Result : Accepted Not Accepted FACTORY ACCEPTANCE TEST SHEET FAT No.: AL3039-C.05-01 Job No.: AL-3039 PROJECT: THAI BINH DEVELOPMENT PROJECT, BLOCK 102 & 106, OFFSHORE VIETNAM TESTED DATE: ITEM: OPEN DRAIN CAISSON PUMP AREA / LOCATION: ALPHA ECC WORKSHOP FORM 05: SUCTION LIFT TEST Tag No.: P-6520 Pump Datasheet: AL3039-A.08-02 Decription: Open Drain Caisson Pump Pump Manufacturer: Wilden Service: Open Drain Caisson Pump Skid Manufacturer: Alpha ECC 2 Testing Height Remarks step (m) Desciption CHECK / WITNESDED BY NAME / SIGNATURE / DATE ALPHA ECC Representative PCVL Representative Dry Suction Lift Wet Suction Lift Third Party Representative 1

Pump Skid Check SHEET AL-3039

Embed Size (px)

DESCRIPTION

FAT report

Citation preview

  • Result :Accepted Not Accepted

    FACTORY ACCEPTANCE TEST SHEETFAT No.: AL3039-C.05-01

    Job No.: AL-3039

    PROJECT: THAI BINH DEVELOPMENT PROJECT, BLOCK 102 & 106, OFFSHORE VIETNAM TESTED DATE:

    ITEM: OPEN DRAIN CAISSON PUMP AREA / LOCATION: ALPHA ECC WORKSHOP

    FORM 05: SUCTION LIFT TEST

    Tag No.: P-6520 Pump Datasheet: AL3039-A.08-02Decription: Open Drain Caisson Pump Pump Manufacturer: WildenService: Open Drain Caisson Pump Skid Manufacturer: Alpha ECC

    2

    Testing HeightRemarks

    step (m)

    Desciption

    CHECK / WITNESDED BY NAME / SIGNATURE / DATE

    ALPHA ECC Representative

    PCVL Representative

    Dry Suction Lift

    Wet Suction Lift

    Third Party Representative

    1