1
KANDY CITY WASTEWATER MANAGEMENT PROJECT PACKAGE-1 ( RSC-C/TP/JICA/KCWMP/2010/01) (Proposed site for Wastewater Treatment Plant) NO UNAUTHORISED ENTRY and NO DUMPING ALLOWED Employer:- Naonal Water Supply and Drainage Board Getambe, Peradeniya. Tel- +94 81 2384717 Engineer:- Nihon Suido Consultants Co. Ltd No. 28, Primrose Road, Mulgampola, Kandy. Tel- +94 81 2234378 Contractor:- JFE Engineering Corporaon No.7, Thissarama Mw. , Dangolla, Kandy City. Tel- +94 81 2065513

Publication 1 for you

Embed Size (px)

DESCRIPTION

Publication 1

Citation preview

  • KANDY CITY WASTEWATER MANAGEMENT PROJECT

    PACKAGE-1 ( RSC-C/TP/JICA/KCWMP/2010/01)

    (Proposed site for Wastewater Treatment Plant)

    NO UNAUTHORISED ENTRY and NO DUMPING ALLOWED

    Employer:-

    National Water Supply and Drainage Board Getambe, Peradeniya. Tel- +94 81 2384717

    Engineer:-

    Nihon Suido Consultants Co. Ltd No. 28, Primrose Road, Mulgampola, Kandy. Tel- +94 81 2234378

    Contractor:- JFE Engineering Corporation No.7, Thissarama Mw. , Dangolla, Kandy City. Tel- +94 81 2065513