Public Safety Committee Meeting Commission Chamber- 8/13/2019- 1:05 PM
PUBLIC SAFETY
1. Motion to approve Memorandum of Understanding (MOU)
between Georgia Emergency Management and Homeland Security Agency and Augusta-Richmond County Emergency
Management Agency for Grant Applications.
Attachments
2. Approve the replacement of infrastructure hardware and
software. Attachments
3. Motion to approve a change order to in the amount of $30,922 for soil remediation that will increase the net amount of P362943
to $91,903.30 for Bid #18-285 Demolition and Reconstruction of Parking and Roadway Entrance at Fire Station 4, awarded to
Contract Management Inc.
Attachments
4. Motion to approve the transfer of $158,000 from the Augusta Fire Department’s fund balance for the Engineering Department purchase of EMTRAC for all Fire Department first-response
vehicles.
Attachments
5. Meeting Management System for the purpose of Augusta decorum and order of questions and statements. (Requested by
Commissioner John Clarke)
Attachments
6. Motion to approve the minutes of the Public Safety Committee held on July 30, 2019. Attachments
www.augustaga.gov
Public Safety Committee Meeting
8/13/2019 1:05 PM
Approval - MOU between Georgia Emergency Management and Homeland Security and Augusta-
Richmond County EMA for Grant Applications
Department: Fire
Presenter:
Caption: Motion to approve Memorandum of Understanding (MOU) between Georgia Emergency Management and Homeland
Security Agency and Augusta-Richmond County Emergency Management Agency for Grant Applications.
Background: Emergency Management Performance Grant is a grant provided through GEMHSA to support the implementation of the National Preparedness System by supporting the building,
sustainment, and delivery of core capabilities essential to achieving the National Preparedness Goal of a secure and resilient Nation. The purpose of the EMPG program is to
provide Federal grants to states to assist state, local, territorial, and tribal governments in preparing for all hazards. The
Augusta-Richmond County Government, the Augusta-Richmond County Emergency Management Agency (EMA), and it’s Director agree to meet the requirements specified in the
Official Code of Georgia Annotated (Section 38-3-27) of the Georgia Emergency Management Act of 1981, as amended, the
Federal Emergency Management Agency (FEMA) FY2017 Emergency Preparedness Grant (EMPG) Guidance, and those rules, regulations and guidelines dictated by the Director of
GEMA/HS. This year GEMA/HS has implemented a new electronic system for grant applications. This MOU is required
in order to gain and maintain access to the electronic application system. This grant is awarded on an annual basis.
Analysis: This MOU is required in order to apply for grants that Augusta
applies for and is awarded on an annual basis. This MOU is required in order to gain and maintain access to the new
electronic system for grant applications implemented by GEMA/HS this year. Cover Memo
Item # 1
Financial Impact: Failure to approve this MOU will result in Augusta not obtaining
grant money that it receives annually and alternative funding would need to be found to continue programs.
Alternatives: Deny and find alternate funding.
Recommendation: To approve the motion to approve and apply.
Funds are
Available in the
Following
Accounts:
N/A
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Public Safety Committee Meeting
8/13/2019 1:05 PM
Approve the replacement of infrastructure hardware and software.
Department: Information Technology
Presenter: Tameka Allen, Director
Caption: Approve the replacement of infrastructure hardware and software.
Background: Information Technology is continuing its effort of making sure
the City has the necessary technology infrastructure in place to meet the growing demands. Therefore, the following items are
being asked for approval: Information Technology is upgrading the existing backup system with a new (Veeam) Infrastructure Management and Backup System. Veeam will provide the
ability to restore data rapidly and prevent the possibility of extended downtime along with extensive virtual resource management. This purchase will be from TSA, off of HPE State
Contract ID SWC90814-04A, in the amount of $107,151. Information Technology is creating a 534 TB storage area. This
will become the ITCloud. In-house storage will be consolidated to provide faster IPOS to improve access speed. This purchase will be from RoundTower, off of State Contract # GA Enterprise
99999-SPD0000139 004, in the amount of $185,888. Additional software is necessary to facilitate these improvements. Six (6)
7JQ-00341 and four (4) 7NQ-00302 SQLSvrEntCore ALNG LicSAPk MVL 2Lic CorLic licenses will be purchased from Dell Marketing, LP, off of State Contract # GA ENterprise
99999-SPD0000060-006A, in the amount of $71,796. Necessary infrastructure replacement to keep all mission critical
communications equipment up to date and provide additional bandwidth to support Augusta’s growing network needs. These upgrades will be purchased from DSI, off of State Contract #
99999-SPD-T20120501-006, in the estimated amount of $1,065,611. This will be a five (5) year capital lease. Pending
approval, all lease information will be provided to Finance and Augusta’s Law Department for review.
Analysis: In accordance to Information Technology’s Strategic Plan, these
replacements and upgrades are necessary to continue the long
Cover Memo
Item # 2
term storage and protection of Augusta’s data. The advancement
of technology innovation to benefit service delivery will also be achieved through the purchase of these products. The replacement of obsolete hardware and software will allow
Information Technology to plan and improve business processes both internally and externally. The implementation of these new
improved services will benefit all support staff and customers. Maintaining a reliable infrastructure, supporting and meeting the technology needs of customers and providing convenient access
are several Strategic Goals that will be accomplished through these purchases.
Financial Impact: The total capital cost for the replacement of infrastructure hardware and software is $364,835. The total cost for the year one (1) capital lease is approximately $208,000. Funds are
available in the Information Technology budget.
Alternatives: Continue using obsolete hardware and software that is currently
in place.
Recommendation: Approve replacement of infrastructure hardware and software.
Funds are
Available in the
Following
Accounts:
Funds are available in the following accounts. Capital Purchase:
SPLOST VI Network Assessment GL#328-01-2110 JL#2199255104 $250,000. IT Capital SQL 2016 Enterprise 272015410-5424210 $30,000. IT Capital Clerk of Court(Tyler)
272015410-5424220 $47,970. IT Capital Data Protector 272015410-5424220 $36,865. Capital Lease: The total capital
lease cost for the replacement of infrastructure hardware and software is estimated to be $1,065,611. The year one (1) payment will be, approximately, $208,000. Funds are available
in the following accounts. IT Capital Core Infrastructure 272015410-5424910 $200,000 IT Capital Data Protector
272015410-5424220 $8,000
REVIEWED AND APPROVED BY:
Procurement.
Information Technology.
