River Glen
Community Development District
Public Facilities Report
Prepared for:
River Glen Community Development District
Board of Supervisors
Prepared by:
McCranie & Associates, Inc.
Daniel I. McCranie, P.E.
July, 2017
Page 2
Contents PURPOSE AND SCOPE ................................................................................................................ 3
GENERAL INFORMATION ......................................................................................................... 3
EXISTING PUBLIC FACILITIES................................................................................................. 3
ROADWAYS ............................................................................................................................. 3
STORMWATER MANAGEMENT ........................................................................................... 4
POTABLE WATER AND SEWER SYSTEM .......................................................................... 4
RECREATION / AMENITY CENTER ..................................................................................... 4
PROPOSED PUBLIC FACILITIES............................................................................................... 4
ROADWAYS ............................................................................................................................. 4
STORMWATER MANAGEMENT ........................................................................................... 5
POTABLE WATER AND SEWER SYSTEM .......................................................................... 5
RECREATION / AMENITY CENTER ..................................................................................... 5
PERMITTING ............................................................................................................................ 5
REPLACEMENT OF EXISTING FACILITIES ............................................................................ 5
Exhibit 1 (Vicinity Map) ................................................................................................................. 6
Exhibit 2 (Subdivision Map) ........................................................................................................... 7
Page 3
PURPOSE AND SCOPE
This report has been prepared at the request of the River Glen Community Development District
(the District) to comply with the requirements of 189.08, Florida Statutes, regarding the special
district public facilities report. This report provides general descriptions of the public facilities
owned by the District. This report includes the existing infrastructure, and the infrastructure
planned to be constructed within the next 7 years.
GENERAL INFORMATION
The River Glen Community Development District (the District), encompasses approximately 369
acres within the unincorporated area of Nassau County, Florida. The District was established for
the purpose of financing and managing the acquisition, construction, maintenance and operation
of a portion of the infrastructure necessary for the community development within the District.
The District is located in Parts of Sections 11, 12, 13 and 14, all lying in Township 2 North, Range
26 East. The District is currently bounded to the north and east by the Timber Creek single family
development, vacant parcels and wetlands to the south and west. Access to the District is via
Edwards Road approximately one mile south of State Road 200/Highway AlA. The District lies
approximately two miles west of 1-95. Exhibit 1 represents a Vicinity Map showing the location
of the development and the adjacent roads and cities. Exhibit 2 is the map of the subdivision (with
phasing).
The District is located within the River Glen Planned Unit Development (PUD) and is planned to
include approximately 651 single-family homes. The community also includes a community
recreation area.
The project is being developed in three (3) Phases. The first Phase of development is completed and includes substantially the entire master sewer infrastructure to accommodate all of Phase 1 and most of Phase 2, the master infrastructure for all three Phases, and the recreation area. The remaining infrastructure required for each subsequent Phase will be completed with the development of that Phase. The timing of the infrastructure improvements for the remaining Phases will be based on the rate of absorption. Each Phase will be able to be developed independent of the remaining Phases.
EXISTING PUBLIC FACILITIES
ROADWAYS
Primary vehicular access to the District is provided from Edwards Road with River Glen Parkway
providing a two (2) lane, unloaded access road with a median at the entrance. Secondary vehicular
access to the District is provided further south on Edwards Road to Lagoon Forest Drive providing
a two (2) lane, access road. These roadways will be connected within the development during
Phase 2. Edwards Road is a two-lane rural County road. Edwards Road runs south from A1A. The
internal road design for the District complies with the Nassau County transportation road
circulation design criteria and the River Glen PUD. In the first Phase of the development, River
Glen Parkway, along with Lagoon Forest Drive and the other local streets, provide access from
each lot to Edwards Road. River Glen Parkway is irrigated and landscaped and has underground
Page 4
electric, streetlights and sidewalks. The District's major entrance features and landscaping were
part of the first Phase of development.
The roadways for Phase 1 have been constructed. They are owned and maintained by the District.
The capacity of the roadway system is adequate for all existing and future Phases.
STORMWATER MANAGEMENT
The ponds for Phase 1 have been constructed. They are owned and maintained by the District. The
capacity of the stormwater system is adequate for the existing Phase.
POTABLE WATER AND SEWER SYSTEM
The District lies within the unincorporated area of Nassau County and JEA provides the potable
water and sewer service. The District is served by a connection with the existing JEA water main
in the Edwards Road right-of-way with water supplied by the Nassau Water Treatment Facility.
The water distribution system consists of 10”, 8”, 6”, and 4” water mains with appurtenant valves
and fire hydrants. The District's onsite sanitary sewer system consists of 8" 10” and 12" gravity
sewer lines with appurtenant manholes and two (2) pumping stations. For the first Phase of
development, the District has installed approximately two thousand five hundred feet (2,500) of
6" force main to connect with the existing JEA force main lying in the Edwards Road right-of-
way. The wastewater service for the first Phase of development includes two (2) pump stations
along with appurtenant collection lines, manholes and force mains located within the right-of-way.
The potable water and sewer system for Phase 1 has been constructed. They are owned and
maintained by JEA. The capacity of the water and sewer system is adequate for the existing Phase.
