15
DPWandYOU.com | Making a difference, together DPWandYOU.com | Making a difference, together Public Meeting for WB&A Trail Bridge February 13, 2019 6:00 pm to 7:00 pm Two Rivers Community Center

Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, togetherDPWandYOU.com | Making a difference, together

Public Meeting for WB&A Trail Bridge

February 13, 20196:00 pm to 7:00 pm

Two Rivers Community Center

Page 2: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Meeting Agenda

• Welcome -• Background and History-• Key Project Information -• Project Overview –• Next Steps -• Questions -

2

Page 3: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 3

Background and History

• Project Goals • Connect Anne Arundel and Prince

George’s Counties• Bicycle & pedestrian shared-use

bridge over the Patuxent River

• Budget $5M• Based on approved FY 2019• Partnership between Anne Arundel

and Prince George’s Counties• Partial funding through Maryland

Bikeways grant (MDOT/SHA)

• FY2018 – Design• FY2020- Construction

Page 4: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 4

Background and History

• The existing WB&A Trail lies on either side of the Patuxent

• The Anne Arundel portion is located off of Conway Road

• Connected bridge will be part of the East Coast Greenway, and connect Washington, DC to Wilmington, DE

• Feasibility study conducted in 2017

• 2019- Permitting process underway

Page 5: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Key Project Information

• Project Name: WB&A Trail Patuxent River (CIP#P570300)• Address: 0 WB&A Trail, Odenton, MD, 21113• Grading Permit Number: G02017870• Zoning: OS – Open Space• Water and Sewer Type: W-6,S-6• Impacted Schools: Not applicable• Number of Proposed Lots: None• Type of Proposed Product: Active Open Space (current use, no

change)• Approximate Road Configuration: Not applicable

5

Page 6: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 6

Key Project Information

• Approximate Location of Environmental Features On-Site: Forested areas, wetlands, floodplain, critical areas and their associated buffers are on site.

• Impacts of Proposed Development on Environmental Features: Areas within the Critical Area and a few specimen trees will be impacted. Impacts to the wetlands and associated buffers will try to be avoided.

• Stormwater Management: On-site drainage improvements

Page 7: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 7

Anne Arundel County Permit Process

• Modification Request: Submitted 12/13/18 • Floodplain Modification; §16-2-202

• Modification Requests: Submitted 12/06/18 • Stream, Steep Slopes, & Non-tidal wetlands; § 17-6-303(b)• Specimen Trees Removal; § 17-6-402,3,4• Forest Conservation Calculations; § 17-6-306

Page 8: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 8

Project Location

Existing Anne Arundel County Trail Terminus Trail and Bridge Connection

Page 9: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 9

Natural Splendor

Picturesque swamps line the PGCO side of the trail

A view of the Mighty Patuxent The trail is full of wildlife, such as this Eastern Painted Turtle

Page 10: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 10

Bridge Design

Bridge Elevation and Plan View

Page 11: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together 11Site of the Proposed Bridge

Page 12: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Next Steps

• Continuation of Permit Process: On-going thru Summer 2019 • Bidding: Anticipated Summer 2019• Contract Award: Anticipated Fall 2019• Construction Phase: 10-12 Months Duration• Grand Opening!

12

Page 13: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Questions?

13

Page 14: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Thank you!!!   ‐ Questions can be mailed to:

Anne Arundel Co. Department of Recreation and Parks, Attn: Dawn Thomas, Capital Projects1 Harry S. Truman Parkway, Annapolis, MD 21401.(410) 222‐[email protected]

Anne Arundel Co. Department of Public Works, Bureau of EngineeringAttn: Robert M. Fernandez, P. E., Senior Engineer2662 Riva Road, MS‐7301Annapolis, MD 21401410‐222‐[email protected]

14

Page 15: Public Meeting for WB&A Trail Bridge · • The existing WB&A Trail lies on either side of the Patuxent • The Anne Arundel portion is located off of Conway Road • Connected bridge

DPWandYOU.com | Making a difference, together

Bureau of Utility Operations

24-Hour Emergency Water Services: (410) 222-8400Billing Inquiries: (410) 222-1144

Bureau of Waste Management Services

Bulk Trash Service/Curbside Collections: (410) 222-6100

Bureau of Highways

Northern District: (410) 222-6120Central District: (410) 222-7940Southern District: (410) 222-1933Traffic Lights/Signs: (410) 222-1940

Bureau of EngineeringGeneral Inquiries: (410) 222-7500

@AACoDPWwww.facebook.com/annearundeldpw

15