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
RoundTowerRoundTower5905 E. Galbraith Rd, 3rd FloorCincinnati OH 45236513-247-7900
Quote
Date 07/26/2019Quote # Q050512
Prepared ForAugusta Richmond CountyAttn: Information Technology Department535 Telfair StBldg 2000Augusta GA 30901
Expires 08/25/2019TermsUnity Solution
Customer Signature
______________________________________________
Subscription $
Component Breakdown
Services $6,904.22Support/Maintenance $38,287.06
Software $0.00Hardware $140,462.08
Prepared ByWes [email protected](704) 621-8208
Freight $235.60Training $
Quantity1
11111
1114
115
626
11111
111
111
111
1
ItemMPC_USS4
PCM_D4_2PS-PD-UXHFXDPD4122FD4SFP10IM-PS-HWE-004
D4BD6C25FD4-2SFXL-800D4FC-2SFX-400D4-2S10-1800D4123FD4-VS07-12000PS-PDAD-UXFRDIND4SP-4X600-10KD4ODPEKITD4SL10ICU458-002-524M-PS-SWE-004
APS_APPSYNC458-001-425M-PS-SWE-004
VIPR_SRM458-002-628M-PSM-SWE-005
RPT_E458-001-586M-PSM-SWE-004
Freight
DescriptionDELL EMC UNITY XT STORAGE (NEWSOLUTION)DELL EMC UNITY 380PD FOR UNITY XT HFUNITY 2U 25X2.5 DAE FLD RCKUNITY CNA 4X10GBE OPT SFPSPROSUPPORT W/NBD-HARDWARESUPPORTUNITY 380 DPE 25 X 2.5 DELL FLD RCKD4 800GB SAS FAST VP 25X2.5 SSDD4 400GB FAST CACHE 25X2.5 SSDD4 1.8TB 10K SAS 25X2.5 DRIVEUNITY 3U 15X3.5 DAE FLD RCKD4 12TB NLSAS 15X3.5 DRIVEPD ADDON, UNITY HF DAE
D4 SYSPACK 4X600GB 10K SAS 25X2.5UNITY 380 DPE INSTALL KITUNITY 2X4 PORT IO 10GBASETUNITY HFA BASE SOFTWARE=ICPROSUPPORT W/NBD-SOFTWARESUPPORTAPPSYNCAPPSYNC BSC FOR UNITY 300/380=ICPROSUPPORT W/NBD-SOFTWARESUPPORTSRMSTORAGE M&R FOR UNITYXT = ICPROSUPPORT W/MISSIONCRITICAL-SOFTWARERECOVERPOINTRP BASIC FOR UNITY 380/480/680/880=ICPROSUPPORT W/MISSIONCRITICAL-SOFTWAREFreight
Customer Unit Price0.00
0.004,224.681,113.29
0.0038,287.06
4,950.521,622.041,072.24
602.27990.11
1,587.81446.59
1,195.420.00
1,051.710.000.00
0.000.000.00
0.000.000.00
0.000.000.00
235.60
Customer Extended Price0.00
0.004,224.681,113.29
0.0038,287.06
4,950.5217,842.444,288.966,624.974,950.55
98,444.222,679.54
1,195.420.00
1,051.710.000.00
0.000.000.00
0.000.000.00
0.000.000.00
235.60
Total $185,888.96
Pricing is valid for 30 days. Subject to RoundTower Terms and Conditions.Contract# GA Enterprise 99999-SPD0000139 0004
Attachment number 1 \nPage 1 of 1
Item # 2
1283 Kennestone Circle Marietta, GA 30066Send PO to: [email protected]@tsa.com
Quote
Date 7/29/2019Quote # 40326
CustomerKevin LuceCity of Augusta535 Telfair StreetMUNICIPAL BUILDING l000Augusta GA 30901United States
Ship ToKevin LuceCity of Augusta535 Telfair StreetMUNICIPAL BUILDING l000Augusta GA 30901United States
Expires 8/29/2019Sales Rep Nadia Namdari
ItemBB916ABB945AHA113A1HA113A1 5KKHA124A1HA124A1 55QH7J35A3H7J35A3 699H7J35A3 XDSR2B30AAETSA ProfessionalServices
Quantity221211122
241
DescriptionHPE StoreOnce 5100 48TB Capacity Upg KitHPE StoreOnce 5100 48TB Upg Kit LTUHPE Installation ServiceHPE StoreOnce Basic Installation SVCHPE Technical Installation Startup SVCHPE StoreOnce System startup SVCHPE 3Y Foundation Care 24x7 wDMR ServiceFor HPE Internal Entitlement PurposesHPE StoreOnce 5100 48TB Upgrade Kit SuppVeeam Pub Avail Ent+ 3yr 24x7 E-LTUTSA Professional Services: 40 hours onsite or remote
Each15,348.84
0.380.00
424.420.00
2,223.660.000.00
3,314.092,448.038,000.00
Extended30,697.68
0.760.00
848.840.00
2,223.660.000.00
6,628.1858,752.728,000.00
Total $107,151.84
Quoted from HPE State Contract ID SWC90813-04A
Attachment number 2 \nPage 1 of 1
Item # 2
Augusta Richmond Unity XT 380
Index Page
System Cabinet Layout 1
General Information 1
System Tier Information 1
Pool Configuration 2
Power Information 3
I/O Configuration 3
Software Suites 3
Additional Information 3
Attachment number 3 \nPage 1 of 5
Item # 2
Cabinet 1
General Information
Model Number Unity XT 380
Raw Capacity 704.86 TB
Unit Count 19 U
IOPS 25512
Block Size 8K
Usable Capacity 553.06 TB
Total Drive Count 92
Workload 80% Read - 20% Write
Capacity Utilization NA
Configuration Type New Solution
System Tier Information
Flash Count HS
800GB FLASH 3 10 1
Total 11
Usable Capacity 5.62 TB
SAS Count HS
600GB 10K 4 0
1.8TB 10K 10 1
15
12.89 TB
NL-SAS Count HS
12TB 7.2K 60 2
62
534.55 TB
Page 1
Attachment number 3 \nPage 2 of 5
Item # 2
Fast Cache
Drive Type 400GB FLASH
Count 4
Hot Spare Count 0
Form Factor 2.5
Total 4
Pool ConfigurationGeneral Use
Tier Form Factor Drive Type RAID Type Drive Count UsableCapacity IOPS
FLASH 2.5 800GB FLASH 3 RAID 5 (4+1) 10 5.62 TB 21875
SAS 2.5 1.8TB 10K RAID 5 (4+1) 10 12.89 TB 937
NL-SAS 3.5 12TB 7.2K RAID 6 (10+2) 60 534.55 TB 2700
Total 80 553.06 TB 25512
Page 2
Attachment number 3 \nPage 3 of 5
Item # 2
Power Information
Power Summary
Power Consumption 1.89 kVA
Region United States
Input Voltage V~208
Phases Single Phase
Site Circuit Breaker 30
Peak Inrush Current 225 A
Environmental
Operating Temp Below 26C
Heat Dissipation 5300 Btu/Hr
Sound Pressure 61 db
Sound Power 7.2 bels
Weight 767 lbs
Dimensions 24 in Width x 39.4 in Depth x 75 in Height
Clearance 42 in Front x 36 in Rear x 18 in Top
Energy Cost
Annual Energy Cost
GHG Emissions 15.39 tonnes/yr
Currency
PUE 2
Emission Factor 1238.39 lb/MWh
Local Utility Rate
I/O Configuration
Onboard CNA 10GbE Opt SFP
Additional I/O - Slot 1 4 x 10GbE BaseT
Software Suites
Unity Hybrid Base Software • Unisphere Suite• File, Block, VVols• Snapshots• Encryption• Anti-virus• Native Replication• FAST Cache & FAST VP
Additional Information
System Drive Tier Performance
System Drives Used For Data No
Raw Percentage of Flash 2 %
Operating System Version Unity 5.0
Date Created 24 Jul 2019
Midrange Sizer Version 8.4.2
Reserved NVMe Slots No
Total Hot Spares 4
Page 3
Attachment number 3 \nPage 4 of 5
Item # 2
Legal DisclaimerDell EMC provides Midrange Sizer as a tool to help estimate, size and analyze storage capacity and IOPS requirements forUnity, SC Series and PowerVault array. Midrange Sizer is provided solely for estimating storage sizing. Results are based onordering requirements and best practices of product capabilities and limitations. Midrange Sizer uses a set of sizing assumptionsalong with provided inputs which may cause results to vary greatly due to many specific factors such as the environmentsetup/infrastructure, use-case and workload.
