52
Special Process: Welding System Assessment CQI-15

Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

Embed Size (px)

Citation preview

Page 1: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

Special Process: Welding System Assessment

CQI-15 Publication Code (Arial, Bold, 40 pt.)

The bottom of the title should sit on this guide.If title wraps to two lines, move title up accordingly.(Arial, Bold, Italic, 18 pt.)

Page 2: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 1 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

ABOUT AIAG Purpose Statement

Founded in 1982, AIAG is a globally recognized organization where OEMs and suppliers unite to address and resolve issues affecting the worldwide automotive supply chain. AIAG’s goals are to reduce cost and complexity through collaboration; improve product quality, health, safety and the environment; and optimize speed to market throughout the supply chain.

AIAG Organization AIAG is made up of a board of directors, an executive director, executives on loan from member companies, associate directors, a full-time staff, and volunteers serving on project teams. Directors, department managers, and program managers plan, direct and coordinate the association’s activities under the direction of the executive director.

AIAG Projects Volunteer committees focus on business processes or supporting technologies and methodologies. They conduct research and develop, publish, and provide training on standards, conventions, standard business practices, white papers, and guidelines in the areas of automatic identification, CAD/CAM, EDI/electronic commerce, continuous quality improvement, health focus, materials and project management, occupational health & safety, returnable containers and packaging systems, transportation/customs and truck & heavy equipment.

AIAG PUBLICATIONS

An AIAG publication reflects a consensus of those substantially concerned with its scope and provisions. An AIAG publication is intended as a guide to aid the manufacturer, the consumer and the general public. The existence of an AIAG publication does not in any respect preclude anyone from manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the publication.

CAUTIONARY NOTICE

AIAG publications are subject to periodic review and users are cautioned to obtain the latest editions.

MAINTENANCE PROCEDURE

Recognizing that this AIAG publication may not cover all circumstances, AIAG has established a maintenance procedure. Please refer to the Maintenance Request Form at the back of this document to submit a request.

Published by: Automotive Industry Action Group

26200 Lahser Road, Suite 200 Southfield, Michigan 48033

Phone: (248) 358-3570 • Fax: (248) 358-3253

APPROVAL STATUS

The AIAG Quality Steering Committee and designated stakeholders approved this document for publication in March 2010.

AIAG COPYRIGHT AND TRADEMARK NOTICE:

© 2010 Automotive Industry Action Group, except that copyright is not claimed as to any part of an original work prepared by a U.S. or state government officer or employee as part of the person’s official duties. Except as noted above, all rights are reserved by AIAG and no part of these materials may be reproduced, reprinted, stored in a retrieval system, or transmitted, in any form or by any means, electronic, photocopying, recording, or otherwise, without the prior written permission of Automotive Industry Action Group. Copyright infringement is a violation of federal law subject to criminal and civil penalties. AIAG and Automotive Industry Action Group are registered service marks of the Automotive Industry Action Group. Automotive Industry Action Group makes no claim to any trademark of a third party. Trademarks of third parties included in these materials are the property of their respective owners. © 2010 Automotive Industry Action Group ISBN 978 1 60534 208 5

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 3: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 2 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 4: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 3 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

FOREWORD

Automotive Industry Action Group (AIAG) committees are made up of volunteers from member companies in the automotive industry. The work of preparing process audits is done by AIAG technical committees.

The main task of technical committees is to prepare Automotive Standards and System Requirements. Draft documents adopted by the technical committees are circulated to the Steering Committee for review and consensus approval. Publication of the documents requires approval by the Quality Steering Committee.

The Quality Steering Committee would like to acknowledge and thank the following individuals and their companies who have contributed time and effort to the development of this document.

ACKNOWLEDGEMENTS

Core Members:

Joseph Beckham Chrysler Group LLC

Gilbert Chrostowski TRW Automotive

Virender Choudhri Delphi Corporation

Thomas Lopiccolo General Motors Company

Neal McMichael Ford Motor Company

Carl Occhialini The Lincoln Electric Company

Veronica Sebald Toyota Motor Engineering & Manufacturing, North America

Ryan Turnwald Honda of America Manufacturing, Inc.

Dave Willig Nexteer Automotive

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 5: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 4 -

TABLE OF CONTENTS ABOUT AIAG .............................................................................................................................................................1

FOREWORD ...............................................................................................................................................................3

ACKNOWLEDGEMENTS ........................................................................................................................................3

TABLE OF CONTENTS ............................................................................................................................................4

INTRODUCTION .......................................................................................................................................................5

GENERAL ...................................................................................................................................................................5 PROCESS APPROACH ..................................................................................................................................................5 WELDING SYSTEM ASSESSMENT GOALS....................................................................................................................5 ASSESSMENT PROCESS...............................................................................................................................................5 ASSESSOR QUALIFICATIONS ......................................................................................................................................6 OTHER REQUIREMENTS..............................................................................................................................................6

1 SCOPE.......................................................................................................................................................................7

1.1 GENERAL .............................................................................................................................................................7 1.2 APPLICATION .......................................................................................................................................................7 1.3 REFERENCE ..........................................................................................................................................................8

2 THE WELDING SYSTEM ASSESSMENT PROCEDURE ................................................................................9

3 SPECIAL PROCESS: WELDING ASSESSMENT ............................................................................................10

APPENDIX A – PROCESS TABLES......................................................................................................................31

GLOSSARY ...............................................................................................................................................................49

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 6: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 5 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

INTRODUCTION

General The work of preparing CQI-15: Special Process: Welding System Assessment (WSA) was carried out through the AIAG Welding Work Group. These welding requirements are complementary to customer and product standards.

The WSA can be used to assess an organization’s ability to meet the requirements in this assessment, as well as customer, regulatory, and the organization’s own requirements. The WSA can also be used between an organization and its suppliers.

In the WSA, the word “shall” indicates a requirement for purposes of the self assessment. Failure to meet the requirements results in an assessment that is either “Not Satisfactory” or “Needs Immediate Action.” The word “should” indicates a recommendation. Where the term “such as” is used, any suggestions given are for guidance only.

Process Approach The WSA supports the automotive process approach as described in ISO/TS 16949.

Welding System Assessment Goals The goal of the WSA is the development of a welding management system that provides for continual improvement, emphasizing defect prevention and the reduction of variation and waste in the supply chain.

The WSA, coupled with an internationally recognized quality management system and applicable customer-specific requirements, defines the fundamental requirements for welding management systems.

The WSA is intended to provide a common approach to a welding management system for automotive production and service part organizations.

Assessment Process Ongoing assessments shall be conducted annually, unless otherwise specified by the customer, to re-examine the continuing compliance with the WSA. Each assessment shall include a review of the organization’s systems using the WSA. Successive Job Audits (Section 6.0 of this document) shall sample parts from different automotive component manufacturers that require compliance to the WSA document.

The assessment shall use the process approach to auditing as identified by the requirements of ISO/TS 16949. Prop

erty o

f Gen

eral M

otors

Corpora

tion

Intern

al Use

Only

Page 7: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 6 -

Assessor Qualifications Assessor(s) shall have the following specific experience to conduct the WELDING SYSTEM ASSESSMENT:

1. Be an experienced quality management system (QMS) internal auditor (for example, latest edition of ISO/TS 16949, ISO 9001)

2. Assessor shall possess welding knowledge. Evidence shall include a minimum of 5 years experience in welding or a combination of formal education in welding and welding experience totaling a minimum of 5 years

3. Assessor shall possess knowledge of and be familiar with the application of automotive quality core tools including statistical process control, measurement systems analysis, part approval, failure mode and effects analysis, and advanced quality planning.

Note: If more than one assessor is required to meet the above qualifications, the lead assessor shall be the person meeting the requirements in item #1.

Other Requirements The organization shall keep records as evidence of compliance to the requirements identified in the WSA, as well as all appropriate action plans to address any unsatisfactory ratings. These records shall be readily available for review by any customer requiring compliance to the requirements within this document.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 8: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 7 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

1 SCOPE

1.1 General This document specifies process requirements for an organization or its suppliers performing applicable welding, who need to:

demonstrate ability to consistently provide product that meets customer and applicable regulatory requirements, and

enhance customer satisfaction through the effective application of the system, including processes for continual improvement of the system.

The Welding System Assessment is applicable to sites where customer-specified parts for production and/or service are processed throughout the automotive supply chain.

1.2 Application All requirements of the WSA are generic and are intended to be applicable to all organizations performing the welding operations addressed in this document, regardless of type, size, and product.

Note: Four Process Tables have been developed and the appropriate table(s) is to be referenced during the assessment. The Process Tables are specific to welding processes as noted below:

Process Table A - Arc Welding

Arc Stud/Fastener Welding

Flux-Cored Arc Welding

Gas Metal Arc welding

Submerged Arc Welding

Shielded Metal Arc Welding

Plasma Arc Welding

Gas Tungsten Arc Welding

Gas Metal Arc Braze Welding

Process Table B - Resistance Welding

Resistance Spot Welding

Projection Welding

Resistance Seam Welding

High-Frequency Seam Welding

Induction Seam Welding

Mash Seam Welding

Flash Welding

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 9: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 8 -

Process Table C - Laser Welding

Nd YAG CO2 DIODE

Wire Fed

Process Table D - Solid State Welding

Inertia Friction Welding

Direct Drive Friction Welding

Friction Stir Welding

Flash Butt Welding

Resistance Butt Welding

Ultrasonic Welding

These Process Tables contain requirements for:

1. Management Responsibility & Quality Planning

2. Floor and Material Handling Responsibility

3. Equipment / Facilities/Controls

4. Tooling/Fixturing

5. Process Controls and Confirmation

6. Essential Variables

The Process Tables specify the tolerances of process parameters and the frequencies for checking process control parameters and parts. The Requirements and Guidance in the WSA form will notify the assessor when to refer to the Process Tables.

1.3 Reference The following standards are used as reference material. There are other reference materials that contain more information, however, the list is not meant to be inclusive. The applicability is limited to the subject matter referenced.

Standard Number Title Standard’s Organization

ANSI Z 49.1 Safety in Welding and Cutting ANSI - www.ansi.org

AWS A3.0 Standard Welding Terms and Definitions

www.aws.org

AWS C7.2 Recommended Practices for Laser Beam and Welding

www.aws.org

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 10: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 9 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

2 THE WELDING SYSTEM ASSESSMENT PROCEDURE

1. Obtain current copy of CQI-15 Special Process: Welding System Assessment, from AIAG.

2. Identify all welding processes to which CQI-15 Special Process: Welding System Assessment, applies (see CQI-15, 1.2). Record these processes on the WSA.

3. Complete the WSA, determining the level of compliance. A minimum of one job audit (Section 6) shall be performed during each assessment.

4. Address each “Not Satisfactory” item and determine corrective action, including root cause analysis and implementation of the corresponding corrective action(s). The corrective action(s) shall be completed within 90 days. Records of the corrective action, including verification, shall be maintained.

5. “Needs Immediate Action” requires immediate containment of suspect product. Address each “Needs Immediate Action” item and determine corrective action(s), including root cause analysis and implementation of the corresponding corrective action(s). The corrective action(s) shall be completed within 90 days. Records of the corrective action, including verification, shall be maintained.

6. Assessments shall be conducted annually unless otherwise specified by the customer.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 11: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 10 -

3 SPECIAL PROCESS: WELDING ASSESSMENT

Cover Sheet................................................................................................................................................. 15

Section 1-5 .................................................................................................................................................. 18

Section 1: Management Responsibility & Quality Planning ..................................................................... 18

Section 2: Floor and Material Handling Responsibility............................................................................. 24

Section 3: Equipment ................................................................................................................................. 26

Section 4: Tooling/Fixturing...................................................................................................................... 27

Section 5: Process Controls and Confirmation .......................................................................................... 27

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 12: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 11 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Instructions for completing the Cover Sheet

1. Facility Name: Name of the facility being assessed.

One form shall be used for each facility. The facility may have several buildings or physical locations in the same general area. If there is a separate management team or different management system, then these locations shall be considered as separate facilities.

2. Address: The street address of the facility being assessed; P.O Box numbers may be given as additional information.

3. Phone Number: The phone number of the facility.

If there is no common phone number for the facility, the phone number of the Operations Manager or Quality Manager shall be used.

4. Fax Number: The fax number of the facility.

5. Number of Welding Employees at this Facility: The number of employees, salaried and hourly, associated with the welding operation at this facility.

6. Captive Weld Organization (Y/N): Enter “Y” if this facility welds components for their own company. Enter “N” if the company does not weld any components for their own company.

7. Commercial Weld Organization (Y/N): Enter “Y” if this facility welds components for companies other than their own company. Enter “N” if this facility does not weld any components for other companies.

8. Date of Assessment: Enter the date(s) of the assessment. An alphanumeric format shall be used to avoid confusion with different numeric formats.

Example: May 3 – 4, 2010

9. Date of Previous Assessment: List the date of the previous CQI-15 Special Process: Welding System Assessment of this facility.

10. Type(s) of Welding Processing at this Facility: Place a checkmark to designate all welding process(es) performed at this facility. This information determines the appropriate Process Table that shall be used during the assessment. Processes not listed on the cover sheet are not part of the Welding System Assessment.

11. Current Quality Certification(s): The weld organization shall list their current quality certifications, e.g., ISO/TS 16949, ISO 9001. Certifications may be from 3rd party sources or customer quality certifications. If customer quality certification is given, then the year of the last assessment by the customer shall also be given.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 13: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 12 -

12. Date of Re-assessment (if necessary): If “Not Satisfactory” findings were observed from the original assessment, then the weld organization shall address each item and determine correct action, including root cause analysis and implementation of the corresponding corrective action(s).

The date of the re-assessment shall be given here, and the appropriate Question(s) from Sections 1 – 5, in the original assessment, shall be modified to reflect that the evidence, relating to the implementation of the corrective action(s), has been observed. Also, the “Number of Not Satisfactory Findings” shall be modified as appropriate.

13. Personnel Contacted: List the name(s), title(s), phone number(s), and email address(es), if available, of the principal participants from the weld organization.

14. Auditors/Assessors: List the name(s), Company(ies), phone number(s) and email address(es), if available, of the auditor/assessor(s).

15. Number of “Not Satisfactory” Findings: Enter the number of “Not Satisfactory” findings observed during the assessment.

16. Number of “Needs Immediate Action” Findings: Enter the number of “Needs Immediate Action” findings observed during the assessment.

17. Number of “Fail” Findings in the Job Audit(s): Enter the number of “Fail” findings observed from the job audit.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 14: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 13 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Process Table A - Arc Welding

Arc Stud/Fastener WeldingFlux Cored Arc WeldingGas Metal Arc Welding

Captive Weld Organization (Y/N) Submerged Arc Welding

Shielded Metal Arc Welding

Commercial Weld Organization Plasma Arc Welding

Gas Tungsten Arc Welding

Date of Assessment: Gas Metal Arc Braze Welding

Process Table B - Resistance Welding

Resistance Spot Welding

Date of Previous Assessment: Projection WeldingResistance Seam Welding

High-frequency Seam Welding

Induction Seam Welding

Mash Seam Welding

Flash Welding

Process Table C - Laser Welding

Nd YAG Welding

CO2 Welding

Diode Welding

Wire Fed

Process Table D - Solid State Welding

Inertia Friction WeldingDirect Drive Friction Welding

Friction Stir Welding

Flash Butt Welding

Resistance Butt Welding

Ultrasonic Welding

Personnel Contacted:

Name Title Phone

Auditors/Assessors

Name Company Phone

Number of "Needs Immediate Action" Findings

Number of "Fail" Findings in the Job Audit(s)

Number of "Not Satisfactory" Findings

Current Quality Certification(s)

Email

Email

Special Process: Welding System Assessment

Address:Facility Name:

Type(s) of Weld Processing at this Facility:

Number of Welding Employees at this Facility:

Phone Number:

Fax Number:

Date of Re-assessment (if necessary):

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 15: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 14 -

Instructions for completing Sections 1 – 5

Sections 1 - 5 contain questions and the requirements and guidance for each question. The Sections are:

Section 1 – Management Responsibility & Quality Planning

Section 2 – Floor and Material Handling Responsibility

Section 3 – Equipment/Facilities/Control

Section 4 – Tooling/Fixturing

Section 5 – Process Controls and Confirmation

The assessor shall assess the weld organization compliance to Sections 1 – 5 by comparing the evidence presented by the weld organization to the requirements listed in the “Requirements and Guidance” column.