The capacity of the existing pump station is adequate for all Phases, however a secondary pump
station is required for portions of Phases 2 and 3. This pump station will discharge into the existing
pump station.
RECREATION / AMENITY CENTER
The recreation area is a 2.3-acre site located within the District. The recreation area consists of a
4,670-sf clubhouse, swimming pool, parking lot, playground, open playfield, basketball court,
baseball field and tennis courts. The recreation area has been constructed. These facilities are
owned and maintained by the District. The capacity of the clubhouse is adequate for the existing
Phase and all future Phases.
PROPOSED PUBLIC FACILITIES
ROADWAYS
The roadways for Phases 2 and 3 are anticipated to be constructed within the next 7 years. They
will be owned and maintained by the District. The capacity of the roadway system will be designed
to be adequate for all existing and future Phases.
Page 5
STORMWATER MANAGEMENT
The ponds for Phases 2 and 3 are anticipated to be constructed within the next 7 years. They will
be owned and maintained by the District. The capacity of the stormwater system will be designed
to be adequate for all Phases as they are constructed.
POTABLE WATER AND SEWER SYSTEM
The potable water and sewer system for Phases 2 and 3 are anticipated to be constructed within
the next 7 years. They will be constructed by the District, then owned and maintained by JEA. The
capacity of the water and sewer system will be adequate for each Phase of construction. A
secondary pump station will be constructed during the construction of Phase 2. A secondary pump
station may also be required to serve portions of Phase 3. This pump station will discharge into the
existing pump station.
RECREATION / AMENITY CENTER
There are no plans to add to the recreation area and/or amenity center. The capacity of the existing
clubhouse and recreation areas are adequate for the existing Phase and all future Phases.
PERMITTING
The River Glen PUD was approved December 13, 2004 by Ordinance 2004-63. All zoning
approvals are in place and allow for the development of the proposed facilities. Currently there are
no approved permits for Phase 2 and Phase 3.
REPLACEMENT OF EXISTING FACILITIES
There are no plans to replace any of the existing facilities. The District will continue to maintain
and perform any repairs necessary to ensure all existing facilities continue to serve the District
adequately.
.dR
d
oo
wdli
W
95
9
9
5
17
A1A
B
B
B
B
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Cuno
Cr.
A1A
P
P
P
D U V A L C O U NN T Y
TO JACKSONVILLE
Plummer
Swamp
Ceek
r
Tom
Mann
Swamp
Swamp
Nassau
Landing
CSX
TRANSPO
RATION
ITALIA
Yulee
Tower
Becker
Nassau County
Detention CenterExit
373
Old
RdYulee
.
Lodge
Police
Rd.
Edwards
Rd.
Kirkland R
d.
Rd.
Rd.
Burns
Rd.
Harts R
d.
Rd. 105
Rd.
88
Rd. 70
Rd.
68
Rd. 72
Rd. 101
Rd.
99
Rd.68
Rd.
85
Sug
Rd.
Rd.
85
Creek
Hedges
YULEE
Yulee Heights
Italia
Hero
Trail
The
keer
C
yggoB
keerC slliM
keerC sa
mo
hT
.rC
re
mm
ul
P
ke
er
C
n
eeuQcM
.rC
notfoL
.r
C
re
bm
uL
.r
C
re
nd
ra
G
13
24
25
1314
151617
18
19 20 21 22
23
2627
28
44
4243
45
24
25
26
46
40
45
43
47
42
42
24
36
45
47
48
36
3839
25
40
1920
21 22 23
2627282930
31 3233
35
23
456
40
39 57
47
41
39
34
12 78
910 11 12
44
46
49
1
1
56
55
50
53
54
50
7
6
44
44
4
8
4
5
9
42
5218
NASSAU
WILDLIFE MANAGEMENT
AREA
95
North
Exhibit 1River Glen, CDD
Vicinity Map
BEE LINEEXPRESSWAY
TU
RNPIK
E
10
PENSACOLA FORT WALTON
BEACH
PANAMACITY
CHIPLEY
TALLAHASSEE
75
10
295
95
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND4
NEW PORT RICHEY
TAMPA
754
LAKELAND
MELBOURNE -COCOA
ORLANDO
BARTOWST PETERSBURG
275
SARASOTA -
BRADENTON
75
95
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
75
75
NAPLES
KEY WEST
CITY
LAKE
FLO
RID
A'S
LOCATION
LOCATION
Exhibit 2Subdivision Map
River Glen, CDD
Phase 2Phase 1
Phase 3
Phase 3
Phase 2
Phase 2
Phase 1
A1A
EDWAR
DS R
D.