Midrange Sizer’s output is not a guarantee that a storage array will meet all actual data storage sizing requirements or anyexpected savings.
Please carefully read all of the terms of this disclaimer. By viewing and utilizing Midrange Sizer, you acknowledge that you haveread, understand and agree to this disclaimer.
* TB/GB label represents capacity in base-2 i.e. 1TB = 1024*1024*1024*1024 bytes* True effective capacity and usable capacity are reported which is calculated after all spare space is accounted for.
Page 4
Attachment number 3 \nPage 5 of 5
Item # 2
Quote Date 7/31/2019
Expiration Date 10/29/2019
Quote Number 7302019-3
Cage Code: 674Q4
DUNS: 962751918
FEIN: 27-2586114
Quote Type:
535 Telfair Street 535 Telfair Street
Attn: Kevin Luce Attn: Kevin Luce
PREPARED BY PREPARED FOR PHONE # EMAIL ADDRESS SHIP TERMS
Pankaj Sharma Kevin Luce (706) 821-1603 [email protected] Best Way NET30
ITEM # PRODUCT DESCRIPTION QTY LIST PRICE UNIT PRICE TOTAL SERVICE DURATION
DC Core switch with fiber channel
N5K-C5672UP Nexus 5672UP 1RU, 32x10G SFP+, 16pxUP SFP+, 6x40G QSFP+ 2 37,702.51$ 18,851.26$ 37,702.51$ -
CON-SSSNT-5672UP SOLN SUPP 8X5XNBD Nexus 5672UP 1RU, 32x10G SFP+, 16pxUP SFP+ 2 14,155.00$ 10,616.25$ 21,232.50$ 60
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 4 -$ -$ -$ -
N5672-ACC-KIT Nexus 5672 Chassis Accessory Kit 2 -$ -$ -$ -
N6KUK9-710N1.1B Nexus 5600/6000 Base OS Software Rel 7.1(0)N1(1b) 2 -$ -$ -$ -
N56-BAS1K9 Nexus 5600 Series LAN Base License 2 -$ -$ -$ -
N56-LAN1K9-P Limited Time Promotion for Nexus 5600 Series LAN Enterprise 2 10,000.00$ 5,000.00$ 10,000.00$ -
N56-16P-SSK9 Nexus 5600 Series 16 Port Storage License 2 6,400.00$ 3,200.00$ 6,400.00$ -
NXA-PAC-1100W-B Nexus 1100W Platinum PS, Port side intake airflow 4 -$ -$ -$ -
N6K-C6001-FAN-B Nexus 6001 Fan for Port Side Intake (Back to Front) airflow 6 -$ -$ -$ -
N1K-VLCPU-96-ESSTL Nexus 1000V Essential Edition Paper Delivery License Qty 96 2 -$ -$ -$ -
SFP-H10GB-CU3M 10GBASE-CU SFP+ Cable 3 Meter 2 100.00$ 50.00$ 100.00$ -
QSFP-H40G-CU5M= 40GBASE-CR4 Passive Copper Cable, 5m 2 375.00$ 187.50$ 375.00$ -
QSFP-H40G-CU3M= 40GBASE-CR4 Passive Copper Cable, 3m 1 250.00$ 125.00$ 125.00$ -
DC Access FEX
N2K-C2348TQ-E Nexus 2000, 10GT FEX; 48x1/10T; 6x40G QSFP 4 12,320.00$ 6,160.00$ 24,640.00$ -
CON-SNT-C2348TQE SNTC-8X5XNBD Nexus 2000, 10GT FEX 4 -$ -$ -$ 60
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 8 -$ -$ -$ -
N2200-PAC-400W-SN N2200-PAC-400W Power Supply - Service Specific 8 -$ -$ -$ -
NXA-FAN-30CFM-F-SN Service Specific - Fan 12 -$ -$ -$ -
N2348TQ-E-FA-BUN Standard airflow pack: N2K-C2348TQ-E, 2AC PS, 3 Fan 4 -$ -$ -$ -
CON-SNT-48TQEFA SNTC-8X5XNBD Standard airflow pac 4 1,850.10$ 1,387.58$ 5,550.30$ 60
CVR-QSFP-SFP10G QSFP to SFP10G adapter 8 350.00$ 175.00$ 1,400.00$ -
SFP-10G-SR-S= 10GBASE-SR SFP Module, Enterprise-Class 16 700.00$ 350.00$ 5,600.00$ -
Augusta Richmond County
44670 Cape Court, Suite 100
Phone: (888) 286-3896
Fax: (703) 802-0798
SHIP TOBILL TO
Quote
State of GA Contract Number: 99999-SPD-T20120501-0006
Ashburn, VA 20147
Augusta Richmond County
Augusta, GA 30901 Augusta, GA 30901
Attachm
ent number 4 \nP
age 1 of 4
Item # 2
Distribution switches - No 100G ports
C9500-16X-A Catalyst 9500 16-port 10Gig switch, Advantage 14 16,535.01$ 8,267.51$ 115,745.07$ -
CON-SSSNT-C95K16XA SOLN SUPP 8X5XNBD Catalyst 9500 16-por 14 6,795.75$ 5,096.81$ 71,355.38$ 60
C9500-NW-A C9500 Network Stack, Advantage 14 -$ -$ -$ -
PWR-C4-950WAC-R 950W AC Config 4 Power Supply front to back cooling 14 -$ -$ -$ -
PWR-C4-950WAC-R/2 950W AC Config 4 Power Supply front to back cooling 14 2,100.00$ 1,050.00$ 14,700.00$ -
CAB-TA-NA North America AC Type A Power Cable 28 -$ -$ -$ -
C9500-NM-BLANK Catalyst 9500 network module blank cover 14 -$ -$ -$ -
S9500UK9-169 UNIVERSAL 14 -$ -$ -$ -
C9500-DNA-16X-A C9500 DNA Advantage, Term licenses 14 -$ -$ -$ -
C9500-DNA-L-A-5Y DNA Advantage 5 Year License 14 11,830.00$ 5,915.00$ 82,810.00$ 60
NETWORK-PNP-LIC Network Plug-n-Play License for zero-touch device deployment 14 -$ -$ -$ -
Distribution Switches with 100G uplink ports
C9500-24Y4C-A Catalyst 9500 24x1/10/25G and 4-port 40/100G, Advantage 6 21,600.00$ 10,800.00$ 64,800.00$ -
CON-SSSNT-C95024YA SOLN SUPP 8X5XNBD Catalyst 9500 24-port 25/100G only, Adva 6 10,670.00$ 8,002.50$ 48,015.00$ 60
C9500-NW-A C9500 Network Stack, Advantage 6 -$ -$ -$ -
S9500UK9-169 UNIVERSAL 6 -$ -$ -$ -
C9K-PWR-650WAC-R 650W AC Config 4 Power Supply front to back cooling 6 -$ -$ -$ -
C9K-PWR-650WAC-R/2 650W AC Config 4 Power Supply front to back cooling 6 2,100.00$ 1,050.00$ 6,300.00$ -
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 12 -$ -$ -$ -
C9K-F1-SSD-BLANK Cisco pluggable SSD storage 6 -$ -$ -$ -
C9500-DNA-24Y4C-A C9500 DNA Advantage, Term License 6 -$ -$ -$ -
C9500-DNA-L-A-5Y DNA Advantage 5 Year License 6 11,830.00$ 5,915.00$ 35,490.00$ 60
NETWORK-PNP-LIC Network Plug-n-Play License for zero-touch device deployment 6 -$ -$ -$ -
SFP-H10GB-CU3M= 10GBASE-CU SFP+ Cable 3 Meter 30 100.00$ 50.00$ 1,500.00$ -
DNAC and 2 x Switches
SDA-W-LABKIT Customer Lab Kit 1 -$ -$ -$ -
DN2-HW-APL Cisco DNA Center Appliance (Gen 2) - 44 Core 1 66,505.50$ 33,252.75$ 33,252.75$ -
CON-SSSNT-DN2HWPL SOLN SUPP 8X5XNBD DNA Center Appliance (Gen 2) 1 21,975.00$ 16,481.25$ 16,481.25$ 60
DNA-SW-1.2 Cisco DNA Center SW 1.2 1 -$ -$ -$ -
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 2 -$ -$ -$ -
SFP-H10GB-CU3M 10GBASE-CU SFP+ Cable 3 Meter 2 75.00$ 37.50$ 75.00$ -
DN2-CPU-6152 2.1 GHz 6152/140W 22C/30.25MB Cache/DDR4 2666MHz 2 -$ -$ -$ -
DN2-MR-X32G2RS-H 32GB DDR4-2666-MHz RDIMM/PC4-21300/dual rank/x4/1.2v 8 -$ -$ -$ -
DN2-PCIE-ID10GF Intel X710-DA2 dual-port 10G SFP+ NIC 1 -$ -$ -$ -
DN2-PSU1-770W Cisco UCS 770W AC Power Supply for Rack Server 2 -$ -$ -$ -
DN2-SD-64G-S 64GB SD Card for UCS Servers 1 -$ -$ -$ -
DN2-SD19TM1X-EV 1.9TB 2.5 inch Enterprise Value 6G SATA SSD 8 -$ -$ -$ -
DN2-TPM2-002 Trusted Platform Module 2.0 for UCS servers 1 -$ -$ -$ -