NOTE 1: In the “Requirements and Guidance” column, the word “shall” indicates a requirement and the term “such as” indicates that any suggestions given are for guidance only.

NOTE 2: The “Requirements and Guidance” column will indicate to the assessor when the Process Tables are pertinent to the Questions. When the Process Tables are pertinent to the Question, the assessor shall assess the weld organization compliance to the specified section(s) in the Process Tables.

NOTE 3: If the question is not applicable to the weld organization, then the assessor shall place a checkmark in the “N/A” Assessment column. If the observed evidence is in compliance to the question, the assessor shall note the evidence in the “Objective Evidence” column and place a check mark in the “Satisfactory” column. If the observed evidence is not in compliance to the question, then the assessor shall note the non-compliance in the “Objective Evidence” column and place a check mark in the “Not Satisfactory” column.

NOTE 4: Where nonconforming product is identified in the assessment of a given question the assessor shall place a check mark in the “Needs Immediate Action” (NIA) column. NIA requires immediate containment of suspect product.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 16: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 15 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

1.1

Is t

he

re a

de

dic

ate

d a

nd

q

ua

lifie

d t

ech

nic

al w

eld

ing

p

ers

on

on

-site

?

To

en

sure

re

ad

ily a

vaila

ble

exp

ert

ise

, th

ere

sh

all

be

a

de

dic

ate

d a

nd

qu

alif

ied

we

ldin

g p

ers

on

on

site

. T

his

in

div

idu

al s

ha

ll b

e o

ne

of

the

fo

llow

ing

: D

eg

ree

d W

eld

ing

E

ng

ine

er,

or

eq

uiv

ale

nt

scie

nce

de

gre

e,

Ce

rtifi

ed

We

ldin

g

Insp

ect

or

fro

m a

pp

rove

d in

tern

atio

na

lly r

eco

gn

ize

d b

od

y,

or

pe

rso

n a

gre

ed

up

on

be

twe

en

cu

sto

me

r a

nd

su

pp

lier.

T

his

pe

rso

n s

ha

ll b

e a

fu

ll-tim

e e

mp

loye

e a

nd

th

e p

osi

tion

sh

all

be

re

flect

ed

in t

he

org

an

iza

tion

ch

art

. A

job

d

esc

rip

tion

sh

all

exi

st id

en

tifyi

ng

th

e q

ua

lific

atio

ns

for

the

p

osi

tion

incl

ud

ing

me

tallu

rgic

al a

nd

we

ldin

g k

no

wle

dg

e.

Th

e q

ua

lific

atio

ns

sha

ll in

clu

de

a m

inim

um

of

5 y

ea

rs

exp

eri

en

ce in

we

ldin

g o

pe

ratio

ns

or

a c

om

bin

atio

n o

f a

m

inim

um

of

5 y

ea

rs o

f fo

rma

l me

tallu

rgic

al e

du

catio

n a

nd

w

eld

ing

exp

eri

en

ce.

1.2

Is t

he

re a

re

spo

nsi

bili

ty m

atr

ix

to e

nsu

re t

ha

t a

ll ke

y m

an

ag

em

en

t a

nd

su

pe

rvis

ory

fu

nct

ion

s a

re p

erf

orm

ed

by

qu

alif

ied

pe

rso

nn

el?

Th

e o

rga

niz

atio

n s

ha

ll m

ain

tain

a r

esp

on

sib

ility

ma

trix

id

en

tifyi

ng

all

key

ma

na

ge

me

nt

an

d s

up

erv

iso

ry f

un

ctio

ns

an

d t

he

qu

alif

ied

pe

rso

nn

el w

ho

ma

y p

erf

orm

su

ch

fun

ctio

ns.

It

sha

ll id

en

tify

bo

th p

rim

ary

an

d s

eco

nd

ary

(b

ack

up

) p

ers

on

ne

l fo

r th

e k

ey

fun

ctio

ns

(as

de

fine

d b

y th

e o

rga

niz

atio

n).

Th

is m

atr

ix s

ha

ll b

e r

ea

dily

ava

ilab

le t

o

ma

na

ge

me

nt

an

d c

ust

om

er

at

all

time

s.

1.3

Do

yo

u u

se o

nly

qu

alif

ied

w

eld

ers

(p

ers

on

ne

l)?

Th

e o

rga

niz

atio

n s

ha

ll p

rovi

de

em

plo

yee

tra

inin

g f

or

all

we

ldin

g o

pe

ratio

ns

spe

cific

to

th

eir

job

fu

nct

ion

. A

ll w

eld

ing

em

plo

yee

s, in

clu

din

g b

ack

up

an

d t

em

po

rary

e

mp

loye

es,

sh

all

be

tra

ine

d.

Do

cum

en

ted

evi

de

nce

sh

all

be

ma

inta

ine

d s

ho

win

g t

he

em

plo

yee

s w

ere

tra

ine

d;

the

e

vid

en

ce s

ha

ll in

clu

de

an

ass

ess

me

nt

of

the

eff

ect

ive

ne

ss

of

the

tra

inin

g,

mu

st p

rove

kn

ow

led

ge

of

the

cu

sto

me

r's

spe

cific

re

qu

ire

me

nts

an

d in

tern

al s

tan

da

rds,

an

d w

he

re

ap

pro

pri

ate

, e

mp

loye

e c

ert

ifica

tion

, su

ch a

s fo

r a

ma

nu

al

we

lde

r.

Ma

na

ge

me

nt

an

d c

ust

om

er

sha

ll d

efin

e t

he

q

ua

lific

atio

n r

eq

uir

em

en

ts f

or

ea

ch f

un

ctio

n a

nd

on

go

ing

o

r fo

llow

-up

tra

inin

g s

ha

ll a

lso

be

ad

dre

sse

d.

1.4

Ho

w d

o y

ou

ma

inta

in w

eld

er

cert

ifica

tion

?

Re

qu

ire

d q

ua

lific

atio

n m

ain

ten

an

ce.

If

the

we

lde

r h

as

no

t w

eld

ed

in t

he

sp

eci

fic o

pe

ratio

n in

a 6

mo

nth

tim

e f

ram

e,

the

we

lde

r m

ust

be

re

qu

alif

ied

to

th

at

op

era

tion

. B

ase

d o

nth

e w

eld

er's

qu

alit

y p

erf

orm

an

ce,

it m

ust

be

est

ab

lish

ed

w

he

n r

etr

ain

ing

an

d r

eq

ua

lific

atio

n o

f th

e in

div

idu

al m

ust

b

e p

erf

orm

ed

.

1.5

Is s

et-

up

pra

ctic

e in

co

mp

lian

ce w

ith d

ocu

me

nte

d

wo

rk in

stru

ctio

ns?

Se

t-u

p v

eri

fica

tion

to

th

e p

roce

du

res

(as

exa

mp

le:

eq

uip

me

nt

sett

ing

s, c

lam

pin

g s

eq

ue

nce

, w

eld

se

qu

en

ce,

dir

ect

ion

of

tra

vel a

nd

oth

er

pro

cess

co

ntr

ols

) in

co

mp

lian

ce t

o d

ocu

me

nte

d w

ork

inst

ruct

ion

s.

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

Se

cti

on

1 -

Ma

na

ge

me

nt

Re

sp

on

sib

ilit

y &

Qu

ali

ty P

lan

nin

g

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 17: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Qu

esti

on

N

um

be

rQ

ue

sti

on

Re

qu

ire

me

nts

an

d G

uid

an

ce

Ob

jec

tiv

e E

vid

en

ce

N/A

Sa

tis

fac

tory

No

t S

ati

sfa

cto

ryN

ee

ds

Im

me

dia

te

Ac

tio

n

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

1.6

Do

es

the

we

ldin

g o

rga

niz

atio

n

pe

rfo

rm a

dva

nce

d q

ua

lity

pla

nn

ing

?

Th

e o

rga

niz

atio

n s

hal

l inc

orp

ora

te a

do

cum

en

ted

ad

vanc

e

qu

alit

y pl

ann

ing

pro

ced

ure

. A

fe

asib

ility

stu

dy

sha

ll b

e

pe

rfo

rme

d a

nd

inte

rna

lly a

pp

rove

d f

or

ea

ch p

art

. S

imila

r p

art

s ca

n b

e g

rou

pe

d in

to p

art

fa

mili

es

for

this

eff

ort

as

de

fine

d b

y th

e o

rgan

iza

tion

. A

fte

r th

e p

art

ap

pro

val

pro

cess

is a

ppr

ove

d b

y th

e c

ust

om

er,

no

pro

cess

ch

an

ge

s a

re a

llow

ed

un

less

app

rove

d b

y th

e c

ust

om

er.

T

he

w

eld

ing

org

an

iza

tion

sha

ll co

nta

ct t

he

cu

sto

me

r w

he

n

cla

rific

atio

n o

f p

roce

ss c

ha

ng

es

is r

eq

uire

d.

Th

is

cla

rific

atio

n o

f p

roce

ss c

han

ges

sha

ll b

e d

ocu

me

nted

.

1.7

Are

we

ldin

g F

ME

A's

up

to

date

an

d r

efle

ctin

g c

urr

ent

p

roce

ssin

g?

Th

e o

rga

niz

atio

n s

hal

l inc

orp

ora

te th

e u

se o

f a

d

ocu

me

nte

d F

ailu

re M

od

e a

nd

Eff

ects

An

aly

sis

(FM

EA

) p

roce

du

re a

nd

en

sure

th

e F

ME

A's

are

up

dat

ed

to

re

flect

cu

rre

nt p

art

qu

alit

y st

atu

s.T

he

FM

EA

sh

all

be

writ

ten

fo

r e

ach

pa

rt o

r p

art

fa

mily

or

the

y m

ay

be

pro

cess

-sp

eci

fic a

nd

writ

ten

fo

r e

ach

pro

cess

.In

an

y ca

se,

the

y sh

all

add

ress

all

pro

cess

ste

ps

fro

m p

art

re

ceip

t to

pa

rt s

hip

me

nt

and

all

key

we

ldin

g p

roce

ss

pa

ram

ete

rs a

s d

efin

ed

by

the

org

an

iza

tion

. A

cro

ss-

fun

ctio

na

l te

am

sh

all

be

use

d in

th

e d

eve

lop

men

t of

the

F

ME

A.

All

spe

cia

l ch

ara

cte

ristic

s, a

s de

fine

d b

y th

e

org

an

iza

tion

an

d it

s cu

sto

me

rs,

sha

ll b

e id

en

tifie

d,

de

fine

d,

an

d a

dd

ress

ed

in t

he

FM

EA

.

1.8

Are

we

ldin

g p

roce

ss c

on

trol

p

lan

s u

p to

da

te a

nd

refle

ctin

g

curr

en

t p

roce

ssin

g?

Th

e o

rga

niz

atio

n s

hal

l inc

orp

ora

te th

e u

se o

f a

d

ocu

me

nte

d C

on

tro

l Pla

n p

roce

du

re a

nd

en

sure

th

e

Co

ntr

ol P

lan

s ar

e u

pda

ted

to

re

flect

cu

rre

nt

con

tro

ls.

Th

e

Co

ntr

ol P

lan

s sh

all

be

writ

ten

fo

r e

ach

pa

rt o

r pa

rt f

am

ily

or

the

y m

ay

be

pro

cess

-sp

eci

fic a

nd

wri

tte

n f

or

ea

ch

pro

cess

. T

he

y sh

all

ad

dre

ss a

ll p

roce

ss s

tep

s fr

om p

art

re

ceip

t to

pa

rt s

hip

me

nt

and

ide

ntif

y a

ll e

qu

ipm

ent

use

d

an

d a

ll e

ssen

tial w

eld

ing

pro

cess

par

am

ete

rs a

s d

efin

ed

by

the

re

leva

nt i

nd

ivid

ua

l pro

cess

ta

ble

s o

r n

on-

ess

en

tial

as

ag

ree

d u

po

n b

etw

een

su

pp

lier

and

cu

sto

me

r. A

cro

ss-

fun

ctio

na

l te

am

, in

clu

din

g a

pro

du

ctio

n o

pe

rato

r, s

ha

ll b

e u

sed

in t

he

de

velo

pm

ent

of

Co

ntr

ol P

lan

s, w

hic

h s

hall

be

co

nsi

ste

nt

with

all

ass

oci

ate

d d

ocu

me

nta

tion

su

ch a

s w

ork

in

stru

ctio

ns,

sh

op t

rave

lers

, a

nd

FM

EA

's.

All

spe

cia

l ch

ara

cte

rist

ics,

as

de

fine

d b

y th

e o

rga

niz

atio

n a

nd

its

cust

om

ers

, sh

all

be

ide

ntif

ied

, d

efin

ed

, a

nd

ad

dre

sse

d in

th

e C

on

tro

l Pla

ns.

Sa

mpl

e s

ize

s a

nd

fre

qu

en

cie

s fo

r e

valu

atio

n o

f p

roce

ss a

nd p

rod

uct

ch

ara

cter

istic

s sh

all

als

o b

e a

dd

ress

ed

co

nsis

ten

t w

ith t

he

min

imu

m

req

uir

em

ents

list

ed

in t

he

Pro

cess

Ta

ble

s.

- 16 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 18: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 17 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

1.9

Are

all

we

ldin

g r

ela

ted

an

d

refe

ren

ced

sp

eci

fica

tion

s cu

rre

nt

an

d a

vaila

ble

? F

or

exa

mp

le:

SA

E,

AIA

G,

AS

TM

, A

SM

E,

AW

S,

ISO

, G

en

era

l M

oto

rs,

Ho

nd

a,

Fo

rd,

To

yota

a

nd

Ch

rysl

er.

To

en

sure

all

cust

om

er

req

uir

em

en

ts a

re b

oth

un

de

rsto

od

a

nd

sa

tisfie

d,

the

org

an

iza

tion

sh

all

ha

ve a

ll sp

eci

fica

lly

rela

ted

we

ldin

g a

nd

cu

sto

me

r re

fere

nce

d s

tan

da

rds

an

d

spe

cific

atio

ns

ava

ilab

le f

or

use

an

d a

me

tho

d t

o e

nsu

re

tha

t th

ey

are

cu

rre

nt.

Su

ch s

tan

da

rds

an

d s

pe

cific

atio

ns

ma

y in

clu

de

, b

ut

are

no

t lim

ited

to

, th

ose

re

leva

nt

do

cum

en

ts p

ub

lish

ed

by

SA

E,

AIA

G,

AS

TM

, A

SM

E,

AW

S,

ISO

, G

en

era

l Mo

tors

, H

on

da

, F

ord

, T

oyo

ta,

an

d

Ch

rysl

er.

