06/2019 Page 1 PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY MAY 2009----April 22, 2011 still composing; August 2011; October 2011; December 2011; March 28, 2012; June 3, 2012; October 17, 2012; December 12, 2012; May 2, 2013: January 16, 2014; January 23, 2014; February 6, 2014; September 12, 2014; September 29, 2014; May 1, 2015; May 26, 2015; October 24, 2015; March 2, 2016; March 17, 2016; February 8, 2017; March 10, 2017; September 20, 2017; October 17, 2017; March 2018; June 2018;May 2019; ALPHABETICAL LISTING 1. Agency for Toxic Substances and Disease Registry National Exposure Registry Dioxin Subregistry Baseline and Follow Ups 1 and 2 Technical Report August 1996 (Public Viewing Document #56) 2. Air Quality Technical Reference Document Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri March 1997 (Public Viewing Document #22) 3. Barrett Heights Plat II Subdivision Annexation Plan City of Des Peres, MO June 8, 1998 (Public Viewing Document #92) 4. Biological Assessment Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO. September 1996 (Public Viewing Document #37) 5. Biological Assessment: Relocation of U.S. Army Chemical School and U.S. Army Military Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO. Jan. 1997 Submitted to U.S. Army Corps of Engineers Kansas City District Prepared by 3D/International, Inc. (Public Viewing Document #32) 5a. Bi-State Development Agency’s Accessibility Plan FY 1988 Prepared by The Marketing, Planning & Research Division (Public Viewing Document # 244) Location: H 6. Bi-State Development Agency Americans With Disabilities Act (ADA) Paratransit Service Plan FY 1996 ADA Plan Update Prepared by the Capital Budget and Grants Department (Public Viewing Document #54)

PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 1

PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY

MAY 2009----April 22, 2011 still composing; August 2011; October 2011; December 2011; March 28, 2012; June 3, 2012; October 17, 2012; December 12, 2012; May 2, 2013: January 16, 2014; January 23, 2014; February 6, 2014; September 12, 2014; September 29, 2014; May 1, 2015; May 26, 2015; October 24, 2015; March 2, 2016; March 17, 2016; February 8, 2017; March 10, 2017; September 20, 2017; October

17, 2017; March 2018; June 2018;May 2019; ALPHABETICAL LISTING

1. Agency for Toxic Substances and Disease Registry National Exposure Registry Dioxin Subregistry Baseline and Follow Ups 1 and 2 Technical Report August 1996 (Public Viewing Document #56) 2. Air Quality Technical Reference Document Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri March 1997 (Public Viewing Document #22) 3. Barrett Heights Plat II Subdivision Annexation Plan City of Des Peres, MO June 8, 1998 (Public Viewing Document #92) 4. Biological Assessment Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO. September 1996 (Public Viewing Document #37) 5. Biological Assessment: Relocation of U.S. Army Chemical School and U.S. Army Military Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO. Jan. 1997 Submitted to U.S. Army Corps of Engineers Kansas City District Prepared by 3D/International, Inc. (Public Viewing Document #32) 5a. Bi-State Development Agency’s Accessibility Plan FY 1988 Prepared by The Marketing, Planning & Research Division (Public Viewing Document # 244) Location: H 6. Bi-State Development Agency Americans With Disabilities Act (ADA) Paratransit Service Plan FY 1996 ADA Plan Update Prepared by the Capital Budget and Grants Department (Public Viewing Document #54)

Page 2: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 2

6 a Big Muddy National Fish & Wildlife Refuge Environmental Assessment & Draft Comprehensive Conservation Plan October 2013 U.S. Fish & Wildlife Service Midwest Region CD Location: formerly at Sachs, now at HQ 6/2018 (Public Viewing Document Sachs #5) 6 b Big Muddy National Fish and Wild life Refuge Environmental Assessment and Draft Comprehensive Conservation Plan U.S. Department of the Interior Fish and Wildlife Service Region 3 (Midwest Region) Division of Conservation Planning Bloomington, MN Date: October 2013? Paper: Format Location: formerly at Sachs, now at HQ 6/2018 (Public Viewing Document Sachs #4) 5 c. Boeing Company Hazardous Waste Permit MOD000818963 Hazardous Waste Permit Application Prepared for the Missouri Department of Natural Resources Hazardous Waste Program Missouri Department of Natural Resources 7545 South Lindbergh Blvd. Suite 210 St. Louis, Missouri 63125 Christine Kump-Mitchell, P.E. Environmental Engineer, Contact information for Report Heidi Rice at Missouri Department of Natural Resources Phone: 1-573-291- 1417 or 1-800 361-4827 Date of reports: 2010 Date received at HQ to be checked in May 26, 2015 and then sent to PC (Public Viewing Document No. #240) HELD AT PC 6 d. BRIDGE DOCUMENTATION (WITH PHOTOS) Spoede Bridge Lindbergh And McKnight Bridge St. Louis County Route I-64 MoDOT Job Numbers JI10978 and J6I1248 Authors: Thomas J Gubbels and Karen L Daniels Date: June 2007 Received: September 2007 Contact Name: Karen Daneils (1-573-526-7346) Location: H ( Public Viewing Document: #197) 6 e. Byasse Drive Drum—Removal Administrative Record AR#62313 Public Repository Copy Prepared by EPA AR Superfund Team Date: December 2011 Received: December 2011 Contact Info: U.S. Environmental Protection Agency Region 7 Superfund Records Manager, Jolleen Werst 901 North 5th Street Kansas City, Kansas 66101 Locations: HQ-Copy 1; PC—Copy 2 (Public Viewing Document # 225)

Page 3: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 3

6f. CAASTLC (Community Action Agency of St. Louis County, Inc. 2015 Annual Report Received: February 2017 Locations: HQ, PC (Public Viewing Document for HQ is HQ # 244; Public Viewing Document for PC is PC # 15) 7. Characterization of CDTF Decontaminated Wastewater and the Estimated Risk of Transportation Prepared for U.S. Army Corps of Engineers, Kansas City District Prepared by Harland Bartholomew and Associates, Inc. Feb. 1997 (Public Viewing Document #58) 8. Chesterfield Valley, MO.

Flood Control Study Feasibility Study Report With Integrated Environmental Impact Statement August 2000 U.S. Army Corps of Engineers St. Louis District (Public Viewing Document #117)

8a. Chicago Heights Site OU 00 also known as the old Missouri Metal Site Administrative Record AR File # 62693 Public Repository Copy Prepared by EPA AR Superfund Team Date: October 2012 Received: 10/17/2012 Contact: Jolleen Werst 1-913-551-7108 U.S. Environmental Protection Agency Region 7 11201 Renner Blvd. Lenexa, KS 66219 Locations: HQ—copy I, II; MC—copy I, II; IT-copy I, II are both missing ) all are cd’s ( Public Viewing Document #230) 8b. Chicago Heights Site OU 00 also known as the old Missouri Metal Site Administrative Record File for the Administrative Settlement Agreement and Order on Consent AR File #62693 Public Repository Copy Prepared by EPA AR Superfund Team December 2012 CD 1 of 1 Received: Dec. 13, 2012 Contact: Jolleen Werst 1-913-551-7108 U.S. Environmental Protection Agency, Region 7 Superfund Records Manager, Jolleen Werst 901 North 5th Street Kansas City, Kansas 66101 Locations: HQ—copy I, II; MC—copy I, II; IT—copy I, II—IT’s copies are missing all are cd’s (Public Viewing Document #231) 8c. Chicago Heights Site Elmwood Park Neighborhood December 2013 Health Consultation Public Repository copy Prepared by Cost Recovery Superfund Team January 2014 1 CD Contact: United States Environmental Protection Agency Region 7

Page 4: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 4

11201 Renner Boulevard Lenexa, Kansas 66219 Contact: Belinda Young 1-800-223-0425 or 1-913-551-7563 Received at HQ: 1/2014 Locations: HQ has copy 2, IT has copy 1, MC has copy 3 (Public Viewing Document #236) 8d. Chicago Heights Site Elmwood Park Neighborhood December 2013 Health Consultation Public Repository Copy Prepared by Cost Recovery Superfund Team January 2014 1 CD Contact: United States. Environmental Protection Agency Region 7 11201 Renner Boulevard Lenexa, Kansas 66219 Contact: Belinda Young 1-800-223-0425 or 1-913-551-7463 Received at Indian Trails on 1/15/2014 Locations: IT ONLY (Public Viewing Document #235) 8e. City of Crystal Lake Park Comprehensive Plan Approved April 5, 2007 No contact given: Received May 22, 2007 Location: H (Public Viewing Document #196) 8f. Coldwater Creek, Missouri Reconnaissance Report Water Resources Investigation St. Louis Metropolitan Area Missouri and Illinois January 1982 U.S. Army Corps of Engineers St. Louis District R 333.91/U 58C6 (H+) but as of March 2018 placed in the metal bin with the blue paper attached in the doc area on the wooden card file (Public Viewing Document # 245) Location: H 8g. Coldwater Creek—Sources of Toxic Pollutants Found in Influents to Sewage Treatment Plants III. Coldwater Creek Drainage Basin, St. Louis, MO. United States Environmental Protection Agency Date on document is June 1979 SUDOC: EP 1.2LP 76/20/pt.3 (Public Viewing Document #246) Location: H 8h. COLDWATER Creek Public Assessment for Evaluation of Community Exposures Related to Coldwater Creek St. Louis Airport/Hazaelwood Interim Storage Sites (HISS)/ Futura Coatings NPL Site North St. Louis County, Missouri EPA Facility ID MOD9808633176 Date: June 8, 2018 Date received: June 20, 2018 Format: Paper

Page 5: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 5

Locations: Copy 3 at HQ; Copies 1 and 2 at FV; Public Viewing Document at HQ is #251; FV is #10 (both copies) 9. Creve Coeur Airport Draft Environmental Assessment Report Prepared for Creve Coeur Airport Improvement Corp. March 1996 MHTD Prepared by Craford, Murphy & Tilley, Inc. Consulting Engineers Locations: HQ (Public Viewing Document #149) 10. Cross-County Corridor Major Transportation

Investment Analysis for St. Louis, MO MITA Report and Exhibits Volume 1 R388.411/C951 Prepared for the MO. Department of Transportation and the East-West Gateway Coordinating Council Prepared by Zverdrup Civil, Inc. Jan. 1997 (Public Viewing Document #85)