DN2-RAID-M5 Cisco 12G Modular RAID controller with 2GB cache 1 -$ -$ -$ -
DN2-MSTOR-SD Mini Storage Carrier for SD (holds up to 2) 1 -$ -$ -$ -
DN2-SD480GM1X-EV 480 GB 2.5 inch Enterprise Value 6G SATA SSD 2 -$ -$ -$ -
DN2-PCIE-IQ10GF Intel X710 quad-port 10G SFP+ NIC 1 -$ -$ -$ -
C9300-24U-A Catalyst 9300 24-port UPOE, Network Advantage 2 4,833.75$ 2,416.88$ 4,833.75$ -
CON-SSSNT-C93002UA SOLN SUPP 8X5XNBD Catalyst 9300 24-port UPOE, Network Adva 2 2,494.50$ 1,870.88$ 3,741.75$ 60
C9300-NW-A-24 C9300 Network Advantage, 24-port license 2 -$ -$ -$ -
S9300UK9-166 CAT9300 Universal image 2 -$ -$ -$ -
PWR-C1-1100WAC-P 1100W AC 80+ platinum Config 1 Power Supply 2 -$ -$ -$ -
PWR-C1-1100WAC-P/2 1100W AC 80+ platinum Config 1 Secondary Power Supply 2 1,425.00$ 712.50$ 1,425.00$ -
Attachm
ent number 4 \nP
age 2 of 4
Item # 2
CAB-TA-NA North America AC Type A Power Cable 4 -$ -$ -$ -
SSD-120G Cisco pluggable USB3.0 SSD storage 2 1,125.00$ 562.50$ 1,125.00$ -
STACK-T1-50CM 50CM Type 1 Stacking Cable 2 75.00$ 37.50$ 75.00$ -
CAB-SPWR-30CM Catalyst Stack Power Cable 30 CM 2 71.25$ 35.63$ 71.25$ -
C1A1TCAT93001 DNA Premier Term, C9300 24-Port 2 -$ -$ -$ -
C1A1TCAT93001-5Y DNA Premier Term C9300 24P 5Y-DNA, 25 ISE PLS, 25 SWATCH 2 3,247.50$ 1,623.75$ 3,247.50$ 60
C1-C9300-24-DNAA-T Cisco ONE C9300 DNA Advantage 24-Port Term licenses 2 -$ -$ -$ -
C1-C9300-TRK-5Y Cisco ONE Subscription SKU 5Y 2 -$ -$ -$ 60
C1-ISE-BASE-T Cisco ONE ISE BASE License Term 50 -$ -$ -$ -
C1-ISE-BASE-TRK-5Y Cisco ONE Subscription ISE BASE 5Y 50 -$ -$ -$ 60
C1-ISE-PLS-T Cisco ONE ISE PLUS License Term 50 -$ -$ -$ -
C1-ISE-PLS-TRK-5Y Cisco ONE Subscription SKU ISE Plus 5Y 50 -$ -$ -$ 60
C1-SWATCH-T Cisco ONE StealthWatch License Term - 1 Flow License 50 -$ -$ -$ -
C1-SWATCH-TRK-5Y Cisco ONE Subscription SWATCH SKU 5Y 50 -$ -$ -$ 60
C9300-NM-8X Catalyst 9300 8 x 10GE Network Module 2 1,912.50$ 956.25$ 1,912.50$ -
NETWORK-PNP-LIC Network Plug-n-Play License for zero-touch device deployment 2 -$ -$ -$ -
40G SFP's
QSFP-40G-LR4-S= QSFP 40GBASE-LR4 Trnscvr Mod, LC, 10km, Enterprise-Class 6 10,900.00$ 5,450.00$ 32,700.00$ -
Voice Servers
BE7M-M5-K9 Cisco Business Edition 7000M (M5) Appliance, Export Restr SW 2 30,915.00$ 15,457.50$ 30,915.00$ -
CON-SNT-BE7MM5K9 SNTC-8X5XNBD Cisco Business Edition 7000M (M5) Applia 2 2,401.05$ 1,800.79$ 3,601.58$ 60
BE7K-PSU Cisco UCS 1050W AC Power Supply for Rack Server 4 -$ -$ -$ -
BE7K-NIC1 Intel i350 Quad Port 1Gb Adapter 4 -$ -$ -$ -
BE7K-PCIERISER Riser 1B incl 3 PCIe slots (x8, x8, x8); all slots from CPU1 2 -$ -$ -$ -
BE7K-RAIDCTRLR Cisco 12G Modular RAID controller with 4GB cache 2 -$ -$ -$ -
BE7K-DISK 300GB 12G SAS 10K RPM SFF HDD 28 -$ -$ -$ -
R2XX-RAID5 Enable RAID 5 Setting 2 -$ -$ -$ -
BE7K-RAM 16GB DDR4-2666-MHz RDIMM/PC4-21300/single rank/x4/1.2v 12 -$ -$ -$ -
BE7K-CPU 2.6 GHz 6132/140W 14C/19.25MB Cache/DDR4 2666MHz 2 -$ -$ -$ -
VIRT-LIC-NONE Do not factory-load a virtualization software license 2 -$ -$ -$ -
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 4 -$ -$ -$ -
BE7H-M5-K9 Cisco Business Edition 7000H (M5) Appliance, Export Restr SW 1 51,495.00$ 25,747.50$ 25,747.50$ -
CON-SNT-BE79M5KH SNTC-8X5XNBD Cisco Business Edition 7000H (M5) Applia 1 2,399.65$ 1,799.74$ 1,799.74$ 60
BE7K-PSU Cisco UCS 1050W AC Power Supply for Rack Server 2 -$ -$ -$ -
BE7K-NIC1 Intel i350 Quad Port 1Gb Adapter 2 -$ -$ -$ -
BE7K-PCIERISER Riser 1B incl 3 PCIe slots (x8, x8, x8); all slots from CPU1 1 -$ -$ -$ -
BE7K-RAIDCTRLR Cisco 12G Modular RAID controller with 4GB cache 1 -$ -$ -$ -
BE7K-DISK 300GB 12G SAS 10K RPM SFF HDD 24 -$ -$ -$ -
R2XX-RAID5 Enable RAID 5 Setting 1 -$ -$ -$ -
BE7K-RAM 16GB DDR4-2666-MHz RDIMM/PC4-21300/single rank/x4/1.2v 12 -$ -$ -$ -
BE7K-CPU 2.6 GHz 6132/140W 14C/19.25MB Cache/DDR4 2666MHz 2 -$ -$ -$ -
VIRT-LIC-NONE Do not factory-load a virtualization software license 1 -$ -$ -$ -
CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America 2 -$ -$ -$ -
VMW-VSP-STD-5A= VMware vSphere 6 Standard (1 CPU), 5-yr, Support Required 4 1,658.33$ 829.17$ 3,316.66$ -
CON-ISV1-VSXSTD5A VSphere Standard for 1 CPU; ANNUAL List 5-YR Reqd 4 1,800.00$ 1,350.00$ 5,400.00$ 60
UCS-VMW-TERMS Acceptance of Terms, Standalone VMW License for UCS Servers 4 -$ -$ -$ -
Wireless
MR45-HW Meraki MR45 Cloud Managed AP 150 1,449.00$ 536.13$ 80,419.50$ -
LIC-ENT-5YR Meraki MR Enterprise License, 5YR 150 450.00$ 225.00$ 33,750.00$ 60
Attachm
ent number 4 \nP
age 3 of 4
Item # 2
FW's
MX68-HW Meraki MX68 Router/Security Appliance 48 995.00$ 497.50$ 23,880.00$ -
LIC-MX68-SEC-5YR Meraki MX68 Advanced Security License and Support, 5YR 48 2,250.00$ 1,125.00$ 54,000.00$ 60
TRN-CLC-001 100 Training credit. Expires in 1 yr. Team Captain required 3 30,000.00$ -$ -$
DSI Professional Services
DSI Professional Services Onsite Configuration, Installation, Migration, Day 2 support and
Training by CCIE R&S and Datacenter Engineer and CCIE Voice Engineer
1 150,000.00$
Additional Comments or Special Instructions SUBTOTAL 1,065,611.48$
TAX RATE 0.000%
TAX $0.00
S & H $0.00
OTHER $0.00
TOTAL $1,065,611.48
Wire Transfer Information: Remittance:
JP Morgan Chase Bank, N.A. DISYS Solutions Inc (DSI)
4 New York Plaza, Floor 15, Mailcode: NY1-E050 44670 Cape Court, Suite 100
New York, NY 10004-2413 Ashburn, VA 20147
Routing/Transit #: 021000021 (NY)
Lockbox Account #: 329381377
ACH Information: 7/31/2019
Routing/Transit #: 021000021 (NY) Authorized by Date
Pankaj Sharma
If you have any questions regarding this quote, please contact
Pankaj Sharma @ 571-707-3610 or [email protected]
Attachm
ent number 4 \nP
age 4 of 4
Item # 2
Augusta County
Statement of Work
Date: Wednesday, July 31, 2019
DSI Engineer: Vijay Yadav
Client: Kevin Luce
Attachment number 5 \nPage 1 of 14
Item # 2
SOW Page 2 of 14
Contents
1) Document Control........................................................................................................................ 3
2) Introduction ................................................................................................................................ 4