Th

e o

rga

niz

atio

n s

ha

ll h

ave

a p

roce

ss t

o e

nsu

re

the

tim

ely

re

vie

w,

dis

trib

utio

n,

an

d im

ple

me

nta

tion

of

all

cust

om

er

an

d in

du

stry

en

gin

ee

rin

g

sta

nd

ard

s/sp

eci

fica

tion

s a

nd

ch

an

ge

s b

ase

d o

n c

ust

om

er-

req

uir

ed

sch

ed

ule

. T

ime

ly r

evi

ew

sh

ou

ld b

e a

s so

on

as

po

ssib

le a

nd

sh

all

no

t e

xce

ed

tw

o w

ork

ing

we

eks

. T

he

o

rga

niz

atio

n s

ha

ll d

ocu

me

nt

this

pro

cess

of

revi

ew

an

d

imp

lem

en

tatio

n,

an

d it

sh

all

ad

dre

ss h

ow

cu

sto

me

r a

nd

in

du

stry

do

cum

en

ts a

re o

bta

ine

d,

ho

w t

he

y a

re m

ain

tain

ed

with

in t

he

org

an

iza

tion

, h

ow

th

e c

urr

en

t st

atu

s is

e

sta

blis

he

d,

an

d h

ow

th

e r

ele

van

t in

form

atio

n is

ca

sca

de

d

to t

he

sh

op

flo

or

with

in t

he

tw

o-w

ee

k p

eri

od

. T

he

o

rga

niz

atio

n s

ha

ll id

en

tify

wh

ois

re

spo

nsi

ble

fo

r p

erf

orm

ing

th

ese

ta

sks.

1.1

0Is

th

ere

a w

ritt

en

pro

cess

sp

eci

fica

tion

fo

r a

ll a

ctiv

e

pro

cess

es?

Th

e w

eld

ing

org

an

iza

tion

sh

all

ha

ve w

ritt

en

pro

cess

sp

eci

fica

tion

s fo

r a

ll a

ctiv

e p

roce

sse

s a

nd

re

pa

ir

pro

cess

es

wh

ich

ide

ntif

y a

ll st

ep

s o

f th

e p

roce

ss in

clu

din

g

rele

van

t o

pe

ratin

g p

ara

me

ters

. E

xam

ple

s o

f o

pe

ratin

g

pa

ram

ete

rs a

s d

efin

ed

by

the

re

leva

nt

pro

cess

ta

ble

s.

Su

ch p

ara

me

ters

sh

all

no

t o

nly

be

de

fine

d,

the

y sh

all

ha

veo

pe

ratin

g t

ole

ran

ces

as

de

fine

d b

y th

e o

rga

niz

atio

n in

o

rde

r to

ma

inta

in p

roce

ss c

on

tro

l.

Th

ese

pro

cess

sp

eci

fica

tion

s m

ay

take

th

e f

orm

of

wo

rk

inst

ruct

ion

s, jo

b c

ard

, se

t-u

p s

he

ets

, o

r o

the

r si

mila

r d

ocu

me

nts

.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 19: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Qu

est

ion

N

um

be

rQ

ue

sti

on

Re

qu

ire

me

nts

an

d G

uid

an

ceO

bje

cti

ve

Ev

ide

nce

N/A

Sa

tis

fact

ory

No

t S

ati

sfa

cto

ryN

ee

ds

Im

me

dia

te

Ac

tio

n

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

Th

e o

rga

niz

atio

n s

ha

ll p

erf

orm

pro

du

ct c

ap

ab

ility

stu

die

s fo

r th

e in

itia

l va

lida

tion

of

ea

ch p

roce

ss,

aft

er

relo

catio

n o

f a

ny

pro

cess

eq

uip

me

nt,

an

d a

fter

a m

ajo

r pr

oce

ss c

ha

ng

e

of

an

y e

quip

me

nt o

r p

ara

me

ter.

Th

e o

rga

niz

atio

n a

nd

cu

sto

me

r sh

all

de

fine

wh

at

con

stitu

tes

a m

ajo

r p

roce

ss

cha

nge

. In

itia

l pro

du

ct c

ap

ab

ility

stu

die

s sh

all

be

co

ndu

cte

d f

or

all

wel

din

g p

roce

sse

s p

er

ea

ch p

roce

ss

pa

th d

efin

ed

in s

cop

e o

f w

ork

an

d in

acc

ord

anc

e w

ith

cust

om

er

requ

irem

ents

. In

the

ab

sen

ce o

f cu

sto

me

r re

qu

ire

men

ts,

the

org

an

iza

tion

sh

all

est

ab

lish

acc

ep

tab

le

ran

ge

s fo

r m

ea

sure

s o

f ca

pabi

lity.

An

act

ion

pla

n sh

all

exi

st t

o a

dd

ress

th

e s

tep

s to

be

fo

llow

ed

in c

ase

ca

pab

ility

in

dic

es

fall

ou

tsid

e cu

stom

er

req

uir

em

en

ts o

r e

sta

blis

he

d

ran

ge

s.

Ea

ch p

roce

ss p

ath

incl

ud

es

all

com

bin

atio

ns

of

equi

pm

en

t th

at

are

inte

gra

ted

in t

he

pe

rfo

rma

nce

of

a w

eld

ing

pro

cess

, e

.g.,

we

ld c

ell

with

A a

nd B

sid

e f

ixtu

re f

ee

din

g

an

oth

er

we

ld c

ell

with

A a

nd

B s

ide

fix

ture

or

mu

ltip

le

ma

chin

es.

Ca

pa

bilit

y st

udy

tech

niq

ue

s sh

all i

nclu

de

b

ou

nd

ary

sa

mp

le c

on

diti

on

s as

de

fine

d b

y th

e c

on

tro

l pla

n

tha

t a

re r

ob

ust

an

d m

ee

t a

ll cu

sto

me

r re

qu

ire

me

nts

. E

xam

ple

, a

ny

com

bin

atio

n o

f to

lera

nce

s a

s d

efin

ed

by

Pro

cess

Ta

ble

s.

1.1

2

Do

es

the

we

ldin

g o

rga

niz

atio

n

mo

nito

r a

nd

an

aly

ze d

ata

ove

r tim

e,

an

d r

ea

ct to

this

da

ta?

Th

e a

na

lysi

s o

f p

rod

uct

s o

r p

roce

sse

s o

ver

time

can

yie

ld

vita

l in

form

atio

n f

or

defe

ct p

reve

ntio

n e

ffo

rts.

Th

e

org

an

iza

tion

sha

ll h

ave

a s

yste

m t

o co

llect

, ana

lyze

, a

nd

re

act

to

pro

du

ct o

r e

sse

ntia

l pro

cess

da

ta o

ver

time.

Me

tho

ds

of

an

aly

sis

sha

ll in

clu

de

ong

oin

g t

ren

d o

r h

isto

rica

l da

ta a

na

lysi

s o

f p

rod

uct

or

pro

cess

pa

ram

ete

rs.

Th

e o

rga

niz

atio

n s

ha

ll d

ete

rmin

e w

hic

h p

ara

me

ters

to

in

clu

de

in s

uch

an

aly

sis.

1.1

3

Is m

ana

gem

ent

revi

ew

ing

th

e

we

ld c

on

tro

l sys

tem

at

a

fre

qu

en

cy d

ete

rmin

ed

by

the

co

ntr

ol p

lan

?

Ma

na

ge

me

nt

sha

ll re

vie

w t

he

we

ld p

roce

ss c

on

tro

l sy

ste

ms.

Th

e m

ana

gem

ent

revi

ew s

ha

ll in

clu

de

eff

ort

s to

d

ete

ct o

ut-o

f-co

ntr

ol c

on

diti

on

s or

ala

rm c

on

diti

on

s. T

he

p

roce

ss o

f re

vie

win

g t

he

co

ntr

ol s

yste

m s

ha

ll b

e d

ocu

me

nte

d a

nd

re

cord

ed

in th

e c

on

tro

l pla

n.

1.1

4

Are

inte

rna

l ass

ess

me

nts

b

ein

g c

om

ple

ted

on

an

an

nua

l b

asi

s, a

t a

min

imum

, u

sin

g

AIA

G W

SA

?

Th

e o

rga

niz

atio

n s

ha

ll co

nd

uct

inte

rna

l ass

ess

me

nts

on

a

n a

nn

ua

l ba

sis,

at

a m

inim

um

, u

sin

g t

he

AIA

G W

SA

. C

on

cern

s sh

all

be

ad

dre

sse

d in

a t

ime

ly m

an

ne

r.

1.1

5

Do

es t

he

Qu

alit

y D

epa

rtm

ent

re

vie

w,

ad

dre

ss,

and

d

ocu

me

nt

cust

om

er a

nd

in

tern

al c

on

cern

s?

Th

e q

ua

lity

man

ag

em

en

t sy

ste

m s

ha

ll in

clu

de

a p

roce

ss

for

do

cum

en

ting

, re

vie

win

g,

an

d a

dd

ress

ing

cu

sto

me

r co

nce

rns

and

any

oth

er

con

cern

s in

tern

al t

o th

e

org

an

iza

tion.

A d

isci

plin

ed

pro

ble

m-s

olv

ing

ap

pro

ach

sh

all

be

use

d.

1.1

1H

as

a v

alid

pro

du

ct c

ap

ab

ility

st

ud

y b

ee

n p

erf

orm

ed

initi

ally

a

nd

aft

er

pro

cess

ch

an

ge

s?

- 18 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 20: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 19 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

1.1

6

Is t

he

re a

co

ntin

ua

l im

pro

vem

en

t p

lan

ap

plic

ab

le

to e

ach

pro

cess

de

fine

d in

th

e

sco

pe

of

the

ass

ess

me

nt?

Th

e w

eld

ing

org

an

iza

tion

sh

all

de

fine

a p

roce

ss f

or

con

tinu

al i

mp

rove

me

nt

for

the

ir w

eld

ing

pro

cess

es

ide

ntif

ied

in t

he

sco

pe

of

the

WS

A.

Th

e c

on

tinu

al

imp

rove

me

nt

pro

cess

sh

all

be

de

sig

ne

d t

o b

rin

g a

bo

ut

imp

rove

me

nts

in q

ua

lity

an

d p

rod

uct

ivity

. Id

en

tifie

d a

ctio

ns

sha

ll b

e p

rio

ritiz

ed

an

d s

ha

ll in

clu

de

tim

ing

(e

stim

ate

d

com

ple

tion

da

tes)

. T

he

org

an

iza

tion

sh

all

sho

w e

vid

en

ce

of

pro

gra

m e

ffe

ctiv

en

ess

.

1.1

7

Do

es

the

Qu

alit

y M

an

ag

er

or

de

sig

ne

e a

uth

ori

ze t

he

d

isp

osi

tion

of

ma

teri

al f

rom

q

ua

ran

tine

sta

tus?

Th

e Q

ua

lity

Ma

na

ge

r o

r d

esi

gn

ee

is r

esp

on

sib

le f

or

au

tho

rizi

ng

an

d d

ocu

me

ntin

g t

he

dis

po

sitio

n o

f q

ua

ran

tine

d m

ate

ria

l.

1.1

8

Are

th

ere

pro

ced

ure

s o

r w

ork

in

stru

ctio

ns

ava

ilab

le t

o t

he

w

eld

ing

pe

rso

nn

el t

ha

t d

efin

e

the

we

ldin

g p

roce

ss?

Th

ere

sh

all

be

pro

ced

ure

s o

r w

ork

inst

ruct

ion

s a

vaila

ble

to

w

eld

ing

pe

rso

nn

el c

ove

rin

g t

he

we

ldin

g p

roce

ss.

Th

ese

p

roce

du

res

or

wo

rk in

stru

ctio

ns

sha

ll in

clu

de

me

tho

ds

of

ad

dre

ssin

g p

ote

ntia

l em

erg

en

cie

s (s

uch

as

po

we

r fa

ilure

),

eq

uip

me

nt

sta

rt-u

p,

eq

uip

me

nt

shu

t-d

ow

n,

pro

du

ct

seg

reg

atio

n (

Se

e 2

.8),

pro

du

ct in

spe

ctio

n,

safe

ty,

ho

use

-ke

ep

ing

, a

nd

ge

ne

ral o

pe

ratin

g p

roce

du

res.

Th

ese

p

roce

du

res

or

wo

rk in

stru

ctio

ns

sha

ll b

e a

cce

ssib

le t

o

sho

p f

loo

r p

ers

on

ne

l.

1.1

9

Is t

he

re a

pre

ven

tive

m

ain

ten

an

ce p

rog

ram

?

Is

ma

inte

na

nce

da

ta b

ein

g

util

ize

d t

o f

orm

a p

red

ictiv

e

ma

inte

na

nce

pro

gra

m?

Th

e o

rga

niz

atio

n s

ha

ll h

ave

a d

ocu

me

nte

d p

reve

ntiv

e

ma

inte

na

nce

pro

gra

m f

or

pro

cess

eq

uip

me

nt

(as

ide

ntif

ied

b

y th

e P

roce

ss T

ab

les)

. T

he

pro

gra

m s

ha

ll b

e a

clo

sed

-lo

op

pro

cess

th

at

tra

cks

ma

inte

na

nce

eff

ort

s fr

om

re

qu

est

to

co

mp

letio

n t

o a

sse

ssm

en

t o

f e

ffe

ctiv

en

ess

. E

qu

ipm

en

t o

pe

rato

rs s

ha

ll h

ave

th

e o

pp

ort

un

ity t

o r

ep

ort

pro

ble

ms,

a

nd

pro

ble

ms

sha

ll a

lso

be

ha

nd

led

in a

clo

sed

-lo

op

m

an

ne

r.C

om

pa

ny

da

ta,

e.g

., d

ow

ntim

e,

qu

alit

y re

ject

s, f

irst

-tim

e-

thro

ug

h c

ap

ab

ility

, re

curr

ing

ma

inte

na

nce

wo

rk o

rde

rs,

an

d o

pe

rato

r-re

po

rte

d p

rob

lem

s, s

ha

ll b

e u

sed

to

imp

rove

th

e p

reve

ntiv

e m

ain

ten

an

ce p

rog

ram

. M

ain

ten

an

ce d

ata

sh

all

be

co

llect

ed

an

d a

na

lyze

d a

s p

art

o

f a

pre

dic

tive

ma

inte

na

nce

pro

gra

m.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 21: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

1.2

0

Ha

s th

e w

eld

ing

org

an

iza

tion

d

eve

lop

ed

a c

ritic

al s

pa

re p

art

lis

t a

nd

are

th

e p

art

s a

vaila

ble

to

min

imiz

e p

rod

uct

ion

d

isru

ptio

ns?

Th

e w

eld

ing

org

an

iza

tion

sh

all

de

velo

p a

nd

ma

inta

in a

cr

itica

l sp

are

pa

rts

list

an

d s

ha

ll e

nsu

re t

he

ava

ilab

ility

of

such

pa

rts

to m

inim

ize

pro

du

ctio

n d

isru

ptio

ns.

1.2

1

Ho

w d

oe

s th

e o

rga

niz

atio

n

do

cum

en

t a

nd

re

spo

nd

to

q

ua

lity

spill

s, n

on

con

form

an

ce,

cust

om

er

con

cern

s?

Re

act

ion

pla

ns

are

to

be

fo

llow

ed

pe

r th

e c

on

tro

l pla

n a

nd

P

FM

EA

or,

in t

he

ca

se o

f n

ew

ly in

de

ntif

ied

issu

es

PF

ME

A

an

d c

on

tro

l pla

n m

ust

be

up

da

ted

to

re

flect

th

e n

ew

fa

ilure

m

od

e a

nd

re

act

ion

ste

ps

take

n.

1.2

2W

ha

t is

th

e p

roce

ss d

evi

atio

n

req

uir

em

en

ts o

f yo

ur

cust

om

er?

