Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - Wadsworth
Attachment 7b
345 ky Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Crosbyton Railroad Co
{
c/o Sneed Montey 1 P0 Box 1949 Vernon Tx 76385-1949
D & T Farms
1
'PO Box 1367 ldalou Tx 79329-1367
Danette Diane Johnston Trust c/o Danette Diane Johnston 7025 Spanish Oaks Drive
North Richland
Hills Tx 76182-3276
Danny E Milner Trust
David D Reed Jr & Joan R Hamilton
Trust
ic/o Danny Milner
c/o Joan R Hamilton, Trustee
2402 FM 54
8539 Vista View Dr
Petersburg
Dallas
Tx
Tx
79250-3407
75243-7415
Davis Adams & Smith, LLC 11810 County Road 6610 Slaton TX 79364
Derrell K Montgomery Irrevocable
Trust 11591 Tamina Trl Conroe TX 78384
Dewey Industries, Inc PO Box 1482 Seminole -n< 79360
Diane Strawn GST Trust c/o Diane Strawn 19985 County Road 437 Princeton Tx 75407-4573
Don Emery Trust c/o Norwest Bank of TX PO Box 1241 Lubbock Tx 79408-1241
Don Foreman Trust ,
801 W 8th St ldalou Tx 79329-9057
Don Holt Family Farms, LLC 750 FM 473 Comfort Tx 78013
Doris Lee Jones Life Estate 503 N CR 3500 Lubbock TX 79403-7735
Dunn Living Trust 541 FM 40 Lorenzo TX 79343-9720
Edna Parks Crawford Trust c/o Marjorie C Kastman, Trustee PO Box 5930 Lubbock TX 79408-5930
Essie V Stephenson Estate PO Box 1235 ldalou Tx 79329-1235
Estate of Isaac Jones
Estate of James C Ethridge _ 503 N CR 3500 -
'2808 County Road 3500
Lubbock
Lubbock
Tx
TX
79403-7735
79403
Estate of John E Protsman Route 1 Box 39 ldalou Tx 79329-9707
Estate of Linda G Gragg 3305 76th St Lubbock TX 79423
Estate of Rosalea Weaver 1
1 RR 1 Box 436 Lubbock Tx 79403-9648
Eugene Becknell Exclusion Trust c/o Wanda Becknell 808 W 7th St ldalou TX 79329
Faye H Hays Trust
c/o Faye H Hays & Janice A
Townsend, Trustees 2380 Salvio St Suite 102 Concord CA 94520
G&C Land, LLC 11212 N County Road 3900 Lorenzo TX 79343
George V & Marguerite Lipps Trust 1
Attn. Marva Lee Hughes 213 Cedar Springs Ct Weatherford TX 76087
Gerry Hettler Life Estate 15126 E FM 2541 Lubbock Tx 79403
Gilbreath Family, Ltd 624 27th St Lubbock TX 79404-1406
Gilda V Bryant Revocable Trust 7713 Baughman Dr Amarillo Tx 79121
2 of 20
100
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No. 48668
Abernathy - Wadsworth
Attachment 7b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 ,
Name First 2 c/o, dba, Attention Address City State Zip
Glenford T Marr Estate Trust c/o Natile Marr Woodrow, Trustee PO Box 851 Shallowater TX 79363-0851
Glennis lodeII Simmons Revocable
Living Trust 12302 Slide Rd Unit 29 Lubbock Tx 79407
Global Signal Services, LLC '4017 Washington Rd PMB 353 McMurray PA 15317
Golden Spread Electric Coop, Inc PO Box 9898 Amarillo Tx 79105-5898
Gregory Farms, Inc
I I PO Box 185 Petersburg TX 79250-0185
GS Project Entity, LLC
1
c/o Duff & Phelps 1 P0 Box 2629 i
Addison Tx 75001-2629
Guy Fondren Harmon Trust 'PO Box 99 ldalou Tx 79329
Hancock Family Trust c/o Harvey Hancock, Trustee 1315 Raleigh 1
Slaton Tx 79364
Harmon Trust IP() Box 278 ldalou TX 79329-0278
Huddleston Family Trust 1P0 Box 6910 Las Cruces NM 88006
ldalou Cemetery
1
c/o Earl Yarbrough 1P0 Box 351 ldalou TX 79329-0351
Idalou Cemetery Assc 1 PO Box 235 ldalou Tx 79329
Isom Family Holdings, LLC 1c/o Ken & Julie Isom 1214 Avenue K Lubbock TX 79401-4026
.1 G H Trust 1
1c/o Scott Harmon, Trustee PO Box 99 Idalou Tx 79329-0099
1 H Green Trusts 1 PO Box 1204
1 Duncan OK 73534-1204
.1 W Kinard Estate 1
, 624 27th St Lubbock Tx 79404-1406
JCR Snodgrass Holdings, Ltd ;c/o M Reed Snodgrass 621 S Harrison St Crosbyton Tx 79322-3013
Jerry Wayne Rollow Estate
Jett Long Harmon Trust — — -- - - -- - _ c/o Christian O'Neal PO Box 1639
PO Box 99
Edmond
Idalou
OK
Tx
73083-1639
79329
Jim & Christine Johnson Revocable
Living Trust 1301 E Itasca Lubbock TX 79403-3407
Joann Grimes Family Trust 1 2282 E Claxton Ave Gilbert AZ 85297
Jodell M Simmons Trust 2302 Slide Rd Unit 29 Lubbock TX 79407
Johnson., Holdings, LLC Ileene Huffard 1 182 Brenrich Cove South l
Attn: Memphis TN 38111
Juanita E Phillip Trust c/o Cynthia K Alexander, Trustee 16001 84th St Lubbock D( 79424-3686
K & S Parrott, LLC I PO Box 30668 Amarillo TX 79120
Kastman Interests, Ltd 1c/o Marjorie C Kastman, Manager PO Box 5930 Lubbock TX 79408-5930
KDR Feeders, Inc 2784 Hwy 54 Petersburg TX 79250
Kenebrew Minerals, LP 105 Main St ldalou TX 79329
King Ranch Turfgrass, LP Three Riverway Suite 1600 Houston TX 77056
KR&M, LLC
,
i PO Box 5930 Lubbock TX 79408-5930
3 of 20 101
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - Wadsworth
Attachment 2b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Kurklin Family Trust PO Box 312 Petersburg TX 79250-0312
L Murfee Investments, Ltd PO Box 10313 Lubbock TX 79408
L V Pounds Estate 518 N FM 400 Lubbock Tx 79403
Leonard Family Farm c/o R Michael Leonard 107 Wisconsin Ave Montreal WI 54550-9700
Leslie Jean Brashear Nichols Estate
Trust RT 2 Box 169 ldalou Tx 79329
Lisa Pryor Johnson Trust PO Box 250
7212 Joliet Ste 9A
Marble Falls
Lubbock
TX
Tx
78654
79423 LU Ventures, LLC
Lois Cone Bates Trust PO Box 3457 Lubbock TX 79452-3457
Lone Star Orchards, LLC 1 12206 E Highway 62 ldalou Tx 79329-6148
Los Carnales MC 3306 75th St Lubbock TX 79423
Louise & James Waters Trust c/o Jim Farley, Southwest Bank PO Box 65269 Lubbock Tx 79464
Louise Johnson & James Waters
Revocable Trust c/o Southwest Bank 1901 W Loop 289, Suite 4 Lubbock TX 79407
Loyd B & Shirley 0 Hancock Family
Trust PO Box 1818 Azle TX 76098-1818
Lutrick Investments, Inc 33 Arapaho Rd Ransom Canyon TX 79366
Margaret B Rhodes Estate 5357 Las Colinas Blvd #2205 Irving TX 75039
Margaret M Crowley Revocable
Trust 1916 W 2nd St Arlington TX 76013-6515
Margarett Cregg GST Trust 1
c/o Margaret Cregg, Trustee 2909 Graphic Place Plano TX 75075-1511
Mark Ellerd Estate 3118 N Hwy 385 Levelland TX 79336
Martin Family Farms, LP 202 N Van Buren Lorenzo TX 79343
Mary Ann Farris Trust c/o Harry Jung PO Box 93063
PO Box 3217
Lubbock
Albany
TX
TX
79493-3063
76430 Matic Investments, Ltd
MC Lane Food Service PO Box 5550 Lubbock TX 79408-5550
McDougal Farms, LLC c/o Diane Sargent 4814 Danbury Wichita Falls TX 76308-5206
Michael Bentley Real Estate
Holdings, LLC 3883 Turtle Creek Blvd #Ste 711 Dallas TX 75219
Milner Brothers c/o Danny Milner 2402 FM 54 Petersburg TX 79250-3407
Mimms Farms 2108 N FM 789 Lorenzo TX 79343
MKH Farms 2633 FM 54 Petersburg TX 79250-3410
Nancy Kay Savino Revocable Trust c/o Southwest Bank 1901 W Loop 289 Ste 4 Hale TX 79407-1725
Natalie Frances Rush Estate Trust Attn: Robert P Rush PO Box 64293 Lubbock TX 79424
4 of 20 102
Sharyland Utihties, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 I
Name First 2 c/o, dba, Attention Address
I
City State Zip
Nita Louise Murray Revocable Trust 2399 County Road 2998 Windom -rx 75492-4032
Nora Louise Debusk Trust
c/o Gary M & Ronald E Debusk,
Trustees 19809 N FM 400 idalou TX 79329
0 Bar 0 Heritages Enterprises, LP [ 6725 US Highway 380 Snyder -rx 79549-9331
Olive P Bolander Life Estate 'PO Box 98 Vadito NM 87579
Ottis Isom Estate
Patschke Land & Cattle, Inc —
1 . Is 1 813 W 7th St - —
-- Attn -Bruceom
8520 E FM 40
idalou
Lubbock
-rx Tx
79329
79403
Peggy Greenwood Revocable Trust
1 c/o Southwest Bank 1 1901 W Loop 289 Ste 4 Hale TX 79407-1725
Pinkies, Inc [1426 E 8th St Odessa -rx 79761-4803
Promise Land Dairy 1708 E 2nd St Portales NM 88130-5005
Pyco Industries, Inc 1 1 12901 Ave A Lubbock TX 79404-2231
Quatro Hermanas Trust [ c/o Eileen T Garcia & Karen T Soriano,
1
1Trustees 14608 85th St 1
Lubbock -n( 79424-4132
Rail Property Management c/o Ken & Rex Isom 1214 Ave K Lubbock TX 79401
Randall & Kelsey McGee Living
Trust PO Box 17 ldalou Tx 79329
Rick Saigling GST Trust i c/o Rick Saigling 7208 Da lewood Drive Plano TX 75074-8920
Robna Overly Estate
1 2416 Marshall St Lubbock Tx 79415-1202
Rodney R Harmon Life Estate PO Box 278 Idalou TX 79329
Roscoe Sides Trust RT 1 Box 433 Lubbock Tx 79401
Roundpoint Mtge Servicing Corp 5016 Parkway Plaza Blvd #Ste 200 Charlotte NC 28217
Saddlehorn Invest, Inc 1902 33rd St Lubbock Tx 79411-1822
Salisbury Children Trust
1 Attn. Kevin Salisbury, Trustee 2610 24th St Lubbock TX 79410-1632
Scott & Amanda Harmon Trust for
Jett Long Harmon , PO Box 99 ldalou Tx 79329
Seggern Farms 1700 CR 446 Taylor TX 76574-5642
Sell Family, Inc 406 Topeka Ave Lubbock Tx 79416
Shanel, Inc c/o HS Patel, President 1700 Pacific Ave #Ste 4610 Dallas TX 75201-4604
Slaton L Trust 1Attn. Sue Clutter 8866 Hillside Dr Newburg IN 47630
Solo Estrella Partners, Ltd 1201 Mellon St Little Rock AR 72207-6146
Southwestern Public Serv Co c/o Property Tax Dept 1P0 Box 1979 Denver CO 80201-1979
Steven A & Kathleen D Nichols
Family Trust 1 [ 331 W Citrus Street Colton CA 92324
5 of 20
103
Maryland Utihties, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kv Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Susan A Lynn Revocable Trust
,
2802 W Country Club Dr Oklahoma City OK 73116-4221
Taters, Inc 2974 FM 789 Petersburg TX 79250-3431
Terra Miller, LLC 309 State Highway 207 Post Tx 79356-5142
Texas Tech University PO Box 42021 Lubbock Tx 79409
Texland Petroleum, Inc c/o K & D, Inc 307 W 7th St Ste 1110 Ft Worth Tx 76102-5199
Thomas Barrett, Investments ETA 7909 E FM 40 Lubbock Tx 79403-9617
Thomas P Kelly Life Estate 4203 County Road 3100 Lubbock Tx 79403
Tims & Chambless Family Trust PO Box 216 Abernathy TX 79311
Tooker Properties, Ltd PO Box 575 Midlothian Tx 76065-0575
Triple E Farms Attention. Cooper Ellison PO Box 698 Petersburg TX 79250-0698
Triple E Farms, Inc PO Box 698 Petersburg TX 79250-0698
US Department of Defense Siting
Clearinghouse
: c/o Mr Ron Tickle
Executive Director
3400 Defense Pentagon, Room
5C646 Washington DC 20301-3400
VLB, #130142 c/o Juan Luis Torres RR 1 Box 692 Lubbock TX 79403-9687
VLB, #150706 c/o Roberto Nava 'PO Box 25 Petersburg TX 79250-0025
VLB, #91186 Attn. Jose M Rodriguez 3301 N CR 3500 Lubbock TX 79403-9627
W A Alspaugh, Inc 9302 CR 3860 Slaton TX 79364
W Eugene & Francis Pate Trust PO Box 190 ldalou TX 79329-0190
Walker Broadcasting &
Communications, Ltd 1500 Broadway St #511 Lubbock TX 79401-3117
Walter 0 Heinrich Family Trust c/o Lillian Heinrich, Trustee 6550 43rd B-104 Lubbock Tx 79407
Wind Blown Investments, LLC 8308 E County Road 5900 ldalou Tx 79329-6252
Adames Manuel Adames Ruby PO Box 414 New Deal Tx 79350-0414
Adams Ricky Lynn Adams Darrell Gene 805 Highland Drive Big Spring Tx 79730
Adams Donna Faye 1502 N County Road 3100 Lubbock Tx 79403
Adams Thomas Adams Donna 1502 N CR 3100 Lubbock TX 79403
Adams C Powell Adams Carol 7317 E FM 40 Lubbock Tx 79403
Adams Richard C Adams Elisa 7327 E FM 40 Lubbock Tx 79403
Adkins Beverly Adkins Shannon 1 806 Dogwood Ave ldalou TX 79329-9021
Adkisson, et al Marie 13701 E FM 597 Abernathy Tx 79311
Anders Loyd 1 4105 E 17th St #Apt B Lubbock Tx 79416-6061
6 of 20 104
Sharyland Utilities, L P. Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kv Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Andress Philip Todd 10909 County Road 2270 Lubbock TX 79423
Anthony Kary Anthony Lesa PO Box 919 ldalou TX 79329
Armstrong Curtis 8907 E CR 5700 ldalou Tx 79329-6185
Ashley Aaron Joseph 11416 E County Road 5900 ldalou Tx 79329
Attebury Wade Atte bu ry Alice .1 901 Vel Ray Drive Abernathy TX 79311-2009
Attebury Shane f0 Box 50 New Deal TX 79350-0050
Babbitt Clifford Babbitt i Diane 15619 N FM 400 ldalou TX 79329-9712
Bacilio
Bailey, et al
Gerardo
Rome
_ 4002 CR 3300 Slaton
Lubbock
TX
Tx
79364
79403-4039 1703 E Amherst St
Baird Patty N 14806 N CR 2700 Lubbock TX 79403
Baker Lanni Mack 13104 N CR 3600 Lorenzo TX 79343-9412
Baldridge Buddy 6725 US Highway 380 Snyder TX 79549-9331
Ball Laurie 2308 Boca Raton Mequite TX 75150-1952
Barter Ken Von Duclos 10461 Hampton Dr Anchorage AK 99507
Bateman Katherine E 1400 Raines St Arlington TX 76010
Baze Mrs Grady P 15301 N FM 2902 ldalou -rx 79329
Baze Bobbie l L 15301 N FM 2902 ldalou TX 79329
Becton Ute Becton Loretta 905 W 8th St ldalou TX 79329-9058
Becton A James 808 Juniper Ave ldalou TX 79329-4207
Becton Jimmie L 1 812 Frontage Rd ldalou TX 79329-9100
Becton A James Becton Bonnie Ann 808 Juniper Ave ldalou TX 79329-4207
Becton A lames Motley Robert F 5626 86th St Lubbock Tx 79424
Benson Huland A 'c/o Roxanna Williams 1715 E Auburn St Lubbock Tx 79403
Berry Joshua Berry Kelli 16225 N CR 3600 Petersburg TX 79250-3451
Bessent Kade 1 PO Box 65232 Lubbock Tx 79464
Bird, 11 Jay C 4012 139th St Lubbock Tx 79423
Bland Lance Bland Tina 12828 E County Road 6610 Slaton TX 79364-8261
Blanton
Blanton
George Lee
George L
Blanton G Genell
1
PO Box 891 ldalou TX
TX
79329-0891
79329-0891 PO Box 891 ldalou
Bloomfield Janette 18132 Forest Briar Ct Glencoe MO 63038-1466
Bolander Olive P PO Box 98 i Vadito NM 87579-0098
Boman Robert Lewis 12802 E Highway 62 ldalou TX 79329-6149
Boyd Blake 1 Boyd Felicia G 1 1306 Raleigh St Slaton TX 79364
Boyd Peggy 1
3922 96th St Lubbock TX 79423-3934
Bozeman Margie 7608 N CR 3000 ldalou TX 79329-6127
Bozeman Larry 10612 E CR 6200 ldalou TX 79329-6145
Bozeman, Jr Viele C 7716 E County Road 6100 ldalou TX 79329-6134
Bradshaw David Arthur 1 5401 72nd St Lubbock TX 79424-2021
Bradshaw Helen Arlene 5207 20th St Lubbock TX 79407
Brightbill Darryl Brightbill Patricia PO Box 192 Abernathy TX 79311-0192
Bristo Earl Marcus 14722 N County Road 3100 ldalou TX 79329
7 of 20 105
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Bristo Earl Marcus Bristo Kimberly Donnet 14722 N CR 3100 ldalou TX 79329-9734
Brown Rodney Wayne 12623 E County Road 5540 Lorenzo TX 79343
Brown Bill W 4003 19TH ST Lubbock Tx 79410
Buckman William Boyd 13101 N County Road 3900 Lorenzo TX 79343-9802
Buckman William Boyd 13101 N CR 3900 Lorenzo Tx 79343
Buckman
Buckman
William Boyd
Buckman Cheryl Ann
HC 2 Box 160 Lorenzo
Lorenzo
TX
TX
79343-9802
79343-9606 William Russell , RR 1 Box 156A
Burnett Craig D 14706 N CR 2700 Lubbock TX 79403
Butterfield Sheila K 1 3908 77th St Lubbock Tx 79423-1224
Byrd Chad Byrd Kerry , PO Box 95 Petersburg TX 79250-0095
Carlisle, Jr John Ralph 13 W Lakeshore Dr Ransom Canyon TX 79366-2517
Carlton, Jr William H PO Box 322 Slaton TX 79364
Carter Noel W Carter Mary K 5103 E County Road 5400 ldalou TX 79329-6162
Casares Daniel S Casares Elvia M PO Box 462 New Deal Tx 79350-0462
Chavez Victor S PO Box 94068 Lubbock TX 79493-4068
Christopher David Christopher Karen 11303 E CR 5500 ldalou TX 79329-6236
Clapp Gordie D Loper Martha Jane c/o Mark Clapp , 5022 S Fannin St Amarillo TX 79110-3202
Clapp, et al G D Loper Martha 1 c/o Mark Clapp 5022 S Fannin St Amarillo TX 79110-3202
Clark Jimmy D 1512 N CR 3900 Lorenzo TX 79343-9603
Clark Jimmy Clark Rita 1512 N CR 3900 Lorenzo Tx 79343
