATOR SUPPORT UK MS75-IC8A ACCESS HATCH ACCESS COVER PLATE UK US75-I048 UK US75-15JD MOTOR MOUNTNG BEAM UK US75-226A 4 6 UK MS7H07 BOLTED SILO COVER FOLDING HANORAILING UK US75-I04A IK MS75-152C INCLINE ADAPTOR UKMS75-225A SCREW SUPPORT 4 CLAMP UK US75-102S FILL PIPE SPIGOT CEMENT SILO ASSEMBLY UK US75-I02A34P

SATE Of LAST ED1T= 15/07/2005-1141

CCMQ jnvvHtruv Ptu Ltd. COPIBOTT PROTECTS THIS PUaiCATON. EXCEPT FOR PURPOSES REMITTED 8Y TTC COPIHQiT ACT, REPRCCUCTK* BY WATEVER HA*S IS PROHBTB) WTHOUT THE PRIOR WSTTE* PSMSSOH Of cvoaciieEBwa EKQUR£3 TO BE DIRECTED TD OJO ENGHEERWG, 157-16 COBALT STREET, CASOU PARK <jOd arSBAIt TElfPHOWE (07) 3879 3738

CMQ Engineering Pty Ltd.

MOBILE STORAGE SILO 75 Tonne STORAGE SILO GENERAL ARRANGEMENT

CHECKED Ail DIMENSIONS ARE IN UUDMflRES UNLESS OTHERWISE NOTED PROJECTION 6 TURD ANO£

SILO LOVtRED 150mm

THIS COPr REWAJNS THE KTELlfClUAl PROPERTY Of CMQ ENGINEERING PTY LTD AND ft FOR IfS SOLI USE REVISION REM3CN

I

1 " .a.:., j /'

y

SL" Sjl wS |j|

*-—

• *l \ pr> £3 •.:. :. ...-.- - - - 3tEt /'

y

• f \ % J ' r t # f * - i K\ ^ h Vi i > ) >= 1

Vf

=TK

u

1i

1

/'

y

: 1 % \ [N, | I I II T t

• kJ Vf

=TK

u

1i

1

/'

y

: 1 % \ [N, | I I II T t

• kJ W ^ 7 Y n ft T~ — y-' f 7 fi P f Vf

=TK

u

1i

1

/'

y . - 'o|S' . U :-r^ -.•• IB hi—,—• . Ja r- ki

*fe=a

J . m ini

1 . or "WjW

ET -1 L—^ H t 1 U 1

date OF LAST EDIT-

CMQ Engineering Pty Ltd, Mmu«ecti.rfr,g Cwierel* Belchln)-Quanrfl»g-iMeNHeU Hnndl'ng &qul|MMnt

157-161 COO*.? S7HEO. CWX£ MFK tlOO BRSJAfC TElfPHOC (07) *71 »S1 FAX (OT] XTO 3375

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288

SCALE 1:25 c MQ Engineering Pty Ltd. CRAJWC No. | At

1624-0000

CMQ Engineering Pty Ltd, Mmu«ecti.rfr,g Cwierel* Belchln)-Quanrfl»g-iMeNHeU Hnndl'ng &qul|MMnt

157-161 COO*.? S7HEO. CWX£ MFK tlOO BRSJAfC TElfPHOC (07) *71 »S1 FAX (OT] XTO 3375

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288

DRAWi EPS 21.02.12 c MQ Engineering Pty Ltd. CRAJWC No. | At

1624-0000

CMQ Engineering Pty Ltd, Mmu«ecti.rfr,g Cwierel* Belchln)-Quanrfl»g-iMeNHeU Hnndl'ng &qul|MMnt