North
16" FM
16" FM
LAKE 8A
LAKE 9A
LAKE 6A
LAKE 7A
LAKE 5A
LAKE 3C
LAKE 1A-B
LAKE 1C
LK 1D
LAKE 2A-B
LK 3B
LK 3A
TO
B
NWLBREAK
BOTT
NW
L
TOB
BR
EA
KB
OT
T
BREAK
NW
LTO
B
BOTT
BOTT
TOB
NWL
BREAK
BOTT
TOB
NWL
BREAK
BOTT
BOTT
BREAK
NWL
TOB
BOTT
BO
TT
TOB
NWLBREAK
BOTT
BOTT
BREAK N
WL
TOB
BOTTBREAKNWLTOB
TOB
BOTT
TO
BNW
LBOTT B
REAK
NW
L
BREAKTO
B
LAKE 8A
LAKE 9A
LAKE 6A
LAKE 7A
LAKE 5A
LAKE 3C
LAKE 1A-B
LAKE 1C
LK 1D
LK 3B
LK 3A
LAKE 1C
TOB
NWL
BOTT
BREAK
RIVER GLEN PARKWAY
RIVER GLEN PARKWAY S.R.1.
MO
RNING G
LEN
CT
RIVER GLEN PARKWAY
HE
RO
N L
AK
E D
RIV
E
HERON LAKE DRIVE
HE
RO
N L
AK
E D
RIV
E
Street E
OTTER RUN WAY
OT
TE
R R
UN W
AY
OTTE
R R
UN W
AY
DRIV
E C.S.2
HE
RO
N L
AK
E
DRIV
E C.S.1
HER
ON L
AKE
MORNING GLEN CT
MO
RNIN
G G
LE
N C
T
CYPRESS LAKE DRIVE
CYPRESS LAKE DRIVEH
AM
MO
CK G
LEN D
RIV
E
CYPRESS L
AKE DRIV
E
DRIV
E C.S.1
CYP
RESS L
AK
E
10+00
11+00
12+0013+00
14+00
15+00
16+00
17+00
18+00 19+00 20+00 21+00 22+00 23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
35+92.70
10+00
11+00
12+00
13+00
14+0
015+00
16+00
16+59.7
3
10+00
11+00 12+00 13+0014+00 15+00
16+00
16+34.6
6
10+0
0
11+0
0
12+0
0
13+00
14+00
15+0
0
16+00 17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
24+44.66
10+00
11+00
12+00
13+0
0
14+00
15+0
0
16+0017+0
0
18+00
19+00
20+00
21+00
22+00
23+0024+00
25+0026+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
35+25.7
9
10+0011+00 12+00
13+00
14+00
15+00
16+00
17+00
18+0
0
19+00
20+00
20+56.3
4
10+00
10+33.78
10+00
10+84.37
10+00
10+80.2
6
10+0
0
11+00
12+00
13+00
13+29.
28
10+00
10+49.4
0
10+00
11+00
12+00
13+00
14+00
14+27.8
6
TOB = 12.50
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+0
0
26+00
27+00
28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
35+14.1
8
LAKE 2A-B
RIVER GLEN PARKWAY
HERON LAKE DRIVE
HAMMOCK GLEN DRIVE
RIV
ER
GLE
N P
AR
KW
AY
RIV
ER G
LE
N P
AR
KW
AY
CYPRESS LAKE DRIVE CYPR
ESS
LAKE DRIV
E
BRID
GE
WA
TE
R D
RIV
E
BRID
GE
WATER D
RIV
E
BRIDGEWATER DRIVE
BRID
GE
WA
TE
R D
RIV
E
BRID
GE
WATE
R D
RIV
E
BRID
GEW
ATER D
RIV
E
WISTERIA LANE
WISTERIA LANE
PE
AC
OC
K L
AN
E
MO
SS
Y C
RE
EK C
OU
RT
ALDERBROOK COURT
ALD
ER
BR
OO
K C
OU
RT
EG
RET L
AN
DIN
G C
OU
RT
CYPRESS
HOLL
OW C
OURT
CYP
RESS H
OLL
OW C
OU
RT
ROSE
APPLE C
OU
RT
ROSEAPP
LE C
OURT
RIVER GLEN PARKW
AY
RIV
ER G
LE
N P
AR
KW
AY
RIVER GLEN PARKWAY
RIV
ER G
LE
N P
AR
KW
AY
RIV
ER G
LE
N P
AR
KW
AY
CHERRY LANE
MARSH C
REEK D
RIV
E
MARSH CREEK DRIVE
MARSH CREEK
DRIVE
MARSH CREEK DRIVE
TURTLE CREEK C
OURT
WATER
VIE
W D
RIV
E
WATER
VIE
W D
RIV
E
WA
TE
RVIE
W D
RIV
E
WA
TE
RVIE
W D
RIV
E
WATE
RVIE
W D
RIV
E
RIVER GLEN PARKWAY S.R.2.
WAY C.S.1
OTTER R
UN
3
2
1
4 5 6 7 8 9 10 11
12
13
14
15
16
17
18
19
20
21
2223
2425 26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
4445
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72 73 74 75 76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92 93
94
95
96
97
98
99
100
101102
103
104
105
106
107
108
109
110
111
112
113
114115
116
117
118
119
120
121
122
123
124
125
126
127
128
129 130
131
132
133
134
135
136 137138
139
140
141
142
143
144
145
146
147148
149
150
151
152
153
154
155 156
157
158
159
160161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
202
203
204
205
206
207
208
209
210
211
212213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228229
230
231
232
233
234
235
236
237