1
Presentasi Investor Summit
Perusahaan Gas Negara
Jakarta. 27 November 2013
2
Disclaimer:The information contained in our presentation is intended solely for your personalreference. In addition, such information contains projections and forward‐lookingstatements that reflect the Company’s current views with respect to future events andfinancial performance. These views are based on assumptions subject to various risk. Noassurance can be given that further events will occur, that projections will be achieved, orthat the Company’s assumptions are correct. Actual results may differ materially fromthose projected.
2
3 3
Model Bisnis
TransporterGTAPerjannjian Transportasi Gas
Pengguna Gas
Distributor
Pemasok
StasiunKompressor
GSAPerjanjian Jual Gas
Pelanggan Industri, Komersial dan Rumah Tangga
PGN & Transgasindo sebagai transporter gas melalui pipa transmisi dengan mendapatkan Toll Fee dan gas di transportasi ke Pihak Ketiga
Produsen Gas
PGN sebagai integrator, membeli gas dari beberapa Pemasok gas dan mendistribusikan ke pelanggan melalui jaringan pipa distribusi
Pengangkut
Pemain utama bisnis transmisi dan distribusi gas bumi nasional
GSAPerjanjian Penjualan Gas antara PGN sebagai distributor gas dan pelanggan
GTAPerjanjian Transportasi Gas antara PGN/Transgasindo sebagai transporter gas dan pemasok/pengguna gas dalam mentransfer gas dari pemasok dari titik serah pengguna gas
4
Struktur Kepemilikan Saham
4
43.03%Publik
56.97%Pemerintah Negara Republik Indonesia
*) Total : 24,241,508,196 lembarSaham Publik meliputi 1.850.000 Saham Treasury Stock
5
SBU, Anak Perusahaan dan Afiliasi
5
40%
60%
60%PGN
40%PGN
40%TransasiaPipeline Company• Petronas International Corporation Ltd. (35%)
• Conoco Indonesia Holding Ltd. (35%)• SPC Indo‐Pipeline Co. Ltd (15%)• Talisman Transgasindo Ltd. (15%)
60%Pertamina
60%
PT TransportasiGas Indonesia
PT Gagas EnergiIndonesia
99%
PT PGAS Solution
99,9%
PT Nusantara
Regas40%
PT PGN LNG Indonesia
99,9%
PT Saka Energi Indonesia
99%
PT PGAS Telekomunikasi
Nusantara 99,9%
Strategic Business UnitsAnak Perusahaan dan Afiliasi% saham kepemilikan
SBU I
SBU II SBU III
SBU TSJ
6
Pemangku Kepentingan Utama
6
Kementerian Badan Usaha Milik NegaraSebagai wakil pemegang saham Pemerintah Republik Indonesia
Kementerian Energi dan Sumber Daya MineralSebagai pembuat rumusan kebijakan nasional, pelaksanaan dan teknis disektor energi dan sumber daya mineral
Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu MigasUntuk mengelola kegiatan usaha Hulu Migas dibawah Kontrak Kerja Sama danuntuk memaksimalkan manfaat dan Pendapatan Negara untuk kemakmuranrakyat
Badan Pengatur Hilir Migas (BPH Migas)Untuk mengatur dan mengawasi kegiatan Hilir Migas (Pengolahan,Pengangkutan, Penyimpanan dan Perdagangan)
KEMENTERIANBADAN USAHA MILIK NEGARA
7
Regulasi Terkait
7
Peraturan Menteri ESDM No. 19/2009• Penetapan struktur dan perijinan bisnis niaga, transmisi dan distribusi gas
bumi.• Pemberian hak khusus dan perijinan untuk dedicated hilir.• Penetapan mekanisme harga jual gas bumi melalui pipa :
o Rumah tangga diatur oleh Badan Pengatur.o Pengguna khusus ditetapkan oleh Menteri.o Pengguna umum ditetapkan oelh Badan Usaha.
Peraturan Menteri ESDM No. 3/2010• Kewajiban kontrak untuk memenuhi kebutuhan domestik dengan
menyerahkan 25% hasil produksi gas bumi bagian kontraktor.• Prioritas pemanfaatan gas bumi domestik untuk peningkatan produksi
minyak dan gas bumi nasional, industri pupuk, penyediaan tenaga listrik danindustri lainnya.