11. Cross-County MetroLink Extension

Segment I Conceptual Design Cross-County MetroLink Extension Draft Capital Cost Estimates Prepared for the East-West Gateway Coordinating Council in Association with the Bi-State Development Agency Missouri Department of Transportation By Parsons Transportation Group and Associated Consultants (Public Viewing Document #78)

12. Cross-County MetroLink Extension

Segment I Conceptual Design Cross-County MetroLink Extension Evaluation Results Draft Technical Report Prepared for the East-West Gateway Coordinating Council in Association with the Bi-State Development Agency MO. Department of Transportation By Parsons Transportation Group and Associated Consultants (Public Viewing Document #79)

13. Cross-County MetroLink Extension

Segment I Conceptual Design Cross-County MetroLink Extension Preliminary Operations Plan Draft Technical Report Prepared for the East-West Gateway Coordinating Council Association with the Bi-State Development Agency MO. Department of Transportation By Parsons Transportation Group and Associated Consultants

Page 6: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 6

March 1999 (Public Viewing Document #83)

14. Cross-County MetroLink Extension Segment I Conceptual Design Draft Cross County MetroLink Extension Financial Analysis Draft Technical Report Prepared for the East-West Gateway Coordinating Council in Association with the Bi-State Development Agency Missouri Department of Transportation Prepared by kpmg under contract to Parsons Transportation Group May 1999 (Public Viewing Document #80)

15. Cross-County MetroLink Extension

Segment I Conceptual Design Cross-County MetroLink Extension Socio-Economic and Environmental Analysis Draft Technical Report Prepared for the East-West Gateway Coordinating Council in Association with the Bi-State Development Agency MO Department of Transportation By Parsons Transportation Group and Associated Consultants R388.42/C951 1999 (Public Viewing Document #75)

16. Cross-County MetroLink Extensions Segment I Conceptual Design Staff Recommendation to the Board of Directors East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County MetroLink

Segment I Extension December 1998 (Public Viewing Document #82)

18. Cross-County MetroLink

Segment I Extensions Technical Memorandum Forest Park Circulator March 24, 1999 (Public Viewing Document #84)

19. Cross-County MetroLink Segment I Extension’s Technical Memoranda Draft

Identify Design Standards and Policies Prepared for the East-West Gateway Coordinating Council in Association with the Bi-State Development Agency MO. Department of Transportation

Page 7: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 7

By Parsons Transportation and Associated Consultants (Public Viewing Document #86)

20. Daniel Boone Study Area

Final Evaluation Report Final Evaluation Report Major Transportation Investment Analysis Prepared by Parsons Brinckerhoff Quade and Douglas, Inc. July 2000 Received October 2000 Locations: HQ, C, D, F, JB, LC, MC, NB, TF, WR (Public Viewing Document #121)

21. Daniel Boone Study Area Major Transportation Investment Analysis (MTIA) March 2000 (Public Viewing Document #95) 22. Department of Transportation

By Federal Aviation Administration Draft Environmental Impact Statement Lambert-St. Louis International Airport Volume 1: Documentation September 1996 Locations: HQ, PC (Public Viewing Document #13)

22a. Documentation of the Historic Meramec River Bridge at Times Beach Bridge No. J0421 St. Louis County, I-44 Outer Road, historic Route 66 Revised September 2017 September 2017 Prepared by MoDOT Received: October 2017 Locations: HQ (Public Viewing Document #247) also contains 2 discs titled Meramec River Bridge J0421 St. Louis County, MO. Photographic and Historical Documentation 2017 Revision, December 2016 Photos 9/7/2017 and Meramec River Bridge J0421 St. Louis County, Mo. Photographic & Historical documentation February 2010 Photographs 9/14/2017 23. Eliminated 24. Department of Transportation

Federal Aviation Administration Draft Environmental Impact Statement-Lambert St. Louis International Airport September 1996 Volume 2: Appendix A-O (Public Viewing Document #14)

25. Department of Transportation Federal Aviation Administration Draft General Conformity Determination Lambert St. Louis International Airport December 1997 (Public Viewing Document #15)

Page 8: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 8

26. Doughtery Ridge Subdivision Annexation Plan City of Des Peres, MO June 8, 1998 (Public Viewing Document #91)

27. Draft Environmental Impact Statement

Lambert-St. Louis International Airport Appendix M Air Quality Assessment Supporting Material (Public Viewing Document #72)

28. Draft

Phase I Remedial Investigation Report for the Tyson Valley Powder Farm Eureka, MO Volume I of II Prepared by HydroGeoLogic, Inc. March 1998 R553.79/D758 Barcode #56850761 (Public Viewing Document #112)

29. Draft

Phase I Remedial Investigation Report for the Tyson Valley Powder Farm Eureka, MO Volume II of II Prepared for U.S. Army Corps of Engineers March 1998 Prepared by HydroGeoLogic, Inc. R553.79/D758 Barcode #5685803 (Public Viewing Document #113)

30. Draft Environmental Assessment for Implementation of an Integrated Cultural Resources

Management Plan for Missouri Army National Guard Facilities Prepared for: The Missouri Army National Guard (MOARNG) Prepared by: Kingston Environmental Services, Inc. 1600 SW Market Lee’s Summit, Missouri 64081 September 17, 2001 Received: September 20, 2001 Location: H (Public Viewing Document #130)

31. Draft Environmental Impact Statement

Office—Highway Recreational Vehicle Opportunities in Salem and Potosi Ranger Districts December 1993 (Public Viewing Document #34)

32. Draft Environmental Impact Statement

Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri Volume 1-Main Report October 1996 (Public Viewing Document #23)

Page 9: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 9

33. Draft Environmental Impact Statement

Volume III Impact Analysis Matrices Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO October 1996 (Public Viewing Document #38)

34. Draft Environmental Impact Statement

Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri Volume III—Technical Appendices October 1996 (Public Viewing Document #25)

35. Draft Environmental Impact Statement

Scoping Process Summary Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri 1995 (Public Viewing Document #24)

36. Draft Environmental Statement Volume IV—Identification and Screening of Alternatives to Accomplish Training Goals at Fort Leonard Wood Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri October 1996 (Public Viewing Document #26)

37. Draft Final Remedial Investigation Work Plan for the Tyson Valley Powder Farm, Eureka, Missouri For the U.S. Army Corps of Engineers, Kansas City District Prepared by HydroGeoLogic, Inc. June 1997 R553.72/D758 Barcode #56850894 Locations: HQ, EH HQ copy is possible #56850894 (Public Viewing Document #109)

37A. Draft Integrated Cultural Resource Management Plan MOARNG Prepared by Regina M. Meyer Prepared for the Missouri Army National Guard (MOARNG) September 14, 2001 Locations: H (Public Viewing Document #129) 37B. FAA Midwest Airspace Plan (MAP) CD Draft Environmental Assessment August 2005 Contact Information: St. Louis MAP Project C/O Ms. Annette Davis FAA-Regional Office AGL 520

Page 10: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 10

2300 East Devon Ave. Des Plaines, IL 60018 Telephone (847) 294-8091 Received: September 7, 2005 Locations: HQ, FV (Public Viewing Document #176) 38. Final Environmental Impact Statement U.S. Route 40/61 Bridge Location Study over the Missouri River St. Charles and St. Louis Counties, Missouri Date: August 27, 2004 Federal Highway Administration/Missouri Department of Transportation MACTEC Engineering and Consulting, Inc. 3199 Riverport Tech Center Dr. St. Louis, MO, 63043 314-209-5900 ANY CONTACT REQUESTS, SHOULD GO TO Mr. Donald Newmann, Programs Engineer Federal Highway Administration = 209 Adams Street Jefferson City, Missouri 65101-3203 573-636-7104 or Mr. Kevin Keith, Chief Engineer Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102-0270 573-751-3758 Locations: HQ, S Disc is available from the Gov. Documents Librarian’s Desk: (Public Viewing Document #159) 38A. Final Site Inspection Report Tyson Valley Powder Farm Eureka, MO Prepared by: U.S. Army corps of Engineers Kansas City, Missouri Locations: HQ October 2002 Received: November 2002 (Public Viewing Document #136) 39. Fine Particle PM 2.5 Boundary Recommendation and Technical Support Document for the Determination of Boundaries in Missouri for the PM 2.5 National Ambient Air Quality Standard Missouri Department of Natural Resources Contact Person: Mr. John Rustige, P.E., Air Pollution Control Program at P.O. Box 176, Jefferson City, MO 65102 Phone: 573-751-4817 Received November 5, 2003 Locations: H, WR (Public Viewing Document #157) 39a. GSA Former National Imagery and Mapping Agency Site THE NEPA Process Prepared by Tetra Tech EM Inc. January 2006

Page 11: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 11

Received January 2006 Contact: Mark Duffy, Senior Assistant Regional Counsel 817-987-9904 [email protected] (Public Viewing Document #192) 40. High Water, Harsh Winters, Heat Waves and More CD Title Regional All-Hazard Mitigation Plan From East West Gateway Council of Governments Contact: Martha T. Kopper Gateway Tower One Memorial Drive, Suite 160 St. Louis, MO 421-4220, Ext.205 Received April 29, 2004 Locations: HQ (Public Viewing Document #158)

41. Integrated Cultural Resource Management Plan

MOARNG Prepared by Regina M. Meyer Prepared for the Missouri Army National Guard (MOARNG) September 14, 2001 Locations: H (Public Viewing Document #129)

42. Interstate 64/U.S. Route 40 Corridor City of St. Louis and St. Louis County, Missouri DRAFT Environmental Impact Statement U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation Volume 1 Locations: HQ Dec. 19, 2002 Received Jan. 2, 2003 (Public Viewing Document #137) 43. Interstate 64/U.S. Route 40 Corridor City of St. Louis and St. Louis County, Missouri DRAFT Environmental Impact Statement U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation Volume 2 Locations: HQ Dec. 19, 2002 Received Jan. 2, 2003 (Public Viewing Document #138) 43a. New I-64 FINAL Environmental Impact Statement- VOL. 1 Interstate 64/U.S. Route 40 Corridor U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation Date: March 29, 2005 Received: April 15, 2005 Contact Information: Mr. Don Neumann-Programs Engineer at 573-636-7104 and Mr. Kevin Keith at 573-751-2803 Locations: HQ (Public Viewing Document #168)

