Financial Year Project Name Project Activity Amount Status Remarks
2013/2014 ADMINISTRATION Day to day CDF office running 4,282,704 Complete Funds Utilised
Monitoring, Evaluation and Capacity Building
Monitoring of CDF Projects 2,141,352 Complete Funds Utilised
2013/2014 BURSARY Fee for needy students 12,000,000 Complete Funds Utilised
2013/2014 Mwongori dispensary Construct staff house 896,551.80 Complete Complete and in use
2013/2014 Nyakongo dispensary Construct staff house 896,551.80 Complete Complete and in use
2013/2014 Kineni dispensary Construct staff house 896,551.80 Complete Complete and in use
2013/2014 Tinderet dispensary Construct staff house 896,551.80 Complete Complete and in use
2013/2014 Mokomoni dispensary Construct staff house 896,551.80 Complete Complete and in use
Emergency Emergencies in the Constituency 3,564,466.00 Complete Funds Utilised on emergencies
2013/2014 Emboye Primary School Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 St. Pauls Omonayo Secondary Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 Endiba Technical Dormitory construction 300,000 Ongoing Ongoing
2013/2014 Mokomoni Boarding Primary
Putting up a dormitory 300,000 Ongoing Ongoing
2013/2014 Nyakwerema Secondary School
Plastering, painting, ceiling and flooring 2 classrooms
500,000 Complete Complete and in use
2013/2014 Omonono Secondary School Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
BORABU NG-CDF
PROJECT IMPLEMENTATION STATUS REPORT AS AT MAY 2016
2013/2014 Ibara Boarding Primary School
Rehabilitation of burnt dormitory (Roofing, plastering and paintng)
300,000 Complete Complete and in use
2013/2014 Kiabonyoru Girls Secondary School
Construction of one classroom 500,000 Complete Complete and in use
2013/2014 Nyaramba Primary School Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 Nyamiranga Secondary School
Construction of dormitory 1,000,000 Ongoing Additional funds required
2013/2014 Ibara Secondaray School Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 ST .Andrews Kerema Polythecnic
Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 Mekenene D.E.B Primary Plastering and flooring 4 classrooms
300,000 Complete Complete and in use
2013/2014 Mwongori Primary Plastering, flooring, painting, ceiling, fixing of doors and
300,000 Complete Complete and in use
2013/2014 Ekige Primary Constructing a classroom 300,000 Complete Complete and in use
2013/2014 Nyagacho Primary Plastering, painting, ceiling and flooring 2 classrooms
300,000 Ongoing Additional funds required
2013/2014 Ekerubo Gietai Girls Secondary School
Dormitory construction 500,000 Complete Complete and in use
2013/2014 Simbauti Primary School Construction of 1 classroom 300,000 Complete Complete and in use
2013/2014 ST.Andrews Kahagwa Boarding Primary
Completion of dormitory 400,000 Complete Complete and in use
2013/2014 Rigena Primary School Plastering, painting flooring, fixing of doors and windows to 2
200,000 Complete Complete and in use
2013/2014 Masige Primary School Plastering, painting, ceiling and flooring 2 classrooms
200,000 Complete Complete and in use
2013/2014 Ribaita Primary School-Classrooms
Construction of 1 classroom 300,000 Complete Complete and in use
2013/2014 Keginga Primary Plastering, painting, ceiling and flooring 2 classrooms
200,000 Complete Complete and in use
2013/2014 Nyansiongo Boys Completion of kitchen 300,000 Complete Complete and in use
2013/2014 Rigoko Secondary Plastering, painting, flooring, fixing of doors and windows to
200,000 Complete Complete and in use
2013/2014 Tinderet Secondary Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 ST.Pauls Nyandoche Plastering, ceiling, flooring, fixing of doors and windows to
500,000 Complete Complete and in use
2013/2014 Menyenya High School Plastering, painting, fixing of doors and windows to toilets and
300,000 Complete Complete and in use
2013/2014 ST.Mathias Secondary School
Construction of 1 classroom 300,000 Complete Complete and in use
2013/2014 Mwongori Youth Polythechnic
Completion of classrooms and construction of toilets
400,000 Complete Complete and in use
2013/2014 Onsando Girls D.E .B Secondary School
Plastering, painting, ceiling and flooring 2 classrooms
300000 Complete Complete and in use
2013/2014 Ensakia Primary Plastering and Flooring Library 200,000 Complete Complete and in use
2013/2014 ST.Gonzagagonza Secondary Plastering, painting, ceiling and flooring administration block
300,000 Complete Complete and in use
2013/2014 Ensinyo Primary Constructing 1 classroom 300,000 Complete Complete and in use
2013/2014 Kebuse Primary Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 Magombo Primary Plastering, painting, ceiling and flooring 2 classrooms
200,000 Complete Complete and in use
2013/2014 Mecheo Secondary Plastering, painting, ceiling and flooring 2 classrooms
300,000 Complete Complete and in use
2013/2014 Memisi Primary Constructing 1 classroom 300,000 Complete Complete and in use
2013/2014 Mecheo Primary Plastering, painting, ceiling and flooring 2 classrooms
