Public Participation Summary Report A Report for the EIA Process: DM/0030/2012 20 February 2015

Public Participation Summary Report

  • Upload
    dokiet

  • View
    291

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Public Participation Summary Report

Public Participation Summary Report

A Report for the EIA Process: DM/0030/2012

20 February 2015

Page 2: Public Participation Summary Report
Page 3: Public Participation Summary Report

i

Document Description

Client:

Tongaat Hulett Developments and eThekwini Municipality

Project Name:

Environmental Impact Assessment for the Proposed Cornubia Mixed-Use, Phased Development, Phase 2,

Mount Edgecombe

Royal HaskoningDHV Reference Number:

E02.DUR.000375

Authority Reference Number:

DM/0030/2012

KZN/EIA/000762/2012

Compiled by:

Humayrah Bassa (Pr.Sci.Nat.)

Date:

24 November 2014

Location:

Durban

Reviewed by: Signature:

Prashika Reddy (Pr.Sci.Nat.)

Approved by: Signature:

Malcolm Roods (EAPSA)

© Royal HaskoningDHV

All rights reserved

No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the

written permission from Royal HaskoningDHV.

Page 4: Public Participation Summary Report
Page 5: Public Participation Summary Report

ii

Table of Contents

1 INTRODUCTION ........................................................................................................... 4

Background ........................................................................................................................................ 4 1.1

The Public Participation Process ....................................................................................................... 4 1.2

Purpose of the Report ........................................................................................................................ 4 1.3

Terms of Reference for Public Participation ...................................................................................... 5 1.4

Public Participation Summary ............................................................................................................ 5 1.5

2 IDENTIFICATION OF I&APS........................................................................................ 6

3 SITE NOTIFICATION .................................................................................................. 48

Site Notice ........................................................................................................................................ 48 3.1

Proof of Site Notices......................................................................................................................... 49 3.2

4 BACKGROUND INFORMATION DOCUMENT .......................................................... 51

BID & Comment Form ...................................................................................................................... 52 4.1

5 ADVERTISEMENTS: ROUND 1 ................................................................................. 59

Advertisement .................................................................................................................................. 59 5.1

Proof of Advertisements ................................................................................................................... 60 5.2

6 PUBLIC MEETINGS: SCOPING PHASE ................................................................... 65

Presentation Slides .......................................................................................................................... 66 6.1

Minutes of the Meetings ................................................................................................................... 71 6.2

Public Meeting Registers ................................................................................................................. 95 6.3

Proof of Public Meetings ................................................................................................................ 145 6.4

Blackburn ....................................................................................................................................... 145 6.4.1

Waterloo ......................................................................................................................................... 146 6.4.2

Ottawa ............................................................................................................................................ 147 6.4.3

Mount Edgecombe ......................................................................................................................... 148 6.4.4

Umhlanga ....................................................................................................................................... 149 6.4.5

Phoenix .......................................................................................................................................... 150 6.4.6

7 PUBLIC REVIEW OF THE ENVIRONMENTAL SCOPING REPORT ...................... 151

8 REVISED BID ........................................................................................................... 151

Revised BID & Comment Form ...................................................................................................... 152 8.1

9 ADVERTISEMENTS: ROUND 2 ............................................................................... 162

Advertisement ................................................................................................................................ 162 9.1

Proof of Advertisements ................................................................................................................. 163 9.2

10 PUBLIC MEETINGS: EIA PHASE ............................................................................ 166

Presentation Slides ........................................................................................................................ 167 10.1

Minutes of the Meeting ................................................................................................................... 176 10.2

Page 6: Public Participation Summary Report

iii

Public Meeting Registers ............................................................................................................... 208 10.3

Proof of Public Meetings ................................................................................................................ 288 10.4

11 PUBLIC REVIEW OF THE EIA Report .................................................................... 292

12 ISSUES TRAIL ......................................................................................................... 292

13 ENVIRONMENTAL AUTHORISATION .................................................................... 292

List of Appendices

Appendix A: Comments & Responses Report

Page 7: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 4

1 INTRODUCTION

Background 1.1

Royal HaskoningDHV (RHDHV) was appointed by Tongaat Hulett Developments (THD) and the eThekwini

Municipality (eTM) to act as an independent Environmental Assessment Practitioner (EAP) for the

environmental authorisation application for the proposed Cornubia Mixed-Use, Phased Development, Phase

2.

The Public Participation Process 1.2

Public participation is a process that is designed to enable all Interested and Affected Parties (I&APs) to voice

their opinion and/ or concerns which enables the practitioner to evaluate all aspects of the proposed

development, with the objective of improving the project by maximising its benefits while minimising its

adverse effects. I&APs include all interested stakeholders, technical specialists, and the various relevant

organs of state who work together to produce better decisions.

The public participation process must adhere to the requirements of Regulations (GNR 543) under the

National Environmental Management Act (NEMA) (No 107 of 1998)(as amended).

The public participation process for the Cornubia Phase 2 EIA process has been undertaken according to the

stages outlined below.

Figure 1-1: Stages of the Public Participation Process

RHDHV, together with Real Consulting, are conducting the Public Participation Process (PPP) for the

Cornubia Phase 2 Development. In recent years THD has taken a much more participatory approach to their

property development projects, with the understanding that the socio-political and economic context of the

times invites this more public approach. Communities that surround the developments are invited to “inform

and be informed” about developments through the establishment of fora in order to achieve the most positive

impacts possible. It is also noted that engaging stakeholders even before developments are built can achieve

the best impacts. It is for this reason that the PPP that forms part of the Environmental Impact Assessment

(EIA) becomes the basis of a long-term stakeholder engagement process.

Purpose of the Report 1.3

The principal purpose of this Public Participation Summary Report is to:

Summarise the public participation processes undertaken for the EIA Process;

Highlight what has been done to date;

Synthesise the issues and concerns identified by Interested and Affected Parties (I&APs) and various

stakeholders during the public participation process; and

Synthesise comments on the proposed development.

Page 8: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 5

Terms of Reference for Public Participation 1.4

One of the main aims of the public participation process is to serve as a structure for communication and

consultation with I&APs. An outline of the communication efforts that was launched as part of this process are

listed below. It should, however, be noted that this plan was adapted throughout the process to ensure

successful communication and consultation by the public participation consultants to all I&APs.

The project team recognises successful communication as a relevant, timely, and continuous tool that enables

the targeted project team, individual and groups of I&APs.

The terms of reference for the implementation of a successful and robust public participation programme,

were as follows:

Identification of I&APs in the vicinity of the study area;

Provision to all I&APs of an opportunity to comment or raise concerns regarding the project;

Maintenance of procedures for communication with I&APs and receiving, documenting and

responding to relevant communication from I&APs;

Identification and elimination of any sources of misunderstandings between the Applicant, Consultants

and the I&APs;

Always aim to improve the communication between the Consultants, the Applicant and I&APs;

Present the project in an objective way by supplying all appropriate, relevant and accurate information

and facts in an unbiased manner to ensure a better understanding of the proposed project; and

Ensure that the public participation process is an independent and transparent process.

Public Participation Summary 1.5

The Public Participation Process commenced in June 2012 where site notices were erected at the entrances

to the site as well as strategic locations on site. During this time comment forms and Background Information

Document (BID) flyers were distributed to neighbouring properties and on Blackburn Estate as well as to other

I&APs by hand and electronically. I&APs were introduced to the project and encouraged to register on the

database.

The PPP commenced in June 2012 where site notices were erected at the entrances to the site as well as at

strategic locations on the site. During this time comment forms & BID flyers were distributed to neighbouring

properties and on Blackburn Estate as well as other interested and affected parties (I&APs). Advertisements

were placed in five newspapers during the week of the 3rd

September to 7th September 2012 followed by a

comment period which was open for the I&APs to raise their issues and concerns regarding the proposed

activity. In addition to this, six public meetings were held from 16th September to 20

th September 2012 in

which I&APs were introduced to the development and given a forum in which to discuss their concerns or

provide comments. A draft Scoping Report was compiled after receiving comments from the I&APs, and

thereafter the draft Scoping Report was distributed to the relevant authorities and to the public for review, for a

40 day comment period in which I&AP’s were afforded the opportunity to raise any further issues and

concerns, until the finalisation of the document for submission to the KwaZulu-Natal Department of Economic

Development, Tourism and Environmental Affairs (KZN EDTEA) – previously known as the KZN Department

of Agriculture and Environmental Affairs (KZN DAEA). I&APs were then notified of the availability of the final

Scoping Report which was submitted to the KZN EDTEA.

Public participation continued into the EIA Phase when the BID was updated in October 2014 and circulated

to all registered I&APs. Four advertisements were placed in English and isiZulu during the week of 3rd

November and 7th November 2014 notifying I&APs and inviting I&APs to attend the EIA Phase Public

Meetings held from 18th November 2014 to 26

th November 2014 at seven venues. They were further notified

of the availability of the draft Environmental Impact Assessment Report for public review for a period of 40

days (excluding the December shut-down period) from the 24th November 2014 to the 26

th January 2015.

I&APs were then notified of the availability of the final Environmental Impact Assessment Report which is to

be submitted to the KZN DEDTEA.

Page 9: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 6

2 IDENTIFICATION OF I&APS

Prior to commencement of the PP Process a detailed understanding of the project description was attained

from the Applicant. Upon receiving the description a site visit was undertaken, this process was used to

identify the following:

Identify key areas of concern.

Identify sites for the placing of the site notices.

Attain a visual understanding of the project.

Identify possible sites to undertake Focus Group Meeting / Public Meetings.

Identify areas most impacted by the proposed development.

The first step in the PP Process entailed the identification of key I&APs and Stakeholders, including:

Local and provincial government;

Local businesses;

Residents;

Affected and neighbouring landowners;

Environmental Non-Governmental Organisations; and

Community Based Organisations.

An I&AP Database was compiled which has been maintained and updated throughout the duration of the EIA

process.

Page 10: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 7

Name Surname Organisation Tel Mobile Fax Email Postal Address

Sijida Abbas 076 384 5699

Afzal Abernethy 083 781 9265 [email protected]

Sue Abernethy 082 871 2529 [email protected]

16 Montgomery Estate 2

Ridhwaan Abid 084 951 9510

S Abid 084 951 9510 [email protected]

Seelan Achery Temple 031 502 1232 083 563 7367 031 502 1232

Amunaljunus Ali 031 500 9369

Waheeda Ali 084 824 1669 [email protected]

Glenn Allanson 031 5394291 0826311964 [email protected]/ [email protected]

61 Columbia Crescent, 4302

Nadia Ally 031 5391939 0799227870 [email protected]

36 Todd Street, Verullum

Ashok Anganoo 071 359 6425

Mrs Anna Shree Mariammen Temple 073 203 8553

Desmond Anthony 073 260 1552

Keith Anthony 079 303 1350 [email protected]

Nisha Anthony 084 555 0187

Davishlin Apadoo 084 083 3306 tayuri08gmail.com

Tasnim Arbee Softline & Pastel VIP [email protected]

Renita Arjoon 083 266 0764 [email protected]

Nazeera Asmal 032 5333909 083 3075546 [email protected]

38 Adam Rd, Lotusville, Verulam

Robiya Asmal 031 5331350 082 666 5358 [email protected]

2 Ireland Street, Ashraf heights, Verulam, 4340

Anwar Asmall 082 7640000 [email protected]

202 Mark Circle, Rrennance Park, Verulam

N Atnee 031 502 5900 [email protected]

N E Attree 082 312 9004 [email protected]

