Purchase Requisition (PR) Release
Strategy – Basic ConceptPosted on August 1, 2010 by Rizki
Purchase Requisition (PR) is an internal purchasing document in SAP R/3. It is used to give
iERP on Social Media SAP SPRO IMG SAP Tcodes SAP Tables
SAP Directory SAP Forum Contact Us
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 2/15
notification to responsible department (purchasing/procurement) of requirements of materials
and/or external services and keep track of such requirements. PR must contain information
about quantity of a material or a service and the required date.
It can be created directly (manually, through ME51N T-code) by a person or indirectly by
another SAP component (such as material requirement planning/MRP, maintenance order of
Plan Maintenance/PM module, production order of Production Planning/PP module).
PR then can be processed to be an external purchasing document (such as Purchase
Order/PO) or internal purchasing document (such as Stock Transport Order/STO).
In SAP R/3, PR can be processed directly to be PO/STO or must be approved/released
before it can be processed to be PO/STO.
If we want that PR must be approved/released before it can be processed to be PO/STO, we
must set up a release procedure for that PR.
The first thing to do in setting up a release procedure for a PR is to decide whether we will
approve/release that PR for:
Overall PR
If we release a PR, all items in that PR will be released and then can be processed to
be PO/STO. If we don’t release it, none of its item will be released nor can be processed
to be PO/STO. Or,
Item-wise
We must release item per item of a PR in order to make them ready to be processed to
be PO/STO. If we don’t release some of PR items, the other items can be released and
processed to be PO/STO.
In an SAP R/3 client, all PRs with a particular PR Document Type can use just one of the
above options. If we have more than one PR Document Type, we can set some of them use
“Overall PR” release procedure and others use “Item-wise” release procedure, depends on our
business process needs.
We can set the option in the process “Define Document Type” of Purchase Requisition that
can be accessed by “OMEB” T-code (only in SAP 4.6.C version or older) or through menu
paths of “SPRO” T-code: Materials Management – Purchasing – Purchase Requisition –
Define Document Type, as per below image:
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 3/15
The above image is © SAP AG 2010. All rights reservedIf we want that a PR Document Type use “Overall
PR” release procedure, we must tick the “Overall release of purchase requisitions
(OverReqRel)” indicator. If we don’t tick that indicator, it means that PR Document Type will
be released with “Item-wise” procedure.
The next thing to do is determining the criteria/parameters of PR that must be
approved/released by specific person. For example:
PR of raw material that has value less than USD 50,000.00 can be released by operational
manager. PR of that item that has value USD 50,000 or more must be approved by operational
manager and operational director. PR for production equipment must be approved by AssetManager and operational director, whatever its cost.
In SAP R/3 there are two release procedures that we can choose:
1.Release Procedure without classification
This procedure can only be used for “item-wise”. It can’t be used for “Overall PR”. The criteria
that can be used with this procedure to distinct the PR approval processes are limited to: PR
item value, material group, account assignment, and plant. We can’t use this procedure if we
want to distinct the PR approval process by other criteria such as Purchasing group,
document type, storage location, or something else.
The only reason we should use this procedure is its simplicity. But if we want more flexibility
in determining the PR release procedure we should use the other option. In this article we
won’t explain the “Release Procedure without classification” in detail. We will explain the other
option (Release Procedure with classification) in detail.
2.Release Procedure with classification
With this procedure, we can choose whether we want to release the PR for “Overall PR” or
“item-wise”. And the main reason why we should use this procedure is because we canchoose more criteria to distinct the PR approval process. The criteria are not limited to PR
item value, material group, account assignment, and plant only.
SAP R/3 has provided a communication structure “CEBAN” that we can use to make
criteria/parameters to determine the PR approval process. Each field in “CEBAN” can be used
as parameters. These parameters must be defined in SAP R/3 as a “Characteristic”. Some
“characteristics” that are used as parameters to determine a release condition for a release
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 4/15
strategy can be group as “Classification”.