Page 12: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 12

43b. New I-64 FINAL Environmental Impact Statement- VOL.2 Interstate 614/U.S. Route 40 Corridor U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation Date: March 29, 2005 Received: April 15, 2005 Contact Information: Mr. Don Neumann-Programs Engineer at 573-636-7104 and Mr. Kevin Keith at 573-751-2803 Locations: HQ (Public Viewing Document #169) 44. Ecological Risk Assessment

Effect of Fog Oil Obscurant on Selected Amphibians, Reptiles, and Birds at Fort Leonard Wood, Missouri Submitted to U.S. Army Corps of Engineers, Kansas City District Prepared by 3D/International, Inc. July 17, 1996 (Public Viewing Document #40)

45. Ecological Risk Assessment Effect of Fog Oil Obscurant on Selected Amphibians, Reptiles, and Birds at Fort Leonard Wood, Missouri January 1997 Submitted to U.S. Army Corps of Engineers, Kansas City District Prepared by 3D/International, Inc. (Public Viewing Document #41) 46. Ecological Risk Assessment Effect of Selected Chemicals on Indiana Bats, Gray Bats, and Bald Eagles at Fort Leonard Wood, MO September 1996 Appendix, IV to the Biological Assessment (Public Viewing Document #33) 47. Effects of Selected Chemicals on Indiana Bats, Gray Bats, and Bald Eagles at Fort Leonard Wood, MO. Appendix IV to the Biological Assessment Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard, Wood, MO Submitted to U.S. Army Corps of Engineers, Kansas City District Prepared by 3D/International, Inc. Environmental Group (Public Viewing Document #55) 48. Engineering Evaluation/Cost Analysis (EE/CA) for the Hazelwood Interim Storage Site (HISS) St. Louis, MO March 1988 U.S. Army Corps of Engineers St. Louis District Office Formerly Utilized Sites Remedial Action Program Locations: HQ, PC (Public Viewing Document #59)

Page 13: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 13

49. Engineering Evaluation/Cost Analysis (EE/CA) For The St. Louis Airport Site (SLAPS) St. Louis, MO March 1998 U.S. Army Crops of Engineers, St. Louis District Office Locations: HQ, PC (Public Viewing Document #96)

50. Environmental Assessment (EA) For The Light Rail Vehicle Maintenance For The Light Rail Vehicle Maintenance Facility St. Clair County MetroLink Extension August 1997 St. Clair County, Illinois Bi-State Development Agency St. Clair County Transit District (Public Viewing Document #43) 51. Environmental Assessment for Replacement of Damaged Production Facilities Defense Mapping Agency Prepared by Harland Bartholomew and Associates, Inc. in association with Engineering-Science, Inc. July 1994 (Public Viewing Document #53) 52. Environmental Assessment Study for the Joint Development at the MetroLink North Hanley Station (Area 1) Bi-State Contract RFF 2012 (GEC) Prepared for Bi-State Development Agency Prepared by Tech Services Jan. 1999 (Public Viewing Document #76) 53. Environmental Fate of Fog Oil at Fort McClellan, Alabama Prepared by 3D/Environmental Submitted to Kansas City District, U.S. Army Corps of Engineers August 1996 (Public Viewing Document #42) 54. Eliminated 55. Environmental Impact Statement

Relocation of U.S. Army Chemical School and U.S. Army Chemical and U.S. Army Military Police School to Fort Leonard Wood, MO. March 1997 Volume I—Main Report (Public Viewing Document #27)

56. Environmental Impact Statement

Scoping Process Summary Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO 1995 (Public Viewing Document #30)

57. Environmental Impact Statement

Volume IV Identification and Screening of Alternatives to Accomplish Training Goals at Fort Leonard Wood

Page 14: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 14

Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, Missouri March 1997 (Public Viewing Document #29)

58. Environmental Impact Statement Volume III Technical Appendices Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO. March 1997 (Public Viewing Document #28) 59. Evaluation of Passenger Rail Service: St. Louis to Kansas City Executive Summary December 1988 Prepared by: Corporate Strategies In Association with Science Applications International Corporation (Public Viewing Document #93) 60. Feasibility Study for the St. Louis Downtown Site

St. Louis U.S. Army Corps of Engineers, St. Louis District April 1998 (Public Viewing Document #97)

61. Feasibility Study for the St. Louis North County Sites Volume I Prepared by U.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program May 1, 2003 Received May 1, 2003 Contact: Jacqueline Mattingly 314-260-3924 Locations: HQ, PC (Public viewing Document #142)

62. Feasibility Study for the St. Louis North County Sites

Volume II Prepared by U.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program May 1, 2003 Received May 1, 2003 Contact: Jacqueline Mattingly 314-260-3924 Locations: HQ, PC (Public Viewing Document #143)

63. Feasibility Study for the St. Louis North County Sites

Final Proposed Plan for the St. Louis North County Sites Prepared by U.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Remedial Action Program May 1, 2003 Received May 1, 2003 Contact: Jacqueline Mattingly 314-260-3924 Locations: HQ, PC

Page 15: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 15

(Public Viewing Document #144)

64. Final Environmental Impact Statement Lambert-St. Louis International Airport Volume 2 Appendix A-R Dec. 1997 R387.74/F491 Department of Transportation Federal Aviation Administration (Public Viewing Document #7) 65. Final Environmental Impact Statement (FEIS)

St. Clair County MetroLink Extension August 1996 St. Clair County, ILL U.S. Department of Transportation Federal Transit Administration Bi-State Development Agency St. Clair County Transit District Locations: HQ, PC (Public Viewing Document #44)

66. Final Report

Evaluation of Human Health Risks Associated with Fog Oil Training at Fort Leonard Wood, MO. Preliminary Risk Evaluation Report Prepared for U.S. Army Corps of Engineers, Kansas City District Prepared by Harland Bartholomew and Associates in Association with Parsons Engineering Science, Inc. September 1996 (Public Viewing Document #39)

67. Finding of No Significant Impact Bi-State Development Agency June 21, 1999 (Public Viewing Document #60)

68. Finding of No Significant Impact

Illinois Maintenance Facility St. Clair County MetroLink Extension Project St. Clair County, Il. By the Bi-State Development Agency Nov. 1997 (Public Viewing Document #103)

69. Finding of No Significant Impact/Record of Decision and Final Environmental Assessment for

Relocation of the Airport Surveillance Radar at Lambert-St. Louis International Airport St. Louis, MO. June 15, 2001 U.S. Department of Transportation Federal Aviation Administration—Central Region Received July 10, 2001 Locations: H, BT, PC, RR H received 5 copies

Page 16: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 16

(Public Viewing Document #127) 70. Forest Service Roadless Area Conservation

Volume I Final Environmental Impact Statement November 22, 2000 Locations: H (Public Viewing Document #124)

71. Forest Service Roadless Area Conservation

Draft Environmental Impact Statement Volume 1 May 2000 U.S. Department of Agriculture Forest Service (Public Service Document #45)

72. Forest Service Roadless Area Conservation

Draft Environmental Impact Statement Volume I May 2000 U.S. Department of Agriculture Forest Service (Public Viewing Document #46) COPY #2

73. Forest Service Roadless Area Conservation

Draft Environmental Impact Statement Volume II U.S. Department of Agriculture Forest Service May 2000 (Public Viewing Document #47)

74. Forest Service Roadless Area Conservation Draft Environmental Impact Statement Volume 2 U.S. Department of Agriculture Forest Service May 2000 (Public Viewing Document #48) COPY #2

75. Forest Service Roadless Area Conservation

Volume 2 Final Environmental Impact Statement—Maps of Inventoried Roadless Areas November 2000 Received November 22, 2000 Locations: H (Public Viewing Document #125)

76. Forest Service Roadless Area Conservation

Volume 3 Final Environmental Impact Statement—Agency Responses to Public Comments November 2000 Received November 22, 2000 Locations: H (Public Viewing Document #126)

Page 17: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 17

77. Forest Service Roadless Area Conservation Volume 4 Final Environmental Impact Statement Letters from Agencies and Elected Officials

November 2000 Received November 22, 2000 Locations: H (Public Viewing Document #128) 77A. FORWARD through FERGUSON: A PATH TOWARD RACIAL EQUITY STL Positive CHANGE THE FERGUSON COMMISSION STLPOSTIVECHANGE.ORG A printed companion to FORWARDTHROUGHFERGUSON.ORG Date: September 14, 2015 Received: HQ 3 copies; multiple copies at ALL SLCL locations (Public Viewing Document #241) 78. General Aviation Economic Impact Study

For the St. Louis Region East-West Gateway Coordinating Council 1995 (Public Viewing Document #74)

78A. GSA Former National Imagery and Mapping Agency Site THE NEPA Process Prepared by Tetra Tech EM Inc. January 2006 Received: January 2006 Contact: Mark Duffy, Senior Assistant Regional Counsel 817-987-9904 [email protected] Locations: H, WR 78A.1. Hazelwood Interim Storage Site Annual Site Environmental Report Hazelwood, Missouri Calendar Year 1988 Date at the bottom is April 1989 BECHTEL NATIONAL, INC Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05- 81OR20722 DOE/OR/20722-218 Locations: H (Public Viewing Document #247) 78A.2. Hazelwood—Environmental Report-Hazelwood Interim Storage Site Department of energy Oak Ridge Operations Date on Document: April 28, 1988 Locations: H (Public Viewing Document #249) 78B. Interstate 70 Corridor Kansas City to St. Louis, Missouri Final First Tier Environmental Impact Statement Improvement Study Received from Bridgeton Trails Library in August 2003 Locations: HQ (Public Viewing Document #156) 79. Interstate 70 Corridor Kansas City to St. Louis, Missouri Volume 1

Page 18: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 18

DRAFT First Tier Environmental Impact Statement Improvement Study U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation Contact Information: Mr. Don Neumann at 573-638-2620 or Mr. Kevin Keith at 573-751-4606 Received from Bridgeton Trails Library in August 2003 (Public Viewing Document #150) Locations: HQ 80. Interstate 70 Corridor Kansas City to St. Louis, Missouri Volume 2 DRAFT First Tier Environmental Impact Statement Improvement Study U.S. Department of Transportation Contact Information: Mr. Don Neumann at 573-638-2620 or Mr. Kevin Keith at 573-751-4606 Received from Bridgeton Trails Library in August 2003 (Public Viewing Document #151) Locations: HQ 80A. Jefferson National Expansion Memorial Draft General Management Plan/Environmental Impact Statement National Park Service/Department of the Interior Date: January 2009 Received: February 1, 2009 DISCARDED per instructions Location: One copy received at HQ (Public Viewing Document #205) Contact: Superintendent Tom Bradley Jefferson National Expansion Memorial 11 North 4th Street St. Louis, MO. 63102\ HOLD UNTIL March 16, 2009 81. Lambert-St. Louis International Airport