Ntombizonke Ayandeni 074 6153489

Hamchand Baboolal 073 630 3269

Shivanie Baijnath 084 029 6479

Carolyn Baker South African Sugar 031 5087404 [email protected] Private Bag X02,

Page 11: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 8

Name Surname Organisation Tel Mobile Fax Email Postal Address

Research Institute Mount Edgecombe, 4300

Mark Baker Ward Committee 084 751 6124 [email protected]

Ntomboya Bakimithi 074 518 6925

Satish Balgobind 083 254 0007 [email protected]

ME Bampezi 076 864 0747

Simfumene Bandezi 0717821993

Thenjiwe Bangani 073 827 2057

Gwala Banothile 073 352 3865

Robert Barbour 031 502 3188 [email protected]

S Basanth 079 734 2070

Virgina Base 078 296 4401

Muhamed Basha 082 582 3672

Humayrah Bassa RHDHV 031 719 5500 [email protected]

6 Payne Street, 3610 Pinetown

Ntembekhaya Bau 071 253 2132

Hemraj Bawawipersad 084 498 9409

Senzekile Bayanda 0782055035

Gavin Benjamin Development Planning 031 311 7884 031 311 7686 [email protected]

PO Box 680 Durban 4000

Reginald B Bhane 0726700030 Blackburn village

Sitimela Bhane 072 670 0030

Zanele Bhavuma 071 066 6532

Mjo Bhele 078 925 4986

Jessica Bhim 032 535 7461

Siyabonga Bhoko 073 508 3402

L K Bhowi 073 646 9570 [email protected]

Aroop Bikhari 073 627 5488

Ashnie Bisoonpersad 078 798 4626 [email protected]

Bonginkosi Biyela 083 722 5741

Fikile Biyela 073 111704 Lot 31306

Zanele Biyela Ward Committee 079 141 7560

Florence Blose Ward Committee 073 176 2009

Yvonne Boden 082 854 3354 [email protected]

Lucas Bokednano 084 2226699 Lot 2816

Page 12: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 9

Name Surname Organisation Tel Mobile Fax Email Postal Address

Nkwathi P Bongi 0786043698

Mpuli Bongisiwe 0789983229 Blackburn village

B Boohzaier

PM Brandburn 082 888 2009

Roshan Brijh Broadlands Homeowners Association 031 502 7529 083 385 0563

031 361 7154 [email protected]

Box 24260, Broadlands, Mt Edgecombe, 4301

Ishwar Brijlal 031 505 7859 078 386 1839

Nirashni Brijlal 076 871 4817

A Briscoe 083 384 4214 [email protected]

Stan Bromley Umhlanga Ratepayers' Association 031 5611 811 082 560 0216

031 561 5383 [email protected]

Box 141, Umhlanga, 4320

Robert Brown Public Schools Club of SA 031 561 4126 Box 63, Umhlanga Rocks, 4320

John Brudsham 031 502 2236 [email protected]

Box 1113, Umhlanga

M Buchanan 083 252 3593 [email protected]

P Buchholz 083 266 6329 [email protected]

Asif Buckas 084 738 9941

Florence Budose 073 176 2009 Lot 3197, waterloo

Zandile Bunjana 073 617 5496 Blackburn village

Mbona Buselaphi 078 884 5120

Claire Bustridge Mt Edgecombe Stables 083 6791870 [email protected]

Andiswa Busuku 073 490 5941

Mandla J. Buthelezi Ward 60 Committee 083 7208317

S Buthelezi 076 164 2022

Sabelo Buthelezi 082 040 8950

SD Buthelezi 072 940 3510

Simon Buthelezi 079 1201808 Lot 32052

Sipho Buthelezi Ward Committee N/A 072 940 3510 N/A N/A Waterloo Community Hall

Hasan Bux 072 4578651 [email protected]

Flat 1, 36 Todd Street, Verulam

Nazeera Bux 032 5330151/ 5331508 083 786 7203 [email protected]

Flat 1- Saleena Heights, Todd Street

Page 13: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 10

Name Surname Organisation Tel Mobile Fax Email Postal Address

Sajida Bux 076 384 6599

D Buxton 031 502 5940 [email protected]

S Buyiswa 078 166 2893

Ajay Calbanadur 074 756 1871 [email protected]

Zandile Camane Ward Committee 072 486 1447

Sally Cameron Pam Golding 082 446 0272 [email protected]

P.o. box 2482, Meece

Robin Candy Ward Committee 083 255 3959 [email protected]

Mobeen Carani 079 911 1785

AJM Carnegie 031 566 4018

PE Carnegie 031 566 4018

Asif Carum 078 201 2085

MS Cassim 073 471 3893

Kurasha Cassim 081 460 8413 [email protected]

Cera Catton Fever Publicators 031 533 7949 084 410 3056 [email protected]

P.o. box 1264, Umhlanga Rocks, 4320

Cebekhulu 073 344 5031

Busi Cele Ward Committee 073 658 4285

Enok Cele 082 954 2513

Francicia Cele 082 544 0123

Joe Cele Ward Committee N/A 073 460 0385 N/A N/A Waterloo Community Hall

mano Cele 083 337 0087

Mbiniseni Cele 082 523 5204

Nokuthula Cele 078 348 9393

Nonkululeko Cele 084 925 6039

Ntombenhle Cele 078 304 4948

Sbongiseni Cele 078 177 2040

Sibusiso Cele Hlanganani Traditional Orchestra 073 1411 735 072 308 2846

3018 Phython Road Verulam, Waterloo

Siphiwe Cele 083 791 5950

Thokah Cele 072 107 1242

Page 14: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 11

Name Surname Organisation Tel Mobile Fax Email Postal Address

Thulani Cele 076 103 6493 760

Zamandosi Cele 073 163 9837

Phembelam Cetywayo ANC 073 789 2120 Blackburn Vilage

Simbongile Cetywayo 078 323 2416 [email protected] Blackburn village

Andile Chagi 078 138 7719

Luvo Chagi 071 518 4824

S Chala 072 690 6381

Syabulela Chala C.P.F 071 402 4421 Blackburn Vilage

R Champkins 031 502 5411 [email protected]

Champkins 082 451 3193 [email protected]

Zethu Changane 072 6584192 Lot 16

Dayalan Chellum 084 915 2071 [email protected]

Theresa Chellum 074 652 4857

Anneline Chetty 074 073 6762

Dhana Chetty 083 385 1152

L Chetty 084 228 5682

Laura Chetty 082 561 7252

Robin Chetty Ethekwini Traffic Authority

S Chetty 079 104 3873

S A Chetty 072 973 2346

Sagren Chetty 073 313 5253

Shamilla Chetty 074 958 0396

Stanley Chetty 074 958 0396

Victor Chetty 083 324 7696 [email protected]

Sylvanus Chetty 073 049 4085 [email protected]

Desigan Chetty 076 441 5733 [email protected]

Bobby Chetty Ward Committee 031 537 3816

Bobby Chetty Ward Committee 5373816

Bobby Chetty 5373816

Cheryl Chetty 084 990 9645 [email protected]

Jane Chetty 074 457 3407 [email protected]

Cimbane Chili 079 574 6665

Eunice Chili 073 418 1306

Happiness Chili 074 275 5690

Hloniphile Chili 084 663 8205

Page 15: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 12

Name Surname Organisation Tel Mobile Fax Email Postal Address

Mongumusa Chili 079 254 7305

Nomusa Chili 084 663 8205

Qinsile Chili 073 022 1738

Thandiwe Chili 073 998 9209

Arunejallem Chillapen Ward Committee 032 533 3458 082 302 1925

Charity Chingova 079 326 1771 [email protected]

Y Chinniah 072 882 0014

Pregasin Chinsami 082 733 5506 [email protected]

Siyabonga Chonco 079 578 0831

Nora Choveaux PMMB Trust 033 396 3344 082 7716324 086 2105819

[email protected]

PO Box 868 Pietermaritzburg 3200

P Clacey 031 502 2004 082 456 4739 [email protected]

Gerald Clarke

Ethekwini Municipality North Operational Entity - Land Use Management 031 311 6054 083 284 6765 [email protected]

5 Lagoon Drive Umhlanga Civic Centre Umhlanga Rocks 4319

Luci Coelho Real Consulting 031 765 6670 [email protected]

Wayne Coetzee Oyster Box Hotel 083 776 4149 082 780 3549

[email protected] ; [email protected]

B Cole Auto Umhlanga [email protected]

John Collin Park Gate Civic Association 032 537 6777 084 250 2734 [email protected]

R Conradt Tony Watson [email protected]

Di Constable Umhlanga Manors Homeowners Forum [email protected]

Adrian Coreejes South African Sugar Association

[email protected]

Adrian Coreejes SASA 031 508 7050 082 654 0211 [email protected]

Elizabeth Cossa 083 492 3196

Peter Cotterell 031 5024015 082 413 6985 [email protected]

29 Rodcliffe , Cherry Hill, Mecce 2, Mt Edgecombe, 4302

JT Crook 031 561 4580

Penny Croucamp Ethekwini Municipality - Environmental 032 311 7517

031 311 7134

Page 16: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 13

Name Surname Organisation Tel Mobile Fax Email Postal Address

Management Branch

Vic Crowther Mt Edgecombe Estate 2 031 502 5360 N/A 031 502 5363

[email protected]

Box 1885, Mt Edgecombe, 4301

Kamphi Cunu

Zanovuyo Cwecwe 074 374 8564

Kiran D 032 537 6825

Aadila Dadabhay 084 500 2004 [email protected]

preline Dadoo 082 806 7213

N Dafothi 073 767 3961

Zahida Dala 071 398 8562

K Dalaic 083 4697 892

Jabulisa Dambuza 073 589 0642

Zehla Danca 083 518 3930

Ndodeni Dango Ward Committee / Youth Forum 031 564 0765

078 521 5626

Ndodeni Dango Ward 35 Committee 031 564 0765 078 521 5626

Suderia Daniel 084 951 4391 [email protected]

Cllr Eunice David 031 502 2351 084 585 6079

Angela Davies

Colin Davies 082 052 1414 [email protected]

Alan & Ena Davis 031 502 2655 [email protected]

Ena & Alan Davis 031 502 2655 [email protected]

N Dawood 073 199 2052

Nasreen Dawood 084 467 4888 [email protected]

Heinz de Boer ward Committee DP 083 355 2343 [email protected]

Gerard de Rauville 082 444 6688 [email protected]

Norma de Rauville 082 444 6688 [email protected]

Suresh Deenanath Phoenix Community Centre 031 539 2428 083 453 5816

031 500 5719

Suresh Deenanath Phoenix Community Centre 031 539 2428 083 453 5816

031 500 5719

Zodwama Demba 0784308087 Lot 819

Raugne Dennaraun 082 049 7224

M Dennis Northglen news 031 572 3749 [email protected]

John Dennison Ethekwini Traffic Authority 031 – 3117702 031 305 [email protected]. za Po Box 680

Page 17: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 14

Name Surname Organisation Tel Mobile Fax Email Postal Address

5871 Durban 4000

Ponnan Devraj 079 951 4816

M Dhanesar 084 359 4559

K Dhanraj 084 550 5517

K Dhawraj 031 571 2500

Gugu Dhlomo 082 503 7454

Paul Dhroomsamy 032 535 7075 084 350 1886

Atom Dilraj Ottawa Civic & Environmental Forum 082 787 2996 [email protected]

Thandekile Dladla 073 747 4225

Fikile Dladla 060 398 5667

Bulelani Dlamini 073 672 2185

Joel Dlamini 073 208 0231

Mduduzi Dlamini 073 394 4612

N Dlamini 073 266 9298

Nomzama Dlamini 073 311 0970

Philile Dlamini 072 0689983 6728 Waterloo

Thobile Dlamini 082 2105522 H398, Hammorns Farm

TM Dlamini 084 884 5691

Zwelakhe Dlamini 0738210721

Dlamini 078 403 0358

Nokuthula Dlamini 078 447 8557 [email protected]