The fields of “CEBAN” communication structure are:
BSART: Purchase requisition document type
BSAKZ: Control indicator for purchasing document type
ESTKZ: Creation indicator (purchase requisition/schedule lines)
EKGRP: Purchasing group
ERNAM: Name of Person who Created the Object
ERDAT: Date on which the record was created
AFNAM: Name of requisitioner/requester
TXZ01: Short text
MATNR: Material number
EMATN: Material number
WERKS: Plant
LGORT: Storage location
BEDNR: Requirement tracking number
MATKL: Material group
RESWK: Supplying (issuing) plant in case of stock transport order
MEINS: Purchase requisition unit of measure
BADAT: Requisition (request) date
LPEIN: Category of delivery date
LFDAT: Item delivery date
FRGDT: Purchase requisition release date
PSTYP: Item category in purchasing document
KNTTP: Account assignment category
LIFNR: Desired vendor
FLIEF: Fixed vendor
EKORG: Purchasing organization
VRTYP: Purchasing document category
KONNR: Number of principal purchase agreement
KTPNR: Item number of principal purchase agreement
INFNR: Number of purchasing info record
DISPO: MRP controller
BWTAR: Valuation typeBMEIN: Order unit
KANBA: Kanban indicator
BPUEB: Adopt requisition price in purchase order
USRC1: User field format character for release strategy
USRC2: User field format character for release strategy
USRN1: User field numeric for release strategy
USRN2: User field numeric for release strategy
GSWRT: Total value of item
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 5/15
.INCLUDE: Communication Structure: Requisition Release for User Exit
PDUMMY: Dummy function in length 1
.INCLUDE: Release Strategy: Account Assignment Fields
SAKTO: G/L account number
GSBER: Business Area
KOSTL: Cost Center
VBELN: Sales and distribution document number
VBELP: Sales document item
VETEN: Schedule line
ANLN1: Main asset number
ANLN2: Asset sub-number
AUFNR: Order Number
WEMPF: Goods recipient
ABLAD: Unloading point
KOKRS: Controlling Area
KSTRG: Cost Object
PAOBJNR: Profitability segment number (CO-PA)
PRCTR: Profit center
PS_PSP_PNR: Work breakdown structure element (WBS element)
NPLNR: Network Number for Account Assignment
AUFPL: Routing number for operations in the order
IMKEY: Internal key for Real Estate object
APLZL: Internal counter
VPTNR: Partner account number
FIPOS: Commitment Item
FISTL: Funds Center GEBER: Fund
DABRZ: Reference date for settlement
PSP_PNR: Work breakdown structure element (WBS element)
GSFRG: Overall release of purchase requisitions
GFWRT: Total value of requisition for overall release procedure
WAERS: Currency Key
Every time a user create a PR, SAP R/3 will pass the PR data (value of PR’s fields) to thecorresponding fields of “CEBAN” communication structure. Then, based on the value in each
field that we use as characteristics, SAP R/3 will determine which PR release strategy will be
assigned to the PR.
For previous example: if we choose PR item value and material group as characteristics, and
the PR item value field (GSWRT) that was entered by user is USD 55,000, and the material
group is “raw material” then this PR must be approved by operational manager and operational
director.
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 6/15
31 T HOUGHTS ON “PURCHASE REQUISITION (PR) RELEASE STRATEGY – BASIC CONCEPT”
In this article we have explained about the basic concept of PR Release Strategy procedure.
In the next articles we will show step by step procedure to create PR Release Strategy.
____________________________________________________________________________
600,000+ scientific, industrial, and business supplies:
____________________________________________________________________________
This entry was posted in PR Release Strategy by Rizki. Bookmark the permalink
[http://ierp.us/sap/mm-materials-management/purchasing/pr-release-
strategy/purchase-requisition-pr-release-strategy-basic-concept/] .
csk
on September 29, 2009 at 3:21 pm said:
this is very helpful information. thank you so much….
Anonymous
on April 27, 2010 at 7:12 am said:
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 7/15
Excellent article.
Purchase order requisition
on May 13, 2010 at 2:59 pm said:
This site becomes a lots of information nice site also good dear keep it up.
Sandy Sharma
on September 30, 2010 at 2:39 pm said:
This post is very nice, Because your post is giving very nice information. So we are
very thankful to you.
Anonymous
on November 22, 2010 at 6:06 am said:
Hi , how to process a partially approved purchase requisition?
ABVP
on October 1, 2012 at 9:57 pm said:
get it completely approved and then process
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 8/15
Anonymous
on November 23, 2010 at 7:59 am said:
what do you mean with "partially approved PR"?
if it's a PR with "item-wise release procedure" and some items are released and some
other are not, the released ones can be processed as usual.
if it's a PR that has several release codes needed to release it, and some of them
have released, and some others have not released it yet, you can't process the PR
until all the release codes release the PR.
dara
on April 19, 2011 at 4:39 pm said:
THIS SET HELP ME A LOT GOOD KEEP IT UP.