Clawson Chad 6102 E CR 5400 ldalou TX 79329-6161
Cole, Jr W S PO Box 9 Rule TX 79547-0009
Collier Shellie 4122 E CR 5400 Lubbock TX 79403-9786
Collins Jonathan Collins Rachelle PO Box 435 Petersburg Tx 79250-0435
Colwell Kim K Colwell Ronald K 7212 Joliet Ave Ste 9 Lubbock Tx 79423
Colwell
Conrad
Rene
Aaron R Conrad Debbie 1
7212 Joliet Ave Ste 9
5709 E FM 597
Lubbock TX 79423
Abernathy Tx 79311
Cook Robert Hugh PO Box 1296 ldalou Tx 79329-1296
Cooley Justin D Cooley Brandee D PO Box 917 ldalou Tx 79329-5105
Corrales Jusus G Corrales Jaquez Ilse ,4908 E County Road 5000 Abernathy D( 79311
Coursey Michael Claylan Coursey Sara Annette PO Box 36 New Deal TX 79350
Covington Elvin PO Box 719 Broken Bow OK 74728
Cox, III Charles Robert Cox Jennifer High 12625 N CR 2700 Lubbock Tx 79403
Crawford James D Crawford Tanya D 702 Vardo Ln Lubbock Tx 79403
Criswell W B Criswell Jo Ellen 804 W 6th St ldalou Tx 79329-9046
Criswell Jo Ellen 806 W 6th St ldalou TX 79329-9046
Crumpler, et al Wesley C 712 lOth St Abernathy Tx 79311-3006
Cunningham Edward George 10615 E CR 6840 Slaton Tx 79364
Davis Jimmie L Davis Betty Gale 17621 NI-27 Abernathy Tx 79311-5322
Davis Suesen Louise Phelps Benjamin Richard 12525 N FM 1729 ldalou Tx 79329-6007
8 of 20 106
Sharyland Utilities, L.P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2
,
Name First 2 c/o, dba, Attention Address City State Zip
Davis Brent W 11001 E CR 6400 Lubbock TX 79403-7804
Davis Brent Wesley 11001 E CR 6400 Lubbock TX 79403-7746
Davis Venita L 1 110910 E FM 40 Lubbock TX 79403-7716
Davis Barbara Jones Terry 12 Navajo Trail Ransom Canyon TX 79366
Davis Elizabeth Jones Janis 12 Navajo Trail Ransom Canyon D( 79366
Dawdy John Owen '611 FM 784 Floydada Tx 79235-5241
Day Vicki L 5701 E Muriel Dr Scottsdale AZ 85254
De La Garza Conrado , PO Box 181 ldalou Tx 79329-0181
Debusk Howard D Debusk Patricia S 1003 Mimosa St ldalou TX 79329
Debusk Gary Monroe ,
9809 N FM 400 ldalou TX 79329-6035
Downey Larry T Downey Kristi D ,P0 Box 53899 Lubbock TX 79453
Dunn Franklin G 141 N FM 2902 ldalou TX 79329
Dunn Robin K Dunn Cheryl A 1615 Avenue H Abernathy n( 79311
Dunn Virginia L PO Box 232 ldalou TX 79329-0232
Edmonds Charles H PO Box 35856 Houston TX 77235-5856
Ellerd James M 3118 N Hwy 385 Levelland TX 79336
Ellison Douglas C PO Box 325 Petersburg TX 79250-0325
Ellison Patricia Anne 4801 French Quarter Ct Lubbock Tx 79424-4022
Ellison Douglas 1 PO Box 869 Petersburg TX 79250
Ellison Virginia PO Box 698 Petersburg TX 79250
Emery Horace Don Leonard Jeanne Ann Emery 3912 Esquire Ct Bryan TX 77808
Englund D W Englund Donna Kay 1540 W Lubbock Slaton TX 79364
Eppes Cory Gorton 106 Twin Creek Ln Kennet Square PA 19348
Ethridge Diane 2808 County Road 3500 Lubbock TX 79403
Eubank Charlsie Meyers 6208 N FM 1264 Lubbock Tx 79415-4708
Faulkner James C _ _ Faulkner _ Faulkner
Glenda Sue 6812 E CR 6000 ldalou Tx 79329-9618
79329-9618 Faulkner James C Sue W 6812 E CR 6000 ldalou TX
Foerster Earl 7412 Huron Ave Lubbock TX 79424
Foerster Marc 5907 FM 835 Lubbock TX 79403
Foerster Floyd Dean i
5019 146th St Lubbock TX 79424
Follis Dusty Follis Valerie S 12403 N CR 3300 ldalou TX 79329-6183
Ford Greg 1 1620 Ave 1 Abernathy TX 79311
Ford Timothy L 13806 CR 5800 Lubbock Tx 79415
Foreman Don '801 W 8th St ldalou TX 79329-9057
Fortenberry Seth S Fortenberry Katie A 904 W 9th St ldalou TX 79329
Franklin Jerry W PO Box 487 Wolfforth TX 79382-0487
Franklin, et al Carrie L Lutrick Ich Life Estate - Mary L Lutrick 10310 Vicksburg Ave Lubbock TX 79424-7339
Fritz Carol A 5815 E FM 835 Lubbock TX 79403-7034
Fritz David L , 501 Hickman St Boerne TX 78006-2714
9 of 20 107
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b 345 kv Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention I I Address City State Zip
Fritz Kenneth W 2308 FM 1729 Lubbock Tx 79403-7049
Fritz Mary Jan 5901 E FM 835 Lubbock Tx 79403-7036
Fritz Kenneth 2308 FM 1729 Lubbock TX 79403-9664
Fritz Carol Angela , 5815 E FM 835 Lubbock Tx 79405
Fritz David 501 Hickman St Boerne Tx 78006-2714
Fulton
Fultz
Glenith .1
David Ken Fultz
, 12020 McCutcheon Ave
Pamela A 1P0 Box 1335
Shreveport
Idalou
LA
TX
71108-5818
79329-1335
Furgeson Eddy J 902 W 8th St ldalou -rx 79329
Furgeson Eddy Furgeson Cindy 1 902 W 8th St ldalou TX 79329-9058
Furgeson Eddy Jay Furgeson Cynthia Ann 1902 W 8th St ldalou TX 79329
Furgeson Hattie ipo Box 327 Lorenzo TX 79343-0327
Furgeson Eddy 1 Furgeson Cynthia A 902 W 8th St ldalou TX 79329-9058
Galindo Javier PO Box 414 New Deal -rx 79350
Gandy Joshua C Gandy Melissa P 428 N FM 789 Slaton -rx 79364
Garrett Phil Garrett Julia 13146 Barry Knoll Ln Houston -rx 77079
Gentry Greg 2416 Marshall St Lubbock -rx 79415-1202
Gilbert Nellie Y PO Box 264 New Deal TX 79350-0264
Ging, et al Calvin J c/o Mark Mohr 410 Water Oak Dr Cedar Park -rx 78613
Givens Jerry PO Box 320 Abernathy -rx 79311-0320
Glenn, et al Dustin R Glenn Andrea B 808 Highway 90 W Holt FL 32564
Goble Martha Dianne 1202 8th St Shallowater TX 79363-5112
Gonzales Roy Gonzales Maria Elena 9601 N Detroit Ave Lubbock -rx 79415
Gonzales Virginia 11201 E CR 6000 ldalou TX 79329
Grair Charles Alan 2614 26th St Lubbock TX 79410
Green Reba Joy H PO Box 65 Slaton TX 79364-0065
Greene Jamethy Patrick
Peggy
2912 E CR 7200
c/o Southwest Bank 11901 W Loop 289 Ste 4
Lubbock
Lubbock
-rx TX
79404-8208
79407 Greenwood
Gregory Tom R Gregory Amy S PO Box 185 Petersburg TX 79250-0185
Grizzell Don Grizzell Virginia 10913 E County Road 6000 Slaton TX 79364-9649
Grizzell Mark Grizzell Tavia 4012 CR 3550 Slaton TX 79364
Groce Gaylord IPO Box 314 Petersburg TX 79250-0314
Groce Shirley ,903 N Main St ttUnit 138 i
San Angelo TX 76903
Guerrero Paul Amherst St 13314 Lubbock TX 79415
Habbinga Richard John 1422 Circle Ridge Dr West Lake Hills TX 78746
Haberer-Boyd Stephenia 1 RT 2 Box 177 ldalou TX 79329
Halbrooks Jane 5401 9th St Lubbock TX 79416
Halbrooks John 5401 9th St Lubbock TX 79416
Halbrooks Melvin 5401 9th St Lubbock -rx 79416
Hall Deborah 8902 Kewanee Ave Lubbock TX 79424-7034
Hall Mark Hall Anna 15305 N FM 400 ldalou TX 79329
Hamby James A Hamby Virginia A 9603 E CR 550 Idalou TX 79329-6201
10 of 20
108
glaryland Utilities, L P
Landowner Mailing Ust
PUC Docket No. 48668 Abernathy - Wadsworth
Attachment 7b 345 0/ Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention , Address City State Zip
Hamel Matt PO Box 507 Slaton Tx 79364-0507
Hamilton Ginalu Tipps Tanya-H 10714 Orlando Ave Lubbock TX 79423
Hamilton Ginalu Tipps , Tanya 10714 Orlando Ave Lubbock TX 79423
Hamilton Craig PO Box 73 Spur -rx 79370-0073
Hamilton Ernmett PO Box 73 Spur -rx 79370-0073
Hamilton Margaret PO Box 73 Spur TX 79370-0073
Haralson Garry Don 8911 E FM 40 Lubbock TX 79403
Harkey Wayne V
Laura Leigh
Harkey Laura Leigh 1 i PO Box 236
PO Box 236
Abernathy
Abernathy
-rx TX
79311-0236
79311-0236 Harkey I
Harkey Curtis L PO Box 339 New Deal TX 79350
Harkey Lacey S Harkey Lindsey G 2505 Newcomb Lubbock TX 79415
Harkey Fredrick A 2505 Newcombe Lubbock TX 79415
Harkey Wayne PO Box 236 Abernathy TX 79311-0236
Harkey, Jr Fredrick A Harkey Laura G 2505 Newcomb Lubbock TX 79415
Harkey, Jr Fredrick Andrew 2505 Newcomb St Lubbock Tx 79415
Harkins Linda Joyce PO Box 947 ldalou TX 79329-0947
Harkins Linda 1 PO Box 947 ldalou TX 79329-0947
Harmon Rita 2302 Slide Rd #Unit 28 Lubbock TX 79407
Harmon Amanda PO Box 99 ldalou TX 79329
Harmon James Wade Harmon Dana S 1 PO Box 714 Lorenzo TX 79343-0714
Harmon James Wade PO Box 714 Lorenzo TX 79343-0714
Harmon Mack ,
PO Box 714 Lorenzo TX 79343-0714
Harper Charles 6609 E CR 6650 Lubbock -rx 79403-9662
Harris Richard G Harris Deborah L 10601 E FM 40 Lubbock TX 79403
Harrison
Harrison
Claiborne
Michael R
Harrison
Jamison
Rebecca PO Box 1499
1307 Avenue G
Wolfforth
Abernathy
TX
TX
79382
79311 Susan J
Hatchett William Hatchett , , Twila PO Box 64730 Lubbock TX 79464-4740
Hatley Tammy Sue 1
PO Box 495 Smyer TX 79367-0495
Hayes Debra McKinney Stanley 5704 62nd St Lubbock TX 79424
Heard Martin Perry 8012 Brentwood Ave Lubbock TX 79424-2820
Heard Martin P 8012 Brentwood Ave Lubbock TX 79424
Heard Sam 2830 County Road CC Petersburg TX 79250-3421
Hegi Rex Hegi Becky 510 lOth St Abernathy TX 79311-3002
Hegi Rex 510 lOth St Abernathy TX 79311-3002
Hegi Sandra 2584 FM 54 Petersburg TX 79250-3408
Heinrich Joseph Wayne 1
1311 Raleigh St Slaton TX 79364-2829
Henley Sandra Henley Eddie 11826 E CR 6300 Lorenzo TX 79343
Herrington Jolynn PO Box 152 ldalou TX 79329-0152
11 of 20 109
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - Wadsworth
Attachment 7b 345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Hettler Terry K 3901 Montecito Dr 919 Denton TX 76210-5568 Hettler Mary Lanay 6829 Tanaqua Ln Austin Tx 78739-2063 Hilbers Donald G Hilbers Janet 3802 105th St Lubbock TX 79423-8103 Hilbers Gerry Hilbers I Patsy ,819 Mimosa Ave ldalou TX 79329-9032
Hilbers Donald G
1
3802 105th St Lubbock TX 79423-8103 Hilbers Donald G Hilbers Gerald C 3802 105th St Lubbock TX 79423 Hill
Hiracheta
Ruth Benton
Kristopher Hiracheta
601 Rockdale Rd
Lindsey 12110 E FM 40
Cleburne
Slaton
TX
TX
76033
79364
Hobbs Larry Dale Hobbs 1
Cinda Louann RR 2 Box 388 Slaton TX 79364-9554 Hodgin Janet
1 PO Box 151 ldalou TX 79329
Hodgin William F Hodgin Janet PO Box 151 ldalou TX 79329-0151
Hodgin Bill Hodgin Janet PO Box 151 ldalou TX 79329-0151
Hoffman Thomas Allan 9006 Rockcrest Dr Austin -rx 78759-7322 Hoggard Willie Dewayne PO Box 264 New Deal Tx 79350-0264 Holbert Joan 8919 E County Road 5700 ldalou TX 79329-6185 Holder Jordan 7311 E County Road 6500 Lubbock Tx 79403 Holland Wayne 3739 50th St Lubbock TX 79413-3913 Holly Franklin T
I PO Box 394 New Deal TX 79350-0394
Hopper Marjorie Brown Janiece 16452 W 74th St Arvada CO 80007 Horn Carl i Attn. Peggy Rogers 2418 Kent St Lubbock TX 79403 Houchin Gary Houchin Mary Alice PO Box 54 } Wilson Tx 79381-0054 Houchin Truma 111372 W US Highway 90 #Lot 52 Del Rio TX 78840-3432 Huddleston Ellis c/o Dennis & Nita Rylant 4420 E CR 5400 Unit #2 Lubbock TX 79403-8239 Huddleston Ellis PO Box 6910 Las Cruces NM 88006-6910 Huffman Kirby Huffman 1 Velma RR 3 Box 187C Lubbock Tx 79403-9786 Huie
Isom
William
Kenneth
Huie
Isom
1 Gail c/o Bill LaFont 1 P0 Box 1510
Julie S 10506 N FM 1729 1
Plainview
ldalou
-n(
Tx
79073-1510
79329 Isom Bruce I 813 W 7th St Space #1 ldalou TX 79329-9040 Isom Kenneth W Isom Jule S 10506 N FM 1729 ldalou Tx 79329 Isom Bruce Isom Wayne 813 W 7th St ldalou TX 79329 Isom Rex Isom Ken 1 1214 Ave K Lubbock Tx 79401 Isom Larry PO Box K ldalou Tx 79329-0320 Jack Kelly D Jack Teresa D 6423 E FM 1294 ldalou TX 79329 Jackson Lee 4525 E FM 597 Abernathy Tx 79311 Jackson Richard L Jackson Frances 4525 E FM 597 Abernathy TX 79311 Jackson Jeremy Charles PO Box 3005 Lubbock Tx 79452-3005 Johnson Casey Johnson Shannon ,8911 E County Road 5300 ldalou TX 79329
Jones Dorothy Sue 2416 Marshall St Lubbock Tx 79415-1202 Jones Randee Jones Cary 10106 N County Road 3000 ldalou TX 79329-6125 Jones Fred Jones Sandra 64 E Canyonview Dr Ransom Canyon TX 79366-2306 Jones Tammi Jones I Royce 12 Navajo Trail Ransom Canyon TX 79366
12 of 20
110
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - Wadsworth
Attachment 7b 345 kv Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2
1 1
c/o, dba, Attention Address 1
City State Zip
Jordan Bob 1 1 5617 Villa Dr Lubbock TX 79412-3213
Josey Kohen 1349 State Highway 207 Post TX 79356-5100
Kelly Thomas P 1
4203 CR 3100 Lubbock TX 79403-9647
Kepler Geraldine Fulton 11465 Strait Ln Dallas TX 75229-2970
King
King
Nelda K
E 1
5524 76th St Lubbock TX
TX
79424
79250-9203 RR 1 Box 82 Petersburg
Kitten Roger H Kitten Janice M ,20402 CR 3300 Slaton TX 79364-7120
Kitten Nicholas Kitten Leslie ' 5406 County Road 7520 Lubbock TX 79424
Kitten Roger H Kitten Janice 120402 CR 3300 Slaton TX 79364
Kitten Timothy G Kitten Carrie 909 W 9th St ldalou TX 79329
Kitten Craig Kitten Glenda 5406 County Road 7520 Lubbock TX 79424-5601
Kitten Janet Kitten Timothy 5406 County Road 7520 Lubbock TX 79424-5601
Kitten Jeffrey 5406 County Road 7520 Lubbock TX 79424-5601
Kitten Nicholas 1 Kitten Leslie A 5406 County Road 7520 Lubbock TX 79424-5601
Kitten Janet 7008 59th St Lubbock TX 79407-8205
Kitten Nicholas J 5406 CR 7520 Lubbock TX 79424
Kizer Aaron Kizer Kristi , 14501 N CR 3300 ldalou TX 79329
Klatt Nathan Christopher Klatt Ashley Brooke 2258 Interstate Highway 27 87 Hale Center TX 79041-3632
Klatt Wallace K Klatt Kathy K 11431 FM 1424 Hale Center TX 79041-3842
Kneisley Marshall Kneisley Francee 16204 N FM 2902 Abernathy TX 79311-5417
Knight Glenn D 6506 County Road 6420 Lubbock TX 79416-9704
Knight Shawn L i
1616 Avenue 1 Abernathy TX 79311-2010
Knight Todd 1616 Avenuel Abernathy TX 79311-2010
Knight Wendy 1616 Avenue 1 Abernathy TX 79311-2010
Knight Redgie Rayona 4607 Cape Colony Dr Amarillo TX 79119-6539
Kurklin Evelyn PO Box 312 Petersburg TX 79250-0312
Kurklin
Kurklin
Kent Eugene
Melisa ,
RR 1 Box 95C Petersburg
Snyder
TX
D(
79250-9208
79549-8530 1534 CR 265
Kveton Mike 470 FM 54 Petersburg TX 79250-4035
LaFont William H LaFont Ellie PO Box 1510 Plainview TX 79073-1510
Langley John 6515 E County Road 6700 Lubbock TX 79403-7667
Lee, et al Marzee Jane 11402 FM 2159 Calvert TX 77837
Lemon Calvin Lemon Sandra 115513 N CR 3100 ldalou TX 79329
Lemon Calvin D Lemon Sandra L 15513 N County Road 3100 ldalou TX 79329
Leserve Nigel Paul 1823 Emerald Bay Dr Rockwall TX 75087-3284
Light James 1 Light Ginger G 11005 N FM 1729 ldalou TX 79329
Lincecum Robert L Meadows Mary Lincecum 16320 Greenwood Ave N Shoreline WA 98133-5625
Loe Patricia Dillon PO Box 13613 Arlington TX 76094-0613
Long Kendall Long Katie E County Road 5900 ,10825 ldalou TX 79329-6214
Long, et ux Aubrey N Long Lynn A T3919 E FM 1729 Lubbock TX 79403
Looney Marvin A 16808 N FM 2902 l
Abernathy TX 79311
Looney Perry , 5920 E CR 5400 ldalou TX 79329
Looney Will Perry TRR 1 ldalou TX 79329-9801
13 of 20
111
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - Wadsworth
Attachrnent 7b 345 IN Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 ,
Name First 2 c/o, dba, Attention Address City State Zip
Looney Dorinda Lee 5920 E CR 5400 ldalou Tx 79329
Lopez Angie 16204 N FM 789 Petersburg TX 79250
Lopez Benito R HC 2 Box 116 Lorenzo Tx 79343-9416
Magness Mary Lois Magness Elizabeth c/o Elizabeth Robbins 6219 E FM 1729 ldalou Tx 79329-6168
Mann Baljit Kaur Randhawa Jagdish Kaur 334 NW 120th Dr Coral Springs FL 33071
Marr
Marshall
Lula Marie
.1 Chris Marshall
c/o Natile Marr Woodrow Trustee _ ,
Karen W
PO Box 851 Shallowater
Slaton
TX
Tx
79363-0851
79364 128 N FM 789
Marshall Lynda Lou 12512 E FM 40 Slaton Tx 79364 Martin Terry Lee Gowens Sandra K PO Box 288 New Deal TX 79350