200,000 Complete Complete and in use
2013/2014 Saiga Ngiya Primary Wiring and Installation of electricity to 2 classrooms
200,000 Complete Complete and in use
2013/2014 Manga Girls Secondary Completion of Dormitory 400,000 Complete Complete and in use
2013/2014 Kineni Calvary Primary 1 Classroom construction 300,000 Complete Complete and in use
2013/2014 Eronge Boarding Primary Completion of dormitory 400,000 Complete Complete and in use
2013/2014 Mwongori Secondary School Purchase of school bus 2,000,000 Ongoing Additional funds required
2013/2014 Nyangoge Secondary School Purchase of school bus 2,000,000 Ongoing Additional funds required
2013/2014 Highlands Sec School Construction of 3 classrooms 1,000,000 Complete Complete and in use
2013/2014 Chinunda Market Construct stalls and shades 500,000 Complete Complete and in use
2013/2014 Kegogi Market Construct stalls and shades 500,000 Complete Complete and in use
2013/2014 Chepilat Market Construct stalls and shades 300,000 Complete Complete and in use
2013/2014 Nyaramba Market Construct roadside shade 200,000 Complete Complete and in use
2013/2014 Eturungi Dispensary Purchase of laboratory equipments
200,000 Complete Complete and in use
2013/2014 Nyansiongo Health Centre Purchase of laboratory equipments
200,000 Complete Complete and in use
2013/2014 Tinderet Health Centre Completion of administration block ( plastering, painting,
200,000 Complete Complete and in use
2013/2014 Mecheo Health Centre Purchase of laboratory equipments
200,000 Complete Complete and in use
2013/2014 Isoge Health Centre Constructing laboratory 500,000 Ongoing Additional funds required
2013/2014 Ekerubo Health Centre Constructing Laboratory 200,000 Complete Complete and in use
2013/2014 Kebirigo Health Centre Purchase of laboratory equipments
200,000 Complete Complete and in use
2013/2014 Amatierio Health Centre Purchase of laboratory equipments
200,000 Complete Complete and in use
2013/2014 Nyamori Health Centre Completion of CDF project 200,000 Ongoing Additional funds required
2013/2014 Omogute Health Centre Completion of administration block (Flooring and plastering)
300,000 Complete Complete and in use
2013/2014 Chinunda Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Rikura Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Egentugi Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Bikororo Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Riamikae Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Riokemwa Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Kegogi Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Ekeendera Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Nyaramba Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Rianyakangitea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Mogwa Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Isoge Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Matongo Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Chaimingi Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Matunwa Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Mesabisabitea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Mwongori Tea Buying Centre
Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Borabu Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Riobiri Tea Buying Centre Renovation of facility (flooring, plastering, painting, fixing doors
100,000 Complete Complete and in use
2013/2014 Matierio Cattle Dip Renovation of facility 100,000 Complete Complete and in use
2013/2014 Chepng’ombe Cattle Dip Renovation of facility 100,000 Complete Complete and in use
2013/2014 Kitaru Water Project Laying of pipes phase one 500,000 Ongoing Additional funds required
2013/2014 Isoge/ Kineni Water Project Building a reservoir tank 800,000 Ongoing Additional funds required
2013/2014 Kiabonyoru/Water Project Building a reservoir tank and piping 1,450,000 Ongoing Additional funds required
2013/2014 Nyansiongo High Shool Water Project
Laying of pipes 200,000 Complete Complete and in use
2013/2014 Street Lighting Lighting the streets along the subcounty hqts
2,000,000 Complete Complete and in use
2013/2014 Sports Activities Organizing sports tournaments (football, volleyball, athletics)
1,000,000 Complete Sports Activities done
2013/2014 Rionyari-rianyona road -1.5km Grading and other routine maintenance
1,000,000 Complete Complete and in use
2013/2014 Riokenye-Masige-omosocho road -2km
Grading and other routine maintenance
1,000,000 Complete Complete and in use
2013/2014 Mwongori sec.-Mogusii sec. –Estate 2.1km
Grading and other routine maintenance
1,869,884 Complete Complete and in use
2013/2014 Gucha Nyankongo-Kegogi road -1.8km
Grading and other routine maintenance
1,870,000 Complete Complete and in use
2013/2014 Kerema-Nyamiranga road and bridge – 1.6km
Grading and other routine maintenance
2,000,000 Complete Complete and in use
2013/2014 Riongaga-Riasoteri road and bridge -1.4km
Grading and other routine maintenance