Feb. 1996 Re: ALPA Report on the Evaluation of Alternatives for the Expansion of Lambert-St. Louis International Airport (Public Viewing Document #49)

82. Lambert-St. Louis International Airport

City of St. Louis, St. Louis County, MO. Record of Decision Appendices Appendices B through J Department of Transportation Federal Aviation Administration September 30, 1998 Locations: HQ, PC (Public Viewing Document #70)

83. Lambert-St. Louis International Airport

City of St. Louis, St. Louis County, MO. Record of Decisions Appendix A Appendices Department of Transportation Federal Aviation Administration September 30, 1988 Locations: HQ, PC (Public Viewing Document #69)

Page 19: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 19

84. Lambert-St. Louis International Airport

City of St. Louis, St. Louis County, MO Record of Decision Department of Transportation Federal Aviation Administration September 30, 1998 Locations: HQ, PC (Public Viewing Document #67)

85. Lambert-St. Louis International Airport

City of St. Louis, St. Louis County, MO Record of Decision Supplemental Materials Public Comments on the FEIS Department of Transportation Federal Aviation Administration September 30, 1998 Locations: HQ, PC (Public Viewing Document #68)

86. Lambert-St. Louis International Airport Master Plan

Draft Environmental Assessment August 1991 By Landrum and Brown, Inc. Locations: HQ, PC (Public Viewing Document #12)

86A. Lambert-St. Louis International Airport 14 CFR Part 150 Noise Exposure Map Update and Note Compatibility Program Update VOL I. Landrum & Brown 11279 Cornell Park Drive Cincinnati, OH 45242 PHONE: 1-513-530 5333 Date: October 2010 Received: October 4, 2010 Locations: HQ, BT, RR, NB, PC Contact: Suzie Kleymeyer 1-513-530-1227 or Jan Titus, Lambert Airport Planning & Development at 314-551-5023 (Public Viewing Document #213) 96B. Lambert-St. Louis International Airport 14 CFR Part 150 Noise Exposure Map Update and Noise Compatibility Program Update VOL II. Landrum & Brown 11279 Cornell Park Drive Cincinnati, OH 45242 PHONE: 513-530-5333 Date: October 2010 Received October 4, 2010 Locations: HQ, BT, RR, NB, PC Contact: Suzie Kleymeyer 1-513-530-1227 or Jan Titus, Lambert Airport Planning & Development at 314-551-5023 (Public Viewing Document #214) 87. Lambert-St. Louis International Airport

FAR Part 150 Noise Compatibility Program Update Appendices

Page 20: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 20

City of St. Louis Airport Authority 1995 R387.74/S145L (Public Viewing Document #11)

88. Lambert St-Louis International Airport

FAR Part 150 Noise Compatibility Program Update Appendices City of St. Louis Airport Authority By Aviation Planning Associates, Inc. R387.74/S145L (Public Viewing Document #9A)

89. Lambert-St. Louis International Airport

FAR Part 150 Noise Compatibility Program Update

Appendices City of St. Louis Airport Authority By Aviation Planning Associates, Inc. R387.74/S145L (Public Viewing Document #10) 90. Lambert St-Louis International Airport

FAR Part 150 Noise Compatibility Program Update Technical Report Volume 1: Noise Exposure Maps (LARGE BINDER) City of St. Louis Airport Authority By Aviation Planning Associates, Inc. A Parsons Brinckerhoff Company 421 Arch Street Cincinati Ohio 45202 1-513-381-4610 R387.74/S145L (Public Viewing Document #9)

91. Lambert-St. Louis International Airport FAR Part 150 Noise Compatibility Program Update Technical Report City of St. Louis Airport Authority August 1995 (Public Viewing Document #66)

91A. Lambert-St. Louis International Airport FAR Part 150 Noise Compatibility Program Update Technical Report City of St. Louis Airport Authority By Aviation Planning Associates, Inc. R387.74/S145L Locations: HQ, PC (Public Viewing Document #8) 92. Lambert-St. Louis International Airport

Final Environmental Impact Statement

Page 21: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 21

Volume 1: Documentation December 1997 Department of Transportation Federal Aviation Administration (Public Viewing Document #63)

93. Lambert-St. Louis International Airport

Final Environmental Impact Statement Volume 3: Appendix S-X December 1997 Department of Transportation Federal Aviation Administration (Public Viewing Document #64) 94. Lambert-St. Louis International Airport

Section 106 Documentation Associated with the Final Environmental Impact Statement Department of Transportation Federal Aviation Administration December 1997 (Public Viewing Document #73)

95. Lambert-St. Louis International Airport

Section 303 and 6(f) Evaluation Department of Transportation Federal Aviation Administration December 1997 (Public Viewing Document #65)

96. LeMar Drive Property

Administrative Record File for the LeMar Drive Property Ellisville, MO April 1998 (Public Viewing Document #99)

97. LeMar Drive Site

Engineering Evaluation/Cost Analysis Ellisville, MO March 25, 1998 United States Environmental Protection Agency (Public Viewing Document #102)

98. Major Transportation Investment Analysis (MTIA’S) for the North St. Louis City and County,

South St. Louis City and County, and Daniel Boone (West St. Louis County) Northside Study Area Major Transportation Investment Analysis Prepared by Parsons Brinckerhoff Quade & Douglas, Inc. May 1999 (Public Viewing Document #101)

99. Mark Twain National Forest Draft Environmental Impact Statement United States Department of Agriculture—Forest Service Received: February 1, 2005 Locations: HQ (Public Viewing Document #162)

Page 22: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 22

100. Mark Twain National Forest Draft Environmental Impact Statement—MAP SET To Accompany the 2005 Draft Revised Forest Plan United States Department of Agriculture—Forest Service Date: January 2005 Received: February 1, 2005 Locations: HQ (Public Viewing Document #163) 101. Mark Twain National Forest Draft Revised –FOREST PLAN United States Department of Agriculture—Forest Service Received: February 1, 2005 Locations: HQ (Public Viewing Document #164) 102. Mark Twain National Forest Draft Environmental Impact Statement and Draft Revised Forest Plan—SUMMARY United States Department of Agriculture—Forest Service Received: February 1, 2005 Locations: HQ (Public Viewing Document #165) 102A. Mark Twain National Forest—Final Environmental Impact Statement 2005 Forest Plan September 2005 Received December 2005 Contact: Forest Planner/Mark Twain Forest Supervisor’s Office 401 Fairgrounds Road Rolla, MO 65401 573-364-4621 (Public Viewing Document #187) given permission to withdraw-hold until May 5, 2005 102B. Mark Twain National Forest—Final Environmental Impact Statement 2005 Forest Plan APPENDICES A-H USDA Forest Service September 2005 Received December 2005 Contact: Forest Planner/Mark Twain Forest Supervisor’s Office 401 Fairgrounds Road Rolla, MO 65401 573-365-4621 (Public Viewing Document #188) given permission to withdraw-hold until May 5, 2005 102C. Mark Twain National Forest—Final Environmental Impact Statement—MAP Set 2005 Forest Plan To Accompany the 2005 Land and Resource Management Plan (2005 Forest Plan) USDA Forest Service September 2005 Received December 2005 Contact: Forest Planner/Mark Twain Forest Supervisor’s Office 401 Fairgrounds Road Rolla, MO 65401 573-365-4621

Page 23: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 23

(Public Viewing Document #190) given permission to withdraw-hold until May 5, 2005 102D. Mark Twain National Forest—2005 Land and Resource Management Plan 2005 Forest Plan USDA Forest Service September 2005 Received December 2005 Contact: Forest Planner/Mark Twain Forest Supervisor’s Office 401 Fairgrounds Road Rolla, MO 65401 573-364-4621 (Public Viewing Document #186) given permission to withdraw-hold until May 5, 2005 102E. Mark Twain National Forest—Record of Decision for 2005 Land and Resource Management Plan 2005 Forest Plan USDA Forest Service September 2005 Received December 2005 Contact: Forest Planner/Mark Twain Forest Supervisor’s Office 401 Fairgrounds Road Rolla, MO 65401 573-365-4621 (Public Viewing Document #189) given permission to withdraw-hold until May 5, 2005 102F. Mark Twain Record of Decision Hardrock Mineral Leasing Mark Twain National Forest Missouri United States Department of Agriculture Forest Service Eastern Region Date of Document: 1988 Location: HQ (Public Viewing Document #250) 103. MetroSOUTH Technical Documents and Publications Planning MetroLink in South St. Louis County Contact Information: Atia Thurman/Vector Communications 314-621-5566 701 N 15th Street Suite 1001E, 10th floor St. Louis, MO 63103 Received: July 8, 2003 Locations: HQ, C, T, W (Public Viewing Document #146) 104. Midwest Regional Rail Initiative Executive Report

By Transportation Economics & Management Systems, Inc. August 1998 (Public Viewing Document #94)

105. Missouri Solid Waste Management Plan DRAFT Missouri Department of Natural Resources Dec. 21, 2004

Page 24: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 24

MO NR.Env/So 2: So 5/DRAFT Received: Jan. 11, 2005 Location: HQ (Public Viewing Document #160) 106. Missouri Solid Waste Management Plan APPENDICES-DRAFT Missouri Department of Natural Resources Dec. 21, 2004 MO. NR.Env/So 2: So 5/APP./DRAFT Received: Jan. 11, 2005 Location: HQ (Public Viewing Document #161) 106A. Missouri State Implementation—2007 Revision of the State Implementation Plan for the St. Louis 8-Hour Ozone Nonattainment Area March 2007 (only retained through May 4, 2007) CD Contact: 573-751-4817 James Kavanaugh P.O. Box 176, Jefferson City, MO 65102 Location: H (Public Viewing Document #195) 107. Missouri State Implementation Plan Doe Run Resource Recycling Facility Near Bixby, Missouri 2002 Revision Department of Natural Resources Air and Land Division, Air Pollution Control Program Contact Jim Kavanaugh 573-751-4817 Locations: HQ Received September 2002 (Public Viewing Document #133) 108. Missouri State Implementation Plan for Carbon Monoxide

