Public Procurement Regulatory Authority (PPR4) Rules. "The power transformer must be equipped...
7
Public Procurement Regulatory Authority (PPR4) Rules. "The power transformer must be equipped with vacuum type On-Load Tap Changer AIR, Germany or equivalent specification " (NTDC