NC 55 CORRIDOR STUDY
WAKE AND HARNETT COUNTIES
STIP PROJECT R-5705
JULY 27, 2017
Public Meeting
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
1
PUBLIC MEETING
NC 55 CORRIDOR STUDY
Wake and Harnett Counties
From South of SR 1532 (Oak Grove Church Roads) to NC 42
STIP PROJECT R-5705
July 27, 2017
PURPOSE OF TODAY’S MEETING
The purpose of today’s meeting is to present the proposed project corridors to the
public for review and comment (a comment sheet is attached to the back of this handout
for comments and questions). Following today’s meeting, NCDOT will review citizen
and local government comments and determine which corridors should be studied in
detail. Environmental surveys will be conducted within these corridors. NCDOT will
present the recommended corridor at a future public meeting to allow an opportunity for
citizens to comment.
PROJECT DESCRIPTION
STIP Project R-5705 is programmed in the approved 2018-2027 North Carolina
State Transportation Improvement Program (STIP) as improvements to NC 55 from south
of SR 1532 (Oak Grove Church Road) in Harnett County to NC 42 in Wake County. The
proposed project is approximately ten miles long, depending on the corridor selected. The
project location is shown in Figure 1.
A multi-lane facility is proposed on new location or along the existing alignment.
It is anticipated approximately 110 feet of right-of-way will be required along the existing
alignment and approximately 150 feet of right-of-way will be required on new location to
accommodate the multi-lane facility. No control of access is proposed for improve
existing NC 55 and limited control of access is proposed for new location options.
PROJECT PURPOSE
The purpose of the project is to reduce traffic congestion and improve mobility on
the NC 55 corridor in the project area, with a goal of achieving an overall Level of
Service (LOS) D.
PROJECT STATUS/SCHEDULE
Project development studies for the proposed project are currently underway.
Corridors to be studied in detail will be selected following this meeting and detailed
environmental studies will begin on those corridors. The recommended corridors for the
2
project will be selected following the environmental studies. A public meeting will be
held to present the preferred corridor to the public.
Right of way acquisition for the project is scheduled to begin in State Fiscal Year
2020 and construction is scheduled to begin in State Fiscal Year 2022.
PROJECT COST
The most recent cost estimate for the project is as follows:
Right of Way Acquisition $9,895,000
Utility Relocation $1,187,000
Construction $38,536,000
Total Estimated Cost $50,618,000
PROJECT CORRIDORS
Three alternative corridors for the proposed project are being considered. The alternative
study corridors on new location developed for STIP R-5705 are approximately two times
wider (1000 feet) than the improved existing study corridor (500 feet) to allow room to
avoid resources within the corridor. Figure 2 presents all the corridors investigated for the
project. The table on page 4 presents a summary of the impacts.
CORRIDOR A - IMPROVE EXISTING CORRIDOR
This corridor follows the existing alignment of NC 55 from south of SR 1532 (Oak Grove
Church Road) in Harnett County to NC 42 in Wake County. Corridor A proposes to
widen existing NC 55 from a two-lane to a four-lane raised median-divided facility within
a 110-foot right-of-way (see Figure 3).
CORRIDOR B - WESTERN BYPASS
Corridor B involves constructing a roadway on new location to the west of Angier. The
proposed bypass would be constructed as a four-lane facility with a 30-foot median
within a 150 foot right-of-way (See Figure 3). Limited control of access (access only
from public roads, no driveways allowed) would be obtained for the new location. To
minimize impacts and costs, minor amounts of right of way and partial control of access
would be obtained for portions along existing roadways.
3
CORRIDOR C - EASTERN BYPASS
Corridor C would involve rerouting NC 55 to the east of Angier using a combination of
existing roads with some new location. The bypass would be constructed as a four-lane
facility with a 30-foot median within a 150 foot right-of-way (See Figure 3). Limited
control of access (access only from intersection roadways) would be obtained for new
location portions of the corridor. To minimize impacts and costs, minor amounts of right
of way and partial control of access would be obtained for portions of the bypass routed
along existing roadways.