Thobile Dlamini 072 515 0798 [email protected]

Andile Dlamini 084 641 3190

Mpume Dlamini 084 095 2861 [email protected]

M Dlikidia 0827430493 Blackburn village

Musa Dludla ward Committee 073 642 0409

Nokuthula Dludla 073 0719940 Lot 572

Yunus Doba 083 786 7527

Melissa Doorsamy 078 590 2192 [email protected]

Brian Downie 082 892 7082 [email protected]

P Du Plessis 0723504911 P.o. box 2434, Country Club, 4301

Page 18: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 15

Name Surname Organisation Tel Mobile Fax Email Postal Address

A Dube 083 243 7224

Bheki Dube 076 053 6181

Constance Dube 032 948 1254

Mr Dube Waterloo Primary 032 533 4783 073 992 333

Nomzama Dube 072 073 5806

Sibongile Dube 083 457 1163

Thandeka Dube 084 243 8955

Dave Duke 031 240 7500 083 795 1969 [email protected]

Xolani Duma 0796174686 Lot 4149 waterloo

Siphino Dumani 072 143 9137

Watson Dumisani 079 690 4350

Sindiswe Dunjama 078 8735345 Lot 7850

Scara Dunjana 071 326 9106

Bulelani Dunywa 084 445 0548

Thembisile Dunywa 073 677 9858

Muzi Dvadit 083 587 3154

Thembalihle Dwayisa 078 191 6270

Aslam Ebrahim 082 786 5644

Mr Ebrahim 083 964 4467

Mrs Ebrahim

Veronica Ebrahim 072 813 2081 [email protected]

Ridwaan Ebrahm 083 761 8438 [email protected]

Felicity Elliott KZN Wildlife [email protected]

Lindie Enge 078 131 3394 [email protected]

Horst Engel ULTRA [email protected]

Helene Epstein Framework Planning 031 311 7845 083 272 7738 [email protected]

I Eslick [email protected]

N Essol 073 035 0676

Aman Essop 084 5786 759 [email protected]

Aman Essop 084 5786 759 [email protected]

Carlos Esteves Ethekwini Traffic Authority

Horst Eugel 031 561 4797

Cllr David Eunice 084 585 6027

Miek Fallon 082 638 3261

Essop Farhana 079 401 2498 P.o. box 45 Kolua

Page 19: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 16

Name Surname Organisation Tel Mobile Fax Email Postal Address

rd, Verulum, 4340

Yvette Farinha MECCEMA 2 031 502 5360

[email protected]

Muhamed Farouk 082 3263829

5 Aspen Link Terance Park, Verulam

V Fene 073 892 2083

Mfeka Fikile 079 254 7305

Mhleli Fili 073 760 8012 P.o. box 55

Colin Fletcher 082 893 6031 [email protected]

S. Francis

Department of Agriculture and Environmental Affairs (DAEA) - eThekwini District Office 031 361 2719

031 361 2728 [email protected]

Private Bag X006 Bishopsgate, 4009

Mrs Frank 073 130 7669

Patrick D R Freeman Ward 35 Committee 082 806 9856

Patrick D R Freeman Ward 35 Committee 082 806 9856

Theresa Fynn 072 723 0618 [email protected]

Ntombifikile Gaga 083 993 2331

Mrs Gama 084 228 5663

Sunil Ganesh 084 795 7379 [email protected]

Neil Ganeson 084 739 2117

Priscilla Ganga United senior citizens 031 539 1240 072 839 4469 N/A N/A Box 60646, Phoenix, 4080

Zamir Gausemah 074 438 6420 [email protected]

Cabangile Gcabashe 079 038 2050

Siyabonga Gcuma 084 098 4115

Schumbuzo Gebashe 073 6633 543

James Gebuza ANC 073 085 3974 Blackburn Vilage

Mucefiz Gebuza 078 669 5765

Justin George 032 5376176 084 8411338 032 5330018 [email protected] 50 Munn Road

D Gers 083 786 2957 [email protected]

N Ggibam 073 138 2401

Nosibusiso Giada 0710005982 Blackburn village

Alphina Giazide 071 1213980 Lot 3489

Page 20: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 17

Name Surname Organisation Tel Mobile Fax Email Postal Address

Bernice Gibson 031 539 6408

Frank Gibson 031 539 6408

Frank Gibson 031 5396408 0822968665 [email protected]

P.o. box 2195 Country Club, 4301

Siyabonga Gigaba 083 547 5518

Peter Gilmore

Rural Area Based Management and Development Programme. Development and Planning Unit 031 261 6640 083 378 8737

031 261 6671 [email protected]

PO Box 680 Durban 4000

Lungelo Gingo 083 112 4335

Goba 084 435 8466

N Gobidolo 078 780 4758

Dheeraj Goburbhein 0732473879 [email protected]

A6 Pearside Ave, Phoenix

Degrees Gogo 073 680 9008

Savinthri Gokol 031 507 9381

Suresh Gokol 031 507 9381 084 568 6069 [email protected]

Riona Gokool 031 539 6416 072 786 2655 [email protected]

Stephanie Gopaul ERM Southern Africa 031 7672080 083 7784904 031 7643643 [email protected]

Unit 6, St Helier Office Park, Cnr St Helia Rd & Forbes Drive, Gillits, 3610

Ranvir Gopichund 031 505 7586 084 225 2493 [email protected]

Judy Gordon Pam Golding 031 5393174 083 7774882 031 5026089 [email protected]

12 Palm Springs Village

Kamalen Gouden IYER urban design studio

Craig Gouindasamy 084 499 7203

Nivendren Gounden 031 5071805 074 2482199

4 Bluefern Place, Redfern, Phoenix, 4068

Valencia Gounden 031 5071805 084 7765094

4 Bluefern Place, Redfern, Phoenix, 4068

Ranganathan Gounden 074 709 5662 [email protected]

Page 21: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 18

Name Surname Organisation Tel Mobile Fax Email Postal Address

Marlene Gounder 079 348 1166 [email protected]

A Govender [email protected]

Bashie Govender 083 643 8265

Bazil Govender 084 475 1355

Charles Govender Ottawa Parkgate, Residents Association 032 5376639 073 5857727

8 Nirvana Dr, Ottawa

Collin Govender 074 323 3214

Collin Govender 074 323 3214 [email protected]

Donovan Govender 084 237 9721

Eshnine Govender 072 367 4776

Femida Govender 031 500 2953 084 080 3628

Inderan Govender 072 245 2116 [email protected]

J Govender 084 280 6056

Janet Govender 078 367 0701

L Govender 076 651 7494

LM Govender 083 536 3615

M Govender 071 249 9520

Mervin Govender 031 505 8886 083 616 1982 [email protected]

Munien Govender 074 405 4117

Pamela Govender 031 539 1777 072 245 2116

Perumal Govender 076 079 162

Pushpa Govender 032 533 8280

Regina Govender 031 505 4426

Rennie Govender Broadlands Homeowners Association 031 502 7529 [email protected]

Roxanne Govender 074 952 3401

Theo Govender 031 500 1366 074 798 1513

Tino Govender Chair 031 539 3409

Tony Govender Safer Cities 031 539 3939

Tony Govender Safer Cities 031 539 3939

Trevor Govender 084 922 7156 [email protected]

Wayne Govender 073 923 2792

Yugeshni Govender KZN EDTEA [email protected]

Page 22: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 19

Name Surname Organisation Tel Mobile Fax Email Postal Address

ov.za

C Govender 073 585 7727

Perumal Govender 031 461 9600 076 079 1628 [email protected]

Ashley Govender 076 562 4611 [email protected]

Danashree Govender 082 805 2534 [email protected]

G Govender 072 488 2688 [email protected]

Melanie Govindsamy 071 495 0271 [email protected]

Dane Govindsamy 082 894 9409 [email protected]

Darryl Govindsamy 082 324 8007 [email protected]

Mr Govindsamy 074 307 1300 [email protected]

Luky Goya 074 846 6708

Nozeneso Gqamore 0781571476

Rob Grant THS Farm manager, West of N2 N/A 082 804 4960 [email protected]

Rose Green Edgeview Management Association

Simone Green 061 152 6713 [email protected]

Helene Griffiths

Beautify Umhlanga Together Association (BUTA) 082 570 6730 [email protected]

J Grout 031 539 6858 082 465 9825 [email protected]

John Grout 031 539 6858 [email protected]

Senzo Gube 077 940 3700

M Gumbi 084 668 8487

Nomthandazo Gumbi 072 733 7126

Cllr Zandile Gumede 083 689 9394

Michael Gumede 072 296 0572

Nigel Gumede Housing

Nozibusiso Gumede 084 407 5101

Zodiwa Gumede 078297011 Lot 373

Mr Gumede 078 041 0610

Zinhle Gumede 071 846 0138 [email protected]

Prince Gumede

Mr Guqa 074 474 1495

Page 23: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 20

Name Surname Organisation Tel Mobile Fax Email Postal Address

P Guya 073 680 5536

Nonceba Gwala 084 422 6863

Slungile Gwaleka 073 091 1277

Sphelele Gwamanda 079 7061363 Lot 5200

Sphelele Gwamanda 079 706 1363

Ant Hacker 082 944 8844 [email protected]

Delisile Hadebe 077 983 1771

Mr Hamed 073 554 0126

AR Hamid 083 360 6316

CF Hamilton [email protected]

Shane hansraj 083 423 8102

B Harchuran 083 342 3101

Vimmi Hardwarpersad 031 5023862 0722288436 [email protected]

59 Acora Street, Stoneridge, Phoenix

David Hardy SA Sugar Mills 031 508 7304 031 508 7310 [email protected]

Beemawathie Harehuran 083 3423101 28 Maharaj Rd, Ottawa

Clinton Harichund 031 579 9600

Sheilla Harilall 032 537 6416 083 268 7045 [email protected]

Venodh Harriparsadh 074 718 4490

Anthiny Harripersad 073 627 5488

Roopchund Harripersadh 074 372 8098

Bagiam Harripesadh 074 372 8098

Bagiam Harripesadh 074 372 8098

Shakira Hashaum 032 537 7177

Yasmin Hassim 084 909 9522 [email protected]

Andre Hattingh Ward Committee 082 552 8652 [email protected]

Paul Hauntermann Flanders Aggregate [email protected]

Peter Hean estate 1 083 701 0196 [email protected]

N Hecrot 0731709189

Cookie Heeralall 032 5376167

Page 24: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 21

Name Surname Organisation Tel Mobile Fax Email Postal Address

Indranie Heerall 074 236 7567 [email protected]

Ann Hill [email protected]

G Hilliar 031 502 3460 [email protected]

Happy Hlangabezo 0832396279 Blackburn village

Nomvelo Hlangu 0788846274

Nolipha Hlangwazo 0739887952 Blackburn village

Nomthethe Hlaziya 073 285 9480

Hlengiwe 071 363 5391

Mabaso Hlomiphile 073 486 0703

TW Hlongwane 084 274 3090

M Hlophe 073 850 8653

Mxolisi P. Hlophe Ward 60 Committee 072 5139253

Nkosinathi Hlophe

Nkosinathi Hlophe Hilltop Bricks and Blocks suppliers 032 533 2678

Patrick Hlophe 073 535 7224

Nozipho Hloza 071 301 3707

Wade Holland

Umdloti Coastal Conservancy 031 568 1839 (home) 031 568 1889

031 568 1889 [email protected]