St. Louis Metropolitan Area Maintenance Provisions and Redesignation Request Submitted to the U.S. Environmental Protection Agency by the MO. Department of Natural Resources August 1996 (Public Viewing Document #62)

109. Missouri State Implementation Plan for the Missouri Portion of the St. Louis Ozone

Nonattainment Area Rate of Progress Plan Element Adopted October 28, 1999 R363.739/M678M (Public Viewing Document #88)

110. Missouri State Implementation Plan for the Missouri Portion

The St. Louis Ozone Nonattainment Area Rate of Progress Plan Element Department of Natural Resources Division of Environmental Quality

Page 25: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 25

1997 (Public Viewing Document #106)

111. Missouri’s Air Pollution Control Plan

St. Louis Ozone Nonattainment Area Attainment Demonstration Plan Department of Natural Resources Division of Environmental Quality 1999 (Public Viewing Document #107)

112. Missouri’s Air Pollution Control Plan

St. Louis Ozone Nonattainment Area RATE OF PROGRESS PLAN Nov. 1, 1994 State of Missouri Department of Natural Resources Division of Environmental Quality (Public Viewing Document #90)

113. Missouri’s Air Pollution Control Plan

St. Louis Ozone Nonattainment Area Rate of Progress Plan 1995 State of Missouri Department of Natural Resources Division of Environmental Quality (Public Viewing Document #89)

113A. North County Site Feasibility Study and Proposed Plan dated May 1, 2003 PUBLIC REVIEW AND COMMENT PERIOD Department of the Army St. Louis District Corps of Engineers Date May 1, 2003 Contact: Jacqueline Mattingly 314-260-3924 Public Viewing Document #144A Format: Floppy disk Locations: HQ (Public Viewing Document #144A) 114. Northside and Southside Study Areas

Major Transportation Investment Analysis Downtown LRT Alignment Options Development and Screening Prepared by: Parsons Brinckerhoff Quade &Douglas, Inc. July 2000 Received October 2000 (Public Viewing Document #119)

115. Northside Study Area

Major Tranpsortation Investment Analysis Final Evaluation Report Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. July 2000 Received October 2000 Locations: HQ, C, D, F, JB, LC, MC, NB, TF, WR (Public Viewing Document #120)

Page 26: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 26

115A. Nox SIP Call Budget Demonstration for Missouri April 26, 2005 Received April 28, 2005 Contact Information: Mr. Jim Kavanaugh 1-573-751-4817 P.O. Box 176, Jefferson City, MO 65102 Locations: HQ (Public Viewing Document #171) 115B. PM Resources, Bridgton, Missouri Hazardous Waste Facility Above Ground Storage Tank Closure Report PR Resources Inc. June 1998 Burns & McDonnell Engineers-Architects-Consultants St. Louis, MO Received from Bridgeton Trails Library in August 2003 Locations: HQ (Public Viewing Document #152) 115C. PM Resources, Inc Missouri Department of Natural Resources Consolidated Closure Plan Hazardous Waste Facility Received from Bridgeton Trails Library in August 2003 Location: H (Public Viewing Document #155) 116. Programmatic Environmental Assessment for Implementation of an Integrated Cultural Resource Management Plan for 89th Regional Support Command Properties in the State of Missouri May 2002 Prepared for U.S. Army Reserve, 89th Regional Support Command Prepared by Andrea Otter—Colorado State University Received April 2003 Locations: HQ (Public Viewing Document #141) 117. Preferred Alternative Lamar Drive Site

McDOnnell Park Site July 10, 1998 U.S. Environmental Protection Agency Locations: HQ (Public Viewing Document #100)

117A. Preliminary Health Assessment—WEST LAKE LANDFILL Bridgeton, St. Louis County, Missouri Prepared by Missouri Department of Health Bureau of Environmental Epidemiology Under Cooperative Agreement with the Agency for Toxic Substances and Disease Registry U.S. Department of Health and Human Services Public Health Service Agency for Toxic Substances and Disease Registry Received from Bridgeton Trails Library in August 2003 Locations: HQ (Public Viewing Document # 153)

Page 27: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 27

118. Progress-I-70 Newsletter Profiling Alternatives for Congestion Mitigation Along I-70 Missouri Highway & Transportation Department (Public Viewing Document #61)

119. Proposed Plan for the St. Louis Downtown Site

St. Louis, MO April 1998 U.S. Army Corps of Engineers, St. Louis District Office (Public Viewing Document #98)

120. Proposed Redesignation Demonstration and Maintenance Plan for the Missouri Portion of the St. Louis Ozone Nonattainment Area September 2002 Missouri Department of Natural Resources Air and Land Protection Division, Air Pollution Control Program Contact Jim Kavanaugh 573-751-4817 Locations: HQ Received September 2002 (Public Viewing Document #134) 120A. Public Sale of Unclaimed Property Held by St. Louis County Police Department Notice of Hearing Pursuant to Section 447.080 and 542.301 RSMO.1 May 15, 2014 9:00 in St. Louis County Circuit Court Division 38 7900 Carondelet Clayton, MO List of Items Received: April 14, 2014 Locations: HQ (Public Viewing Document #237) 120B. Public Sale of Unclaimed Property Held by St. Louis County Police Department Notice of Hearing Pursuant to Section 447.080 and 542.301 RSMO.1 October 30, 2014 9:00 in St. Louis County Circuit Court Division 38 7900 Carondelet Clayton, MO List of Items (Public Viewing Document #238) 120C. Public Sale of Unclaimed Property Held by St. Louis County Police Department Notice of Hearing Pursuant to Section 447.080 and 542.301 RSMo.1 May 29, 2015 9:00 St. Louis County Circuit Court Division 38 7900 Carondelet Clayton, MO List of Items (Public Viewing Document #239) Locations: HQ 120D. Public Sale of Unclaimed Property Held by St. Louis County Police Department Notice of Hearing Pursuant to Section 447.080 and 542.301 RSMO.1 April 19, 2016 at 9:00 in st. Louis county circuit Court Division 38 105 S. Central Clayton, Missouri LIST OF ITEMS Received: March 15, 2016 Locations: HQ

Page 28: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 28

(Public Viewing Document #243) 121. Redesignation Request and Maintenance Plan for the Glover, Missouri LEAD (PB) Nonattainment Area DOE RUN PRIMARY LEAD SMELTER Doe Run Primary Lead Smelter Draft for Public Hearing September 2003 Missouri Department of Natural Resources Air and Land Protection Division Air Pollution Control Program P.O. Box 176, Jefferson City, MO 65102 Telephone 573-751-4817 Contact: John Rustige Locations: HQ Received August 27, 2003 (Public Viewing Document #148) 121 A. Regulatory Impact Reports for Dry Cleaner Contamination Cleanup Rulemaking Public Comment for Rules Contact Information: Missouri Department of Natural Resources Brownfields/Voluntary Cleanup Section ATTN: Drycleaning Environmental Response Trust (DERT) Fund P.O. Box 176 Jefferson City, MO 65102-0176 573-526-8913 [email protected] Date of Report: July 13, 2005 Received: July 17, 2005 Locations: HQ (Public Viewing Document #175) 122. Responsiveness Summary

LeMar Drive Site Engineering Evaluation/Cost Analysis U.S. Environmental Protection Agency July 10, 1998 (Public Viewing Document #105)

123. Review of the Finding of NO Significant Impact Statement

(FONSI) for the Enhancements at the Delmar MetroLink Station Area August 1999 (Public Viewing Document #104)

124. Revised Draft Environmental Assessment for Relocation of the Airport Radar at Lambert—St. Louis International Airport St. Louis, MO Prepared by the Federal Aviation Administration Kansas City NAS Implementation Center October 30, 2000 Received October 31, 2000 Locations: HQ, BT, PC, RR Also sent copies for distribution to the public (Public Viewing Document #123)

125. Revised Final Report Evaluation of Human Health Risks Associated with Fog Oil Training at Fort Leonard

Page 29: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 29

Wood, Missouri Preliminary Risk Evaluation Report Prepared for U.S. Army Corps of Engineers, Kansas City District Prepared by Harland Bartholomew and Associates, Inc. in association with Parsons Engineering Science, Inc. February 1997 (Public Viewing Document #31) 126. Route 17 Draft Environmental Impact Statement Texas County, Missouri Mo. Department of Transportation/Department of Transportation Date of Publication: Dec. 2002 Received April 2003 Contact Person: Mr. Don Neumann at 573-636-7104 or Mr. Kevin Keith at 573-751-4622 (Public Viewing Document #140) 127. Route 50 East-Central Corridor Study

Draft Major Transportation Investment Analysis Environmental Impact Statement U.S. Department of Transportation Federal Highway and Administration and Missouri Department of Transportation July 2000 (Public Viewing Document #118)

128. Route 50 East-Central Corridor Study FINAL Major Transportation Investment Analysis Environmental Impact Statement U.S. Department of Transportation Federal Highway Administration and Missouri Department of Transportation December 18, 2002 Contact Number: 314-335-4463 Contact Name: Crystal Howard Received December 2002 Locations: HQ (Public Viewing Document #139) 128A. South County Connector Draft Environmental Impact Statement St. Louis County, MO Publication Date: April 2013 Flyer of Notice of Availablity and Public Hearing included Contact: Mr. John Hicks, St. Louis County Department of Highways and Traffic 314-615- 8532 Received: May 2, 2013 Locations: HQ (received at HQ) and WR (Public Viewing Document #232) 129. Southside Study Area

Major Transportation Investment & Analysis FINAL EVALUATION REPORT Prepared by Parsons Brinckerhoff Quade and Douglas, Inc. July 2000

Page 30: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 30

Received October 2000 Locations: HQ, C, D, F, JB, LC, MC, NB, TF, WR (Public Viewing Document #122)

130. St. Charles Corridor St. Louis and St. Charles Counties, Missouri Major Investment Study Draft Environmental Impact Statement May 1996 U.S. Department of Transportation East-West Gateway Coordinating Council (Public Viewing Document #21)

131. St. Louis Airport Site (SLAPS)

Draft Interim Action Engineering Evaluation/Cost Analysis (EE/CA)

St. Louis, MO July 1997 Prepared by U.S. Department of Energy Oak Ridge Operations Office (Public Viewing Document #71)