4
CORRIDOR COMPARISONS
* lengths calculated for non-existing facilities
** stream impacts include ditches which may not be jurisdictional
PRELIMINARY ALTERNATIVE CORRIDORS IMPACT MATRIX
A B C
New Location Length (mi)* 0 4.84 2.63
Total Length (mi) 10.25 11.5 10.3
Total Relocations 38 32 53
Properties Impacted 211 204 225
Historic Properties 0 0 0
Registered Underground Storage Tanks 9 3 3
Wetlands Affected (ac) 9 17 19
Stream Impacts (ft)** 808 1378 1291
Floodplain (ac) <0.01 0.495 0.495
Forested Acres (ac) 49.5 103.95 94.05
Farmland Soils (ac) 346.5 394.35 358.05
Voluntary Agricultural Districts (ac) 6.6 33 13.2
LEVEL OF F SERVICECECE
FLOWW CONDITIONSNSS
TECHNICALAL DESCRIPTIONSNSSS
A Traffic flows freely with li le or no restric ons on speed or maneuverability.
N D
B Traffic is stable and flows freely. The ability to maneuver in traffic is slightly restricted.
M D
C Few restric ons on speed. Freedom to maneuver is restricted. Drivers must be more careful making lane changes.
A D
D Speeds decline slightly and density increases. Freedom to maneuver is no ceably limited.
L D
E Vehicles are closely spaced, with li le room to maneuver. Driver comfort is poor.
C D
F Very congested traffic with traffic jams, especially where vehicles have to merge.
S D
NC 55 CORRIDORPROPOSED STUDY AREA
WAKE
HARNETT
JOHNSTON
GarnerCaryHolly Springs
Fuquay-Varina
Angier
UV55
£¤401
£¤401
UV42
UV210
UV550 2 41
Miles
±Legend
Proposed Study Area
Municipal Boundary
County Boundary
ESRI World Street Basemap
N.T.S.
NC 55 Corridor StudyHarnett-Wake Counties
STIP Project R-5705
VICINITY MAPCounty: HARNETT/WAKE
Div: 5/6 STIP# R-5705
WBS: 46377.1.1
Date: 6-1-2016
1FIGURE
WAKE
MOORE WAYNEJOHNSTON
CHATHAM
NASH
LEEHARNETT
WILSONPITT
LENOIR
£¤401
£¤401
FUQUAY-VARINA
ANGIERSR-1501
SR-1566
SR-27
57
SR-3827
SR-15
09
SR-1552
SR-1512
SR-1404
SR-1006
SR-2743
SR-2745
SR-1401
SR-15 04
SR-1547
SR-1541
SR-2750
SR-1502
SR-2768
SR-1513
SR-2759
SR-2751
SR-1448
SR-2763
SR-1316
SR-2739
SR-1549
SR-2736
SR-1446SR
-2215
SR-1544
SR-2740
SR-1546
SR-2761
SR-1551
SR-2753
SR-1538SR-2760
SR-2742
SR-27
65
SR-2770
SR-1531
SR-2748
SR-1542
SR-1510
SR-14
15
SR-2756
SR-1301
SR-2754
SR-1465
SR-4869
SR-55
57
SR-220
9
SR-38
24
SR-3825
SR-37
36
SR-11
07
S R-29
88
SR-14
00
SR-1537
SR- 5543
SR- 5390
SR-38
06
SR-4885
SR-3723
SR-1481
SR-4 355
SR-1539
SR-15
50
SR-3792
SR-4 749
SR-1564
SR-3805
SR-15
07
SR-4887
SR-1511
SR-2764
SR-15
43
SR-1540
SR-2755
SR-2747
SR-1440
SR-27
62
SR-2758
SR-1313
SR- 143 9
SR-27
67
SR-14
41
SR-15
05SR-15
32
SR-15
00
SR-3743
SR-2780
UV210
UV55
UV42
WAKE
HARN
ETT
WAKE
JOHNSTON
HARNETT
JOHNSTON0 1 20.5
Miles
±
LegendR-5705 Project CorridorCorridor ACorridor BCorridor C
National Wetland InventoryFreshwater Emergent WetlandFreshwater Forested/Shrub WetlandFreshwater PondLakeStreamMunicipal BoundaryCounty Boundary
N.T.S.
