12
Public Works Department Strategic Plan 2012

Public Works Department Strategic Plan 2012

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Public Works Department

Strategic Plan

2012

2

City of Gainesville’s Vision Statement

The City of Gainesville will set the standard of excellence for a top ten mid-sized American city

recognized nationally as an innovative provider of high quality cost effective services.

Department Vision Statement

To provide innovative and cost effective services to sustain Gainesville as a model community.

Department Mission Statement

Manage the city’s transportation, stormwater, and solid waste systems to enhance the quality of life for the Gainesville Community.

Department Value Statements

Diversity – we recognize and embrace the community’s diversity to achieve our vision. Integrity – our actions demonstrate honesty, trustworthiness and reliability. Responsibility – we will provide effective and sustainable stewardship of the community’s

assets and resources. Environment – we promote and protect the environment in the delivery of our services. Community Satisfaction – we will provide professional, reliable and courteous services in achieving our vision. Teamwork – we will work together to achieve our vision.

3

Goals and Objectives

City Goals City Objectives City Initiative Dept Goals Dept Objectives Performance Measures

FY 2012 Targets

Infrastructure and Transportation

Invest in community infrastructure and continue to enhance the transportation

network and systems

Support the reconstruction of transportation

facilities to encourage

redevelopment of 6th Street

Provide transportation

choices

Complete Phase 3 of 6th Street Rail Trail

Complete construction by May 2012

May 2012

Complete trail connections to

Porters neighborhood

Complete construction by February 2012

February 2012

Complete SW 6th Street, SW 4

Avenue to University Avenue

Begin design phase by March 2012

March 2012

Complete SW 6 Street, SW 16th Avenue to 4th

Avenue

Obtain funding On-going

Support the reconstruction of transportation

facilities to encourage

redevelopment of Depot Avenue

Complete Depot Avenue, Segments 1,

2, 4 and Roundabout at Main Street

Begin construction following right of way acquisition in Spring

2013

Bring existing roadway stock up

to 70% rating level, as established by

the Army Corp of Engineers

Maintain transportation infrastructure

through preservation of

pavement condition

Preserve pavement condition

Finalize existing pavement inspection and develop short and long-

range work plans to bring city-maintained roadways

up to an overall 70% rating level by January

2012

January 2012

Present the cost of both plans for consideration in the FY 2013 Budget and

CIP by April 2012

April 2012

Increase pavement condition by maintaining a minimum of 55,000 square yards per year

55,000

Protect the City’s investment in its infrastructure

Enhance Safety of Traffic Signs and

Markings

Increase compliance with retro-reflectivity standards

for traffic signs by replacing 450 low

reflective traffic control signs per year

450

Increase long-line pavement markings

maintenance by repainting 37,000 linear feet of long-

line per year

37,000

4

City Goals City Objectives City Initiative Dept Goals Dept Objectives Performance Measures

FY 2012 Targets

Environment and Energy

Protect and sustain our natural environment and address future energy needs

Protect the environment

Enhance recycling efforts

Increase tonnage of recyclable (non-vegetative)

materials collected to 15,000 tons per year from residential and commercial

uses

15,000

Reduce residential waste disposal

Reduce the average tonnage of residential

disposal per household per year to 0.68

0.68

Enhance water quality of the natural

environment

Construct 1 water quality project per year

1

Reduce kWh’s used in departmental

operations

Coordinate with GRU to ensure the traffic signals

LED conversion cost savings are realized

May 2012

Reduce total fuel consumption in department fleet

Reduce gallons of gasoline and diesel used by 1%

1%

Reduce congestion, delay, fuel

consumption & carbon emissions

Retime 3 corridors via the TMS to improve traffic

flow

3

Increase number of incidents managed with the TMS by 12 each year

12

Neighborhoods Improve the quality of life in our

neighborhoods for the benefit of all residents

Assess neighborhoods to determine need for

infrastructure improvements for

bicycle and pedestrian use

Provide Transportation

Choices

Expand transportation infrastructure

Determine feasibility and prioritization of sidewalk segments for construction

by June 2012

June 2012

Identify off-road multi-use trail opportunities focused

on connecting neighborhood to neighborhood

On-going

Increase bicycle/pedestrian network by one mile per

year

1

Enhance mobility Increase ADA accessibility by adding 30 new curb ramps per year

30

Enhance the Community Appearance

Streets cleaned of debris

Increase in miles of streets swept each year to ensure a minimum of 18,000 miles

of curb line are swept

18,000

Well maintained Rights-of-way

Increase in miles of roadway litter picked up to ensure a minimum of

375 miles

375

Increase in acres of right of way maintained by

mowing a minimum of 1,500 acres

1,500

5

City Goals City Objectives City Initiative Dept Goals Dept Objectives Performance Measures