3) Proprietary and Confidential ......................................................................................................... 4
4) Definitions ................................................................................................................................... 4
5) Scope of Work ............................................................................................................................. 5
6) Milestones ................................................................................................................................... 7
7) Project Management .................................................................................................................... 8
8) Deliverables ................................................................................................................................ 8
9) Client Responsibilities................................................................................................................... 8
10) DSI’s Responsibilities ................................................................................................................... 9
11) Assumptions ................................................................................................................................ 9
12) Out of Scope ............................................................................................................................... 9
13) Project Completion ...................................................................................................................... 9
14) Pricing ...................................................................................................................................... 10
15) Billing ....................................................................................................................................... 10
16) Change Order to Statement of Work ........................................................................................... 10
17) SOW Acceptance ....................................................................................................................... 10
Appendix A ....................................................................................................................................... 11
Appendix B ....................................................................................................................................... 12
Appendix C ....................................................................................................................................... 13
Appendix D ....................................................................................................................................... 14
Attachment number 5 \nPage 2 of 14
Item # 2
SOW Page 3 of 14
1) Document Control Preparation
Action Name Role / Function Date
Prepared by Vijay Yadav Sr. Network Engineer 07-01-2019
Release
Version Date Released
Change Notice Pages Affected Remarks
1.0 07-01-2019 Initial Release All None
Distribution List
Approvals
Name Organization Title
DSI Engineering DSI N/A
Augusta County GA NA NA
Name Title Date Version Organization
[Name] [Job Title] [mm/dd/yyyy] [Version #] [Organization]
Attachment number 5 \nPage 3 of 14
Item # 2
SOW Page 4 of 14
2) Introduction This Statement of Work (“SOW”) is entered into on 7/31/19 (the “Effective Date”) by and between Disys Solutions, Inc. (“DSI”), a Virginia corporation, located at 44670 Cape Court, Suite 100, Ashburn, Virginia 20147 and Augusta County (“Client”), located at 535 Telfair St Bldg. 2000 Augusta, GA 30901. System and product names described in this document are not always accompanied by their trademark symbols (™, ®). All other trademarks are the property of their respective owners.
3) Proprietary and Confidential This Statement of Work (SOW) includes data that shall not be disclosed outside of [Client] and shall not be duplicated, used, or disclosed - in whole or in part - for any purpose other than to evaluate this proposal or quotation. If, however, a contract is awarded to DISYS Solutions Inc. (DSI) as a result of, or in connection with, the submission of this data, the client shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Client’s right to use information contained in this data if it is obtained from another source without restriction.
4) Definitions • Deliverable: For the purposes of this SOW, the term ‘deliverable’ refers to one specific work product that is
the outcome of the engagement. Collectively, deliverables are the product for which the price of this SOW is exchanged. Services or activities (work) will be performed as a part of this SOW in order to produce the deliverables (work product).
• Documentation: The terms ‘document’ and ‘documentation’ as they relate to this SOW are intended to
mean any notes, charts, graphs, diagrams, report outputs, network addresses, passwords, configuration logs, or any other discretionary information deemed by DSI to be relevant to this effort. Documentation is not intended to be, or considered to be, complete, comprehensive, or exhaustive as it relates to the overall Client network or information systems environment. Any documentation provided as a part of the execution of this SOW will be limited to systems, items, or topics specifically referenced in this SOW.
• Knowledge Transfer: The term ‘knowledge transfer’, as it relates to this SOW, is intended to mean
conversational discussions about various technical aspects of this effort. Knowledge transfer is not intended to be, expected to be, or considered to be complete, comprehensive, or exhaustive as it relates to the overall Client network or information systems environment. Additionally, knowledge transfer is not intended to replace the need for formal instruction or vendor-supplied training in the operation of any systems installed or configured as part of this SOW.