NORTH CAROLINADEPARTMENT OF
TRANSPORTATION
County: HARNETT/WAKE
WBS: 46377.1.1Div: 5/6 STIP# R-5705
Date: 5/4/2017
2FIGURE
WAKE
JOHNSTON
HARNETTLEE
CHATHAM
NATURALFEATURES
MAP
NC 55CORRIDOR STUDY
STIP R-5705
ENDSTIP R-5705
BEGINSTIP R-5705
±
B
C
A
2’2’
VAR 2:1 to 4:1
VAR 2:1 to 4:1
VAR 2:1 to 4:1
VAR 2:1 to 4:1
GROUND
ORIGINAL0.02 0.02 0.02
POINT
GRADE
CL
12’-0" 12’-0"23’-0"
75’-0"
0.02 0.02
POINT
GRADE
CL
12’-0" 12’-0" 12’-0" 12’-0"30’-0"
11’-0" w/GR
8’-0"
FDPS
4’-0"
SLOPE
VARIABLE
FO
R FIL
LS
HIN
GE P
OIN
T
GROUND
ORIGINAL
6:1
30’-0"
FDPS
4’-0"
11’-0" w/GR
8’-0"
FO
R C
UTS
HIN
GE P
OIN
T
6:14:1
6:1
4:1
18’-0" 6’-0" 10’-0"
SLOPES
VARIABLE
2:1
2:1
14’-0" w/GR
10’-0"
14’-0" w/GR
10’-0"
0.08 0.08
GROUND
ORIGINAL
GROUND
ORIGINAL
7/24/2017
X:\
NC
DO
T\
R-5705\
PD
EA\
Mapping\
CA
DD\
R-5705_
Rdy_typicals.d
gn
User:k
ha
mlin
SHEET NO.PROJECT REFERENCE NO.
CORP. LICENSE NO.: C-0275
PH (919) 773-8887
RALEIGH, NC 27603
706 HILLSBOROUGH ST. SUITE 200
TGS ENGINEERSTGSENGINEERS
2’2’
6"VAR 2:1 to 4:1
VAR 2:1 to 4:1
VAR 2:1 to 4:1
VAR 2:1 to 4:1
6"
GROUND
ORIGINAL
5’-0"4’-0"5’-0" 4’-0"
0.02 0.02 0.02 0.02
POINT
GRADE
CL
12’-0" 12’-0"23’-0"
79’-0"
14’-0" * 14’-0" *
14’-0" w/GR
10’-0"
14’-0" w/GR
10’-0"
GROUND
ORIGINAL
12’-0" 12’-0"
0.02
R-5705
* *
7/2/99
* 4’ PAVED SHOULDERS MAY ACCOMMODATE BICYCLES, IF REQUIRED
110’-0" Min. Right-of-Way
110’-0" Min. Right-of-Way
150’-0" Min. Right-of-Way
STIP NO. R-5705
FIGURE 3
NO BICYCLE OR PEDESTRIAN ACCOMMODATIONS
4 LANE DIVIDED (23’ RAISED MEDIAN) WITH CURB AND GUTTER
TYPICAL 1 (ALONG EXISTING NC 55)
FOR BICYCLE AND PEDESTRIAN ACCOMMODATIONS
WITH WIDE OUTSIDE LANES AND SIDEWALKS
4 LANE DIVIDED (23’ RAISED MEDIAN) WITH CURB AND GUTTER
TYPICAL 2 (ALONG EXISTING NC 55)
4 LANE DIVIDED (23’ RAISED MEDIAN) WITH PAVED SHOULDERS
TYPICAL 3 (ALONG NEW LOCATION)
R-5705_Rdy_typicals.dgn 7/24/2017 3:58:07 PM TGS
NC 55 Corridor Study
Angier, Harnett County
Meeting Type: Public Meeting
Location: Angier Municipal Building, 28 N. Raleigh St., Angier, NC 27501
Date: July 27, 2017
STIP NO. R-5705
Project Description: NC 55 Corridor Study.