FY 2012 Targets

Economic Development and Redevelopment

Foster economic development and

encourage redevelopment

Continue implementation of

the Strategic Redevelopment Plan for Depot Park and the Power District

Complete remediation and

development of the stormwater park

Complete the arsenic remediation for the site

and stormwater facilities by September 2012

September 2012

Continue transparent, efficient and

consistent regulation of land development in furtherance of the comprehensive plan

Enhance Responsiveness

Enhance responsiveness in

Development Review

Development applications reviewed and reports

submitted to Planning within deadlines

100%

Governance Measure and improve the cost-effectiveness of government services

Improve communication

through increased use of available internet tools to

improve the City’s website portals

Improve communication

with public

Improve communication of information to the

public through use of website and social

media

Update the department webpages to ensure

information is up to date and relevant by reviewing

quarterly

4

Update the department Facebook page with relevant information

monthly

12

Increase public outreach and

accessibility of public works services to the

public

Increase number of public outreach efforts to ensure a

minimum of 24 events each year

24

Ensure effective delivery of public works services

Increase preventative maintenance of the traffic signals to

reduce malfunctions and increase safety

Conduct a minimum of 40 preventative

maintenance calls per year

40

Reduce number of signal malfunction calls to 500

per year

500

Respond to 98% of the signal malfunction calls

within one hour of notification

98%

Ensure parking needs are met and spaces are used as

allocated

Increase the percent of maximum potential

parking meter revenue received by 10% each year

– target 35%

35%

Maximize available parking in Downtown

Increase in number of Overtime sign, Expired

Meter and Loading Zone violation citations

5% each

Increase daytime parking garage occupancy rate by 10% each year – target

25%

25%

Streetlight requests are resolved in timely

manner

Respond to 95% customer requests within 2 business

days

95%

Accurate floodzone information is

Respond to 95% customer requests for floodzone

95%

6

City Goals City Objectives City Initiative Dept Goals Dept Objectives Performance Measures

FY 2012 Targets

provided to customers information within 2 business days

Ensure SMU billing for new

construction is timely set-up

Data is submitted to GRU within 2 business

days of receipt of notification 95%

95%

Provide quality solid waste

management services to the community

Solid waste collection is provided each

week

Limit number of missed pick-ups to less than 5%

of the customer base

5%

Provide effective, efficient, safe and environmentally

sensitive mosquito control services

Ensure timely response to mosquito control complaints

Respond to 90% calls within 2 working days during non-outbreak

conditions

90%

Department Accomplishments – FY 2010/2011

The Public Works Administration Building and Traffic Management Center opened in September 2010.

Developed two year budget for FY 11 and FY 12. Completed multiple major construction projects including Duval Stormwater Park, Pinkoson

Pond, SW 2 Avenue/6th Street Roundabout, SW 23 Terrace/35 Place Roundabout, NE 19 Terrace/20th Street reconstruction and phases 1 and 2 of the 6th Street Rail Trail, Rosewood Trash Trap, Traffic Signal Indicators 100% LED, Depot Avenue, Segment 3, Design-Build three traffic signals, Pilot LED Streetlights installed, Main Street, Stephen Foster neighborhood Speed Table conversions.

Reorganized to assume responsibility for maintenance of the urban tree canopy. Successfully implemented the paper leaf bag program. Implemented transit service from UF Campus to Gainesville Regional Airport. Implemented pre-paid program for Santa Fe College. Expanded the Operations Division Safety Team to function as a department-wide PW Safety

Team. Implemented the Progression through Training Programs for Maintenance Workers and

Equipment Operators. Developed a three-year pavement management program. Evaluated the Mosquito Control program to ensure efficient, responsive management of the

program. Purchased and implemented new parking citation equipment. Presented the CRA Parking Study recommendations to the City Commission for

consideration. Implemented a pilot program for solar powered refuse containers at 5 transit stops. Developed an MUTCD compliance plan. Developed an ADA compliance plan. Updated Commercial Mandatory Recycling Ordinance to provide effective enforcement

tools. Established a Project Management Office.

7

Department Objectives 1 – 5 years Department-wide

Achieve Re-Accreditation through American Public Works Association.

Dealing with the budget reductions in such a manner as to ensure continued delivery of effective critical services.

Development of a plan for the utilization of social media tools to better understand how public works services are being perceived by the public.

Utilize individual employee development/training plans for budgeting travel/training budgets.