Martin Terry Lee 17624 N County Road 2700 Abernathy TX 79311-5336
Martin Susan Werhan PO Box 14 Montezuma GA 31063-0014
Martin, Jr Rufus Benjamin HC 2 Box 64 Lorenzo Tx 79343-9423
Martinez Martin E 12509 N FM 1729 ldalou Tx 79329-6007 Martinez Glofiro 2207 Maedell Dr Killeen TX 76542
Massey Laree , , 9111 Justice Ave Lubbock Tx 79424
Massey Marillee Wilson 17018 Cinnabar Dr Frisco Tx 75035 Masten Larry B 16726 N FM 2902 Abernathy Tx 79311-5415
Mayo Joyce Vesta Amerson 2108 W Jackson Ave McAllen TX 78501-7243
Mayo Jackie 212 Jade Dr Corpus Christi TX 78409
McCallister Roy Dale 1 1303 County Road 3650 Slaton Tx 79364-8269
McCann Timmy 116 Cumberland Ln Ardmore OK 73401-7566
McGaugh Thelma Ann 1102 13th St Abernathy TX 79311-2414
McGaugh Jackie M McGaugh Janis B 1102 13th St Abernathy Tx 79311-2414
McGehee Heath McGehee 1
Julie I PO Box 1368 ldalou TX 79329
McGehee Heath McGehee Julie J PO Box 1368 ldalou Tx 79329-1368
McGehee Dennis H McGehee 1 Julie PO Box 1368 ldalou Tx 79329
Mclnroe
McKenzie
Dwayne
Gary D
RR 1 Box 34
PO Box 41
ldalou
Abernathy
TX
TX
79329-9706
79311-0041 McNew Rodney Ray , ,2941 Sun Rd Abernathy TX 79311-6013
McPherson Clara 2131 56th St Lubbock TX 79412
McQuary Harold G McQuary Gladys L 5611 E FM 1729 ldalou TX 79329
Megna Mary 5208 18th PI Lubbock TX 79416
Megna Mary Hix 3410 98th St #Ste 4 Lubbock TX 79423-3847
Melcher John C 1565 W Garza St Slaton TX 79364-3621
Melcher John C Melcher Quita 1 1565 W Garza St Slaton TX 79364-3621
Melcher Robert 4408 17th St Lubbock TX 79416-5702 Metzler Michael E Metzler Heidi 1708 N Genoa Ave Lubbock TX 79416-9675
Metzler Michael E Metzler Heidi K 1708 N Genoa Ave Lubbock TX 79416-9640
Meyer Jennifer T 729 Lancashire Ct Lincoln NE 68510-5216 Mickan Russell Speer Kay Mickan 13191 Lomas Rodando Calzada Kempner TX 76539 Miller Markus F Moller Celia Rodriguez i 1762 FM 2060 1 Abernathy TX 79311-6028 Miller Markus F Miller Celia R 1762 FM 2060 Abernathy Tx 79311-6028
14 of 20 112
Sharyland Utilities, L P
Landowner Mailing List
PuC Docket No 48668 Abernathy - Wadsworth
Attachment 7h
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Miller Markus Festus Miller Celia R 1 RR 1 Box 9 Abernathy TX 79311 Miller James A IRR 1 Box 50B ldalou TX 79329-9713 Mimms Susan A '511 N CR 3800 Lorenzo -rx 79343
Mimms Bobbie Lee 43 E Canyon View Dr Ransom Canyon TX 79366 Mitchell Charlie Mitchell Mack Ic/o Randall Roberts PO Box 759 Plainview D( 79073-0759 Montez Jessus , 417 Milwaukee St Houston TX 77009
Montgomery Clifford L I '2126 57th St Lubbock Tx 79412-2626
Moore Anna B 11909 E FM 40 Slaton TX 79364
Morrison Katy M
I
PO Box 245 Era TX 76238-0245 Motley LeeRoy 15626 86th St Lubbock TX 79424 Motley Robert 5626 86th St Lubbock TX 79424 Mull Gwendolyn Grimes 805 W 8th St ldalou TX 79329 Munster Candice Werhan PO Box 670452 Dallas D( 75367-0452 Myatt, et al Vivian 2410 E Highway 377 Granbury TX 76049-5922
Myatt, et al John T 2410 E US Highway 377 Grandbury Tx 79049-5922
Nava Ralph Nava [ Amelia [ i PO Box 261 Petersburg TX 79250-0261 Neff A R 16801 State Highway 206 Coleman TX 76834-8139 Neill Marilyn Barnett Moore Anna 11909 E FM 40 Slaton TX 79364 Neill Marilyn Barnett 11909 E FM 40 Slaton Tx 79364 Neis Thomas Blane Neis Julie 1 11906 Vicksburg Ave Lubbock TX 79424-7697 Neis Vernon L '202 Navasota Dr Plainview -rx 79072-6510
Newton
Teresa Ann
Klattenhoff 2711 32nd St Snyder TX 79549 Nichols Wade T Brady Adelaide A 17316 N FM 400 ldalou TX 79329-9716 Nichols Harold Dean RT 2 Box 169 ldalou TX 79329 Noland _
Noret
Betty __
R A
5626 86th St
2726 82nd St
Lubbock
Lubbock
TX
Tx
79424
79423-1428
Norman Jack C 1717 Astro Ct Arlington TX 76012-5436 Nornd David W Wesley Brenda K 608 N Hudson Ave Lubbock TX 79415 Norton Richard Norton Jan 4504 Chicago Lubbock Tx 79414 Nunez Antonio Nunez Reyna
, , 6210 E County Road 6450 Lubbock Tx 79403
Orta Maurilio A Orta Rebecca M 10803 N CR 3300 ldalou Tx 79329-9606 Ostrom Mary Beth 3645 Woodhaven Ln Idaho Falls ID 83404-7926 Owens Sheryl 2921 E Baylor St Lubbock TX 79403
Park Tony Park Rebel i 11705 E CR 6400 Lubbock TX 79403-7745 Parker Billie Wayne 1 1601 Ave 0 Tahoka TX 79373-4117 Patschke Michael Wilde Peyton 8520 E FM 40 Lubbock TX 79403
Patschke Brandon Patschke Ella E ,8819 E FM 40 Lubbock TX 79403-7905 Patschke Michael L 1,8520 E FM 40 Lubbock TX 79403
15 of 20 113
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kv Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2
1
c/o, dba, Attention Address City State Zip
Patschke Michael 8520 E FM 40 Lubbock TX 79403
Patschke Dwayne A Patschke Carla 1 711 CR 3300 Lubbock Tx 79403
Pearson Sylvia Bessent 3703 County Road 3650 Slaton TX 79364-8271
Pereira Veronica M Pereira Albert E 18024 N CR 2700 Abernathy TX 79311-5300
Perez Rene 14321 FM 400 ldalou TX 79329
Perez Jose A
Jackie L
Perez Mary 11308 E Highway 62
4615 91st St
ldalou
Lubbock
TX
Tx 79329-6146
79424-5035 Petree
Petree Larry G PO Box 53120 Lubbock TX 79453-3120
Petree Kristy T 33 Arapaho Rd Ransom Canyon TX 79366
Phillips Stacy Koch Lisa PO Box 886 ldalou Tx 79329-0886
Pope Robert Pope Gwyn , PO Box 306 Abernathy TX 79311-0306
Pope Todd Pope Helen 1413 9th St Shallowater TX 79363-5127
Porterfield David V Porterfield lames R c/o D V Porterfield 1110 Meadow Ridge Dr Duncanville TX 75137-3648
Pounds Keegan Pounds Kaleb 10010 E County Road 6500 Lubbock Tx 79403
Pounds Kevin Pounds Tammy 10010 E CR 6500 Lubbock Tx 79403-7764
Powers Donna Crownover 1805 Dogwood Ave ldalou n( 79329-9023
Powers Bonnie Gay 1 7320 E CR 6710 Lubbock Tx 79403
Powers Stan C Powers Sandra A 7403 95th St Lubbock n( 79424
Price Elizabeth Kay 4413 10th St Lubbock Tx 79416
Protsman Donna 1 Route 1 Box 39 ldalou TX 79329-9707
Protsman Donna 1 1 12510 N CR 3500 ldalou TX 79329
Pruitt Celia Ruth 5201 19th St Lubbock Tx 79407
Rainwater Willard Ray Rainwater Jeffie Ann 2109 Carter St Bastrop TX 78602
Rakestraw John B Rakestraw Darlene V 502 Villa Creek Dr Duncanville TX 75137
Ramirez Juan M Ramirez Laura 10803 N CR 3300 ldalou TX 79329
Ramirez Laura 10803 N County Road 3300 ldalou Tx 79329
Ramirez
Ramsey
Bertha Alicia Gallegos
Myles B
Trevino
Ramsey
Jose Salvador Mendez
Victoria W
3301 N County Road 3500 Unit 2
907 W 7th St
Lubbock
ldalou
TX
TX
79403-7762
79401
Rapstine, et al Melleva 1611 Avenue F Abernathy TX 79311-2103
Reams Shelda Gale Bradshaw Gary 15822 Lomita Springs Dr San Antonio TX 78247
Reid Kyle Reid Linda '8811 E FM 597 Petersburg TX 79250
Reid Randal W Reid Kyla D 10206 E CR 5600 ldalou TX 79329-6200
Reid Gene Star Route, Box 86 Lorenzo TX 79343
Reid Gene 15826 N County Road 3500 Lorenzo TX 79343-5246
Reid Randal 10206 E County Road 5600 ldalou TX 79329
Reilly Amy 1721 FM 54 Abernathy TX 79311-6014
Reynolds Ed R 7106 E FM 40 Lubbock -rX 79403
Rhodes Kathryn Boyd 5357 Las Colinas Blvd #2205 Irving n( 75039
Rieken Ralph Rieken Karl 15006 N County Road 2600 Lubbock Tx 79403
Riemath Brad William ,
HC 2 Box 115 Lorenzo TX 79343-9416
Riley Van Earl 1610 Avenue .1 Abernathy TX 79311-2010
Riley Bob 1611 Avenue E Abernathy Tx 79311-2101
Riley, et ux Van Earl 1610 Avenue 1 Abernathy Tx 79311-2010
16 of 20
114
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kv Transmission Lune in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2
1
Name First 2 1 c/o, dba, Attention Address 1
City State Zip
Robb Don Richard 12618 N FM 400 ldalou Tx 79329
Robbins Elizabeth Ann 1 16219 E FM 1729 ldalou TX 79329-6168
Robbins Randy R 1019 Cedar Ave ldalou TX 79329
Robbins Barbara
1
IPO Box A ldalou TX 79329-0080
Rodriguez Agustin Z Rodriguez Maria 1 6813 E Highway 62 Lubbock TX 79403-7304
Rodriguez Sylvia 1P0 Box 1232 ldalou TX 79329
Rodriquez, Jr
Rojas
Aurelio _ Richard
Rodriquez Renee PO Box 218
T6316 E FM 40 1
ldalou
Lubbock
TX
TX
79329
79403
Rollow, Ill William H PO Box 1507 Ada OK 74821-1507
Rothmund Billy E Rothmund Jeanette L I
10301 N FM 400 ldalou Tx 79329
Runchey Peggy Ann 1717 Norfolk Ave Apt 1180 Lubbock TX 79416-6030
Russwurm Clayton Russwurm Leslie I 23 N Rim Rd Ransom Canyon TX 79366-2226
Rylant Dennis R 4420 E CR 5400 Unit #2 Lubbock Tx 79403-8239
Sage Roger I 723 6th PI ldalou TX 79329-9053
Sammons Roxie Ann 1 5230 90th St Lubbock -rx 79424-4302
Savino Nancy K c/o Southwest Bank 1901 W Loop 289 Ste 4 Lubbock TX 79407
Scarborough Charles I c/o Southwest Bank 1901 W Loop 289 Ste 4 Lubbock Tx 79407
Scarborough David [ c/o Southwest Bank 1901 W Loop 289 Ste 4 Lubbock Tx 79407
Schattel Joy Marie 7204 E Highway 62 Lubbock TX 79403-7295
Schide James Elliott 1 PO Box 697 Colleyville Tx 76034
Schiffmayer Sylvia Sumner 8739 Serenade Ln Houston TX 77040
Schilling Wayne Schilling Mary 1 16912 County Road 3000 Slaton TX 79364-7750
Schoppa Rodney 1 , 2605 CR 2800 Lubbock TX 79403
Scoggins Karen L 216 Scenic Dr Aledo TX 76008-4364
Scruggs Cynthia Gragg Roger K 3305 76th Lubbock TX 79423
Scruggs Cynthia K Gragg Roger K j 3305 76th St Lubbock TX 79423
Searsy Sandra Jo 1818 Mimosa Ln I
ldalou TX 79329
Sherrod Gary L 4505 E FM 1294 Lubbock TX 79403
_ Sherrod _
Sherrod
Karen _
Ronnie
, 5818 92nd St — —L — -- — --
1851 FM 1914
Lubbock
Hale Center
TX
TX
79424-3629
79041-9741
Sherrod Johnny Sherrod Ronnie 8.51 FM 1914 Hale Center TX 79041-9741
Sherrod Barbara Elaine 1702 N FM 1729 Lubbock Tx 79403-7233
Sides Sue Weaver , I
1 RR 1 Box 436 Lubbock Tx 79403-9648
Sides Sue Weaver ,3416 CR 3300 Lubbock TX 79403-9648
Sides W A 1 9401 E FM 40 Lubbock TX 79403
Sides Jack W :3002 CR 3300 Lubbock TX 79403
Sides Benny H I
13416 CR 3300 Lubbock TX 79403-9648
Silva Manuel I 11104 E CR 5200 Petersburg TX 79250-9205
Simons Debra Kay 10312 E FM 40 Lubbock TX 79403
Smith Lloyd Smith Andrea 18202 N FM 400 Petersburg TX 79250-2807
17 of 20
115
Sharyland litilitues, L P
Landowner Mailing List
PUC Docket No. 48668 Abernathy - Wadsworth
Attachment 7b
345 ky Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 I
c/o, dba, Attention
1
I Address City State Zip
Smith Morris Sheppard '511 W 4th St ldalou Tx 79329-9006
Smith Clyde Brinson
1
10807 E CR 6840 Slaton TX 79364-8240
Smith Eva., , c/o DBA Echo Enterprises 23 Sunrise Ln Ransom Canyon TX 79366-2522
Smith Billy Smith Diann 1 RR 1 Box 53 ldalou TX 79329-9711
Smith Julie Marie 114323 N FM 400 ldalou TX 79329-9711
Smith
Smitherman
Elda
Monte B Smitherman Debra .1
1 8903 E County Road 5700 I PO Box 326
ldalou
Abernathy
TX
TX
79329
79311-0326
Sneed Nelda Kay Rogers 4009 Appian Way Arlington TX 76013
Snodgrass Jimmie Steve Snodgrass Carla Ann 10901 E County Road 5500 ldalou TX 79329-6204
Snodgrass, et al Rodney Craig 915 Dragon St Dallas TX 75207-4007
Solberg Paul Solberg Carrie Todd 1 RR 1 Box 95 D Petersburg TX 79250-9208
Sollis Alfred W Sollis Frances D 1 17811 N County Road 3600 Petersburg TX 79250
Spears Richard M Spears Debbie N 1 10835 Kit Carson Dr Austin TX 78737-9271
Speer Glena 1 6218 Emeraldwood PI Dallas TX 75254
Spradlin Danak Spradlin Michelle 1 512 Phillips Blvd Abernathy TX 79311-2112
Stanley Bryan D Stanley Catharine E 1 10006 N CR 3900 Lorenzo TX 79343
Stanton John Tyler Stanton Allyson 12974 FM 789 Petersburg TX 79250-3431
Stanton John William Stanton Cynthia Gail '2974 FM 789 Petersburg -rx 79250-3431
Stanton Tyler Stanton Allyson 13310 County Road 0 Abernathy TX 79311-6125
Stanton John W Stanton Cynthia G 1 2974 FM 789 Petersburg -pc 79250
Stanton Matthew W Stanton Katrina R I PO Box 1329 Idalou -rx 79329-1329
Stanton Harold Dayne 10818 E CR 5500 ldalou TX 79329
Stanton Matthew V/ i PO Box 1329 ldalou TX 79329-1329
Steen Richard Wayne '25 Brilliant Sky Dr Santa Fe NM 87508
Stence William Edwin Stence Carla 14320 E CR 5640 Lubbock TX 79403
Stennett Thelma Ernestine 208 N FM 400 Lubbock TX 79403
Stennett Thelma E Cass May S 1208 N FM 400 Lubbock TX 79403
Stephens
Stephenson
Billy
Margaret Ann
Stephens Marvin H , ,
2682 Hwy 37
7306 N County Road 3500
Petersburg
ldalou
TX
n< 79250
79329
Stephenson Margaret Ann 1 1 7306 N CR 3500 ldalou TX 79329-6142
Stephenson Clay 1
16307 County Road 3600 ldalou Tx 79329
Storrs Steven Kelly 15001 E FM 1729 Lubbock TX 79403
Storrs Steven K Storrs Dee Ann 1 5001 E FM 1729 Lubbock TX 79403-6980
Swan Thomas C Swan Allison V 9023 E County Road 5300 ldalou TX 79329
Swann William Pat 803 Cedar Ave ldalou TX 79329-9029
Talley John L 5 Squaw Ln Ransom Canyon TX 79366
Talley John L Talley Pamela R 15 Squaw Lane Ransom Canyon TX 79366-2404
Teal Connye Lynn ,
PO Box 76 New Deal TX 79350
Tennell Herman 909 Velray Ave Abernathy TX 79311-2009
Thiel William 1 Thiel Lynn 1 1 PO Box 1266 ldalou TX 79329-1266
Thiel, Jr Bernie 1 Thiel Cynthia 3113 76th St Lubbock TX 79423-1310
Thomas Christine 1 4420 E County Road 5400 #Unit 1 Lubbock TX 79403
Thomas Rex A 1 6012 84th St Lubbock TX 79424
18 of 20
116
Sharyland Utulities, L P
Landowner Mailing List
PUC Docket No 48668 Abernathy - wadsworth
Attachment 7h 345 ky Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention I Address City State Zip
Thompson John E PO Box 338 Olton TX 79064-0338 Thompson Ryan 0 Thompson Lezhe 1 2730 County Road 315 Petersburg Tx 79250-6400 Thompson Kevin 119116 Club Rim Dr Canyon TX 79015-5871 Thompson Oliver 1201 US Highway 87 Lubbock TX 79423-0101
Thompson Paul W 12509 59th St Lubbock Tx 79413-5637 Tinsley Hope Hickman 1 5013 Highland Meadow Dr Fort Worth Tx 76132
Toler
Torres
Sammie
Isabel Torres
1 1934 E Colgate St
Edwardo 1 521 N Chicago Ave #Apt B
Lubbock
Lubbock
Tx
TX
79403-3503
79416
Torres George L Torres Rosa 1 4301 CR 3100 Lubbock TX 79403 Truett Rynn H I 13108 N FM 400 ldalou TX 79329 Truett Rynn H Truett Jane E 113108 N FM 400 ldalou Tx 79329 Truett Randy 0 113108 N FM 400 ldalou TX 79329-6029 Verkamp Lucille C IPO Box 53402 Lubbock Tx 79453-3402 Villarreal Raquel H Ramirez Jose 1 1625 County Road 7245 Lubbock n< 79423
Vincurek Reita Fern Vincurek James Francis 203 Fiesta Ln El Cajon CA 92019-1946 Vincurek, et al Reita F
1 203 Fiesta Ln El Cajon CA 92019-1946
Wade Janice Phillips Matlock Lynne Phillips J 1,1505 Hawthorn Dr Richmond TX 77469-4815
Walker Randy ,10907 E CR 6840 Slaton TX 79364-8241 Wall Catherine E Wall Bill Z 111107 N FM 1729 ldalou TX 79329 Wall Zach Wall Catherine 1 11107 N FM 1729 ldalou TX 79329
Wallace Norman Phil 18403 County Road 6930 Lubbock Tx 79407 Wallace Linda Wallace Dale 11494 FM 2576 Rails Tx 79357
Walter Melvin C 1 1 5106 FM 400 Slaton TX 79364-8286
Walter James C 11 192 Desert Flower Spring Branch TX 78070
Wampler Larry
1
Ipo Box 238 Lorenzo Tx 79343-0238
Ware Pamela Petree I Po Box 53756 Lubbock TX 79453-3756
Weaver T R
1
1RR 1 Box 436 Lubbock TX 79403-9648
Weaver Fred H Weaver Joan W [ 13507 Windmill Trace Heotes Tx 78023-3036 Weaver Gary 105 William Wallace Dr Burleson Tx 76028-2319 Webb Dusty K Webb
1 Debra A 1013 Justice Ave Lubbock TX 79416