In accordance with Title VI of the Civil Rights Act of 1964 and related authorities, the North Carolina Department of Transportation
(NCDOT) assures that no person(s) shall be excluded from participation in, denied the benefits of, or subjugated to discrimination, under
any of the Department’s programs, policies, or activities, based on their race, color, national origin, disability, age, income, or gender.
Completing this form helps meet our data collection and public involvement obligations under Title VI and NEPA, and will im-
prove how we serve the public. Please place the completed form in the designated box on the sign-in table, hand it to an NCDOT official,
or mail it in to the PDEA-Human Environment Section, 1598 Mail Service Center, Raleigh, NC 27699-1598. All forms will remain on file at
NCDOT as part of the public record.
Zip Code: _____________________
Street Name:
(i.e. Main Street)
Gender: Male Female
Age:
Less than 18 45-64
18-29 65 and older
30-44
Total Household Income:
Less than $12,000 $47,000 – $69,999
$12,000 – $19,999 $70,000 – $93,999
$20,000 – $30,999 $94,000 – $117,999
$31,000 – $46,999 $118,000 or greater
Have a Disability: Yes No
Race/Ethnicity:
White Asian
Black/African American Hispanic/Latino
American Indian/Alaskan Native
Native Hawaiian/Pacific Islander
Other (please specify): _______________________
National Origin: (if born outside the U.S.)
Mexican
Central American: ____________________
South American: _____________________
Puerto Rican Vietnamese
Chinese Korean
Other (please specify): __________________
How did you hear about this meeting? (newspaper advertisement, flyer, and/or mailing) _________________________________________
For more information regarding Title VI or this request, please contact the NCDOT Title VI Section at (919) 508-1886, or by email at
Thank you for you participation!
Title VI Public Involvement Form Completing this form is completely voluntary. You are not required to provide information requested in order to participate in this meeting.
STIP Project No. R-5705 Thursday, July 27, 2017
PDEA-HUMAN ENVIRONMENT SECTION,1598 Mail Service Center, Raleigh, NC 27699-1598
Comment Sheet
NC 55 Corridor Study
Wake and Harnett Counties
STIP Project R-5705
July 27, 2017
Name:_______________________________________________________________________ (please print)
Address:_____________________________________________________________ (please print)
City __________________________ State _________________Zip _____________________
Email:__________________________________________(optional)
Which corridor do you prefer for the NC 55 Corridor?
___ Corridor A (Existing Alignment)
___ Corridor B (Western Bypass)
___ Corridor C (Eastern Bypass)
Are there any corridors you think should be dropped from further consideration (not
studied in detail)?
___ Corridor A (Existing Alignment)
___ Corridor B (Western Bypass)
___ Corridor C (Eastern Bypass)
General comments, concerns and/or questions regarding this project:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
(If you need additional space, please continue on the back)
You may leave your comments with NCDOT representatives at the meeting or comments
may be mailed, faxed, or emailed by August 28, 2017 to:
Tommy Register, PE
TGS Engineers
706 Hillsborough Street
Suite 200
Raleigh, NC 27603
Fax: (919) 773- 8839
Email: [email protected]
PDEA-HUMAN ENVIRONMENT SECTION,1598 Mail Service Center, Raleigh, NC 27699-1598