If t

he

re a

re t

o b

e c

ha

ng

es

in p

roce

ss o

uts

ide

of

the

cu

rre

nt

con

tro

l pla

n a

nd

last

ag

ree

d u

po

n p

roce

ss a

nd

pa

rts

sig

n

off

, d

o y

ou

kn

ow

wh

at

you

r cu

sto

me

r re

qu

ire

me

nts

are

, h

ave

yo

u n

otif

ied

yo

ur

cust

om

er,

an

d d

o y

ou

ha

ve

cust

om

er

ap

pro

val p

rio

r to

ma

kin

g t

he

ch

an

ge

?

1.2

3Is

th

ere

a s

yste

m in

pla

ce t

o

au

tho

rize

re

pro

cess

ing

an

d

rep

air

? I

s it

do

cum

en

ted

?

Th

e q

ua

lity

ma

na

ge

me

nt

syst

em

sh

all

incl

ud

e a

d

ocu

me

nte

d p

roce

ss f

or

rep

roce

ssin

g a

nd

re

pa

ir t

ha

t sh

all

incl

ud

e a

uth

ori

zatio

n f

rom

a c

ust

om

er

de

sig

na

ted

in

div

idu

al.

Th

e p

roce

ss s

ha

ll d

esc

rib

e p

rod

uct

ch

ara

cte

rist

ics

for

wh

ich

re

pro

cess

ing

is a

llow

ed

as

we

ll a

s th

ose

ch

ara

cte

rist

ics

for

wh

ich

re

pro

cess

ing

is n

ot

pe

rmis

sib

le.

An

y re

pro

cess

ing

act

ivity

sh

all

req

uir

e a

ne

w

pro

cess

ing

co

ntr

ol s

he

et

issu

ed

by

qu

alif

ied

te

chn

ica

l p

ers

on

ne

l de

no

ting

th

e n

ece

ssa

ry w

eld

ing

mo

difi

catio

ns.

R

eco

rds

sha

ll cl

ea

rly

ind

ica

te w

he

n a

nd

ho

w a

ny

ma

teri

al

ha

s b

ee

n r

ep

roce

sse

d.

Th

e Q

ua

lity

Ma

na

ge

r o

r a

d

esi

gn

ee

sh

all

au

tho

rize

th

e r

ele

ase

of

rep

roce

sse

d

pro

du

ct.

- 20 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 22: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 21 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

2.1

Do

es

the

fa

cilit

y e

nsu

re t

ha

t th

e d

ata

en

tere

d in

th

e

rece

ivin

g s

yste

m m

atc

he

s th

e

info

rma

tion

on

th

e c

ust

om

er's

sh

ipp

ing

do

cum

en

ts?

It is

cri

tica

l th

at

all

cust

om

er

req

uir

em

en

ts a

nd

lot

ide

ntif

ica

tion

be

ad

eq

ua

tely

tra

nsf

err

ed

to

inte

rna

l we

ldin

g

do

cum

en

ts.

Th

e f

aci

lity

sha

ll e

nsu

re t

ha

t th

e d

ata

en

tere

d

in t

he

re

ceiv

ing

sys

tem

ma

tch

th

e in

form

atio

n o

n t

he

cu

sto

me

r's s

hip

pin

g d

ocu

me

nts

. D

ocu

me

nte

d p

roce

sse

s a

nd

evi

de

nce

of

com

plia

nce

sh

all

exi

st,

e.g

., s

ho

p

tra

vele

rs,

wo

rk o

rde

rs,

etc

. S

om

etim

es

the

ma

teri

al

rece

ive

d d

oe

s n

ot

pre

cise

ly c

orr

esp

on

d t

o c

ust

om

er

ship

pin

g d

ocu

me

nts

. T

he

fa

cilit

y sh

all

ha

ve a

de

taile

d

pro

cess

in p

lace

to

re

solv

e r

ece

ivin

g d

iscr

ep

an

cie

s.T

he

re

qu

ire

me

nts

sta

ted

ab

ove

als

o a

pp

ly t

o c

ap

tive

w

eld

ing

de

pa

rtm

en

ts.

Th

is p

roce

ss r

efe

rs t

o r

ece

ivin

g a

nd

ship

pin

g t

he

pa

rts

in a

nd

ou

t o

f th

e w

eld

ing

de

pa

rtm

en

t.

2.2

Is p

rod

uct

cle

arl

y id

en

tifie

d

an

d s

tag

ed

th

rou

gh

ou

t th

e

we

ldin

g p

roce

ss?

Pro

ced

ure

s fo

r p

art

an

d c

on

tain

er

ide

ntif

ica

tion

he

lp t

o

avo

id in

corr

ect

pro

cess

ing

or

mix

ing

of

lots

. A

pp

rop

ria

te

loca

tion

an

d s

tag

ing

with

in t

he

fa

cilit

y a

lso

he

lp t

o e

nsu

re

tha

t o

rde

rs a

re n

ot

ship

pe

d u

ntil

all

req

uir

ed

op

era

tion

s a

r ep

erf

orm

ed

. C

ust

om

er

pro

du

ct s

ha

ll b

e c

lea

rly

ide

ntif

ied

a

nd

sta

ge

d t

hro

ug

ho

ut

the

we

ldin

g p

roce

ss.

No

n-w

eld

ed

, in

-pro

cess

, a

nd

fin

ish

ed

pro

du

ct s

ha

ll b

e p

rop

erl

y se

gre

ga

ted

an

d id

en

tifie

d.

All

ma

teri

al s

ha

ll b

e s

tag

ed

in a

de

dic

ate

d a

nd

cle

arl

y d

efin

ed

are

a.

2.3

Is lo

t tr

ace

ab

ility

an

d in

teg

rity

m

ain

tain

ed

th

rou

gh

ou

t a

ll p

roce

sse

s?

Ou

t-g

oin

g lo

t(s)

sh

all

be

tra

cea

ble

to

th

e in

com

ing

lot(

s).

Th

e d

isci

plin

e o

f p

reci

sely

ide

ntif

yin

g lo

ts a

nd

lin

kin

g a

ll p

ert

ine

nt

info

rma

tion

to

th

em

en

ha

nce

s th

e a

bili

ty t

o d

o

roo

t ca

use

an

aly

sis

an

d c

on

tinu

al i

mp

rove

me

nt.

2.4

Are

pro

ced

ure

s a

de

qu

ate

to

p

reve

nt

mo

vem

en

t o

f n

on

-co

nfo

rmin

g p

rod

uct

into

th

e

pro

du

ctio

n s

yste

m?

Th

e c

on

tro

l of

susp

ect

or

no

n-c

on

form

ing

pro

du

ct is

re

qu

ire

d t

o p

reve

nt

ina

dve

rte

nt

ship

me

nt

or

con

tam

ina

tion

o

f o

the

r lo

ts.

Pro

ced

ure

s sh

all

be

ad

eq

ua

te t

o p

reve

nt

mo

vem

en

t o

f n

on

-co

nfo

rmin

g p

rod

uct

into

th

e p

rod

uct

ion

sy

ste

m.

Pro

ced

ure

s sh

all

exi

st a

dd

ress

ing

pro

pe

r d

isp

osi

tion

, p

rod

uct

ide

ntif

ica

tion

, a

nd

tra

ckin

g o

f m

ate

ria

l flo

w in

an

d o

ut

of

the

ho

ld a

rea

. A

no

n-c

on

form

ing

ho

ld

are

a s

ha

ll b

e c

lea

rly

de

sig

na

ted

to

ma

inta

in s

eg

reg

atio

n o

f su

ch m

ate

ria

l.

Se

cti

on

2 -

Flo

or

an

d M

ate

ria

l H

an

dli

ng

Re

sp

on

sib

ilit

y

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 23: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

2.5

Are

co

nta

ine

rs f

ree

of

in

ap

pro

pri

ate

ma

teri

al a

nd

co

nta

min

an

ts?

Co

nta

ine

rs h

an

dlin

g c

ust

om

er

pro

du

ct s

ha

ll b

e f

ree

of

ina

pp

rop

ria

te m

ate

ria

l an

d c

on

tam

ina

nts

. A

fte

r e

mp

tyin

g

an

d b

efo

re r

e-u

sin

g c

on

tain

ers

, co

nta

ine

rs s

ha

ll b

e

insp

ect

ed

to

en

sure

th

at

all

pa

rts

an

d in

ap

pro

pri

ate

m

ate

ria

l ha

ve b

ee

n r

em

ove

d.

Th

e s

ou

rce

of

ina

pp

rop

ria

te

ma

teri

al s

ha

ll b

e id

en

tifie

d a

nd

ad

dre

sse

d.

Th

is is

to

e

nsu

re t

ha

t n

o n

on

con

form

ing

we

lde

d p

art

s o

r in

ap

pro

pri

ate

ma

teri

al c

on

tam

ina

te t

he

fin

ish

ed

lot.

2.6

Is p

art

loa

din

g s

pe

cifie

d,

do

cum

en

ted

an

d c

on

tro

lled

?

Lo

ad

ing

pa

ram

ete

rs s

ha

ll b

e s

pe

cifie

d,

do

cum

en

ted

, a

nd

co

ntr

olle

d.

Exa

mp

les

incl

ud

e p

art

loa

d s

eq

ue

nce

an

d

cla

mp

se

qu

en

ce.

2.7

Is t

he

re a

co

nta

inm

en

t re

act

ion

pla

n a

nd

are

o

pe

rato

rs t

rain

ed

in t

he

p

roce

ss?

Op

era

tors

sh

all

be

tra

ine

d in

ma

teri

al h

an

dlin

g,

con

tain

me

nt

act

ion

, a

nd

pro

du

ct s

eg

reg

atio

n in

th

e e

ven

t o

f a

n e

qu

ipm

en

t e

me

rge

ncy

incl

ud

ing

po

we

r fa

ilure

.

Tra

inin

g s

ha

ll b

e d

ocu

me

nte

d.

Wo

rk in

stru

ctio

ns

spe

cific

ally

ad

dre

ssin

g p

ote

ntia

l typ

es

of

eq

uip

me

nt

em

erg

en

cie

s a

nd

fa

ilure

s sh

all

be

acc

ess

ible

to

an

d

un

de

rsto

od

by

eq

uip

me

nt

op

era

tors

. T

he

se in

stru

ctio

ns

sha

ll a

dd

ress

co

nta

inm

en

t/re

act

ion

pla

ns

rela

ted

to

all

ele

me

nts

of

the

we

ldin

g p

roce

ss.

Evi

de

nce

sh

all

exi

st

sho

win

g d

isp

osi

tion

an

d t

race

ab

ility

of

aff

ect

ed

pro

du

ct.

Un

pla

nn

ed

or

em

erg

en

cy d

ow

ntim

e g

rea

tly r

ais

es

the

ris

k o

f im

pro

pe

r p

roce

ssin

g.

2.8

Is t

he

ha

nd

ling

, st

ora

ge

an

d

pa

cka

gin

g a

de

qu

ate

to

p

rese

rve

pro

du

ct q

ua

lity?

Th

e w

eld

er'

s lo

ad

ing

sys

tem

, in

-pro

cess

ha

nd

ling

, a

nd

sh

ipp

ing

pro

cess

sh

all

be

ass

ess

ed

fo

r ri

sk o

f p

art

d

am

ag

e o

r o

the

r q

ua

lity

con

cern

s.O

the

r p

ract

ice

s su

ch a

s st

ack

ing

of

ove

rlo

ad

ed

co

nta

ine

rs

can

als

o in

cre

ase

th

e r

isk

of

pa

rt d

am

ag

e.

2.9

Are

pla

nt

cle

an

line

ss,

ho

use

kee

pin

g,

en

viro

nm

en

tal

an

d w

ork

ing

co

nd

itio

ns

con

du

cive

to

co

ntr

ol a

nd

im

pro

ved

qu

alit

y?

Pla

nt

cle

an

line

ss,

ho

use

kee

pin

g,

en

viro

nm

en

tal,

an

d

wo

rkin

g c

on

diti

on

s sh

all

be

co

nd

uci

ve t

o c

on

tro

llin

g a

nd

im

pro

vin

g q

ua

lity.

T

he

we

ldin

g o

rga

niz

atio

n s

ha

ll e

valu

ate

su

ch c

on

diti

on

s a

nd

th

eir

eff

ect

on

qu

alit

y.

A

ho

use

kee

pin

g p

olic

y sh

all

be

cle

arl

y d

efin

ed

an

d

exe

cute

d.

Th

e f

aci

lity

sha

ll b

e r

evi

ew

ed

fo

r co

nd

itio

ns

tha

t a

re d

etr

ime

nta

l to

qu

alit

y p

roce

ssin

g s

uch

as

loo

se p

art

s o

n f

loo

r, c

on

tam

ina

nts

, o

il, in

ad

eq

ua

te p

lan

t lig

htin

g,

fum

es,

etc

.

- 22 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 24: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 23 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

2.1

0

Are

pa

rts

fre

e f

rom

co

nta

min

an

ts t

ha

t w

ou

ld b

e

de

trim

en

tal t

o t

he

qu

alit

y o

f th

ew

eld

ing

pro

cess

es,

su

bse

qu

en

t p

roce

sse

s, o

r th

e

pro

du

ct?

Pa

rts

sha

ll b

e f

ree

fro

m c

on

tam

ina

nts

th

at

are

de

trim

en

tal

to t

he

qu

alit

y o

f th

e w

eld

ing

pro

cess

es,

su

bse

qu

en

t p

roce

sse

s, o

r th

e p

rod

uct

. I

f a

pp

lica

ble

, p

re-w

ash

an

d

po

st-w

ash

pa

ram

ete

rs

sha

ll b

e m

on

itore

d a

nd

d

ocu

me

nte

d.

3.1

Are

th

e f

aci

litie

s su

ffic

ien

t fo

r th

e w

eld

ing

op

era

tion

?

Th

is c

ou

ld in

clu

de

bu

t is

no

t lim

ited

to

, fa

cilit

ies

cap

ab

ilitie

s su

ch a

s sa

fely

, e

nvi

ron

me

nta

l re

gu

latio

ns/

pra

ctic

e,

suff

icie

nt

inco

min

g p

ow

er

(ba

lan

ce

an

d lo

ad

ing

), a

ir (

sizi

ng

, fil

teri

ng

an

d c

lea

nlin

ess

), w

ate

r,

po

we

r su

pp

ly g

rou

nd

ing

pe

r O

EM

an

d r

eg

ula

tory

sp

eci

fica

tion

s, g

as

mix

ing

sys

tem

(e

qu

ipm

en

t a

nd

siz

ing

),

ven

tila

tion

, a

nd

ad

eq

ua

te li

gh

ting

.

3.2

Are

th

e p

ow

er

sup

plie

s su

ffic

ien

tly s

ize

d?

Th

e p

ow

er

sup

ply

sh

ou

ld b

e a

de

qu

ate

fo

r th

e

ma

nu

fact

uri

ng

pro

cess

with

co

nsi

de

ratio

n n

ot

limite

d t

o

ou

tpu

t e

ne

rgy,

du

ty c

ycle

, co

olin

g,

flow

ra

tes

an

d

gro

un

din

g.

3.3

Are

pro

cess

eq

uip

me

nt

calib

ratio

ns

an

d/o

r ve

rific

atio

n

cert

ifie

d,

do

cum

en

ted

, a

vaila

ble

, a

nd

cu

rre

nt?

Th

e c

alib

ratio

n a

nd

ce

rtifi

catio

n o

f th

e p

roce

ss e

qu

ipm

en

t sh

all

be

ch

eck

ed

at

reg

ula

r sp

eci

fied

inte

rva

ls.

Re

fer

to

the

ap

plic

ab

le P

roce

ss T

ab

les.

3.4

Ha

s a

pre

ven

tativ

e

ma

inte

na

nce

pro

gra

m b

ee

n

est

ab

lish

ed

an

d d

ocu

me

nte

d?