J Hollick 031 502 4449

Jerry Holmes Ward Committee 083 250 9110 [email protected]

Eraman Honeysett Ottawa Civic & Environmental Forum 082 572 3380 [email protected]

Simle Hongwe 0732158681

Nasreen Hoosen 031 505 5918 [email protected]

Carol Hubert 083 377 9263 [email protected]

Queeneth Hulley 072 506 1780

M Human 071 104 3402

Menzi Huzwayo 073 637 3667

Mothilal Inderlal 083 527 0324

Janine Isaacs 083 304 3945 [email protected]

Anha Ishwarlall 084 924 6257

Mala Ishwarlall 084 238 1226

K Isiripershad Ottawa Parkgate, 073 310 6302

Page 25: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 22

Name Surname Organisation Tel Mobile Fax Email Postal Address

Residents Association

Khonziwe Isiya 0849050418

Rookaya Ismail 032 537 7171

Nathan Iyer Iyer Urban Design Studio [email protected]

Philasende Jabulane 0739005164 Blackburn village

Bradley Jacobs 084 444 6529

Maynelym Jagarnath 031 539 2537 072 972 1067

Mayvelyn Jagarnath 072 972 1067

Mayvelyn Jagernath 084 457 5635 [email protected]

Bhekinkosi Jali 073 113 8848

Bongani Jali 0739626607 Blackburn village

Simb Jali 071 922 2295

Sipho Jali 072 588 9221

Stanford Jali 0780151212

Nobizo Jama 083 771 0664

T Jaman 0783205675 Blackburn village

Khansasi Jasi 0763927686 Blackburn village

Lungelo Jayiya 083 338 8655

Pamela Jinida ANC 07821917 Blackburn Vilage

Mlamuli Jiyane 076 111 3395

Jennifer Johnson 031 539 4952 [email protected]

11 Dyke end, Mecce 1

ZP Johnson 072 717 1668

Kelvin Johnson 031 539 2607 [email protected]

Nohlahla Jojisa 078 338 0873

Themba Jojo 083 331 8571

W Jordaan 082 468 2754 [email protected]

Wayne Jordaan 082 808 1737 [email protected]

PO Box 1548, Umhlanga Rocks, 4320

Angie Joseph 072 686 6587

Christine Joseph 072 686 6587

Justin Joseph 084 623 2024

Ralph Joseph 084 395 8401

Page 26: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 23

Name Surname Organisation Tel Mobile Fax Email Postal Address

Tyrone Joseph 078 390 9466 [email protected]

Sarisha Jowtan 074 736 4868

Khuzwayo Joyce 078 654 349

Sandile Joyisa Housing Projects 031 3112402 083 3788753 031 5054125 [email protected]

17 Doveside Place, Phoenix, Unit 20

Vuyisani Jshilase ethekwini 073 863 1315 Blackburn village

Rita Juggadesan Tritan Contractors 032 537 7441 084 595 4652 [email protected]

Thandeka Juna 076 488 6825

Stella Junda 083 744 6868

Thandeka K 0793926411

B K VCM 0789874158 Blackburn Vilage

Mohammed Kadon 073 644 0716 [email protected]

Nandi Kahla Ward Committee [email protected]

Mdate Kalakalla 0732627872 Blackburn village

B Karon 083 778 5001 Roy@??

Mrs Kaval 084 704 1687 [email protected]

Terry Keller Mt Edgecombe Estate 2 031 502 5360 [email protected]

Box 2000, Mt Edcombe, 4301

Sarah Kennedy Mt Edgecombe Stables 031 5648109 083 2878742 031 5639881 [email protected]

PO Box 20708, Durban North, 4016

Thuto Khamhedi 072 427 5408 thutok@gmail com

Aaliya Khan 074 254 3932

H Khan 074 475 9990

Iqbal Khan 073 705 7850

Jabil Khan 074 525 9991

Mehroonisa Khan 084 768 2257

Saeed J Khan 072 4578651 [email protected]

Flat 3, 36 Todd Street

Shehnaaz Khan 074 1495021 [email protected]

flat 2, 36 Todd Street

Fathima Khan 073 255 8881 [email protected]

Beryl Khanyile ethekwini housing 031 311 2469 [email protected]

Bongemusa Khanyile 082 253 8664

Page 27: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 24

Name Surname Organisation Tel Mobile Fax Email Postal Address

Thandeka Khanyile 083 238 6314

Sebenzile Khenyeza 0735050259

Mrs S.E Khomo 0826894084 Lot 4227

Laurence Khoza Ward 35 Committee 083 245 0895

Precious Khoza

Buyisile Khumalo 072 700 8813

Thabo Khumalo 082 6129819 Lot 4101

Sibosiso Khumalo 074 717 1203 [email protected]

Simpiwe Khumalo 084 255 1839 [email protected]

Bongumusa Khuzwayo 071 967 9495

Prudence Khuzwayo 079 849 7432

Stembile Khuzwayo 083 536 0348

Thabsile Khuzwayo 0765340773 Lot 4227

Promise Khuzwayo

Thobile Khwanini 0833949998 Lot 11399

Peter King 083 695 9190 [email protected]

Bhe Kinisa 0781689695

Rishi Kissoon 084 223 6302 [email protected]

Deborah Kisten Fiat and Alfa Umhlanga [email protected]

Evelyn Kistensamy 084 604 5182 [email protected]

Chantal Koekemoer 073 231 1446 [email protected]

Ronica Koopan 078 142 5629

N.C. Kubeka 032 481018 Lot 21106

Fikile Kumome 078 661 1057

Thuto Kwamhledi 072 427 5408 [email protected]

Simphiwe Kwathekhane Ward Committee 078 409 8036

Simthembile Ladwedwa 083 714 0995 Blackburn village

R Lallbahadur Verulam Civic 761454748 076 145 4748

Casper Landman SANRAL 033 3928100 [email protected]

Box 100410, Scottsville

Chris Langa CLLR 072 1025696 Verulam 1991 Cottonlands

Sifiso Langa Ward Committee 071 790 1634 [email protected]

B Legemaate 031 539 6055 082 775 4059 [email protected]

B Legemaate 031 539 6055 082 775 4059 [email protected]

Page 28: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 25

Name Surname Organisation Tel Mobile Fax Email Postal Address

Gary Liebenberg 084 502 4000 [email protected]

PO Box 1526, Mt Edgecombe CC, 4301

Thandisile Lindelo 073 451 2866 Blackburn village

George Lingerous Trade Centre 031 502 5380 031 502 5405

PO Box 4300, Mt Edgecombe, 4301

A Livingstone 031 502 4887 redfern@

Craig Longworth 083 259 0895 [email protected]

Angela Lorio 082 567 8647 [email protected]

Malayan Lutchaman 072 967 6282

Sameer Lutchman 084 766 5698 [email protected]

Mzonzi Ma 0726999812

Nozuko Mabunzi ANC 0719611788 Tshaphasi

Mgini Machi VCM 0764317828 Blackburn Vilage

Rory MacPherson Ward 35 Committee 031 563 6280 082 455 7113 [email protected]

Nkosi Madikizela 083 960 5840

Nosihle Madikizela 0731444227 Blackburn village

Pethen Madurai 078 105 0675

V Madurai 078 105 0675

Bongani Madya 0787114320 bongz.co.za Blackburn village

David Mafumbatha Ward Committee 073 013 8153

Nompumelelo Magewushe 073 899 9712 Blackburn village

Angel Magwaza Ward Committee 073 501 2466

A Magwaza Ward Committee 073 501 2466 [email protected]

R.B Mahammed 082 353 2596 137 Tiffmore Cres, Unit 17, Phoenix

Andisha Maharaj Ottawa Civic & Environmental Forum 032 5376980 079 9276770 031 2082372 [email protected]

2 Munn Rd, Ottawa, 4339

Arvin Maharaj 072 268 1612

Ashika Maharaj 082 573 1809 [email protected]

Binash Maharaj 073 879 8464

BR Maharaj 084 520 6726

Manisha Maharaj DWA [email protected]

P Maharaj 074 338 1452

Sharm Maharaj Phoenix Childwelfare 031 311 2051 083 577 1705 031 311 [email protected]

Page 29: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 26

Name Surname Organisation Tel Mobile Fax Email Postal Address

Society 2066

Ntokhoza Mahlaba 079 850 7237 [email protected]

Jabu Mahlobo 071 153 9678

Iftikar Mahomed 084 7000 8131 [email protected]

Razia Mahomed 078 688 4961 [email protected]

Zahia Mahomed 082 839 7000 [email protected]

Simindile Majola ethekwini housing 0738497232 Blackburn village

Jabulani Majola 078 598 9997

Nondumiso Makhathini 076 2006823 4695 Phase 3, waterloo

Zonke Makhoba Ward Committee 084 056 0135

N Makhoba Ward Committee 084 055 0135

M Makholwana 083 975 7873

Trevor Makhosonke 073544399

P Makise 084 900 1096

Mala Malaruthab 073 798 5805 [email protected]

Jim Malcolm Prestondale Homeowners Assoc 031 566 1451 082 920 6090

031 566 1452 [email protected]

Andries Malefane Ward Committee 079 602 1088

B.W. Mandonza 0836127318 Blackburn village

Awand Maniram

Jacquilin Maniram 084 048 4989 [email protected]

M.P. Manqele 0714308301

Ayesha Mansoor 031 5077932 0832865528/ 083 519 3692

[email protected]

11 Wick Street, Flat 4 Benmark Centre, Verulam

M Manxweni 083 962 5104

Neelaghandan Marapora 032 537 7171

Judy Marx SANRAL 033 3928100 [email protected]

Box 100410, Scottsville

Smangele Mashati 072 696 4577

Bongi Masuku Ward Committee 071 725 5183 [email protected]

P Mateura 032 533 0912 072 614 9783

Anthony Matimutltu 031 537 3556

Page 30: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 27

Name Surname Organisation Tel Mobile Fax Email Postal Address

Zodwa Matonyela 076 093 0710

Mtura Matshini Tongaat Hulett [email protected]

VB Mayela 076 228 2418

Zondumo Mazalani 0820810174 Lot 7742

Thulisile Mbele 074 6373 533

A Mbesa 073 577 0694

Nokulunga Mbili 078 038 4148

Thembekile Mbiwa 0762140682

Dennis Mbonenbe 0728649420 Lot 1388

Sipho Mbotho 073 127 1842

H McCarthy 082 651 2905 [email protected]

D McFarlane 031 240 7320 [email protected]

David McFarlane 083 456 8210 [email protected]

Rufast Mchune 0741857598

Nathi Mchunu 078 861 6898

Bruce McIlwraith 031 580 1000 086 682 5127 [email protected]

L Mckenna [email protected]

Sifikile Mdaleni 0739292055

Dumisani Mdlalose Ward Committee 072 694 6299

P.H Mdludla 0731331414 Thumbele L.P. school

Zthethele Mdusile 0736485343

L Meyer 082 781 9317 [email protected]

Thobile Mfeka 083 756 7702

Nkedliwe Mfenqa 072 6082687

Ntsizwa Mhlamsi 0846236276 [email protected] Blackburn village

S.S Mhlongo 073 8938770

T.E. Mhlongo 072 1716361 Lot 91

T Mhlongo 076 740 2260

Stephan Michaux Penny Pinchers 031 539 1481 082 467 7217 [email protected]

Penelope Miya 0833522507 Lot 862

Xoliswa Mjevale ANC 0710475906 Blackburn Vilage

Page 31: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 28

Name Surname Organisation Tel Mobile Fax Email Postal Address

Siniko Mkhathi 0719757949

Agnes Mkhize 078 639 7575

H.T. Mkhize 076 489124 Lot 4130

Malusi Mkhize 0746485440 Lot 142 (4939)