Development and implementation of a department wide Work Management System to track and manage work and infrastructure maintenance; including automation of data entry from field.

Develop funding plan for the replacement of metal buildings and sheds for the PW Center.

Secure funding for sidewalk and ADA ramp expansion program. Administration

Develop appropriate monthly monitoring and projection reports of revenues and expenditures of the enterprise funds to ensure proper long term health of the stormwater utility and solid waste enterprise operations.

Develop monthly monitoring reports for the streetlights, traffic signals, and utility usages to provide the division managers the information needed to manage the energy consumption of their operations.

Complete the development and implementation of the Records Management System including digitization of maps and plans.

Engineering/Environmental Management

Develop a stormwater management master plan that identifies the project needs associated with meeting requirements of NPDES, TMDL, Nutrient and hydraulic/hydrologic improvements and the revenue streams available to provide necessary funding.

Complete inventory of all stormwater ponds and design characteristics and maintenance/operation requirements.

Complete QA on stormwater pipe inventory.

Complete the Depot Stormwater Park.

Monitor the Duck Pond aquatic plant project.

Complete the Paynes Prairie Sweetwater Branch Wetlands Treatment project.

Provide dedicated in-house expertise to develop an effective stormwater management operation and maintenance program.

Fully utilize the APPIA software for project management/bidding/inspections.

Fully implement project management protocols for all projects to ensure projects are delivered on-schedule.

Depot Park Maintenance and Operation Plan must be ready and funded for implementation in FY 13.

8

Paynes Prairie Maintenance and Operation Plan must be ready and funded for implementation in FY 14.

Develop an action plan to increase CRS Rating for the next audit.

Monitor NPDES Permit program to ensure compliance and renewal.

Incorporate Low Impact Development concepts into all PW projects.

Update the design manual to include sustainability considerations along with residential traffic calming designs for new roadways, providing clear design goals and minimum standards related to stormwater management facilities to address issues of erosion/sediment controls and trash collection, and other various pavement and drainage design options to address seasonal high ground water conditions.

Coordinate capital projects associated with large land development proposals, particularly in southwest Gainesville, to ensure adequate provision of infrastructure and services.

Operations

Develop a fully funded multi-year pavement management program that maintains the overall pavement condition of the city‟s street network.

Monitor the streetsweeper program to evaluate cost of the routing that has been implemented to minimize conflicts with solid waste collection service.

Acquire equipment needed for the construction crew – zipper and brush.

Acquire equipment needed for the new Materials Storage Facility – loader, screener.

Develop a clean-up plan for the old Materials Storage Facility.

Develop budget needs plan for assuming maintenance/operation responsibilities for the CRA and FDOT projects.

Evaluate the right-of-way maintenance program to ensure effective operations aimed to enhance the community‟s appearance.

Planning

Coordination with MTPO staff in the Long Range Transportation Plan Update process to ensure the City‟s Transportation Strategies are appropriately identified.

Develop Citywide Sidewalk and Multi-Use Trail Construction Prioritization Plan.

Develop a strategy for implementing the Traffic/Pedestrian Safety Program through crash analyses.

Develop GIS mapping inventories for all public works infrastructure including trees, signal equipment.

Deploy the GIS Enterprise for public use.

Develop department protocols to ensure the as-built data for city projects and privately developed public infrastructure is captured for integration into GIS database.

Coordinate with Planning & Development Services Department through the update of the City‟s Land Development Code to ensure protection of the City‟s infrastructure.

Implement a grants program that accounts for all stages from identification of new opportunities to compliance post-award.

9

Solid Waste Management

Develop management plan for the tire removal from the Closed Airport Landfill site.

Work with Alachua County in the development of a plan to capture commercial solid waste stream in a manner that is compatible with the needs of the City of Gainesville.

Further develop partnership with Alachua County to ensure effective and sustainable solid waste management practices into the future.

Review of all ordinances to provide more incentive to increase recycling and reduce solid waste at the source.

Provide public recycling everywhere the City provides public trash containers.

Pursue Organics Recycling program.

Pursue mandatory C&D recycling. Transportation

Implement use of Transit Signal Priority along a state highway corridor such as Archer Road.

Develop a budget plan for current unfunded maintenance requirements such as painting of mast arm signals and brick-textured crosswalks.

Complete the TMS project.

Develop strategy to implement the TMS along the I-75 Corridor through Alachua County.

Explore partnerships to expand the TMS regionally.

Market the SW Parking Garage to maximize day-time use.

Ensure efficiency for both day-time and night-time operations.

Develop a written daily maintenance, operation plan as well as a long-range plan for the parking garage infrastructure and operating systems.

