17
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT

Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Embed Size (px)

DESCRIPTION

Project Background Private development client Development includes two large retail buildings, service station, bank, and general commercial No gravity sewer service in area

Citation preview

Page 1: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional

Force Main

Rachel Rausch, EIT

Page 2: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Site Location

Bluffton, SC

Page 3: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Project Background

• Private development client

• Development includes two large retail buildings, service station,

bank, and general commercial

• No gravity sewer service in area

Page 4: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Project Background

Page 5: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Unique Design Considerations• Donation of project to Beaufort Jasper Water and Sewer

Authority (BJWSA)

• Little topographical variability on site

• Deep wetwell

• Site pump station will pump into 16” combined regional

force main Unknown conditions in regional force main

Page 6: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Design Solution: Data Collection

• BJWSA Standards

• Force main record drawings

• Force main operating conditions

• Operating pressure

• Flow

Page 7: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Design Solutions: Calculations• Wastewater Flow Estimate

• Site Storage Volume

• Force Main Operating Conditions

• Choosing Pumps

Page 8: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Design Solutions: CalculationsWastewater flow from site:Peaking Factor=4Qpeak=92.4

BJWSA storage volume requirement:

Storage volume in site MH and pipes > 24 hour volume from site

Page 9: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Pump SelectionExisting force main conditions analyzed

• Regional Force Main Pump station on• 1,000 gpm @ 70’ TDH

• Regional Force Main Pump Station CP-67 off

• No flow in regional force main

• Two C factors analyzed for each system curve

Page 10: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

System Curve-Pumps On

0 200 400 600 800 1000 12000

50

100

150

200

250System Curve-Regional Force Main Pumps On

TDH C1 MIN [FT] TDH C1 MAX [FT] TDH C2 MIN [FT] TDH C2 MAX [FT] PUMP CURVE #1

PUMP CURVE #2 PUMP CURVE #3 PUMP CURVE #4 PUMP CURVE #5 PUMP CURVE #6

Flowrate (gpm)

TDH

(ft)

Design Point:310 gpm at 102’ TDH

Hazen-Williams C Factors:C1=110C2=130

Page 11: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

System Curves-Pumps Off

0 200 400 600 800 1000 12000

50

100

150

200

250

300

350System Curve-Regional Force Main Pumps Off

TDH C1 MIN [FT] TDH C1 MAX [FT] TDH C2 MIN [FT] TDH C2 MAX [FT] PUMP CURVE #1

PUMP CURVE #2 PUMP CURVE #3 PUMP CURVE #4 PUMP CURVE #5 PUMP CURVE #6

Flowrate (gpm)

TDH

(ft)

Design Point:410 gpm at 96’ TDH

Hazen-Williams C Factors:C1=110C2=130

Page 12: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Pump Selection

Page 13: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Other Calculations

• Cycle time

• Buoyancy Calculations

• High groundwater table

• Deep wetwell, approximately 24 feet deep

Page 14: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Final Pump Station Layout

Page 15: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Project Status• BJWSA Approval• Construction Status

Page 16: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Questions?

Page 17: Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main…

Lessons Learned