Weingartner Jaala Celeste Jackson I 1 8309 Hartford Ave Lubbock TX 79423 Werhan James Robert 4204 Indian Springs Dr NE Albuquerque NM 87109-1912
West Gwyn Caroline '5448 E Lakeshore Dr Belton Tx 76513-4812 White John E 1 9209 County Road 5840 ldalou TX 79329-6085 waking Thomas Eddy Wilking Tammy Gait I PO Box 754 Lorenzo TX 79343-0754 Wilkmg Thomas E Waking Tammy G 112705 ECR 5900 Lorenzo TX 79343
Williams Valerie T 14501 E FM 1729 Lubbock TX 79403 Williams Royce Williams Sue ,P0 Box 232 ldalou TX 79329 Williams Kyle Williams Anita l 8708 E County Road 5700 Idalou TX 79329-6024 Williams Kyle Williams Ann 1 P0 Box 910 ldalou Tx 79329 Williams Kenneth W J 1P0 Box 232 ldalou TX 79329-0232 Williams Royce I po Box 232 ldalou TX 79329-0232 Williamson Donald E 11760 FM 2060 Abernathy Tx 79311-6028
19 of 20 117
Sharyland Utilities, L P
Landowner Mailing List
PUC Docket No 48668
Abernathy - Wadsworth
Attachment 7b
345 kV Transmission Line in Hale and Lubbock Counties, TX
Company, Trust, or Entity Name Last Name First Name Last 2 Name First 2 c/o, dba, Attention Address City State Zip
Willias Chance A Willias Kristina M 8223 E County Road 5200 ldalou TX 79329
Wilson Larry D Wilson Shanda R PO Box 118 Petersburg TX 79250-0118
Winter Jay 7801 E County Road 6300 Lubbock TX 79403
Wofford Celeste S 3006 N CR 3500 Lubbock TX 79403
Worthington, Jr L G 5403 N CR 3100 Lubbock -rx 79403
Wyers Jess Wyers Margie 16413 N County Road 3200 ldalou TX 79329-6159
Zuber Paul D 807 W 7th St ldalou Tx 79329
Zuber Paul D Zuber Sue 807 W 7th St ldalou TX 79329
20 of 20 118
Exhibit 2
Representative Copy of Notice Letter Mailed to Landowners
119
Sharyland Utilities, L.P. Lubbock Office
5224 751h Street, Suite A Lubbock, Texas 79424 Phone (866) 354-3335
Fax: (806) 467-3501 Shalyland Utilities'
September 20, 2018
[Name] [Address] [City, State, ZIP]
Re: PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO. 48668 Joint Application of Sharyland Utilities, L.P. and City of Lubbock, Acting By and Through Lubbock Power & Light, for a Certificate of Convenience and Necessity for the Proposed Abernathy to Wadsworth 345 kV Transmission Line in Hale and Lubbock Counties, Texas
Dear [Name],
Sharyland Utilities, L.P. ("Sharyland") and the City of Lubbock, acting by and through Lubbock Power & Light ("LP&L") (collectively "Joint Applicants") propose to construct a single-circuit 345 kilovolt ("kV") electric transmission line on double-circuit capable structures in Hale and Lubbock counties, Texas. The proposed transmission line will connect the existing Abernathy Station, located north of Abernathy in Hale County, to the existing Wadsworth Station, located east of Lubbock in Lubbock County (the "Project"). The Project will be approximately 32 to 50 miles in length, depending on the route selected by the Public Utility Commission of Texas ("Commission" or "PUC"), and will be constructed on a combination of monopole and lattice structures within a typical right-of-way approximately 175 feet wide. Depending on the route selected by the Commission, the estimated cost for the Project ranges from approximately $65.3 million to $90.4 million, including costs to modify existing switching stations. This proposal will be evaluated in Commission Docket No. 48668.
Earlier this year, the Commission approved LP&L's proposal to transition a portion of its system from the Southwest Power Pool ("SPP") grid to the Electric Reliability Council of Texas ("ERCOT") grid pursuant to a transmission interconnection plan developed by ERCOT. The Commission determined that, under the terms of its order, the transition is in the public interest. The Commission also designated Joint Applicants to provide the transmission facilities needed to interconnect LP&L's system to ERCOT. The Project is an important part of the infrastructure needed to ensure the LP&L system can safely and reliably operate in ERCOT.
Your land may be directly affected in this docket, and the deadline for intervention in the proceeding is November 4, 2018. If one of Joint Applicants routes is approved by the Commission, Joint Applicants will have the right to build a facility that may directly affect your land. Further, during the course of the proceeding, the possibility exists that additional routes may be developed that could affect your property in a manner different than the original alternative routes proposed by Joint Applicants. This docket will not determine the value of your land or the value of an easement if one is needed to build the facility.
All routes and route segments (links) included in this notice are available for selection and approval by the Public Utility Commission of Texas.
1
120
Enclosed is a map illustrating Joint Applicants alternative routes for the Project as well as a written
description of these routes. A complete copy of the joint application filed at the Commission and a detailed
routing map may be viewed at the following location:
Sharyland Utilities, L.P.
Lubbock Office 5224 75th Street, Suite A Lubbock, Texas 79424
If you have questions about the Project, or need an additional copy of the enclosed map, you may contact
Sharyland at (866) 354-3335 or email your questions to [email protected].
The enclosed brochure entitled "Landowners and Transmission Line Cases at the PUC" provides basic
information about how you may participate in this docket and how you may contact the Commission.
Please read this brochure carefully. Included in this mailing with the brochure are forms for making comments and for making a request to intervene as a party in this docket. In addition to the contacts
listed in the brochure, you may call the Commission's Customer Assistance Hotline at (888) 782-8477.
Hearing- and speech-impaired individuals with text telephones ("TTY") may contact the Commission's
Customer Assistance Hotline at (512) 936-7136 or toll free at (800) 735-2989. If you wish to participate in this proceeding by becoming an intervenor, the deadline for intervention in the proceeding is November 4, 2018, which is 45 days after the application is filed at the Commission. The Commission
should receive either a letter or a completed Request to Intervene form from you requesting intervention
by that date. Mail the request for intervention and 10 copies of the request to:
Public Utility Commission of Texas Central Records
Attn: Filing Clerk
1701 N. Congress Ave.
P.O. Box 13326 Austin, Texas 78711-3326
Persons who wish to intervene in the docket must also mail a copy of their request for intervention to all
parties in the docket, and all persons that have pending motions to intervene, at or before the time the
request for intervention is mailed to the Commission.
The only way to fully participate in the Commission's decision on where to locate the transmission line is to intervene in the docket. It is important for an affected person to intervene because the utility is not obligated to keep affected persons informed of the Commission's proceedings and cannot predict which route may or may not be approved by the Commission.
In lieu of intervention, an affected person may file comments as a protestor. However, filing comments
as a protestor does not allow for full participation in the Commission's decision on where to locate the transmission line.
In addition to the intervention deadline, other important deadlines may already exist that affect your participation in this docket. You should review the orders and other filings already made in the docket. The enclosed brochure explains how you can access these filings.
2
121
Troy Vaughn Director, Transmission Construction Sharyland Utilities, L.P.
Enclosures: Segment Descriptions Notice Map Landowner Brochure, Protest Form, Intervention Form
3
122
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Sharyland Utilities, L.P. ("Sharylane) and Lubbock Power & Light (LP&L") have filed an application with the Public Utility Commission of Texas ("Commission" or "PUC") for a Certificate of Convenience and Necessity ("CCN") for the proposed Abernathy to Wadsworth 345-kV Transmission Line Project ("Project") in Hale and Lubbock Counties, Texas. In their CCN application, Sharyland and LP&L have presented 1 8 alternative routes comprised of 123 segments for consideration by the Commission for this Project. The following table lists the segment combinations that make up the 1 8 alternative routes. All routes and route segments are available for selection and approval by the Commission. Only one multi-segment route will ultimately be constructed from the existing Abernathy Station, located in Hale County, to the existing Wadsworth Station, located in Lubbock County.
Alternative Route
Route Composition
1 1-5-26-41-53a-125-70-76-88-106-108-110-112-120-123-124 2 1-5-26-41-53a-53b-59-66-70-76-88-106-109-113-115-117-122-124 3 1-2-3-6-8-21-27-42-54-59-66-70-76-88-106-109-113-115-117-122-124 4 1-2-3-6-8-21-22-28-39-43-51-54-59-66-70-76-88-106-109-113-114-118-119 5 1-5-26-37-38-39-40-44-47-56-58-71-80-85-87-88-106-109-111-112-120-123-124 6 1-2-3-6-8-21-27-42-54-59-66-70-77-78-79-82-86-92-98-101-103-105-107-110-112-120-123-124 7 1-2-3-6-8-21-22-23-29-32-33-34-49-63-75-82-86-90-91-97-106-109-111-112-120-123-124 8 1-5-26-37-38-39-40-44-47-56-57-60-61-63-75-82-86-92-93-95-99-102-103-105-107-110-112-120-123-124 9 1-5-20-21-22-23-24-25-31-36-48-60-62-72-74-81-83-85-89-91-97-106-109-113-115-117-121-123-124
10 1-2-4-9-1 1-13-14-17-30-33-34-49-63-75-82-86-92-98-100-102-103-104-107-1 10-1 12-120-123-124 11 1-5-20-21-27-42-54-59-66-67-68-69-72-73-75-82-86-92-98-101-103-104-107-110-112-120-123-124 12 1-2-4-9-1 1-13-14-16-18-31-36-48-60-62-72-74-81-83-85-87-88-109-1 13-114-118-1 19 13 1-2-4-9-1 1-12-19-29-35-44-45-46-49-63-75-82-86-92-93-94-97-106-109-1 13-1 15-1 16-1 18-1 19 14 1-2-3-7-10-19-29-35-44-47-44-47-56-58-71-80-85-89-91-96-99-102-103-105-107-110-112-120-123-124 15 1-2-4-9-1 1-12-19-29-35-44-47-56-58-71-80-85-89-91-96-99-102-103-105-107-1 10-1 12-120-123-124 16 1-2-4-9-1 1-13-15-18-31-34-49-63-75-82-84-83-85-89-91-97-106-109-113-1 15-1 16-1 18-1 19 17 1-2-4-9-1 1-13-15-18-31-34-49-63-75-82-86-92-98-101-103-104-107-1 10-1 12-120-123-124 18 1-5-26-41-50-51-52-56-58-71-80-85-87-88-106-109-111-112-120-123-124
The following narrative, along with the enclosed map, provides a detailed description of the segments that form the 1 8 alternative routes proposed for consideration by the Commission.
Segment 1
Segment 1 begins at the existing Abernathy Substation in Hale County, located approximately 0.37 mile east-northeast of the intersection of County Road ("CR") 295 and CR Q. The segment exits the east corner of the existing substation and proceeds east for approximately 0.08 mile, paralleling the south side of an existing 345 kV transmission line, until reaching its intersection with Segments 2 and 5, located approximately 0.45 mile east-northeast of the intersection of CR 295 and CR Q.
Segment 2
Segment 2 begins its intersection with Segments 1 and 5, located approximately 0.45 mile east-northeast of the intersection of CR 295 and CR Q. The segment proceeds north for approximately 0.1 5 mile, crossing an existing 345 kV transmission line, until reaching its intersection with Segments 3 and 4, located approximately 0.52 mile northeast of the intersection of CR 295 and CR Q.
Page 1 of 23
123
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 3
Segment 3 beings at its intersection with Segments 2 and 4, located approximately 0.52 mile northeast of the intersection of CR 295 and CR Q. The segment proceeds north for approximately 0.12 mile. The segment then turns east for approximately 0.67 mile, crossing CR R. The segment then turns east-northeast for approximately 0.45 mile. The segment then turns east for approximately 0.50 mile, crossing CR S, until reaching its intersection with Segments 6 and 7, located on the east side of CR S approximately 0.49 mile north-northeast of the intersection of CR 295 and CR S.
Segment 4
Segment 4 begins at its intersection with Segments 2 and 3, located approximately 0.52 mile northeast of the intersection of CR 295 and CR Q. The segment proceeds east for approximately 1.08 miles, crossing CR R. The segment then turns south for approximately 0.32 mile. The segment then turns east for approximately 0.53 mile, paralleling the north side of CR 295 and crossing CR S, until reaching its intersection with Segments 6, 8, and 9, located on the northeast corner of the intersection of CR 295 and CR S.
Segment 5
Segment 5 beings at its intersection with Segments 1 and 2, located approximately 0.45 mile east-northeast of the intersection of CR 295 and CR Q. The segment proceeds east for approximately 0.03 mile, paralleling the south side of an existing 345 kV transmission line. The segment then turns south for approximately 0.23 mile, paralleling the west side of an existing 345 kV transmission line and crossing CR 295. The segment then turns east for approximately 0.53 mile, paralleling the south side of an existing 345 kV transmission line. The segment then turns south for approximately 0.97 mile, paralleling the west side of CR R and crossing Farm to Market (`FM") 54 and an existing 69 kV transmission line. The segment then turns southeast for approximately 0.19 mile, crossing an existing pipeline right-of-way (ROW"). The segment then turns south for approximately 0.82 mile, paralleling the west side of CR R and crossing an existing 345 kV transmission line and CR 315. The segment then continues south for approximately 0.65 mile, crossing CR 325. The segment then turns east for approximately 0.58 mile, paralleling the south side of CR 325. The segment then turns south for approximately 1.00 mile, paralleling the west side of CR S and crossing FM 2060. The segment then continues south for approximately 0.72 mile, crossing from Hale County to Lubbock County. The segment then turns east for approximately 0.11 mile, paralleling the north side of an existing 230 kV transmission line, until reaching its intersection with Segments 20 and 26, located on the north side of an existing 230 kV transmission line approximately 0.50 mile northwest of the intersection of CR 5000 and CR 2700.
Segment 6
Segment 6 begins at its intersection with Segments 3 and 7, located on the east side of CR S approximately 0.49 mile north-northeast of the intersection of CR 295 and CR S. The segment proceeds south for approximately 0.46 mile, paralleling the east side of CR S, until reaching its intersection with Segments 4, 8, and 9, located on the northeast corner of the intersection of CR 295 and CR S.