• Training: Unless otherwise specifically stated in this SOW, DSI supplied training is not intended to convey
any formal certification or credential and is provided on a ‘best effort’ basis as a courtesy to the Client.
• Best Effort: The term ‘best effort’ as it relates to this SOW is intended to mean services provided by DSI to
the Client with no express warrantee or guarantee implied. A particular outcome of best effort service is not guaranteed, but every effort will be made to ensure the best result possible within the time allowed and with the resources available.
• IN SCOPE: The work described in the Activities section of this document, and effort toward the fulfillment
and delivery of items described in the Deliverables section of this document are considered to be ‘IN SCOPE’ as they relate to this effort. The contents of the Assumptions sections of this document provide specific clarification of the scope.
• OUT OF SCOPE: Any items, components, materials, efforts, objectives, tasks, or services not described in
either the Activities or Deliverables section of this document are considered ‘OUT OF SCOPE’ as they relate to this effort. OUT OF SCOPE work will not be performed without written authorization by the Client via the project change control process described herein.
• Testing, Validation, Verification: The terms ‘testing’, ‘validation’ and ‘verification’ refer to the process of
comparing measurements and observations of specific information systems to Client provided expectations or criteria. The Client is responsible to confirm that tests, validation, or verification is successful.
• Client: means entity who is authorized to receive or use the service or solution described in this SOW.
• Normal Business Hours: are Monday-Friday, 8:00am to 5:00pm local time excluding state, local and
national holidays.
• Milestone: A specific goal, objective, or event pertaining to services described under the terms of this SOW.
• Site Survey: An assessment by partner of the readiness of the client site for the implementation of the
product as further defined below.
• Staging: The assembly and software loading of product prior to Installation at client site.
Attachment number 5 \nPage 4 of 14
Item # 2
SOW Page 5 of 14
5) Scope of Work This section provides an overview of the implementation services that Disys Solutions Inc. (DSI) is pleased to offer to Augusta County who are planning to purchase the following Cisco products and services. Those products include the following:
• 2 x Cisco Nexus N5K-C5672 Switches as DC core.
• 4 x Cisco Nexus N2K-C2348TQ-E as the FEX switches.
• 14 x Cisco Catalyst C9500-16-A
• 6 x Cisco Catalyst C9500-24Y4C-A
• Install and configure SDA-W-LABKIT
• Installation of 3 x Cisco Business Edition 7000 Servers
• Migration of Existing Unified Communication Applications to new BE7000 Servers
• Testing and Handover Below are the tasks involved in DC Migration & Implementation of Core, Distribution Switches, and SDA Lab.
Activity Duration
Nexus 5672 Core Switches
55 Man Days
Racking and hardware installation of New Nexus 9500 Core Switches
Check critical components network modules, Fan, Power supply are working fine.
Configure and makes sure that all the components are healthy and operable
Upgrade the switch NX-OS code to the latest version.
Install and check licenses if applicable.
Racking and hardware installation of Four FEX Nexus 2k Switches
Configure VPC between both core switches using 2 x 40G links for vPC peer Links and 1 x 10G link for peer keep alive.
Verify Verifying the vPC Configuration and vPC Consistency Checks.
Replicate all Data center layers 2 VLAN’s and layer 3 VLAN’s to new core switches.
Replicate all other configuration in new core switches similar to old core, stripping the configurations which are not required and align with cisco best practices.
Check Layer 3 routing between the different network segments i.e. interclan, WAN, internet etc.
Test the connectivity To/From different segment of network.
Configure for proper traffic flow, security, and other features using Cisco best practice
Catalyst 9500 as Distribution Switches
Racking and hardware installation.
Attachment number 5 \nPage 5 of 14
Item # 2
SOW Page 6 of 14
Activity Duration
Check critical components like Supervisor, network modules, Fan, Power supply are working fine.
Configure and makes sure that all the components are healthy and operable.
Upgrade the switch IOS code to the latest version.
Configure L2 and L3 VLAN
Configure Routing as per requirement
Configure for proper traffic flow, security, and other features using Cisco best practice
Configure for proper traffic flow, security, and other features using Cisco best practice
SDA Lab Kit with 2 x Switches
Install DNA appliance into customer provided racks
Racking and hardware installation of 2 x Catalyst 9300 Switches
Upgrade the DNAC code to the latest version
Install and check licenses if applicable.
Add Devices in DNA appliance
Below are the tasks involved in UC Upgrade and Migration
Activity Duration
Install, Rack and Configure 3 x Cisco Business Edition 7000 Servers
20 Man
Days
Upgrade to the latest version of ESXi
Upgrade Cisco BE7000 drivers to the latest version
Migrate applications from old UCS to the new BE7000 servers
Upgrade CUCM (Pub, Sub1, and Sub2) to v12.5
Upgrade CUCN (Pub and Sub) to v12.5
Upgrade another CUCN (Pub) to v12.5
Upgrade CCX (Pub and Sub) to v12.0
Upgrade Quality Manager
Attachment number 5 \nPage 6 of 14
Item # 2
SOW Page 7 of 14
Activity Duration
Provide Finesse training
Migrate Applications from v10.x to 12.5
Testing
Next Day Support and Project Closeout
IMPORTANT: Below are the Phone Models which have been deprecated in version CUCM 12.5. These phones
will not work with CUCM 12.5 anymore.
• Cisco Unified IP Phone 7970G
• Cisco Unified IP Phone 7971G-GE
• Cisco Unified Wireless IP Phone 7921G
• Cisco IP Phone 12 SP+ and related models
• Cisco IP Phone 30 VIP and related models
• Cisco Unified IP Phone 7902
• Cisco Unified IP Phone 7905
• Cisco Unified IP Phone 7910
• Cisco Unified IP Phone 7910SW
• Cisco Unified IP Phone 7912
• Cisco Unified Wireless IP Phone 7920
• Cisco Unified IP Conference Station 7935
Customer should verify with any third party software application vendor if it supports Cisco Collaboration 12.5
6) Milestones
# Milestone Task
1 Project Launch Workshop / Site Visit / Information Gathering
2 Low level Design and Configurations Development
3 OS upgrade/ Racking and Cabling / Configuration Deployment and Testing
4 Migration / Cutover / Testing
5 Day2 Support
6 As-Built Documentation
Attachment number 5 \nPage 7 of 14
Item # 2
SOW Page 8 of 14
7) Project Management A DSI Project Manager will schedule, coordinate and assist DSI personnel assigned to the project. The Project Manager will communicate regularly with Client personnel and be the single point of contact for Client personnel during the project.
Some or all the following activities may be included in the project depending on duration and complexity.
