PYRO PROCESS UNIT AdnanCan
Optimization & Capacity Upgrade
Evaluation of the Existing Conditions
Clinker Cooler Refrofit
Cooler Vent Fan Replacement
Preheater Cyclone Modifications
Kiln Feed System Modification
Capacity Upgrade of an Existing
Clinker Production Line, Nuh Cement
01-EVALUATING THE EXISTING CONDITIONS
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyEvaluating the Existing Conditions of the 1st Line
Capacity : 2700-2800 tpd
Specific Heat Consumption : 850-870 kcal/kg clinker
Standard Cooler Loss : 140 kcal/kg clinker
Clinker Temperature : 170°C + ambient
Tertiary Air Temperature : 715°C
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyEvaluating the Existing Conditions of the 1st Line
Pressure Drop at PH-Tower Exit : 82-84 mbar
ID Fan Power Consumption : 12-13 kWh/t clinker
Cooler Vent Fan Power Consumption : 2,5 kWh/t clinker
Kiln Feeding System : Pneumatic
Total Power Consumption of Kiln : 31 kWh/t clinker
01-EVALUATING THE EXISTING CONDITIONS
02- CLINKER COOLER
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 1# Clinker Cooler Reftrofit Scope of Work
Complete Cooler Internals
Cooler Casing
Clinker Cooler (Roller Crusher to be installed)
New Cooler fans with Silencer, Motor and Drives
Dismantling and Erection Works
Supervision, Commissioning and Training
03- COOLER VENT FAN
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 2# Cooler Vent Fan Replacement
The fan rotor to be replaced with state-of-the-art design fan
Complete procurement, dismantling and erection is in the scope
1 kWh/t clinker to be reduced
03- PREHEATER CYCLONE MODIFICATION
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 3# Preheater Cyclone Modification Guaranteed Values
Capacity : 3200 tpd
Preheater Tower Pressure : 69 mbar at 3200 tpd
Energy Consumption Saving : 2 kWh/t clinker
Specific Heat Consumption : 790 kcal/kg clinker
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 3# Preheater Cyclone Modification Scope of Work
8 cyclones (O1A, O1B, O2, O3 & V1A, V1B, V2 and V3) to be
modified together with riser ducts
Dip tubes, splash boxes, meal flaps
Complete manufacture, dismantling and erection
Commissioning, Training and Optimization
03- PREHEATER CYCLONE MODIFICATION
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 3# Preheater Cyclone Modification / Existing Cyclones
Preheater String 1# O2 & O3 Cyclones
03- PREHEATER CYCLONE MODIFICATION
03- PREHEATER CYCLONE MODIFICATION
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 3# Preheater Cyclone Modification / Modified Cyclones
Preheater String 1# O2 & O3 Cyclones
03- PREHEATER CYCLONE MODIFICATION
04- CFD ANALYSIS OF THE MODIFIED CYCLONE
CFD Analysis of the Modified Cyclones
Before the modification After the modification
Static Pressure Distribution
Before Modification : 2436 Pa
After Modification : 1657 Pa
Before the modification After the modification
CFD Analysis of the Modified Cyclones
Tangential Velocity Distribution
04- CFD ANALYSIS OF THE MODIFIED CYCLONE
Before the modification After the modification
CFD Analysis of the Modified Cyclones
Axial Velocity Distribution
04- CFD ANALYSIS OF THE MODIFIED CYCLONE
05- CFD ANALYSES RESULTS FOR 2NDSTAGE
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
1657 Pa
2603 Pa
1788 Pa
Phase 3# Preheater Cyclone Modification / CFD Analyses Results for 2nd Stage
Nuh Cement Plant, Turkey
STATIC PRESSURE
TOTAL PRESSURE
Existing Cyclone
Simple Modification
Existing Cyclone
Simple Modification
2436 Pa
06- NUH CEMENT PLANT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, Turkey
07- KİLN FEED SYSTEM MODİFİCATİON
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyPhase 4# Kiln Feed System Modification Scope of Work
