TDK-CS-P8C3-0717 ©2017 Tendeka. All rights reserved. www.tendeka.com Case Study 3: PulseEight TM wireless intelligent compleon technology delivers P/T data from clients wells in Norway The PulseEight product range from Tendeka uses unique ‘pressure pulse telemetry’ to deliver pressure & temperature data to surface, without control line. Well Data Offshore Norway Locaon: Gas producer Well Type: May 2012 Installaon Date: Depth: 3250m 6Liner Size: 112°C Temperature: Norway The Challenge During pressure pulsing the potenal existed for condensate to build up and kill the well. Tendeka Soluon Tendeka minimised the pulse size to 0.4bar at surface to minimise transient producon effects. No surface acquision equipment or data relay system was required as the exisng wellhead pressure sensor was used to read the signal. Project Results The gauge transmied data for 177 days unl the baeries depleted. When this gas field was originally developed it was not envisaged that any further wells would be drilled and no permanent downhole gauges where installed. Nearly twenty years later, in the drive to improve recovery from the field the operator requires downhole data to evaluate the potenal value of an in-fill drilling program.

PulseEight Case Study 3 - Tendeka Website · Title: PulseEight wireless intelligent completion technology in Norway_Case Study 3 2017 Created Date: 8/9/2017 10:49:29 AM

Embed Size (px)

Citation preview

Page 1: PulseEight Case Study 3 - Tendeka Website · Title: PulseEight wireless intelligent completion technology in Norway_Case Study 3 2017 Created Date: 8/9/2017 10:49:29 AM

TDK-CS-P8C3-0717©2017 Tendeka. All rights reserved. www.tendeka.com

Case Study 3: PulseEightTM wireless intelligent completion technology delivers P/T data from clients wells in Norway

The PulseEight product range from Tendeka uses unique ‘pressure pulse telemetry’ to deliver pressure & temperature data to surface, without control line.

Well Data

Offshore NorwayLocation:

Gas producerWell Type:

May 2012Installation Date:

Depth: 3250m

6⅝”Liner Size:

112°CTemperature:

Norway

The ChallengeDuring pressure pulsing the potential existed for condensate to build up and kill the well.

Tendeka SolutionTendeka minimised the pulse size to 0.4bar at surface to minimise transient production effects. No surface acquisition equipment or data relay system was required as the existing wellhead pressure sensor was used to read the signal.

Project ResultsThe gauge transmitted data for 177 days until the batteries depleted.

When this gas field was originally developed it was not envisaged that any further wells would be drilled and no permanent downhole gauges where installed. Nearly twenty years later, in the drive to improve recovery from the field the operator requires downhole data to evaluate the potential value of an in-fill drilling program.