Segment 7
Segment 7 begins at its intersection with Segments 3 and 6, located on the east side of CR S approximately 0.49 mile north-northeast of the intersection of CR 295 and CR S. The segment proceeds east for approximately 0.34 mile. The segment then turns southeast for approximately 0.18 mile. The segment then turns south for approximately 0.38 mile, until reaching its intersection with Segments 9, 10, and 11, located on the north side of CR 295 approximately 0.49 mile west-northwest of the intersection of CR 295 and CR T.
Page 2 of 23
124
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 8
Segment 8 begins at its intersection with Segments 4, 6, and 9, located on the northeast corner of the intersection of CR 295 and CR S. The segment proceeds south, immediately crossing CR 295 and an existing 345 kV transmission line, for approximately 1.00 mile, paralleling the east side of CR S. The segment then turns southeast for approximately 0.42 mile, crossing FM 54, an existing pipeline ROW, an existing 69 kV transmission line, and CR S. The segment then turns south for approximately 0.89 mile, paralleling the east side of CR S and crossing an existing 345 kV transmission line and CR S. The segment then continues south for approximately 0.41 mile, paralleling the west side of CR S and crossing CR 325. The segment then turns south-southeast for approximately 0.49 mile. The segment then turns southeast for approximately 0.63 mile, crossing FM 2060. The segment then turns south for approximately 0.70 mile, crossing from Hale County to Lubbock County reaching its intersection with Segments 20 and 21, located on the north side of CR 5000 approximately 0.24 mile west-northwest of the intersection of CR 5000 and CR 2800.
Segment 9
Segment 9 begins at its intersection with Segments 4, 6, and 8, located on the northeast corner of the intersection of CR 295 and CR S. The segment proceeds east for approximately 0.50 mile, paralleling the north side of CR 295, until reaching its intersection with Segments 7, 10, and 11, located on the north side of CR 295 approximately 0.49 mile west-northwest of the intersection of CR 295 and CR T.
Segment 10
Segment 10 begins at its intersection with Segments 7, 9, and 11, located on the north side of CR 295 approximately 0.49 mile west-northwest of the intersection of CR 295 and CR T. The segment proceeds south, immediately crossing CR 295 and an existing 345 kV transmission line, for approximately 1.00 mile. The segment then turns east for approximately 0.07 mile, paralleling the north side of an existing 115 kV transmission line and FM 54. The segment then turns south immediately crossing FM 54, an existing 69 kV transmission line, and an existing pipeline ROW for approximately 1.05 miles, and crossing an existing 345 kV transmission line and CR 315. The segment then turns east for approximately 2.10 miles, paralleling the south side of CR 315 and crossing CR U. The segment then turns south for approximately 0.61 mile, paralleling the west side of CR V The segment then turns east, immediately crossing CR V for approximately 1.95 miles, paralleling the north side of CR 325, until reaching its intersection with Segments 12 and 19, located approximately 0.69 mile southwest of the intersection of CR X and FM 400.
Segment 11
Segment 11 begins at its intersection with Segments 7, 9, and 10, located on the north side of CR 295 approximately 0.49 mile west-northwest of the intersection of CR 295 and CR T. The segment proceeds east for approximately 1.46 miles, paralleling the north side of CR 295. The segment then turns north for approximately 0.98 mile. The segment then turns east for approximately 1.02 miles, crossing CR V. The segment then continues east for approximately 1.08 miles, paralleling the south side of CR 285 and crossing CR W, until reaching its intersection with Segments 12 and 13, located on the southeast corner of the intersection of CR 285 and CR W.
Segment 12
Segment 12 begins at its intersection with Segments 11 and 13, located on the southeast corner of the intersection of CR 285 and CR W. The segment proceeds south for approximately 1.00 mile, paralleling the east side of Way Road and crossing CR 295 and two existing 345 kV transmission lines. The segment then continues south for approximately 0.97 mile, crossing two existing transmission lines. The segment then turns southeast for
Page 3 of 23
125
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
approximately 0.28 mile, crossing FM 54, an existing 69 kV transmission line, and an existing pipeline ROW. The segment then turns south for approximately 1.04 miles. The segment then turns east for approximately 0.33 mile. The segment then turns south for approximately 0.27 mile, crossing CR 320. The segment then continues south for approximately 0.23 mile, paralleling CR W, until reaching its intersection with Segments 10 and 19, located northeast of the intersection of CR 325 and CR W.
Segment 13
Segment 13 begins at its intersection with Segments 11 and 12, located on the southeast corner of the intersection of CR 285 and CR W. The segment proceeds east for approximately 0.93 mile, paralleling the south side of CR 285. The segment then turns northeast for approximately 0.14 mile, crossing FM 400 and an existing 345 kV transmission line. The segment then turns east for approximately 0.95 mile. The segment then turns southeast for approximately 0.20 mile. The segment then turns east for approximately 0.77 mile, until reaching its intersection with Segments 14 and 15, located on the west side of CR Z approximately 0.97 mile north-northwest of the intersection of CR 295 and CR Z.
Segment 14
Segment 14 beings at its intersection with Segments 13 and 15, located on the west side of CR Z approximately 0.97 mile north-northwest of the intersection of CR 295 and CR Z. The segment proceeds south for approximately 1.00 mile, paralleling the west side of CR Z. The segment then turns south-southeast for approximately 0.18 mile, crossing CR Z. The segment then turns south for approximately 1.81 miles, paralleling the east side of CR Z and crossing an existing 345 kV transmission line, FM 54, an existing 69 kV transmission line, an existing pipeline ROW, and CR 315, until reaching its intersection with Segments 16 and 17, southeast of the intersection of CR 315 and CR Z
Segment 15
Segment 15 begins at the intersection with Segments 13 and 14, located on the west side of CR Z approximately 0.97 mile north-northwest of the intersection of CR 295 and CR Z. The segment proceeds east, immediately crossing CR Z, for approximately 1.00 mile. The segment then turns south for approximately 2.94 miles, paralleling the west side of CR AA and crossing CR 295, an existing 345 kV transmission line, an existing 115 kV transmission line, FM 54, an existing 69 kV transmission line, and an existing pipeline ROW. The segment then turns southwest for approximately 0.22 mile, crossing CR 315, until reaching its intersection with Segments 16 and 18 on the west side of CR AA, located approximately 0.29 mile northeast of the intersection of CR AA and CR 325.
Segment 16
Segment 16 begins at its intersection with Segments 14 and 17, southeast of the intersection of CR 315 and CR Z. The segment proceeds east for approximately 0.83 mile, paralleling the south side of CR 315. The segment then turns south for approximately 0.14 mile, until reaching its intersection with Segments 15 and 18 on the west is of CR AA, located approximately 0.29 mile northeast of the intersection of CR AA and CR 325.
Segment 17
Segment 17 begins at its intersection with Segments 14 and 16, southeast of the intersection of CR 315 and CR Z. The segment proceeds southwest for approximately 0.50 mile, paralleling the southeast side of an existing 69 kV transmission line and crossing CR 325. The segment then turns south for approximately 1.00 mile, paralleling the east side of CR Z and crossing CR 330. The segment then continues south for approximately 1.00 mile, paralleling
Page 4 of 23
126
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
the east side of an existing 69 kV transmission line, and crossing from Hale County to Lubbock County and CR 5000, until reaching its intersection with Segments 24, 25, and 30, located on the southeast corner of the intersection of CR 34 and CR 5000.
Segment 18
Segment 18 beings at its intersection with Segments 15 and 16, northeast of the intersection of CR 325 and CR W. The segment proceeds south for approximately 0.25 mile, crossing CR 325. The segment then turns southwest for approximately 0.29 mile. The segment then turns south for approximately 1.75 miles, paralleling the east side of CR AA and crossing CR 330 and CR 5000, and crossing from Hale County to Lubbock County, until reaching its intersection with Segments 25 and 31, located on the southeast corner of the intersection of CR 35 and CR 5000.
Segment 19
Segment 19 beings at its intersection with Segments 10 and 12, located approximately 0.69 mile southwest of the intersection of CR X and FM 400. The segment proceeds south for approximately 1.03 miles. The segment then turns east for approximately 0.15 mile, paralleling the north side of CR 330. The segment then turns south, immediately crossing CR 330, for approximately 0.72 mile, crossing from Hale County to Lubbock County, until reaching its intersection with Segments 23, 24, and 29, located on the north side of CR 5000 approximately 0.04 mile northeast of the intersection of CR 3200 and CR 5000.
Segment 20
Segment 20 beings at its intersection with Segments 5 and 26, located on the north side of an existing 230 kV transmission line approximately 0.05 mile northwest of the intersection of CR 5000 and CR 2700. The segment proceeds east for approximately 0.80 mile, paralleling the north side of an existing 230 kV transmission line, until reaching its intersection with Segments 8 and 21, located on the north side of CR 5000 and an existing 230 kV transmission line.
Segment 21
Segment 21 begins at its intersection with Segments 8 and 20, located on the north side of CR 5000 approximately 0.24 mile northwest of the intersection of CR 5000 and CR 2800. The segment proceeds east for approximately 0.20 mile, paralleling the north side of an existing 230 kV transmission line, until reaching its intersection with Segments 22 and 27, located on the north side of CR 5000 approximately 0.05 mile northwest of the intersection of CR 5000 and CR 2800.
Segment 22
Segment 22 begins at its intersection with Segments 21 and 27, located on the north side of CR 5000 approximately 0.05 mile northwest of the intersection of CR 5000 and CR 2800. The segment proceeds east-southeast for approximately 0.25 mile. The segment then turns east for approximately 0.75 mile, paralleling the north side of CR 5000 and crossing CR U, until reaching its intersection with Segments 23 and 28, located on the north side of CR 5000.
Segment 23
Segment 23 begins at its intersection with Segments 22 and 28, located on the north side of CR 5000. The segment proceeds east for approximately 3.03 miles, paralleling the north side of CR 5000 and crossing CR V and CR 3100, until reaching its intersection with Segments 19, 24, and 29, located on the north side of CR 5000 approximately 0.04 mile northeast of the intersection of CR 3200 and CR 5000.
Page 5 of 23
127
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 24
Segment 24 begins at its intersection with Segments 19, 23, and 29, located on the north side of CR 5000 approximately 0.04 mile northeast of the intersection of CR 3200 and CR 5000. The segment proceeds east for approximately 1.33 miles, paralleling the north side of CR 5000 and crossing CR X. The segment then turns east-southeast for approximately 0.11 mile, crossing FM 400 and CR 5000. The segment then turns east for approximately 0.55 mile, paralleling the south side of CR 5000 and crossing an existing 69 kV transmission line and CR 34, until reaching its intersection with Segments 17, 25, and 30, located on the southeast corner of the intersection of CR 34 and CR 5000.
Segment 25
Segment 25 begins at its intersection with Segments 17, 24, and 30, located on the southeast corner of the intersection of CR 34 and CR 5000. The segment proceeds east for approximately 1.00 mile, paralleling the south side of CR 5000 and crossing CR 35, until reaching its intersection with Segments 18 and 31, located on the southeast corner of the intersection of CR 35 and CR 5000.
Segment 26
Segment 26 begins at its intersection with Segments 5 and 20, located on the north side of an existing 230 kV transmission line approximately 0.05 mile northwest of the intersection of CR 5000 and CR 2700. The segment proceeds south, immediately crossing an existing 230 kV transmission line and CR 5000, for approximately 1.06 miles, paralleling the west side of CR 2700 and crossing FM 597. The segment then turns south-southeast for approximately 0.20 mile, crossing CR 2700. The segment then turns south for approximately 0.82 mile, paralleling the east side of CR 2700 and crossing CR 5200, until reaching its intersection with Segments 37 and 41, located on the southeast corner of the intersection of CR 2700 and CR 5200.
Segment 27
Segment 27 begins at its intersection with Segments 21 and 22, located on the north side of CR 5000 approximately 0.05 mile northwest of the intersection of CR 5000 and CR 2800. The segment proceeds south, immediately crossing an existing 230 kV transmission line and CR 5000, for approximately 2.04 miles, paralleling the west side of an existing 230 kV transmission line and crossing FM 597 and CR 5200, until reaching its intersection with Segments 37, 38 and 42, located on the southwest corner of the intersection of CR 5200 and CR 2800 and on the west side of an existing 230 kV transmission line.
Segment 28
Segment 28 begins at its intersection with Segments 22 and 23, located on the north side of CR 5000. The segment proceeds south, immediately crossing CR 5000, for approximately 1.02 miles, crossing FM 597. The segment then continues south for approximately 1.02 miles, paralleling the west side of FM 2902 and crossing CR 5200, until reaching its intersection with Segments 38 and 39, located on the southwest corner of the intersection of FM 2902 and CR 5200.
Segment 29
Segment 29 begins at its intersection with Segments 19, 23, and 24, located on the north side of CR 5000 approximately 0.04 mile northeast of the intersection of CR 3200 and CR 5000. The segment proceeds south, immediately crossing CR 5000, for approximately 1.05 miles, paralleling the east side of CR 3200, and crossing FM 597, until reaching its intersection with Segments 32 and 35, located on the southeast corner of the intersection of FM 597 and CR 3200.
Page 6 of 23
128
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 30
Segment 30 begins at its intersection with Segments 17, 24, and 25, located on the southeast corner of the intersection of CR 34 and CR 5000. The segment proceeds south for approximately 0.96 mile, paralleling the east side of CR 34 and an existing 69 kV transmission line, until reaching its intersection with Segments 32 and 33, located on the northeast corner of the intersection of CR 34 and CR 51.
Segment 31
Segment 31 begins at its intersection with Segments 18 and 25, located on the southeast corner of the intersection of CR 35 and CR 5000. The segment proceeds south for approximately 0.96 mile, paralleling the east side of CR 35 and crossing an existing pipeline ROW, until reaching its intersection with Segments 33, 34, and 36, located on the northeast corner of the intersection of CR 35 and CR 51.
Segment 32
Segment 32 begins at its intersection with Segments 29 and 35, located on the southeast corner of the intersection of FM 597 and CR 3200. The segment proceeds east for approximately 1.28 miles, paralleling the south side of FM 597. The segment then turns east-northeast for approximately 0.20 mile, crossing FM 597. The segment then turns east for approximately 0.22 mile, paralleling the north side of FM 597 and crossing FM 400. The segment then continues east for approximately 0.32 mile, paralleling the north side of CR 51 and crossing an existing 69 kV transmission line and CR 34, until reaching its intersection with Segments 30 and 33, located on the northeast corner of the intersection of CR 34 and CR 51.
Segment 33
Segment 33 begins at its intersection with Segments 30 and 32, located on the northeast corner of the intersection of CR 34 and CR 51. The segment proceeds east for approximately 1.00 mile, paralleling the north side of CR 51 and crossing an existing pipeline ROW and CR 35, until reaching its intersection with Segments 31, 34, and 36, located on the northeast corner of the intersection of CR 35 and CR 51.
Segment 34
Segment 34 begins at its intersection with Segments 31, 33, and 36, located on the northeast corner of the intersection of CR 35 and CR 51. The segment proceeds east for approximately 2.95 miles, paralleling the north side of CR 51 and crossing CR 36, an abandoned railroad, an existing pipeline ROW, and CR 37. The segment then turns south, immediately crossing CR 51, for approximately 2.03 miles, paralleling the west side of FM 789 and crossing CR 52, an existing pipeline ROW and CR 53. The segment then turns south-southeast for approximately 0.17 mile, crossing FM 789. The segment then turns south for approximately 0.84 mile, paralleling the east side of FM 789 and crossing CR 5400, until reaching its intersection with Segments 46 and 49, located on the southeast corner on the intersection of FM 789 and CR 5400.
Segment 35
Segment 35 begins at its intersection with Segments 29 and 32, located on the southeast corner of the intersection of FM 597 and CR 3200. The segment proceeds south for approximately 1.00 mile, paralleling the east side of CR 3200 and crossing CR 52, until reaching its intersection with Segments 40 and 44, located on the southeast corner of the intersection of CR 3200 and CR 52.
Page 7 of 23
129
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 36
Segment 36 begins at its intersection with Segments 31, 33, and 34, located on the northeast corner of the intersection of CR 35 and CR 51. The segment proceeds south for approximately 1.50 miles, paralleling the east side of CR 35 and crossing CR 52. The segment then turns east for approximately 0.97 mile, crossing an abandoned railroad. The segment then turns south for approximately 1.55 miles, paralleling the west side of CR 3600, and crossing an existing pipeline ROW, CR 53, and CR 54, until reaching its intersection with Segments 45, 46, and 48, located on the southwest corner of the intersection of CR 36 and CR 54.
Segment 37
Segment 37 begins at its intersection with Segments 26 and 41, located on the southeast corner of the intersection of CR 2700 and CR 5200. The segment proceeds east for approximately 0.95 mile, paralleling the south side of CR 5200, until reaching its intersection with Segments 27, 38, and 42, located on the southwest corner of the intersection of CR 2800 and CR 5200 and west of an existing 230 kV transmission line.
Segment 38
Segment 38 begins at its intersection with Segments 27, 37, and 42, located on the southwest corner of the intersection of CR 2800 and CR 5200 and west of an existing 230 kV transmission line. The segment proceeds east, immediately crossing an existing 230 kV transmission line and CR 2800, for approximately 1.01 miles, paralleling the south side of CR 5200 and crossing an existing pipeline ROW, until reaching its intersection with Segments 28 and 39, located on the southwest corner of the intersection of FM 2902 and CR 5200.
Segment 39
Segment 39 begins at its intersection with Segments 28 and 38, located on the southwest corner of the intersection of FM 2902 and CR 5200. The segment proceeds east, immediately crossing FM 2902, for approximately 1.05 miles, paralleling the south side of CR 5200, until reaching its intersection with Segments 40 and 43, located on the southwest corner of the intersection of CR 5200 and CR 3000.
Segment 40
Segment 40 begins at its intersection with Segments 39 and 43, located on the southwest corner of the intersection of CR 5200 and CR 3000. The segment proceeds east for approximately 2.00 miles, paralleling the south side of CR 5200 and crossing CR 3100 and CR 3200, until reaching its intersection with Segments 35 and 44, located on the southeast corner of the intersection of CR 3200 and CR 5200.
Segment 41
Segment 41 begins at its intersection with Segments 26 and 37, located on the southeast corner of the intersection of CR 2700 and CR 5200. The segment proceeds south for approximately 1.16 miles, paralleling the east side of CR 2700 and crossing an existing pipeline ROW, an existing 115 kV transmission line, and CR 5300. The segment then turns east for approximately 0.12 mile, paralleling the south side of CR 5300. The segment then turns south for approximately 0.96 mile, paralleling the west side of an existing 115 kV transmission line, until reaching its intersection with Segments 50 and 53a, located approximately 0.03 mile northwest of the intersection of CR 5400 and CR 2700.