• Pemanfaatan gas bumi sebelum penetapan peraturan ini yang telahdilaksanakan dan memiliki kontrak jual beli gas bumi, HoA, MoU atau telahmemasuki tahap negosiasi tetap dilaksanakan.
8
Permintaan Gas Bumi Domestik
8
Bahan Bakar Non Subsidi Bagi IndustriSubsidi bahan bakar bagi konsumen industri dicabut sejak tahun 2005.
Harga dan EfisiensiKeuntungan harga dan efisiensi yang diperoleh ataskonversi ke gas bumi serta dampak positip terhadaplingkungan.
Konversi Energi Pembangkit ListrikPermintaan pembangkit listrik dual-fired yang belumterpenuhi karena kurangnya ketersediaan gas bumi.
Permintaan Sektor IndustriKebutuhan gas bumi dalam rangka persaingan industri di era perdagangan bebas.
2.415
987 926
388270
145 98 157
Total Permintaan : 5,386MMSCFD
Source: Kementerian Perdagangan Republik Indonesia &
Forum Industri Pengguna Gas Bumi (FIPGB)
[MMSCFD
]
9
Strategi Pemenuhan Permintaan Gas Bumi
9
Memperoleh akses terhadap sumber gas bumi baru• Aktif mencari pasokan gas bumi baru, mulai dari lokasi yang
dekat dengan keberadaan infrastruktur jaringan.• Berupaya memperoleh alokasi dari penerapan DMO pada
kontrak produksi baru dengan pembangunan infrastrukturyang diperlukan.
Mengembangkan jaringan eksisting dan membuatinfrastruktur baru
• Penambahan kapasitas transmisi dan distribusi eksisting.• Perencanaan moda transportasi alternatif seperti CNG dan
LNG.
Berupaya mencari sumber gas bumi non konvensional• Perencanaan sumber pasokan gas bumi non konvensional.
10
30,41
29,67
29,32
27,81
21,29
20,00
17,89
16,29
12,91
9,55
9,20
Gasoline 88 Ron
HSD (Diesel)
Kerosene
MDF/ IDO (Diesel)
MFO
LNG
LPG Bulk
LPG ‐ 50 Kg
LPG ‐ 12 Kg(Subsidized)
LPG ‐ 3 Kg(Subsidized)
Natural Gas
USD/MMBtu
17.00 ‐
10
Rata‐Rata Harga Jual PGN
Catatan: Harga Bahan Bakar Pertamina per 15 Agustus 2013Nilai Tukar USD 1 = IDR 10.000,‐* Sesuai Harga ICP
10
Harga Gas Bumi Yang Kompetitif
Rata‐Rata Harga Jual PGN sebelum April 2013:USD 8,54/MMBtu
*
0
5
10
15
20
25
30
35
40
03/01/05
08/01/05
01/01/06
06/01/06
11/01/06
04/02/07
09/03/07
02/04/08
06/02/08
10/24/08
01/06/09
04/01/09
10/01/09
03/02/10
08/03/10
01/03/11
06/01/11
11/01/11
04/02/12
09/03/12
02/01/13
07/01/13
USD/MMBTU
Perbandingan Antara HSD vs Gas Alam
HSD Unsubsidized Price
Natural Gas‐PGN's Price
11
Struktur Harga Jual
11
Peraturan Menteri ESDM No. 19 Tahun 2009 Harga jual gas bumi melalui pipa untuk pengguna
umum ditetapkan oleh Badan Usaha. Pengguna umum adalah industri non-subsidi dan
pembangkit listrik.
Pedoman Pembentukan Harga Daya beli konsumen. Dinamika pasokan dan permintaan. Tingkat ekonomian dengan marjin yang wajar.
Menstimulasi penambahan pasokan untuk memenuhi pertumbuhan permintaan
Implementasi Upaya komunikasi dan edukasi konsumen akan
kebijakan harga gas bumi yang menyesuaikan kondisi saat ini.