1,000,000 Complete Complete and in use
2013/2014 Environmental Activities Tree Planting, Awareness Creation, Cleanup Of Markets
1,000,000 Complete Trees Planted
2013/2014 Motor Vehicle Purchase Of Motor Vehicle (Land Rover /Land Cruiser)
5,500,000 Complete Vehicle puchased and in use
2013/2014 Nyansiongo Chief’s Office Construction Of Office 300,000 Complete Complete and in use
2013/2014 Esise Do’s Office Construction Of Office 300,000 Complete Complete and in use
2013/2014 Bonyarorande Chief’s Office Construction Of Office 300,000 Complete Complete and in use
2013/2014 Bosaragei Chief’s Office Construction Of Office 300,000 Complete Complete and in use
2013/2014 Kiang’eni Do’s Office Construction Of Office 300,000 Complete Complete and in use
2013/2014 Anti Stock Theft Unit Office At Memisi
Construction Of Office 400,000 Complete Complete and in use
2013/2014 Borabu Ocpd’s Office Construction Of Office 500,000 Complete Complete and in use
2013/2014 Kiabonyoru Chief’s Office Construction Of 4 Door Toilet 100,000 Complete Complete and in use
2013/2014 Makenene Chief’s Office Completion Of Office (Plastering, Fixing Of Doors And Windows)
100,000 Complete Complete and in use
2013/2014 Riotonyi Police Station Completion Of Office (Plastering, Fixing Of Doors And Windows)
300,000 Complete Complete and in use
2013/2014 Isoge Ap Line Construction Of 4 Door Toilet 100,000 Complete Complete and in use
2013/2014 Raitigo Ap Post Completion Of Office (Plastering, Fixing Of Doors And Windows)
100,000 Complete Complete and in use
2013/2014 Ensinyo Ap Post Completion Of Office (Plastering, Fixing Of Doors And Windows)
100,000 Complete Complete and in use
2014/2015Administration/Recurrent
Payment of staff salaries and gratuity, Purchase of fuel, repairs and maintenance, printing,
8,808,027.00 Complete
2014/2015Monitoring and Evaluation
Undertake Training of the PMCs/CDFCs on CDF Related issues
1,000,000Complete Funds Utilised by cdfc
2014/2015Audit Fee Payment of Audit Fee to KENAO 500,000
New Funds not Utilised
2014/2015Constituency Strategic Plan
Preparation of Constituency Strategic Plan
2,000,000Ongoing Works in progress
2014/2015Mogusii Primary School Painting/Roofing of classrooms 209,482.75
Complete Complete and in use
2014/2015Rianyakangi Primary School Painting/Roofing of classrooms 209,482.75
Complete Complete and in use
2014/2015Matunwa Primary School Painting/Roofing of classrooms 209,482.75
Complete Complete and in use
2014/2015Riamanoti Primary School Painting/Roofing of classrooms 209,482.75
Complete Complete and in use
2014/2015Environment
Undertaking tree planting, awareness creation and cleanup of markets
500,000Complete
Trees planted and awareness done
2014/2015Emergency
To cater for any unforeseen occurrences in the constituency during the financial year
5,400,259Complete
Funds utilised on emergencies
2014/2015Constituency Sports
Carry out Constituency Sports tournament and the winning
500,000Complete Sports activities done
2014/2015
Bursary to Secondary Schools
Payment of bursary to needy student
1,000,000Complete Funds utilised
2014/2015
Bursary to Tertiary Institutions
Payment of bursary to needy student
10,000,000Complete Funds utilised
2014/2015Mocks/CATs/Education Day
Printing and distribution of Mocks and CATs
1,000,000Complete Funds utilised
2014/2015Mwongori Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Nyankono Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Kitaru Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Chepilat Primary School Purchase of land (one acre) 1,000,000
Complete Complete and in use
2014/2015Emboye Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
1,000,000Complete Complete and in use
2014/2015Ibara Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Omonono Primary School
Completion of building (Plastering/ Roofing/
300,000Complete Complete and in use
2014/2015
Kineni Calvary Boarding Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Nyankongo Primary School
Completion of Administration Block (Plastering/Roofing/
300,000Complete Complete and in use
2014/2015
Mokomoni Boarding Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Nyageita Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Riangombe DOK Primar School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
300,000Complete Complete and in use
2014/2015Memisi Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
450,000Complete Complete and in use
2014/2015Kebuse Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
450,000Complete Complete and in use
2014/2015Ensinyo Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
450,000Complete Complete and in use
2014/2015Kenyoro Primary School
Completion of two classrooms (Plastering/ Roofing/Painting/Fixing Doors &
200,000Ongoing Works in progress
2014/2015St James Nyaronde Secondary School
Construction of Dormitory (Phase 1) 700,000Ongoing Additional funds needed
2014/2015St Paul Nyandoche II Secondary School
Part payment for purchase of school bus.