Su

pp

lier

sha

ll h

ave

a p

reve

nta

tive

ma

inte

na

nce

pro

gra

m

tha

t is

do

cum

en

ted

an

d im

ple

me

nte

d.

Re

fer

to S

ect

ion

1

.19

an

d t

he

ap

plic

ab

le P

roce

ss T

ab

les.

3.5

Ha

ve t

he

ne

cess

ary

re

pla

cem

en

t p

art

s a

nd

p

roce

ss c

on

sum

ab

les

be

en

id

en

tifie

d a

nd

ma

de

re

ad

ily

ava

ilab

le?

Th

e r

ep

lace

me

nt

pa

rts

an

d p

roce

ss c

on

sum

ab

les

sha

ll b

e

ide

ntif

ied

, m

ain

tain

ed

in t

he

ap

pro

pri

ate

vo

lum

es

an

d

pro

pe

r st

ora

ge

. C

on

sum

ab

les

mu

st b

e o

n t

he

cu

sto

me

r's

ap

pro

ved

so

urc

e li

st (

if a

pp

lica

ble

). R

efe

r to

th

e a

pp

lica

ble

P

roce

ss T

ab

les,

Se

ctio

n 2

.0 a

nd

Se

ctio

n 1

.19

. T

his

sh

all

be

ca

ptu

red

in t

oo

ls s

uch

as

the

se

t u

p p

roce

du

re,

PF

ME

Aa

nd

Co

ntr

ol P

lan

s.

It s

ho

uld

be

incl

ud

ed

in t

he

laye

red

p

roce

ss a

ud

it o

r o

the

r si

mila

r ty

pe

qu

alit

y re

vie

w p

roce

ss.

3.6

Are

th

e p

roce

ss,

eq

uip

me

nt,

a

nd

sa

fety

ala

rm c

he

cks

be

ing

te

ste

d a

t th

e r

eq

uir

ed

fr

eq

ue

ncy

or

aft

er

an

y re

pa

ir o

rre

bu

ild?

Th

e w

eld

ing

op

era

tion

sh

all

ha

ve a

list

of

we

ldin

g

pro

cess

, e

qu

ipm

en

t, a

nd

sa

fety

ala

rms.

Th

ese

ala

rms

sha

ll b

e in

div

idu

ally

te

ste

d a

t th

e r

eq

uir

ed

fre

qu

en

cy a

s lis

ted

in t

he

co

ntr

ol p

lan

, a

nd

aft

er

an

y re

pa

ir,

pro

cess

ch

an

ge

or

reb

uild

. T

he

se c

he

cks

sha

ll b

e d

ocu

me

nte

d.

Se

cti

on

3 -

Eq

uip

me

nt

/ F

ac

ilit

ies

/Co

ntr

ols

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 25: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

es

tio

nR

eq

uir

em

en

ts a

nd

Gu

ida

nc

eO

bje

cti

ve

Ev

ide

nc

eN

/AS

ati

sfa

cto

ryN

ot

Sa

tis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

4.1

Is t

he

re a

re

cord

of

the

de

sig

n

an

d s

et-

up

of

the

fixtu

re?

Su

pp

lier

sha

ll ha

ve d

ocu

me

nta

tion

of

the

fix

ture

de

sig

n,

tha

t a

re s

tore

d p

rop

erly

an

d a

cce

ssib

le.

Pro

pe

r id

en

tific

atio

n a

nd

re

visi

on

leve

l on

th

e f

ixtu

re o

r re

late

d to

th

e f

ixtu

re.

Do

cum

en

ted

fix

ture

se

t-u

p (

i.e.,

cla

mp

s, p

ins,

lo

catin

g d

evi

ces)

4.2

Is t

he

po

sitio

nin

g o

f e

ach

pa

rt

be

ing

co

ntr

olle

d?

A m

eth

od

to

de

tect

pro

pe

r fix

ture

an

d p

art

po

sitio

n is

re

qu

ired

fo

r e

ach

pa

rt,

such

as

the

use

of

pro

xim

ity

switc

hes

, o

ptic

al s

en

sors

, m

ech

an

ical

pro

bes

, p

art

p

rese

nce

or

po

ke y

oke

s.,

etc

.

4.3

Ha

s fix

turi

ng

/to

olin

g

pre

ven

tativ

e m

ain

tena

nce

p

rog

ram

be

en

est

ab

lish

ed

?

Su

pp

lier

sha

ll ha

ve a

pre

ven

tativ

e m

ain

ten

an

ce p

rog

ram

th

at

is d

ocu

me

nte

d a

nd

imp

lem

en

ted

. R

efe

r to

Se

ctio

n

1.1

8 a

nd t

he

ap

plic

ab

le P

roce

ss T

able

s. E

xam

ple

s:

cle

an

ing

, d

eg

rea

sin

g,

an

d f

ixtu

rin

g in

teg

rity

.

4.4

Are

the

fix

ture

co

mp

on

en

ts

rob

ust?

Ga

s, a

ir,

sen

sors

, co

ntro

l ca

ble

s, e

tc.

are

ad

eq

ua

tely

p

rote

cte

d f

or

the

pro

cess

en

viro

nm

en

t.

4.5

Are

th

e to

olin

g c

om

po

ne

nts

d

esi

gn

ed

fo

r th

e w

eld

ing

p

roce

ss?

Fix

turi

ng

/to

olin

g w

as

dev

elo

pe

d c

on

sid

eri

ng

mov

em

en

t,

rea

ch,

acc

ess

ibili

ty,

too

l ce

nte

r p

oin

t, m

ain

ten

an

ce,

an

d

erg

on

om

ics

(ma

nu

al,

au

tom

atic

, a

nd

ro

bo

tics)

5.1

Do

es

we

ldin

g o

pera

tion

incl

ud

e t

he

follo

win

g?

Ide

ntif

y th

e p

roce

ss c

on

tro

l eq

uip

me

nt

ne

cess

ary

to

m

on

itor,

co

ntr

ol a

nd

pro

vid

e f

ee

db

ack

on

all

ess

en

tial

pro

cess

va

ria

ble

s a

s lis

ted

be

low

an

d in

th

e a

pp

lica

ble

P

roce

ss T

ab

les.

5.1

.1L

og

ic h

as b

ee

n e

sta

blis

he

d t

o e

ffe

ctiv

ely

ide

ntif

y a

nd

a

dd

ress

pro

cess

or

eq

uip

me

nt

fau

lts.

5.1

.2W

ith o

ver

rid

es

or

rese

ts,

log

s m

ust

be

mai

nta

ine

d.

5.1

.3W

eld

fa

ults

au

dib

le,

visi

ble

an

d li

ne

sh

ut

do

wn

.

5.1

.4A

t w

eld

cyc

le in

terr

up

t, p

art

mu

st n

ot b

e r

emo

ved

or

pa

sse

d u

ntil

dis

po

sitio

ne

d b

y a

pp

rop

ria

te p

erso

nn

el.

5.1

.5C

alib

ratio

n o

f m

ete

rs a

nd

sys

tem

co

ntr

ols

.

5.1

.6

Inte

r-lo

ckin

g o

f pre

vio

us

op

era

tion

s h

ave

occ

urr

ed

an

d

qu

alit

y o

f p

art

s h

as

be

en

ve

rifie

d b

efo

re t

he

ne

xt o

pe

ratio

n

be

gin

s.

5.1

.7S

ecu

re b

acku

ps

of

all

pro

gra

ms

an

d p

roce

du

res

(ele

ctro

nic

pre

ferr

ed).

5.1

.8H

igh

/Lo

w li

mit

ala

rms

est

ab

lish

ed

by

act

ua

l da

ta.

5.1

.9P

roce

ss v

ari

ab

les

ha

ve b

ee

n d

efin

ed

an

d d

eve

lop

ed

by

da

ta a

nd s

ho

wn

to

be

sta

tistic

ally

ca

pa

ble

.

5.1

.10

Acc

ep

tab

le t

race

ab

ility

(se

que

nce

/da

te c

od

ing

)

Se

cti

on

5 -

PR

OC

ES

S C

ON

TR

OL

S A

ND

CO

NF

IRM

AT

ION

Se

cti

on

4 -

TO

OL

ING

/FIX

TU

RIN

G

- 24 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 26: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 25 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Qu

es

tio

n

Nu

mb

er

Qu

est

ion

Re

qu

ire

me

nts

an

d G

uid

an

ce

Ob

jec

tiv

e E

vid

en

ce

N/A

Sa

tis

fac

tory

No

t S

atis

fac

tory

Ne

ed

s I

mm

ed

iate

A

cti

on

As

se

ss

me

nt

Sp

ec

ial

Pro

ce

ss

: W

eld

ing

Sy

ste

m A

ss

es

sm

en

t

5.1

.11

All

too

ling

an

d p

roce

ss c

ha

ng

es

are

do

cum

en

ted

.

5.1

.12

Doc

um

en

ted

wel

din

g p

roce

dur

es

for

ea

ch w

eld

loca

tion

a

nd

ea

ch p

roce

ss v

ari

ab

le.

5.1

.13

Ch

an

ge

ove

r p

roce

du

re (

fille

r m

ate

ria

l, fix

ture

s)

5.1

.14

Mu

st h

ave

do

cum

en

ted

sta

rt-u

p a

nd

sh

ut-

do

wn

pro

ced

ure

.

5.2

Are

pro

cess

co

ntr

ol

pa

ram

ete

rs m

on

itore

d a

t e

sta

blis

he

d f

req

ue

nci

es?

Pro

cess

con

tro

l pa

ram

ete

rs s

hall

be

mo

nito

red

pe

r fr

eq

ue

nci

es

est

ab

lish

ed

in t

he

co

ntr

ol p

lan

. A

n a

pp

rop

ria

te

pe

rso

n s

ha

ll ve

rify

th

e p

roce

ss c

on

tro

l pa

ram

ete

rs.

M

an

ag

em

en

t re

vie

w is

re

qu

ire

d p

er

Qu

est

ion

1.1

3.

5.3

Ho

w d

oe

s th

e o

rga

niz

atio

n

revi

ew

an

d r

eac

t to

ou

t o

f co

ntr

ol/s

peci

fica

tion

p

ara

me

ters

?

Are

th

ere

do

cum

en

ted

re

actio

n p

lan

s w

ith a

pp

ropr

iate

le

vels

of

con

tain

me

nt

for

bo

th o

ut

of

con

tro

l an

d o

ut

of

tole

ran

ce p

roce

ss p

ara

me

ters

?

Is t

he

re d

ocu

me

nte

d

evi

de

nce

th

at

rea

ctio

n p

lan

s a

re f

ollo

we

d?

5.4

Ho

w d

oe

s th

e o

rga

niz

atio

n

ha

nd

le c

han

ge

s to

pro

cess

co

ntr

ol p

ara

me

ters

aft

er

initi

al

cust

om

er

ap

pro

val?

Th

ere

sh

all

be

a h

iera

rch

y e

sta

blis

he

d f

or

ma

kin

g a

nd

ap

pro

vin

g p

roce

ss c

ha

ng

es.

E

ach

pro

cess

sh

ou

ld b

e

act

ed

on

acc

ord

ing

to

th

e le

vel o

f ch

an

ge

. R

evi

ew

p

roce

ss c

ha

ng

es

with

yo

ur

cust

om

er.

5.5

Are

In

-Pro

cess

an

d F

ina

l T

est

s p

erf

orm

ed

at

est

ab

lish

ed

fre

qu

en

cie

s?

In-P

roce

ss a

nd

Fin

al T

est

s sh

all

be

pe

rfo

rmed

per

fr

eq

ue

nci

es

in t

he

co

ntr

ol p

lan

as

ag

ree

d u

po

n b

etw

ee

n

the

su

pp

lier

an

d t

he

cu

sto

mer

.

5.6

Are

we

ld q

ua

lity

req

uir

em

en

ts

cle

arl

y d

efin

ed

pe

r cu

sto

me

r sp

eci

fica

tion

s?

We

ld q

ua

lity

req

uir

em

en

ts p

er

inte

rna

l an

d c

ust

om

er

spe

cific

atio

ns,

suc

h a

s b

ut

no

t lim

ited

to

th

e f

ollo

win

g

test

ing

me

tho

do

logy

:

5.6

.1C

ut

an

d e

tch

5.6

.2P

art

loca

tion

, w

arp

ing

, g

ap

, a

nd

d

ime

nsi

on

al

req

uir

em

en

ts

5.6

.3C

orr

ect

nu

mb

er

of

we

lds

5.6

.4W

eld

len

gth

/siz

e

5.6

.5W

eld

loca

tion

5.6

.6N

on D

est

ruct

ive

Te

stin

g (

ND

T)

5.6

.7S

pa

tte

r, u

nd

erc

ut,

po

rosi

ty,

disc

on

tinu

itie

s,.

5.6

.8W

eld

dir

ect

ion

co

nfir

ma

tion

5.6

.9D

est

ruct

ive

te

stin

g

5.6

.10

Ad

diti

ona

l te

stin

g

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 27: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 26 -

Instructions for completing the Job Audit

The organization is to complete a minimum of one welding part job audit during each assessment. This should be done preferably on a part identified for one of the customers requiring compliance to this document. More part job audits may be done if time permits. Preferably, safety or critical parts should be audited. This may not be easily determined with fasteners, especially if the fastener manufacturer does not identify the end customer (auto manufacturer, tier one, etc.). It is recommended that the job audit be performed at the end of the welding system assessment.

The job audit is not the only or main focus of the WSA. The other five sections on Management Responsibility and Quality Planning, Floor and Material Handling Responsibility, and Equipment/Facilities/Control, Tooling/Fixturing, and Process Controls and Confirmation are equally if not even more important. The job audit of one part, one weld process, is not sufficient to use as a basis to complete the other sections of the complete WSA.

The job audit is a compliance type audit/review of a specific part and its related paperwork and processing, including welding equipment and processing records for that job from the beginning receipt of a part through processing in the welding operation and inspection to packaging. Parts shall be taken from the shipping area at the dock or the end of the welding operation. If an automotive manufacturer’s part is not available or identifiable, then parts from other customers requiring compliance with this document shall be used for the assessment.

The part checked shall represent a major weld operation such as an individual operation, cell, or assembly line. In subsequent welding system assessments, different parts and welding processes shall be checked.

The specific welding processing parameters (applies to 6.1 and 6.13 in the Job Audit) that are required in the job audit shall be added to the job audit form. This can be done by reviewing the customer specification(s), the Control Plan, the FMEA, and the floor work/job order. Each processing step shall be reviewed for proper production records/compliance/inspection. These steps can be compared to those in the Welding System Assessment for the actual job/welding process being reviewed for compliance. The welding records for the actual time frame/shift etc. that the job was processed shall also be checked. The actual welding equipment and instrumentation certification shall be verified as being in compliance to the appropriate equipment requirements in the equipment section.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 28: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 27 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Se

cti

on

6 -

Jo

b A

ud

it

Jo

b I

de

nti

ty:

Cu

sto

me

r:S

ho

p O

rde

r N

um

be

r:P

art

Nu

mb

er:

Pa

rt D

es

cri

pti

on

:B

as

e M

eta

l S

pe

cif

ica

tio

ns

:F

ille

r M

eta

l S

pe

cif

ica

tio

n (

if r

eq

uir

ed

):W

eld

ing

Pro

ce

ss

(es

):

Qu

est

ion

#Jo

b A

ud

it Q

ue

stio

nR

ela

ted

WS

A Q

ue

stio

n #

Cu

sto

me

r o

r In

tern

al

Re

qu

ire

me

nt

Job

(S

ho

p)

Ord

er

or

Re

fere

nce

Do

cum

en

tatio

n

Re

qu

ire

me

nt

Act

ua

l Co

nd

itio

n

(Ob

ject

ive

Evi

de

nce

)P

ass

/ F

ail

/ N

/A

6.1

Ha

s th

e w

eld

ing

op

era

tion

ide

ntif

ied

th

e

pro

cess

co

ntr

ol e

qu

ipm

en

t n

ece

ssa

ry t

o

mo

nito

r, c

on

tro

l an

d p

rovi

de

fe

ed

ba

ck o

n a

ll e

sse

ntia

l pro

cess

va

ria

ble

s a

s lis

ted

in t

he

a

pp

lica

ble

Pro

cess

Ta

ble

s?