Segment 42
Segment 42 begins at its intersection with Segments 27, 37, and 38, located on the southwest corner of the intersection of CR 2800 and CR 5200 and west of an existing 230 kV transmission line. The segment proceeds
Page 8 of 23
130
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
south for approximately 0.63 mile, paralleling the west side of an existing 230 kV transmission line. The segment then continues south for approximately 0.34 mile, paralleling the west side of CR 2800. The segment then turns east for approximately 0.20 mile, crossing CR 2800 and an existing 230 kV transmission line. The segment then turns south for approximately 1.17 miles, paralleling the east side of an existing 230 kV transmission line and crossing CR 5300, an existing pipeline ROW, and CR 5400, until reaching its intersection with Segments 50, 51, and 54, located approximately 0.04 mile southeast of the intersection of CR 5400 and CR 2800.
Segment 43
Segment 43 begins at its intersection with Segments 39 and 40, located on the southwest corner of the intersection of CR 5200 and CR 300. The segment proceeds south for approximately 0.98 mile. The segment then turns southeast for approximately 0.27 mile, crossing two existing pipeline ROWs. The segment then turns south for approximately 0.74 mile. The segment then turns south-southwest for approximately 0.20 mile, until reaching its intersection with Segments 51 and 52, located on the north side of CR 5400 approximately 1.08 miles west-northwest of the intersection of CR 5400 and CR 3100.
Segment 44
Segment 44 begins at its intersection with Segments 35 and 40, located on the southeast corner of the intersection of CR 3200 and CR 5200. The segment proceeds south for approximately 0.98 mile, paralleling the east side of CR 3200 and crossing two existing pipeline ROWs and CR 5300. The segment then turns east for approximately 2.02 miles, paralleling the south side of CR 5300 and crossing FM 400. The segment then turns south for approximately 1.00 mile, paralleling the east side of FM 400 and crossing CR 5400, until reaching its intersection with Segments 45 and 47, located on the southeast corner of the intersection of FM 400 and CR 5400.
Segment 45
Segment 45 begins at its intersection with Segments 44 and 47, located on the southeast corner of the intersection of FM 400 and CR 5400. The segment proceeds east for approximately 1.96 miles, paralleling the south side of CR 5400 and crossing an abandoned railroad and CR 35, until reaching its intersection with Segments 36, 46, and 48, located on the southwest corner of the intersection of CR 35 and CR 54.
Segment 46
Segment 46 begins at its intersection with Segments 36, 45, and 48, located on the southwest corner of the intersection of CR 36 and CR 54. The segment proceeds east, immediately crossing CR 36, for approximately 2.03 miles, paralleling the south side of CR 54 and crossing CR 37, and FM 789, until reaching its intersection with Segments 34 and 49, located on the southeast corner of the intersection of CR 5400 and FM 789.
Segment 47
Segment 47 begins at its intersection with Segments 44 and 45, located on the southeast corner of the intersection of FM 400 and CR 54. The segment proceeds south for approximately 0.51 mile, paralleling the east side of FM 400, until reaching its intersection with 52 and 56, located on the east side of FM 400 approximately 0.46 mile north-northeast of the intersection of CR 5500 and FM 400.
Segment 48
Segment 48 begins at its intersection with Segments 36, 45, and 46, located on the southwest corner of the intersection of CR 36 and CR 5400. The segment proceeds south for approximately 1.00 mile, paralleling the west
Page 9 of 23
131
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
side of CR 3600 and crossing CR 5500, until reaching its intersection with Segments 57 and 60, located on the southwest corner of the intersection of CR 3600 and CR 5500.
Segment 49
Segment 49 begins at its intersection with Segments 34 and 46, located on the southeast corner of the intersection of CR 5400 and FM 789. The segment proceeds south for approximately 1.34 miles, paralleling the east side of FM 789 and crossing CR 54D. The segment then turns south-southeast for approximately 0.19 mile, crossing FM 789 and CR 55D until reaching its intersection with Segments 61 and 63, located on the southwest corner of the intersection of FM 789 and CR 55D.
Segment 50
Segment 50 begins at its intersection with Segments 41 and 53a, located approximately 0.04 mile northwest of the intersection of CR 5400 and CR 2700. The segment proceeds east, immediately crossing an existing 115 kV transmission line, for approximately 0.89 mile, paralleling the north side of CR 5400. The segment then turns east-southeast for approximately 0.18 mile, crossing CR 5400, an existing 230 kV transmission line, and CR 2800, until reaching its intersection with Segments 42, 51 and 54, located approximately 0.04 mile southeast of the intersection of CR 5400 and CR 2800.
Segment 51
Segment 51 begins at its intersection with Segments 42, 50, and 54, located approximately 0.04 mile southeast of the intersection of CR 5400 and CR 2800. The segment proceeds east for approximately 1.04 miles, paralleling the south side of CR 5400 and crossing FM 2902. The segment then turns east-northeast for approximately 0.16, crossing CR 5400. The segment then turns east for approximately 0.77 mile, paralleling the north side of CR 5400, until reaching its intersection with Segments 43 and 52, located on the north side of CR 5400 approximately 1.08 miles west-northwest of the intersection of CR 5400 and CR 3100.
Segment 52
Segment 52 begins at its intersection with Segments 43 and 51, located on the north side of CR 5400 approximately 1.08 miles west-northwest of the intersection of CR 5400 and CR 3100. The segment proceeds southeast for approximately 0.17 mile, paralleling the north side of CR 5400. The segment then turns east for approximately 3.31 miles, paralleling the north side of CR 5400 and crossing CR 3100, CR 3240, and CR 3300. The segment then turns south, immediately crossing CR 5400, for approximately 0.37 mile. The segment then turns east for approximately 0.45 mile, crossing FM 400, until reaching its intersection with Segments 47 and 56, located on the east side of FM 400 approximately 0.46 mile north-northeast of the intersection of CR 5500 and FM 400.
Segment 53a
Segment 53a begins at its intersection with Segments 41 and 50, located approximately 0.03 mile northwest of the intersection of CR 5400 and CR 2700. The segment proceeds south, immediately crossing CR 5400, for approximately 0.97 mile, paralleling the west side of CR 2700, until reaching its intersection with Segments 53b and 125, located approximately 0.05 mile northwest of the intersection of CR 2700 and CR 5500.
Segment 53b
Segment 53b begins at its intersection with Segments 53a and 125, located approximately 0.05 mile northwest of the intersection of CR 2700 and CR 5500. The segment proceeds east-southeast, immediately crossing CR 2700 and an existing 115 kV transmission line, for approximately 0.20 mile. The segment then turns east for
Page 10 of 23
132
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
approximately 0.84 mile, paralleling the north side of CR 5500 and crossing an existing 230 kV transmission line and CR 2800, until reaching its intersection with Segments 54 and 59, located on the northeast corner of the intersection of CR 2800 and CR 5500.
Segment 54
Segment 54 begins at its intersection with Segments 42, 50 and 51, located approximately 0.04 mile southeast of the intersection of CR 5400 and CR 2800. The segment proceeds south for approximately 0.96 mile, paralleling the east side of CR 2800 and an existing 230 kV transmission line, until reaching its intersection with Segments 53b and 59, located on the northeast corner of the intersection of CR 2800 and CR 5500.
Segment 56
Segment 56 begins at its intersection with Segments 47 and 52, located on the east side of FM 400 approximately 0.46 mile north-northeast of the intersection of CR 5500 and FM 400. The segment proceeds south, immediately crossing an abandoned railroad, for approximately 0.45 mile. The segment then turns east for approximately 0.85 mile, paralleling the north side of CR 5500. The segment then turns east-southeast for approximately 0.13 mile, crossing CR 5500, until reaching its intersection with Segments 57 and 58, located on the southwest corner of the intersection of CR 35 and CR 5500.
Segment 57
Segment 57 begins at its intersection with Segments 56 and 58, located on the southwest corner of the intersection of CR 35 and CR 5500. The segment proceeds east, immediately crossing CR 3500, for approximately 1.00 mile, paralleling the south side of CR 5500, until reaching its intersection with Segments 48 and 60, located on the southwest corner of the intersection of CR 36 and CR 5500.
Segment 58
Segment 58 begins at its intersection with Segments 56 and 57, located on the southwest corner of the intersection of CR 3500 and CR 5500. The segment proceeds south for approximately 2.00 miles, paralleling the west side of CR 3500 and crossing CR 56 and CR 5700, until reaching its intersection with Segments 68, 69, and 71, located on the southwest corner of the intersection of CR 3500 and CR 5700.
Segment 59
Segment 59 begins at its intersection with Segments 53b and 54, located on the northeast corner of the intersection of CR 2800 and CR 5500. The segment proceeds south, immediately crossing CR 5500, for approximately 1.05 miles, paralleling the east side of CR 2800 and crossing an existing pipeline ROW and FM 1729. The segment then turns east for approximately 0.96, paralleling the south side of FM 1729. The segment then turns south for approximately 0.49 mile, paralleling the west side of CR 2900. The segment then turns east, immediately crossing CR 2900, for approximately 0.50 mile, until reaching its intersection with Segment 66, located approximately 0.70 mile northwest of the intersection of CR 5700 and CR 3000.
Segment 60
Segment 60 begins at its intersection with Segments 48 and 57, located on the southwest corner of the intersection of CR 36 and CR 5500. The segment proceeds south for approximately 0.51 mile, paralleling the west side of CR 36, until reaching its intersection with Segments 61 and 62, located approximately 0.03 mile southwest of the intersection of CR 36 and CR 54D.
Page 11 of 23
133
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 61
Segment 61 begins at its intersection with Segments 60 and 62, located approximately 0.03 mile southwest of the intersection of CR 36 and CR 54D. The segment proceeds east, immediately crossing CR 36, for approximately 1.99 miles, paralleling the south side of CR 54D, and crossing CR 37, until reaching its intersection with Segments 49 and 63, located on the southwest corner of the intersection of FM 789 and CR 55D.
Segment 62
Segment 62 begins at its intersection with Segments 60 and 61, located approximately 0.03 mile southwest of the intersection of CR 36 and CR 54D. The segment proceeds south for approximately 1.50 mile, paralleling the west side of CR 36 and crossing CR 56 and CR 5700, until reaching its intersection with Segments 69 and 72, located on the southwest corner of the intersection of CR 36 and CR 5700.
Segment 63
Segment 63 begins at its intersection with Segments 49 and 61, located on the southwest corner of the intersection of FM 789 and CR 55D. The segment proceeds south for approximately 2.47 miles, paralleling the west side of FM 789, until reaching its intersection with Segments 73 and 75, located on the northwest corner of the intersection of FM 789 and CR 5800.
Segment 66
Segment 66 begins at its intersection with Segment 59, located approximately 0.70 mile northwest of the intersection of CR 5700 and CR 3000. The segment proceeds south for approximately 0.50 mile, until reaching its intersection with Segments 67, 70, and 125, located approximately 0.52 mile west-southwest of the intersection of CR 5700 and CR 3000.
Segment 67
Segment 67 begins at its intersection with Segments 66, 70, and 125, located approximately 0.52 mile west-southwest of the intersection of CR 5700 and CR 3000. The segment proceeds east for approximately 0.52 mile, crossing CR 3000. The segment then continues east for approximately 0.53 mile, paralleling the south side of CR 5700. The segment then turns east-northeast for approximately 0.18 mile, crossing CR 5700. The segment then turns east for approximately 0.31 mile, paralleling the north side of CR 5700. The segment then turns north-northeast for approximately 0.18 mile, crossing FM 1729 and CR 5700, until reaching its intersection with Segment 68, located on the northeast corner of the intersection of FM 1729 and CR 5700.
Segment 68
Segment 68 begins at its intersection with Segment 67, located on the northeast corner of the intersection of FM 1729 and CR 5700. The segment proceeds east for approximately 1.56 miles, paralleling the north side of CR 5700 and crossing CR 3240 and an abandoned railroad. The segment then turns east-southeast for approximately 0.17 mile, crossing CR 5700 and CR 3300. The segment then turns east for approximately 0.97 mile, paralleling the south side of CR 5700 and crossing an existing pipeline ROW. The segment then turns east-southeast for approximately 0.17 mile, crossing FM 400. The segment then turns east for approximately 0.95 mile, paralleling the south side of CR 5700, until reaching its intersection with Segments 58, 69, and 71, located on the southwest corner of the intersection of CR 3500 and CR 5700.
Page 12 of 23
134
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 69
Segment 69 begins at its intersection with Segments 58, 68, and 71, located on the southwest corner of the intersection of CR 3500 and CR 5700. The segment proceeds east, immediately crossing CR 3500, for approximately 1.00 mile, paralleling the south side of CR 5700, until reaching its intersection with Segments 62 and 72, located on the southwest corner of the intersection of CR 3600 and CR 5700.
Segment 70
Segment 70 begins at its intersection with Segments 66, 67, and 125, located approximately 0.52 mile west-southwest of the intersection of CR 5700 and CR 3000. The segment proceeds south for approximately 1.52 miles, crossing CR 5800, until reaching its intersection with Segments 76 and 77, located approximately 0.66 mile northwest of the intersection of CR 3000 and FM 1294.
Segment 71
Segment 71 begins at its intersection with Segments 58, 68, and 69, located on the southwest corner of the intersection of CR 3500 and CR 5700. The segment proceeds south for approximately 0.34 mile, paralleling the west side of CR 3500. The segment then turns south-southeast for approximately 0.16 mile, crossing CR 3500. The segment then turns south for approximately 1.53 miles, paralleling the east side of CR 3500 and crossing CR 5800 and CR 5900, until reaching its intersection with Segments 77, 78, and 80, located on the southeast corner of the intersection of CR 3500 and CR 5900.
Segment 72
Segment 72 begins at its intersection with Segments 62 and 69, located on the southwest corner of the intersection of CR 3600 and CR 5700. The segment proceeds south for approximately 0.97 mile, paralleling the west side of CR 3600, until reaching its intersection with Segments 73 and 74, located on the northwest corner of the intersection of CR 3600 and CR 5800.
Segment 73
Segment 73 begins at its intersection with Segments 72 and 74, located on the northwest corner of the intersection of CR 3600 and CR 5800. The segment proceeds east, immediately crossing CR 3600, for approximately 2.00 miles, paralleling the north side of CR 5800 and crossing CR 3700, until reaching its intersection with Segments 63 and 75, located on the northwest corner of the intersection of FM 789 and CR 5800.
Segment 74
Segment 74 begins at its intersection with Segments 72 and 73, located on the northwest corner of the intersection of CR 3600 and CR 5800. The segment proceeds south, immediately crossing CR 5800, for approximately 1.04 miles, paralleling the west side of CR 3600 and crossing CR 5900, until reaching its intersection with Segments 78, 79, and 81, located on the southwest corner of the intersection of CR 3600 and CR 5900.
Segment 75
Segment 75 begins at its intersection with Segments 63 and 73, located on the northwest corner of the intersection of FM 789 and CR 5800. The segment proceeds south, immediately crossing CR 5800, for approximately 1.05 miles, paralleling the west side of FM 789 and crossing CR 5900, until reaching its intersection with Segments 79 and 82, located on the southwest corner of the intersection of FM 789 and CR 5900.
Page 13 of 23
135
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 76
Segment 76 begins at its intersection with Segments 70 and 77, located approximately 0.66 mile northwest of the intersection of CR 3000 and FM 1294. The segment proceeds southeast for approximately 0.73 mile, crossing FM 1294 and an existing pipeline ROW. The segment then turns south for approximately 0.42 mile, paralleling the west side of CR 3000. The segment then turns east, immediately crossing CR 3000, for approximately 0.54 mile, crossing an existing pipeline ROW. The segment then turns south for approximately 1.53 mile, crossing CR 6000, CR 61, and an abandoned railroad. The segment then turns south-southwest for approximately 0.18 mile. The segment then turns south for approximately 0.66 mile. The segment then turns south-southeast for approximately 0.15 mile, crossing U.S. Highway (US) 62 and an existing 69 kV transmission line. The segment then turns east for approximately 0.47 mile, paralleling the south side of an existing 69 kV transmission line. The segment then turns south for approximately 0.44 mile, paralleling the west side of CR 3100, until reaching its intersection with Segments 87 and 88, located on the west side of CR 3100 approximately 0.42 mile south-southwest of the intersection of CR 6200 and CR 3100.
Segment 77
Segment 77 begins at its intersection with Segments 70 and 76, located approximately 0.66 mile northwest of the intersection of CR 3000 and FM 1294. The segment proceeds east for approximately 2.41 miles, crossing CR 3000 and FM 1729. The segment then turns north for approximately 0.09 mile, paralleling the west side of CR 3200 and crossing an abandoned railroad. The segment then turns east, immediately crossing CR 3200, for approximately 0.78 mile. The segment then turns east-northeast for approximately 0.17 mile, crossing CR 3300. The segment then turns east for approximately 1.02 miles, paralleling the south side of CR 58D and crossing an existing pipeline ROW and FM 400. The segment then turns south for approximately 0.47 mile, paralleling the east side of FM 400 and crossing an existing pipeline ROW. The segment then turns east for approximately 0.64 mile, paralleling the north side of CR 5900 and crossing an existing pipeline ROW. The segment then turns east-southeast for approximately 0.17 mile, crossing CR 59. The segment then turns east for approximately 0.21 mile, paralleling the south side of CR 59 and crossing CR 3500, until reaching its intersection with Segments 71, 78 and 80, located on the southeast corner of the intersection of CR 3500 and CR 59.
Segment 78
Segment 78 begins at its intersection with Segments 71, 77, and 80, located on the southeast corner of the intersection of CR 3500 and CR 5900. The segment proceeds east for approximately 0.97 mile, paralleling the south side of CR 5900, until reaching its intersection with Segments 74, 79, and 81, located on the southwest corner of the intersection of CR 3600 and CR 5900.
Segment 79
Segment 79 begins at its intersection with Segments 74, 78, and 81, located on the southeast corner of the intersection of CR 3500 and CR 5900. The segment proceeds east-northeast, immediately crossing CR 3600, for approximately 0.18 mile, crossing CR 5900. The segment then turns east for approximately 1.34 miles, paralleling the north side of CR 5900 and crossing CR 3700. The segment then turns east-southeast for approximately 0.18 mile, crossing CR 5900. The segment then turns east for approximately 0.33 mile, paralleling the south side of CR 5900, until reaching its intersection with Segments 75 and 82, located on the southwest corner of the intersection of FM 789 and CR 5900.
Page 14 of 23
136
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 80
Segment 80 begins at its intersection with Segments 71, 77, and 78, located on the southeast corner of the intersection of CR 3500 and CR 59. The segment proceeds south, immediately crossing an existing pipeline ROW for approximately 0.43 mile, paralleling the east side of CR 3500. The segment then turns south-southwest for approximately 0.19 mile, crossing CR 3500. The segment then turns south for approximately 1.33 miles, paralleling the west side of CR 3500 and crossing CR 6000, until reaching its intersection with Segments 83 and 85, located on the northwest corner of the intersection of US 62 and CR 3500.