2,000,000Ongoing Additional funds needed
2014/2015St Mathias Mulumba Secondary School
Part payment for purchase of school bus.
1,900,000Ongoing Additional funds needed
2014/2015AIC Gietai Girls Sec School Construction of dormitory 700,000
Ongoing Additional funds needed
2014/2015Onsando Girls Secondary School Construction of staff house 500,000
Complete Complete and in use
2014/2015Manga Girls High School
Part payment for purchase of school bus.
2,000,000Ongoing Additional funds needed
2014/2015Kineni Secondary School Construction of dormitory 500,000
Ongoing Additional funds needed
2014/2015Mecheo Secondary School Construction of dormitory 500,000
Ongoing additional funds needed
2014/2015Ibara Mixed Secondary School
Completion of Classroom (Plastering/Roofing/Painting/ Fixing Doors.
200,000Complete Complete and in use
2014/2015Omonayo Secondary School Part payment for School Bus 2,000,000
Ongoing Additional funds needed
2014/2015Amakura Sec School Construction of classroom 400,000
Complete Complete and in use
2014/2015Kiabonyoru Girls Secondary School
Construction of Dormitory (Phase 1) 500,000Ongoing Additional funds needed
2014/2015Nyakwerema Sec School
Completion of dormitory (Plastering/ Roofing/ Painting & Fixing Doors.
1,000,000Ongoing Additional funds needed
2014/2015Motoguto Sec School Construction of classroom 600,000
Complete Complete and in use
2014/2015Nyamiranga Sec School
Completion of dormitory (Plastering/Roofing/ Painting & Fixing Doors.
1,000,000Complete Complete and in use
2014/2015Endiba Technical Sec School
Completion of Laboratory (Plastering, Roofing, Painting & Fixing of doors & windows
200,000Ongoing Additional funds needed
2014/2015
Nsicha Technical Training Institute
Construction of Institute in collaboration with the relevant ministry.
10,000,000Ongoing Works in progress
2014/2015Mwongori Youth Polytechnic Construction of Kitchen 500,000
Complete Complete and in use
2014/2015Saiga Ngiya Youth Polytechnic
Completion of Dormitory (Plastering/ Roofing/ Painting/ Fixing of doors & windows
400,000Complete Complete and in use
2014/2015Omogute Dispensary
Construction of Outpatient Wing (Phase 1)
1,200,000Complete Complete and in use
2014/2015Nyamori Dispensary
Construction of Outpatient Wing (Phase 1)
1,300,000Ongoing Works in progress
2014/2015Eturungi Dispensary Completion of Outpatient Wing 2,100,000
Complete Complete and in use
2014/2015Kijauri Level 4 Hospital
Construction of septic tank and purchase of lab equipment
1,000,000Ongoing Works in progress
2014/2015Isoge Health Centre
Completion of maternity wing (Painting/Roofing/Ceiling/Plastering/
800,000Ongoing Additional funds needed
2014/2015Nyankono Health Centre
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
500,000Complete Complete and in use
2014/2015Mwongori Dispensary
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
500,000Complete Complete and in use
2014/2015Raitigo Dispensary
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
200,000Complete Complete and in use
2014/2015Rigoko Health Centre
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
500,000Complete Complete and in use
2014/2015Nsicha Health Centre
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
300,000Complete Complete and in use
2014/2015Mokomoni Dispensary
Renovation of facility (Painting/Roofing/Plastering/Ceiling)
400,000Complete Complete and in use
2014/2015Nyankogo Health Centre
Renovation of facility (Painting/Roofing/Plastering/Ceiling) and construction of incinerator
400,000Complete Complete and in use
2014/2015Mecheo Dispensary
Renovation of facility (Painting/Roofing/Plastering/Ceiling) and construction of incinerator
500,000Complete Complete and in use
2014/2015Mwongori Water Project
Purchase of pipes and laying of pipeline distribution.
800,000Ongoing Works in progress
2014/2015Kiabonyoru Water Project
Purchase of pipes and laying of pipeline distribution.
800,000Complete Complete and in use
2014/2015Kiongongi Borehole Drilling and equipping of Borehole 1,740,000
Ongoing Additional funds needed
2014/2015Eturungi Borehole Drilling and equipping of Borehole 1,840,000
Ongoing Additional funds needed
2014/2015Endemu Earth Dam Construction of reservoir tank 900,000
Ongoing Additional funds needed
2014/2015Isoge Kineni Water Project Drilling and equipping of Borehole 1,040,000
Ongoing Additional funds needed
2014/2015Nyanchoka Water Spring Spring Protection 100,000
Ongoing Additional funds needed
2014/2015Kitaru emboye Water Project
Purchase of pipes and laying of pipeline distribution.