132. St. Louis Airport Site (SLAPS)

Interim Action Engineering Evaluation/Cost Analysis (EE/CA) St. Louis, MO July 1997 U.S. Department of Energy Oak Ridge Operations Office Formerly Utilized Sites Remedial Action Program (Public Viewing Document #50)

132A.1 St. Louis County Fiscal Year 2015 Consolidate Annual Performance and Evaluation Report January 1, 2015-December 31, 2015 also known as St. Louis Consortium Draft Consolidated Annual Performance and Evaluation Report (CAPER)-FY 2015 THIS IS A DRAFT Prepared by: Department of Planning Glenn A. Powers, Director Office of Development Date of Report: 2016 Date Received: 3/2/2016 Location: HQ (Public Viewing Document #242) 132A.2 St. Louis County Fiscal Year 2016 Consolidated Annual Performance and Evaluation Report DRAFT St. Louis County Government Prepared by: Department of Planning and Office of Community Development January 1, 2016-December 31, 2016 Date Received: March 19, 2017 Location: HQ (Public Viewing Document #245) 132A.3 St. Louis County Home Consortium Consolidated Plan 2017 Annual Action Plan DRAFT Date: 2017 Date Received: September 20, 2017 Locations: HQ (Public Viewing Document HQ #246)

Page 31: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 31

132A.2 St. Louis County Notice of Public Sale of Unclaimed Property Held by St. Louis County Police Department and Inventory List 2010 Date: September 14th, 2010 Received: September 15th 2010 Locations: HQ, DB (Public Viewing Document #212) 132A.3 St. Louis County ORDER—SMURFIT-STONE CONTAINER ENTERPRISES Date April 19, 2005 Received: April 26, 2005 Locations: HQ (Public Viewing Document #170) 132B. St. Louis Metro South MetroLink Extension DRAFT ENVIRONMENTAL IMPACT STATEMENT—VOLUME 1 U.S. Department of Transportation/Federal Transit Administration and East-West Gateway Council of Government November 2005 Received November 2005 Contact Person: Donna Day 314-421-4220 Locations: HQ, C, T, W (Public Viewing Document #183) 132C. St. Louis Metro South MetroLink Extension DRAFT ENVIRONMENTAL IMPACT STATEMENT—VOLUME 2 U.S. Department of Transportation/Federal Transit Administration and East-West Gateway Council of Governments November 2005 Received November 2005 Contact Person: Donna Day 314-421-4220 Locations: HQ, C, T, W (Public Viewing Document #184) 132D. St. Louis Metro South MetroLink Extension CD DRAFT ENVIRONMENTAL IMPACT STATEMENT Prepared by U.S. Department of Transportation/Federal Transit Administration and East- West Gateway Council of Governments November 2005 Received November 2005 (Public Viewing Document #185) 133. St. Louis 1-Hour Maintenance Area Inspection and Maintenance SIP Received mysteriously June 24, 2003 No contact/documentation provided Locations: HQ (Public Viewing Document #145) 134. St. Louis Region PrintSTEP

Public Information Repository PrintSTEP Environmental Pilot Program October 2001 State of Missouri Department of Natural Resources

Page 32: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 32

Received February 2002 Contact Name: Bill Hernlund 314-301-7600 Locations: HQ, LC (Public Viewing Document #131)

135. State Implementation Plan for the St. Louis Ozone Nonattainment Plan

Contingency Element July 24, 1997 (Public Viewing Document #36)

136. Summary Report for the Draft Implementation Plan

Workshops on the U.S. DOE Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Recorded for Environmental Restoration and Waste Management Program U.S. Department of Energy Washington, D.C. Recorded by Barry Lawson Associates, Inc. Concord Massachusetts May 1992 (Public Viewing Document #52)

137. Supplemental Draft Environmental Impact Statement (SDEIS)

May 1996 St. Clair County MetroLink Extension St. Clair County, ILL. U.S. Department of Transportation Federal Transit Administration Bi-State Development Agency St. Clair County Transit District (Public Viewing Document #16)

138. Supplemental 1—Hour Ozone Attainment Demonstration

St. Louis Nonattainment Area August 1999 DRAFT (Public Viewing Document #87)

139. Times Beach Dioxin Stack Test Report Time Beach Remediation Project Volume 3 Appendix G Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Corporation and Agribusiness Technologies, Inc. (Public Viewing Document #6) 140. Times Beach Site

Multimedia Risk Assessment Volume II Air Dispersion and Deposition Modeling Report ARCS Remedial Activities at Uncontrolled Hazardous Waste Sites in the Zone of Regions VI, VII, VIII Prepared by CH2M HILL November 17, 1984 (Public Viewing Document #20)

141. Times Beach Remediation Project

Trial Burn Report

Page 33: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 33

Volume 3 Appendix H Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Cooperation and Agribusiness Technologies, Inc. (Public Viewing Document #1)

142. Times Beach Remediation Project

Trial Burn Report Volume 4 Appendix H (con’t.) Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Corporation and Agribusiness Technologies Inc. Public Viewing Document #2)

143. Times Beach Remediation Project

Trial Burn Report Volume 5 Appendix H (con’t.) Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Corporation and Agribusiness Technologies, Inc. (Public Viewing Document #3)

144. Times Beach Remediation Project

Trial Burn Report Volume 6 Appendix H (con’t.) Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Corporation and Agribusiness Technologies, Inc. (Public Viewing Document #4)

145. Times Beach Remediation Project Dioxin Stack Test Report

Volume 4 Appendix G Jan. 1996 Submitted by International Technology Corporation and Foster Wheeler Environmental Technologies, Inc. and Agribusiness Technologies, Inc. (Public Viewing Document #5)

146. Times Beach Site

Multimedia Risk Assessment Volume I Nov. 17, 1994 U.S. Environmental Protection Agency Region VII (Remedial Activities at Uncontrolled Hazardous Waste Sites in the Zone of Regions VI, VII, VIII) (Public Viewing Document #18)

147. Times Beach Site

Multimedia Risk Assessment Volume I Appendices U.S. Environmental Protection Agency Region VII (Remedial Activities at Uncontrolled Hazardous Waste Sites in the Zones of Regions by CH2M HILL Nov. 17, 1984 (Public Viewing Document #19)

147A. Times Beach Site

Page 34: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 34

Public Comment Draft Proposed Plan for Final Management of Dioxin-Contaminated Soil and Final Disposition of Structures and Debris at Times Beach, Missouri and the Minker Stout/Romine Creek Site, Missouri Prepared by U.S. Environmental Protection Agency Date on Document: February 19, 1988 (Public Viewing Document #248) 148. Transportation Improvement Program

Fiscal Years 1996 Through 1998 Draft St. Louis Metropolitan Area East-West Gateway Coordinating Council September 1995 (Public Viewing Document #51)

149. Transportation Improvement Program

Fiscal Years 1995 through 1997 St. Louis Metropolitan Area East-West Gateway Coordinating Council July 24, 1994 (Public Viewing Document #77)

149A. Tyson Valley—ELECTRONIC CD Draft 2008 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm Prepared for: U.S. Army Corps of Engineers Prepared by: Summit Technical Resources, Inc. Date: May 14, 2009 Received: May 18, 2009 Location: HQ (Public Viewing Document #207) 149A.1. Tyson Valley Powder Farm FINAL 2008 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm, Eureka MO. Contract No. W912DQ-07-D-0028 Task Order, No. 0001 MARKS No. 200-1e Prepared by: SUMMIT Technical Resources, Inc. 5460 Ward Road, Suite 205 Arvada, CO 80002 Date: September 2010 Received: September 28, 2010 Locations: HQ, EH (Public Viewing Document #215) 149B. Tyson Valley—ELECTRONIC CD DRAFT 2009 Data Summary Report Former Tyson Valley Powder Farm Prepared for: U. S. Army Corps of Engineers Prepared by: Summit Technical Resources, Inc. Date: May 14, 2009 Received: May 18, 2009 Locations: HQ (Public Viewing Document #207) 149C. Tyson Valley—ELECTRONIC CD

Page 35: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 35

DRAFT 2009 Data Evaluation for Eight Historical Site Use Report Areas of Interest Technical Memorandum Former Tyson Valley Powder Farm Eureka, Missouri Prepared for: U.S. Army Corps of Engineers Prepared by: Summit Technical Resources, Inc. Date: May 14, 2009 Received: May 18, 2009 Location: HQ (Public Viewing Document #208) 149D. Tyson Valley—Final Work Plan for Groundwater Monitoring Former Tyson Valley Powder Farm Contract No. W912DQ-09-D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Prepared by: SUMMIT Technical Resources 5450 Ward Road, Suite 205 Arvada, CO. 80002 CONTACT: Michael Anderson, 303-403-4056 Date: March 2010 Received: March 2, 2010 Location: HQ (Public Viewing Document #209) 149E. Tyson Valley Powder Farm Bench Scale Study and Bedrock Injection Pilot Study for Area of Concern 2 FINAL ACCIDENT PREVENTION PLAN Date: Jan. 12, 2011 Contract No.: W912DQ-08-D-0018 Task Order No.: 022 Prepared by: CDM Federal Programs Corp. 9200 Ward Parkway, Suite 500 Kansas City, MO. 64114 Contact: Thomas Simmons Department of the Army Kansas City District, Corps of Engineers 635 Federal Building, Kansas City, MO 64106 Received: Feb. 8, 2011 Locations: HQ, EH (Public Viewing Document #216) 149F. Tyson Valley Powder Farm July 21, 2011 Final Bench Scale Work Plan U.S. Army Corps of Engineers Kansas City District Bench Scale Study and Bedrock Injection Pilot Study at Area of Concern 2 Former Tyson Valley Powder Farm St. Louis County Contract No. W912DQ-08-D-0018 Task Order No.:002 Prepared for Army Corps of Engineers Kansas City District 601 East 12th Street Kansas City, MO. 64106 Prepared by: CDM Federal Programs Corporation 9200 Ward Parkway, Suite 500 Kansas City, MO. 64114 Received: August 2011 Locations: HQ, EH (Public Viewing Document #220) 149G. Tyson Valley Powder Farm July 21, 2011 Bench Scale Study and Bedrock Injection Pilot Study at Concern 2 Former Tyson Valley