Segment 81
Segment 8 rbegins at its intersection with Segments 74, 78, and 79, located on the southeast corner of the intersection of CR 3600 and CR 5900. The segment proceeds south, immediately crossing an existing pipeline ROW, for approximately 0.83 mile, paralleling the west side of CR 3600. The segment then turns south-southeast for approximately 0.14 mile, crossing CR 3600. The segment then turns south, immediately crossing CR 60 for approximately 1.02 miles, paralleling the east side of CR 3600, until reaching its intersection with Segments 83 and 84, located on the northeast corner of the intersection of US 62 and CR 3600.
Segment 82
Segment 82 begins at its intersection with Segments 75 and 79, located on the southwest corner of the intersection of FM 789 and CR 5900. The segment proceeds south, immediately crossing an existing pipeline ROW, for approximately 0.80 mile, paralleling the west side of FM 789. The segment then turns south-southeast for approximately 0.21 mile, crossing FM 789. The segment then turns south, immediately crossing CR 60, for approximately 1.00 mile, paralleling the east side of FM 789, until reaching its intersection with Segments 84 and 86, located on the northeast corner of the intersection of US 82 and FM 789.
Segment 83
Segment 83 begins at its intersection with Segments 81 and 84, located on the northeast corner of the intersection of US 62 and CR 3600. The segment proceeds west, immediately crossing CR 3600, for approximately 1.04 miles, paralleling the north side of US 62 and crossing CR 3500, until reaching its intersection with Segments 80 and 85, located on the northwest corner of the intersection of US 82 and CR 3600.
Segment 84
Segment 84 begins at its intersection with Segments 82 and 86, located on the northeast corner of the intersection of US 82 and FM 789. The segment proceeds west, immediately crossing FM 789, for approximately 2.01 miles, paralleling the north side of US 62 and crossing CR 3700, until reaching its intersection with Segments 81 and 83, located on the northeast corner of the intersection of US 62 and CR 3600.
Segment 85
Segment 85 begins at its intersection with Segments 80 and 83, located on the northwest corner of the intersection of US 62 and CR 3500. The segment proceeds south, immediately crossing US 62, for approximately 0.98 mile, paralleling the west side of CR 3500. The segment then turns southeast for approximately 0.42 mile, crossing CR 3500, an existing 69 kV transmission line, and CR 6200. The segment then turns south for approximately 0.33 mile, paralleling the east side of CR 3500, until reaching its intersection with Segments 87 and 89, located on the west side of CR 3500 approximately 0.35 mile north-northwest of the intersection of CR 3500 and CR 6300.
Page 15 of 23
137
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 86
Segment 86 begins at its intersection with Segments 82 and 84, located on the northeast corner of the intersection of US 62 and FM 789. The segment proceeds south, immediately crossing US 62, for approximately 1.98 miles, paralleling the east side of CR 3800 and crossing an existing 69 kV transmission line, CR 6200, and an existing pipeline ROW, until reaching its intersection with Segments 90 and 92, located on the northeast corner of the intersection of CR 3800 and CR 6300.
Segment 87
Segment 87 begins at its intersection with Segments 76 and 88, located on the west side of CR 3100 approximately 0.42 mile south-southwest of the intersection of CR 6200 and CR 3100. The segment proceeds southeast, immediately crossing CR 3100, for approximately 0.14 mile. The segment then turns east for approximately 3.86 miles, paralleling the north side of an existing 69 kV transmission line and crossing CR 3200, an existing pipeline ROW, CR 3300, and FM 400, until reaching its intersection with Segments 85 and 89, located on the west side of CR 3500 approximately 0.35 mile north-northwest of the intersection of CR 3500 and CR 6300.
Segment 88
Segment 88 begins at its intersection with Segments 76 and 87, located on the west side of CR 3100 approximately 0.42 mile south-southwest of the intersection of CR 6200 and CR 3100. The segment proceeds south, immediately crossing an existing 69 kV transmission line, for approximately 2.55 miles, paralleling the west side of CR 3100 and crossing CR 6300, an existing pipeline ROW, CR 6400, and CR 6500, until reaching its intersection with Segments 97 and 106, located on the southwest corner of the intersection of CR 3100 and CR 6500.
Segment 89
Segment 89 begins at its intersection with Segments 85 and 87, located on the west side of CR 3500 approximately 0.35 mile north-northwest of the intersection of CR 3500 and CR 6300. The segment proceeds south, immediately crossing an existing 69 kV transmission line, for approximately 0.32 mile, paralleling the west side of CR 3500 and an existing 69 kV transmission line, until reaching its intersection with Segments 90 and 91, located approximately 0.04 mile northwest of the intersection of CR 6300 and CR 3500.
Segment 90
Segment 90 begins at its intersection with Segments 89 and 91, located approximately 0.04 mile northwest of the intersection of CR 6300 and CR 3500. The segment proceeds east, immediately crossing CR 3500 and an existing 69 kV transmission line, for approximately 2.87 miles, paralleling the north side of an existing 69 kV transmission line and crossing CR 3600, an existing 69 kV transmission line, FM 789, an existing pipeline ROW, and CR 3800, until reaching its intersection with Segments 86 and 92, located on the northeast corner of the intersection of CR 3800 and CR 6300.
Segment 91
Segment 91 begins at its intersection with Segments 89 and 90, located approximately 0.04 mile northwest of the intersection of CR 6300 and CR 3500. The segment proceeds south for approximately 2.03 miles, paralleling the west side of CR 3500 and crossing CR 6300, an existing pipeline ROW, and CR 6400, until reaching its intersection with Segments 94, 96, and 97, located approximately 0.03 mile northwest of the intersection of CR 6500 and CR 3500.
Page 16 of 23
138
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 92
Segment 92 begins at its intersection with Segments 86 and 90, located on the northeast corner of the intersection of CR 3800 and CR 6300. The segment proceeds south, immediately crossing an existing 69 kV transmission line and CR 6300, for approximately 2.01 miles, crossing an existing pipeline ROW and CR 6400, until reaching its intersection with Segments 93 and 98, located on the northeast corner of the intersection of CR 3800 and CR 6500.
Segment 93
Segment 93 begins at its intersection with Segments 92 and 98, located on the northeast corner of the intersection of CR 3800 and CR 6500. The segment proceeds west for approximately 0.20 mile, paralleling the north side of CR 6500. The segment then turns west-southwest for approximately 0.20 mile, crossing CR 6500. The segment then turns west for approximately 1.68 miles, paralleling the south side of CR 6500 and crossing FM 789, CR 3640, an existing 69 kV transmission line, CR 3600, and an existing pipeline ROW. The segment then turns west-northwest for approximately 0.17 mile, crossing CR 6500. The segment then turns west for approximately 0.57 mile, paralleling the north side of CR 6500, until reaching its intersection with Segments 94 and 95, located on the northeast corner of the intersection of CR 3500 and CR 6500.
Segment 94
Segment 94 begins at its intersection with Segments 93 and 95, located on the northeast corner of the intersection of CR 3500 and CR 6500. The segment proceeds west for approximately 0.03 mile, crossing CR 3500, until reaching its intersection with Segments 91, 96, and 97, located approximately 0.03 mile northwest of the intersection of CR 6500 and CR 3500.
Segment 95
Segment 95 begins at its intersection with Segments 93 and 94, located on the northeast corner of the intersection of CR 3500 and CR 6500. The segment proceeds south for approximately 0.14 mile, paralleling the east side of CR 3500 and crossing CR 6500, until reaching its intersection with Segments 96 and 99, located on the west side of CR 3500 approximately 0.11 mile south-southeast of the intersection of CR 3500 and CR 6500.
Segment 96
Segment 96 begins at its intersection with Segments 91, 94, and 97, located approximately 0.03 mile northwest of the intersection of CR 6500 and CR 3500. The segment proceeds southeast for approximately 0.14 mile, crossing CR 3500, until reaching its intersection with Segments 95 and 99, located on the east side of CR 3500 approximately 0.11 mile south-southeast of the intersection of CR 3500 and CR 6500.
Segment 97
Segment 97 begins at its intersection with Segments 91, 94, and 96, located approximately 0.03 mile northwest of the intersection of CR 6500 and CR 3500. The segment proceeds south for approximately 0.18 mile, paralleling the west side of CR 3500. The segment then turns west for approximately 0.89 mile, paralleling the north side of CR 6500. The segment then turns southwest for approximately 0.12 mile, crossing CR 6500 and FM 400. The segment then turns west for approximately 0.16 mile, paralleling the south side of CR 6500. The segment then turns northwest for approximately 0.17 mile, crossing CR 6500. The segment then turns west for approximately 0.68 mile, paralleling the north side of CR 6500. The segment then turns west-northwest for approximately 0.19 mile, crossing CR 3300. The segment then turns west for approximately 1.85 miles, paralleling the south side of CR 6500 and crossing CR 3200 and CR 3100, until reaching its intersection with Segments 88 and 106, located on the southwest corner of the intersection of CR 3100 and CR 6500.
Page 17 of 23
139
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 98
Segment 98 begins at its intersection with Segments 92 and 93, located on the northeast corner of the intersection of CR 3800 and CR 6500. The segment proceeds south, immediately crossing CR 6500, for approximately 0.54 mile, paralleling the east side of CR 3800. The segment then turns south-southwest for approximately 0.13 mile, crossing CR 3800. The segment then turns south for approximately 0.34 mile, paralleling the west side of CR 3800. The segment then turns west for approximately 0.30 mile, paralleling the north side of FM 40. The segment then turns south, immediately crossing FM 40, for approximately 0.16 mile, and crossing CR 6610. The segment then continues south for approximately 1.03 mile, paralleling the east side of CR 3760, until reaching its intersection with Segments 100 and 101, located on the northeast corner of the intersection of CR 3760 and CR 6700.
Segment 99
Segment 99 begins at its intersection with Segments 95 and 96, located on the east side of CR 3500 approximately 0.11 mile south-southeast of the intersection of CR 3500 and CR 6500. The segment proceeds south for approximately 1.04 miles, paralleling the east side of CR 3500 and crossing FM 40. The segment then turns southwest for approximately 0.23 mile. The segment then turns south for approximately 0.90 mile, until reaching its intersection with Segments 100 and 102, located on the north side of CR 6700 approximately 0.54 mile west-northwest of the intersection of CR 6700 and CR 3550.
Segment 100
Segment 100 begins at its intersection with Segments 98 and 101, located on the northeast corner of the intersection of CR 3760 and CR 6700. The segment proceeds west, immediately crossing CR 3760, for approximately 2.67 miles, paralleling the north side of CR 6700 and crossing CR 3650, an existing pipeline ROW, and CR 3550, until reaching its intersection with Segments 99 and 102, located on the north side of CR 6700 approximately 0.54 mile west-northwest of the intersection of CR 6700 and CR 3550.
Segment 101
Segment 101 begins at its intersection with Segments 98 and 100, located on the northeast corner of the intersection of CR 3760 and CR 6700. The segment proceeds south, immediately crossing CR 6700, for approximately 1.57 miles, paralleling the east side of CR 3760. The segment then turns west, immediately crossing CR 3760, for approximately 1.84 miles, paralleling the north side of CR 6840 and crossing CR 3650. The segment then turns west-southwest for approximately 0.19 mile, crossing CR 6840. The segment then turns west for approximately 0.64 mile, paralleling the south side of CR 6840 and crossing an existing pipeline ROW, until reaching its intersection with Segments 102 and 103, located on the south side of CR 6840 approximately 0.54 mile west-southwest of the intersection of CR 6840 and CR 3550.
Segment 102
Segment 102 begins at its intersection with Segments 99 and 100, located on the north side of CR 6700 approximately 0.54 mile west-northwest of the intersection of CR 6700 and CR 3550. The segment proceeds south, immediately crossing CR 6700, for approximately 1.62 miles, crossing CR 6800 and CR 6840, until reaching its intersection with Segments 101 and 103, located on the south side of CR 6840 approximately 0.54 mile west-southwest of the intersection of CR 6840 and CR 3550.
Page 18 of 23
140
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 103
Segment 103 begins at its intersection with Segments 101 and 102, located on the south side of CR 6840 approximately 0.54 mile west-southwest of the intersection of CR 6840 and CR 3550. The segment proceeds west for approximately 1.53 miles, paralleling the south side of CR 6840 and crossing FM 400, until reaching its intersection with Segments 105 and 104, located on the southeast corner of the intersection of CR 330 and CR 6840.
Segment 104
Segment 104 begins at its intersection with Segments 103 and 105, located on the southeast corner of the intersection of CR 3300 and CR 6840. The segment proceeds southwest for approximately 0.12 mile, crossing CR 3300 and an existing pipeline ROW. The segment then turns west for approximately 2.00 miles, crossing CR 3200, CR 3140, and CR 3100. The segment then turns north for approximately 0.48 mile, paralleling the west side of CR 3100 and crossing CR 6840, until reaching its intersection with Segment 105 and 107, located on the west side of CR 3100 approximately 0.24 mile north-northwest of the intersection of CR 6840 and CR 3100.
Segment 105
Segment 105 begins at its intersection with Segments 103 and 104, located on the southeast corner of the intersection of CR 330 and CR 6840. The segment proceeds north for approximately 0.38 mile, paralleling the east side of CR 3300. The segment then turns west, immediately crossing CR 3300 and an existing pipeline ROW, for approximately 2.03 miles, paralleling the south side of CR 6800 and crossing CR 3200 and CR 3100, until reaching its intersection with Segments 104 and 107, located on the west side of CR 3100 approximately 0.24 mile north-northwest of the intersection of CR 6840 and CR 3100.
Segment 106
Segment 106 begins at its intersection with Segments 88 and 97, located on the southwest corner of the intersection of CR 3100 and CR 6500. The segment proceeds south for approximately 1.47 miles, paralleling the west side of CR 3100 and crossing CR 6400 and FM 40, until reaching its intersection with Segments 108 and 109, located on the west side of CR 3100 approximately 0.48 mile south-southwest of the intersection of CR 3100 and FM 40.
Segment 107
Segment 107 begins at its intersection with Segments 104 and 105, located on the west side of CR 3100 approximately 0.24 mile north-northwest of the intersection of CR 6840 and CR 3100. The segment proceeds north for approximately 0.11 mile, paralleling the west side of CR 3100. The segment then turns west for approximately 0.29 mile. The segment then turns north for approximately 0.11 mile, until reaching its intersection with Segments 108 and 110, located approximately 0.37 mile northwest of the intersection of CR 3100 and CR 6800.
Segment 108
Segment 108 begins at its intersection with Segments 106 and 109, located on the west side of CR 3100 approximately 0.48 mile south-southwest of the intersection of CR 3100 and FM 40. The segment proceeds south for approximately 0.80 mile, paralleling the west side of CR 3100 and crossing CR 6700. The segment then continues south for approximately 0.78 mile, until reaching its intersection with Segments 107 and 110, located approximately 0.37 mile northwest of the intersection of CR 3100 and CR 6800.
Page 19 of 23
141
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 109
Segment 109 begins at its intersection with Segments 106 and 108, located on the west side of CR 3100 approximately 0.48 mile south-southwest of the intersection of CR 3100 and FM 40. The segment proceeds west for approximately 1.97 miles, crossing FM 1729 and an existing pipeline ROW, until reaching its intersection with Segments 111 and 113, located on the east side of CR 2900 approximately 0.49 mile south-southeast of the intersection of FM 40 and CR 2900.
Segment 110
Segment 110 begins at its intersection with Segments 107 and 108, located approximately 0.37 mile northwest of the intersection of CR 3100 and CR 6800. The segment proceeds west for approximately 0.80 mile, crossing an existing pipeline ROW. The segment then turns west-northwest for approximately 0.17 mile, crossing FM 1729. The segment then turns west for approximately 0.68 mile. The segment then turns west-southwest for approximately 0.16 mile. The segment then turns west for approximately 0.18 mile, crossing CR 2900 and an existing 230 kV transmission line, until reaching its intersection with Segments 111 and 112, located on the south side of CR 2900 approximately 0.97 mile north-northwest of the intersection of CR 2900 and FM 835.
Segment 111
Segment 111 begins at its intersection with Segments 109 and 113, located on the east side of CR 2900 approximately 0.49 mile south-southeast of the intersection of FM 40 and CR 2900. The segment proceeds south for approximately 1.57 miles, paralleling the east side of CR 2900 and crossing CR 6700, an existing 230 kV transmission line, and CR 2900, until reaching its intersection with Segments 110 and 112, located on the south side of CR 2900 approximately 0.97 mile north-northwest of the intersection of CR 2900 and FM 835.
Segment 112
Segment 112 begins at its intersection with Segments 110 and 111, located on the south side of CR 2900 approximately 0.97 mile north-northwest of the intersection of CR 2900 and FM 835. The segment proceeds west for approximately 1.74 miles, crossing CR 2800 and two existing pipeline ROWs. The segment then turns west-northwest for approximately 0.16 mile. The segment then turns west for approximately 0.23 mile, crossing an existing 115 kV transmission line, and entering Lubbock city limits, until reaching its intersection with Segments 118, 119, and 120, located approximately 0.11 mile east of State Highway ("SH") 289 approximately 1.01 miles north-northeast of the intersection of SH 289 and FM 835.
Segment 113
Segment 113 begins at its intersection with Segments 109 and 111, located on the east side of CR 2900 approximately 0.49 mile south-southeast of the intersection of FM 40 and CR 2900. The segment proceeds west, immediately crossing CR 2900, an existing 230 kV transmission line, and an existing 69 kV transmission line, for approximately 1.03 miles, crossing CR 2800, until reaching its intersection with Segments 114 and 115, located on the west side of CR 2800 approximately 0.49 mile south-southwest of the intersection FM 40 and CR 2800.
Segment 114
Segment 114 begins at its intersection with Segments 113 and 115, located on the west side of CR 2800 approximately 0.49 mile south-southwest of the intersection FM 40 and CR 2800. The segment proceeds south for approximately 1.00 mile, paralleling the west side of CR 2800 and crossing CR 6700. The segment then turns west for approximately 1.03 miles, paralleling the north side of an existing 230 kV transmission line and crossing two
Page 20 of 23
142
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
existing pipeline ROWs, and entering Lubbock city limits, until reaching its intersection with Segments 116 and 118, located approximately 0.17 mile east of SH 289 approximately 0.49 southeast CR 6700 and SH 289.
Segment 115
Segment 115 begins at its intersection with Segments 113 and 114, located on the west side of CR 2800 approximately 0.49 mile south-southwest of the intersection of FM 40 and 2800. The segment proceeds west for approximately 0.48 mile, crossing two existing pipeline ROWs, until reaching its intersection with Segments 116 and 117, located approximately 0.68 mile southwest of the intersection of FM 40 and CR 2800.
Segment 116
Segment 116 begins at its intersection with Segments 115 and 117, located approximately 0.68 mile southwest of the intersection of FM 40 and CR 2800. The segment proceeds south for approximately 0.41 mile, paralleling the west side of an existing pipeline ROW. The segment then turns southwest for approximately 0.18 mile. The segment then turns west for approximately 0.24 mile, paralleling the north side of CR 6700. The segment then turns southwest for approximately 0.20 mile, crossing CR 6700 and entering Lubbock city limits. The segment then turns south for approximately 0.38 mile, until reaching its intersection with Segments 114 and 118, located approximately 0.17 mile east of SH 289 approximately 0.49 southeast CR 6700 and SH 289.