1.8

5.1

5.2

6.2

Ha

s th

e lo

gic

be

en

est

ab

lish

ed

to

eff

ect

ive

ly

ide

ntif

y a

nd

ad

dre

ss p

roce

ss o

r e

qu

ipm

en

t fa

ults

?

5.1

6.3

Are

ove

r ri

de

s o

r re

sets

log

s m

ain

tain

ed

?

5.1

.2

6.4

Are

we

ld f

au

lts a

ud

ible

, vi

sib

le a

nd

do

es

the

lin

e s

hu

t d

ow

n?

5.1

.3

6.5

If t

he

we

ld c

ycle

is in

terr

up

ted

, is

th

e p

art

co

ntr

olle

d o

r co

nta

ine

d u

ntil

dis

po

sitio

ne

d b

y a

pp

rop

ria

te p

ers

on

ne

l?

2.7

5.1

.4

6.6

Are

th

e m

ete

rs a

nd

fe

ed

ba

ck c

on

tro

ls

calib

rate

d p

er

est

ab

lish

ed

fre

qu

en

cie

s?

5.1

.53

.3

6.7

If a

pp

lica

ble

, is

th

ere

an

inte

r-lo

ckin

g o

f th

e

pre

vio

us

op

era

tion

an

d h

as

the

qu

alit

y o

f p

art

s b

ee

n v

eri

fied

?

5.1

. 6

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 29: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Se

cti

on

6 -

Jo

b A

ud

it

Jo

b I

de

nti

ty:

Cu

sto

me

r:S

ho

p O

rde

r N

um

be

r:P

art

Nu

mb

er:

Pa

rt D

es

cri

pti

on

:B

as

e M

eta

l S

pe

cif

ica

tio

ns

:F

ille

r M

eta

l S

pe

cif

ica

tio

n (

if r

eq

uir

ed

):W

eld

ing

Pro

ce

ss

(es

):

Qu

est

ion

#Jo

b A

ud

it Q

ue

stio

nR

ela

ted

WS

A Q

ue

stio

n #

Cu

sto

me

r o

r In

tern

al

Re

qu

ire

me

nt

Job

(S

ho

p)

Ord

er

or

Re

fere

nce

Do

cum

en

tatio

n

Re

qu

ire

me

nt

Act

ua

l Co

nd

itio

n

(Ob

ject

ive

Evi

de

nce

)P

ass

/ F

ail

/ N

/ A

6.8

Are

th

ere

se

cure

ba

cku

ps

of

all

pro

gra

ms

an

d p

roce

du

res

(ele

ctro

nic

pre

ferr

ed

)?

5.1

.7

6.9

Are

hig

h/lo

w li

mit

ala

rms

est

ab

lish

ed

by

act

ua

l da

ta.

5.1

.85

.1.1

6.1

0

Ha

ve p

roce

ss v

ari

ab

les

be

en

de

fine

d a

nd

d

eve

lop

ed

by

da

ta a

nd

sh

ow

n t

o b

e

sta

tistic

ally

ca

pa

ble

?

5.1

.9

6.1

1Is

th

ere

acc

ep

tab

le t

race

ab

ility

(s

eq

ue

nce

/da

te c

od

ing

)?

5.1

.10

5.1

.11

2.3

2.7

6.1

2Is

th

ere

tra

cea

bili

ty o

f a

ll p

roce

ss a

nd

to

olin

g c

ha

ng

es?

4.1

5.1

.11

5.4

6.1

3A

re t

he

re d

ocu

me

nte

d w

eld

ing

pro

ced

ure

s fo

r e

ach

we

ld lo

catio

n a

nd

ea

ch p

roce

ss

vari

ab

le?

5.1

.12

1.5

1.1

0

6.1

4Is

th

ere

a d

ocu

me

nte

d c

ha

ng

e o

ver

pro

ced

ure

(fil

ler

ma

teri

al,

fixtu

res)

?

1.5

5.1

.13

3.6

6.1

5Is

th

ere

a d

ocu

me

nte

d s

tart

-up

an

d s

hu

t-d

ow

n p

roce

du

re?

1.5

1.1

05

.1.1

4

6.1

6 A

re p

roce

ss c

on

tro

l pa

ram

ete

rs m

on

itore

d

at

est

ab

lish

ed

fre

qu

en

cie

s?

5. 2

- 28 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 30: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 29 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Se

cti

on

6 -

Jo

b A

ud

it

Jo

b I

de

nti

ty:

Cu

sto

me

r:S

ho

p O

rde

r N

um

be

r:P

art

Nu

mb

er:

Pa

rt D

es

cri

pti

on

:B

as

e M

eta

l S

pe

cif

ica

tio

ns

:F

ille

r M

eta

l S

pe

cif

ica

tio

n (

if r

eq

uir

ed

):W

eld

ing

Pro

ce

ss

(es

):

Qu

est

ion

#Jo

b A

ud

it Q

ue

stio

nR

ela

ted

WS

A Q

ue

stio

n #

Cu

sto

me

r o

r In

tern

al

Re

qu

ire

me

nt

Job

(S

ho

p)

Ord

er

or

Re

fere

nce

Do

cum

en

tatio

n

Re

qu

ire

me

nt

Act

ua

l Co

nd

itio

n

(Ob

ject

ive

Evi

de

nce

)P

ass

/ F

ail

/ N

/ A

6.1

7

Are

th

ere

do

cum

en

ted

re

act

ion

pla

ns

with

a

pp

rop

ria

te le

vels

of

con

tain

me

nt

to b

oth

o

ut

of

con

tro

l an

d o

ut

of

tole

ran

ce p

roce

ss

pa

ram

ete

rs a

nd

pro

vid

e d

ocu

me

nte

d

evi

de

nce

th

at

rea

ctio

n p

lan

s a

re f

ollo

we

d?

5.3

1.2

15

.61

.82

.7

6.1

8

Ho

w d

oe

s th

e o

rga

niz

atio

n h

an

dle

ch

an

ge

s to

pro

cess

co

ntr

ol p

ara

me

ters

aft

er

initi

al

cust

om

er

ap

pro

val a

nd

ho

w d

o y

ou

no

tify

you

r cu

sto

me

r?

1.6

5.4

1.2

21

.16

6.1

9A

re I

n-P

roce

ss a

nd

Fin

al T

est

s p

erf

orm

ed

at

est

ab

lish

ed

fre

qu

en

cie

s?

1.8

5.5

6.2

0A

re w

eld

qu

alit

y re

qu

ire

me

nts

cle

arl

y d

efin

ed

pe

r cu

sto

me

r sp

eci

fica

tion

s?

1.9

5.6

6.2

0.1

Te

st T

ype

:

Te

st M

eth

od

:

Te

st F

req

ue

ncy

an

d Q

ua

ntit

y:

Sp

eci

fica

tion

:

6.2

0.2

Te

st T

ype

:

Te

st M

eth

od

:

Te

st F

req

ue

ncy

an

d Q

ua

ntit

y:

Sp

eci

fica

tion

:

Ea

ch p

art

ma

y h

ave

on

e o

r m

ore

re

qu

ire

me

nts

de

term

ine

d b

y th

e w

eld

ing

sp

eci

fica

tion

. P

art

s m

ust

me

et

ea

ch r

eq

uir

em

en

t.

Lis

t re

qu

ire

me

nts

be

low

an

d v

alid

ate

.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 31: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Se

cti

on

6 -

Jo

b A

ud

it

Jo

b I

de

nti

ty:

Cu

sto

me

r:S

ho

p O

rde

r N

um

be

r:P

art

Nu

mb

er:

Pa

rt D

es

cri

pti

on

:B

as

e M

eta

l S

pe

cif

ica

tio

ns

:F

ille

r M

eta

l S

pe

cif

ica

tio

n (

if r

eq

uir

ed

):W

eld

ing

Pro

ce

ss

(es

):

Qu

est

ion

#Jo

b A

ud

it Q

ue

stio

nR

ela

ted

WS

A Q

ue

stio

n #

Cu

sto

me

r o

r In

tern

al

Re

qu

ire

me

nt

Job

(S

ho

p)

Ord

er

or

Re

fere

nce

Do

cum

en

tatio

n

Re

qu

ire

me

nt

Act

ua

l Co

nd

itio

n

(Ob

ject

ive

Evi

de

nce

)P

ass

/ F

ail

/ N

/ A

6.2

0.3

Te

st T

ype

:

Te

st M

eth

od

:

Te

st F

req

ue

ncy

an

d Q

ua

ntit

y:

Sp

eci

fica

tion

:

6.2

0.4

Te

st T

ype

:

Te

st M

eth

od

:

Te

st F

req

ue

ncy

an

d Q

ua

ntit

y:

Sp

eci

fica

tion

:

- 30 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 32: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 31 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

APPENDIX A – PROCESS TABLES

Process Table A: Arc Stud/Fastener Welding, Flux-Cored Arc Welding, Gas Metal Arc Welding, Submerged Arc Welding, Shielded Metal Arc Welding, Plasma Arc Welding, Gas Tungsten Arc Welding, and Gas Metal Arc Braze Welding ............................................................................................................. 32

Process Table B: Resistance Spot Welding, Projection Welding, Resistance Seam Welding, High-Frequency Seam Welding, Induction Seam Welding, Mash Seam Welding, and Flash Welding.............. 34

Process Table C: Nd YAG, CO2, DIODE, and Wire Fed......................................................................... 36

Process Table D: Inertia Friction Welding, Direct Drive Friction Welding, Friction Stir Welding, Flash Butt Welding, Resistance Butt Welding and Ultrasonic Welding ............................................................. 40

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 33: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 32 -

It

xx

em

#R

ela

ted

WS

A

Qu

es

tio

n #

Ca

teg

ory

/Pro

ce

ss

Ste

ps

Arc

Stu

d/

Fa

ste

ne

r W

eld

ing

(S

W)

Flu

x-

Co

red

Arc

W

eld

ing

(F

CA

W)

Ga

s M

eta

l A

rc

We

ldin

g

(GM

AW

)

Su

bm

erg

ed

A

rc W

eld

ing

(S

AW

)

Sh

ield

ed

M

eta

l A

rc

We

ldin

g

(SM

AW

)

Pla

sm

a A

rc

We

ldin

g

(PA

W)

Ga

s

Tu

ng

ste

n

Arc

W

eld

ing

(G

TA

W)

Ga

s M

eta

l A

rc B

raze

W

eld

ing

1.0

1.7

, 1

.8A

rc w

eld

ing

sp

ec

ific

es

se

nti

al

va

ria

ble

s w

hic

h s

ha

ll b

e

ad

dre

ss

ed

in

th

e F

ME

A,

co

ntr

ol

pla

n a

nd

we

ldin

g

pro

ce

du

res

A1

.1A

rc v

olta

ge

xx

xx

xx

A1

.2A

mp

era

ge

xx

xx

xx

xx

A1

.3C

urr

en

t ty

pe

(A

C/D

CE

N/D

CE

P)

xx

xx

xx

xx

A1

.4W

ire

fe

ed

sp

ee

dx

xx

x1

x1

x

A1

.5P

uls

e s

ett

ing

va

ria

ble

s sp

eci

fic t

o t

he

OE

M o

f th

e w

eld

ing

e

qu

ipm

en

t m

ust

be

do

cum

en

ted

an

d c

on

tro

lled

.x

x

A1

.6S

tud

gu

n/t

orc

h p

osi

tion

wo

rk a

ng

le,

tra

vel a

ng

le

xx

xx

xx

xx

A1

.7C

on

tact

tip

-to

-wo

rk d

ista

nce

xx

xx

A1

.8E

lect

rod

e-t

o-w

ork

dis

tan

c ex

x

A1

.9L

ift h

eig

ht

of

stu

dx

.10

Fa

ste

ne

r co

atin

g (

de

term

ine

s cu

rre

nt

typ

e)

x

.11

Plu

ng

e c

on

tro

l mo

de

fo

rce

or

po

sitio

nx

.12

Flu

x cl

ass

ifica

tion

an

d d

ep

thx

.13

Flu

x re

mo

val a

nd

re

cla

ima

tion

pla

nx

.14

Ga

s flo

w p

re-f

low

, p

ost

-flo

w,

rate

an

d t

ype

(s)

x2

x2

xx

.15

Ele

ctro

de

an

d/o

r fil

ler

me

tal t

ype

, d

iam

ete

r, a

nd

cl

ass

icifa

catio

nx

xx

xx

x1

x1

x

.16

Tra

vel s

pe

ed

xx

A1

A1

A1

A1

A1

xx

A1

A1

xx

x

.17

Ga

s n

ozz

le s

ize

an

d t

ype

x2

x2

xx

.18

Arc

sta

rtin

g p

ara

me

ters

xx

x

A1

xx

A1

xx

x

.19

Arc

en

d p

ara

me

ters

xx

xx

xx

l c

on

tro

l o

f v

ari

ab

les

giv

en

be

low

are

su

bo

rdin

ate

to

cu

sto

me

r s

pe

cif

ic r

eq

uir

em

en

ts.

cu

sto

me

r m

ay

ha

ve

ad

dit

ion

al

req

uir

em

en

ts,

e.g

., i

ns

pe

cti

on

te

sti

ng

, g

rea

ter

fre

qu

en

cie

s,

etc

. W

he

n p

erf

orm

ing

th

e j

ob

au

dit

, th

e a

ud

ito

r s

ha

ll v

eri

fy w

eld

ing

is

co

nfo

rmin

g

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

x

A1

Al

Th

eto D

aX

i.

in

dic

ate

s t

ha

t p

roc

ed

ure

sh

ou

ld b

e r

ev

iew

ed

an

d d

oc

um

en

ted

wh

en

ne

ce

ss

ary

.