Page 36: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 36

Powder Farm St. Louis County, Missouri Final Quality Assurance Project Plan Contract No. W912DQ-08-D-0018 Task Order No. 0022 Received: August 2011 Locations: HQ, EH (Public Viewing Document #221) 149H. Tyson Valley Powder Farm July 2011 Final 2010 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm Eureka, Missouri Contract No. W912DQ-09-D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2898 Prepared By: Summit Technical Resources, Inc. 5460 Ward Road, Suite Arvada, Colorado 800002 Received: August 2011 Locations: HQ, EH (Public Viewing Document #222) 149I. Tyson Valley Powder Farm July 2011 Final February 2011 Groundwater Monitoring Data Summary Report Former Tyson Valley Powder Farm Eureka, Missouri Contract No. W912DQ 07-D-0028 Task Order No. 0001 MARKS No. 200-1e Prepared For: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Prepared By: Summit Technical Resources, Inc. 5460 Ward Road, Suite 205 Arvada, Colorado 800002 Received: August 2011 Locations: EQ, EH (Public Viewing Document #223) 150. U.S. Route 40/61 Bridge Location Study Over the Missouri River St. Charles and St. Louis Counties, Missouri Draft Environmental Impact Statement Federal Highway Administration Contact Information: Mr. Donald Neumann, Programs Engineer Federal Highway Administration 209 Adams Street Jefferson City, MO 65101 573-636-71-4 or Mr. Kevin Keith, Chief Engineer Missouri Department of Transportation P.O. Box 270 Jefferson City, MO 65103 573-751-3758 Received: August 19, 2003 Locations: HQ, S (Public Viewing Document #147) 151. Volume II Impact Analysis Matrices and EIS

Page 37: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 37

Review Comments and Responses Environmental Impact Statement Relocation of U.S. Army Chemical School and U.S. Army Military Police School to Fort Leonard Wood, MO March 1997 (Public Viewing Document #17)

152. U.S. Department of Energy

Environmental Restoration and Waste Management Programmatic Environment Impact Statement Public Scoping Meeting Dec. 6, 1990 (Public Viewing Document #35)

152A. Tyson Valley –Administrative Record File—Former Tyson Valley Powder Farm –Electronic CD—Project No. B07MO017300 Prepared for: U.S. Army Corps of Engineers Kansas City Corps of Engineers Contract No. DACW41-97-D-9004 Delivery Order No. 012 Received: March 8, 2005 Locations: HQ and EH (Public Viewing Document #166) 152A.1 Tyson Valley Former Tyson Valley Powder Farm Areas of Concern 3 and 7 Completion Report Debris and Waste Excavation, Incidental to the Remedial Investigation APPENDIX G---Contractor Quality Control Reports---March 14, 2008 Prepared by Pangea, Inc. 2604 S. Jefferson Avenue St. Louis, MO. 63118 Submitted by Department of the Army, Army Corps of Engineer District, Kansas City Corps of Engineers 601 East 12th Street Kansas City, Missouri 64106 CONTACT 314-333-0600 (PANGEA, INC) Received: April 24, 2008 Locations: HQ (Public Viewing Document #201) 152A.2 Tyson Valley-ELECTRONIC CD DRAFT 2008 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm Prepared for: U.S. Army Corps of Engineers Prepared by: Summit Technical Resources, Inc. Date: May 14, 2009 Received: May 18, 2009 Location: HQ (Public Viewing Document #206) 152B. Tyson Valley Draft Final Engineering Evaluation and Cost Analysis AICs 3 and 7 Former Tyson Valley Powder Farm

Page 38: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 38

Eureka, Missouri Prepared by Pangea, Inc. January 2006 Received January 2006 Contact: Clark Oberlag, 314-330-0600 Locations: HQ and EH (Public Viewing Document #191) 152C. Tyson Valley Final Addendum To The Work Plan For The Groundwater Investigation And Monitoring At THE FORMER TYSON VALLEY POWDER FARM-EURKA, MISSOURI Prepared by SUMMITT Technical Resources, Inc. P.O. Box 4490 Boulder, CO 80306 For the U.S. Army Corps of Engineers, Kansas City District 601 East 12th Street Kansas City, MO 64016 Date: January 2008 Received: February 2008 Contact Name: Michael Anderson (720-838-5533) (303-403-4056) Location: H-Copy11, EH-Copy 12 (missing) HQ copy sent to EH 5/13/08 (Public Viewing Document #199) 152D. Tyson Valley Final Addendum To The Quality Plan For The Groundwater Investigation And Monitoring AT THE FORMER TYSON VALLEY POWDER FARM EUREKA, MISSOURI Prepared by SUMMIT Technical Resources, Inc. P.O. Box 4490 Boulder, CO 80306 For the U.S. Army Corps of Engineers, Kansas City District 601 East 12th Street Kansas City, MO 64106 Date: January 2008 Received: February 2008 Contact Name: Michael Anderson (720-838-5533) (303-403-4056) Location: H-Copy 11, EH-Copy 12 (missing) HQ copy sent to EH 5/13/08 (Public Viewing Document #200) 152E. Tyson Valley Farm FINAL Technical Memorandum Atomic Energy Commission Material Storage Concerns Former Tyson Valley Powder Farm Eureka, Missouri Prepared by: U.S. Army Corps of Engineers Kansas City District January 2005 Received: April 2005 Locations: HQ and EH (Public Viewing Document #167) 153. Tyson Valley—FINAL COMMUNITY RELATIONS PLAN FORMER TYSON VALLEY POWDER FARM EUREKA, MO September 2002 Prepared for U.S. Army Corps of Engineers Kansas City District Kansas City, MO. 64106 HydroGeologic, Inc. Received September 2002 Locations: HQ, EH (Public Viewing Document #132)

Page 39: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 39

154. Tyson Valley—Final Draft Summary Report Phase II Remedial Investigation Tyson Valley Powder Farm Eureka, MO Prepared for U.S. Army Corps of Engineers, Kansas City District March 1999 Prepared by HydroGeoLogic, Inc. R553.79/F491 Barcode #56851058 Locations: H, EH (Public Viewing Document #110) 154 A. Tyson Valley--Final Phases I, II, III Remedial Investigation & Risk Assessment Report Former Tyson Valley Powder Farm Eureka, Missouri Vol 1 of 5 Prepared for the U.S. Army Corps of Engineers—Kansas City District 601 East 12th Street Kansas City, Missouri 64106 September 2005 Received October 2005 Contact person Margaret Johnston 703-736-4573 Locations: HQ, EH (Public Viewing Document #178) 154 B. Tyson Valley—Final Phases I, II, III Final Phases I, II, III Remedial Investigation & Risk Assessment Reports-Tables Former Tyson Valley Powder Farm Eureka, Missouri Vol 2 of 5 Prepared for the U.S. Army Corps of Engineers—Kansas City District 601 East 12th Street Kansas City, Missouri 64106 September 2005 Received October 2005 Contact person Margaret Johnston 703-736-4573 Locations: HQ, EH (Public Viewing Document #179) 154 C. Tyson Valley Final Phases I, II, III Remedial Investigation & Risk Assessment Report- Figures Former Tyson Valley Powder Farm Eureka, Missouri Vol 3 of 5 Prepared for the U.S. Army Corps of Engineers—Kansas City District 601 East 12th Street Kansas City, Missouri 64106 September 2005 Received October 2005 Contact person Margaret Johnston 703-736-4573 Locations: HQ, EH (Public Viewing Document #180) 154 D. Final Phases I, II, III Remedial Investigation & Risk Assessment Report

Page 40: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 40

Appendices A-H Volume 4 of 5 Former Tyson Valley Powder Farm Eureka, MO Prepared for the U.S. Army Corps of Engineers-Kansas City District 601 East 12th Street Kansas City, Missouri 64106 September 2005 Contact person Margaret Johnston 703-736-4573 Locations: HQ, EH (Public Viewing Document #181) 154 E. Final Phases I, II, III Remedial Investigation & Risk Assessment Report Appendices I-P Former Tyson Valley Powder Farm Eureka, Missouri Volume 5 of 5 Prepared for the U.S. Army Corps of Engineers—Kansas City District 601 East 12th Street Kansas City, Missouri 64106 September 2005 Received October 2005 Contact person Margaret Johnston 7030736-4573 Locations: HQ, EH (Public Viewing Document #182) 154 E.1. Tyson Valley—FINAL SAMPLING AND ANALYSIS PLAN Former Tyson Valley Powder Farms Firing Point Investigation Lone Elk County Park Eureka, Missouri Marks 200-1f FIIP NO. B07MO017300_03.04_011_a Prepared by U.S. Army Corps of Engineers Kansas City District May 2005, Revision B Received: September 22, 2005 Locations: HQ (Public Viewing Document #177) 155. Tyson Valley—Final Site Inspection Report Tyson Valley Powder Farm Eureka, MO Prepared by: U.S. Army Corps of Engineers Kansas City, MO Locations: HQ, EH October 2002 Received Nov. 2002 (Public Viewing Document #136) 155A. Tyson Valley FINAL Tyson Valley Powder Farm Historical Site Use Report

Page 41: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 41

U.S. Army Corps of Engineers Kansas City District Department of the Army Kansas City District Corps of Engineers Richard Boling Federal Building 601 East 12th Street Kansas City, Missouri 64106 Report Prepared by Dedox Cliet—7136 Mill Creek Drive Zuni, VA 23898 and Malcolm Pirnie, Inc. 701 town center Drive Suite 600 Newport News, VA 23606 CONTACT Mirek S. Towster, CENWK-EC-EC//Malcolm Pirnie, INC 757-873-4423 Date: May 2008 Received: May 23, 2008 Location: HQ (Public Viewing Document #202) 156. Tyson Valley—Final Water Well Data Summary Report Addendum Tyson Valley Powder Farm Eureka, MO Prepared for U.S. Army Corps of Engineers, Kansas City District August 1998 Locations: HQ, EH (Public Viewing Document #108) 156A. Tyson Valley Powder Farm Eureka MO 200-1F Final 2004 Environmental Consolidation Report U.S. Army Corps of Engineers Kansas City District May 2005 Contact Information: Mirek S. Towster 1-816-983-3886 Locations: HQ and EH (Public Viewing Document #172) 156B. Tyson Valley Powder Farm Eureka MO CD Final Technical Memorandum AEC Material Storage Concerns U.S. Army Corps of Engineers Kansas City District Jan. 2005 Received May 2005 Contact Information: Mirek S. Towster 1-816-983-3886 Locations: HQ and EH (Public Viewing Document #173) 156C. Tyson Valley Powder Farm Eureka MO CD Final 2004 Environmental Consolidation Report U.S. Army Corps of Engineers Kansas City District Received May 2005 Contact Information: Mirek S. Towster 1-816-983-3886 Locations: HQ and EH (Public Viewing Document #174) 156D. Tyson Valley Powder Farm Firing Point Technical Memorandum Lone Elk County Park