400,000Ongoing Additional funds needed
2014/2015
Saidiana Nyansakia Water Project
Drilling and equipping of Borehole 1,740,000Ongoing Additional funds needed
2014/2015
Ensakia – Nderema –Kineni Road
Grading and Gravelling 2,000,000Complete Complete and in use
2014/2015
Mecheo-Manga Police –Harambee –Kineni Road
Grading and Gravelling 1,500,000Complete Complete and in use
2014/2015
Riombaso-Nyansiongo DOK-Riaranga-Kineni Pry Road
Grading and Gravelling 2,500,000Complete Complete and in use
2014/2015Riomare –Rionsongo Road Grading and Gravelling 1,000,000
Complete Complete and in use
2014/2015
Mekenene –Riagesengi –Riomwena –Mesabisabi Road
Grading and Gravelling 1,000,000Complete Complete and in use
2014/2015Matogo –Roisebe Junction Road Grading and Gravelling 780,000
Complete Complete and in use
2014/2015Daraja –Nyagware Road Grading and Gravelling 1,500,000
Complete Complete and in use
2014/2015Eronge – Nyanchoka Road Grading and Gravelling 1,500,000
Complete Complete and in use
2014/2015Kiangeni DO’s Office
Completion of DO’s Office (Plastering/Roofing/Fixing Windows /Ceiling Board)
600,000Complete Complete and in use
2014/2015
Borabu Subcounty AP commandant Vehicle
Repair of Motor vehicle to assist in tackling issues of cattle rustling.
600,000Complete Complete and in use
2014/2015Kineni Police Station
Completion of Office (Plastering/ Roofing/Fixing Windows and Doors/ Ceiling Board)
400,000Complete Complete and in use
2014/2015Mogusii Chief’s Office Construction of staff houses -5No 400,000
Complete Complete and in use
2014/2015Nyaramba AP Post Construction of Office 400,000
Complete Complete and in use
2014/2015Bosaragei Chief’s Office
Construction of AP houses/ cubicles- 5No (10ft X 10ft)
200,000Complete Complete and in use
2014/2015Bonyarorande Chief’s Office
Completion of Office (Plastering/ Roofing/Fixing Windows and Doors/ Ceiling Board)
200,000Complete Complete and in use
2014/2015Getare AP Line
Completion of Office (Plastering/ Roofing/Fixing Windows and Doors/ Ceiling Board)
450,000Complete Complete and in use
2014/2015Ensinyo AP Line
Construction of AP houses/ cubicles – 5No (10ft X 10ft)
450,000Complete Complete and in use
2014/2015Nyansiongo Chief’s Office
Construction of AP houses/ cubicles – 5No (10ft X 10ft)
200,000Complete Complete and in use
2014/2015
Constituency Rural Electrification
Supply of electricity to public institutions and market centres in conjunction with Rural
1,600,000Complete Complete and in use
2014/2015Kineni Milk Cooler Rehabilitation of Milk Cooling Plant 500,000
Complete Complete and in use
2014/2015Riomoruri Tea Buying Centre Painting/Roofing/Repair of table beds 200,000
Complete Complete and in use
2014/2015Nyankongo Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Moteoguto Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nsicha Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Biego Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Riogeto Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyagacho Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Riobadia Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Mogusii Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyankono Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Geta Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyandoche II Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyanguru B Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Riamomanyi Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Kenyoro Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Gesarate Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Gasiara Cattle Dip Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Riorori Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Kineni Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Egesenyi Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Ndurumo Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Omonono Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyakwerema Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Erandi Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Nyaramba Tea Buying Centre Painting/Roofing/Repair of table beds 100,000
Complete Complete and in use
2014/2015Riomaiko Tea Buying Centre Painting/Roofing/Repair of table beds 200,000
Complete Complete and in use
2014/2015Mortorcycles Purchase of two motorcycles 400,000
Complete Complete and in use
2014/2015Chinunda Market Completion of Market Shed 450,000
Complete Complete and in use
2014/2015Kegogi Market Completion of Market Shed 450,000
Complete Complete and in use
2014/2015Nyaramba Market Completion of Boda Boda Shed 241,869
Complete Complete and in use
2014/2015Mokomoni Market Purchase of land 2,000,000
Complete Complete and in use
2014/2015
Nyansiongo Boda Boda Shade
Construction of Boda Boda Shade 400,000Ongoing Works in progress
2014/2015Mwongori Boda Boda Shade Construction of Boda Boda Shade 300,000
Complete Complete and in use
2014/2015Ibara Boda Boda Shade Construction of Boda Boda Shade 300,000
Complete Complete and in use
2014/2015Getare Social Hall Construction of Hall (Phase 1) 1,000,000
Ongoing Works in progress
2015/2016Administration/Recurrent Payment of staff salaries and