PR

OC

ES

S T

AB

LE

A-

Arc

We

ldin

g P

roc

es

se

s

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 34: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 33 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Arc

Stu

d/

Fa

ste

ne

r W

eld

ing

(S

W)

Flu

x-

Co

red

Arc

W

eld

ing

(F

CA

W)

Ga

s M

eta

l A

rc

We

ldin

g

(GM

AW

)

Su

bm

erg

ed

A

rc W

eld

ing

(S

AW

)

Sh

ield

ed

M

eta

l A

rc

We

ldin

g

(SM

AW

)

Pla

sm

a A

rc

We

ldin

g

(PA

W)

Ga

s

Tu

ng

ste

n

Arc

W

eld

ing

(G

TA

W)

Ga

s M

eta

l A

rc B

raze

W

eld

ing

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

A-

Arc

We

ldin

g P

roc

es

se

s

A1

.20

Wir

e b

urn

ba

ck s

ett

ing

sx

xx

A1

.21

Plu

ng

e d

ep

thx

A1

.22

Arc

tim

ex

x3

x3

x3

x3

A1

.23

Fa

ste

ne

r g

eo

me

try

pe

r m

ate

ria

l typ

ex

A1

.24

No

zzle

cle

an

ing

an

d c

lea

ne

rs,

rep

lace

me

n

x

tA

1.2

5T

ip c

ha

ng

es

A1

.26

Wir

e li

ne

rs/c

on

du

its c

lea

nin

g a

nd

re

pla

cin

g

A1

.27

Dri

ve r

oll

cha

ng

es

A1

.28

Wir

e g

uid

e t

ub

e c

ha

ng

e

A1

.29

An

tisp

att

er

Ap

plic

atio

n (

spra

y/d

ip a

nd

eq

uip

me

nt)

A1

.30

Ele

ctro

de

an

d s

tud

co

llet

cha

ng

e

A1

.31

O r

ing

s in

ga

s sy

ste

m m

ain

ten

an

ce

A1

.32

Ga

s d

eliv

ery

an

d m

ixin

g s

yste

mx

2x

2x

x

A1

.33

Flu

x d

eliv

ery

sys

tem

s m

ain

ten

an

c

xx

e

A1

.34

Flu

x re

mo

val (

scre

en

s si

ze a

nd

ma

gn

etic

se

pa

rato

rs)

A1

.35

Ele

ctro

de

sh

arp

en

ing

A1

.36

Sla

g r

em

ova

lx

xx

A1

.37

Wir

e d

ere

ele

rs m

ain

ten

an

ce

A1

.38

Wir

e b

rake

ad

just

me

nt

A1

.39

Inte

gri

ty o

f g

rou

nd

sys

tem

x1 : P

roce

sse

s ca

n b

e u

sed

bo

th w

ith a

nd

with

ou

t fil

ler

me

tal.

x2 : T

he

se w

eld

ing

pro

cess

es

are

de

sig

na

ted

fo

r e

ithe

r g

as

shie

lde

d,

self

shie

lde

d o

r g

asl

ess

.

x3 : A

rc S

po

t w

eld

ing

ap

plic

act

ion

s o

nly

.

Wh

at

are

yo

ur

pro

ced

ure

s fo

r:

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 35: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Re

sis

tan

ce

S

po

t W

eld

ing

(RS

W)

Pro

jec

tio

n

We

ldin

g

(PW

)

Re

sis

tan

ce

S

ea

m

We

ldin

g

(RS

EW

)

Hig

h-

Fre

qu

en

cy

S

ea

m

We

ldin

g

(RS

EW

-HF

)

Ind

uc

tio

n

Se

am

W

eld

ing

(R

SE

W-I

)

Ma

sh

S

ea

m

We

ldin

g

(RS

EW

-M

S)

Fla

sh

W

eld

ing

* (F

W)

2.0

1.7

, 1

.8R

es

ista

nc

e w

eld

ing

sp

ec

ific

es

se

nti

al

va

ria

ble

s w

hic

h

sh

all

be

ad

dre

ss

ed

in

th

e F

ME

A,

co

ntr

ol

pla

n a

nd

we

ldin

g

pro

ce

du

res

B2

.1W

eld

fo

rce

XX

XX

B2

.2C

lam

p f

orc

Xe

B2

.3F

org

e f

orc

e

B2

.4F

org

e d

ela

y

B2

.5A

mp

era

ge

XX

XX

B2

.6V

olta

ge

XX

XX

B2

.7P

ow

er

B2

.8F

req

ue

ncy

XX

XX

XX

XB

2.9

Pu

lsa

tion

XX

XX

B2

.10

Sq

ue

eze

tim

e/c

ycle

sX

XX

X

B2

.11

We

ld t

ime

/cyc

les

XX

XX

B2

.12

Ho

ld t

ime

/cyc

les

XX

XX

XB

2.1

3Q

ue

nch

tim

e/c

ycle

X

s

B2

.14

Te

mp

er

time

B2

.15

Co

ol t

ime

/cyc

les

XX

XX

B2

.16

Up

slo

pe

tim

e/c

ycle

sX

XX

XX

XX

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s

co

nfo

rmin

g t

o t

he

cu

sto

me

r's

re

qu

ire

me

nts

.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

B-

Re

sis

tan

ce

We

ldin

g P

roc

es

se

s

- 34 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 36: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 35 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Re

sis

tan

ce

S

po

t W

eld

ing

(RS

W)

Pro

jec

tio

n

We

ldin

g

(PW

)

Re

sis

tan

ce

S

ea

m

We

ldin

g

(RS

EW

)

Hig

h-

Fre

qu

en

cy

S

ea

m

We

ldin

g

(RS

EW

-HF

)

Ind

uc

tio

n

Se

am

W

eld

ing

(R

SE

W-I

)

Ma

sh

S

ea

m

We

ldin

g

(RS

EW

-M

S)

Fla

sh

W

eld

ing

* (F

W)

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s

co

nfo

rmin

g t

o t

he

cu

sto

me

r's

re

qu

ire

me

nts

.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

B-

Re

sis

tan

ce

We

ldin

g P

roc

es

se

s

B2

.17

Ste

pp

er

pro

gra

ms

X

B2

.18

Tip

/ele

ctro

de

/wh

ee

l dre

ssin

gX

XX

XX

B2

.19

We

ld t

rave

l sp

ee

dX

XX

XB

2.2

0A

de

qu

ate

ele

ctro

de

fo

llow

up

in w

eld

fo

rce

/ d

ista

nce

XX

XB

2.2

1S

yste

m c

oo

ling

-tra

nsf

orm

ers

, e

lect

rod

es,

etc

.X

XX

XX

X

B2

.22

Tip

/ele

ctro

de

/wh

ee

l/co

il ch

an

ge

fre

qu

en

cyX

XX

XX

XB

2.2

3T

ip/e

lect

rod

e/w

he

el/c

oil

alig

nm

en

tX

XX

XX

XB

2.2

4E

lect

rod

e s

ele

ctio

n/t

ype

(m

ate

ria

l typ

e e

tc.

X X X X

)

B2

.25

Ele

ctro

de

ge

om

etr

yB

2.2

6In

du

ctio

n c

oil

ge

om

etr

yB

2.2

7S

eco

nd

ary

loo

p e

lect

rica

l co

nd

uct

ors

(ca

ble

s, le

af

shu

nts

, e

tc.)

an

d m

ech

an

ica

l jo

ints

ma

inte

na

nce

B

2.2

8P

roje

ctio

n w

eld

ge

om

etr

y a

nd

siz

e

*Fla

sh W

eld

ing

is a

So

lid S

tate

pro

cess

, h

ow

eve

r, t

he

pro

cess

co

ntr

ols

mo

st r

ese

mb

le a

re

sist

an

ce w

eld

pro

cess

.R

efe

r to

Ta

ble

D fo

r o

the

r re

qu

ire

me

nts

on

Fla

sh W

eld

ing

Wh

at

are

yo

ur

pro

ced

ure

s fo

r:

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 37: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s N

d Y

AG

(L

BW

)C

O2

(L

BW

)D

IOD

E

(LB

W)

Wit

h W

ire

F

ee

d

Sy

ste

m

3.0

1.7

, 1

.8 W

eld

ing

sp

ec

ific

es

se

nti

al

va

ria

ble

s w

hic

h s

ha

ll b

e

ad

dre

ss

ed

in

th

e F

ME

A,

co

ntr

ol

pla

n a

nd

we

ldin

g

pro

ce

du

res

Eq

uip

me

nt

C3

.1B

ea

m q

ua

lity

XX

XX

C3

.2O

ptic

cle

an

line

ssX

XX

XC

3.3

Cro

ss je

t o

r la

ser

knife

XX

XX

C3

.4B

ea

m c

on

figu

ratio

n (

split

, si

ng

le)

XX

XX

C3

.5F

oca

l le

ng

thX

XX

XC

3.6

Be

am

sp

ot

size

XX

XX

C3

.7G

as

tub

e a

ng

le/a

rra

ng

em

en

tX

XX

XC

3.8

Op

tics

pu

rge

ga

s (f

low

an

d q

ua

lity)

XX

C3

.9M

irro

r cl

ea

nlin

ess

XX

XC

3.1

0M

irro

r d

eg

rad

atio

nX

XX

C3

.11

Be

am

sh

ari

ng

XX

XX

C3

.12

Sp

lit b

ea

mX

XX

XC

3.1

3T

ip c

ha

ng

es

XC

3.1

4O

rin

gs

in g

as

syst

em

X

PR

OC

ES

S T

AB

LE

C-

La

se

r W

eld

ing

Pro

ce

ss

es

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

- 36 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 38: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 37 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s N

d Y

AG

(L

BW

)C

O2

(L

BW

)D

IOD

E

(LB

W)

Wit

h W

ire

F

ee

d

Sy

ste

m

PR

OC

ES

S T

AB

LE

C-

La

se

r W

eld

ing

Pro

ce

ss

es

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

C3

.15

Ga

s n

ozz

leX

C3

.16

To

rch

an

gle

sX

C3

.17

Ch

ille

rs (

inte

rna

l - e

xte

rna

l)X

XX

XC

3.1

8 -

Flo

w r

ate

XX

XX

C3

.19

- W

ate

r q

ua

lity

XX

XX

C3

.20

- T

ype

of

coo

lan

tX

XX

XC

3.2

1 -

Ad

diti

ve c

on

cen

tra

tion

XX

XX

C3

.22

- T

em

pe

ratu

re c

on

tro

l (ra

te o

f ch

an

ge

an

d r

an

ge

)X

XX

XC

3.2

3W

ire

fe

ed

sys

tem

XC

3.2

4 -

Wir

e f

ee

d s

pe

ed

XC

3.2

5 -

Wir

e li

ne

rs/c

on

du

its c

lea

nin

g a

nd

re

pla

cin

gX

C3

.26

- D

rive

ro

ll ch

an

ge

sX

C3

.27

- W

ire

gu

ide

tu

be

XC

3.2

8 -

Wir

e d

ere

ale

rsX

C3

.29

- W

ire

bra

ke a

dju

stm

en

tX

C3

.30

- W

ire

cle

an

ers

/wip

ers

XC

3.3

1 -

Co

nta

ct t

ip t

o w

ork

dis

tan

ceX

C3

.32

- W

ire

po

sitio

n t

o la

ser

foca

l po

int

X

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 39: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s N

d Y

AG

(L

BW

)C

O2

(L

BW

)D

IOD

E

(LB

W)

Wit

h W

ire

F

ee

d

Sy

ste

m

PR

OC

ES

S T

AB

LE

C-

La

se

r W

eld

ing

Pro

ce

ss

es

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

Be

am

De

liv

ery

C3

.33

Dir

ect

XX

C3

.34

Fib

er

XX

XC

3.3

5 -

Fib

er

dia

me

ter

XX

C3

.36

- F

ibe

r le

ng

ths

XX

C3

.37

- B

en

d r

ad

ius

XX

C3

.38

- C

on

diti

on

of

fibe

rX

X

C3

.39

- F

ibe

r e

nd

s (c

on

diti

on

of

fibe

r e

nd

s)X

X

C3

.40

- F

ibe

r e

nd

co

olin

gX

X

C3

.41

Mir

ror

XX

C3

.42

- P

ow

er

loss

th

ou

gh

th

e d

eliv

ery

sys

tem

XX

C3

.43

- A

lign

me

nt

XX

C3

.44

- C

lea

nlin

ess

XX

C3

.45

- C

oa

ting

s o

f m

irro

rX

XC

3.4

6 -

Mir

ror

typ

eX

XC

3.4

7 -

Op

tic a

nd

mir

ror

coo

ling

XX

Pro

ce

ss

Va

ria

ble

sC

3.4

8S

hie

ldin

g g

as

typ

e -

flo

w r

ate

XX

XX

C3

.49

We

ld t

rave

l sp

ee

d c

on

tro

l (ra

te o

f ch

an

ge

, a

nd

ve

loci

ty

con

tro

l)X

X

XX

C3

.50

Po

we

r O

utp

ut

Co

ntr

ol

XX

XX

C3

.51

Po

we

r ra

mp

ing

/pro

gra

m (

sta

rt,

we

ld,

en

d)

XX

XX

C3

.52

Po

we

r a

t th

e w

ork

pie

ceX

XX

X X X X X X X

- 38 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 40: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 39 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s N

d Y

AG

(L

BW

)C

O2

(L

BW

)D

IOD

E

(LB

W)

Wit

h W

ire

F

ee

d

Sy

ste

m

PR

OC

ES

S T

AB

LE

C-

La

se

r W

eld

ing

Pro

ce

ss

es

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

C3

.53

Off

set

of

be

am

to

join

tX

XX

XC

3.5

4C

on

tinu

ou

s w

ave

XX

XX

C3

.55

Pu

lsa

tion

XX

XX

C3

.56

An

gle

of

Inci

de

nce

XX

XX

C3

.57

Fo

cus

po

int

XX

XX

C3

.58

Dir

ect

ion

of

we

ldin

g (

tra

ilin

g o

r le

ad

)X

XX

XC

3.5

9B

ea

m q

ua

lity

bu

rn-i

nX

XX

XC

3.6

0P

ow

er

ou

tpu

t co

ntr

ol c

alib

ratio

nX

XX

XC

3.6

1P

lasm

a s

up

pre

ssio

nX

XC

3.6

2 -

Mo

nito

rin

g B

ack

sca

tte

r fo

r co

ntr

ol p

roce

ss

Fix

ture

s/P

art

C3

.63

- S

tab

ility

an

d/o

r vi

bra

tion

iso

latio

nX

XX

XC

3.6

4 -

Art

icu

latio

n s

yste

m (

smo

oth

ne

ss o

f m

otio

n a

nd

acc

ura

cy)

XX

XX

C3

.65

Pa

rt f

it u

pC

3.6

6S

ea

m t

rack

ing

C3

.67

Ed

ge

co

nd

itio

nC

3.6

8C

oa

ting

s

Wh

at

are

yo

ur

pro

ced

ure

s fo

r co

ntr

olli

ng

:

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 41: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

4.0

1.7

, 1

.8 W

eld

ing

sp

ec

ific

es

se

nti

al

va

ria

ble

s w

hic

h s

ha

ll b

e

ad

dre

ss

ed

in

th

e F

ME

A,

co

ntr

ol

pla

n a

nd

we

ldin

g

pro

ce

du

res

D4

.1T

ole

ran

ces

on

axi

al a

lign

me

nt

XX

XD

4.2

Fa

yin

g s

urf

ace

are

aX

XX

D4

.3F

ayi

ng

su

rfa

ce c

lea

nlin

ess

XX

XD

4.4

Initi

al s

pin

da

l sp

ee

dX

XX

D4

.5W

eld

ing

sp

ind

al s

pe

ed

XD

4.6

Sp

ind

al t

orq

ue

- t

o n

ot

da

ma

ge

eq

uip

me

nt

XX

XD

4.7

Fly

wh

ee

ls;

tota

l mo

me

nt

of

ine

rtia

X

D4

.8S

pin

dle

cla

mp

pre

ssu

reX

XX

D4

.9F

ixtu

re c

lam

p p

ress

ure

XX

XD

4.1

0P

art

stic

kou

t X

X

Pre

he

at

(Fir

st

fric

tio

n p

ha

se

) if

ne

ed

ed

D4

.11

-Pro

ject

ion

on

fa

yin

g s

urf

ace

X1

X1

D4

.12

-Pre

he

at

forc

eX

1X

1

D4

.13

-Pre

he

at

time

or

RP

MX

1X

1

D4

.14

Pre

he

at

bu

rno

ff le

ng

th-a

mo

un

t o

f d

ime

nsi

on

loss

du

rin

g

pre

he

at

X1

XX

We

ld H

ea

t (S

ec

on

d f

ric

tio

n p

ha

se

)

D4

.15

-Fri

ctio

n w

eld

fo

rce

XX

D4

.16

-Fri

ctio

n s

pe

ed

at

wh

ich

fo

rgin

g b

eg

ins

XX

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

- 40 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 42: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 41 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