Skema harga jual baru yang berdasarkan wilayah dan diferensiasi di seluruh area penjualan PGN.
Harga Beli Gas BumiHarga Beli Gas Bumi
Biaya Transportasi & Distribusi
Biaya Transportasi & Distribusi
Biaya InternalBiaya Internal
MarjinMarjin
Harga JualGas BumiHarga JualGas Bumi
12
Wilayah Jaringan dan Fasilitas Pipa Transmisi dan Distribusi
12
Duri
KALIMANTAN
Terbanggi Besar St.Pagardewa St.
Panaran St.
Bojonegara St.
Grissik Receiving St.
Legend:
South Sumatera – West Java Transmission Pipeline (SSWJ)Grissik – Duri transmission pipeline
PLN – Medan
Strategic Business Unit (SBU) I
Strategic Business Unit (SBU) II
Strategic Business Unit (SBU) III
Grissik – Singapore transmission pipeline
Pagardewa Compressor St.
Muara Bekasi St.
Labuhan Maringgai St.
Wampu - Belawan transmission pipeline
13
Sumber Pasokan Gas Bumi
1313
14
Melayani Penjualan Gas Bumi Ke Berbagai Sektor
14
KOMERSIAL DAN UKM
2.7%Dari Total Volume
1,709Pelanggan
RUMAH TANGGA
< 1%Dari Total Volume
88,153Pelanggan
*)s.d 30/9/2013
INDUSTRI DAN PEMBANGKIT LISTRIK
96.8%Dari Total Volume
1,247Pelanggan
14
15
Pelanggan Sektor Industri
15
39%
14%
11%
8%6% 6% 5% 4% 4%
2%1% 0,06%
PowerPlant
Chemical Ceramic Food FabricatedMetal
Glass Others Paper BasicMetal
Textile Cement Wood
Sampai dengan 30 September 2013, Volume Penjualan ke Pelanggan Industri adalah 784MMSCFD atau setara dengan 97% penjualan PGN
16
Pertumbuhan Kinerja Operasional
16
Transmisi Distribusi
(MMSCFD
)
(MMSCFD
)
767
836845
877
2009 2010 2011 2012
792
824
795
807
2009 2010 2011 2012
17
Kinerja Distribusi
17
Distribusi
(MMSCFD
)
792
824
795
807
801
808
2009 2010 2011 2012 9M 2012 9M 2013
SBU I
SBU II
SBU III
72%
11%
17%
18
Kinerja Transmisi
18
Transmisi
(MMSCFD
)
767
836845
877 878867
2009 2010 2011 2012 9M 2012 9M 2013
TGI
PGN4%
96%
19
Laporan Laba Rugi Komprehensif Konsolidasian Interim 30 September 2013
19
Dalam Juta USD 30 Sep 13 30 Sep 12 %
Pendapatan Neto 2,201.0 1,830.8 20.2
Beban Pokok Pendapatan 1,157.2 749.9 54.3
Laba Bruto 1,043.8 1,080.8 ‐3.4
Laba Operasi 697.6 785.6 ‐11.2
EBITDA 836.0 921.0 ‐9.2
Laba Bersih 641.6 621.3 3.2
20
Laporan Posisi Keuangan Konsolidasian Interim 30 September 2013
20
Dalam Juta USD 30 Sep, 2013 31 Des, 2012
Aset LancarAset Tidak Lancar
1,3952,371
1,9841,924
Total Aset 3,766 3,908
Liabilitas LancarLiabilitas Tidak LancarTotal Ekuitas
421843
2,501
4731,0812,354
Total Liabilitas dan Ekuitas 3,766 3,908
Key Ratios FY 2012Rasio Liabilitas terhadap Ekuitas(x) 0.4
EBITDA/Interest expense (x) 55.1
Return on Investment (%) 30.4
21
Komposisi Pinjaman Jangka PanjangPer 30 Sept 2013
21
JPY70,9%
USD29,1%
Fixed82%
Float18%
Pinjaman jangka panjang sejumlah USD 676.59 Juta
dengan mayoritas bersumber dari Bank Pembangunan
Rata‐Rata Bunga Pinjaman 2.04%
22
Perkembangan Terkini
22
Event Detail of Event
28 Agustus 2013Pembangunan Pipa Cikande – Bitung
Pembangunan Pipa 24 inch sepanjang 30Km dengan progres 90%. Segmen inimerupakan kelanjutan dari segmen Bojonegara – Cikande yang merupakanbagian dari pipa SSWJ.