Thokozani Mkhize 0726204358 Lot 6869

Thandi Mkhize 073 588 6889

Nonceba Mkozo 073 450 0430

Nikelwa Mlinyelwa 079385075

Clement Mlotshwa 078 6080028

Fikiswe Mngadi 071 9104448 Lot 3797 waterloo

Thosi F Mngadi 083 7187128 Lot 3797 waterloo

Ngakanani Mngoma 078 1267755 [email protected] Lot 15 waterloo

Sibongile Mnguni 079 995 3775

Lindiwe Mnguni 071 005 1732

M Mngwangwa 074 856 4147

Qiniso Mnyandu Ward Committee 082 773 6355 [email protected]

Mzali Modakezela 073 4830056 Lot 7862

B Modlaryitl 031 502 4181

Raj Moethilalh COPE [email protected]

Hanisa Mohamed 079 256 0109 [email protected]

Omar Mohammed 076 815 1552

Sadhya Mohammed 079 651 8098

Raj Mohun 084 702 8751 [email protected]

Sello Mokhaya Amafa [email protected]

M Mollett 0824595566 [email protected]

PO Box 1747, Mt Egdecombe

Nomzumo Moluli 0788097881

Lindile Mono 0734681775 Blackburn village

Bobby Moodley SAAF 031 450 4901 082 457 2698 031 450 4904

Clenton Moodley 072 804 5900 [email protected]

DK Moodley 082 600 2741

Page 32: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 29

Name Surname Organisation Tel Mobile Fax Email Postal Address

Krebem Moodley 031 505 3479 krebeum@

Kris Moodley 031 502 1946 082 374 0850 [email protected]

Lana Moodley 031 506 1438

Morgan Moodley 032 537 6242 083 652 0578

S Moodley 076 815 3390

Selvan Moodley 031 507 6197

T Moodley 083 568 1565

Vasanthie Moodley 031 505 7316 076 604 5860

YP Moodley 076 480 3242

Yanasagren Moodley 073 234 1943 [email protected]

Kavendrum Moodley 073 2744 486 [email protected]

Michelle Moodley 083 799 6692 [email protected]

Sandra Moodley 073 022 7368 [email protected]

Kuben moodley 061 200 6151 [email protected]

Julie Moodley 082 090 0328 [email protected]

JP Moodley 073 856 0090 [email protected]

Kelvin Moonsamy 083 8904427 078 6277738

4 Cobblepark, Shastri Park, Phoenix

Michelle Moonsamy 084 802 9702 [email protected]

Stanley Moonsamy Phoenix Parliamentary Office 031 507 1800 072 140 9017

Stanley Moonsamy Phoenix Parliamentary Office 031 507 1800 072 140 9017 [email protected]

C Moonsamy Departmant of Water Affairs [email protected]

F Moosa 082 662 2075

Farida Moosa 073 425 0100 [email protected]

Jane Morris 078 408 0621

Yasmin Motala Sugar Bargaining Council 031 508 7332 031 508 7339 [email protected]

Mkhuphelwi Mousezo 0737955802

A Mpanza 071 3472849 Lot 238

Page 33: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 30

Name Surname Organisation Tel Mobile Fax Email Postal Address

Bonginkosi Mpanza 082 549 0820

Sbar Mphenduka 0736410529 Blackburn village

Mhlengi Mphili 074 236 9467

Thoko Mpongose Ward Committee 073 301 0122

Vuyisile Mpowduka 0789855106

N Mseswa 078 704 8910

Baphindile Msomi 072 6589550

Bongani Msomi 031 539 3425

Lindiwe Msomi 071 1962598 [email protected]

Lot 1774, Waterloo

Njabulo Msomi 031 539 3425

Themba Msomi 031 539 3425

Thembeka Msomi 078 498 7143

Nomalizo Msomi Ward Committee 083 321 5049

Gugu Msweli 078 405 9839

Thulisiwe Mtetwa 0745552428

jane Mthembu 073 620 5900

Lindokule Mthembu 079 256 0065

Lungani Mthembu LBI memebr 58 073 0456241 Lot 366, waterloo, 4340

V. Mthembu ANC 0710618902 Blackburn Vilage

Vusimuzi Mthembu 0820519544

Mdaduzi Mthembu 073 910 9052

Nonhlanhla Mthembu 071 153 0668

Sindisiwe Mthethwa 073 098 9411

Ruth Mthethwa 074 420 9717

Nomusa Mthethwa 076 708 1686

B.S. Mthiyane 0839692095 Lot 120

Tshilase Mthokozi 0785889143

Sipho Mtshali Amenzamnomdica 0737731197 Lot 234

Mazwi Mtshali 079 906 2568

Gert Muller [email protected]

Seetha Mungroo 083 485 8532

Strini Munien 032 537 6266 084 272 8186

Colin Munisamy 074 284 9864

Page 34: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 31

Name Surname Organisation Tel Mobile Fax Email Postal Address

Gamson Munn Ottawa Pioneer 032 537 6459

Craig Munsami 073 516 1313

Joelene Munsami 083 748 4675

Randy Munsami 072 710 0335

Paul Munsami 084 601 3324 [email protected]

Randy Munsami 084 423 8473 [email protected]

Anika Munsami 084 888 8208 [email protected]

Elvis Munsamy 073 929 5555

G Munsamy 031 5724000 071 3241852 4 Niru Ana Drive, Ottawa

V Munsamy 076 707 2994

Sidha Munsamy Phoenix Working Committee 031 539 4168 084 444 8467

031 500 5719

S N Murugan 084 729 0241

Alcina Murugasen 031 502 5690

Jerry Murugasen 072 332 1525

Nomsa Mxinwa 0737512986

Nomvula Mxinwa 0785486788

Nonhlanhla Myenu KZNDAE [email protected]

Rita Myeza 073 954 0088

Thembile Mzabe 0719807021 X297

Bongisisa Mzemba 0837723376

Erick Mzobe Ward Committee 076 661 8889 [email protected]

Jabu Mzobe 083 534 5044

Lwazi Mzobe 079 115 1989 [email protected]

Nhlanhla Mzomi 0733572726

K Mzwili 076 504 2800

Clayton Naaido 078 721 8585

Michelle Naaidoo 073 561 1885

Sagren Naick 074 6640 777

Anand Naicker 073 699 5220

Elvis Naicker 079 944 8102

Roland Naicker 083 393 0347 [email protected]

Page 35: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 32

Name Surname Organisation Tel Mobile Fax Email Postal Address

Subashnie Naicker [email protected]

Alisha Naicker 072 811 8966 [email protected]

Christinell Naidoo 074 517 7089

Daphne Naidoo 078 735 1936

Gregory Naidoo 073 792 9698

Janet Naidoo 031 505 3387

Julian Naidoo 082 336 8804

Kresan Naidoo 084 977 0482 [email protected]

Mark Naidoo 031 360 7089 079 160 5921 [email protected]

Michelle Naidoo 071 308 2470

Michelle Naidoo 073 561 1885

P Naidoo 031 505 6564

preline Naidoo 078 326 2985

S Naidoo 073 048 2416

Sarastian Naidoo 031 5061886 084 592 5620 1 Junghbadur Rd, Ottawa

Shamlla Naidoo 031 2026500 074 8946293 031 2026472 [email protected]

Flat 2, Ashraf Heights, 2 Ireland St, Verulam

Shaun Naidoo DWS [email protected]

Sivagani Naidoo 032 5376176 084 8411338 50 Munn Road

Melini Naidoo 084 4974523 [email protected]

7 Arne wood Place, Woodview, Phoenix, 4008

Poobalan Naidoo 083 715 5964

Ravi Naidoo

Rita Naidoo Phoenix netball 031 506 1167 078 576 1257 031 506 1710

5 Wiltonwood Gardens, Woodview, Phonex, 4068

Greg Naidoo 076 630 6698 [email protected]

Pragasen Naidu 084 769 9326

Rowen Naidu 072 672 6443

R Naidu 074 292 0178

Page 36: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 33

Name Surname Organisation Tel Mobile Fax Email Postal Address

Desiree Naidu 082 385 8176 [email protected]

Poovendraw Nair 078 259 5995

Trevor Nair Ward Committee 074 605 0345 082 729 9417

Zidmalide Namdi 0732399748 Blackburn village

Sumintha Nandrai 073 304 6890

Jabulani Naphanga 0711076755 Lot 4132

M Narainsamy 031 539 2125 082 823 3611

M Narainsamy 079 269 6643 [email protected]

Berlin Nayager Ward 35 Committee 031 562 0723

Berlin Nayager Ward Committee 083 789 7593 [email protected]

Lingum Nayager Mount Edgecombe Virgin Active 083 775 5702

[email protected]

Bonginkosi Ncala 073 835 5803

Musa Ncobela 0734769551

Mthowili Ndleku 0735879766

Dudu Ndlela 073 223 7549

Phumzile Ndlovu 083 9669051 Lot 704

Thabani Ndlovu 082 712 9887 [email protected]

Xolon Ndovela 0718344797

Mxolisi Ndzimbomvu Ward Committee ANC 032 948 1025 082 844 6079 [email protected]

Lot 4987, Waterloo

Sfiso Neayiyana 0739526205

PJ Neethling 083 447 5581 [email protected]

Sizwe Nene 032 9482090 [email protected] Lot 333

Zama nene 078 051 5752 [email protected]

Niren Nepaul 083 5196 203 [email protected]

Renica Nepaul 078 636 3730

Shahila Nepaul 084 220 9046

M Ngalo VCM 0783159032 Blackburn Vilage

Lungile Ngcobo 082 745 1840

Nonhlanhla Ngcobo 084 680 5472

Philisiwe Ngcobo 073 6633 543

Thabisile Ngcobo 084 078 3452

Zama Ngcobo Ward Committee 072 301 0957

Page 37: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 34

Name Surname Organisation Tel Mobile Fax Email Postal Address

Simbongile Ngcolo 0787544677

Thembeka Ngcutha 083 8785211 Lot 3663

Buyi Ngidi 071 811 0999

Sbusiso Ngidi 0782734146

Thulani Ngidi 074 8207466 Lot 7864

Vusi Ngidi 083 589 6421 [email protected]

Ncenginkosi Ngize ethekwini 0736197937 Blackburn village

Khethiwe Nglobo 073 1941904

Asanda Ngweniso 078 519 7852

Anusha Nhaywandin 078 1663 0421

Gary Niehuis 031 502 1146 [email protected]

Doris Nikwa 084 397 7149

Sibongile Nkomo Ward Committee 076 152 7340

Nomandla Nkosi 073 5206 214 [email protected]

Nomvuyiso Nkosyane 0738210721

Nowlam Nkungu ANC 0736045993

Jeffrey Nkwannyan 0767612117 Lot 4356

Anele Nodwele 0789133591

Athini Nokhamandona 0783262313 Blackburn village

Ntuli Nomanene 0731172917 Blackburn village

R Nortje SPAR Mount Edgecombe 071 547 6116 [email protected]

Blessing Nthetha 072 695 3267

Mtsipo Ntombiyenkosi 0748587355 Lot 4443

Pastor S Ntshangase 0789134140

Zola Ntuli 079 985 9510 [email protected]

Wiseman Nxamolo 079 036 3356

Mdaduzi Nxele 076 600 0091

Phakamke Nxumalo 078 4153417

T Nxumalo 0717087535 122

Malindi Nxumalo 074 873 3796 [email protected]

Simpiwe Nxumalo 084 255 1839 [email protected]

