20
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Embed Size (px)

DESCRIPTION

Introduction – 1% Annual Chance Flood Event Albany Park Stormwater Diversion Tunnel Source of Flood Boundary: Detailed Watershed Plan (January 2011) Note: 336 structures impacted in Albany Park neighborhood

Citation preview

Page 1: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Public MeetingApril 2, 2015

Albany Park Stormwater Diversion Tunnel

Page 2: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion Tunnel

NBCR = North Branch of Chicago RiverNSC = North Shore Channel

Albany Avenue Stream Gauge onNBCR exceeded flood stage:• September 2008*• July 2010• April 2013*

*Significant Flooding Events

Introduction - FloodingIntroduction - FloodingAlbany Park Stormwater Diversion

Tunnel

Justin Bartels
Show gauge locaiton on this map too
Page 3: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction – 1% Annual Chance

Flood Event Albany Park Stormwater Diversion

Tunnel

Source of Flood Boundary: Detailed Watershed Plan (January 2011)Note: 336 structures impacted in Albany Park neighborhood

Page 4: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - 2013 Flood

Albany Park Stormwater Diversion Tunnel

Page 5: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingIntroduction – Overbank Flooding in

Albany Park NeighborhoodAlbany Park Stormwater Diversion

Tunnel

The purpose of this project is to alleviate overbank flooding along the NBCR in the Albany Park neighborhood.

Page 6: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelAlternatives Considered

Albany Park Stormwater Diversion Tunnel

Alternatives Considered But Dismissed• Remove North

Branch Dam• Modify Ridgeway

Bridge (Eugene Field Park)

• Add Upstream Storage

Alternatives Analyzed• Floodwall (DWP)• Buyouts• Floodproofing

Structures• Diversion Tunnel

Page 7: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingAlternatives Considered –

Floodwall or BuyoutsAlbany Park Stormwater Diversion

Tunnel

Page 8: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Plan ViewAlbany Park Stormwater Diversion

Tunnel

Page 9: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Profile ViewAlbany Park Stormwater Diversion

Tunnel

Page 10: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Inlet Plan ViewAlbany Park Stormwater Diversion

Tunnel

Page 11: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Inlet Cross Section ViewAlbany Park Stormwater Diversion

Tunnel

Page 12: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Inlet 3-D Model (no water)Albany Park Stormwater Diversion

Tunnel

NBCR Flow Direction

Page 13: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Inlet 3-D Model (1% Annual Chance Flood)

Albany Park Stormwater Diversion Tunnel

To Dam To Diversion Tunnel

*Roughly 45/55% Split Between River and Diversion Tunnel for the 1% Annual Chance Flood

NBCR Flow Direction

Page 14: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Outlet Plan ViewAlbany Park Stormwater Diversion

Tunnel

Page 15: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Outlet Cross Section ViewAlbany Park Stormwater Diversion

Tunnel

Page 16: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project –

Outlet 3-D Model (no water)Albany Park Stormwater Diversion

Tunnel

NSC Flow Direction

Page 17: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project – Outlet 3-D

Model (1% Annual Chance Flood)

Albany Park Stormwater Diversion Tunnel

NSC Flow Direction

From Diversion

Tunnel

Page 18: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project – Hydraulic Profile

of NBCR Upstream of Dam(1% Annual Chance Flood)

Albany Park Stormwater Diversion Tunnel

Page 19: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelIntroduction - FloodingProposed Project – Hydraulic Profile

of NBCR and NSC Below Dam(1% Annual Chance Flood)

Albany Park Stormwater Diversion Tunnel

Page 20: Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion TunnelConstruction – General Sequence

Part 2 (Tunnel Construction)