1. Project kick off meeting/workshop a. Team introductions b. Project overview c. Initial schedules d. Document any follow ups
2. Initial project planning meeting a. Escalation contacts b. Identify proposed project schedule c. Identify estimated project completion date
3. Ongoing project meetings (for projects lasting more than two weeks) a. Current status b. Concerns c. Follow ups d. Identify any changes that may require a Change Order
4. Project Close out Meeting a. Project review b. Address any open issues
8) Deliverables Some or all of the listed documentation may be included as part of the delivered services. Bullet (a) and (b) are for assessments only.
a. Services identified in Section (5) Scope of Work b. Final Presentation and review of findings and recommendations c. Final report documenting findings and recommendations d. Any additional supporting documentation as appropriate
(1) As-Built network diagram (2) Addressing and passwords of devices (3) All pertinent configuration files (4) Brief explanation of configuration file parameters (5) Basic troubleshooting techniques and links to appropriate online administration guides
9) Client Responsibilities In the delivery of the service, the Client responsibilities will be to provide where applicable:
a. Provide any supporting documentation such as building drawings/schematics/blueprints of Client site(s), network diagrams, configurations in electronic format;
b. Provide remote Access to network(s) if necessary c. Provide any necessary escort personnel for DSI staff; d. Provide any necessary access, passwords, and visibility to all network devices configuration
and security information e. Provide approval for digital photography f. Provide on-site access to all required areas and rooms, including secure and sensitive areas
as necessary to perform the assessment g. Provide access to ladders, lifts and other available equipment, when required, for wireless
network assessments h. Designate individuals as primary Project and engineering contacts
Attachment number 5 \nPage 8 of 14
Item # 2
SOW Page 9 of 14
i. Provide access to key knowledge personnel
10) DSI’s Responsibilities In the delivery of the service, DSI’s responsibilities will be to provide: a. Trained and certified personnel to perform the activities identified in the Scope of Work
Section of this document. b. Provide any necessary tool(s) and related technologies essential to perform activities
identified in the Scope of Work Section of this document. c. Maintain client confidentiality and information security
11) Assumptions Below is a list of assumptions related to the execution of the activities for this Statement of Work. Some assumption may vary depending on whether the activities are remote or on site.
a. Access to Client systems as required as part of the scope of work b. Client Site(s) is accessible during project hours and there are no restrictions present to
entering an area necessary for the Assessment c. DSI will be provided with necessary Client escort personnel to gain access to any necessary
locations that may otherwise be inaccessible for security reasons d. Client will respond in a timely manner to requests for access to Client Site(s), device login,
configuration and security information. Any delays may cause delays in the agreed to timeline e. Work will begin on an agreed schedule between the client, DSI PMO and DSI Sales. f. If there is a schedule delay not exclusively caused by DSI, or a change in scope or
deliverables, there may be a mutually agreed to price increase g. Any changes to the design and equipment presented to the Client within this proposal and
BOM will require a change order to the scope of work h. All Client systems that will interface with the solution provided as part of these services will
have manufacturer support in place. Additional charges may result if DSI is required to trouble shoot unsupported systems.
12) Out of Scope Any services that are not specifically detailed herein are excluded from the Services to be provided under this SOW.
13) Project Completion This project will be considered complete when all expected deliverables have been received by Client, as acknowledged and agreed to by the parties through a Project Completion form, in accordance with the procedures set forth in this paragraph. At the completion of the project, DSI will provide the Client with a Project Completion form. The Client will have 7 calendar days from the date of receipt of the Project Completion form either (i) to accept it by signing and returning it to DSI, or (ii) to articulate its objections in writing to DSI. If the Client does not timely provide DSI with written acceptance or objection(s) within the Seven (7) calendar day period, the Client will be deemed to have ACCEPTED the project and all associated deliverables without any further action by either party.
Attachment number 5 \nPage 9 of 14
Item # 2
SOW Page 10 of 14
14) Pricing Below is pricing for the services and activities defined in this statement of work.
Service Cost
Engineering Services 150,000.00$
Total 150,000.00$
15) Billing Client will be invoiced monthly for services to date. If the project is completed prior to the end of the month, the final invoice will be submitted as soon as the project effort is complete. If billing milestones are established as part of the project, it will supersede monthly invoicing.
16) Change Order to Statement of Work Requests by Client, which are outside the scope of this SOW are subject to a change order using the form in Appendix C.
17) SOW Acceptance As a duly authorized representative, I hereby acknowledge, accept and authorize this statement of work.
Client
(SIGNED) (DATE)
(PRINT NAME) (TITLE)
This SOW will not be considered valid for execution unless signed by autorized agent of Client.
Attachment number 5 \nPage 10 of 14
Item # 2
SOW Page 11 of 14
Appendix A
PROJECT COMPLETION CERTIFICATE
When the project is complete, DSI will request final acceptance of all services and deliverables from Client via the following project completion form: PROJECT COMPLETION FORM This document serves to confirm that the project has been completed and all of its deliverables have been met per the Statement of Work.
1. Project Name:
2. Client: Client Client Contact Title Address1 Address2 City, State, Zip Phone number Email Address
3. Project Number: DSI Internal Use
4. Phase(s) to be Billed: Specific phase(s) billed
Summary of Deliverables:
First Deliverable Second Deliverable Third Deliverable Additional DeliverablesS
Note: Please provide total project hours
5. Acceptance
PROJECT COMPLETION DELARATION: The Client project team has received and reviewed all expected deliverables of the project, accepts all the services provided, and considers the terms of the SOW fulfilled. Client authorizes DSI to invoice any outstanding balance for services rendered.
Signature: Title: Date:
Attachment number 5 \nPage 11 of 14
Item # 2
SOW Page 12 of 14
Appendix B Satisfaction Survey
To ensure we are providing service excellence please take a moment to fill out the survey below and return it to the DSI Project Manager assigned to the project.
Overall, I am very satisfied with the way DSI performed this project.
Strongly agree Agree Neutral Disagree Strongly Disagree
Overall, I am very satisfied with the scheduling of this project.
Strongly agree Agree Neutral Disagree Strongly Disagree
Overall, I am very satisfied with the level of communication during this project.
Strongly agree Agree Neutral Disagree Strongly Disagree
Overall, I am very satisfied with the Project Management on this project.
Strongly agree Agree Neutral Disagree Strongly Disagree
Overall, I am very satisfied with the Engineering effort on this project.
Strongly agree Agree Neutral Disagree Strongly Disagree
Overall, I am satisfied with the DSI account manager.
Strongly agree Agree Neutral Disagree Strongly Disagree
Compared to how you felt about DSI before this project, what is the likelihood of completing
another project with DSI?
Better, based on Performance About the same Worse, based on performance
Based on your experience, how likely would you be to recommend DSI?
Definitely will Probably will About the same Probably will not Definitely will not
Additional comments:
Attachment number 5 \nPage 12 of 14
Item # 2
SOW Page 13 of 14
Appendix C
PROJECT CHANGE ORDER
Throughout the project it may be necessary to amend this scope of work or request approval for additional project related costs. Such requests will be submitted to Client via the following project change order.
PROJECT CHANGE ORDER
1. Project Information 1. Project Name:
2. Account Manager:
3. Project Manager:
4. Client Sponsor:
5. Governing SOW: This change request shall serve as an extension of service SOW ‘Statement of Work for Storage Assessment executed between DSI and Client on [DATE].
2. Change Request
2.1. Change Description
Details of changes requested
2.2. Change Description:
2.3. Change Justification:
2.4. Change Impact
2.4.1. Effective Date:
2.4.2. Estimated Duration:
2.4.3. Estimated Cost:
3. Acceptance Client ACCEPTANCE OF PROPOSED CHANGE: The Client project team has reviewed and accepts the proposed change to the project scope and modification of the terms of the governing SOW.
Signature: Title: Date:
Attachment number 5 \nPage 13 of 14
Item # 2
SOW Page 14 of 14
Appendix D Additional Supporting Information
Attachment number 5 \nPage 14 of 14
Item # 2
Public Safety Committee Meeting
8/13/2019 1:05 PM
Change Order Request - P362943 for Bid #18-285 Demolition and Reconstruction of Parking and
Roadway Entrance at Fire Station 4
Department: Fire
Presenter:
Caption: Motion to approve a change order to in the amount of $30,922 for soil remediation that will increase the net amount of P362943
to $91,903.30 for Bid #18-285 Demolition and Reconstruction of Parking and Roadway Entrance at Fire Station 4, awarded to
Contract Management Inc.