Vincent Nyamela 0730793472

Simnikiwe Nyawose 081 060 5110

Nomzabalazo Nyawuza 0710765960 Blackburn village

Page 38: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 35

Name Surname Organisation Tel Mobile Fax Email Postal Address

Desmond Nzimande 072 093 7072

Angel Nzuza 079 045 7811 [email protected]

John Oliver 082 881 7766 [email protected]

Muhammad Ismail

Omar 082 6540096 [email protected]

24 Glenmore Cres, Durban North, 4051

Khaya Ooba 0733376364

Feroz Osman 032 5337867 084 7301492 [email protected]

P.O.Box 786, Verulam, 4340

Nivashinee P 084 398 0035

Bernadet P Amafa [email protected]

K Padayachee 031 505 3144

Mavis Padayachee KZN EDTEA [email protected]

Michelle Padayachee 084 302 8032 [email protected]

Nicholas Padayachee 074 0737145

Sylester Padayachee 074 073 7145

Cookie Pakkiri 074 479 8943

Ritdesh Palhad 084 423 8339 [email protected]

Ashika Palhad 084 206 9180 [email protected]

KP Pandaram 083 540 2124

Munro A Papanicolaou Ward Committee 082 788 1526

Rithesh Parapershad 074 207 4588 [email protected]

D Parmanand 073 629 2002

Kenneth Parsons Ward Committee 031 561 1650

Seethal Parthar

Vasanthi Patchapan 084 262 4530

Kuben Pather 084 4219 591

Ricky Pather 072 398 7678

Siva Pather 084 454 5372

Pam Pather 084 738 9612 [email protected]

Solly Patrick 031 539 7541

Stanton Patrick 074 578 8552

S Patterson 031 502 6958 [email protected]

Page 39: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 36

Name Surname Organisation Tel Mobile Fax Email Postal Address

Kenny Paul 031 502 6709 074 247 8489

Kay Pedley 031 502 3340 082 490 1995

Kalven Perisamy 084 465 3471

Keeny Persad 084 767 4076

Shenice Persad 074 821 6108 [email protected]

Lawrence Perumal 072 670 4687

Sharrol Perumal 076 1286648

13 Camelthorn Place, Trenance Park, Verulam

Alice Peters 076 539 6606 [email protected]

Hlangabezo Philiswa 0734682612 Blackburn village

Yoliswa Phindela 076 936 2110

Madia Phiri 082 4140303 [email protected] P.O.Box 3360

Thami Phiri 071 933 3136

Noku Phiwa 061 324 2845

Busiswo Phokaki 0736803021 Blackburn village

Baca Pillay 031 500 1030

Bradley Pillay 031 500 8081 084 540 9238 [email protected]

Francis Pillay 078 163 0421

Gordon Pillay 031 505 0636 031 508 8047 [email protected]

Julian Pillay 074 223 6343

K Pillay Engen Island Park 074 1818343 [email protected] 89 Flanders Drive

K Pillay 083 403 4730

kevin Pillay 074 269 4405

M Pillay 083 742 8067

Meera Pillay 031 505 6096

Patrick Pillay Ward Committee MF 031 500 7580 083 797 9824 [email protected]

Patrick Pillay 084 508 5269

R Pillay Engen Island Park [email protected]

Rochelle Pillay 031 508 8047 [email protected]

Roshni Pillay 073 029 3270

S Pillay 082 673 8054

Stanton Pillay 084 795 3462

Tanya Pillay 074 537 6153

Page 40: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 37

Name Surname Organisation Tel Mobile Fax Email Postal Address

Teddy Pillay 084 690 7976 [email protected]

Wayne Pillay 073 1822 319

J Pillay 031 537 3737

Ruben Pillay Safer Cities 031 505 2274 072 568 0834 N/A N/A N/A

Sulush Pillay Phoenix Domestic Violence Helpline 031 502 1883 082 858 7805

031 539 5048

Box, 434, Verulam , 4340

Anjelai Pillay 074 439 4124 [email protected]

Jerome Pillay 084 887 7708 [email protected]

Desiree Pillay 073 003 4435 [email protected]

Devrani Pillay 083 456 5094 [email protected]

Christine Poonen 083 5822 898

Nobulelo Poswa Ward Committee 082 574 9560 [email protected]

Rose Potgieter 084 573 1259

Mark Povall 082 907 7364 [email protected]

Marsha Prithipal 033 573 7490 [email protected]

Kamal Prithipal 083 777 1105 [email protected]

Rolanda Puckleappen Ottawa 076 8797430 50 Munn Road

Geoff Pullan Ward 58 083 695 9190 [email protected]

Nasisa Qhina 0792414926

Nontuthuko Qumo 0736020987

N Qwabe Ward 51 Committee

Ronny R NRA [email protected]

Ashveer Rabbikishoon 084 5791966 1 Junghbadur Rd, Ottawa

Rosanne Rabbikishoon 084 5191966 1 Junghbadur Rd, Ottawa

B Rabilal 082 447 0172

M Rabilal 082 447 0172

Sayed Rajack Phoenix Police Forum 084 522 5277

Neshika Rajpal 071 514 6403 [email protected]

Ivory Raman 074 335 4637

Yogan Raman 031 569 1061 074 403 7929

Aritha Rambharose 084 610 6236 [email protected]

R Rambharose 084 250 5687

Page 41: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 38

Name Surname Organisation Tel Mobile Fax Email Postal Address

S Rambharose 073 351 2844 [email protected]

Seema Ramcheran 084 713 2543 [email protected]

Brandon Ramcheran 082 880 5838 [email protected]

Keshav Ramdaizile 072 684 8631

Kiran Ramdhanee 082 4009147 [email protected]

Leena Ramdhani 073 786 4933 [email protected]

Ellisha Ramdhin 084 887 4600 [email protected]

Sunjay Ramgulam 071 396 0661

R Ramkisson [email protected]

Poobalan Ramkistan 084 583 4959

Sanjay Ramnarain RDO Verulam 084 331 5452 P.O. Box 1991, Verulam

Rajesh Ramnirain 031 508 8039 086 270 8513 [email protected]

Asha Ramouther 031 505 8058 073 3908 129

ricky Ramouther 031 505 8058 083 375 7683

Wesley Ramparsad 071 896 6183 [email protected]

N Rampershad 082 451 2967

Mala Rampurshad 083 259 0210

A Rampurtab 083 337 5612 [email protected]

Rehka Rampurtab 083 566 2145

Mishka Ramraj 082 869 9381 [email protected]

A Ramsamy 078 440 2135

K Ramsamy 071 917 7361

N Ramsamy 083 482 8593

Wesley Ramsamy 084 550 3681 [email protected]

29 Creslen, Lenham, Phoenix, 4068

Enver Ramsamy 084 587 8627

Narisha Ramsaroop 073 210 4873 [email protected]

Narendra Ramsewak 078 255 0584

Khundaye Ramsurab 031 539 5118 073 421 0432

Goomthi Ramsuran 032 537 6012

Claude Rangana 073 404 1657 [email protected]

Anna Raphiel 076 255 5315 [email protected]

Page 42: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 39

Name Surname Organisation Tel Mobile Fax Email Postal Address

Anwar Abdul Rashid 082 704 3096

90/92 Wick Street, Flat 8, Ayeshia Razak Centre, Verulam

Betty Rawheath La Mercy Residents Action Group 032 941 5128 082 375 4735

[email protected]

Aslam Razak 032 5338747 083 495 5768 032 9449948 [email protected]

2A Ireland Street, Verulam

Ebrahim Razak 084 080 3617

Amith Reddy 031 578 6651 083 867 5975

Beaver Reddy 031 537 6357

Judy Reddy Department of Transport 086 270 8513 [email protected]

R Reddy 084 835 7416

Sadha Reddy 032 537 6357

Rumeshni Reddy 084 851 8758 [email protected]

Henry James Reynolds

031 562 1166

North Entity Council Offices, Lagoon Drive, Umhlaga Rocks

Erika Rivalland 083 775 6533 [email protected]

Erika Rivalland 083 775 6533 [email protected]

Marc Robert 083 444 8666

Barry Roberts Rotary Club of Durban – Umhlanga 031 205 9341 083 259 3693

031 205 8112 [email protected]

Box 17114, Congela, 4013

Jessica Roberts 072 1262481 154 Queenspark, Shastri Park

W Rodd 031 561 3345

L Rodd 084 655 4745 [email protected]

L Rodd 084 655 4745 [email protected]

Mr Rupesh Ottawa Used Spares 083 334 5786

J Ruthab 083 730 2466 [email protected]

Roy Ryan DOT 033 3558600 [email protected]

Sandy Sammons 031 5021306 0834478609 [email protected]

PO Box 2219, Country Club, 4300

Page 43: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 40

Name Surname Organisation Tel Mobile Fax Email Postal Address

Zain Samuel 084 750 2853

Sanjay Sathnarayan LDM Consulting 031 7018699 083 7928333 083 0317018633 [email protected]

P.O. Box 2289, Pinetown, 3600

Persius Saule 076 922 8919

Andre Schoeman 031 5024986 [email protected]

PO Box 2424 Country Club, 4301

Basil Schreiber 082 921 5052 [email protected]

Basil Schrieber Mt Edgecombe Estate 1 031 502 5360 0836314827 031 5028363 [email protected]

Carolyn Schwegman WESSA 039 975 2147 083 9814814 [email protected] P O Box 343 Pennington 4184

M Seokwang NDA [email protected]

R Sewnarain 082 728 5668

G Sewnarrian Ward 48 031 505 4356 084 045 6327

G Sewnath 084 88 55 760 [email protected]

Subitha Sewsunker 078 911 9097

Musa Shabane Tongaat Hulett 031 5601936 083 4442717 086 5505131 [email protected]

305 Umhlanga Rocks Drive

Faisha Shaik Mt Edgecombe Estate 1 031 502 2534 [email protected]

Farouk Shaik 078 205 6544

Sahima Shaik 031 506 1681 [email protected]

Maryam Shaik 0845464632 35 Townside pl, Caneside, Phoenix

Dorese Shandu 0795412764 Lot 169

Mavis Shange 073 087 0954

S Shange 079 488 5851

Sondiya Shange 079 058 4744

Zarina Sheik Coastal Farmers co-op 032 5337130 079 4911560 031 5088199 [email protected]

2 A Ireland Street, Verulam

G Sheikamad 073 350 8877

Thami Shelembe 071 3181197 Lot 360

Thembi Shezi Ward Committee 083 335 3292

T F Shezi 071 194 7341

Khanyiso Shiza 0780407073 Blackburn village

Page 44: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 41

Name Surname Organisation Tel Mobile Fax Email Postal Address

Lindiwe Shoba 072 936 2404

Siyanda Shoba 071 259 1389

Bheki Shongwe Tongaat Hulett 031 5601937 083 4590262 [email protected]

P.O. Box 22319, Glenashley, 4002

Zensele Shumalo 078 323 0193

Bafana Shusha 082 965 0760

Mthokozi Si 0719222295

Thandeka Sibisi 082 059 4903

Mpume Sibiya 0734050242 Lot 11814

Nonhlanhla Sibiya 073 063 4077

Zwelifikile Sicindi 0737126346 Blackburn village

Kasaven Sigamoney 083 621 6181

V. Sikabeni 0787764171

Sthembile Sikhakhane 0742619496

Ntombifuthi Sikhona 0788383786

Mxinwa Simbuli 0738996724 262

shenitha Sing 084 460 7902 [email protected]