Segment 117
Segment 117 begins at its intersection with Segments 115 and 116, located approximately 0.68 mile southwest of the intersection of FM 40 and CR 2800. The segment proceeds west for approximately 0.26 mile, crossing an abandoned railroad. The segment then turns southwest for approximately 0.22 mile. The segment then turns west for approximately 0.34 mile, entering Lubbock city limits, crossing an existing 69 kV transmission line and SH 289. The segment then turns south for approximately 0.66 mile, paralleling the west side of SH 289 and crossing CR 6700, until reaching its intersection with Segments 121 and 122, located on the west side of SH 289 approximately 0.23 mile southwest of the intersection of CR 6700 and SH 289.
Segment 118
Segment 118 begins at its intersection with Segments 114 and 116, located approximately 0.17 mile east of SH 289 approximately 0.49 southeast CR 6700 and SH 289. The segment proceeds south-southwest, immediately crossing an existing 230 kV transmission line and an existing 69 kV transmission line, for approximately 0.55 mile, until reaching its intersection with Segments 112, 119, and 120, located approximately 0.11 mile east of SH 289 and approximately 1.01 miles north-northeast of the intersection of SH 289 and FM 835.
Segment 119
Segment 119 begins at its intersection with Segments 112, 118, and 120, located approximately 0.11 mile east of SH 289 and approximately 1.01 miles north-northeast of the intersection of SH 289 and FM 835. The segment proceeds south for approximately 0.06 mile. The segment then turns southwest for approximately 0.16 mile. The segment then turns south for approximately 0.23 mile, paralleling the east side of SH 289 and an existing 69 kV transmission line. The segment then turns west for approximately 0.69 mile, crossing an existing 69 kV transmission line and SH 289, until reaching the northeast side of the existing Wadsworth Substation in Lubbock County, located approximately 0.84 mile northwest of the intersection of SH 289 and FM 835.
Page 21 of 23
143
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
Segment 120
Segment 120 begins at its intersection with Segments 112, 118, and 119, located approximately 0.11 mile east of SH 289 approximately 1.01 miles north-northeast of the intersection of SH 289 and FM 835. The segment proceeds west for approximately 0.16 mile, crossing an existing 69 kV transmission line and SH 289, until reaching its intersection with Segments 121 and 123, located on the west side of SH 289, approximately 0.99 mile south-southwest of the intersection of SH 289 and CR 6700.
Segment 121
Segment 121 begins at its intersection with Segments 117 and 122, located on the west side of SH 289, approximately 0.23 mile southwest of the intersection of CR 6700 and SH 289. The segment proceeds south-southeast for approximately 0.15 mile, paralleling the west side of SH 289 and crossing an abandoned railroad and an existing 69 kV transmission line. The segment then turns south for approximately 0.64 mile, paralleling the west side of SH 289 and crossing an abandoned railroad and an existing 230 kV transmission line, an existing 115 kV transmission line, and an existing 69 kV transmission line, until reaching its intersection with Segments 120 and 123, located on the west side of SH 289, approximately 0.99 mile south-southwest of the intersection of SH 289 and CR 6700.
Segment 122
Segment 122 begins at its intersection with Segments 117 and 121, located on the west side of SH 289, approximately 0.23 mile southwest of the intersection of CR 6700 and SH 289. The segment proceeds southwest for approximately 0.33 mile, paralleling the northwest side of an abandoned railroad. The segment then turns south, immediately crossing an abandoned railroad, two existing 69 kV transmission lines, for approximately 0.64 mile, paralleling the west side of an existing 230 kV transmission line and crossing an existing 230 kV transmission line, until reaching its intersection with Segments 123 and 124, located approximately 0.97 mile northwest of the intersection of SH 289 and FM 835.
Segment 123
Segment 123 begins at its intersection with Segments 120 and 121, located on the west side of SH 289, approximately 0.99 mile south-southwest of the intersection of SH 289 and CR 6700. The segment proceeds west for approximately 0.18 mile. The segment then turns southwest for approximately 0.11 mile, paralleling the southeast side of an existing 230 kV transmission line, until reaching its intersection with Segments 122 and 124, located approximately 0.97 mile northwest of the intersection of SH 289 and FM 835.
Segment 124
Segment 124 begins at its intersection with Segments 122 and 123, located approximately 0.97 mile northwest of the intersection of SH 289 and FM 835. The segment proceeds southwest for approximately 0.47 mile, paralleling the southeast side of an existing 230 kV transmission line. The segment then turns south for approximately 0.03 mile, until reaching the northeast side of the existing Wadsworth Substation in Lubbock County, located approximately 0.84 mile northwest of the intersection of SH 289 and FM 835.
Segment 125
Segment 125 begins at its intersection with Segments 53a and 53b, located approximately 0.05 mile northwest of the intersection of CR 2700 and CR 5500. The segment proceeds south, immediately crossing CR 5500, for approximately 0.32 mile, paralleling the west side of an existing transmission line. The segment then turns south-southwest for approximately 0.21 mile. The segment then turns south-southeast for approximately 0.19 mile. The
Page 22 of 23
144
Sharyland Utilities, L.P. and Lubbock Power & Light Proposed Abernathy to Wadsworth 345-kV Transmission Line Project in
Hale and Lubbock Counties, Texas Docket No. 48668
Description of Alternative Route Segments
segment then turns south for approximately 0.81 mile, paralleling the west side of an existing 115 kV transmission line and crossing an existing pipeline ROW and FM 1729. The segment then turns southeast for approximately 0.10 mile, crossing an existing 115 kV transmission line and CR 2700. The segment then turns south for approximately 0.44 mile, paralleling the east side of CR 2700. The segment then turns east for approximately 0.83 mile, paralleling the north side of CR 5700. The segment then turns east-northeast for approximately 0.18 mile, crossing an existing 230 kV transmission line and CR 2800. The segment then turns east for approximately 1.01 miles, paralleling the north side of an existing 230 kV transmission line and crossing CR 2900. The segment then turns east-southeast for approximately 0.47 mile, until reaching its intersection with Segments 66, 67, and 70, located approximately 0.52 mile west-southwest of the intersection of CR 5700 and CR 3000.
Page 23 of 23
145
THIS PAGE IS OVERSIZED
AND CAN BE VIEWED
IN CENTRAL RECORDS
Landowners and Transmission Line Cases
at the PUC
Public Utility Commission of Texas
1701 N. Congress Avenue P.O. Box 13326
Austin, Texas 78711-3326 (512) 936-7261
www.puc.state.tx.us
Effective: June 1, 2011
147
Purpose of This Brochure
This brochure is intended to provide landowners with information about proposed new transmission lines and the Public Utility Commission's ("PUC or "Commissioe) process for evaluating these proposals. At the end of the brochure is a list of sources for additional information.
The following topics are covered in this brochure: • How the PUC evaluates whether a new transmission line should be built, • How you can participate in the PUC's evaluation of a line, and • How utilities acquire the right to build a transmission line on private property.
You are receiving the enclosed formal notice because one or more of the routes for a proposed transmission line may require an easement or other property interest across your property, or the centerline of the proposed project may come within 300 feet of a house or other habitable structure on your property. This distance is expanded to 500 feet if the proposed line is greater than 230 kilovolts (kV). For this reason, your property is considered directly affected land. This brochure is being included as part of the formal notice process.
If you have questions about the proposed routes for a transmission line, you may contact the applicant. The applicant also has a more detailed map of the proposed routes for the transmission line and nearby habitable structures. The applicant may help you understand the routing of the project and the application approval process in a transmission line case but cannot provide legal advice or represent you. The applicant cannot predict which route may or may not be approved by the PUC. The PUC decides which route to use for the transmission line, and the applicant is not obligated to keep you informed of the PUC's proceedings. The only way to fully participate in the PUC's decision on where to locate the transmission line is to intervene, which is discussed below.
The PUC is sensitive to the impact that transmission lines have on private property. At the same time, transmission lines deliver electricity to millions of homes and businesses in Texas, and new lines are sometimes needed so that customers can obtain reliable, economical power.
The PUC's job is to decide whether a transmission line application should be approved and on which route the line should be constructed. The PUC values input from landowners and encourages you to participate in this process by intervening in the docket.
PUC Transmission Line Case
Texas law provides that most utilities must file an application with the PUC to obtain or amend a Certificate of Convenience and Necessity (CCN) in order to build a new transmission line in Texas. The law requires the PUC to consider a number of factors in deciding whether to approve a proposed new transmission line.
The PUC may approve an application to obtain or amend a CCN for a transmission line after considering the following factors: • Adequacy of existing service; • Need for additional service; • The effect of approving the application on the applicant and any utility serving the proximate area; • Whether the route utilizes existing compatible rights-of-way, including the use of vacant positions on existing
multiple-circuit transmission lines; • Whether the route parallels existing compatible rights-of-way; • Whether the route parallels property lines or other natural or cultural features; • Whether the route conforms with the policy of prudent avoidance (which is defined as the limiting of exposures to
electric and magnetic fields that can be avoided with reasonable investments of money and effort); and • Other factors such as community values, recreational and park areas, historical and aesthetic values, environmental
integrity, and the probable improvement of service or lowering of cost to consumers in the area.
If the PUC decides an application should be approved, it will grant to the applicant a CCN or CCN amendment to allow for the construction and operation of the new transmission line.
2. 148
Application to Obtain or Amend a CCN:
An application to obtain or amend a CCN describes the proposed line and includes a statement from the applicant describing the need for the line and the impact of building it. In addition to the routes proposed by the applicant in its application, the possibility exists that additional routes may be developed, during the course of a CCN case, that could affect property in a different manner than the original routes proposed by the applicant.
The PUC conducts a case to evaluate the impact of the proposed line and to decide which route should be approved. Landowners who would be affected by a new line can: • informally file a protest, or • formally participate in the case as an intervenor.
Filing a Protest (informal comments):
If you do not wish to intervene and participate in a hearing in a CCN case, you may file comments. An individual or business or a group who files only comments for or against any aspect of the transmission line application is considered a "protestor."
Protestors make a written or verbal statement in support of or in opposition to the utility's application and give information to the PUC staff that they believe supports their position.
Protestors are not parties to the case, however, and do not have the right to: • Obtain facts about the case from other parties; • Receive notice of a hearing, or copies of testimony and other documents that are filed in the case; • Receive notice of the time and place for negotiations; • File testimony and/or cross-examine witnessesi • Submit evidence at the hearing; or • Appeal P.U.C. decisions to the courts.
If you want to make comments, you may either send written comments stating your position, or you may make a statement on the first day of the hearing. If you have not intervened, however, you will not be able to participate as a party in the hearing. Only parties may submit evidence and the PUC must base its decision on the evidence.
Intervening in a Case:
To become an intervenor, you must file a statement with the PUC, no later than the date specified in the notice letter sent to you with this brochure, requesting intervenor status (also referred to as a party). This statement should describe how the proposed transmission line would affect your property. Typically, intervention is granted only to directly affected landowners. However, any landowner may request to intervene and obtain a ruling on his or her specific fact situation and concerns. A sample form for intervention and the filing address are attached to this brochure, and may be used to make your filing. A letter requesting intervention may also be used in lieu of the sample form for intervention.
If you decide to intervene and become a party in a case, you will be required to follow certain procedural rules: • You are required to timely respond to requests for information from other parties who seek information. • If you file testimony, you must appear at a hearing to be cross-examined. • If you file testimony or any letters or other documents in the case, you must send copies of the documents to every
party in the case and you must file multiple copies with the PUC. • If you intend to participate at the hearing and you do not file testimony, you must at least file a statement of
position, which is a document that describes your position in the case. • Failure to comply with these procedural rules may serve as grounds for you to be dismissed as an intervenor in the
case. • If you wish to participate in the proceedings it is very important to attend any prehearing conferences.
Intervenors may represent themselves or have an attorney to represent them in a CCN case. If you intervene in a case, you may want an attorney to help you understand the PUC's procedures and the laws and rules that the PUC applies in deciding whether to approve a transmission line. The PUC encourages landowners to intervene and become parties.
3. 149
Stages of a CCN Case:
If there are persons who intervene in the case and oppose the approval of the line, the PUC may refer the case to an administrative law judge (ALJ) at the State Office of Administrative Hearings (SOAH) to conduct a hearing, or the Commission may elect to conduct a hearing itself The hearing is a formal proceeding, much like a trial, in which testimony is presented. In the event the case is referred to SOAH, the ALJ makes a recommendation to the PUC on whether the application should be approved and where and how the line should be routed.
There are several stages of a CCN case: • The ALJ holds a prehearing conference (usually in Austin) to set a schedule for the case. • Parties to the case have the opportunity to conduct discovery; that is, obtain facts about the case from other parties. • A hearing is held (usually in Austin), and parties have an opportunity to cross-examine the witnesses. • Parties file written testimony before the date of the hearing. Parties that do not file written testimony or statements
of position by the deadline established by the ALJ may not be allowed to participate in the hearing on the merits. • Parties may file written briefs concerning the evidence presented at the hearing, but are not required to do so. • In deciding where to locate the transmission line and other issues presented by the application, the ALJ and
Commission rely on factual information submitted as evidence at the hearing by the parties in the case. In order to submit factual information as evidence (other than through cross-examination of other parties witnesses), a party must have intervened in the docket and filed written testimony on or before the deadline set by the ALJ.
• The ALJ makes a recommendation, called a proposal for decision, to the Commission regarding the case. Parties who disagree with the All's recommendation may file exceptions.
• The Commissioners discuss the case and decide whether to approve the application. The Commission may approve the ALJ's recommendation, approve it with specified changes, send the case back to the ALJ for further consideration, or deny the application. The written decision rendered by the Commission is called a final order. Parties who believe that the Commission's decision is in error may file motions for rehearing, asking the Commission to reconsider the decision.
• After the Commission rule on the motion for rehearing, parties have the right to appeal the decision to district court in Travis County.
Right to Use Private Property
The Commission is responsible for deciding whether to approve a CCN application for a proposed transmission line. If a transmission line route is approved that impacts your property, the electric utility must obtain the right from you to enter your property and to build, operate, and maintain the transmission line. This right is typically called an easement.
Utilities may buy easements through a negotiated agreement, but they also have the power of eminent domain (condemnation) under Texas law. Local courts, not the PUC, decide issues concerning easements for rights-of-way. The PUC does not determine the value of property.
The PUC final order in a transmission case normally requires a utility to take certain steps to minimize the impact of the new transmission line on landowners' property and on the environment. For example, the order normally requires steps to minimize the possibility of erosion during construction and maintenance activities.
4. 150
HOW TO OBTAIN MORE INFORMATION
The PUC's online filings interchange on the PUC website provides free access to documents that are filed with the Commission in Central Records. The docket number, also called a control number on the PUC website, of a case is a key piece of information used in locating documents in the case. You may access the Interchange by visiting the PUC's website home page at www.puc.state.tx.us and navigate the website as follows:
• Select "Filings." • Select "Filings Search." • Select "Filings Search." • Enter 5-digit Control (Docket) Number. No other information is necessary. • Select "Search." All of the filings in the docket will appear in order of date filed • Scroll down to select desired filing. • Click on a blue "Item" number at left. • Click on a "Download" icon at left.
Documents may also be purchased from and filed in Central Records. For more information on how to purchase or file documents, call Central Records at the PUC at 512-936-7180.
PUC Substantive Rule 25.101, Certification Criteria, addresses transmission line CCNs and is available on the PUC's website, or you may obtain copies of PUC rules from Central Records.
Always include the docket number on all filings with the PUC. You can find the docket number on the enclosed formal notice. Send documents to the PUC at the following address.
Public Utility Commission of Texas Central Records Attn: Filing Clerk 1701 N. Congress Avenue P.O. Box 13326 Austin, TX 78711-3326
The information contained within this brochure is not intended to provide a comprehensive guide to landowner rights and responsibilities in transmission line cases at the PUC. This brochure should neither be regarded as legal advice nor should it be a substitute for the PUC's rules. However, if you have questions about the process in transmission line cases, you may call the PUC's Legal Division at 512-936-7261. The PUC's Legal Division may help you understand the process in a transmission line case but cannot provide legal advice or represent you in a case. You may choose to hire an attorney to decide whether to intervene in a transmission line case, and an attorney may represent you if you choose to intervene.
Communicating with Decision-Makers
Do not contact the ALJ or the Commissioners by telephone or emaiL They are not allowed to discuss pending cases with you. They may make their recommendations and decisions only by relying on the evidence, written pleadings, and arguments that are presented in the case.
5. 151
Comments in Docket No. 48668
If you want to be a PROTESTOR only, please complete this form. Although public comments are not treated as evidence, they help inform the PUC and its staff of the public concems and identify issues to be explored. The PUC welcomes such participation in its proceedings.
Mail this completed form and 10 copies to:
Public Utility Commission of Texas Central Records Attn: Filing Clerk 1701 N. Congress Ave. P.O. Box 13326 Austin, TX 78711-3326
First Name: Last Name:
Phone Number: Fax Number:
Address, City, State:
I am NOT requesting to intervene in this proceeding. As a PROTESTOR, I understand the following:
• I am NOT a party to this case;
• My comments are not considered evidence in this case; and
• I have no further obligation to participate in the proceeding.
Please check one of the following:
n I own property with a habitable structure located near one or more of the utility's proposed routes for a transmission line.
n One or more of the utility's proposed routes would cross my property.
El Other. Please describe and provide comments. You may attach a separate page, if necessary.
Signature of person submitting comments:
Date:
Effective: January 1, 2003 152
Request to Intervene in PUC Docket No. 48668
The following information must be submitted by the person requesting to intervene in this proceeding. This completed form will be provided to all parties in this docket. If you DO NOT want to be an intervenor, but still want to file comments, please complete the "Comments" pa2e.
Mail this completed form and 10 copies to:
Public Utility Commission of Texas Central Records Attn: Filing Clerk 1701 N. Congress Ave. P.O. Box 13326 Austin, TX 78711-3326
First Name: Last Name:
Phone Number: Fax Number:
Address, City, State:
I am requesting to intervene in this proceeding. As an INTERVENOR, I understand the following:
• I am a party to the case;
• I am required to respond to all discovery requests from other parties in the case;
• If I file testimony, I may be cross-examined in the hearing;
• If I file any documents in the case, I will have to provide a copy of that document to every other party in the case; and
• I acknowledge that I am bound by the Procedural Rules of the Public Utility Commission of Texas (PUC) and the State Office of Administrative Hearings (SOAH).
Please check one of the following:
I own property with a habitable structure located near one or more of the utility's proposed routes for a transmission line.
nOne or more of the utility's proposed routes would cross my property.
El Other. Please describe and provide comments. You may attach a separate page, if necessary.
Signature of person requesting intervention:
Date:
Effective: January 1, 2003 153