Page 42: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 42

Eureka, MO December 2005 Prepared by U.S. Army Corps of Engineers Kansas City District Received October 2006 (Public Viewing Document #193) 156F. Tyson Valley Powder Farm Safety, Health, and Emergency Response Plan Groundwater Investigation and Monitoring FORMER TYSON VALLEY POWDER FARM-EUREKA, MISSOURI Prepared by SUMMIT Technical Resources, Inc. P.O. Box 4490 Boulder, CO 80306 For the U.S. Army Corps of Engineers, Kansas City District 601 East 12th Street Kansas City, MO. 64016 Date: January 2008 Received: February 2008 Contact Name: Michael Anderson (720-838-5533) (303-403-4056) Location: H, EH (missing) H copy sent to EH 5/13/08 (Public Viewing Document #198) 157. Tyson Valley Work Plan Addendum for the Phase II Remedial Investigation

Tyson Valley Powder Farm, Eureka, MO July 1998 Prepared for the U.S. Army Corps of Engineers By HydroGeoLogic, Inc. R553.79/W926 (Public Viewing Document #111)

157A. Tyson Valley Powder Farm FINAL Work Plan for Debris and Waste Excavation Incidental to the Remedial Investigation Project Number DACW41-01-D-0010, Task Order #0003 Pangea, Inc, 2604 South Jefferson Avenue St. Louis, MO 63118 Received: December 2006 CD Locations: H, EH (Public Viewing Document #194) 157B. Tyson Valley Powder Farm---FINAL February 2009 Groundwater Monitoring Data

Summary Report Former Tyson Valley Powder Farm Eureka MO Contract No. W912DQ-07-D-0028 Task Order No. 0001 MARKS No. 2001-1e MARCH 2010 Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, MO 64106-2896 Prepared by: SUMMIT Technical Resources, Inc. 5460 Ward Road, Suite 360 Arvada, Colorado 80002 DATE: March 2010 Received: March 19, 2010 Contact person: Michael Anderson 303-403-4056/303-292-3059

Page 43: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 43

Locations: HQ, EH 2 copies (Public Viewing Document # 210)

157B1. Tyson Valley Powder Farm FINAL WORK PLAN Site-Wide (Phase IV) Remedial Investigation Former Tyson Valley Powder Farm Prepared For: U.S. Army Corps of Engineers Kansas City district 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Prepared By: SUMMITE Technical Resources, Inc. 5460 Ward Road, Suite 360 Arvada, CO 80002; CENWK-EC-EB (Mirck S. Towster) CONTACT: Michael Anderson 303-403-4056 Date: August 2008 Location: HQ-First Copy; EH-Second Copy (Public Viewing Document #203) 157B2. Tyson Valley FINAL WORK PLAN Site-Wide (Phase IV) Remedial Investigation Former Tyson Powder Farm CONTRACT NUMBER: W912DQ-07-D-2008 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Kansas City, Missouri 64106-2896 Prepared by: SUMMIT Technical Resources, Inc. 5460 Ward Road, Suite 360 Arvada, Colorado 80002 Date: August 2008 Received: December 2008 Location: One copy received at HQ (Public Viewing Document #204) 157C. Tyson Valley Farm Final Work Plan for AOC 2/18 Plume Delineation and Well Installation Contract No. W912DQ-09 D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Prepared by: Summit Technical Resources, In c. CONTACT: Michael Anderson 303-403-4056 Date: June 2010 Received: July 2010 Location: HQ, EH (Public Viewing Document #211) 157D. Tyson Valley Powder Farm March 2010 Groundwater Monitoring Data Summary Report Contract No. W912-DQ-07-D-0028 Task Order No. 0001—February 2011 Prepared for: Army Corps of Engineers Kansas City District 601 E. 12 Street 700 Federal Building Kansas City, Missouri 64106-2896 Contact: Michael Anderson, 303-403-4056 Received: March 3 2011 Locations: HQ, EH (Public Viewing Document #217)

Page 44: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 44

157E. Tyson Valley Powder Farm April 2010 Final 2009 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm Contract no. W912DQ-07-D-0028 Task Order No. 0001 MARKS No. 200-1-3 Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Contact: Michael Anderson 303-403-4056 Received: April 11, 2011 Locations: HQ, EH (Public Viewing Document #218) 157F. Tyson Valley Powder Farm April 2011 Final June/July 2010 Well Completion Summary Report Contract No. W912DQ-D-3001 Task Order No. 0001 MARKS No. 200 1-e Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Contact: Michael Anderson 3030403-4056 Received: April 11, 2011 Locations: HQ, EH (Public viewing Document #219) 157G. Tyson Valley Powder Farm Bench Scale Study and Bedrock Injection Pilot Study at Area of Concern 2 Former Tyson Valley Farm, St. Louis County, Missouri FINAL BASELINE GEOPHYSICAL WORK PLAN Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street Kansas City, MO 64106 Prepared By: CDM Federal Programs Corporation 9200 Ward Parkway, Suite 500 Kansas City, Mo. 64114 Contract No. W912DQ-D-0018 Task Order 0022 Date: August 24, 2011 Received: September 2011 Locations: HQ, EH (Public Viewing Document #224) 157H. Tyson Valley Powder Farm Former Tyson Valley Powder Farm Volume I FINAL Site-Wide (Phase IV) Remedial Investigation, Eureka Missouri Prepared by: Summit Technical Resources, Inc. 5460 Ward Road, Suite 205 Arvada, CO 80002 Contract No. W912DQ-09-D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64102-2896 Date: March 2012 Date received: March 20, 2012 Locations: HQ only (Public Viewing Document #226) 157I. Tyson Valley Powder Farm Former Tyson Valley Powder Farm Volume II TABLES FINAL Site-Wide (Phase IV) Remedial Investigation, Eureka Missouri

Page 45: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 45

Prepared by: Summit Technical Resources, Inc. 5460 Ward Road, Suite 201 Arvada, CO 80002 Contract No. W912DQ-09-D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Date: March 2012 Date received: March 20, 2012 Locations: HQ only (Public Viewing Document #227) 157J. Tyson Valley Powder Farm Former Tyson Valley Powder Farm Volume III—FIGURES FINAL Site-Wide (Phase IV) Remedial Investigation Eureka Missouri Prepared by: Summit Technical Resources, Inc. 5460 Ward Road, Suite 205 Arvada, CO 8002 Contract No. W912DQ-09-D-3001 Task Order No. 0001 MARKS No. 200-1e Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Date received: March 20, 2012 Locations: HQ only (Public Viewing Document #228) 157K. Tyson Valley Powder Farm Former Tyson Valley Powder Farm Final 2011 Annual Groundwater Monitoring Report Former Tyson Valley Powder Farm Eureka, Missouri Contract No. W912DQ-09-D-3001 Task Order No. 0001 Marks No. 200-1e May 2012 Prepared for: U.S. Army Corps of Engineers Kansas City District 601 E. 12th Street 700 Federal Building Kansas City, Missouri 64106-2896 Prepared by: Summit Technical Resources, Inc. 5460 Ward Road, Suite 205 Arvada, Colorado 80002 Contact: Michael A. Anderson 303-403-4056 Date received: May 2012 Locations: HQ—copy I; EH—copy II (Public Viewing Document #229) 157L. Tyson Valley Powder Farm Administrative Record Former Tyson Valley Powder Farm Eureka, MO U.S. Army Corps of Engineers Northwest Division Kansas City District January 2014 Contact: United States. Army Corps of Engineers Kansas City District Charles Colbert 1-816-389-3357 or Timothy R. Shepherd Ph.D. 1-816-389-3920 601 East 12th Street Kansas City, MO 1 CD -- 2 copies Date: January 2014 Received: January 2014 Locations: HQ-copy 1; EH-copy II (Public Viewing Document #234) 158B. U. S. Environmental Protection Agency

Page 46: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 46

Technical Enforcement Support at Hazardous Waste Sites Final Community Relations Plan for WEST LAKE LANDFILL SITE Produced by Metcalf & Eddy, Inc Received from Bridgeton Trails Library in August 2003 Locations: HQ (Public Viewing Document #154) Added exceptions---dropped off at BT CD’s 1. Westlake Landfill OU #1 MAD079900932 AR 12438 CD 1 2. Westlake Landfill OU #2

MAD079900932 AR 12468 CD 2 3. Westlake Landfill OU#3 MD079900932 AR 12468 CD 3 4. Westlake Landfill OU #2 MBD079900932 AR 12459 225 Documents 9,449 pages

158C. Preliminary Health Assessment WEST LAKE LANDFILL Bridgeton St. Louis County Missouri CERCLIS NO. MODO79900932 Prepared by Missouri Department of Health Bureau of Environmental Epidemiology Under Cooperative Agreement with the Agency for Toxic Substances and Disease Registry U.S. Department of Health and Human Services Public Health Service (PHS) Agency for Toxic Substances and Disease Registry No Date Received: from BT (Public Viewing Document #153) Location: HQ 158.D U.S. Environmental Protection Agency Technical Enforcement Support at Hazardous Waste Sites FINAL COMMUNITY RELATIONS PLAN FOR WEST LAKE LANDFILL SITE Operable Unit 1 (Radiological Areas 1 and CERCLA Community Relations Plan, Bridgeton,\ Missouri U.S. EPA Region VII Contract No. 68-W9-0007 TES X Metcalf & Eddy, INC. 10502 N. W. Ambassador Drive. Suite 210 Kansas City, MO. 64153 Project No. 270065

Page 47: PUBLIC VIEWING DOCUMENTS ST. LOUIS COUNTY LIBRARY … · 2019-06-17 · East-West Gateway Coordinating Council June 30, 1999 R388.42/C951 (Public Viewing Document #81) 17. Cross-County

06/2019 Page 47

Date: March 21, 1994 (Public Viewing Document #154) Location: HQ

159. 2004 Mobile Sources Emissions Budgets For The St. Louis Ozone Nonattainment Area