Anonymous
on May 17, 2011 at 3:34 pm said:
Well thank you so much. I was searching alot about sap PR and PO. This site gives
us best concepts
Anonymous
on May 24, 2011 at 8:43 pm said:
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 9/15
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 10/15
wrote this article, I used SAP IDES 4.6.C, and the "OMEB" tcode indeed existed on
that version. I don't know why SAP decide to delete this tcode on ECC 6.0. But, you
still can access it from SAP "SPRO" tcode menu tree: Materials Management –
Purchasing – Purchase Requisition – Define Document Type.
Thank you very much for bringing this issue.
Regards,
Rizki
Anonymous
on August 6, 2011 at 2:05 pm said:
Hi Rizki,
Thanks for the clarification, makes total sense.
.
Do you know the ECC 6.0 t-code to create/maintain PR Doc Types or even PO Doc
Types? I've been looking for those two t-codes and have NOT been successful in
finding them.
Cheers,
K
Rizkion August 6, 2011 at 2:33 pm said:
Hi K,
You can define PR Doc Types with "SPRO" tcode.
Click the "SAP Reference IMG" button. Go to menu: Materials Management –
Purchasing – Purchase Requisition – Define Document Type.
For PO doc. type, on go to menu: Materials Management – Purchasing – Purchase
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 11/15
Order – Define Document Type.
Anonymous
on August 6, 2011 at 9:48 pm said:
Hi Rizki,
Thanks again for your prompt response!
Instead of going through SPRO, is there a direct t-code for the PR or PO Doc Type?
Did SAP create another t-code for ECC 6.0 that replaces OMEB?
Thanks,
K
Rizkion August 8, 2011 at 9:09 am said:
Hi K,
Unfortunately, I can't find the tcodes in ECC 6.0.
What is your exact requirement, why do you want to access those from tcodes?
Anonymous
on August 24, 2011 at 11:06 pm said:
Would you please advise SAP ERP version used in the book PR Release Strategy
and the book's publish date? I'm looking for the current info related to the topic for
ECC 6.0. Thanks.
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 12/15
Rizki
on August 25, 2011 at 5:09 pm said:
Hi,
At first I wrote this book using SAP IDES 4.7 (2008) then I update it by using SAP
ECC 6.0 in 2010.
Regards,
Rizki
man castello
on January 11, 2012 at 1:25 pm said:
can we create release strategy for multiple person in one strategy out of multiple
person.
Eg: We must obtain at lease any 2 director out of 5 director available. how do we
configure this?
Mike
on January 12, 2012 at 2:28 pm said:
Hi,
I don’t think we can make SAP chose randomly a release code in a release
strategy.
But, for workaround, you can create only two release codes for the 2 directors,
and then assign the 2 release codes authorization to all 5 directors. You can
develop an offline procedure who should release which PR.
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 13/15
Anil
on February 21, 2012 at 4:04 pm said:
Hi Rizki,
Thanks for providing the informative article. I have two questions:
Q1. How can we define the parameters of CEBAN as a characteristic for PR release
(overall/ item-wise)? Do we have a specific t-code for that?
Q2. How to set-up the approval procedure in SAP ECC 6.0?
Could you please provide me the answer of these.
Thanks!!
Vasuki
on February 24, 2012 at 10:09 am said:
Great Explanation
Muhammad Hassan Malik
on August 26, 2012 at 7:08 pm said:
Hi..
This was a very useful information. Thank you so much for this article
Regards
M. Hassan
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 14/15
Pingback: SAP Purchasing Group in Details | iERP.us - Integrated ERP Software
Solution Guide: SAP ERP
Deepak
on September 28, 2012 at 3:03 pm said:
in pr release strategy if any pr is not to be released. how to put that comment in
ME55
ABVP
on October 1, 2012 at 10:01 pm said:
put a note on the PR header text
Deena
on October 15, 2012 at 7:10 pm said:
Very useful……
Tammy M
on April 1, 2013 at 10:20 pm said:
Once you have the release strategy in place do you have a solution where executives
can use their mobile devices to approve requisitions without having to log in SAP?
8/13/2019 Purchase Requisition (PR) Release Strategy – Basic Concept _ iERP
http://slidepdf.com/reader/full/purchase-requisition-pr-release-strategy-basic-concept-ierp 15/15
comment pirater compte facebook d'un ami
on December 3, 2013 at 12:38 am said:
Hello there, There’s no doubt that your website might be
having internet browser compatibility issues.When I look at your site in Safari, it looks fine however when opening in
Internet Explorer, it’s got some overlapping issues.
I just wanted to provide you with a quick heads up!
Other than that, great site!