Gratuity, Purchase of office 6,929,826 Ongoing Use of funds ongoing
2015/2016Emergency Fund Reserve fund for emergencies and
disasters 5,767,647.00 Ongoing Use of funds ongoing
2015/2016Monitoring & Evaluation Purchase of stationary, fuel,
vehicle repairs, telephone 3,464,912.00 Ongoing Use of funds ongoing
2015/2016Kineni Health Centre Planting of assorted tree varieties
in Health Centre compound 100,000 CompleteTrees planted and awareness done
2015/2016 Gesibei Primary School Planting of assorted tree varieties
in school compound 100,000 CompleteTrees planted and awareness done
2015/2016Mwongori Dispensary Planting of assorted tree varieties
in Health Centre compound 100,000 CompleteTrees planted and awareness done
2015/2016Nyakwerema Primary School
Planting of assorted tree varieties in school compound 100,000 Complete
Trees planted and awareness done
2015/2016Kiabonyoru Primary School Planting of assorted tree varieties
in school compound 100,000 CompleteTrees planted and awareness done
2015/2016BORABU Constituency Sports Tournament
Facilitation of Sports activities for within the 984,711 Ongoing Process ongoing
2015/2016Tertiary Fees Payment for needy students
in Universities and Middle Level 11,000,000 Ongoing Process ongoing
2015/2016Secondary Fees Payment for needy students
in Secondary Schools. 2,000,000 Ongoing Process ongoing
2015/2016Mocks/CATS Facilitation of
Mock/CATS/Education Day 1,000,000 Ongoing Process ongoing
2015/2016Electricity Installation of electricity
transformers in all wards within 4,000,000.00 OngoingAwaiting Funds from NG-CDF Board
2015/2016Embonye -Magura Road Opening of road and Grading
.2km 1,500,000 New Complete and in use
2015/2016Daraja - Nyagware Road Opening of road and Grading
.4km 2,000,000 Ongoing Complete and in use
2015/2016Eronge - Nyanchoka Road Opening of road and Grading
.4km 2,000,000 New Complete and in use
2015/2016Kitaru - Dispensary Road Opening of road and Grading
.4km 2,000,000 New Complete and in use
2015/2016Mecheo-Manga-Kineni Road
Opening of road and Grading .8km 2,100,000 Ongoing Complete and in use
2015/2016Mekenene Bridge-Riomwena-Mesabisabi Road
Opening of road and Grading .4km 2,000,000 New
Awaiting Funds from NG-CDF Board
2015/2016Riombaso- St Kagwa - Riaranga Road
Opening of road and Grading .5km 2,500,000 New Complete and in use
2015/2016Isoge Ensinyo Road Opening of road and Grading
and Construction of Culverts 3,500,000 New Complete and in use
2015/2016Kahawa - Kebuse Road Opening of road and Grading
.4km 2,500,000 New Complete and in use
2015/2016Nyakwerema - Getare Road Opening of road and Grading
.3km 2,000,000 New Complete and in use
2015/2016Nderema- Saiga Ngiya Bridge Road
Opening of road and Grading .4km 1,900,000 New
Awaiting Funds from NG-CDF Board
2015/2016Yaya Centre - Endiba Karenda Road
Opening of road and Grading .4km 2,000,000 New
Awaiting Funds from NG-CDF Board
2015/2016Biego - Nyangoibera Tea Buying Centre Road
Opening of road and Grading .1km 1,500,000 New
Awaiting Funds from NG-CDF Board
2015/2016Kiongongi- Endiba Water Project
Drilling of a Bore Hole;Installation of a tank, pump 1,500,000 On-going
Awaiting Funds from NG-CDF Board
2015/2016Kiabonyoru Water Project Drilling of a Bore Hole:Piping to
reserviour 1,000,000 On-goingAwaiting Funds from NG-CDF Board
2015/2016Eturungi Water Project Drilling bore hole - tank and
piping 800,000 On-goingAwaiting Funds from NG-CDF Board
2015/2016Mogusii Water Project Drilling of a Bore Hole:Piping,
installation of a tank and Pump. 1,400,000 NewAwaiting Funds from NG-CDF Board
2015/2016 Kitaru/Emboye Water Project piping:Laying of pipeline 500,000 On-going
Awaiting Funds from NG-CDF Board
2015/2016Riensune Water Project Drilling of a Bore Hole:Drilling
and Casing 1,400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Isoge / Kineni Water Project Drilling bore hole:Installation of
a tank, piping and Casing 1,200,000 On-goingAwaiting Funds from NG-CDF Board
2015/2016Mecheo Water Project Construction of Reserviour tank
and installation of Pipes 800,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riangombe Water Project Drilling of a Bore Hole:Drilling
and Casing 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Saiga Ingiya Water Project Drilling bore hole - piping and
installation of tank. 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyansakia/Saidia Water Project
Drilling of bore hole - pump, tank, piping 1,000,000 On-going WORKS IN PROGRESS
2015/2016Nyageita Water Project Drilling of bore hole - Drilling
and casing 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nairobi Tea Buying Centre Completion of Tea Buying
:Roofing and Flooring 200,000 Ongoing Works in Progress
2015/2016Getaari Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Isoge Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kiomosubo Tea Buying Centre Renovation of Tea Buying Centre 100,000 New
Awaiting Funds from NG-CDF Board
2015/2016Ribate Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kegogi Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Esaka Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Emete Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kerumbe Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kerenda Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kijauri Tea Buying Centre