18 Agustus 2013Pengoperasian Mobile Refueling Unit
PGN mulai mengoperasikan MRU untuk Transportasi Publik pada 18 Agustus2013.
Juli 2013Pembangunan Proyek FSRU Lampung
Penyelesaian Lambung Kapal FSRU Lampung, saat ini berada di Hyundai HeavyIndustries Shipyard, Ulsan, Korea.
21 Juni 2013Penandatanganan kesepakatan denganKufpec Pangkah PSC
PGN melalui anak perusahaannya Saka Energi Indonesia (SEI) mengakuisisi 25%hak partisipasi di PSC Pangkah dengan nilai transaksi sebesar USD 265 Jutamelalui pengambilalihan saham KUFPEC Indonesia B.V dari Kuwait ForeignPetroleum Company K.S.C dengan persentase kepemilikan saham 100%.
30 Mei 2013Peerbaikan kebocoran Pipa selesai
Perbaikan selesai dalam waktu 9 hari sejak terjadinya insiden kebocorandengan memasang repair clamp untuk menghentikan kebocoran pipa SSWJbawah laut yang berukuran 32 inci. Pipa Transmisi berada di KP 138‐139 antaraLabuhan Maringgai dan Muara Bekasi dengan kedalaman sekitar 23 meterdibawah permukaan laut.
Mei 2013Penandatanganan kesepakatan denganBangkanai PSC
PGN melalui anak perusahaannya Saka Energi Indonesia (SEI) mengakuisisi 30%hak partisipasi di PSC Bangkanai dari Salamander dengan nilai transaksi sebesarUSD 27 Juta.
23
Recent Updates
23
Event Detail of Event
29 Mei 2013Alokasi LNG Domestik
Kementerian Energi dan Sumber Daya Mineral mengalokasikan pasokan LNGuntuk keperluan domestik dari Tangguh dengan jumlah setara dengan 2.700BBTU di akhir tahun 2013.
13 Mei 2013Alokasi Pasar Domestik LNG
SKK Migas telah mengalokasikan total 644 kargo LNG untuk pasar domestikselama periode 2013‐2021 dengan FSRU Lampung akan menerima 18 kargomulai 2016. Pasokan akan datang dari BP Tangguh, Chevron SLI dan Eni MuaraBakau. Alokasi diatur dengan jumlah muatan. Aspek komersial antara pemasokdan pelanggan harus diatur dengan mekanisme Business to Business.
17 April 2013Keputusan Rapat Umum PemegangSaham Tahunan pada Komposisi DewanKomisaris dan Direksi
Rapat menyetujui pengangkatan kembali Bapak Riza Pahlevi Tabrani sebagaiDirektur Keuangan. Rapat memberhentikan dengan hormat Bapak BambangDwijanto sebagai anggota Dewan Komisaris dan menggantinya dengan BapakFirmanzah.
17 April 2013Keputusan Rapat Umum PemegangSaham Tahunan pada Dividen
Rp 4,915,075,492,403 dari laba tahun berjalan yang dapat diatribusikan kepadapemilik Entitas Induk tahun 2012 atau Rp 202,77/ saham telah dibagikan secaratunai kepada pemegang saham :• Cum dividend:
‐ Pasar Reguler dan Negosiasi, 10 Mei 2013.‐ Pasar Tunai, 16 Mei 2013.
• Tanggal Pembayaran Dividen Tunai, 29 Mei 2013
24
Perkembangan Terkini
24
Event Detail of Event
1 April 2013Penerapan penyesuaian harga tahapkedua
Penerapan penyesuaian harga tahap kedua dari rata rata USD 8,8/mmbtu menjadi USD9,8/mmbtu untuk pelanggan di Jawa Barat mulai tanggal 1 April 2013. Hal ini sejalandengan adanya kenaikan harga beli dari Conoco Philips dan Pertamina dengan hargamasing masing USD 5,44/mmbtu dan USD 5,33/mmbtu.