Background: Bid Item #18-285 Demolition and Reconstruction of Parking and Roadway Entrance at Fire Station 4 was awarded to Contract
Management in October 2018. This project is a means to create a more direct access point for Fire Department personnel to enter and park fire apparatus without damaging the driveway/parking
lot surface due to the weight of the vehicles. As part of the site preparation, Contract Management had CSRA Testing &
Engineering Co. test the soil. CSRA Testing & Engineering reported at least three feet of soil needs to be removed and replaced with stabilizing stone or geogrid before construction of
the new parking lot and driveway can begin. The quote for soil remediation at the Station 4 work site exceeds 50% of the
original job cost of $60,981.30. A letter, dated May 14, 2019, was sent to Geri Sams of the Procurement Department explaining the issue and asking if the best course of action
would be to request a change order or to bid the work out separately. The Procurement Department advised that it could
not go out for bid separately and instructed the Fire Department to request a change order through Commission for soil remediation at Station 4 to complete this project.
Analysis: Accepting the quote and approving the change order will get the project completed in a timely manner. Alternatively, putting the
soil remediation out for bid separately or rebidding the project in its entirety will delay the completion of this project for several months but the Procurement Department advised since Contract
Cover Memo
Item # 3
Management was awarded the bid that these issues had to be
addressed with a change order.
Financial Impact: $30,922 - Funds are available in the Augusta Fire Department Fund Balance
Alternatives: (1) Approve the change order request for $30,922 to P362943 (2) Bid out the additional work as a separate bid to obtain
competitive pricing for soil remediation at Station 4 - Not Recommended by the Procurement Department (3) Pay Contract Management for work they have completed up to this point and
rebid the entire project to include the cost of soil remediation to one bidder.
Recommendation: approve Motion to approve a change order in the amount of $30,922 for soil remediation that will increase the net amount of P362943 to $91,903.30 for Bid #18-285 Demolition and
Reconstruction of Parking and Roadway Entrance at Fire Station 4, awarded to Contract Management Inc.
Funds are
Available in the
Following
Accounts:
$30,922 - Funds are available in the Augusta Fire Department Fund Balance
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Public Safety Committee Meeting
8/13/2019 1:05 PM
Fire Department Fund Balance Transfer for EMTRAC Engineering Purchase for Fire Department
Vehicles.
Department: Fire
Presenter:
Caption: Motion to approve the transfer of $158,000 from the Augusta Fire Department’s fund balance for the Engineering Department
purchase of EMTRAC for all Fire Department first-response vehicles.
Background: The EMTRAC system will be purchased through the Engineering Department’s current contract and installed on all Fire Department first-response vehicles.
Analysis: EMTRAC will give the Fire Department the ability to reduce response times and increase roadway safety.
Financial Impact: Equipment and installation costs are estimated at 158,000. Funds
are available in the Fire Department fund balance
Alternatives: None
Recommendation: Motion to approve the transfer of $158,000 from the Augusta Fire Department’s fund balance for the Engineering Department purchase of EMTRAC for all Fire Department first-response
vehicles.
Funds are
Available in the
Following
Accounts:
Equipment and installation costs are estimated at 158,000. Funds are available in the Fire Department fund balance
REVIEWED AND APPROVED BY:Cover Memo
Item # 4
Public Safety Committee Meeting
8/13/2019 1:05 PM
Meeting Management System
Department:
Presenter: Commissioner John Clarke
Caption: Meeting Management System for the purpose of Augusta decorum and order of questions and statements. (Requested by
Commissioner John Clarke)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 5
AGENDA. ITEM REQUEST FORM
Commission meetings: First and third Tuesdays of each month - 2:00 p.m.Committee meetings: Second and last Tuesdays of eaeh month - 1:00 p.m.
Commission/Committee: (Please check one and insert meeting date)
Commission Date of Meeting_Date of Meetings.-/J -nDate of Meeting _Date of Meeting _Date of Meeting _Date of Meeting
Contact Information for IndividuaVPresenter Making the Request:
Name: ffi/ 'a 4Address:Telephone Number:Fax Number:E-Mail Address:
Caption/Topic of Discussion to be placed on the A
Public Services CommitteeAdministrative Services CommitteeEngineering Services CommitteeFinance Committee
Please send this request form to the
Ms. Lena J. BonnerClerk of CommissionSuite 220 Municipal Building535 Telfair StreetAugusta, GA 30901
following address:
Telephone Number:Fax Number:E-MaiI Address:
706-821-1820706-821-r838nmorawski@au gustaga.gov
Requests may be faxed, e-mailed or delivered in person andOffice no later than 9:00 a.m. on the Thursday precedingmeeting of the following week. A five-minute time limit will
must be received in the Clerk'sthe Commission or Committeebe allowed for presentations.
Attachment number 1 \nPage 1 of 1
Item # 5
Public Safety Committee Meeting
8/13/2019 1:05 PM
Minutes
Department:
Presenter:
Caption: Motion to approve the minutes of the Public Safety Committee held on July 30, 2019.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 6
Public Safety Committee Meeting Commission Chamber - 713012019
ATTENDANCE:
Present: Hons. D. Williams, Chairman; Garrett, Vice Chairman; B.Williams and Sias, members.Absent: Hon. Hardie Davis, Jr., Mayor.
PUBLIC SAF'ETY
1. Motion to approve acceptance of a grant from the Juvenile Justice Incentive ItemGrant Program Funding Committee in the amount of $467,621 effective July Action:1,2019 for the Richmond County Juvenile Court Multi-systemic Therapy and ApprovedAggression Replacement Training Programs.
Motions
Motion Motion Text
r ype
Motion to. aDDrove.APProve
vtorio, Passes4-0.
Made By
CommissionerBobby Williams
Seconded By
CommissionerBrandon Garrett
MotionResult
Passes
MotionResult
Passes
2. Motion to approve the minutes of the Public Safety Committee held on July 9, Item2019. Action:
Approved
Motions
Motion Motion Textr ype
Motion to^ aDDrove.APProve vtotion passes
4-0.
Made By
CommissionerBobby Williams
Seconded By
CommissionerBrandon Garrett
3.
Attachment number 1 \nPage 1 of 2
Item # 6
Discuss status of the demolition of 401 Walton Wuy; progress with the ltemdevelopment of new juvenile court and training facility. (Requested by Action:Commissioner John Clarke - referred from July 9 Public Safety ApprovedCommittee)
Motions
Y::*1"' Motion Text Made By seconded By MotionType ''---- -'t *-------- -r Result
Motion to delete
^ this item from the Commissioner CommissionerApprove agenda. Bobby williams Brandon Garrett Passes
Motion Passes 4-0.
4. Motion to approve a Second Amendment of the Contract with Pierce ItemManufacturing in reference to RFP 17-137 Emergency Apparatus/Fire Action:Pumper to Pierce to purchase three (3) Pierce Engines, and to authorize the ApprovedMayor to execute the appropriate documents.
Motions
Motion r. Motion;------ Motion Text Made By Seconded By'l ype "---- -r Result
Motion to
^ approve. Commissioner CommissionerApprove ruro,ion passes Sammie Sias Bobby Williams Passes
4-0.
www.augustaqa.gov
Attachment number 1 \nPage 2 of 2
Item # 6