Pneumatic Feeding System to be replaced with mechanical
method (bucket elevator, airslide)
Basic and Detailed Engineering
Complete set of equipment
Steel structure and manufacture
All erection, commissioning, supervision and training
08- MODIFICATIONS AT NUH CEMENT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, Turkey
09- OVERALL GUARANTEES OF ALL PROJECT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyOverall Guarantees of All Project
Capacity : 3200 tpd
Specific Heat Consumption : 790 kcal/kg clinker
Energy Consumption : 26 kWh/t clinker
Energy Consumption Saving : 5 kWh/t clinker
Clinker Temperature : 65°C + ambient
10- ACHIEVED VALUES
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, TurkeyAchieved Values
Capacity : 3400 tpd
Specific Heat Consumption : 750 kcal/kg clinker
Energy Consumption : 24 kWh/t clinker
Energy Consumption Saving : 7 kWh/t clinker
Clinker Temperature : 55°C + ambient
11- BEFORE AND AFTER
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Nuh Cement Plant, Turkey
Evaluation of the Existing Conditions
Raw Meal Drying and Grinding Unit
Kiln De-Dusting Unit
Pyro Process Unit
Ongoing Capacity Upgrade Project of an Existing
Clinker Production Line, Gazakh Cement Plant
11- GAZAKH CEMENT PLANT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanEvaluating the Existing Conditions
Capacity : 2500-2700 tpd
Specific Heat Consumption : 870 kcal/kg clinker
Raw Mill Capacity : 205 tph
Fineness of the Mill Product :≥15.5% R90µm
Separator Efficiency : 75%
12- RAW MEAL DRYING AND GRINDING UNIT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanRaw Meal Drying and Grinding Unit Scope of Work
New drying equipment for the raw meal
Complete replacement of the separator and cyclones
New Raw Mill Fan complete with motor and drive
New raw meal transport unit
Raw meal weighing unit modifications
Complete procurement, dismantling and erection
Supervision, commissioning and training
13- KILN DE-DUSTING UNIT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanKiln De-Dusting Unit Scope of Work
Bag Filter modifications
New Bag Filter Fan with motor and drive
Complete procurement, dismantling and erection works
Commissioning, Training and Optimization
14- PREHEATER UNIT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanPreheater Unit Scope of Work
Preheater cyclone modifications
TA Duct and Calciner connection modification
New dip tubes, riser ducts and splash boxes
New ID Fan, complete with motor and drive
Complete manufacture, dismantling and erection
Commissioning, Training and Optimization
15- GUARANTEES
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanOverall Guarantees of All Project
Production Capacity : ≥240 tph
Mixed Raw Material Moisture : Max 8%
Mixed Raw Material Feed Size : 90% <25 mm
Raw Meal Moisture Content : ≤1%
Separator Efficiency : ≥85%
Raw Mill Unit
15- GUARANTEES
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanOverall Guarantees of All Project
Clinker Production Capacity : ≥3300 tpd
Heat Consumption : ≤765 kcal/kg clinker
Preheater Pressure Drop : ≤60 mbar
ID Fan Power Consumption : 9 kWh/t clinker
Top Stage Cyclone Efficiency : 93%
Rotary Kiln Unit
15- GUARANTEES
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, AzerbaijanOverall Guarantees of All Project
Free Lime : ≤1.5% (daily avg.)
C3S : ≥55 (Std. Bogue formula)
LSF : 93-97
Silica Ratio : 2.0 - 2.8
Al2O3 : 1.0 – 1.8
New Process Fans’ Efficiency : ≥80%
Quality Parameters
16- HIGHLIGHTS OF THE PROJECT
Lorem ipsum dolor sit amet, consectetur adipiscingelit.
Gazakh Cement Plant, Azerbaijan
Supply of the equipment will be at 6 months
Flame-off flame-off period is planned to be 35 days
Highlights of the Project