Continue discussions regarding the Downtown Parking Study recommendations as directed by the City Commission.

Replace parking garage access equipment.

Complete the Transit Fleet Maintenance Facility Expansion

10

Department Challenges – 5 to 10 Years

With aging infrastructure and funding shortfalls, it is critical that we:

concentrate on services that are most vital;

review our operations to ensure we effectively manage and prioritize resources;

explore opportunities to use better technology to deliver these services.

Achieve 75% recycling goal by 2020.

Achieve compliance with MUTCD by 2018.

Fully fund infrastructure maintenance/operation/replacement.

Develop an effective staffing succession plan in place to deal with the retiring workforce.

Ensure we are keeping up with technological advances in our traffic management system.

Develop Bus Rapid Transit system

Develop a sustainable fleet replacement program Carbon Reduction Strategies

LED Traffic Lights The traffic signals are now 100% LED„s total of 8,279 indicators for an estimated reduction of 1,345 metric tons of CO2, 75,419 millions of Btu and 6,930 MWh saved each year for a total estimated cost savings of $299,000.

Outdoor Lighting: Establishing a pilot study to utilize energy efficient lighting such as LED‟s for all outdoor public lighting including streetlights, pedestrian lights and parking lot lights. Pilot includes 24 traditional, globe style pedestrian fixtures along SE 1 Street in Downtown. Meter readings are being taken monthly to evaluate reductions in kWh usage.

Traffic Management System: According to the 2007 National Traffic Signal Report Card, an appropriately designed, located, operated and maintained traffic signal system can:

o Reduce travel delays between 15 and 40 percent (reduction in travel time up to 25 percent and reductions in stops from 10 to 40 percent);

o Reduce emissions (carbon monoxide, nitrogen oxides and volatile organic compounds) up to 22 percent; and

o Reduce fuel consumption by up to 10 percent.

Based on 2005 data, there were there were 2,192,562 vehicle-miles traveled (VMT) on major roads, arterials and collectors, in the City of Gainesville alone. Assuming gasoline consumption to be an average of 12 miles/gallon per vehicle; the total consumption of gasoline in 2005 equals 182,714 gallons. Assuming a 10% reduction in fuel consumption there will be a corresponding reduction of 160 metric tons of CO2 per year. As of October 1, 2011, 187 intersections have been brought on-line. Travel delay studies have shown an average of 17 – 20% reduction in delay along the re-timed corridors.

Transportation Fuel

11

B-20 Bio-diesel fuel is being utilized on campus buses made available through funding from the University of Florida. 22 routes, close to 50 buses. It is estimated, based on the 2006 fuel usage of 859,756 gallons that the utilization of B-20 will result in approximately 1,510 metric tons of carbon dioxide equivalent reduction each year.

The City‟s Fleet Management plans to piggy back on this pilot project as their original plan is still on hold pending direction from GM with respect to their invitation for us to partner with them in a similar project for other vehicle types. This could result in an additional 404 metric tons of carbon dioxide equivalent reduction each year.

Fleet Reduction Effective Oct; 1st; 07 the City‟s General Government fleet was reduced by (14) vehicles and “take home” privilege was taken away from (20) employees. The fleet reduction creates a reduction in fuel usage by approximately 2,400 gallons/ year and the reduction in take home privilege reduces fuel usage by approximately 50,000 gallons/yr. This results in 460 metric tons of CO2 equivalent reduction each year.

In 2008, the department instituted an anti-idling practice.

Solid Waste According to EPA‟s Waste Reduction Model (WARM) for every ton of waste recycled instead of landfilled there is a corresponding reduction of 2.97 metric tons of carbon dioxide equivalent. There is approximately 5,600 tons of recyclable waste collected from non-residential properties in the city each year representing of 16,632 metric tons of CO2 each year. This represents a compliance rate of about 35% of the businesses. The City has used education rather than enforcement as a mechanism to increase compliance with mandatory commercial recycling. Providing focused education combined with enforcement our goal would be to increase participation by 10% each year. We estimate that this would result in a 10% increase in tonnage collected each year. This equates to an additional 3,417 tons resulting in an additional reduction of 10,148 metric tons of carbon dioxide over the five year period. Five solar powered waste containers were deployed for use at high usage transit stops for evaluation. Residential waste collection has gone to a 4-day/week collection cycle.

Transit Ridership FY 2011 – 9,987,346 FY 2010 - 9,415,672 FY 2009 - 9,015,643 FY 2008 - 9,084,368 FY 2007 – 8,939,334 FY 2006 - 8,648,370 FY 2005 – 8,152,989

12