Renovation of Tea Buying Centre 100,000 New WORKS IN PROGRESS
2015/2016Etangi Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Amakuka Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Keginga Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Endemu Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Omonayo Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Chai Mingi Tea Buying Centre Renovation of Tea Buying Centre 100,000 New
Awaiting Funds from NG-CDF Board
2015/2016Ribaita Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kenyerere Tea Buying Centre Renovation of Tea Buying Centre 100,000 New
Awaiting Funds from NG-CDF Board
2015/2016Matongo Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kineni Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Omosocho Tea Buying Centre Renovation of Tea Buying Centre 100,000 New
Awaiting Funds from NG-CDF Board
2015/2016Mecheo Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riandege Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Matutu Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riasegera Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyasaikia Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riakebati Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Matunua Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Engenta Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riobiri Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riariaga Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Endiba Tea Buying Centre
Renovation of Tea Buying Centre 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kineni Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Engoto Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Eramba Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Matierio Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kerumbe Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riang'ombe Cattle Dip
Renovation of Cattle Dip 100,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyamori Dispensary Completion of out patient wing
phase 1 500,000 OngoingAdditional funds needed for completion
2015/2016Omogute Dispensary Completion of out patient wing
phase 1 500,000 Ongoing Complete and in use
2015/2016Isoge Health Centre
Completion of maternity wing 700,000 Ongoing WORKS IN PROGRESS
2015/2016Kitaru Dispensary Completion of out patient wing
phase 1 500,000 Ongoing WORKS IN PROGRESS
2015/2016Borabu District Hospital
Completion of Wards 800,000 Ongoing Intending to tender
2015/2016Nyabikomu Health Centre
Renovation of facility 400,000 New WORKS IN PROGRESS
2015/2016Nyakwerema Secondary School Purchase of a school bus 1,500,000 New
Additional funds needed for completion
2015/2016Omonayo Secondary School Additional funds for Purchase of
a school bus 1,000,000 OngoingAdditional funds needed for completion
2015/2016Nyangoge Secondary School Additional funds for Purchase of
a school bus 1,000,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Kineni ELCK Secondary School
Completion of a Dormitory:Roofing, plastering 1,000,000 Ongoing
Awaiting Funds from NG-CDF Board
2015/2016Nyansiongo High School
Purchase of a school bus 2,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyandoche II Girls Secondary School
Additional funds for Purchase of a school bus 1,000,000 Ongoing
Awaiting Funds from NG-CDF Board
2015/2016Onsando Girls Secondary School
Construction of a Staff House:Foundation, walling and 800,000 New
Awaiting Funds from NG-CDF Board
2015/2016Tinderet Secondary School Construction of a
laboratory:Foundation 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Rigoko Secondary School Construction of a
Dormitory:Foundation and 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Itumbe Secondary School Completion of 2
Classrooms:Roofing, plastering 500,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Nsicha Secondary School Construction of 1
Classrooms:Foundation, walling 500,000 NewAwaiting Funds from NG-CDF Board
2015/2016Mogusii Secondary School Completion of an Admin
block:Roofing and Plastering 400,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Gonza ga Gonza Secondary School
Completion of an Admin block:Roofing and Plastering 500,000 Ongoing
Awaiting Funds from NG-CDF Board
2015/2016Mecheo Secondary School Construction of a staff
House:Foundation and walling 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016St Thomas Moore Secondary School
Completion of an Admin block:Roofing and Plastering 400,000 Ongoing
Awaiting Funds from NG-CDF Board
2015/2016Kerema Secondary School Construction of a
classroom:Foundation, walling 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Egetubi Secondary School Construction of a
classroom:Foundation, walling 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kiabonyoru Girls Secondary School
Construction of a classroom:Foundation, walling 400,000 New
Awaiting Funds from NG-CDF Board
2015/2016Eronge SDA Mixed Secondary School
Construction of a classroom:Foundation, walling 400,000 New
Awaiting Funds from NG-CDF Board
2015/2016Ensinyo Primary School Completion of tuition block:2nd
