32

Purpose of Workshop

  • Upload
    becky

  • View
    56

  • Download
    0

Embed Size (px)

DESCRIPTION

Purpose of Workshop. Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans. Workshop Process. Second Workshop Present Preferred Scheme Revisions Solicit Comment Revise Schemes Accordingly Provide Final Report. - PowerPoint PPT Presentation

Citation preview

Page 1: Purpose of Workshop
Page 2: Purpose of Workshop

Purpose of Workshop

Scope project to be included in a Design Build RFP

Review Program Needs

Site Analysis

Concept Plans

Page 3: Purpose of Workshop

Workshop Process

Second Workshop

Present Preferred Scheme Revisions

Solicit Comment

Revise Schemes Accordingly

Provide Final Report

Page 4: Purpose of Workshop

MSU Residential Life Mission

The Department of Residential Life facilitates students’ academic and personal success by providing educational opportunities and convenient accommodations.

Page 5: Purpose of Workshop

Freshmen

Sophomores

Juniors / Seniors

Student Maturation

Page 6: Purpose of Workshop

Freshmen

Sophomores

Juniors

Seniors

Traditional Semi-Suite Suite Apartments

$ $$$$

Prototypical Unit Types by Class

Page 7: Purpose of Workshop

Freshmen 70%

Sophomores 15%

Juniors 8%

Seniors 7%

Traditional – 95% Semi-Suite – 5% Suite Apartments

$ $$$$

MSU On-Campus Unit Types by Class

% of students living on campus

Page 8: Purpose of Workshop

Freshmen ?%

Sophomores ?%

Juniors ?%

Seniors ?%

Traditional – 95% Semi-Suite – 5% Suite Apartments

$ $$$$

MSU On-Campus VISION (Peers?)

Page 9: Purpose of Workshop

Traditional Double

200-225 gsf/bed

Semi – suite

225-250 gsf/bed

Suite 275-300 gsf/bed Apartment 325-350 gsf/bed

AGE APPROPRIATE UNITS – Customized Solutions

Page 10: Purpose of Workshop

Campus Plan – Short Term

Page 11: Purpose of Workshop

Campus Plan – Mid Term

Page 12: Purpose of Workshop

Campus Plan – Long Term

Page 13: Purpose of Workshop

Campus Plan Master – Current Considerations

Not building Residence Halls on Athletic Fields

4 Storey Ramp vs. Business School Site

City/County Pedestrian Bridge

Renovating Crawford D Hall rather than demolition – proposed parking lots and access road no longer planned

Wind Turbines

Observatory

Field Relocations

Allied Health Outreach Clinic

Trafton Science Renovation/Addition

Land Acquisition

Page 14: Purpose of Workshop

Not building Residence Halls on Athletic Fields

4 Storey Ramp vs. Business School Site

City/County Pedestrian Bridge

Renovation of Crawford D Hall rather than demolition – proposed parking lots and access road no longer planned

Wind Turbines

Observatory

Field Relocations

Allied Health Outreach Clinic

Trafton Science Renovation/Addition

Land Acquisition

Campus Plan Master – Current Considerations

Page 15: Purpose of Workshop

Scheme 1

Page 16: Purpose of Workshop

Scheme 1

Pros

Creates image to Stadium Road

Phased demo to maintain bed count

Responds to bridge concept

Responds to parking ramp concept

Extends MP “Green Boulevard”

Parking convenient to housing

Page 17: Purpose of Workshop

Scheme 1

Cons

Cost of commons/food service

Distance to campus

Phased construction premiums

Phased demo premiums (unfunded)

Distance from other housing

Mixing of sophs w/ jrs/snrs “off campus”

Softball relocation funding?

Land use driven by existing Gage

Unknown site improvements/cost

First Year students split on campus

Page 18: Purpose of Workshop

Scheme 1Full Build Out

Page 19: Purpose of Workshop

Scheme 1Phase 1

Build 600 Beds and Commons

Page 20: Purpose of Workshop

Scheme 1Phase 2

Demo Tower A and Commons

Page 21: Purpose of Workshop

Scheme 1Phase 3

Build 600 Beds

Page 22: Purpose of Workshop

Scheme 1Phase 4

Demo Tower B

Page 23: Purpose of Workshop

Scheme 1Full Build Out

Complete Landscape & Parking

Page 24: Purpose of Workshop

Scheme 2

Page 25: Purpose of Workshop

Scheme 2

Pros

Soph’s proximity to first year

Sophs’ separated from jrs/srs

Soph’s proximity to campus

Reduces Stadium Rd. crossing

Supports Student Center

Jrs / Srs @ campus perimeter

Minimizes construction impact

Easier demo

Rugby Pitch easily relocated

Can separate into 2 - 600 Bed RFP’s

Page 26: Purpose of Workshop

Scheme 2

Cons

Reallocates Parking (neg?)

Relationship to Master Plan Axis

Academic site?

Fuel Tank Access/Location

Page 27: Purpose of Workshop

Scheme 2Phase 2 Option A

Build 600 Beds and Landscape @ Gage Site

(No Gage Demo Required)

Page 28: Purpose of Workshop

Scheme 2Phase 2 Option B

Build 600 Beds and Landscape on Sunken Lot Site

Page 29: Purpose of Workshop

Scheme 2Phase 2 Option C

Build 600 Beds and Landscape on McElroy & Crawford Parking Lot

Page 30: Purpose of Workshop

Scheme 2(Original)

Build 600 Beds

Page 31: Purpose of Workshop

Scheme 2(Revised)

Housing & Commons Expansion

(600 Beds or more?)

Page 32: Purpose of Workshop