Bunny Singh 083 779 3760

Dharam Singh 071 900 6817

G Singh 031 561 3627

G Singh 072 268 8142

Heeminanth Singh 083 959 2942

M Singh 073 849 8495

Prauli Singh 082 967 6282

Pravin Singh 072 967 6282

R Singh 076 248 7477

R R Singh 031 561 3627

Ramesh Singh 076 6236065 2A Maharaj Rd, Ottawa

Shalimar Singh 084 802 5322 [email protected]

S Singh 082 851 6573 [email protected]

B D Singh 032 537 6243 [email protected]

H Singh 032 537 6243 [email protected]

Shalimar Singh 084 802 5322 [email protected]

Manitha Singh 083 711 6320

Page 45: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 42

Name Surname Organisation Tel Mobile Fax Email Postal Address

D Singh Keep Phoenix Beautiful 031 306 6912 073 411 3917 032 945

2658 Box 49387, Qualbert, 4078

Davanand (Solly) Singh Ward Committee MF 031 500 7580 084 900 0196 [email protected]

Suite 3, 1st Floor, Gem City, 80 Parthenon Street, Phoenix

Shellen Singh 073 161 3434 [email protected]

Ritesh Singh 082 781 8634 [email protected]

Mziwoxolo Siphika 0813183160

Abegail Sithole 073 806 6849 [email protected]

R Sivlal 083 887 7701

Ian Sivlal 073 365 2593

Sarabjeeth Sivnarain 073 334 0017 [email protected]

Arthie Sivnarain 083 789 5535 [email protected]

S Siyslakca 0793559378 314

Senzo S'khahlane 0715389240

Di Smale 031 5394896 0836322405 PO Box 2562, 4301

N Soboyise 0836706433

Sihi Sogoni ANC 0739753311 Blackburn Vilage

Roshila Sokdeo 073 153 5389

Simon Somi 0730067613 Blackburn village

T.P Sonjica 0794180163 Blackburn village

R Sookcloe 072 882 0014

Rita Sookfall 083 368 5404

Rita Sooklall 083 3685404 28 Maharaj Rd, Ottawa

Cynthia Sorragee 031 505 8841 [email protected]

Cynthia Sorragee 031 505 8841 [email protected]

N.P Sovane 0737801075

A Srinivason 031 502 5359

S Subban 032 533 2422

Roshila Sukdeo Ward Committee 073 153 5389

Anusha Sukdeo 061 615 1147 [email protected]

Mohammad Suleman 071 398 8562

Page 46: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 43

Name Surname Organisation Tel Mobile Fax Email Postal Address

Nivash Sumer 078 626 0724

Chandni Sumer [email protected]

Michelle Sunkardutt 074 212 4669 [email protected]

Seebran Suriya 032 533 2132

S Swalingam 083 726 8855 [email protected]

Sipho Sweba 0789074072 Box 2333

Mary Sydney Grove-end clinic 031 502 7184 073 376 9492 N/A Box, 4068, Phoenix, 4068

Farhad Syed 078 644 1593

Sheriffa Syed 071 358 1855

P Tack 083 325 9394 [email protected]

Charles Tebener 082 822 7884 [email protected]

Fezeko Tedeni 0838456160

Caren Terblanche 082 256 0186 [email protected]

Corrie Terblanche 082 256 0186

H.I Thabo 0737771139

Lucinda Thangavaloo 082 406 8930 [email protected]

Melinda Thangavaloo 079 430 9486 [email protected]

Nick Theunissen 082 443 7665 [email protected]

Ndowuyo Thewo 073 5923356

Mathuhuzo Thobeka 0834396791

B.R. Thushini 072 7930655

Zanna Timol 076 5169657

2 Ireland Street, Ashraf heights, Flat 1, Verulam, 4340

S Titaver 031 505 3274

E Tonjeni 072 515 0798

R Toobinda 082 304 0391

Trix Trikam

Other key media contacts include 082 653 2344

031 508 7197 [email protected]

Box 700, Mt Edgecombe, 4301

Themba Tshabalala 084 226 4867

Page 47: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 44

Name Surname Organisation Tel Mobile Fax Email Postal Address

Weziwe Tshabalala Amafa [email protected]

T Tshabalala 073 730 1439

Mboneni Tshiqi 0783009530

Frank Tshowaphile 0711632071

Thembile Tsibiyana 0737988968 Blackburn village

Akhona M Tutu 083 5296849

Ayesha Uddin 076 067 1055

Emil Unger 083 289 1593 [email protected]

Vincent Valayatham 076 799 5916 [email protected]

Anthony Valayatham 083 993 1184 [email protected]

Katherine Valayatham 071 490 9611 [email protected]

Diane van Rensburg eThekwini Municipality [email protected]

Diane Van Rensburg eThekwini Municipality [email protected]

Dina van Walsen 031 539 3484

Dina Van Walsen 031 5393485 082 5598129 031 5393484 [email protected]

PO Box 1825, Country club, 4301

Anika Vasudeo 084 888 8208

Nokuzola Vava 082 809 7761

Billy vd Berg 083 669 6647

Ronnie Veeran Ward Committee DA 082 371 7698 [email protected]

Janet Veersamy 084 124 9700

R Venketsamy 083 566 1849

Thobani Vetsheza DAFF [email protected]

SV Vidimo Emmanual Fellowship Community Centre 074 662 9980 [email protected]

Melville Vogel 031 5805145 [email protected]

PO Box 1703, Umhlanga Rocks, 4302

Nokuthula Vumase 072 451 8031

Siviwe Vutha 0769529079

Thomson Vyawose ANC 0781426000 Blackburn Vilage

Page 48: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 45

Name Surname Organisation Tel Mobile Fax Email Postal Address

Elaine W Softline & Pastel VIP [email protected]

Tony Weltz 0824430849

Siadisi Wemaditizela 0736290312

Leroy White Flanders Aggregate [email protected]

Ronnie & sally Wienaber 0828222875 [email protected]

7 Cart Gate close, St Andrews, Mecca

Rory Wilkinson 031 5601 900 [email protected]

John Wilson Mt Edgecombe Estate 2 0823210891 [email protected]

M.L Wlethi 0710444754

Rainer Woodrich Mt Edgecombe Estate 1 031 502 2534 031 502 1746

[email protected]

Box 2000, Mt Edcombe, 4301

Brian Wright Urban Management 083 324 3367 [email protected] Box 990, Umdloti

Bhekithemba Wushe 0718037269

Malcom Wyndham 083 631 4827 [email protected]

Amelia X 074 635 3852

Asanda X 071 937 0042

Bongani X 078 748 1423

Chester X 083 348 7168

Danny X 076 031 0190

Dion X 072 967 6282

Geetha X 083 544 1034

Hlaniphile X 078 230 8219 Blackburn village

Jabulile X 072 369 0652 Blackburn village

Jayson X 031 5055 951

Joanne X 073 210 3342

Lawrence X 074 073 7154

Lungelwa X ANC 078 315 9037

Lungisa X ANC 073 801 9558 Blackburn Vilage

Makholela X 073 663 7710 142

Mama's X 073 599 4132

Matsala X 074 030 3940 135

Mazwi X 073 925 7168

Mziwoxolo X 073 785 1843 Blackburn village

Ncasile X 076 228 2418

Page 49: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 46

Name Surname Organisation Tel Mobile Fax Email Postal Address

Philisine X 082 439 7949

renita X 031 539 7858 083 738 56 35

Rishi Maharaj X 031 5006428 072 619 7868

Rita X 084 069 0084

Saleena X 031 505 3274

Sangeetha X 084 404 5549

Seelao X 084 872 6448

Shandu X 071 273 2866

Sheryl X 084 391 2300

Sibusiso X Mdunjana 078 196 1592

Simon X 072 042 3708

Simphiwe X ethekwini 073 193 4657 Blackburn village

Sipho X 083 739 5162

Thandi X 072 637 5732 Lot 787

Thandi X 031 579 9600

Thembie X 078 272 0072

Thembisile X Nothe 071 332 2749

Theombesile X 071 332 2749 x2333, Blackburn village

Thombulethu X 073 962 0189 Blackburn village

Zanovuya X 078 748 1422

Ulhngisi Zinto ethekwini 0732898196 X297

Vubani Zukuku 0837644817

Cecilia Zuleni 076 021 7448

Sthembiso Zulu 073 2378420 Lot 333

V Zulu 073 477 9672 Blackburn village

Zweli Zulu Ward Committee [email protected]

M B Zulu 078 204 9409 [email protected]

M B Zulu 078 204 9409 [email protected]

Futokwakhe Zuma 079 025 5843 Lot 2099

M Zuma 082 840 0999

Milngisi Zunti ethekwini 073 863 1315 Blackburn village

Geert Zweegman 031 502 4203 083 637 1875 [email protected]

Lia Zweegman 031 502 4203 [email protected]

Bongumusa 076 931 8470

Page 50: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 47

Name Surname Organisation Tel Mobile Fax Email Postal Address

Desiree 084 620 5895 [email protected]

Feros 079 888 9696 [email protected]

Ramdhir 083 538 0287 [email protected]

Thandi Ward Committee 073 585 6889

Vikesh 084 2168679 [email protected]

Jojisa 078 987 4158

078 913 4140

Marcus 073 776 6527 [email protected]

David 083 764 8351

Page 51: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 48

3 SITE NOTIFICATION

The NEMA EIA Regulations (2010) require that a site notice be fixed at a place conspicuous to the public at

the boundary or on the fence of the site where the activity to which the application relates is to be undertaken

and on any alternative sites. The purpose of this is to notify the public of the project and to invite the public to

register as stakeholders and inform them of the PP Process. Royal HaskoningDHV (known at the time as SSI

Environmental) erected site notices at various noticeable locations around the perimeter of the site and at

strategic locations on site, such as at the existing school and Blackburn Estate.

Site Notice 3.1

Page 52: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 49

Proof of Site Notices 3.2

Page 53: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 50

Page 54: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 51

4 BACKGROUND INFORMATION DOCUMENT

A briefing paper or BID for the project was compiled. The aim of this document is to provide a brief outline of

the application and the nature of the development. It is also aimed at providing preliminary details regarding

the EIA process, and explains how I&APs could become involved in the project. The briefing paper was

distributed to all identified I&APs and stakeholders, together with a registration/comment sheet inviting I&APs

to submit details of any issues, concerns or inputs they might have with regards to the project.

Page 55: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 52

BID & Comment Form 4.1

Page 56: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 53

Page 57: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 54

Page 58: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 55

Page 59: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 56

Page 60: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 57

Page 61: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 58

Page 62: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 59

5 ADVERTISEMENTS: ROUND 1

In compliance with the EIA Regulations (2010), notification of the commencement of the EIA process for the

project was advertised in a five local newspaper, namely:

Northglen News Newspaper (04.09.2012)

Phoenix Rising Sun (05.09.2012)

The Mercury (05.09.12)

Isolezwe (05.09.12)

Umafrika (05.09.12).

I&APs were requested to register their interest in the project and become involved in the EIA process. The

primary aim of these advertisements was to ensure that the widest group of I&APs possible was informed and

invited to provide input and questions and comments on the project. I&APs were also notified of the availability

of the draft Environmental Scoping Report for public review and invited to attend the Scoping Phase Public

Meeting.

Advertisement 5.1

Page 63: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 60

Proof of Advertisements 5.2

Page 64: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 61

Page 65: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 62

Page 66: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 63

Page 67: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 64

Page 68: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 65

6 PUBLIC MEETINGS: SCOPING PHASE

The primary aim of the public meetings was to:

provide I&APs and stakeholders with information regarding the proposed project and associated

infrastructure;

provide I&APs and stakeholders with information regarding the EIA process;

provide an opportunity for I&APs and stakeholders to seek clarity on the project;

record issues and concerns raised; and

provide a forum for interaction with the project team.