floor slab 1,000,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Isoge Primary School Renovation of 4 Construction of
Classrooms:Roofing, plastering 500,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kebuse Primary School Construction of Classrooms 2
classrooms:Foundation,walling,ro 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Itumbe Primary School Renovation of 5 class
rooms:Roofing, plastering, 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Memisi Primary School Construction of Classrooms 2
classrooms:Foundation,walling,ro 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nderema Primary School Construction of Classrooms 2
classrooms:Foundation,walling,ro 800,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kerema Primary School Construction of Classrooms 1
classrooms:Foundation,walling,ro 500,000 NewAwaiting Funds from NG-CDF Board
2015/2016Ibara Boarding Primary Additional funds for purchase of
a school bus 1,000,000 NewAwaiting Funds from NG-CDF Board
2015/2016Ibara DOK Primary Renovation of 7
classrooms:Roofing and fixing 700,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyakwerema Primary School
Construction of one classroom:Foundation, walling, 400,000 New
Awaiting Funds from NG-CDF Board
2015/2016Nyageita Primary School Construction of two
classroom:Foundation, walling, 700,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyankono Primary School Construction of two
classroom:Foundation, walling, 700,000 NewAwaiting Funds from NG-CDF Board
2015/2016Ekige Primary School Construction of pit
latrine:Digging of pit, walling, 300,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kitaru Primary School Construction of 1
classrooms:Foundation, walling, 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Keginga Primary School Construction of 1
classrooms:Foundation, walling, 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riamanoti Primary School Completion of office
block:Plastering and Painting 300,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Ribaita Primary School Renovation of a
classroom:Roofing,flooring, 300,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyagacho DOK Primary School
Renovation of 1 classrooms;Plastering and 250,000 New
Awaiting Funds from NG-CDF Board
2015/2016Nyamori Primary School Renovation of 1
classrooms;Plastering and 250,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kineni Primary School Renovation of 2
classrooms;Plastering and 500,000 NewAwaiting Funds from NG-CDF Board
2015/2016Biego Primary School Renovation of 1
classroom;Plastering and 250,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyandoche II Pri School Renovation of 2
classrooms:Repair of floor, roof, 250,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kineni Calvary Boarding Pri School
Completion of a Dormitory:Plastring, painting, 400,000 Ongoing
Awaiting Funds from NG-CDF Board
2015/2016Kiabonyuru Primary School Renovation of 3
classrooms:Repair of floor, roof, 500,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyanchoka Primary School Construction of one class room:,
roofing, Foundation, plastering 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Riangombe DOK Pri School Construction of one class room:,
roofing, Foundation, plastering 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Kitaru Chiefs Office Completion of chief's
Office:Plastering 300,000 NewAwaiting Funds from NG-CDF Board
2015/2016Mecheo Chiefs Office Completion of chief's
office:Roofing, plastering 200,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Esise DO'S Office Completion of DO's
office:Roofing, plastering 400,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Ensakia Chief's Office Construction of Chief's
Office:Foundation 300,000 NewAwaiting Funds from NG-CDF Board
2015/2016Bosaragei Chiefs Office Completion of Chiefs
Office:Plastering and Painting 100,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Bonyarorande Chiefs Office Completion of Chiefs
Office:Plastering and Painting 100,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Kiabonyoru Location Chiefs Office
Construction of a pit Latrine:Digging of a pit, 150,000 New
Awaiting Funds from NG-CDF Board
2015/2016Nyansiongo Chiefs Office Completion of Chief's
Office:Plastering and Painting 200,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Memisi ASTU Completion of Office :Roofing,
Plastering and Painting 500,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Raitigo AP Post Completion of staff
Houses:Roofing and Plastering 400,000 OngoingAwaiting Funds from NG-CDF Board
2015/2016Eronge AP Post Construction of staff
House:Foundation, Walling and 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Saiga ngiya AP Post Construction of staff
House:Foundation, Walling and 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Getare AP Post Construction of staff
House:Foundation, Walling and 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Nyageita AP Post Construction of staff
House:Foundation, Walling and 400,000 NewAwaiting Funds from NG-CDF Board
2015/2016Audit Fees FY 15/16 Constituency Accounts
Audit fees 500,000.00 Ongoing Awaiting Funds from NG-CDF Board