Fo

rgin

g S

tag

eD

4.1

7-F

org

ing

sp

ee

dX

XD

4.1

8-F

org

e f

orc

eX

XD

4.1

9-F

org

e t

ime

XD

4.2

0-F

org

e le

ng

th if

lim

ited

up

set

is u

sed

XD

4.2

1-F

org

e d

ela

yX

D4

.22

-Up

set

dis

tan

ceX

D4

.23

-Up

set

rem

ova

l / m

an

ag

em

en

tX

XD

4.2

4-U

pse

t h

old

tim

eX

XD

4.2

5-U

pse

t ra

teX

XD

4.2

6-F

rict

ion

up

set

dis

tan

ce a

nd

tim

eX

D4

.27

Bra

ke s

ett

ing

or

sto

pp

ing

tim

e d

ime

nsi

on

s a

nd

to

lere

nce

sX

D4

.28

Bra

ke f

orc

eX

D4

.29

Bra

ke d

ela

y p

rio

r to

up

set

XD

4.3

0F

ina

l po

sitio

nX

D4

.31

Po

stw

eld

he

at

tre

atm

en

t if

ne

ed

ed

ba

sed

on

ma

teri

als

join

ed

D4

.32

Pro

tect

ive

atm

osp

he

re if

ne

cess

ary

fo

r th

e b

ase

ma

teri

al

D4

.33

To

tal b

urn

off

-am

ou

nt

of

dim

en

sio

n lo

ss d

uri

ng

to

tal p

roce

ssX

XX

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 43: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

FS

WD

4.3

4P

rim

ary

co

ntr

ol (

po

sitio

n o

r fo

rce

)X

D4

.35

To

ol t

o w

eld

join

t a

lign

me

nt

du

rin

g le

ng

th o

f tr

ave

lX

To

ol

D4

.36

-Pin

to

sh

ou

lde

r ra

tioX

D4

.37

-Pin

len

gth

XD

4.3

8-I

ncl

ud

ed

an

gle

fo

r p

inX

D4

.39

-In

clu

de

d a

ng

le f

or

sho

uld

er

XD

4.4

0-T

hre

ad

on

pin

su

rfa

ceX

D4

.41

-Pin

ma

teri

al

X

Plu

ng

e P

rac

tic

e

D4

.42

-Sp

ee

d o

f p

lun

ge

XD

4.4

3-S

pin

da

l sp

ee

d d

uri

ng

plu

ng

eX

D4

.44

-Pre

he

at

dw

ell

time

aft

er

plu

ng

eX

D4

.45

-Plu

ng

e f

orc

eX

We

ld

D4

.46

-We

ld f

orc

eX

D4

.47

-Tra

vel s

pe

ed

XD

4.4

8-T

oo

l tilt

an

gle

XD

4.4

9-W

eld

sp

ind

al s

pe

ed

X

We

ld t

erm

ina

tio

nD

4.5

0-E

xit

mo

tion

of

too

l su

ch a

s til

t a

ng

le r

ota

tion

XD

4.5

1-S

pin

da

l sp

ee

d a

t to

ol e

xtra

ctio

nX

D4

.52

-Dw

ell

at

en

d o

f tr

ave

lX

- 42 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 44: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 43 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

FB

W R

BW

D4

.53

Ele

ctro

de

de

sig

n-e

limin

ate

die

bu

rns

XX

D4

.54

Ele

ctro

de

/Die

cle

an

line

ssX

XD

4.5

5E

lect

rod

e/D

ie c

lam

pin

g p

ress

ure

XX

D4

.56

Pa

rt c

lea

nlin

ess

an

d s

cale

re

mo

val

XX

D4

.57

Pa

rt a

lign

me

nt

XX

D4

.58

Join

t g

eo

me

try

pre

po

ratio

nX

XD

4.5

9In

itia

l ma

rtia

l stic

kou

t o

r e

xte

nsi

on

be

yon

d e

lect

rod

es

XX

Pre

he

at

D4

.60

-Pre

he

at

forc

eX

XD

4.6

1-T

ap

se

lect

ion

XX

D4

.62

-Pe

rce

nt

he

at

XX

D4

.63

-Off

tim

e d

uri

ng

initi

al d

ie o

pe

nin

gX

Init

ial

Fla

sh

ing

D

4.6

4-I

niti

al d

ie o

pe

nin

gX

D4

.65

-In

itia

l fla

shin

g r

ate

XD

4.6

6-T

ype

of

pla

tte

n m

ove

me

nt

(lin

ea

r o

r p

ara

bo

lic)

XD

4.6

7-V

olta

ge

XD

4.6

8-I

niti

al f

lash

ing

dis

tan

ce o

r tim

eX

D4

.69

-Pe

rce

nt

he

at

XD

4.7

0-T

ap

se

lect

ion

X

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 45: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

Fla

sh

ing

D4

.71

-Fla

shin

g r

ate

XD

4.7

2-T

ype

of

pla

tte

n m

ove

me

nt

(lin

ea

r o

r p

ara

bo

lic)

XD

4.7

3-V

olta

ge

XD

4.7

4-F

lash

ing

dis

tan

ce o

r tim

eX

D4

.75

-Pe

rce

nt

he

at

XD

4.7

6-T

ap

se

lect

ion

X

We

ld S

tag

e 1

D4

.77

-Pe

rce

nt

he

at

XD

4.7

8-T

ap

se

lect

ion

vo

ltag

eX

D4

.79

-Fo

rce

XD

4.8

0-P

uls

atio

n (

on

, o

ff a

nd

nu

mb

er

of

pu

lse

s)X

D4

.81

-Off

tim

e b

efo

re s

tag

e c

ha

ng

eX

We

ld S

tag

e 2

(c

an

be

mu

ltip

le s

tag

es

wit

h d

iffe

ren

t p

ara

me

ters

)D

4.8

2-P

erc

en

t h

ea

tX

D4

.83

-Ta

p s

ele

ctio

n v

olta

ge

XD

4.8

4-F

orc

eX

D4

.85

-Pu

lsa

tion

(o

n,

off

an

d n

um

be

r o

f p

uls

es)

X

- 44 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 46: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 45 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

Fo

rge

/Up

se

tD

4.8

6-F

org

e r

ate

XX

D4

.87

-Fo

rge

fo

rce

XX

D4

.88

-Fo

rge

dis

tan

ce /

to

tal u

pse

tX

XD

4.8

9-U

pse

t tim

eX

XD

4.9

0-U

pse

t cu

rre

nt

XX

D4

.91

-Fla

shin

g v

olta

ge

cu

t o

ffX

D4

.92

-Fla

shin

g r

em

ova

l / m

an

ag

em

en

tX

X

Po

st

we

ld h

ea

t tr

ea

tme

nt

if n

ee

de

dD

4.9

3-H

ea

t tr

ea

tme

nt

cla

mp

ing

dis

tan

ceD

4.9

4-Q

ue

nch

tim

eD

4.9

5-T

ap

se

lect

ion

D4

.96

-Pre

cen

t h

ea

tD

4.9

7-T

em

pe

r tim

eD

4.9

8F

ina

l die

op

en

ing

XX

Ult

ras

on

ic M

eta

l w

eld

D4

.99

Ta

p s

ele

ctio

n /

d

esi

gn

of

rib

bo

n s

tru

ctu

reD

4.1

00

Fre

qu

en

cy o

f p

ow

er

sup

ply

fo

r a

pp

lica

tion

(4

0/3

0/2

0kH

z)D

4.1

01

Fix

ture

& p

art

de

sig

n w

ith m

ax

dim

en

sio

n d

evi

atio

n a

nd

ma

teri

al s

pe

cs

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 47: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

W

eld

ing

(U

W)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

Up

se

t a

nd

Mo

nit

ori

ng

(w

ind

ow

ing

)D

4.1

02

We

ldin

g-E

ne

rgy

XD

4.1

03

We

ldin

g-T

ime

XD

4.1

04

We

ldin

g-A

mp

litu

de

XD

4.1

05

We

ldin

g-F

orc

eX

D4

.10

6W

eld

ing

-Cu

rre

nt

XD

4.1

07

We

ldin

g p

re H

eig

ht

an

d t

rave

l (co

mp

act

ion

)X

D4

.10

8E

ne

rgy

with

he

igh

t co

mp

en

satio

nX

D4

.10

9W

eld

He

ad

Co

olin

gD

4.1

10

En

viro

nm

en

tal c

on

diti

on

s co

ntr

ol (

i.e.,

te

mp

era

ture

, h

um

idity

, d

ust

, e

tc.)

D4

.11

1T

AP

/Die

cle

an

line

ssD

4.1

12

TA

P/D

ie c

lam

pin

g p

ress

ure

D4

.11

3P

art

cle

an

line

ss a

nd

sca

le r

em

ova

lD

4.1

14

Pa

rt a

lign

me

nt

x1:

If r

eq

uir

ed

to

ach

ieve

he

at

ba

lan

ce.

Exa

mp

le t

hin

pa

rt t

o t

hic

k p

art

or

vari

ou

s h

ard

ne

sse

s.

- 46 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 48: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 47 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

Ite

m #

Re

late

d W

SA

Q

ue

sti

on

#C

ate

go

ry/P

roc

es

s S

tep

s

Ine

rtia

F

ric

tio

n

We

ldin

g

(FR

W-I

)

Dir

ec

t D

riv

e

Fri

cti

on

W

eld

ing

(F

RW

-DD

)

Fri

cti

on

S

tir

We

ldin

g

(FS

W)

Fla

sh

Bu

tt

We

ldin

g

(FW

)

Re

sis

tan

ce

B

utt

We

ldin

g

(UW

)

Ult

ras

on

ic

We

ldin

g

All

co

ntr

ol

of

va

ria

ble

s g

ive

n b

elo

w a

re s

ub

ord

ina

te t

o c

us

tom

er

sp

ec

ific

re

qu

ire

me

nts

.

Th

e c

us

tom

er

ma

y h

av

e a

dd

itio

na

l re

qu

ire

me

nts

, e

.g.,

in

sp

ec

tio

n t

es

tin

g,

gre

ate

r fr

eq

ue

nc

ies

, e

tc.

Wh

en

pe

rfo

rmin

g t

he

jo

b a

ud

it,

the

au

dit

or

sh

all

ve

rify

we

ldin

g i

s c

on

form

ing

to

th

e c

us

tom

er'

s r

eq

uir

em

en

ts.

Da

sh

es

be

low

in

dic

ate

"n

ot

ap

pli

ca

ble

".

X i

nd

ica

tes

an

es

se

nti

al

va

ria

ble

wh

ich

sh

all

be

do

cu

me

nte

d a

nd

co

ntr

oll

ed

. i

nd

ica

tes

th

at

pro

ce

du

re s

ho

uld

be

re

vie

we

d a

nd

do

cu

me

nte

d w

he

n n

ec

es

sa

ry.

PR

OC

ES

S T

AB

LE

D -

So

lid

Sta

te W

eld

ing

Pro

ce

ss

es

Up

se

t a

nd

Mo

nit

ori

ng

(w

ind

ow

ing

)D

4.1

13

We

ldin

g-E

ne

rgy

XD

4.1

14

We

ldin

g-T

ime

XD

4.1

15

We

ldin

g-A

mp

litu

de

XD

4.1

16

We

ldin

g-F

orc

eX

D4

.11

7W

eld

ing

-Cu

rre

nt

XD

4.1

18

We

ldin

g p

re H

eig

ht

an

d t

rave

l (co

mp

act

ion

)X

D4

.11

9E

ne

rgy

with

he

igh

t co

mp

en

satio

nX

D4

.12

0W

eld

He

ad

Co

olin

gD

4.1

21

En

viro

nm

en

tal c

on

diti

on

s co

ntr

ol (

i.e.,

te

mp

era

ture

, h

um

idity

, d

ust

, e

tc.)

D4

.12

2T

AP

/Die

cle

an

line

ssD

4.1

23

TA

P/D

ie c

lam

pin

g p

ress

ure

D4

.12

4P

art

cle

an

line

ss a

nd

sca

le r

em

ova

lD

4.1

25

Pa

rt a

lign

me

nt

x1 : If

re

qu

ire

d t

o a

chie

ve h

ea

t b

ala

nce

. E

xam

ple

th

in p

art

to

th

ick

pa

rt o

r va

rio

us

ha

rdn

ess

es.

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 49: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 48 -

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 50: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 49 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

GLOSSARY

See also AWS A3.0: welding terms and definitions

AIAG – Automotive Industry Action Group

AWS American Welding Society

ANSI American National Standard Institute

Capability – The total range of inherent variation in a stable process.

Control Plans – Written descriptions of the system for controlling processes for production of parts or bulk materials. Control Plans are written by organizations to address the important characteristics and engineering requirements of the product. Each part must have a Control Plan, but in many cases, “family” Control Plans can apply to a number of parts produced using a common process.

Critical Spare Parts List – A list of service parts critical for the operation of equipment. Extended delay in obtaining spare parts would result in unacceptable delays in the welding operation.

Cross-Functional Team – A team of employees that represent the different functions within an organization. The team will typically consist of an operator, line supervision, process engineer, metallurgist, and quality personnel.

Customer – The recipient of the organization's or supplier’s product or service.

Customer Requirements – This term refers to the requirements or specifications from the original equipment manufacturer (typically the automobile company). These may be identified in the contract or purchase order, in engineering standards, part specifications, etc.

Inter-Lock – A method of preventing missed steps within the operations by putting controls on how an operation can be performed in order to force the correct completion of the operation.

Nonconforming Product – Product that does not conform to the customer requirements.

Process Tables – Tables in the WSA that list the required process controls for the welding processes covered. These tables contain minimum requirements.

Reprocessing – Any process that is performed on nonconforming product so that it will meet the specified requirements.

Responsibility Matrix – A responsibility matrix defines the designated personnel for all key functions. This matrix includes the primary and secondary designees.

Robust – A stable predictive outcome regardless of variation within operating window; able to withstand its environment, not prone to failure.

SAE International – Society of Automotive Engineers International

Shop Traveler – A document usually created in the receiving department for each batch or lot of parts received. The document defines the process routing of the parts.

Special Characteristics – are product characteristics or manufacturing process parameters which can affect safety or compliance with regulations, fit, function, performance or subsequent processing of product. Refer to customer-specific requirements.

WSA - Welding System Assessment

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 51: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

CQI-15 Special Process: Welding System Assessment Version 1 Issued 3/10

- 50 -

Work Instructions – Instructions that describe work conducted in one function in a company, e.g., setup, inspection, welding operation, process parameter tolerances, etc. The term “work instructions” is synonymous with the term “job instructions.”

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only

Page 52: Publication Code (Arial, Bold, 40 pt.) - erp.mjmetal.comerp.mjmetal.com/Download/MJN/133027331.pdf · Special Process: Welding System Assessment CQI-15 Publication Code (Arial, Bold,

- 51 -

CQI-15Special Process: Welding System Assessment

Version 1 Issued 3/10

MAINTENANCE REQUEST FORM

Name of Submitter: Date:

Company:

Company Address:

Phone: Fax: E-mail:

MAINTENANCE REQUEST

Page Number of Change:

Document Currently Reads:

Recommended Changes/Should Read:

Reason for Change (Use additional sheets if necessary):

Signature of Submitter:

DISPOSITION (AIAG USE ONLY)

Manager’s Recommendation:

Final Disposition:

Comments:

Note: Complete form and return to the AIAG Publication Specialist for consideration. Automotive Industry Action Group • 26200 Lahser Road • Suite 200 • Southfield, MI 48033

Telephone: (248) 358-3570 • Fax: (248) 358-3253 Web: www.aiag.org

Propert

y of G

enera

l Moto

rs Corp

oratio

n

Intern

al Use

Only