Six public meetings were held as follows:

Sharper’s Town (16.09.2012 – 10h00);

Waterloo (16.09.2012 – 12h30);

Ottawa (17.09.2012 – 17h30);

Mt Edgecombe (18.09.2012 – 17h30);

Umhlanga (19.09.2012 – 17h30); and

Phoenix (20.09.2012 – 17h30).

Page 69: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 66

Presentation Slides 6.1

Page 70: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 67

Page 71: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 68

Page 72: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 69

Page 73: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 70

Page 74: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 71

Minutes of the Meetings 6.2

Page 75: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 72

Page 76: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 73

Page 77: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 74

Page 78: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 75

Page 79: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 76

Page 80: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 77

Page 81: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 78

Page 82: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 79

Page 83: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 80

Page 84: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 81

Page 85: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 82

Page 86: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 83

Page 87: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 84

Page 88: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 85

Page 89: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 86

Page 90: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 87

Page 91: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 88

Page 92: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 89

Page 93: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 90

Page 94: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 91

Page 95: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 92

Page 96: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 93

Page 97: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 94

Page 98: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 95

Public Meeting Registers 6.3

Page 99: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 96

Page 100: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 97

Page 101: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 98

Page 102: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 99

Page 103: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 100

Page 104: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 101

Page 105: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 102

Page 106: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 103

Page 107: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 104

Page 108: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 105

Page 109: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 106

Page 110: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 107

Page 111: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 108

Page 112: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 109

Page 113: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 110

Page 114: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 111

Page 115: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 112

Page 116: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 113

Page 117: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 114

Page 118: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 115

Page 119: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 116

Page 120: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 117

Page 121: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 118

Page 122: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 119

Page 123: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 120

Page 124: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 121

Page 125: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 122

Page 126: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 123

Page 127: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 124

Page 128: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 125

Page 129: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 126

Page 130: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 127

Page 131: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 128

Page 132: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 129

Page 133: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 130

Page 134: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 131

Page 135: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 132

Page 136: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 133

Page 137: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 134

Page 138: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 135

Page 139: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 136

Page 140: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 137

Page 141: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 138

Page 142: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 139

Page 143: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 140

Page 144: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 141

Page 145: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 142

Page 146: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 143

Page 147: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 144

Page 148: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 145

Proof of Public Meetings 6.4

Blackburn 6.4.1

Page 149: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 146

Waterloo 6.4.2

Page 150: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 147

Ottawa 6.4.3

Page 151: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 148

Mount Edgecombe 6.4.4

Page 152: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 149

Umhlanga 6.4.5

Page 153: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 150

Phoenix 6.4.6

Page 154: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 151

7 PUBLIC REVIEW OF THE ENVIRONMENTAL SCOPING REPORT

An advert was placed in the five newspapers, as detailed in Section 5 above, informing I&APs of the

application and the availability of the draft ESR and Plan of Study for EIA for review and comment.

Additionally, all registered I&APs were notified of the availability of the report in writing.

The draft ESR, together with the Plan of Study for EIA was made available for authority and public review for a

total of 40 days. In addition, the report was made available at the following public locations within the study

area, which are all readily accessible to I&APs:

Libraries

Phoenix Library Playpark Place Shastri Park, Phoenix

Umhlanga Library, 4 Lagoon Drive, Umhlanga

Verulam Library, 8 Groom Street. Verulam

Councillors’ offices

Cllr Mxolisi Ndzimbomvu, Ward 58, Support Centre, 187 Woodpecker Rd, Waterloo

Cllr Musa Dludla, Ward 102, Room 102, White House Shopping Centre Mt Edgecombe

Cllr Solly Singh. Ward 50, Suite 3, 1st Floor, Gem City, 80 Parthenon Street, Phoenix

Cllr Patrick Pillay, Ward 61, Suite 3, 1st Floor, Gem City, 80 Parthenon Street, Phoenix

Cllr Heinz de Boer, Ward 35, Sizakala Centre327 Umhlanga Rocks Drive, Umhlanga Rocks

Mount Edgecombe Country Club;

Tongaat Hulett Developments: 305 Umhlanga Rocks Drive, Umhlanga; and

RHDHV Website: www.rhdhv.co.za

The final stage in the Environmental Scoping Study entailed the capturing of responses and comments from

I&APs on the draft ESR in order to refine the ESR, and ensure that all issues of significance are addressed

(Appendix A). The final ESR was then submitted to KZN EDTEA for review and decision-making.

8 REVISED BID

Due to the time lag between the scoping and EIA phases and in the interest of ensuring a robust and

transparent PPP, the briefing paper / BID for the project was revised in October 2014 and circulated to all

registered I&APs, together with a registration/comment sheet inviting I&APs to submit details of any issues,

concerns or inputs they might have with regards to the project.

Page 155: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 152

Revised BID & Comment Form 8.1

Page 156: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 153

Page 157: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 154

Page 158: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 155

Page 159: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 156

Page 160: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 157

Page 161: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 158

Page 162: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 159

Page 163: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 160

Page 164: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 161

Page 165: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 162

9 ADVERTISEMENTS: ROUND 2

In compliance with the EIA Regulations (2010), notification of the EIA Phase public meetings and availability

of the draft EIAR was advertised in four newspapers as follows:

Northglen News Newspaper (04.11.2014);

Phoenix Rising Sun (05.11.2014);

The Mercury (05.11.2014); and

Isolezwe (05.11.2014).

The Umafrika was no longer in print in 2014 and therefore, advertisements were not placed in this publication

as done in the scoping phase. The isiZulu advertisement continued to be placed in the Isolezwe.

Advertisement 9.1

Page 166: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 163

Proof of Advertisements 9.2

Page 167: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 164

Page 168: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 165

Page 169: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 166

10 PUBLIC MEETINGS: EIA PHASE

The primary aim of the public meetings was to:

provide I&APs and stakeholders with information regarding the proposed project and associated

infrastructure;

provide I&APs and stakeholders with information regarding the EIA process;

provide an opportunity for I&APs and stakeholders to seek clarity on the project;

record issues and concerns raised; and

provide a forum for interaction with the project team.

Seven public meetings were held as follows:

Cornubia Pilot Phase (18.11.2014 – 18h00);

Ottawa (19.11.2014 – 18h00);

Phoenix (20.11.2014 – 18h00);

Sharper’s Town (23.11.2014 – 11h00);

Waterloo (23.11.2014 – 14h00);

Mt Edgecombe (25.11.2014 – 18h00); and

Umhlanga (26.11.2014 – 18h00).

Page 170: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 167

Presentation Slides 10.1

Page 171: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 168

Page 172: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 169

Page 173: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 170

Page 174: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 171

Page 175: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 172

Page 176: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 173

Page 177: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 174

Page 178: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 175

Page 179: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 176

Minutes of the Meeting 10.2

Page 180: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 177

Page 181: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 178

Page 182: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 179

Page 183: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 180

Page 184: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 181

Page 185: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 182

Page 186: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 183

Page 187: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 184

Page 188: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 185

Page 189: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 186

Page 190: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 187

Page 191: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 188

Page 192: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 189

Page 193: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 190

Page 194: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 191

Page 195: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 192

Page 196: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 193

Page 197: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 194

Page 198: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 195

Page 199: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 196

Page 200: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 197

Page 201: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 198

Page 202: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 199

Page 203: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 200

Page 204: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 201

Page 205: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 202

Page 206: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 203

Page 207: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 204

Page 208: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 205

Page 209: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 206

Page 210: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 207

Page 211: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 208

Public Meeting Registers 10.3

Page 212: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 209

Page 213: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 210

Page 214: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 211

Page 215: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 212

Page 216: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 213

Page 217: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 214

Page 218: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 215

Page 219: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 216

Page 220: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 217

Page 221: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 218

Page 222: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 219

Page 223: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 220

Page 224: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 221

Page 225: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 222

Page 226: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 223

Page 227: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 224

Page 228: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 225

Page 229: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 226

Page 230: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 227

Page 231: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 228

Page 232: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 229

Page 233: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 230

Page 234: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 231

Page 235: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 232

Page 236: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 233

Page 237: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 234

Page 238: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 235

Page 239: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 236

Page 240: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 237

Page 241: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 238

Page 242: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 239

Page 243: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 240

Page 244: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 241

Page 245: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 242

Page 246: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 243

Page 247: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 244

Page 248: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 245

Page 249: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 246

Page 250: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 247

Page 251: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 248

Page 252: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 249

Page 253: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 250

Page 254: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 251

Page 255: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 252

Page 256: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 253

Page 257: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 254

Page 258: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 255

Page 259: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 256

Page 260: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 257

Page 261: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 258

Page 262: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 259

Page 263: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 260

Page 264: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 261

Page 265: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 262

Page 266: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 263

Page 267: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 264

Page 268: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 265

Page 269: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 266

Page 270: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 267

Page 271: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 268

Page 272: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 269

Page 273: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 270

Page 274: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 271

Page 275: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 272

Page 276: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 273

Page 277: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 274

Page 278: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 275

Page 279: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 276

Page 280: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 277

Page 281: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 278

Page 282: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 279

Page 283: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 280

Page 284: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 281

Page 285: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 282

Page 286: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 283

Page 287: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 284

Page 288: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 285

Page 289: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 286

Page 290: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 287

Page 291: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 288

Proof of Public Meetings 10.4

Page 292: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 289

Page 293: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 290

Page 294: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 291

Page 295: Public Participation Summary Report

Cornubia Phase 2 final Public Participation Summary Report

© Royal HaskoningDHV Ltd 292

11 PUBLIC REVIEW OF THE EIA Report

The draft EIAR was made available for authority and public review for a total of 40 days (excluding the

December shut-down period) from 24 November 2014 to 26 January 2015. The report was made available at

the following public locations within the study area, which are all readily accessible to I&APs:

Libraries

Phoenix Library Playpark Place Shastri Park, Phoenix

Umhlanga Library, 4 Lagoon Drive, Umhlanga

Verulam Library, 8 Groom Street. Verulam

Councillors’ offices

Cllr Mxolisi Ndzimbomvu, Ward 58, Support Centre, 187 Woodpecker Rd, Waterloo

Cllr Musa Dludla, Ward 102, Room 102, White House Shopping Centre Mt Edgecombe

Cllr Solly Singh. Ward 50, Suite 3, 1st Floor, Gem City, 80 Parthenon Street, Phoenix

Cllr Patrick Pillay, Ward 61, Suite 3, 1st Floor, Gem City, 80 Parthenon Street, Phoenix

Cllr Heinz de Boer, Ward 35, Sizakala Centre327 Umhlanga Rocks Drive, Umhlanga Rocks

Mount Edgecombe Country Club;

Tongaat Hulett Developments: 305 Umhlanga Rocks Drive, Umhlanga; and

RHDHV Website: www.rhdhv.co.za

The final EIAR has been made available for public review for an additional 21 days. I&APs have been notified

of the submission of the final EIAR and have been requested to submit any comment on the final EIAR directly

to the EDTEA and to copy RHDHV on this correspondence.

12 ISSUES TRAIL

Issues and concerns raised during the PPP have been compiled into an Issues Trail presented in a Comment

and Responses Report. The Issues Trail to date has been attached as Appendix A, in which all comments

received and responses provided have been captured. This report includes correspondence received from

I&APs to date.

13 ENVIRONMENTAL AUTHORISATION

On receipt of environmental authorisation (positive or negative) for the project, I&APs registered on the project

database will be informed of this authorisation and its associated terms and conditions by correspondence

and advertisement.

Page 296: Public Participation Summary Report

Appendix A

Comments & Responses Report

Page 297: Public Participation Summary Report