Maret 2013Penandatanganan kesepakatan denganKetapang PSC
PGN melalui anak perusahaannya SEI mengakuisisi 20% hak partisipasi di Ketapang PSCdari Sierra Oil Services Limited dengan nilai transaksi sebesar USD 71 Juta.
28 Februari 2013Pengembangan Proyek FSRU Lampung
Konstruksi FSRU pada tahap keel laying di Hyundai Heavy Industries Shipyard, Ulsan,Korea.
21 January 2013Amandemen Kontrak dengan MedcoE&P
PGN dan Medco E&P sepakat untuk memperpanjang kontrak selama 2 tahun kedepandengan harga baru USD 7,11/mmbtu, 3% Eskalasi dan total volume 41.900 BBTU.
30 Agustus 2012Kenaikan harga Pasokan Gas dariPemasok Utama
Penerapan 2 tahap kenaikan harga pasokan gas dari huluMulai 1 September 2012 :ConocoPhillips menaikkan harga jual dari USD1,85/MMBTU menjadiUSD4,36/MMBTUPertamina menaikkan harga jual dari USD2,2/MMBTU menjadi USD 4,42/MMBTU
Mulai 1 April 2013 :Harga jual ConocoPhillip’s naik dari USD4,36/MMBTU menjadi USD 5,44/MMBTUHarga jual Pertamina’s naik dari USD4,42/MMBTU menjadi USD5,33/MMBTU
24
25
Rencana Pembangunan Infrastruktur LNG
25
Donggi‐SenoroBlock
Mahakam Block Tangguh
Block
MaselaBlock
Existing LNG Liquefaction Plant
Existing LNG Receiving Terminal
Existing transmission pipelines (PGN involvement)
(planned)
(planned)
ArunBlock
Planned LNG Liquefaction Plant
Planned LNG Receiving Terminal
(PGN Involvement)
(PGN Involvement)
(Revitalisation)
26
Rancangan Terminal Penerima LNG Terapung
26
27
Proyek Terminal Penerima LNG Terapung
27
Jawa Barat Lampung
Lokasi Teluk Jakarta Labuhan Maringgai
Kapasitas (MTPA) 3 1,5‐2
Pelanggan Pembangkit Listrik, Industri
Kepemilikan PGN (40%) Pertamina (60%) PGN
Ruang Lingkup FSRU, jetty serta pipa dan fasilitas jaringan
28
Proyek FSRU – Jawa Barat
28
29
Kemajuan Proyek Floating LNG Receiving Terminal
29
Jawa Barat:• Pasokan LNG berasal dari Mahakam PSC sejumlah 11,75 juta tonselama 11 tahun dan ditindaklanjuti dengan penandatangananHoA dengan PLN sebagai pembeli gas.
• FSRU Nusantara Regas‐1 berada di Teluk Jakarta dan telahberoperasi mulai Juni 2012.
• Pasokan LNG berikutnya berasal dari Bontang.
Lampung:• FSRU diluncurkan dari Dry Dock pada Juli 2013.• Dimulainya pembuatanMooring System pada Maret 2013.• Target penyelesaian proyek pada 2014 dan komersialisasi dimulaipada tahun 2015
• Amandemen dan perjanjian kembali dengan Hoegh pada 17Oktober
Lampung
West Java
30
NOTE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30
31
NOTE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
31
32
Thank YouContact:Investor RelationsPT Perusahaan Gas Negara (Persero) TbkJl. K H Zainul Arifin No. 20, Jakarta-11140,Indonesia
Ph: +62 21 6334838 Fax: +62 21 6331632http://www.pgn.co.id
Thank YouContact:Investor RelationsPT Perusahaan Gas Negara (Persero) TbkJl. K H Zainul Arifin No. 20, Jakarta-11140,Indonesia
Ph: +62 21 6334838 Fax: +62 21 6331632http://www.pgn.co.id