157-161 COO*.? S7HEO. CWX£ MFK tlOO BRSJAfC TElfPHOC (07) *71 »S1 FAX (OT] XTO 3375

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288

CHECKED - - AGGREGATE WEIGH HOPPER

AUXILIARY WEIGH HOPPER. GENERAL ARRANGEMENT

CRAJWC No. | At

1624-0000 - AIL DWEN90NS ARE IN MIUMETRfS INIESS OTtCRWSE NOTED - PROJECTION 5 THRD ANCLE

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288

DESIRED AGGREGATE WEIGH HOPPER

AUXILIARY WEIGH HOPPER. GENERAL ARRANGEMENT

CRAJWC No. | At

1624-0000 - AIL DWEN90NS ARE IN MIUMETRfS INIESS OTtCRWSE NOTED - PROJECTION 5 THRD ANCLE

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288

APPROVED - -

AGGREGATE WEIGH HOPPER

AUXILIARY WEIGH HOPPER. GENERAL ARRANGEMENT

CRAJWC No. | At

1624-0000 THIS COPY REMAINS THE INTELLECTUAl PROPERTY OF CMQ ENONEERKC PTY LTD AND IS FOR ITS SOU USE

Si CMQ Engineering Pty Ltd. COPYRJCHT PROTECTS MS PUBLICATION EXCEPT FOR PURPOSES PERMITTED BY THE C0PW6HT ACT, REPRODUCTION BY WHATE'O UCANS IS PROMOTED WIHOUT THE PRIOR YRTTEM PERWSSON OF CUQ EWOhEEraNC ENQUIRES TO BE ORECTED 10 CUQ ENGINEERING. 157-161 COBALT STREET, CAROLE PAW UOO. BRISBANE-TELEPHONE (07) M79 3288 No. REVISION DRAW DATE No REM3QN DRAWN OATE JOB COST N«|

AGGREGATE WEIGH HOPPER

AUXILIARY WEIGH HOPPER. GENERAL ARRANGEMENT

CRAJWC No. | At

1624-0000

n « 6 APPENDIX B - TRAFFIC MOVEMENTS

n D n n

B

II

B 0

D II II

U

B 0

U 0

) RECYCLED WATER TANKS-

SEDIMENT PIT

iC\D°A

iTORA ' ±m\C

LOADER AREA

MATERIALS BINS

RAMP UP VISITOR'S .CARPARK

DUST BIN

SUB BOARD MAINV

BOARD CTR £ -UMP STAN|

WATER TANKS, LOADING

BAY

EMERGENCY ASSEMBLY

AREA 1

ADDITIVE STAND *

DRIVERS' ROOM

STAFF CARPARK

TRUCK PARKIN<

SITE PLAN

TOILETS

OHS OFHCER'S ROOM

WRIGHT ST

°NLY;

feSXlonEKSi.

BORAL CONCRETE BAYSWATER

PERSONAL PROTECTIVE EQUIPMENT REQUIREMENTS

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES, HELMET REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES, HEARING PROTECTION REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR REQUIRED

TRAFFIC MANAGEMENT

> AGITATOR TRUCKS

MATERIALS DEUVERY VEHICLES (INCLUDING CEMENTTANKERS UNLESS OTHERWISE INDICATED)

-> CEMENTTANKERS (IF DIFFERENT FROM OTHER MATERIALS DELIVERY VEHICLES)

CURRENT TRAFFIC MOVEMENTS

Document No.: 242 SIPL-001 Revision No. 1

22/10/09 Page 1 of 1

)X-/ RECYCLED WATER TANKS

SEDIMENT PIT

LOADER AREA

WEDGE PITS

MATERIALS BINS TRUCK

WASH BAY RAMP UP VISITOR'S

CARPARK WEDGE PTT DUST

BIN COMPRESSOR

SHED SITE

OFFICI HOPPERS

SUB BOARD SLUMP STANI

/WATER ^ TANKS LOADING

BAY LIMESTONE

ADDITIVE STAND "

nV/N/ r EMERGENCY / ASSEMBLY

] g a t e \ a ^ _ U _

DRIVERS' ROOM

DRIVI RO£

TOILETS RAMP

OHS OFFICER': ROOM

STAFF CARPARK TRUCK PARKING

WRIGHT ST

PERSONAL PROTECTIVE EQUIPMENT REQUIREMENTS

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES, HELMET REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES, HEARING PROTECTION REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR, SAFETY GLASSES REQUIRED

LONG TROUSERS, LONG SLEEVES, SAFETY FOOTWEAR REQUIRED

TRAFFIC MANAGEMENT

AGITATOR TRUCKS

MATERIALS DELIVERY VEHICLES (INCLUDING CEMENT TANKERS UNLESS OTHERWISE INDICATED)

CEMENT TANKERS (IF DIFFERENT FROM OTHER MATERIALS DELIVERY VEHICLES)

SYMBOLS LEGEND

© ACID STORAGE

• LUBRICANT STORAGE

• EMERGENCY SHOWER

e ADMIXTURE STORAGE

pi FIRE EXTINGUISHER

*• FIRE EXTINGUISHER & BLANKET

«r FIRE HOSE REEL

• COMPRESSED AIR

m ELECTRICAL SWITCH BOARD

m DIESEL FUEL DRUMS

i WATER METER

i GAS VALVE

A L.P.G. TANK

• SPILL KIT

PROPOSED TRAFFIC MOVEMENTS

Document No.: 242 SIPL-001 Revision No. 1

22/10/09 Page 1 of 1